Loading...
HomeMy WebLinkAboutNCC232045_ESC Approval Submitted_20230711 i ROY COOPER 5 -`'Q 1 Governor , ELIZABETH S.BISER ,7.„= Secretary * w„avw�% DOUGLAS R ANSEL NORTH CAROLINA Interim Director Environmental Quality • I June 29, 2023 LETTER OF APPROVAL 1 I Roger F. Penland &Betty Penland PO Box 741 Burnsville, NC 28714 RE: Project Name: Cane River Church Road Fill Site Acres Approved: 2.8 Project ID: YANCE-2023-005 County: Yancey City: Burnsville Address: Cane River Church Road River Basin: French Broad Stream Classification: C; Tr Submitted By:ABH -Wyatt Edsel, PE Date Initially Received by LQS:April 13, 2023 Date Revision Received by LQS: June 20, 2023 Plan Type: Fill Site Dear Mr. Penland, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new C-0C. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land-Resources Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778 noon I CARO,in D aeparlmena al Environmental anal; 828.296.4500 Letter of Approval Mr. Roger F. Penland and Ms. Betty Penland June 29, 2023 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, >& Laura Christiansen Engineer II Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications Required for Approval ec: Mr.Wyatt Edsel, PE (wyatt@builtbyabh.com) Mr. Roger F. Penland (freddypenland46@aol.com) cc: Regional Office file Letter of Approval Mr. Roger F. Penland and Ms. Betty Penland June 29, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Cane River Church Road Fill Site Project ID: YANCE-2023-005 County: Yancey For final plan approval, please submit to this office the following modifications on or before Tuesday, July 11, 2023. 1. The existing measures should be shown to the best extent possible on the E&SC drawings. The plans should show that the work done to these measures is within the approved LOD and is clearly described in the construction sequence. {G.S. 113A- 57.3} 2. The construction sequence states that the existing sediment basins and silt fence will be removed once the proposed measures are installed. Since the proposed sediment basin overlaps with the location of the existing basins, the installation of the proposed sediment basin will alter the existing basins. Please clarify in the construction sequence what work, if any,will be done to the existing measures to prepare for the installation of the proposed sediment basin,and if any part of the existing basins will be remaining for removal after the installation of the proposed basin. {G.S. 113A-57.31 y �, CD CD ml � et)'� Acli 4 o �:i ta ,e F L= ' . o nf - o - tI o c -CD N © ' < C CD F. =' P:i c r) n n 2 y n Imo+ cA' cp CD sa n e C CD *11 rt O = C y v. �. ;' 1- + cp C con My til -• cC EAT:F4;- i'ef",d_1,-, _ eli\q`' % co:::) �v CD • �< ► eD ►� O CD t 'O AF jltr ` -1z'. .t.*i? t ,-,.. ;.'f i ec.). 8, , E. cL n to • .. )--+ p' d, --=�; • ?l o © o *Iet • � CD � 0• = - J J ...• (A p.m r1,# P:J e w c 5 - ;: .. �. o' e• = I c n h �\ � � A: .p r-r- _ � ^ o . -t ii,\' (4.) A: <-t. rp C - o Z AD .. I