Loading...
HomeMy WebLinkAbout20201105 Ver 3_EMAIL_RE_ Request for Additional Information_ Proposal to Revise existing NWP 39 verification_2023-07-07_20230707From: Bailey, David E CIV USARMY CESAW (USA) To: Trone. Rick Cc: seren.homer(a)dea.nc.aov; "Chandler. Rebecca D" Subject: [EXTERNAL] RE: Request for Additional Information: Proposal to Revise existing NWP 39 verification (after -the - fact) - SAW-2020-01543 (Reidsville Rural Ready Site / Diesel Drive / Reidsville / Rockingham County) Date: Friday, July 7, 2023 7:24:47 AM Attachments: imaae001.ma imaae002.ona imaae003.ona imaae004.ona imaae005.ona imaae006.ona imaae007.ona CAUTION: This email originated from outside of WithersRavenel. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Rick. The Corps is amenable to this proposal without requiring additional compensatory mitigation in the case as the additional wetland impacts appear to be overlapping at least somewhat with stream channel impacts. Send on the revised PCN/plans. Thanks. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bail ey2Co�usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httQs://regulatory.ops.usace.army.mil/customer-service- su rve Thank you for taking the time to visit this site and complete the survey. From: Trone, Rick <rtrone@withersravenel.com> Sent: Thursday, July 6, 2023 11:54 AM To: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Cc: seren.homer@deq.nc.gov;'Chandler, Rebecca D' <rebecca.chandler@deq.nc.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: Request for Additional Information: Proposal to Revise existing NWP 39 verification (after -the -fact) - SAW-2020-01543 (Reidsville Rural Ready Site / Diesel Drive / Reidsville / Rockingham County) Dave, See below. Impact #6 f�. po Rick Trone 4 - nor. iTAL SCi- f M PACT # PERMANENT WETLAND. 0.0008 AC. 1 PACT # TEMPORARY WETLANI (CONSTRUCTION AI WETLAN 0m93a0 Cary. NC From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bail ey2CG�usace.army.mil> Sent: Th u rsd ay, J u ly 6, 2023 11:12 AM To: Trone, Rick <rtrone anwithersravenel.com> Cc: seren.homer(@deq.nc.gov; 'Chandler, Rebecca D' <rebecca.chandler @deq.nc.gov> Subject: [EXTERNAL] RE: Request for Additional Information: Proposal to Revise existing NWP 39 verification (after -the -fact) - SAW-2020-01543 (Reidsville Rural Ready Site / Diesel Drive / Reidsville / Rockingham County) CAUTION: This email originated from outside of WithersRavenel. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Rick. Can you send me a screen shot of the additional wetland impact area? -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David.E.Bailey2Pusace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulator)l.ops.usace.arm)l.mil/customer-service- su rve Thank you for taking the time to visit this site and complete the survey. From: Trone, Rick <rtrone @withersravenel.com> Sent: Thursday, July 6, 2023 8:01 AM To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2C@usace.army.mil> Cc: seren.homer @deq.nc.gov; 'Chandler, Rebecca D' <rebecca.chandler @deq.nc.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: Request for Additional Information: Proposal to Revise existing NWP 39 verification (after -the -fact) - SAW-2020-01543 (Reidsville Rural Ready Site / Diesel Drive / Reidsville / Rockingham County) Good morning, Dave, We will be revising the PCN to account for the 0.0008 ac (33 SF) of additional permanent wetland impacts in item (2) of your email received on 7/1/23. Previously, 0.132 acres of wetland mitigation was purchased, and we feel that the additional 0.0008 acres of permanent wetland impacts is inconsequential, and we don't feel additional wetland mitigation is necessary. If you and Seren can let me know if you all agree I can move forward with sending a revised PCN. Thanks, Rick Trone NO'JVIRONMENTAL SCIE — t:919.469.334D d:919.538.8184 0Im93a0 Cary. NC — - - From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2(@usace.army.mil> Sent: Saturday, July 1, 2023 9:30 AM To: Trone, Rick < rtron e P with ersravenel.com>; Lance Metzler <Imetzlerna co.rockingham.nc.us> Cc: Chandler, Rebecca D <rebecca.chandlerna deq.nc.gov>; Homer, Seren M <seren.home r @deq.nc.gov>; Beasley, Troy <TBeasley(@withers rave ne1.com>; Woodard, Summer R <swoodardna ci.reidsviIle. nc.us> Subject: [EXTERNAL] Request for Additional Information: Proposal to Revise existing NWP 39 verification (after -the -fact) - SAW-2020-01543 (Reidsville Rural Ready Site / Diesel Drive / Reidsville / Rockingham County) CAUTION: This email originated from outside of WithersRavenel. Do not click links or open attachments unless you recognize the sender and know the content is safe. 0, Thank you for your PCN, dated 5/26/2023 (received 6/2/2023), for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the after -the - fact use of Nationwide Permit (NWP) 39 (https://saw-reg.usace.army.mil/NWP2021/NWP39.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1. The PCN is not signed (Section 1) and therefore is not considered complete. 2. It appears that the additional length of culvert on the upstream side of the crossing has been extended through a section of stream with immediately abutting wetlands, although no additional permanent wetland impacts have been proposed. Please explain this apparent discrepancy or update the PCN (including the compensatory mitigation plan) and plan sheet accordingly. 3. It appears that an Individual 401 Water Quality Certification (WQC) is required from the North Carolina Division of Water Resources (NCDWR) for this project. Per the 2020 CWA Section 401 Rule, the PCN must contain the 9 elements listed in Section 121.5(b) of the Rule. According to the 9/16/2022, Programmatic Agreement (PA) between the USACE, Wilmington District, and the NCDWR, the Reasonable Period of Time (RPOT) for NCDWR to act on a Section 401 certification request is 120 days after receipt of a certification request containing the 9 required elements. However, it appears that items 8 and 9 (see item 1 above) of the 9 elements are not met; as such, NCDWR's RPOT has not started yet. Please note that the Corps cannot verify the use of any NWP without a valid 401 WQC. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David. E.Bail ey2Co�usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://re ulg atory.ops.usace.army.mil/customer-service- s u rve Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG(-o)usace.army.mil> Sent: Thursday, June 8, 2023 2:55 PM To: Trone, Rick <rtronena withersravenel.com> Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2C@usace.army.mil> Subject: SAW-2020-01543 (Reidsville Rural Ready Site / Diesel Drive / Reidsville / Rockingham County / commercial) Good Afternoon, More Information Response for the above project has been received and forwarded to Dave Bailey for further processing. Thank you, Josephine Schaffer From: laserfiche.ncdenr.govna mccicloud.io<Iaserfiche.ncdenr.govpmccicloud.io> Sent: Friday, June 2, 2023 4:34 PM To: RaleighNCREG <RaleighNCREGPusace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RGPusace.army.mil> Subject: [Non-DoD Source] More Information Received - Non -DOT - Rockingham More Information Response has been received on 6/2/2023 4:33 PM for Reidsville Rural Ready Site - Access & Utilities. The link below will take you to the project folder. https://ed ocs.d eQ. n c. gov/Laserfi ch e/index.aspx?d b=W aterResou rces#id=546066; view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.