Loading...
HomeMy WebLinkAboutGW1--04113_Well Construction - GW1_20230623 • • WELL CONSTRUCTION RECO (Gw Y) . I For]hte,nal Use Only. 1 , • 1. Contractor. lion: , L. � , �.. 14W Well ContraotorName WATER ZONES - FrtOM TO DEECEUMON • 95ci7- A • sow' ft C Well Coutru tor Cerdfi Number ft ft • Is.OUTER CASING(for multi-eased wells)OR LINER(if ap Iicable) • At IMAM ���/ ft.FROM I TO 'I DIancrEB. I •rwroc�Ss MATERIAL, Company Name V f. 2.Well Construction Permit#: �p (Al 116.INNER CASING OR TUBING(reothermal closed-loop) Luialll CUcablewell Per ui permits(La MaM DIAMETER THICKNESS MATERIAL Cam%Slaiq Variance,etc) .-L ,ft. cteft. fY in' • /C.✓` ,h.. 3.Well Use(check well Ise): in. / • Water Supply Well: .7_SCREEN ❑Agricultural OMlmicipaUPablic - FROM TO DIAMETER SLOTSIZE TRZCRIVESS MATERIAL ' CI Geothermal(Heating/CoolingSupply) �� Supply(single)ential WaterftI. f. _ in. ['Industrial/Commercial ial fr. ft in.' . ential Water Supply(s�4 18.GROUT ❑Imgatioti. ❑Wells>100,000 GPD FROM TO I MA Non-Water Supply Well: ' ^ EMeL+ncE^nzfxr Metso/D AMoimr • ❑Monitoring ORecovery • l/ fi- 2• '"`.y"�i /V L , f.'l • • Injection Well: fa I r ! %( D(�(,-.�. ❑AguiferRecharge ❑GmundwaterRemediation 6 T ❑Aquifer Storage and Recovery • ❑$a yB a 19.SANID/GRAVBLPACFC(ifapplicable) • ❑Aquifer Test FROM TO MATERIALLA EmceM METHOD FROM l ft g ❑ExperimentalTechnology l]SubsidenceControl ft ft • • °Geothermal(Closed Loop) ❑Tiaeer 20.DRUZING LOG(attach additional sheets if necessary) ❑Geothermal(Heating/CoolingRettma). ❑Other(explainunder#21 Remarks) FROM TO DESCR1PTiON(tolar.hardoeu.sa0/nektipe paiosae,eta) f ft. -•2 3 4.Date Welks)Completed: Co -. Well ID# ft. , Sa Well Location: . !D St•�e[1 r� LlL hc,, ft ft •s -.+� tt�v� 1 . • Faci�ity/OwnerName FaciityID#(ifappliable) ft ft JUN ? "i• 21173 O t -TM i 0 k ire- -# (41( ...IL ft Physical Address,City.and Tap ( ft. . Init.,ti.,ea..i...i i 1,,-...,:•un.,rog lit r i (A)./ 1./7 • ,2Limams/ G�D�`t+tSLtii� CountyPusolldentifiationNo.(PIN) • ' Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one latilongis sufficient) 22.C _Sip' 3/D 80 N r��• Q 9... ." /37 W I • 6.Is(are)thewell(s): 'ermanent or ❑Temporary :.. ..,'o£ - •.;, a,Co ^ �� Z 3 Si nhaetor Date 7.Is this a repair to'an existing well: ❑Yes or Bysgningth oim,Iherebyare)9 that the well(1)war(were)conrtructedlnaccordan ewith o LS,tNCdC 02C:0I00 orov;edt0 Cthewell2C.0200 owner. U Corrrtrucnon Staidadt and that a copy repo ism repair dill out known well construction irfos»a n. ondexplain the nature ofthe of this record has beenprovidedto the well owner: •repoirunderOf remarks section or on the back of this form. : 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Nosed-Loop Geothermal Wells having the same You_may use the back of this page to provide additional well construction info • drilled:construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over in Remadrs Box).You may also attach additional pages ifnt.cessatp. 9.Total well depth below land surface: 2...a / • 'SUBMITTAL INSTRUCTIONS • ' For multiple wells Art all depths jdlf a errt(ermnp/a.3�p•and2(aj(00) -(ft) Submit this GW-1 within 30 days of well completion per the following 10.Static water level below top of easing 60 • ( ) 24a..For All Wells; Original farm to Division of Water Resources (DWR • lfworerlevel is above eo,j, ice+� IaformationProcessing Unit,1617 MSC,Raleigh,NC 27699-1617 • ) 1L Borehole diameter: 11c, •(n.) 24b.For Infection Wells:Co to DWR, , Pr'ogram,1636 MSC, N -1 Underground Injection Control(IUC) 12.Welt construction method:_ ? •D�—a►�, _ A- -- Raleigh,NC 27699-1636 (r a cage;rotary.able,direct push.eta) —� 24e.For Water So and 0oen-Loou Geothermal Return Wells:Copy county environmental health department of the comity where installed to the • ' FOR WATER SUPPLY WELLS ONLY: ti ' 24d.For Water Wells producine over 100 000 GPD Copy to MR,�pCUA 132.Yield(gpm) /U Method of test: �ln; P�utProgram,1611 MSC,Raleigh,• .27699-1611 13b.Disinfection type: l'"I a' Amount d !- - t s Cy-, , , • • 'Form GW 1