20210364 Ver 1_20230608 - PNG Line 142 Bi-Weekly Permit Report_20230608 Report
Project Name: PNG Line 142 Date: 06/8/2023 Feature ID Start Date Completion Date Notes Stream S1 3-1-2023 Matted crossing removed Stream S2 3-1-2023 Matted crossing removed Stream S3 3-1-2023 Matted crossing removed Stream S4 4-18-2023 Matted crossing removed Stream S5 4-18-2022 Matted crossing removed Stream S6 3-3-2023 Matted crossing removed Stream S7 11-25-2022 11-25-2022 Pipe installation complete (HDD) Stream S8 4-26-2023 Clearing complete Stream S9 4-26-2023 Clearing complete Stream S10 5-8-2023 Pipe installation complete Stream S11 4-26-2023 Pipe installation complete Stream S12 5-22-2023 Matted crossing removed Stream S13 8-26-2022 False ROW for HDD Matted crossing removed Stream S14 8-26-2022 False ROW for HDD Matted crossing removed Stream S15 3-1-2023 Matted crossing removed Stream S16 3-1-2023 Matted crossing removed Stream S17 3-8-2023 Matted crossing removed Stream S18 9-19-2022 12-10-2022 Pipe installation complete (HDD) Stream S19 1-17-2023 5-16-2023 Matted crossing removed Stream S20 1-17-2023 5-16-2023 Matted crossing removed Stream S21 5-10-2023 Matted crossing removed Stream S22 4-29-2023 Matted crossing removed Stream S23 3-20-2023 Matted crossing removed Stream S24 3-22-2023 Matted crossing removed Stream S25 3-22-2023 Matted crossing removed Stream S26 3-23-2023 Matted crossing removed Stream S27 3-20-2023 Matted crossing removed Stream S28 4-3-2023 Matted crossing removed Stream S29 4-3-2023 Matted crossing removed Stream S30 4-3-2023 Matted crossing removed Stream S31 3-30-2023 Matted crossing removed Stream S32 3-30-2023 Matted crossing removed Stream S33/34 3-16-2023 Matted crossing removed Stream S35 3-16-2023 Matted crossing removed Stream S36 3-21-2023 Matted crossing removed Stream S37/38 3-16-2023 Matted crossing removed Project Name: PNG Line 142 Date: 06/8/2023 Feature ID Start Date Completion Date Notes Wetland W1 3-28-2023 Matted crossing removed Wetland W1A 9-19-2022 False ROW for HDD Clearing complete Wetland W1B 03-01-2023 Matted crossing removed Wetland W2 11-30-2022 11-30-2022 Pipe installation complete (HDD) Wetland W3 03-01-2023 Matted crossing removed Wetland W4A-A 5-10-2023 Pipe installation complete Wetland W4A-B 5-10-2023 Pipe installation complete Wetland W41) 5-10-2023 Pipe installation complete Wetland W4C 5-10-2023 Pipe installation complete Wetland W4E 5-23-2023 Matted crossing removed Wetland W4F 5-23-2023 Matted crossing removed Wetland W5-A 5-24-2023 Matted crossing removed Wetland W5-B 5-24-2023 Matted crossing removed Wetland W6-A 9-19-2022 12-10-2022 Pipe installation complete (HDD) Wetland W513-A 3-1-2023 Matted crossing removed Wetland W513-13 3-1-2023 Matted crossing removed Wetland W6-A1 5-31-2023 Matted crossing removed Wetland W6-B1 5-31-2023 Matted crossing removed Wetland W7-A 3-15-2023 Matted crossing removed Wetland W7-13 3-15-2023 Matted crossing removed Wetland W7C-A 3-22-2023 Matted crossing removed Wetland W7C-B 3-22-2023 Matted crossing removed Wetland W7D-A 3-22-2023 Matted crossing removed Wetland W7D-B 3-22-2023 Matted crossing removed Wetland W7E-A 3-24-2023 Matted crossing removed Wetland W7E-B 3-24-2023 Matted crossing removed Wetland W8-A 3-23-2023 Matted crossing removed Wetland W8-13 3-23-2023 Matted crossing removed Wetland W9-A 3-21-2023 Matted crossing removed Wetland W9-13 3-21-2023 Matted crossing removed Wetland W9C-A 4-3-2023 Matted crossing removed Wetland W9C-B 4-3-2023 Matted crossing removed Wetland W9D-A 4-3-2023 Matted crossing removed Wetland W9D-B 4-3-2023 Matted crossing removed Wetland W9E-A 4-5-2023 Matted crossing removed Wetland W9E-B 4-5-2023 Matted crossing removed Project Name: PNG Line 142 Date: 06/8/2023 a� 0126°5E(T) 35.69475,-78.475171 • -1 m -«e r 1. 3- d t Stream S-10 MON. 7• _ f.�; c�v��t ���� 6yy,9+ham =�S� Stream S-11 Project Name: PNG Line 142 Date: 06/8/2023 N,1M South West Elevation 0 50bNE(T) 35.696077,-78,472419 A 14 m r �I u r I"w KAll h- � a �, S C k .y ,fiery `° �, n r��+q ',•t b� �. '\: Stream 5-12 South East Elevation 0 311'NW(T)®35.698233,-78.395759 A 52 m " s _ `.�'� :.f I�•.jlF�}, ,rl 1. f \ Stream S-32