Peck, Kaitlin
From:Farkas, Jim J
Sent:Monday, February 6, 2023 1:11 PM
To:Moseley, Alan, PE
Subject:RE: \[External\] RE: Rowan County RV Dealership in Salisbury, Rowan County
That’s the directions for filling out the Fast-Track ATC form (the form itself can be found here:
https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-program/post-
construction-program/new-permits-permit-modifications)
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: Moseley, Alan, PE <amoseley@Blcompanies.com>
Sent: Monday, February 6, 2023 1:08 PM
To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Subject: \[External\] RE: Rowan County RV Dealership in Salisbury, Rowan County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Jim,
Is this what you’re talking about for permit? The link in the legislation doesn’t work and I found this with
Google. https://deq.nc.gov/media/10104/download
Alan W. Moseley, P.E.
Principal Engineer
BL Companies | Employee owned. Client driven.
3420 Toringdon Way, Suite 210 Charlotte, NC 28277
1
tel: 704.565.7070 | direct: 704.851.7093
mobile: 704.999.5154
www.blcompanies.com
From: Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Sent: Monday, February 6, 2023 12:02 PM
To: Moseley, Alan, PE <amoseley@Blcompanies.com>
Cc: rstclair@generalrv.com
Subject: Rowan County RV Dealership in Salisbury, Rowan County
We have received a new application for the subject project on February 2, 2023. At this time, we are not processing new
Standard Applications. We will hold onto the provided application until we resume processing Standard Applications or
until May 3, 2023 (90 days after receiving the application), whichever comes first.
Your options are as follows:
- Withdraw the Standard Application and apply for a permit for this project through the Fast-Track process. NOTE:
Please refer to the eligibility requirements outlined in 15A NCAC 02H .1043
(http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20quality/chapter%2002%20-
%20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1043.pdf) and Part A of the
Fast-Track ATC Application Form as not all projects are suited to be permitted through the Fast-Track process.
The provided application fee can be applied to the Fast-Track Application.
- Wait for us to process the application. If we do not process the application within 90 days of receiving it, it is
assumed that the Division has no issues with what is being proposed and the project is deemed approved (in
accordance with 15A NCAC 02H .1042(3)(c) http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2002%20-
%20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1042.pdf).
Sorry for the inconvenience, we are working to correct this issue and will do so as soon as we are able to.
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646