Loading...
HomeMy WebLinkAboutR5930_Wetland_Impact_Summary_Form_REV_20230707Station Structure(From/To) Size / TypePermitted Amount Prop. (∆)Permitted Amount Prop. (∆)Permitted Amount Prop. (∆)Permitted Amount Prop. (∆)Permitted Amount Prop. (∆)1 - -L-43+01 / -L- 43+50 (RT) Skimmer Basin 0.018 -0.0181 Construction Easement0.006 15 0.0020.0041052 Outet Protection (Bank Stabilization)0.008 17 0.014-0.00639-223 1@ 7' x 7' RCBC, Buried 1'0.078 270 0.092-0.014251194 Inlet Protection (Bank Stabilization)0.006 17 0.014-0.00838-215 Construction Easement0.032 10 0.0020.03010 --L-68+23 / -L- 69+00 TOTAL0.091 0.038 304 25 0.120-0.0280.0040.034328-242056 Construction Easement0.011 33 0.0050.00610237 Outet Protection (Bank Stabilization)0.009 26 0.017-0.00838-128 1@11' x 7' RCBC, Buried 1'0.062 201 0.078-0.016170319 Inlet Protection (Bank Stabilization)0.006 18 0.017-0.01138-2010 Construction Easement0.009 30 0.0050.0041020-L-108+17 / -L- 109+84 TOTAL0.077 0.020 245 63 0.112-0.0350.0100.010246-1204311 Construction Easement0.023 31 0.0050.018102112 Outet Protection (Bank Stabilization)0.021 33 0.023-0.00250-17133@11' x 12' RCBC, Buried 1'East Floodbench Barrel, 2' Sills0.100 174 0.111-0.011242-6814 Inlet Protection (Bank Stabilization)0.022 38 0.024-0.00253-1515 Construction Easement0.020 38 0.0050.0151028- Channel Change0.007 0.004 29 20 -0.007-0.004-29-20-L-124+00 / -L- 125+26 TOTAL0.149 0.046 274 89 0.158-0.0080.0100.037345-71206916 Construction Easement0.001 10 0.002-0.00110 -17 Outet Protection (Bank Stabilization)0.004 29 0.008-0.00435-618 1 @ 54" RCP, Buried 1'0.026 125 0.032-0.006138-1319 Inlet Protection (Bank Stabilization)0.002 9 0.008-0.00636-2720 Construction Easement0.003 10 0.0020.00110 --L-148+85 / -L- 149+73 TOTAL0.032 0.004 163 20 0.048-0.0160.004 0.000 209-4620 0TOTALS*:0.00 0.00 0.00 0.00 0.02 0.35 0.11 986 197 0 -0.0180.44-0.090.030.081128-14280117*Rounded totals are sum of actual impactsNOTES:NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS02/13/2023CHATHAM COUNTYR-5930Revised 2018 Feb SHEET 19OF19Permit Modification Site No.SURFACE WATER IMPACTSWETLAND IMPACTSOriginal Permit Impact #3245Natural Stream Design (ft) WETLAND AND SURACE WATER IMPACTS SUMMARYHand Clearing in Wetlands (ac.)Permanent SW Impacts (ac) Temp. SW Impacts (ac)Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp (ft)ORIGINIALLY PERMITTED IMPACTS / PROPOSED ∆ (+ or -)Permanent Fill in Wetlands (ac).Temp Fill in Wetlands (ac.)Excavation in Wetlands (ac.)Mechanized Clearing in Wetlands (ac.)Hand Clearing in Wetlands (ac.)Permanent SW Impacts (ac) Temp. SW Impacts (ac)Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp (ft)