Loading...
HomeMy WebLinkAboutR5930_Riparian_Buffer_ Impact_ Summary_Form_REV_20230707Site Station StructureNo. (From/To) Size / TypePermitted Amount Prop. (∆)Permitted Amount Prop. (∆)Permitted Amount Prop. (∆)1 -L-68+23 / -L- 69+00 1@ 7' x 7' RCBC, Buried 1' X19685 12600 32285 15291439413893-12932918431012 -L-108+17 / -L- 109+84 1@11' x 7' RCBC, Buried 1'X X 1413 632204518034 12638 30671 1067273621085017882152291503 -L-124+00 / -L- 125+263@11' x 12' RCBC, Buried 1'East Floodbench Barrel, 2' SillsX 18235 10135 28370 14493374214440-430528933-5631413 632 2045 55953 35373 91326 404561549739183-38107963911688NOTES:Revised 2018 Feb SHEET 8 OF 8TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ALLOWABLE MITIGABLECHATHAM COUNTYR-5930TOTALS*:ROAD CROSSINGUTILITYPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)RIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS02/13/2023ZONE 1(ft2)ZONE 2(ft2)TOTAL(ft2)IMPACTSTYPEORIGINIAL MITIGABLE (*Note - "Allowable" impacts are new and not accounted in these totals)ORIGINIALLY PERMITTED IMPACTS / PROPOSED ∆ (+ or -)