Loading...
HomeMy WebLinkAbout20230678 Ver 1_Design/Maps/Site Plans Revised_20230705 (3)ENERGY DISSIPATOR DESIGN WORKSHEET PROJECT: DATE PREPARED: NEW HANOVER COUNTY VICE DETECTIVES EXPANSION 7/5/2023 DESCRIPTION: PREPARED FOR: CULVERTI NCDEQ ENGINEER: * PREPARED BY: REVIEWED BY: V�MC M&CREED DCO RMC PROJECT NO.04245-0012 SCM 1 - OUTFALL Outlet flowrate 6.30 cfs Total Q = 18.9 CFS. Flow divided by 3 for multiple culverts. Pipe diameter 18 inches Outlet pipe slope 0.25 percent Number of pipes 1 Des. flow velocity 3.56 ft/sec Fieurc 8.06.b.1 25 20 Z one-6-Zone 7 u 15 w Z d 10 5 ft/sec on 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 1 Outlet pipe diameter 18 in. Apron Length = 6.0 ft. Outlet flowrate 6.3 cfs Apron Width = 4.5 ft. Outlet velocity 3.6 ft/sec Max. Stone Dia = 6 in. Material =- Class A Thickness = 9 in. Zone Material Max Stone Dia. Thickness Length Width 1 Class A 6 9 4 x D(o) 3 x D(o) 2 Class B 12 18 6 x D(o) 3 x D(o) 3 Class I 17 26 8 x D(o) 3 x D(o) 4 Class II 23 35 10 x D(o) 3 x D(o) Notcs: 1. Calculations based on NY DOT method - Section 8.06.05 through 8.06.06 in NCDENR ESC Manual. McKim Creed, Inc. 243 N Front Street Wilmington, North Carolina 28401 (910) 343-1048 Page 1 of 1