Loading...
HomeMy WebLinkAboutSWA000190_email_20230131 Peck, Kaitlin From:Farkas, Jim J Sent:Tuesday, January 31, 2023 11:12 AM To:Nick Buysse Cc:Eplin, Jerry W Subject:Fairview Fire and Rescue in Monroe, Union County Good Morning, We received your application for a new Fast-Track ATC post-construction stormwater permit on 1/26/2023. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 3/2/2023) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies of the Application Form (or pages) with the following corrections made (A complete application is required per 15A NCAC 02H .1043(3)(a)):  Part D1 & D2 – Please provide the contact information (Phone number and email address) for the Applicant and Registered Agent.  Part E5 – The project density does not appear to be calculated correctly. This form is not set up for situations where there is a net decrease in BUA on-site*. For this project, please show the decrease in BUA on the “Proposed New BUA” item (or you can leave this item as “zero” since negative numbers could be confusing when recalculating the project density). The “Proposed New BUA” item typically refers to the net increase in BUA, not the amount of BUA that will exist in proposed conditions. Please revise as needed.  Part F7 – Please provide 2x hard copies of official documentation showing the title and position of the signing official (Jody Mills) within the applicant organization (Fairview Fire and Rescue Association). The provided documentation showing that the applicant is in good standing does not list this person as being associated with the organization.  1x additional hard copy of the construction sequence discussing how any future development on the project may be phased. This item is required per 15A NCAC 02H .1043(3)(g). A single construction sequence was provided, however, we require 2x hard copies.  2x hard copies of a plan sheet with the following corrections made:  Wetland delineation or a note on the plans stating that there are no wetlands located on-site. This item is required per 15A NCAC 02H .1043(3)(f) and Part F4 of the Application. Please also list the name of the individual that made this determination in a note on the plans. * Typically, sites that do not have an increase in BUA can qualify for the redevelopment exemption (15A NCAC 02H .1001(1)(f) & G.S. 143-214.7(a1)), however, the proposed pipe network does not appear to meet the second requirement for redevelopment, that the proposed activity provides greater or equal stormwater control than the previous development, since it is more extensive than what is shown in existing conditions. If you are interested, you could either rework the design so that there is equal or greater stormwater control than what is existing or show that the existing network is comparable to what is proposed, this project could meet the redevelopment exemption and would not need to be permitted through our office. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. While not required for administrative completeness, the following items were noted during review: - As designed, this project does not appear to meet the definition of a low-density project (the proposed pipe network is not allowable under 15A NCAC 02H .1003(2)). 1 - This project is located within the Goose Creek Watershed, and is subject to the Goose Creek Rules (15A NCAC 02B .0602). The Goose Creek Rules will most likely not apply to this project though since there is a net decrease in BUA (in which case, 15A NCAC 02H .1017 will be followed). - Please fold any plans submitted to our office as we do not have the room to store rolls of plans. If the plan set is too large to roll, please consider removing extraneous plan sheets from the submission (we only need the plan sheets needed to complete our review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track permitting process can take up to 30 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas at jim.farkas@ncdenr.gov or 919-707-3646. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 2