Loading...
HomeMy WebLinkAboutSWA000212_Soils/Geotechnical Report_20230706 i I Report of Subsurface Exploration Services Banner Elk Hotel - Added Parking Area Banner Elk, North Carolina S&ME Project No. 1558-20-071 PREPARED FOR: Commercial Reality Advisors, LLC 751 West Fourth Street, Suite 310 Winston-Salem, North Carolina 27101 PREPARED BY: S&ME, Inc. 8646 West Market Street, Suite 105 Greensboro, North Carolina 27409 May 4, 2021 r r P I illr May 4, 2021 Commercial Reality Advisors, LLC 751 West Fourth Street, Suite 310 Winston-Salem, North Carolina 27101 Attention: Mr.Jack Reece Reference: Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071 NC PE Firm License No. F-0176 Dear Mr. Reece: S&ME, Inc. (S&ME) has completed subsurface exploration services for the added parking area for the planned hotel project in Banner Elk, North Carolina. The exploration was performed in general accordance with S&ME Proposal 1558-20-071 (CO1) dated March 9, 2021. The purpose of the services was to explore general subsurface conditions within the proposed development area and evaluate those conditions with regard to site grading and construction. S&ME previously prepared a Report of Subsurface Exploration Services for the nearby planned hotel structure (report dated February 12, 2021). S&ME appreciates the opportunity to provide geotechnical engineering services for this added parking lot area. If you have questions or need additional information regarding this report, please call us at (336) 288-7180. Sincerely, 011111//0 S&ME, Inc. ?D.%)FESS/46y.yam. .4 SEAL Ili.? — • 30037 Stephen W. Lacz, P.E. Mark Stephenson Project Manager/Geotechnical Group Leader Geotechnical Staff Professional Registration No. 030037 Reviewed by Matt Moler, P.E. SL/MS/MM/wj S&ME, Inc.18646 West Market Street,Suite 105 I Greensboro, NC 27409 I p 336.288.7180 I www.smeinc.com Report of Subsurface Exploration Services Banner Elk Hotel -Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071II 1 Table of Contents 1.0 Project and Site Information 1 2.0 Exploration Procedures 1 2.1 Field 1 2.2 Laboratory 2 3.0 Regional Geology 2 4.0 Site Conditions 3 4.1 Surface Conditions 3 4.2 Existing Fill 4 4.3 Residuum 4 4.4 Partially Weathered Rock and Auger Refusal Materials 4 4.5 Groundwater 5 5.0 Evaluation 5 6.0 Site Earthwork Recommendations 5 6.1 Previously Graded Sites 5 6.2 Site Preparation 5 6.3 Excavation 5 6.4 Fill Material 6 6.5 Cut and Fill Slopes 6 6.6 Potential Subgrade Deterioration and Repair 6 7.0 General Pavement Thickness Recommendations 6 8.0 Limitations of Report 7 Insert: Important Information About Your Geotechnical Report May 4, 2021 Report of Subsurface Exploration Services Banner Elk Hotel -Added Parking ditr Banner Elk, North Carolina II I S&ME Project No. 1558-20-071 illIk Appendices Appendix I-Figures Appendix II-Boring Information Appendix III-Laboratory Information May 4, 2021 ii Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071 I I 1.0 Project and Site Information Project information was based on the following information: An e-mail from Jack Reece with Commercial Realty Advisors, LLC (CRA) to Stephen Lacz with S&ME on March 5, 2021. The e-mail included an image of the parcel. Review of Google Earth aerial imagery and Avery County GIS web map information. A site visit by Mark Stephenson on March 23, 2021. Review of previous S&ME borings for project 1558-20-071 dated February 12, 2021. We understand that CRA is planning to construct an added parking .r area in conjunction with a proposed four-story hotel southeast of _ • the intersection of NC Highway 105 and Tynecastle Highway in � ., "�� \ Added Banner Elk, North Carolina (Figure 1 —Site Vicinity Plan in Appendix "K` ' Parking I). The added parking will be located in a parcel northeast of Lowes V--� Y.. Foods as shown to the right. At this time, detailed grading information has not been provided. !/' Based on observations during a previous site visit, the property lo" slopes slightly from the east to the west and is grass-covered. Site - Hotel "- - - elevations range from approximately 4030 around the perimeter to -•:. 1 ; ; about 4036 feet in the eastern center of the proposed area. CRA requested four borings be performed in the additional parking area for use in design of the lot by others. Assumptions In developing the proposed scope of services, we made the following assumptions: Maximum cuts and fills of up to 2 feet will be required to reach design grades in the additional parking area. Traffic conditions will be limited to automobiles and occasional light to heavy trucks. 2.0 Exploration Procedures 2.1 Field Four soil test borings (P-1 through P-4) were conducted at the approximate locations indicated on the Boring Location Plan (Figure 2 in Appendix I)within the planned additional parking area. The borings were located in the field using existing site features as reference. The borings were conducted using a CME 45 track-mounted drill rig equipped with an automatic hammer. Hollow stem, continuous flight augers were used to advance the borings to termination depths of 10 to 15 feet below existing grade. Standard Penetration Tests (SPT) were performed in the borings at 2.5-foot intervals in the top 10 May 4, 2021 1 Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina s S&ME Project No. 1558-20-071 I I feet, then at 5-foot intervals thereafter, in general accordance with ASTM D 1586 to provide an index for estimating strength parameters and relative consistency of subsurface soils. Groundwater measurements were attempted after drilling was completed in each of the test borings. After completion of water level measurements, the boreholes were backfilled with auger cuttings and a commercial hole closure device placed near the ground surface. 2.2 Laboratory Once the samples were received in our laboratory, a geotechnical staff professional visually examined each sample to estimate the distribution of grain sizes, plasticity, organic content, moisture condition, color, presence of lenses and seams, and apparent geological origin. The results of the classifications as well as the field test results can be observed on the Boring Logs in Appendix II. The soils were classified using the Unified Soil Classification System (USCS). Similar soils were grouped into strata on the logs. The strata contact lines represent approximate boundaries between the soil types; the actual transition between the soil types in the field may be gradual in both the horizontal and vertical directions. Atterberg limits (ASTM D 4318), grain size analysis (ASTM D 422 without hydrometer), and natural moisture content tests (ASTM D 2216) were performed on selected samples. Results of the laboratory tests are presented in Appendix III. 3.0 Regional Geology The Geologic Map of North Carolina (1985) indicates the site is in the Blue Ridge Physiographic Province. The bedrock in this region is a complex crystalline formation that has been faulted and contorted by past tectonic movements. The rock has weathered to residual soils which form the mantle for hillsides and hilltops. The typical residual soil profile in areas not disturbed by erosion or the activities of man consists of clayey silts and silty sands. Soils typically become less clayey and more sandy with depth. There may be also be colluvial (old land-slide) material on slopes. More specifically, the site is in the Grandfather Mountain Formation of the Western Blue Ridge terrane. This is one of the most geologically complicated areas of the state and is likely composed of several geologic terranes. Generally, the Western Blue Ridge includes rocks that have always been associated with ancient North America (known as Laurentia by geologists). This mountainous region is composed of a group of over one billion-year-old gneisses and the younger sedimentary rocks that were deposited on top of them. This complex mixture of igneous, sedimentary, and metamorphic rock has repeatedly been squeezed, fractured, faulted, and folded. The formation generally contains metasiltstone and locally contains thin bedded iron-bearing dolomitic marble; interlayered with phyllite, metagraywacke, and meta-arkose. The boundary between soil and rock is not sharply defined. This transitional zone termed "partially weathered rock" is normally found overlying the parent bedrock. Partially weathered rock is defined for engineering purposes as residual material that can be penetrated by the drilling rig augers and has standard penetration test blow counts in excess of 50 blows for six inches or less of sampler penetration. Weathering is facilitated by fractures,joints, and by the presence of less resistant rock types. Consequently, the profile of the partially May 4, 2021 2 Report of Subsurface Exploration Services R- ._ Banner Elk Hotel —Added Parking III Banner Elk, North Carolina III S&ME Project No. 1558-20-071 weathered rock and hard rock is quite irregular and erratic, even over short horizontal distances. Also, it is not unusual to find lenses and boulders of hard rock and zones of partially weathered rock within the soil mantle, well above the general bedrock level. 4.0 Site Conditions The generalized subsurface conditions within the proposed added parking area are described below. A Generalized Subsurface Profile (Figure 3) is included in Appendix I to graphically summarize subsurface conditions encountered in the borings. Ground surface elevations shown on the boring logs and Generalized Subsurface Profile were interpolated from provided topographic information and should be considered approximate. For more detailed descriptions and stratifications at a particular boring location, the Boring Logs in Appendix II should be consulted. 4.1 Surface Conditions The proposed added parking area has been previously graded and is an open, grass-covered area bounded on the west by a fill slope, on the north by a fill slope contained at its base by a block retaining wall, and on the west by the parking lot of the Lowes store. All of the borings encountered a layer of topsoil ranging from 2 to 3 inches in thickness. Representative photos of general site conditions are shown below. Jf t • View looking south-southwest with fill slope at left. View looking west along north side of the site. May 4, 2021 3 Report of Subsurface Exploration Services _ill, Banner Elk Hotel —Added Parking iiiir Banner Elk, North Carolina IIIIIII S&ME Project No. 1558-20-071 r//ff% .per I/� rl l 4li , ,,.,• ,,...„ . 4,110 - / ,,...--' r'S••7.- .."....",•%,„ ----N••••„-.Z.•-",+ --4••••:N.• 1 ../JI:Ar. 1: View east along north side with slope and retaining wall. View looking north along west side of site. 4.2 Existing Fill Existing man-placed fill soils were encountered underlying the topsoil in the borings. The fill extended to the termination depth of 10 feet in borings P-1, P-2, and P-4, and to a depth of 12 feet in boring P-3. The fill material consisted of sandy silt (Unified Soil Classification System (USCS) of ML). Standard Penetration Test (SPT) values in the fill ranged from 6 to 12 blows per foot (bpf). In general, fill soils with consistent SPT values of 8 bpf or higher typically indicate adequate compaction was achieved. Atterberg limits testing of the near surface fill soil at P-1 and P-3 indicated liquid limits of 43 and 42 percent, plastic limits of 37 percent, and plastic indices of 6 and 5 percent. These Atterberg limit values indicate the soils are low plasticity sandy silts (ML). Grainsize analysis testing of the soil in the upper 3 feet at P-2 indicated 7.4 percent gravel, 17.3 percent sand, and 75.3 percent silts and clay. Moisture contents for soils tested ranged from 22.7 to 32.8 percent and appear to be at or above compactable levels. 4.3 Residuum Residual soil resulting from the in-place weathering of underlying bedrock was encountered underlying the existing fill soils at boring P-3 at a depth of about 12 feet and extending to the boring termination depth of 15 feet. Residual soil encountered in the boring consisted of sandy silt (ML)with an SPT value of 12 bpf. 4.4 Partially Weathered Rock and Auger Refusal Materials Partially Weathered Rock (PWR) is defined for engineering purposes as residual material that can be penetrated with drill rig augers and has standard penetration resistance values in excess of 50 blows for 6 inches of penetration. Partially weathered rock was not encountered in the borings to the depths explored. Auger refusal is defined as material that could not be penetrated by the drill equipment used on the project. Auger refusal material may consist of obstructions, boulders, rock ledges, lenses, or the top of parent rock. Auger refusal material was not encountered in the borings to the depths explored. May 4, 2021 4 Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071 I I 4.5 Groundwater Groundwater measurements were attempted in all borings at the time of drilling. Water was not encountered in the borings at the time of drilling to the depths explored. 5.0 Evaluation Based on the subsurface conditions encountered in the borings and our understanding of the planned parking lot development, the site is generally adaptable for the proposed development. 6.0 Site Earthwork Recommendations The following paragraphs present our recommendations for site preparation and grading. When reviewing these recommendations, please note that deteriorated subgrades due to adverse weather can develop during construction. Such conditions, if encountered, can best be handled by engineering evaluations made in the field during construction. 6.1 Previously Graded Sites Our experience with previously graded sites indicates unexpected conditions often exist between soil test boring locations. These may include active or abandoned utility lines, areas of low consistency fill, buried debris, and others. Such conditions, if encountered, can be handled by engineering evaluations at the time of construction. 6.2 Site Preparation In the proposed added parking area, the topsoil should be removed. Once excavations are made to achieve final subgrade elevations and in areas to receive new fill, subgrades should be evaluated by the project Geotechnical Engineer(or his/her representative) by proofrolling with a loaded dump truck or similar pneumatic tire vehicle (minimum loaded weight of 20 tons) to identify unstable soils requiring remediation. If possible, the proofrolling procedure should consist of two complete passes of the equipment over the subgrade, perpendicular to one another. Areas of the subgrade that rut or deflect excessively in the opinion of the project Geotechnical Engineer, considering the depth below finished grade and proposed construction at the specific location, should be repaired. Repair should consist of undercutting to stable soils and replacement with compacted structural fill, or scarifying and recompaction. 6.3 Excavation Based on the subsurface conditions encountered by the borings and our understanding of planned site excavations, the planned excavations can be performed using conventional earthmoving equipment without the need for ripping or blasting. In this geology, it is possible to encounter occasional, isolated, boulders or ledges of rock that may be difficult to excavate. Excavations should be sloped or shored in accordance with OSHA (29 CFR Part 1926) excavation trench safety standards. May 4, 2021 5 Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071 J1; I 6.4 Fill Material The majority of the existing site sandy silt soils are suitable for reuse as compacted fill provided they meet the recommendations below. Criteria for soil used as structural fill in site grading should include: No deleterious materials. USCS classification of GW, SW, SM, SC, ML, CL or some combination of these. Plastic soils (CH or MH) may not be used as structural fill. A standard Proctor maximum dry density of at least 90 pcf. Maximum particle size of 3 inches in any dimension. Samples of the proposed fill soils should be tested for moisture content and moisture-density relationship (standard Proctor) to establish their compaction properties. Moisture adjustment may be needed to achieve a compactable soil moisture content. The extent of soil moisture adjustments will be affected by the source of fill material and weather conditions prior to and during grading. Drying may be accomplished by spreading and discing to maximize exposure to sun and wind during favorable weather conditions. Favorable weather conditions are typical of the late Spring, Summer, and early Fall. 6.5 Cut and Fill Slopes Permanent cut and fill slopes should be no steeper than 2(H):1(V) and should be properly seeded and mulched to minimize erosion. For maintenance purposes, the permanent slopes may need to be flatter to allow access to mowing equipment. Temporary slopes in confined or open excavations should perform satisfactorily at inclinations of 1(H):1(V). All confined excavations, such as trenches, should conform to applicable OSHA regulations. The crests of all slopes should be maintained at least five (5) feet horizontally from any pavement limits. Surface runoff should be diverted away from the slope faces. Slopes taller than 30 feet should incorporate appropriately sized ditches parallel to the crest at selected intervals to reduce the velocity and erosion potential of surface waters. 6.6 Potential Subgrade Deterioration and Repair Potential subgrade soils consist of sandy silts that are moderately to highly susceptible to weather related deterioration. The exposed subgrade soil of both cut and fill areas can deteriorate when exposed to construction activities and environmental changes. Subgrade soil deterioration can occur from exposure to rainwater, rutting from construction traffic, freezing, and erosion. Exposed subgrades in the pavement areas that have deteriorated should be properly repaired by scarifying, moisture conditioning, and recompacting, or by undercutting and replacement immediately prior to construction. Drying may be accomplished by spreading and discing to maximize exposure to sun and wind during favorable drying weather. 7.0 General Pavement Thickness Recommendations S&ME was not provided traffic frequency or vehicle weight information and thus a detailed pavement design was not conducted. However, for parking areas that receive only car traffic, we generally recommend a minimum May 4, 2021 6 Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071 I pavement section consisting of 2-inches of Type S-9.5B surface mixture underlain by 6-inches of aggregate base course stone. In the main access drives and truck (dumpster) routes, we generally recommend a minimum of 4- inches of asphalt (2.5 inches of I-19C underlying 1.5 inches of S-9.5B) underlain by a minimum of 8-inches of aggregate base course. These thicknesses are based on our experience and assume that a compacted, stable subgrade was developed at the time of construction. The asphalt pavement should not be deficient by more than 1/4 inch in any area. Materials and workmanship should meet the North Carolina Department of Transportation's Standard Specifications for Roads and Structures, latest edition. The aggregate base course should consist of Crushed Aggregate Base Course (Refer to NCDOT's Standard Specifications for Roads and Structures, Section 520). This base course should be compacted to at least 98 percent of the maximum dry density, as determined by the modified Proctor compaction test (ASTM D1557). To confirm that the base course has been uniformly compacted, in-place field density tests should be performed by a qualified Materials Technician and the area should be methodically proofrolled under his evaluation. The condition of the subgrade is critical for the performance of the pavement. The soil subgrade should be proofrolled immediately prior to placement of base course stone. The stone subgrade should be proofrolled immediately prior to placement of asphalt. Unstable areas identified should be repaired. Sufficient testing and evaluation should be performed during pavement installation to confirm that the required thickness, density, and quality requirements of the specifications are followed. The pavement subgrade should be sloped to allow rainwater to properly drain away. Areas adjacent to pavements (embankments, landscape islands, ditching, etc.) which can drain water should be designed so that water does not seep below or surface drain onto pavements. Adequate drainage is very important for the long- term performance of the pavement. 8.0 Limitations of Report This report has been prepared in accordance with generally accepted geotechnical engineering practice for specific application to this project. The conclusions and recommendations contained in this report are based upon applicable standards of our practice in this geographic area at the time this report was prepared. No other representation or warranty either express or implied, is made. We relied on project information given to us to develop our conclusions and recommendations. If project information described in this report is not accurate, or if it changes during project development, we should be notified of the changes so that we can modify our recommendations based on this additional information if necessary. Our conclusions and recommendations are based on limited data from a field exploration program. Subsurface conditions can vary widely between explored areas. Some variations may not become evident until construction. If conditions are encountered which appear different than those described in our report,we should be notified. This report should not be construed to represent subsurface conditions for the entire site. Unless specifically noted otherwise, our field exploration program did not include an assessment of regulatory compliance, environmental conditions or pollutants or presence of any biological materials (mold, fungi, bacteria). May 4, 2021 7 Report of Subsurface Exploration Services Banner Elk Hotel —Added Parking Banner Elk, North Carolina S&ME Project No. 1558-20-071 I I If there is a concern about these items, other studies should be performed. S&ME can provide a proposal and perform these services if requested. S&ME should be retained to review the final plans and specifications to confirm that earthwork, pavement, and other recommendations are properly interpreted and implemented. The recommendations in this report are contingent on S&ME's review of final plans and specifications followed by our observation and monitoring of earthwork and foundation construction activities. A document prepared by S&ME and titled Important Information About Your Geotechnical Engineering Report follows this page. This document discusses how geotechnical recommendations are developed based on professional opinions of site subsurface conditions, limited exploration information, and experience. Variations in subsurface conditions can be a principal cause of construction delays, cost overruns, and claims. This document is provided to assist you in understanding and managing the risk of these variations. May 4, 2021 8 ii : Important Information About Your Geotechnical Engineering Report Variations in subsurface conditions can be a principal cause of construction delays, cost overruns and claims. The following information is provided to assist you in understanding and managing the risk of these variations. Geotechnical Findings Are Professional Services Are Performed for Specific Projects Opinions Because the scope of each geotechnical Geotechnical engineers cannot specify material exploration is unique, each geotechnical report is properties as other design engineers do. unique. Subsurface conditions are explored and Geotechnical material properties have a far broader recommendations are made for a specific project. range on a given site than any manufactured Subsurface information and recommendations may construction material, and some geotechnical not be adequate for other uses. Changes in a material properties may change over time because proposed structure location, foundation loads, of exposure to air and water, or human activity. grades, schedule, etc. may require additional geotechnical exploration, analyses, and Site exploration identifies subsurface conditions at consultation. The geotechnical engineer should be the time of exploration and only at the points where consulted to determine if additional services are subsurface tests are performed or samples required in response to changes in proposed obtained. Geotechnical engineers review field and construction, location, loads, grades, schedule, etc. laboratory data and then apply their judgment to render professional opinions about site subsurface Geo-Environmental Issues conditions. Their recommendations rely upon these The equipment, techniques, and personnel used to professional opinions. Variations in the vertical and perform a geo-environmental study differ lateral extent of subsurface materials may be significantly from those used for a geotechnical encountered during construction that significantly exploration. Indications of environmental impact construction schedules, methods and contamination may be encountered incidental to material volumes.While higher levels of subsurface performance of a geotechnical exploration but go exploration can mitigate the risk of encountering unrecognized. Determination of the presence, type unanticipated subsurface conditions, no level of or extent of environmental contamination is beyond subsurface exploration can eliminate this risk. the scope of a geotechnical exploration. Scope of Geotechnical Services Geotechnical Recommendations Are Not Professional geotechnical engineering judgment is Final required to develop a geotechnical exploration scope to obtain information necessary to support Recommendations are developed based on the design and construction. A number of unique geotechnical engineer's understanding of the project factors are considered in developing the proposed construction and professional opinion of scope of geotechnical services, such as the site subsurface conditions. Observations and tests exploration objective; the location, type, size and must be performed during construction to confirm weight of the proposed structure; proposed site subsurface conditions exposed by construction grades and improvements; the construction excavations are consistent with those assumed in schedule and sequence; and the site geology. development of recommendations. It is advisable to retain the geotechnical engineer that performed the Geotechnical engineers apply their experience with exploration and developed the geotechnical construction methods, subsurface conditions and recommendations to conduct tests and exploration methods to develop the exploration observations during construction. This may reduce scope. The scope of each exploration is unique the risk that variations in subsurface conditions will based on available project and site information. not be addressed as recommended in the Incomplete project information or constraints on the geotechnical report. scope of exploration increases the risk of variations in subsurface conditions not being identified and addressed in the geotechnical report. Portion obtained with permission from"Important Information About Your Geotechnical Engineering Report",ASFE, 2004 ©S&ME, Inc. 2010 Appendices Appendix I - Figures C QC . \ / retire / A_ _, • GfouSe� 'Cranberrykno// NORM - 1 F-7---- / lynelocn-Df 1 0d ,,,,„.,Y r sf'efern-Or\ 0 c ,,s,,0 -, 4\e' 1 \ .. :-..- - wi,' ,C.,-• Ilk t--', eird, / • II / rr by Lak'A}f , 6>0 0 t lik ;; Ilfr , -i 111, - ��co P y� o y\® Site .a 2, .-- -J. ViStia_ 1r - Banner Elk Fos • \\ CD Seven Devils <—) .' Sugar _ •. Mrtlr .Tir urandtather • ./i Mountain - EV to o - a State Park o d Linville REFERENCE:Google Earth Pro and Maps SCALE: FIGURE NO. —_ © SITE VICINITY PLAN None DATE: 1 III = Banner Elk Hotel —Added Parking Area May 2021 1 Banner Elk, Avery County, North Carolina PROJECT NUMBER 1558-20-071 'jr*.____-----"Agrt . . 1,„).06( z ,-. _ , • yr , ,4 . .4, Ir \ 'IA'44, A_ _, • , \ \. . . NoRm \ 41,11#1,..> diP 7' ' '. ' i'il # IV 11 C , ,..‘i A .i, s,„, ._ ,f• ,,,, . • • -Yu.. .*' . 1 A h. \ ‘. . '1F:: b • Vip • • , , .00"- , \ .. .. / If .1 . . 4.• F' fi P-3 ; .,,,frk . �-- , Ili;$ _7/- 4,6,40., ..._ 1 • �r -f V' •, a 11 ' . „ ,. . . i VV. 'V p i; l•-------- 1...ff 4 ''.4 4e* ' -. • '111'; 'Pr ' t / ! ' 40 40'1' ., ,� •�' ort. IA- , 1 -1 '•.11---- ...r 4 r • „c- disv •- .-, ,,...,T4 '16 • �� 40% Allop i / d 4, ' ..ao _AAA• \ REFERENCE: Approximate Boring Location Aerial image from Avery County GIS webmap SCALE: FIGURE NO. BORING LOCATION PLAN None DATE: 2 I I I . Banner Elk Hotel —Added Parking Area May 2021 Banner Elk, Avery County, North Carolina PROJECT NUMBER 1558 20 071 4,038 — — 4,038 P-2 P-3 P-4 4,036 - N. • ••N .• .N - 4,036 • • ♦� �� 4,034 — N � ...3 �'_...10 % 6 — 4,034 • • •• •� �- • I 4,032 — ♦• si�• — 4,032 a • $ � 10 . 10 7 � �w 4,030 — �• t> 4 L — 4,030 z •• 7 HC • 6 8 HC Ii 9 • ♦ �� Q• 4,028 — • • I.• — 4,028 Lu HC ♦ • 6 • • w 4,026 •— 0• 8 6 i 9 — 4,026 � 'BT@10' BT@10' 4,024 — �• I 12 HC..♦ ' — 4,024 BT@10' 4,022 — — 4,022 12 BT@15' 4,020 — — 4,020 Topsoil III ML,Low Plasticity Silt r♦♦♦� Fill N=Standard Penetration Test resistance value(blows per foot). The depicted stratigraphy is shown for illustrative purposes only. The actual subsurface conditions will vary between boring locations. Elevations are approximate. JOB NO: 1558-20-071 iiir Project: Banner Elk Hotel Figure DATE: 5/3/21 IIIor Location: Banner Elk,North Carolina 3 Appendix II - Boring Information LEGEND TO SOIL CLASSIFICATION AND SYMBOLS SOIL TYPES CONSISTENCY OF COHESIVE SOILS (Shown in Graphic Log) STD. PENETRATION RESISTANCE Fill CONSISTENCY BLOWS/FOOT !.!.!.! Very Soft 0 to 2 g Soft 3 to 4 Alluvium Firm 5 to 8 Stiff 9 to 15 ■ Very Stiff 16 to 30 Asphalt Hard 31 to 50 Very Hard Over 50 N Concrete RELATIVE DENSITY OF COHESIONLESS SOILS ■ Topsoil STD. PENETRATION RESISTANCE ° 0. Gravel RELATIVE DENSITY BLOWS/FOOT Very Loose 0 to 4 Sand Loose 5 to 10 Medium Dense 11 to 30 Dense 31 to 50 Silt Very Dense Over 50 Clay SAMPLER TYPES CONSTITUENT MODIFIERS (Shown in Samples Column) Trace: <5% Few: 5 to <15% Organic m Split Spoon Little: 15 to <30% [1] Rock Core Some: 30 to <50% Silty Sand Mostly: 50 to 100% No Recovery Clayey Sand 111111 TERMS Sandy Silt Standard - The Number of Blows of 140 lb. Hammer Falling //►/% Penetration 30 in. Required to Drive 1.4 in. I.D. Split Spoon A Clayey Silt Resistance Sampler 1 Foot. As Specified in ASTM D-1586. SandyClayREC - Total Length of Rock Recovered in the Core Barrel Divided by the Total Length of the Core Run Times 100%. ro, Silty Clay RQD - Total Length of Sound Rock Segments Partially Weathered Rock Recovered that are Longer Than or Equal to 4" (mechanical breaks excluded) Divided by the / / Total Length of the Core Run Times 100%. /// Cored Rock TOB Termination of Boring WATER LEVELS EOD End of the the Day of Boring (Shown in Water Level Column) V = Water Level at TOB = Water Level After 24 Hours or at EOD = Loss of Drilling Water I I I HC= Hole Cave PROJECT: Banner Elk Hotel Banner Elk, North Carolina BORING LOG P-1 S&ME Project No.1558-20-071 DATE DRILLED: 3/26/21 ELEVATION: 4034.0 ft NOTES: Borehole backfilled with auger cuttings and a commercial hole closure device placed near DRILL RIG: CME-45 BORING DEPTH: 10.0 ft the ground surface. DRILLER: NT WATER LEVEL: Dry to 7 ft @ TOB HAMMER TYPE: 140-lb Autohammer LOGGED BY: M.Stephenson SAMPLING METHOD: Split Spoon DRILLING METHOD: 2'/<"H.S.A. w BLOW COUNT U zo z } /CORE DATA STANDARD PENETRATION TEST DATA w W Q J MATERIAL DESCRIPTION W a a (PAS 0 a _ z w cc 10 2,0 30 , 6080 �♦� TOPSOIL 3 inches FILL:SANDY SILT(ML) ♦�� firm to stiff,tan,fine to medium, moist,with trace coarse sand and fine to coarse gravel -SS-1 4 3 5 8 N ♦♦♦ ch ♦♦♦ N ♦:♦ d ♦♦♦ SS-2 3 3 4 7 0 5— 4029.0 — HC -SS-3 3 3 3 - 6 w ♦�♦ 9 i♦i SS-4 4 6 6 12 • 10 4024.0 — Boring terminated at 10 ft 0 z W 0 z 0 z F- 0 z 0 z 0 0 J cn z 0 0] W UU NOTES: 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED Page 1 of 1 PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASzTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT.4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. II _ PROJECT: Banner Elk Hotel Banner Elk, North Carolina BORING LOG P-2 S&ME Project No.1558-20-071 DATE DRILLED: 3/26/21 ELEVATION: 4036.0 ft NOTES: Borehole backfilled with auger cuttings and a commercial hole closure device placed near DRILL RIG: CME-45 BORING DEPTH: 10.0 ft the ground surface. DRILLER: NT WATER LEVEL: Dry to 7.5 ft @ TOB HAMMER TYPE: 140-lb Autohammer LOGGED BY: M.Stephenson SAMPLING METHOD: Split Spoon DRILLING METHOD: 2'/<"H.S.A. w BLGNCCU 1- U W Z Ci a- /CCRE DATA STANDARD PENETRATION TEST DATA w W Q J MATERIAL DESCRIPTION a a ( S EIVIARK v 0 Q 2 _ = c Z w uai 10 20 30 , 6080 �♦� TOPSOIL 3 inches FILL:SANDY SILT(ML) ♦�� firm to stiff,orange tan,fine to medium, moist, with trace coarse sand and fine gravel,slightly -SS-1 5 5 3 $ clayey at 6 ft to 7.5 ft Oi ♦♦♦ SS-2 3 5 5 10 0 5— 4031.0 — Q i♦i -SS-3 3 3 3 - 6 HC 9 i♦i SS-4 2 4 4 8 N 10 4026.0 — Boring terminated at 10 ft c0 z W 0 z c0 z 0 0 z 0 z 0 0 J cn z 0 0] W UU NOTES: 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED Page 1 of 1 PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASzTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT.4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. - I I PROJECT: Banner Elk Hotel Banner Elk, North Carolina BORING LOG P-3 S&ME Project No.1558-20-071 DATE DRILLED: 3/26/21 ELEVATION: 4036.0 ft NOTES: Borehole backfilled with auger cuttings and a commercial hole closure device placed near DRILL RIG: CME-45 BORING DEPTH: 15.0 ft the ground surface. DRILLER: NT WATER LEVEL: Dry to 12 ft @ TOB HAMMER TYPE: 140-lb Autohammer LOGGED BY: M.Stephenson SAMPLING METHOD: Split Spoon DRILLING METHOD: 21/4"H.S.A. w BLOW COUNT w oz O CI- /CORE DATA STANDARD PENETRATION TEST DATA C.) w> -- _ w — — w H t (bla�ros/ft) o MATERIAL DESCRIPTION W w REn s CL w co cn `° F a 10 20 30 6080 N N Co w TOPSOIL 3 inches FILL:SANDY SILT(ML) ♦�� stiff to firm,tan,trace fine gravel,trace mica,fine to medium, moist 4 4 6 -SS-1 • - 10 Oi cn M Oi w ♦♦♦ ♦♦i wSS-2 4 4 6 10 0 5—�% 4031.0 — LL z i♦i a -SS-3 3 4 4 8 a ♦♦i cc i♦i SS-4 2 2 4 6 10 �% 4026.0 — _ ♦j♦ F ♦♦♦ — ♦� w ♦♦♦ a ♦f� HC Z I RESIDUUM:SANDY SILT(ML) r J stiff grayish tan,fine, moist — 0 0 0 6 5 7 SS-5 12 LL 15 4021.0 — Boring terminated at 15 ft cn NOTES: 1. THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE NAMED Page 1 of 1 PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH AStTM D-1586. gf 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. 4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. 111 = PROJECT: Banner Elk Hotel Banner Elk, North Carolina BORING LOG P-4 S&ME Project No.1558-20-071 DATE DRILLED: 3/26/21 ELEVATION: 4036.0 ft NOTES: Borehole backfilled with auger cuttings and a commercial hole closure device placed near DRILL RIG: CME-45 BORING DEPTH: 10.0 ft the ground surface. DRILLER: NT WATER LEVEL: Dry to 7 ft @ TOB HAMMER TYPE: 140-lb Autohammer LOGGED BY: M.Stephenson SAMPLING METHOD: Split Spoon DRILLING METHOD: 2'/<"H.S.A. w BLOW COUNT U zo z } /CORE DATA STANDARD PENETRATION TEST DATA w (W J MATERIAL DESCRIPTION a Q PASW a w _ c z cc 1,0 2,0 30 , ,6080 %i TOPSOIL 2 inches with grass roots FILL:SANDY SILT(ML) firm,grayish brown,fine to medium, moist,with trace coarse sand and fine gravel -SS-1 3 3 3 - 6 ,71 FILL:SANDY SILT(ML) 1 firm,tan,fine to medium, moist,slightly clayey W ii SS-2 3 3 4 7 0 5 4031.0 — Z �•� FILL:SANDY SILT(ML) > �� stiff,tan,fine to medium, moist,with trace fine to coarse gravel HC -SS-3 3 5 4 9 W ••• • • 9 ii SS-4 4 4 5 9 co 10 ••• - 4026.0 — • Boring terminated at 10 ft 0 z W 0 z 0 z O z O z 0 0 J 0 Z O co cn UU NOTES: 1. THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED Page 1 of 1 PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING SAMPLING AND PENETRATION TEST DATA IN GENERAL ACCORDANCE WITH ASzTM D-1586. 3. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT.4. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. II _ Appendix III - Laboratory Information Form No:TR-D2216-T265-1 LABORATORY DETERMINATION OF —- Revision No. 1 WATER CONTENT Revision Date:08/16/17 I ASTM D 2216 ❑ AASHTO T 265 ❑ S&ME, Inc. Charlotte: 9751 Southern Pine Boulevard, Charlotte, NC 28273 Project#: 1558-20-071 Phase 110 Report Date: 4/5/2021 Project Name: Banner Elk Additional Parking Borings Test Date(s): 4/2-5/2021 Client Name: NI Client Address: NI Sample by: Stephenson Sample Date(s): NI Sampling Method: Split Spoon Drill Rig : NI Balance ID. 20233 Calibration Date: 9/22/2020 Method: A (1%o) ❑ B (o.1%) ❑ Oven ID. 10844 Calibration Date: 2/9/2021 Boring Sample Sample Tare# Tare Weight Tare Wt.+ Tare Wt. + Water Percent N No. No. Depth Wet Wt Dry Wt Weight Moisture ° t ft.or m. grams grams grams grams % e P-1 SS#1 1-2.5 TW-44 8.06 167.22 130.78 36.44 29.7% P-2 SS#1 1-2.5 TW-60 8.12 177.78 135.91 41.87 32.8% P-3 SS#2 3.5-5 TW-46 8.18 173.22 132.75 40.47 32.5% P-4 SS#1 1-2.5 BB-38 8.24 185.97 153.11 32.86 22.7% Notes/Deviations/References ASTM D 2216: Laboratory Determination of Water(Moisture) Content of Soil and Rock by Mass Gustavo Salazar NICET#153473 4/5/2021 Technician Name Signature Certification Type/No. Date Stephen Lacz, P.E Project Manager Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc. -Corporate 3201 Spring Forest Road 1558-20-071 Phase 110 Moistures Raleigh,NC. 27616 Page 1 of 1 Form No.TR-D4318-T89-90 LIQUID LIMIT,PLASTIC LIMIT, Revision No. 1 & PLASTIC INDEX ,� Revision Date:7/26/17 I I s ASTM D 4318 ❑x AASHTO T 89 ❑ AASHTO T 90 ❑ S&ME, Inc. Charlotte: 9751 Southern Pine Boulevard, Charlotte, NC 28273 Project#: 1558-20-071 Phase 110 Report Date: 4/19/21 Project Name: Banner Elk Additional Parking Borings Test Date(s) 4/2-19/21 Client Name: NI Client Address: NI Boring: P-1 Sample#: SS#1 Sample Date: NI Location: NI Offset: NI Elevation: 1-2.5' Sample Description: Tan Sandy Silt (ML) Type and Specification S&ME ID# Cal Date: Type and Specification S&ME ID# Cal Date: Balance (0.01 g) 3222 7/30/2020 Grooving tool 33625 6/30/2020 LL Apparatus 33625 6/30/2020 Grooving tool Oven 10844 2/9/2021 Grooving tool Pan# Liquid Limit Plastic Limit Tare#: J19 J62 J2 J25 J18 A Tare Weight 14.16 ' 14.03 14.12 1 14.13 14.03 B Wet Soil Weight + A 24.36 25.54 24.63 21.24 20.39 C Dry Soil Weight +A 21.33 ' 22.07 21.39 19.30 18.70 D Water Weight(B-C) 3.03 3.47 3.24 1.94 1.69 E Dry Soil Weight(C-A) 7.17 8.04 7.27 5.17 4.67 F %Moisture(D/E)*100 42.3% 43.2% 44.6% 37.5% 36.2% N #OF DROPS 27 23 17 Moisture Contents determined by LL LL = F* FACTOR ASTM D 2216 Ave. Average 36.9% r , One Point Liquid Limit 50.0 - N Factor N Factor . 20 0.974 26 1.005 • 21 0.979 27 1.009 22 0.985 28 1.014 '- 45.o o 23 0.99 30 1.018 L • 24 0995 30 1.022 25 1.000 40.0 NP, Non-Plastic ❑ Liquid Limit 43 Plastic Limit 37 IPlastic Index 6 35.0 I 1 I I I I Group Symbol ML 10 15 20 25 30 35 40 #of Drops] 100 Multipoint Method ❑ One-point Method ❑ Wet Preparation ❑ Dry Preparation ❑ Air Dried ❑ Estimate the%Retained on the#40 Sieve: 8% Notes/Deviations/References: ND: Not Determined NI: No Information Provided ASTM D 4318:Liquid Limit, Plastic Limit,&Plastic Index of Soils Karen Warner 4/19/2021 Stephen Lacz, PE. Technician Name Date Technical Responsibility Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road 1558-20-071 Phase 110 P-1 SS#1(1-2.5)PI Raleigh,NC.27616 Page 1 of 1 Form No:TR-D422-WH-1Ga SIEVE ANALYSIS OF SOILS & Revision No. 1 Revision Date:8/10/17 s ASTM D 422 S&ME, Inc. Charlotte: 9751 Southern Pine Boulevard, Charlotte, NC 28273 Project#: 1558-20-071 Phase 110 Report Date: 4/10/2021 Project Name: Banner Elk Additional Parking Borings Test Date(s): 4/2-10/2021 Client Name: NI Client Address: NI Sample Id. P-2 Type: Split Spoon Sample Date: NI Location: NI Sample: SS#1 Elevation: 1-2.5' Sample Description: Orange Tan Sandy Silt (ML) 3" 1.5" 1"3/4" 3/8" #4 #10 #20 k#40 #60 #100 #200 L \ 100% • • • • • • • — • • • • • w-• 90% 80% an 70% s 60% I I 50% p; 40% 30% 20% 10% 0% 100.00 10.00 0.10 0.01 Millimeters 1, Cobbles < 300 mm (12")and > 75 mm (3") Fine Sand < 0.425 mm and > 0.075 mm Gravel < 75 mm and >4.75 mm (#4) Silt < 0.075 and > 0.005 mm Coarse Sand <4.75 mm and >2.00 mm (#10) Clay < 0.005 mm Medium Sand < 2.00 mm and > 0.425 mm (#40) Colloids < 0.001 mm Maximum Particle Size 3/4" Coarse Sand 3.8% Fine Sand 7.8% Gravel 7.4% Medium Sand 5.7% Silt &Clay 75.3% Liquid Limit ND Plastic Limit ND Plastic Index ND Specific Gravity ND Moisture Content ND Coarse Sand 3.8% Medium Sand 5.7% Fine Sand 7.8% Description of Sand &Gravel Particles: Rounded ❑ Angular 0 Hard & Durable 0 Soft ❑ Weathered & Friable 0 Notes/Deviations/References: ND: Not Determined NI: No Information Provided Stephen Lacz, P.E. Project Manager Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1558-20-071 Phase 110 P-2 SS#1(1-2.5) Wash Raleigh,NC.27616 Page 1 of 1 Form No.TR-D4318-T89-90 LIQUID LIMIT,PLASTIC LIMIT, Revision No. 1 & PLASTIC INDEX ,� Revision Date:7/26/17 I I s ASTM D 4318 ❑x AASHTO T 89 ❑ AASHTO T 90 ❑ S&ME, Inc. Charlotte: 9751 Southern Pine Boulevard, Charlotte, NC 28273 Project#: 1558-20-071 Phase 110 Report Date: 4/19/21 Project Name: Banner Elk Additional Parking Borings Test Date(s) 4/2-19/21 Client Name: NI Client Address: NI Boring: P-3 Sample#: SS#1 Sample Date: NI Location: NI Offset: NI Elevation: 1-2.5' Sample Description: Tan Sandy Silt (ML) Type and Specification S&ME ID# Cal Date: Type and Specification S&ME ID# Cal Date: Balance (0.01 g) 3222 7/30/2020 Grooving tool 33625 6/30/2020 LL Apparatus 33625 6/30/2020 Grooving tool Oven 10844 2/9/2021 Grooving tool Pan# Liquid Limit Plastic Limit Tare#: J48 J33 J13 J43 J59 A Tare Weight 14.10 14.11 14.06 14.12 14.17 B Wet Soil Weight + A 25.84 25.42 25.32 20.87 21.95 C Dry Soil Weight +A 22.41 22.02 21.84 19.03 19.84 D Water Weight(B-C) 3.43 3.40 3.48 1.84 2.11 E Dry Soil Weight(C-A) 8.31 7.91 7.78 4.91 5.67 F %Moisture(D/E)*100 41.3% 43.0% 44.7% 37.5% 37.2% N #OF DROPS 27 24 18 Moisture Contents determined by LL LL = F* FACTOR ASTM D 2216 Ave. Average 37.4% r , One Point Liquid Limit 50.0 - N Factor N Factor 20 0.974 26 1.005 • 21 0.979 27 1.009 22 0.985 28 1.014 J 45.o 23• 24 25 1.000 40.0 I NP, Non-Plastic ❑ Liquid Limit 42 Plastic Limit 37 IPlastic Index 5 35.0 I 1 I I I I Group Symbol ML 10 15 20 25 30 35 40 #of Drops] 100 Multipoint Method ❑ One-point Method ❑ Wet Preparation ❑ Dry Preparation ❑ Air Dried ❑ Estimate the%Retained on the#40 Sieve: 12% Notes/Deviations/References: ND: Not Determined NI: No Information Provided ASTM D 4318:Liquid Limit, Plastic Limit,&Plastic Index of Soils Karen Warner 4/19/2021 Stephen Lacz, PE. Technician Name Date Technical Responsibility Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road 1558-20-071 Phase 110 P-3 SS#1(1-2.5)PI Raleigh,NC.27616 Page 1 of 1