HomeMy WebLinkAboutSWA000212_Stormwater Report_20230706 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB STORM WATER SYSTEM ANALYSIS AND REPORT Project: Courtyard Marriott NC 105 Hwy at Tynecastle Hwy Banner Elk, NC 28604 BRE Project #20064 Prepared for: Sugar Mountain Hospitality, LLC 751 West Fourth Street, Suite 310 Winston-Salem, NC 27101 Prepared by: Blue Ridge Engineering PLLc \UWniuuun, 924 Main Street,Suite 200 ��`�•Z�,,,,,,,,,,'4��Q���i,� North Wilkesboro, NC 28659 �` 41-"'s4ESS;�'• (336)838-2500 �,;•, �.i Firm#P 0205 • r = I E. rgnediby"�• P\' March 29, 2023 IftWAtatAi 6E84B5976D2841 E... 03/29/2023 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Introduction The proposed four (4) story hotel is proposed in the Grandfather Center shopping center located at the intersection of NC 105 Hwy and Tynecastle Hwy in Banner Elk, NC. The hotel will be located west of and adjacent to the existing Lowe's Foods grocery store. Development will include the hotel building, parking lot, utilities, storm drainage facility, landscape, etc. The hotel parcel will include a portion of existing shared drive aisles and parking spaces, to remain, which are currently part of the shopping center. Stormwater on the hotel parcel will be treated by an ADS Stormtech system with Bayfilters. An additional parking lot, on the east side of Lowe's Foods parking lot, will be constructed to serve as additional hotel parking. A separate ADS Stormtech system with Bayfilter will be constructed at the additional parking lot to provide stormwater treatment. The project drains to High Quality Waters (HQW) and is subject to post-construction stormwater requirements per 15A NCAC 02H.1017. The project is proposed as high-density and will be required to treat the one-inch storm. The receiving stream is the Watauga River,which is classified as B; Tr, HQW by NCDEQ with a Stream Index 8-(1). Rainfall data was taken from National Oceanic and Atmospheric Administration (NOAA) Atlas 14, Volume 2, Version 3. Storm water run-off for water quality and detention analysis was calculated from United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Technical Release 55 (TR-55) utilizing Hydra'low Hydrographs for Civil 3D 2023 software. 20064 Courtyard Marriott—Banner Elk,NC 2 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Pre-Developed Conditions The hotel and additional parking lot project areas are undeveloped and have been maintained as a lawn area in good condition since original development of the shopping center. The hotel site is shaped to drain to an existing yard inlet located in the northern corner of the property. Stormwater is then conveyed through the shopping center storm system toward NC Hwy 105. The additional parking lot is shaped to drain to a yard inlet in the northwest corner of the property. Stormwater is then conveyed through the shopping center storm system toward NC Hwy 105. Post-Developed Conditions The post-developed built-upon drainage areas will consist of 1) a new hotel, parking lot, and concrete walks/patios along with associated utilities, stormwater drainage facility, etc. All runoff from the new built-upon areas will be collected into a storm drainage pipe network before discharging into an ADS Stormtech underground detention system with four (4) 522 Bayfilter cartridges. Runoff from other wooded areas to remain (outside the project area) will be collected and routed through the proposed project, and not into the underground detention system. 2) The additional parking area will include a new parking facility with 54 total parking spaces. Stormwater will be routed to an ADS Stormtech system with two 522 Bayfilter cartridges. Post-developed conditions are summarized below using the same methodology as for the pre- developed conditions. 20064 Courtyard Marriott—Banner Elk,NC 3 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Post-Developed Conditions DA #1 DA#2 Drainage Area, (acres): 1.45 0.42 Proposed Impervious Area, (acres): 1.32 0.37 SCS Curve Number (weighted): 93 91 Time of Concentration, (min): 5 5 Post-Developed Storm Water Treatment As previously stated, the project is proposed as high-density and will be required to treat the one- inch storm. An ADS Stormtech system with four (4) 522 Bayfilter cartridges will be constructed on the hotel parcel and an ADS Stormtech system with two (2) 522 Bayfilter cartridges will be constructed at additional parking. Each system exceeds the required storage and treatment for the required one-inch storm depth. DA #1 DA#2 Required Storage, (cf): 2,275 546 Storage Provided (cf): 2,474 641 One-inch Storm Release Rate(cfs): 0.062 0.011 20064 Courtyard Marriott—Banner Elk,NC 4 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Storm Drainage Piping Storm drainage piping has been designed utilizing HyrdaFlow Storm Sewers for Civil 3D 2023 software which computes peak flows using the Rational Method. Hydraulic capacity of storm drain piping is designed to convey the flow from a calculated 25-yr storm event. (See attached exhibits and summary tables.) Erosion and Sediment Control The project is disturbing 2.3 total acres, therefore NCDEQ Certificate of Coverage is required. Sediment shall still be controlled at the site using standard practices including: temporary stone construction entrances, sediment fence, diversion ditching, and silt fence stone outlets. The erosion and sediment control design has been prepared in conformance with NCDEQ design standards. All storm water shall be diverted to an approved erosion control device during construction of the project. The contractor shall take whatever measures are necessary to prevent sediment from leaving the site,including tracking onto adjacent roadways. 20064 Courtyard Marriott—Banner Elk,NC 5 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Conclusions This drainage report examines all known and reasonable conditions for this site. No detention will occur on any paved areas for the calculated storm event and the design meets NCDEQ requirements. Therefore,it is our opinion that this plan provides sufficient mitigation to address the impacts to stormwater run-off for development of this property. This report has been prepared for the sole benefit of the client to identify the storm water parameters to be considered during planning, design, permitting, and construction of the proposed project. Our recommendations are based on observations made on site, experience, and generally accepted engineering practices. It is our professional opinion that the conditions reported, and recommendations made within this report are appropriate for this project. 20064 Courtyard Marriott—Banner Elk,NC 6 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB STORMTECH HYDROGRAPH CALCULATIONS HOTEL PARCEL 20064 Courtyard Marriott-Banner Elk,NC DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 0.000 2.363 20064 PreDeveloped 2 SCS Runoff 1.105 15.41 20064 PostDeveloped 3 SCS Runoff 0.000 0.684 Predeveloped-Remote Parking 4 SCS Runoff 0.257 4.393 Remote Parking-Post Developed 5 Reservoir 2 0.062 15.14 Hotel Parcel-Routing 6 Reservoir 4 0.011 4.349 Parking Lot Routing Proj. file: 20064 Hydrographs 2023-02-01.gpw Wednesday, 03/29/2023 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.000 2 n/a 0 20064 PreDeveloped 2 SCS Runoff 1.105 2 718 2,224 20064 PostDeveloped 3 SCS Runoff 0.000 2 n/a 0 Predeveloped-Remote Parking 4 SCS Runoff 0.257 2 718 514 Remote Parking-Post Developed 5 Reservoir 0.062 2 780 2,222 2 4034.31 1,060 Hotel Parcel-Routing 6 Reservoir 0.011 2 814 509 4 4028.24 253 Parking Lot Routing 20064 Hydrographs 2023-02-01.gpw Return Period: 1 Year Wednesday, 03/29/2023 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/29/2023 Hyd. No. 5 Hotel Parcel - Routing Hydrograph type = Reservoir Peak discharge = 0.062 cfs Storm frequency = 1 yrs Time to peak = 13.00 hrs Time interval = 2 min Hyd. volume = 2,222 cuft Inflow hyd. No. = 2 - 20064 PostDeveloped Max. Elevation = 4034.31 ft Reservoir name = Hotel ADS Max. Storage = 1,060 cuft Storage Indication method used. Hotel Parcel - Routing Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 2.00 2.00 1.00 - — 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hrs) Hyd No. 5 Hyd No. 2 1111111 [ Total storage used = 1,060 cuft DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 5 Pond Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/29/2023 Pond No. 1 - Hotel ADS Pond Data Pond storage is based on user-defined values. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 4032.90 n/a 0 0 0.50 4033.40 n/a 255 255 1.00 4033.90 n/a 450 705 1.50 4034.40 n/a 434 1,139 2.00 4034.90 n/a 410 1,549 2.50 4035.40 n/a 373 1,921 3.00 4035.90 n/a 298 2,219 3.50 4036.40 n/a 255 2,474 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 36.00 1.41 Inactive 0.00 Crest Len(ft) = 0.00 4.00 0.00 0.00 Span(in) = 36.00 1.41 12.00 0.00 Crest El.(ft) = 4039.00 4035.25 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 4031.20 4031.20 4034.00 0.00 Weir Type = 1 Rect --- --- Length(ft) = 8.00 1.00 1.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 1.12 1.00 1.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 4.00 4036.90 3.00 4035.90 2.00 • 4034.90 1.00 4033.90 0.00 1 4032.90 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge(cfs) DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB U.S. Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 2: Runoff Curve Number and Runoff Project: Courtyard Marriott Designed By: MDS Date: 1/2/23 Location: Sugar Mountain, NC Checked: Date: Check one: I Present ViDeveloped 1. Runoff curve number (CN) Soil name Cover description CN '-' Area Product and hydrologic ( Cover type, treatment, and hydrologic El acres of group condition; percent impervious; Table Fig. Fig. 0 mi2 CN x area (Appendix A) unconnected/connected impervious area 2-2 2-3 2-4 p ratio) A Pavements, Roofs, Sidewalks 98 1.3 129.4 A Lawn, Landscape 39 0.1 5.1 1' Use only one CN source per line. Totals = 1.5 134.5 CN (weighted) = total product = 134.5 = 93 Use CN = 93 total area 1.5 2. Runoff Storm#1 Storm #2 Storm#3 Frequency years 1 Rainfall, P (24 hour) in. 1.0 Runoff, Q in. 0.434 (Use P and CN with Table 2-1, Figure 2-1. or equations 2-3 and 2-4.) DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Project: Courtyard Marriot //ADS 0 Include Perimeter Stone in Calculations Chamber Model - SC-740 Units- Imperial StormTech 0 Click for Stage Area Data Number of Chambers- 25 ❑ Click to Invert Stage Area Data Voids in the stone (porosity)- 40 % Base of Stone Elevation - 4032.90 ft Amount of Stone Above Chambers- 6 in Click Here for Metric Amount of Stone Below Chambers- 6 in Area of system - 1275 sf Min. Area - 845 sf min. area StormTech SC-740 Cumulative Storage Volumes Height of Incremental Single Incremental Incremental Incremental Ch Cumulative System Chamber Total Chamber Stone & St Chamber Elevation (inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (feet) 42 0.00 0.00 42.50 42.50 2474.26 4036.40 41 0.00 0.00 42.50 42.50 2431.76 4036.32 40 0.00 0.00 42.50 42.50 2389.26 4036.23 39 0.00 0.00 42.50 42.50 2346.76 4036.15 38 0.00 0.00 42.50 42.50 2304.26 4036.07 37 0.00 0.00 42.50 42.50 2261.76 4035.98 36 0.05 1.37 41.95 43.32 2219.26 4035.90 35 0.16 4.07 40.87 44.94 2175.94 4035.82 34 0.28 7.05 39.68 46.73 2130.99 4035.73 33 0.60 15.10 36.46 51.56 2084.26 4035.65 32 0.80 20.04 34.48 54.53 2032.71 4035.57 31 0.95 23.77 32.99 56.76 1978.18 4035.48 30 1.07 26.86 31.75 58.62 1921.42 4035.40 29 1.18 29.51 30.70 60.21 1862.80 4035.32 28 1.27 31.64 29.84 61.48 1802.59 4035.23 27 1.36 33.88 28.95 62.83 1741.11 4035.15 26 1.45 36.35 27.96 64.31 1678.28 4035.07 25 1.52 38.12 27.25 65.37 1613.97 4034.98 WQv=2474cf 24 1.58 39.56 26.68 66.23 1548.60 4034.90 23 1.64 41.06 26.08 67.13 1482.37 4034.82 22 1.70 42.49 25.50 67.99 1415.23 4034.73 21 1.75 43.82 24.97 68.79 1347.24 4034.65 WQv achieved at elevation 4036.4 20 1.80 45.07 24.47 69.54 1278.45 4034.57 19 1.85 46.37 23.95 70.32 1208.90 4034.48 18 1.89 47.33 23.57 70.90 1138.58 4034.40 17 1.93 48.35 23.16 71.51 1067.68 4034.32 16 1.97 49.37 22.75 72.12 996.17 4034.23 15 2.01 50.25 22.40 72.65 924.05 4034.15 14 2.04 51.12 22.05 73.17 851.40 4034.07 13 2.07 51.87 21.75 73.62 778.22 4033.98 12 2.10 52.62 21.45 74.07 704.60 4033.90 11 2.13 53.29 21.18 74.48 630.53 4033.82 10 2.15 53.85 20.96 74.81 556.05 4033.73 9 2.18 54.43 20.73 75.16 481.24 4033.65 8 2.20 54.96 20.52 75.48 406.09 4033.57 7 2.21 55.18 20.43 75.61 330.61 4033.48 6 0.00 0.00 42.50 42.50 255.00 4033.40 5 0.00 0.00 42.50 42.50 212.50 4033.32 4 0.00 0.00 42.50 42.50 170.00 4033.23 3 0.00 0.00 42.50 42.50 127.50 4033.15 2 0.00 0.00 42.50 42.50 85.00 4033.07 1 0.00 0.00 42.50 42.50 42.50 4032.98 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB BAYSAVER TECHNOLOGIES° Project Name: Courtyard Marriott HWY 105 Date 3/28/2023 Location: Sugar Mountain Site Designation: BF-1 SITE CONDITIONS Rainfall Depth 1 in Impervious Acreage 1.320 ac Total Acreage 1.450 ac Time of Concentration 6 min I 91.0 % Rv(Runoff Coefficient) 0.87 WQv 3296 cf 75% WQv (Treatment Volume) 2472 cf ci (Unit Peak Discharge) 1000 csm/in From Type II Chart Qp(Water Quality Storm) 1.97 cfs VOLUME BASED SIZING Volume per cartridge 1250 CF Cartridge Type 522 Min. Number of cartridge required 2 Cartridge Flow rate 11.25 gpm (0.25 gpm/SF) System Flow Rate 0.05 cfs Release time 13.7 hours SEDIMENT BASED SIZING Influent Concentration 70 mg/L Annual Rainfall (P) 55 in Annual Sediment Load 711 lbs Pretreatment reduction 30% Sediment Load to BayFilter 498 lbs 85% Capture Capacity 423 lbs Cartridge Type 522 Sediment load per cartridge 131 lbs Min. Number of cartridge required 4 Anticipated Maintenance Cycle 1.24 years (must be greater than 1 year) FINAL DESIGN Cartridge Type 522 Number of Cartridges 4 Precast Size 6x10 approx outlet orifice 1.41 inch DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB STORMTECH HYDROGRAPH CALCULATIONS ADDITIONAL PARKING PARCEL 20064 Courtyard Marriott- Banner Elk,NC DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 0.000 2.363 20064 PreDeveloped 2 SCS Runoff 1.105 15.41 20064 PostDeveloped 3 SCS Runoff 0.000 0.684 Predeveloped-Remote Parking 4 SCS Runoff 0.257 4.393 Remote Parking-Post Developed 5 Reservoir 2 0.062 15.14 Hotel Parcel-Routing 6 Reservoir 4 0.011 4.349 Parking Lot Routing Proj. file: 20064 Hydrographs 2023-02-01.gpw Wednesday, 03/29/2023 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.000 2 n/a 0 20064 PreDeveloped 2 SCS Runoff 1.105 2 718 2,224 20064 PostDeveloped 3 SCS Runoff 0.000 2 n/a 0 Predeveloped-Remote Parking 4 SCS Runoff 0.257 2 718 514 Remote Parking-Post Developed 5 Reservoir 0.062 2 780 2,222 2 4034.31 1,060 Hotel Parcel-Routing 6 Reservoir 0.011 2 814 509 4 4028.24 253 Parking Lot Routing 20064 Hydrographs 2023-02-01.gpw Return Period: 1 Year Wednesday, 03/29/2023 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/29/2023 Hyd. No. 6 Parking Lot Routing Hydrograph type = Reservoir Peak discharge = 0.011 cfs Storm frequency = 1 yrs Time to peak = 13.57 hrs Time interval = 2 min Hyd. volume = 509 cuft Inflow hyd. No. = 4 - Remote Parking-Post DeveMpodElevation = 4028.24 ft Reservoir name = Parking ADS Max. Storage = 253 cuft Storage Indication method used. Parking Lot Routing Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 — - 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) Hyd No. 6 Hyd No. 4 1111111 Total storage used = 253 cuft DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB 5 Pond Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,03/29/2023 Pond No. 2 - Parking ADS Pond Data Pond storage is based on user-defined values. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 4026.92 n/a 0 0 0.50 4027.42 n/a 68 68 1.00 4027.92 n/a 115 183 1.50 4028.42 n/a 111 294 2.00 4028.92 n/a 105 399 2.50 4029.42 n/a 96 495 3.00 4029.92 n/a 78 573 3.50 4030.42 n/a 68 641 5.00 4030.92 n/a 4 645 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 0.62 0.00 0.00 Crest Len(ft) = 2.00 0.00 0.00 0.00 Span(in) = 18.00 0.62 0.00 0.00 Crest El.(ft) = 4029.50 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 4026.92 4026.92 0.00 0.00 Weir Type = Rect --- --- --- Length(ft) = 115.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 1.70 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 - 4031.92 4.00 4030.92 3.00 4029.92 2.00 4028.92 1.00 4027.92 0.00 ' 4026.92 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Total Q Discharge(cfs) DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB U.S.Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 2: Runoff Curve Number and Runoff Project: Courtyard Marriott - Remote Parking Designed By: MDS Date: 2/1/23 Location: Sugar Mountain, NC Checked: Date: Check one: ! ' Present iiDeveloped 1. Runoff curve number (CN) Soil name Cover description CN '1/ Area Product and hydrologic ( Cover type, treatment, and hydrologic pacres of group condition; percent impervious; Table Fig. Fig. p mi2 CN x area (Appendix A) unconnected/connected impervious area 2-2 2-3 2-4 p ratio) A Pavements, Roofs, Sidewalks 98 0.4 36.3 A Lawn, Landscape 39 0.1 2.0 1' Use only one CN source per line. Totals = 0.4 38.2 CN (weighted) = total product = 38.2 = 91 Use CN = 91 total area 0.4 2. Runoff Storm #1 Storm #2 Storm #3 Frequency years 1 Rainfall, P (24 hour) in. 1.0 Runoff, Q in. 00•35.91 (Use P and CN with Table 2-1, Figure 2-1. or equations 2-3 and 2-4.) DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Project: //A DS 0 Include Perimeter Stone in Calculations Chamber Model - SC-740 Units- Imperial StormTech 0 Click for Stage Area Data Number of Chambers- 6 ❑ Click to Invert Stage Area Data Voids in the stone (porosity)- 40 % Base of Stone Elevation - 4026.92 ft Amount of Stone Above Chambers- 6 in Click Here for Metric Amount of Stone Below Chambers- 6 in Area of system - 340 sf Min. Area - 203 sf min. area StormTech SC-740 Cumulative Storage Volumes Height of Incremental Single Incremental Incremental Incremental Ch Cumulative System Chamber Total Chamber Stone & St Chamber Elevation (inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (feet) 42 0.00 0.00 11.33 11.33 641.42 4030.42 41 0.00 0.00 11.33 11.33 630.09 4030.34 40 0.00 0.00 11.33 11.33 618.76 4030.25 39 0.00 0.00 11.33 11.33 607.42 4030.17 38 0.00 0.00 11.33 11.33 596.09 4030.09 37 0.00 0.00 11.33 11.33 584.76 4030.00 36 0.05 0.33 11.20 11.53 573.42 4029.92 35 0.16 0.98 10.94 11.92 561.89 4029.84 34 0.28 1.69 10.66 12.35 549.97 4029.75 33 0.60 3.62 9.88 13.51 537.62 4029.67 32 0.80 4.81 9.41 14.22 524.12 4029.59 31 0.95 5.70 9.05 14.76 509.90 4029.50 30 1.07 6.45 8.75 15.20 495.14 4029.42 29 1.18 7.08 8.50 15.58 479.94 4029.34 28 1.27 7.59 8.30 15.89 464.36 4029.25 27 1.36 8.13 8.08 16.21 448.47 4029.17 26 1.45 8.72 7.84 16.57 432.25 4029.09 25 1.52 9.15 7.67 16.82 415.69 4029.00 WQv= 641 cf 24 1.58 9.49 7.54 17.03 398.86 4028.92 23 1.64 9.85 7.39 17.25 381.83 4028.84 22 1.70 10.20 7.25 17.45 364.59 4028.75 21 1.75 10.52 7.13 17.64 347.14 4028.67 WQv achieved at elevation 4030.42 20 1.80 10.82 7.01 17.82 329.49 4028.59 19 1.85 11.13 6.88 18.01 311.67 4028.50 18 1.89 11.36 6.79 18.15 293.66 4028.42 17 1.93 11.60 6.69 18.30 275.51 4028.34 16 1.97 11.85 6.59 18.44 257.21 4028.25 15 2.01 12.06 6.51 18.57 238.77 4028.17 14 2.04 12.27 6.43 18.70 220.20 4028.09 13 2.07 12.45 6.35 18.80 201.51 4028.00 12 2.10 12.63 6.28 18.91 182.70 4027.92 11 2.13 12.79 6.22 19.01 163.79 4027.84 10 2.15 12.92 6.16 19.09 144.79 4027.75 9 2.18 13.06 6.11 19.17 125.70 4027.67 8 2.20 13.19 6.06 19.25 106.53 4027.59 7 2.21 13.24 6.04 19.28 87.28 4027.50 6 0.00 0.00 11.33 11.33 68.00 4027.42 5 0.00 0.00 11.33 11.33 56.67 4027.34 4 0.00 0.00 11.33 11.33 45.33 4027.25 3 0.00 0.00 11.33 11.33 34.00 4027.17 2 0.00 0.00 11.33 11.33 22.67 4027.09 1 0.00 0.00 11.33 11.33 11.33 4027.00 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB BAYSAVER TECHNOLOGIES Project Name: Courtyard Marriot HYW 105 Date 3/17/2023 Location: Sugar Mountain, NC Site Designation: BF-2 SITE CONDITIONS Rainfall Depth 1 in Impervious Acreage 0.37 ac To Be Verifeid Total Acreage 0.37 ac To Be Verified Time of Concentration 6 min I 100.0 % R„(Runoff Coefficient) 0.95 WQv 1266 cf 75% WQv (Treatment Volume) 641 cf qu(Unit Peak Discharge) 1000 csm/in From Type II Chart Qp(Water Quality Storm) 0.54 cfs VOLUME BASED SIZING Volume per cartridge 1250 CF Cartridge Type 522 Min. Number of cartridge required 1 Cartridge Flow rate 11.25 gpm 0.25 gpm/sf System Flow Rate 0.03 cfs Release time 10.5 hours SEDIMENT BASED SIZING Influent Concentration 70 mg/L Annual Rainfall (P) 55 in Annual Sediment Load 273 lbs Pretreatment reduction 30% Sediment Load to BayFilter 191 lbs 85% Capture Capacity 162 lbs Cartridge Type 522 Sediment load per cartridge 131 lbs Min. Number of cartridge required 2 Anticipated Maintenance Cycle 1.61 years (must be greater than 1 year) FINAL DESIGN Cartridge Type 522 Number of Cartridges 2 Precast Size 6x8 Equivalent Orifice Size 1.00 inch DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB STORM SEWERS REPORT 25-YR 20064 Courtyard Marriott- Banner Elk,NC DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Hydratlow Storm Sewers Extension for Autodesk® Civil 3D® Plan Outfall 11 12 13 tfall -\ 14 1 5 4 7 8 15 6 3 Outfall 2 p Outfall 16 18 17 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date:3/15/2023 Storm Sewers v2023 00 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 1 Storm Sewer Inventory Report Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 1 End 22.359 43.470 Comb 0.00 0.15 0.86 5.0 4035.81 0.49 4035.92 15 Cir 0.012 1.00 4038.86 Pipe-(108) 2 End 47.248 -127.644 Comb 0.00 0.09 0.89 5.0 4032.99 0.55 4033.25 18 Cir 0.012 0.93 4038.72 Pipe-7 3 2 22.395 19.050 DrGrt 0.00 0.03 0.90 5.0 4033.35 2.01 4033.80 15 Cir 0.012 1.49 4038.61 Pipe-8B1 4 3 28.615 -5.989 DrGrt 0.00 0.03 0.90 5.0 4033.90 1.99 4034.47 12 Cir 0.012 1.50 4038.56 Pipe-8B2 5 4 31.112 -90.131 DrGrt 0.00 0.03 0.90 5.0 4034.57 1.99 4035.19 12 Cir 0.012 1.00 4038.61 Pipe-8B3 6 2 83.000 -34.472 Comb 0.00 0.09 0.88 5.0 4033.35 1.00 4034.18 15 Cir 0.012 0.89 4038.80 Pipe-8 7 6 33.500 -32.404 Comb 0.00 0.07 0.87 5.0 4034.28 1.02 4034.62 15 Cir 0.012 1.00 4038.80 Pipe-9 8 3 15.294 83.960 None 0.00 0.43 0.90 5.0 4033.90 2.03 4034.21 12 Cir 0.012 1.00 0.00 Pipe-(115) 9 End 10.828 65.244 Comb 0.00 0.13 0.87 5.0 4033.59 2.03 4033.81 15 Cir 0.012 1.50 4037.41 Pipe-(111) 10 9 9.542 116.868 Comb 0.00 0.10 0.88 5.0 4033.91 1.99 4034.10 15 Cir 0.012 1.00 4037.93 Pipe-7C 11 End 25.000 65.886 MH 0.00 0.00 0.00 0.0 4028.02 5.32 4029.35 18 Cir 0.012 0.15 4035.80 Pipe-1 12 11 6.000 0.000 DrGrt 0.00 0.04 0.30 5.0 4029.60 0.50 4029.63 24 Cir 0.012 1.16 4035.23 Pipe-1(2) 13 12 28.852 -47.275 MH 0.00 0.04 0.30 5.0 4029.73 0.49 4029.87 24 Cir 0.012 0.76 4035.89 Pipe-2 14 13 94.589 46.216 MH 0.00 0.00 0.00 0.0 4029.97 0.50 4030.44 24 Cir 0.012 0.15 4036.45 Pipe-3 15 14 97.191 0.768 MH 0.00 0.00 0.00 0.0 4030.54 0.50 4031.03 24 Cir 0.012 1.00 4037.29 Pipe-4 16 15 106.129 40.094 DrGrt 0.00 4.53 0.15 10.0 4031.13 2.00 4033.25 24 Cir 0.012 1.50 4038.42 Pipe-5 17 16 60.000 -269.040 DrGrt 0.00 0.49 0.15 10.0 4033.36 1.50 4034.26 18 Cir 0.012 0.50 4038.94 Pipe-6 18 17 132.000 0.000 DrGrt 0.00 1.48 0.15 10.0 4034.36 1.50 4036.34 18 Cir 0.012 1.00 4039.46 Pipe-6(2) Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date: 3/15/2023 Storm Sewers v2023.00 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 1 Structure Report Struct Structure ID Junction Rim Structure Line Out Line In No. Type Elev Shape Length Width Size Shape Invert Size Shape Invert (ft) (ft) (ft) (in) (ft) (in) (ft) 1 CB-18 Combination 4038.86 Rect 2.00 3.00 15 Cir 4035.92 2 CB-12 Combination 4038.72 Rect 2.00 3.00 18 Cir 4033.25 15 Cir 4033.35 15 Cir 4033.35 3 YI-15 DropGrate 4038.61 Rect 2.00 3.00 15 Cir 4033.80 12 Cir 4033.90 12 Cir 4033.90 4 YI-16 DropGrate 4038.56 Rect 2.00 2.00 12 Cir 4034.47 12 Cir 4034.57 5 YI-17 DropGrate 4038.61 Rect 2.00 2.00 12 Cir 4035.19 6 CB-13 Combination 4038.80 Rect 2.00 3.00 15 Cir 4034.18 15 Cir 4034.28 7 CB-14 Combination 4038.80 Rect 2.00 3.00 15 Cir 4034.62 8 Null Structure None 0.00 n/a n/a n/a 12 Cir 4034.21 9 CB-10 Combination 4037.41 Rect 2.00 3.00 15 Cir 4033.81 15 Cir 4033.91 10 CB-9 Combination 4037.93 Cir 2.00 3.00 15 Cir 4034.10 11 New Manhole 4035.80 Cir 4.00 4.00 18 Cir 4029.35 24 Cir 4029.60 12 DI-1 DropGrate 4035.23 Rect 2.00 3.00 24 Cir 4029.63 24 Cir 4029.73 13 JB-2 Manhole 4035.89 Cir 4.00 4.00 24 Cir 4029.87 24 Cir 4029.97 14 JB-3 Manhole 4036.45 Cir 4.00 4.00 24 Cir 4030.44 24 Cir 4030.54 15 JB-4 Manhole 4037.29 Cir 4.00 4.00 24 Cir 4031.03 24 Cir 4031.13 18 Cir 4031.13 15 Cir 4031.13 16 DI-6 DropGrate 4038.42 Rect 6.00 8.00 24 Cir 4033.25 18 Cir 4033.36 17 New DropGrate 4038.94 Rect 6.00 8.00 18 Cir 4034.26 18 Cir 4034.36 18 DI-7 DropGrate 4039.46 Rect 6.00 8.00 18 Cir 4036.34 Project File: 20064 Hotel Storm System.stm Number of Structures: 18 Run Date: 3/15/2023 Storm Sewers v2023.00 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 1 Inlet Report Line Inlet ID Q= Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 CB-18 1.13 0.00 0.87 0.26 Comb 6.0 3.00 0.00 3.00 2.00 0.020 2.00 0.030 0.020 0.012 0.13 5.69 0.08 3.00 0.0 Off 2 CB-12 0.70 0.00 0.70 0.00 Comb 6.0 3.00 3.10 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.12 6.20 0.12 6.20 0.0 Off 3 YI-15 0.24 0.00 0.24 0.00 DrGrt 0.0 0.00 1.00 1.50 1.50 Sag 2.00 0.020 0.020 0.000 0.06 7.57 0.06 7.57 0.0 Off 4 YI-16 0.24 0.00 0.24 0.00 DrGrt 0.0 0.00 1.00 1.50 1.50 Sag 2.00 0.020 0.020 0.000 0.06 7.57 0.06 7.57 0.0 Off 5 YI-17 0.24 0.00 0.24 0.00 DrGrt 0.0 0.00 1.00 1.50 1.50 Sag 2.00 0.020 0.020 0.013 0.06 7.57 0.06 7.57 0.0 Off 6 CB-13 0.70 0.00 0.70 0.00 Comb 6.0 3.00 3.10 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.12 6.16 0.12 6.16 0.0 Off 7 CB-14 0.54 0.00 0.54 0.00 Comb 6.0 3.00 6.00 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.11 5.34 0.11 5.34 0.0 Off 8 Null Structure 3.40 0.00 0.00 3.40 None 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 9 CB-10 0.99 0.00 0.99 0.00 Comb 6.0 3.00 3.10 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.15 7.55 0.15 7.55 0.0 Off 10 CB-9 0.77 0.00 0.77 0.00 Comb 6.0 3.00 3.10 3.00 2.00 Sag 2.00 0.020 0.020 0.000 0.13 6.54 0.13 6.54 0.0 Off 11 New 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 2.00 0.020 0.020 0.013 0.00 0.00 0.00 0.00 0.0 Off 12 DI-1 0.11 0.00 0.11 0.00 DrGrt 0.0 0.00 3.10 3.00 2.00 Sag 2.00 0.020 0.020 0.013 0.02 4.31 0.02 4.31 0.0 11 13 JB-2 0.11 0.00 0.00 0.11 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 14 JB-3 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 15 JB-4 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.0 Off 16 DI-6 4.88 0.10 4.98 0.00 DrGrt 0.0 0.00 6.20 6.00 2.00 Sag 2.00 0.020 0.020 0.013 0.22 24.06 0.22 24.06 0.0 Off 17 New 0.53 0.00 0.43 0.10 DrGrt 0.0 0.00 0.00 3.00 2.00 0.015 2.00 0.050 0.050 0.012 0.08 5.24 0.08 5.24 0.0 16 18 DI-7 1.59 0.00 1.59 0.00 DrGrt 0.0 0.00 3.10 6.00 2.00 Sag 2.00 0.050 0.050 0.013 0.10 6.13 0.10 6.13 0.0 17 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Run Date: 3/15/2023 NOTES: Inlet N-Values=0.016; Intensity=67.51 /(Inlet time+10.90)A 0.74; Return period=25 Yrs. ; *Indicates Known Q added.All curb inlets are Horiz throat. Storm Sewers v2023.00 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 1 MyReport Line Area Area Byp Coeff Coeff Coeff Capac Crit Cross Cross Curb Defl Depth Depth DnStm Drng Easting EGL EGL Energy No. Dn Up Ln No C1 C2 C3 Full Depth SI,Sw SI,Sx Len Ang Dn Up Ln No Area X Dn Up Loss (sqft) (sqft) (C) (C) (C) (cfs) (ft) (ft/ft) (ft/ft) (ft) (Deg) (ft) (ft) (ac) (ft) (ft) (ft) (ft) 1 0.36 0.36 Offsite 0.15 0.30 0.90 4.90 0.42 0.030 0.020 3.00 43.470 0.42 0.42** Outfall 0.15 1162095.50 4036.38 4036.49 0.000 2 1.08 1.09 Sag 0.15 0.30 0.90 8.44 0.89 0.020 0.020 3.00 -127.644 0.88 0.89** Outfall 0.09 1162251.14 4034.24 4034.51 0.000 3 0.79 0.79 Sag 0.15 0.30 0.90 9.92 0.77 0.020 0.020 .... 19.050 0.79 0.77** 2 0.03 1162244.00 4034.46 4034.90 0.000 4 0.17 0.17 Sag 0.15 0.30 0.90 5.45 0.27 0.020 0.020 .... -5.989 0.67 0.27** 3 0.03 1162232.10 4034.67 4034.84 0.000 5 0.09 0.11 Sag 0.15 0.30 0.90 5.45 0.20 0.020 0.020 .... -90.131 0.17 0.20** 4 0.03 1162203.83 4034.81 4035.46 0.000 6 0.37 0.37 Sag 0.15 0.30 0.90 6.99 0.42 0.020 0.020 3.00 -34.472 0.79 0.42** 2 0.09 1162172.15 4034.29 4034.76 0.000 7 0.21 0.21 Sag 0.15 0.30 0.90 7.05 0.28 0.020 0.020 3.00 -32.404 0.32 0.28** 6 0.07 1162139.72 4034.71 4035.01 0.000 8 0.56 0.66 n/a 0.15 0.30 0.90 5.49 0.79 .... 83.960 0.67 0.79** 3 0.43 1162257.90 4034.98 4035.41 0.000 9 0.49 0.49 Sag 0.15 0.30 0.90 9.97 0.52 0.020 0.020 3.00 65.244 0.53 0.52** Outfall 0.13 1162335.10 4034.32 4034.53 0.000 10 0.27 0.27 Sag 0.15 0.30 0.90 9.88 0.34 0.020 0.020 3.00 116.868 0.42 0.34** 9 0.10 1162325.57 4034.46 4034.57 0.000 11 1.65 1.76 n/a 0.15 0.30 0.90 26.24 1.47 .... 65.886 1.32 1.47** Outfall 0.00 1162260.59 4031.49 4032.97 0.000 12 3.14 3.14 11 0.15 0.30 0.90 17.26 1.63 0.020 0.020 .... 0.000 2.00 2.00 11 0.04 1162263.04 4032.28 4032.30 0.043 13 3.14 3.14 n/a 0.15 0.30 0.90 17.08 1.63 .... -47.275 2.00 2.00 12 0.04 1162290.38 4033.08 4033.29 0.205 14 3.14 3.14 n/a 0.15 0.30 0.90 17.27 1.63 .... 46.216 2.00 2.00 13 0.00 1162330.62 4033.80 4034.47 0.669 15 3.14 3.14 n/a 0.15 0.30 0.90 17.40 1.63 .... 0.768 2.00 2.00 14 0.00 1162370.77 4034.57 4035.26 0.690 16 3.14 3.14 Sag 0.15 0.30 0.90 34.63 0.89 0.020 0.020 .... 40.094 2.00 2.00 15 4.53 1162342.08 4035.32 4035.39 0.070 17 1.77 1.48 16 0.15 0.30 0.90 13.93 0.53 0.050 0.050 .... -269.040 1.50 1.17 16 0.49 1162284.59 4035.44 4035.46 0.019 18 0.48 0.48 17 0.15 0.30 0.90 13.93 0.47 0.050 0.050 .... 0.000 1.09 0.47** 17 1.48 1162158.12 4035.62 4036.99 0.000 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date: 3/15/2023 NOTES: **Critical depth Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 2 MyReport Flow Sf Sf Grate Grate Grate Gnd/Rim Gnd/Rim Gutter Gutter Gutter Gutter HGL HGL HGL HGL HGL Incr Incr Inlet Inlet Rate Ave Dn Area Len Width El Dn El Up Depth Slope Spread Width Dn Up Jnct Jmp Dn Jmp Up CxA Q Depth Eff (cfs) (ft/ft) (ft/ft) (sqft) (ft) (ft) (ft) (ft) (ft) (ft/ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (cfs) (ft) (%) 1.13 0.000 0.000 3.00 2.00 0.00 4038.86 0.13 0.020 5.69 2.00 4036.23 4036.34 4036.34 .... 0.13 1.13 0.13 77 5.31 0.000 0.000 3.10 3.00 2.00 4038.80 4038.72 0.12 Sag 6.20 2.00 4033.87 4034.14 4034.14 .... .... 0.08 0.70 0.12 100 3.63 0.000 0.000 1.00 1.50 1.50 4038.72 4038.61 0.06 Sag 7.57 2.00 4034.14 4034.57 j 4034.57 4034.17 4034.14 0.03 0.24 0.06 100 0.43 0.000 0.000 1.00 1.50 1.50 4038.61 4038.56 0.06 Sag 7.57 2.00 4034.57 4034.74 j 4034.74 4034.55 4034.36 0.03 0.24 0.06 100 0.24 0.000 0.000 1.00 1.50 1.50 4038.56 4038.61 0.06 Sag 7.57 2.00 4034.74 4035.39 4035.39 .... .... 0.03 0.24 0.06 100 1.16 0.000 0.000 3.10 3.00 2.00 4038.72 4038.80 0.12 Sag 6.16 2.00 4034.14 4034.60 j 4034.60 4034.12 4033.89 0.08 0.70 0.12 100 0.54 0.000 0.000 6.00 3.00 2.00 4038.80 4038.80 0.11 Sag 5.34 2.00 4034.60 4034.91 j 4034.91 4034.60 4034.58 0.06 0.54 0.11 100 3.40 0.000 0.000 .... .... 4038.61 0.00 .... .... 4034.57 4035.00 4035.00 .... .... 0.39 3.40 .... .... 1.75 0.000 0.000 3.10 3.00 2.00 4038.05 4037.41 0.15 Sag 7.55 2.00 4034.12 4034.34 j 4034.34 4034.14 4034.13 0.11 0.99 0.15 100 0.77 0.000 0.000 3.10 3.00 2.00 4037.41 4037.93 0.13 Sag 6.54 2.00 4034.34 4034.44 j 4034.44 4034.30 4034.27 0.09 0.77 0.13 100 20.70 0.000 0.000 .... .... 4035.70 4035.80 .... .... 4029.34 4030.82 4030.82 .... .... 0.00 0.00 .... .... 20.70 0.710 0.714 3.10 3.00 2.00 4035.80 4035.23 0.02 Sag 4.31 2.00 4031.60 4031.63 4032.41 .... 0.01 0.11 0.02 100 20.64 0.710 0.710 4035.23 4035.89 4032.41 4032.62 4033.13 .... 0.01 0.11 20.61 0.707 0.708 4035.89 4036.45 .... 4033.13 4033.80 4033.90 0.00 0.00 20.64 0.710 0.710 4036.45 4037.29 4033.90 4034.59 4035.26 .... 0.00 0.00 6.29 0.066 0.066 6.20 6.00 2.00 4037.29 4038.42 0.22 Sag 24.06 2.00 4035.26 4035.33 4035.42 .... 0.68 4.88 0.22 100 1.96 0.031 0.030 .... 3.00 2.00 4038.42 4038.94 0.08 0.015 5.24 2.00 4035.42 4035.43 4035.45 .... .... 0.07 0.53 0.08 82 1.59 0.000 0.000 3.10 6.00 2.00 4038.94 4039.46 0.10 Sag 6.13 2.00 4035.45 4036.81 j 4036.81 4035.41 4035.15 0.22 1.59 0.10 100 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date: 3/15/2023 NOTES: **Critical depth Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 3 MyReport Inlet Inlet Inlet i i Invert Invert Jump Jump Vel Hd Vel Hd J-Loss Junct Known Cost Cost Cost ID Loc Time Sys Inlet Dn Up Loc Len Jmp Dn Jmp Up Coeff Type Q RCP CMP PVC (ft) (min) (in/hr) (in/hr) (ft) (ft) (ft) (ft) (ft) (ft) (cfs) CB-18 On Grade 5.0 8.79 8.79 4035.81 4035.92 .... 0.00 0.00 1.00 z Comb. 0.00 760 684 646 CB-12 Sag 5.0 7.72 8.79 4032.99 4033.25 .... 0.00 0.00 0.93 z Comb. 0.00 2,000 1,800 1,700 YI-15 Sag 5.0 7.75 8.79 4033.35 4033.80 2.24 3.86 0.32 0.45 1.49 z Dp-Grate 0.00 890 801 757 YI-16 Sag 5.0 8.01 8.79 4033.90 4034.47 11.45 2.13 0.03 0.26 1.50 z Dp-Grate 0.00 975 878 829 YI-17 Sag 5.0 8.79 8.79 4034.57 4035.19 .... 0.00 0.00 1.00 z Dp-Grate 0.00 968 871 823 CB-13 Sag 5.0 8.30 8.79 4033.35 4034.18 16.60 3.03 0.06 0.27 0.89 z Comb. 0.00 3,008 2,707 2,556 CB-14 Sag 5.0 8.79 8.79 4034.28 4034.62 3.35 1.44 0.10 0.15 1.00 z Comb. 0.00 1,275 1,148 1,084 Null Structure Sag 5.0 8.79 8.79 4033.90 4034.21 .... 0.00 0.00 1.00 z None 0.00 520 468 442 CB-10 Sag 5.0 8.69 8.79 4033.59 4033.81 1.08 2.64 0.20 0.27 1.50 z Comb. 0.00 443 398 376 CB-9 Sag 5.0 8.79 8.79 4033.91 4034.10 1.91 1.75 0.12 0.20 1.00 z Comb. 0.00 385 347 327 New Sag 0.0 5.34 0.00 4028.02 4029.35 .... 0.00 0.00 0.15 z MH 0.00 1,255 1,130 1,067 DI-1 Sag 5.0 5.35 8.79 4029.60 4029.63 .... 0.00 0.00 1.16 Dp-Grate 0.00 396 356 337 JB-2 Sag 5.0 5.35 8.79 4029.73 4029.87 .... 0.00 0.00 0.76 MH 0.00 1 1,392 1,253 1,183 JB-3 Sag 0.0 5.38 0.00 4029.97 4030.44 .... 0.00 0.00 0.15 MH 0.00 4,372 3,935 3,716 JB-4 Sag 0.0 5.41 0.00 4030.54 4031.03 .... 0.00 0.00 1.00 MH 0.00 4,974 4,477 4,228 DI-6 Sag 10.0 6.45 7.18 4031.13 4033.25 .... 0.00 0.00 1.50 Dp-Grate 0.00 4,920 4,428 4,182 New On Grade 10.0 6.62 7.18 4033.36 4034.26 .... 0.00 0.00 0.50 Dp-Grate 0.00 2,520 2,268 2,142 DI-7 Sag 10.0 7.18 7.18 4034.36 4036.34 26.40 3.28 0.07 0.42 1.00 z Dp-Grate 0.00 4,740 4,266 4,029 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date: 3/15/2023 NOTES: Intensity=67.51 /(Inlet time+ 10.90)A 0.74--Return period=25 Yrs. ; **Critical depth Storm Sewers DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Page 4 MyReport Line Line Line Line Line Local n-val n-val Minor Northing Pipe Q Q Q Line Runoff Line Area Area Area ID Length Size Slope Type Depr Gutter Pipe Loss Y Travel Byp Capt Carry Rise Coeff Span Al A2 A3 (ft) (in) (%) (in) (ft) (ft) (min) (cfs) (cfs) (cfs) (in) (C) (in) (ac) (ac) (ac) Pipe-(108) 22.359 15 0.49 Cir 0.0 0.012 0.012 n/a 873650.38 0.40 0.26 0.87 0.00 15 0.86 15 0.00 0.01 0.14 Pipe-7 47.248 18 0.55 Cir 0.0 .... 0.012 0.34 873545.89 0.24 0.00 0.70 0.00 18 0.89 18 0.00 0.00 0.09 Pipe-861 22.395 15 2.01 Cir .... .... 0.012 n/a 873567.12 0.11 0.00 0.24 0.00 15 0.90 15 0.00 0.00 0.03 Pipe-862 28.615 12 1.99 Cir .... .... 0.012 n/a 873593.14 0.80 0.00 0.24 0.00 12 0.90 12 0.00 0.00 0.03 Pipe-863 31.112 12 1.99 Cir .... .... 0.012 0.07 873580.13 2.15 0.00 0.24 0.00 12 0.90 15 0.00 0.00 0.03 Pipe-8 83.000 15 1.00 Cir 0.0 .... 0.012 n/a 873571.38 1.39 0.00 0.70 0.00 15 0.88 15 0.00 0.00 0.09 Pipe-9 33.500 15 1.02 Cir 0.0 .... 0.012 n/a 873562.98 1.28 0.00 0.54 0.00 15 0.87 15 0.00 0.00 0.07 Pipe-(115) 15.294 12 2.03 Cir 0.012 n/a 873573.50 0.06 .... 12 0.90 12 0.00 0.00 0.43 Pipe-(111) 10.828 15 2.03 Cir 0.0 .... 0.012 n/a 873521.50 0.13 0.00 0.99 0.00 15 0.87 15 0.00 0.01 0.12 Pipe-7C 9.542 15 1.99 Cir 0.0 .... 0.012 n/a 873521.85 0.25 0.00 0.77 0.00 15 0.88 15 0.00 0.00 0.09 Pipe 1 25.000 18 5.32 Cir 0.012 0.32 873722.18 0.03 .... 18 0.00 18 0.00 0.00 0.00 Pipe-1(2) 6.000 24 0.50 Cir .... .... 0.012 0.78 873716.71 0.01 0.00 0.11 0.00 24 0.30 24 0.00 0.04 0.00 Pipe 2 28.852 24 0.49 Cir 0.012 0.51 873707.50 0.07 .... 24 0.30 24 0.00 0.04 0.00 Pipe 3 94.589 24 0.50 Cir 0.012 0.10 873621.89 0.23 .... 24 0.00 24 0.00 0.00 0.00 Pipe-4 97.191 24 0.50 Cir 0.012 0.67 873533.39 0.23 .... 24 0.00 24 0.00 0.00 0.00 Pipe-5 106.129 24 2.00 Cir .... .... 0.012 0.09 873431.21 0.82 0.00 4.98 0.10 24 0.15 24 4.53 0.00 0.00 Pipe-6 60.000 18 1.50 Cir .... 0.012 0.012 0.01 873448.40 0.85 0.10 0.43 0.00 18 0.15 18 0.49 0.00 0.00 Pipe-6(2) 132.000 18 1.50 Cir .... .... 0.012 n/a 873486.22 2.44 0.00 1.59 0.00 18 0.15 18 1.48 0.00 0.00 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date: 3/15/2023 NOTES: **Critical depth Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Page 5 MyReport Tc Throat Total Total Total Vel Vel Vel Vel Vel Cover Cover Storage Ht Area CxA Runoff Ave Dn Hd Dn Hd Up Up Dn Up (min) (in) (ac) (cfs) (ft/s) (ft/s) (ft) (ft) (ft/s) (ft) (ft) (cft) 5.0 6.0 0.15 0.13 1.13 3.14 3.13 0.15 0.15 3.14 n/a 1.69 8.08 8.1 6.0 0.77 0.69 5.31 4.91 4.93 0.37 0.37 4.88 4.31 3.97 51.18 7.9 .... 0.52 0.47 3.63 4.52 4.46 0.33 0.33 4.58 4.12 3.56 17.98 7.1 .... 0.06 0.05 0.43 1.64 0.77 0.10 0.10 2.50 3.71 3.09 10.41 5.0 .... 0.03 0.03 0.24 2.38 2.64 0.07 0.07 2.12 2.99 2.42 3.14 6.3 6.0 0.16 0.14 1.16 2.30 1.43 0.16 0.16 3.17 4.12 3.37 48.98 5.0 6.0 0.07 0.06 0.54 2.33 2.12 0.10 0.10 2.55 3.27 2.93 7.75 5.0 .... 0.43 0.39 3.40 5.61 6.09 0.41 0.41 5.12 3.71 n/a 9.37 5.3 6.0 0.23 0.20 1.75 3.55 3.53 0.20 0.20 3.57 3.21 2.35 5.33 5.0 6.0 0.10 0.09 0.77 2.46 2.10 0.12 0.12 2.82 2.25 2.58 3.06 20.3 .... 6.85 1.04 5.56 12.16 12.56 2.15 2.15 11.76 6.18 4.95 42.75 20.3 .... 6.85 1.04 5.56 6.59 6.59 0.68 0.67 6.59 4.20 3.60 18.85 20.2 .... 6.81 1.03 5.50 6.57 6.57 0.67 0.67 6.57 3.50 4.02 90.62 20.0 .... 6.77 1.02 5.47 6.56 6.56 0.67 0.67 6.56 3.92 4.01 297.10 19.8 .... 6.77 1.02 5.50 6.57 6.57 0.67 0.67 6.57 3.91 4.26 305.27 13.3 .... 6.50 0.98 6.29 2.00 2.00 0.06 0.06 2.00 4.16 3.17 333.35 12.4 .... 1.97 0.30 1.96 1.21 1.11 0.02 0.03 1.32 3.56 3.18 103.15 10.0 .... 1.48 0.22 1.59 2.25 1.16 0.17 0.17 3.33 3.08 1.62 122.36 Project File: 20064 Hotel Storm System.stm Number of lines: 18 Date: 3/15/2023 NOTES: **Critical depth Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm r/•iV• ••• .............• • • V•••V �co C c. 0 0 O— J co N Op03' m(}l CDp Ln (n V) c. Elev. (ft) o LT:, N �c) O-p W c WW m E > (y E> co E w cc 4048.00 4048.00 4045.00 • 4045.00 • • 4042.00 • 4042.00 4039.00 4039.00 • 4036.00 4036.00 22.359Lf 15"®0 4A% . 4033.00 4033.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm rI-V• •.• —V•V,V• • • V•••V CC N Cn .. Lc) 3 0 E E O C C O C C O E E O J J _ J J _ O co 0 NCC)LO 00 01--r- 0 0 a) C'N.CO m m Gn Vco 0 V"I N C')CO CO CO (h CO CO N N CO CO CO (+] Elev. (ft) o w v ^r 4•0 v m `rvc CD- 7vv N Nv O-p W O W W W +O W W W 0 W W W ,- W W m E > ca E>; m E>> as E>; w E > (00 E co E c c !o iicc m iicc u) Fe 4050.00 4050.00 4046.00 4046.00 4042.00 4042.00 / 4038.00 4038.00 4034.00 9� a I.OJ�r —4034.00 47.248Lf-18'a 0.55% — 22.395Lf-15"@2.01% 4030.00 4030.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm rI-V• ••• —V•V,V• • • V•••V =Q N CD N- 3 3 3 3 Q C C O.C E OE C 0 J Q aD W . r'-NOS') marN mO Q V e) N C7 arse) N �vs rs �es GI -Elev. (ft) o •w v �vv• ��� �� o-aw o Www Www s Ww co E > as E» w E» w E coo E in E c c co E c c us irk 4045.00 4045.00 4042.00 4042.00 4039.00 / 4039.00 4036.00 — - 4036.00 . ■ 4033.00 474$Lt-7 tS-@ 0.55% • -4033.00 4030.00 4030.00 0 25 50 75 100 125 150 175 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm rI-V• ••• --......• • • V•••V =Q m 30 E J C+E E 0 Q M 030) J O o v CV c,cfo j c! om Elev. (ft) o w•v o v-�v N v� o-a W o WWw o Ww co E > as E >; co E> rn0 E co EcE m ixE 4046.00 4046.00 4043.00 • 4043.00 • • 4040.00 • 4040.00 4037.00 4037.00 4034.00 4034.00 95421f-15"a1co% — 10.828Lf-15'@ 2.33% 4031.00 4031.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm r --. ••• SIV••V• • • Y•••V f0 Ct 0) CO r 7 7 7 7 7 7 �O c �. 0 ..c 0c c r pc c c Jp c Oc c 0 Q NJm Lo(0 _I VI r- 03 m0) v- JNN N10 O v.)(0 Nco J 0 so O(V N p NNN Q coNN GAD QNN NmCO CCOO �MC7 O NCO 0 CD Elev. (ft) o w v N v "c v7 0 °n)• v0 0 , vvv n NC.vv m• `ry O 16 W O W W W O W W W O W W W W W W N W W W N W W m E m E» m E» m E» m E>; m E» ca E>: oo c cn Ecc co iicc iicc co Ecc o iicc a Es 4045.00 4045.00 4041.00 4041.00 / / / I 4037.00 �1 —4037.00 4033.00 — I 4033.00 -- -r — r u/7191Lf- r 94.58911-14'a 0.50 4029.00 ^ 4029.00 ' 20.11/2L1-24"@i 0.49% — 17.372Lf-18"@ 0.52% 6.000Lf 24"@ 0.60% — 25.000Lf-18"@ 5i 32% 4025.00 4025.00 0 25 50 75 100 125 150 175 200 225 250 275 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm rI.V• ••• SI V••V• • • V•••V M In O a, (N r N 7 7 7 7 7 3 cNs S0 c �. Oc .. 0c c O. c Oc c O. c 0 0 ui O J mccn co J Nccor J U) J n70 J NO- J "r• p V N CO O MNN 0 MNN CAD MNN oicsi :Tr- MMco CCO MMM coN McO O 0 0 0 0 0 0 • Q Q O 0 0 0 0 0 0 0 0 Elev. (ft) Qo w v N v�� v�� °n' v�� �v •v�� sil v�� 0 a,,,r W W W a- W MWO-C7 W O WW O WW O WW IA (NI WWW W m E > as E>; as E>> m E>; m E >; m E» m E> o 0 c co E c c co ii c c co E c c U E c c co a c c A R E 4045.00 4045.00 s 4041.00 - 4041.00 4037.00 _ � 4037.00 4033.00 _.__/ —4033.00 / — S 9 1 RUL_f-1�-ar0.75% 4.589E -L4 le! ®.,09E 97 iLf-24" '" 0.50%--r 4029.00 —4029.00 I 20.032Lf-24"@ 0.49% 6.000Lf 24"@ 0.50't — 25.000Lf-18"@ 5i.2% 4025.00 4025.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Proj. file: 20064 Hotel Storm System.stm r/•iV• ••• .............• • • V•••V co ti m 7 7 3 a 3 O C O C E 0 c C 0 J J J N o%- ' INM ' mN� ' V� c) C)C) N Cn Cr)C) N QC)C) CV CO Cn() Elev. (ft) o v v v cci o �vv m �� w �_� O W WW WWW WWW N WW coE > > m E >; m E>; m E> cnE C c co E c c co E c c c EE 4052.00 4052.00 4047.00 4047.00 4042.00 4042.00 4037.00 - 4037.00 132. Ct-1©•61 ` % 4032.00 14_ �D —4032.00 106.129E - — 80.000Lt-18"@ 1.50% 4027.00 4027.00 0 25 50 75 100 125 150 175 200 225 250 275 300 HGL EGL Reach (ft) Storm Sewers DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB 9 / // ' DRAINAGE AREAS ` EXHIBIT 'c/4..O i' / IAii i / DI-5 i / \_, /O IMP:0 /'+C PER:0.266 / ��� IMP:0 / PER:5.019 �\ // / -..\...._ CB-10 \ // % I P:..119 V_� • R:..016 \ / �� 2 I P:0.094 / /`�.` E �.004 \ / V 0 ®� ram® '///..1m ,._: / \ / r1 �AV/I C.NN11 i 1INN1 \ / iv IL ' , CB-12 \ CB-:0.092 \ ' /r°°92 // \\ DI-7 ME ir ' \ // / \ IMP:0 _ PER:1.476 'olll, IMP:0.026 -- N\ CB-13 / — IMP ROOF:O , 77'I IMP:0.086 / \\ rr PER:0.0 f/ \ PER:0.0(Dd / \ '� , I \� '\ MP 0.0.' \ � ` -,A , - PER:0.003 ? , (I---IT \ i r 1.025 • IMP:Q.026 1.0 PER:.,' ill r - e ' ' 111• �pird . Iii lognik __. 4 / M-18 /W "EMI•hp -.. wi ®.. _ ji . PtR:0.009 L7 1 % dii: zi, \V� -r, N. DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB r \ OFF-SITE DRAINAGE y AREAS EXHIBIT I \\ ��'p'V / \ / \ / \ / \. / \ / \. / \ / \ \ / \ / \ / \ ' I /I I // I / � I I / I / ! / / � /./ j // / / 1 / / I / / / I / / / I / i / / , y / I Pr-5 I I �`v- PER:0. 66 DI-6 // 41r* _ IMP:O / / ; 777.7,,„_, PER:5.019 / / 10 IM P:0.1 /�/ N / PER:O :Q6/CB-9 / / ;/ IMP:0.09• / 8.4 `'`'" CB-12 DI-7 1 IMP:O.P•' IMP:O YI-15 PER:t.002\ PER:1.476 — e .. IMP: .026 - 1 \ f IMP OS :0.43 / R >> C A ' 6 486 4 0 03 / 1117• WA ' 5 YI CB-14 1 � „ • • IMP:O. 65 / 1 ■ t ii PER:I : _'i' PER:O.O03 7 * iw ,. � t / _ � I P:0 -1 .1.8E144 �l Arr► - __ DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB DRAINAGE AREAS EXHIBIT / } / , )) i - / % / / / / — CB—B1 / C I M P:0.208 / / PER:0.04• / / / , if i ...---" \-, 4.P ._. CB—B3 T Atio IMP:0.139 I - PER:0.0rcpinletJ 4,031.50' , Inv:4,025.2" \ \AI\ _ ___ �/ DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB SUPPORTING DOCUMENTS 20064 Courtyard Marriott- Banner Elk,NC DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB SCS Runoff Calculations Project:20064 Courtyard Marriott Location:Sugar Mountain,NC 2 S 1000—10 Q ((p+0 83) CN HOTEL PARCEL Soil Name and Product of CN Required Volume Cover Description Hydrologic Group CN Area(sf) Area(acres) Storm Depth(in.) x Area Weighted CN _ S(in.) Q(inches) (CF) Pavement,Roofs,etc. UdC-A 98 _ 57,631 1.32 1 Lawn,Landscape Areas UdC-A 39 5,814 0.13 1 — 134.86 93 0.80 0.430 2274.92 ADDITIONAL PARKING LOT Soil Name and Product of CN Required Volume Cover Description Hydrologic Group CN Area(sf) Area(acres) Storm Depth(in.) x Area Weighted CN S(in.) Q(inches) (CF) Pavement,Roofs,etc. UdC-A 98 _ 15,980 0.37 1 Lawn,Landscape Areas UdC-A 39 2,133 0.05 1 37.86 91 0.98 0.361 545.52 DocuSign Envelope ID:77B84443-26A2-4B3E-81EA-BC16A9AB34AB Site Location Map ..,.... ',,, . . . Courtyard Marriott -.0.. Village of Sugar Mountain, NC c: ... [Ij c!css ••, , •• .0,1(0,- ., -,, ' . y1 4400* -•••• I e- C,, t , ..,,„ 0 ...tras„ • et (1 co %,ICl/crlat° / - , 400 ft - 4b, - ,s Water LIA ; ... 1 , ,,. ......- ,- . 1.)nn villa 4370 ft Gap (1C Site e ,7-•., & -Ro 42.99'T Hotel Site .---7-- _-- ) /----.. ,. DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB z z OZ5L66E ObbL66E 09£L66£ 08ZL66£ OOZL66E OZI.L66£ Ot0L66E N M N w M..9S.6b oT8 M,.9S.6b oT8 O 0 N N— o CO O o a a w a U) 11:, i a N o a N ; V 4. c o tr• • N co L Zo ; ! s v T O C,I*. O I y CO _ I O co cl Q' F z 8 E� v co F 2 co '77. ' -..- -% .h t co + \' ( Q M .,! 0 N _ 4 8 w - ;,►, in 8 reD GI . Qo N • o 8 8 o:---, Y. P av t a)Sdill oM 8 0 y V 0 G a C C 0 O a N .� 5 0 04. � CeZ o o m O , g N21 4 z Z U 4 M..9Z.OS oT8 M,.9Z.OS oT8 QG11 0Z5L66£ ObbL66E 09EL66E OSZL66£ 00ZL66£ OZlL66E OtOL66£ NL z z o DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB N CO N 4- O 0 CO N N _cell CO > a) ° _- 2 co ... c0 Z O In co 2 u' m U U M co I a' a a coo a) m r ° co -o co co 3co U 'O Q U o L b -OTo O y 7 'O C U y a) a .Q 3 E co o N C O E Z a o m m ° o m � m m '9 ° ns E > � � o O E 6 'a a' 3 �n w N co 0 a cn ° co m a) ° . 2 @ ° E m m M a0 ° �' V oN o g Yw ..c O U O r O@ a' a' a) Ce N 7 0 Q 3 ° E as o U)) aZi -0 co z UN 3 a o m - w o cwt E3 c a CD -0 co z co < - o N 'sue m 0 � a �' E ° w � c von t 3 co a, Q a co ao aci r a ° m oN m a o LQ ° NEB °' o a) o mto ro ° m o D Zm c' LL N 9 O WI O a) O N Z 0 m m p Q O N u' Q O Q E Z C -o a) N V) w a U O 'a Q o a) ° • o ° V (n2 co I o v) a`�ia°i ° o m m m d o c o N Ea- c' — o °a o n m o aa' c U E co E o° m ° J In - % _ > > Tu y -° o p N E a O N fu Q N a' •• O `' < V c a)a) Q coO' a) p N 0 w a E rn H w a) Z ° ° m m aci:? :° cu a`> �'E o :rn 0 'c .-c >, el) L oo o c u' 6 L >, olc a' m 7 0f6° m0 co m o o > f3 L 'a) o cco co O6 23u) y3c ° m co >, f6 _cc0E O co ` E O) " E _ (n a> E @ O U O E O ;v O O 0 O. m � �• EoN � � �' ° 'oc ooa) m� oo � a ' 0 m taco O o c o a m u) a) , m w U m > ° >, o -- r °' �' rn u) O .E O' ? Q f` N u) 0 2 -2 ql N c i O- 0 (n a) E O p o -a a) c U N (0 .(L1 N C CO _N CO O >� ° �'O _4 Uti �' y — — +�'-' (Ni N E EO' H ,— > W E = c°' N a E (n > 0 2 Q-° Q co H O (n v) (n w— 0 cs H U _ o c0 c O >, co 0 c 3 r o Z o0 T >• > C (n c N O o n N $io Q ' c to > > • U t o co t m c a U aco a' _O co y N O o 2 co_ co 2 a g J y a) O O O L z O Q O- N E a' OO I 1 d (n .O > V1 N 'cl i N ct O @ a wO a) .) L O. N C l9 a' (n O N 2 (n (n > s O (n 2 U) O 0 2 J a Ci N o O N 3 2 0 • 13 nsco o H co W J N a c O N N a QC CO "N 0) C O C O a � -O G y a a y E Z. N a' a) 2 r- w o as S' to a ▪ °' 3 3 a) _ y ) o oo a > > > a a) .. COC o cp IA C mTorn > o O CO ( ` O _ _ NOO ( -O U- LO 0 a) >. ` O O )3 na Q O 5 CD > ) a c - O m Ya Oc N 2 O •O- •O C O O N 2 m O N > M C n N 0 O a' a) C "O u) co U) •o c ao 0 U 0 0 J J 2 2 2 0 II u) co co u) U) co a) a a) c.)a) N > CD Q co o 0 y o a) co D: T2 m c N l6 O Q Z U 1 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Soil M T—Avery County, North Carolina M ap Unit Legend Map Unit Symbol M p Unit Name Pores in AO I Rrcent of AO I BuD B urton-Craggey-Rock outcrop 0.3 0 .5% corn Flex,windswept, 15 to 30 percent slopes CrE C rossnore-Jeffrey corn ilex,30 14.1 2 2.7% to 50 percent slopes,very stony CuA C ullowhee loam,0 to 3 percent 0.1 0 .1% slopes,frequently flooded PnD P ineola gravelly loam,15 to 30 4.6 7 .4% percent slopes,stony SpD S pivey cobbly loam,15 to 30 12.4 2 0.0% percent slopes,extrem dy bouldery SpE S pivey cobbly loam,30 to 50 0.0 0 .0% percent slopes,extrem dy bouldery Ua U dorthents,loamy 35 5 .7% UdC U dorthents-Urban land 26.9 4 3.4% corn Flex,2 to 15 percent slopes h WhB W iteoak fine sandy loam,2 to 0.1 0 .2% 8 percent slopes Totals for Area of Interest 6 2.0 1 00.0% USDA Natural Resources Web Soil Survey 5/31/2022 Conservation Service National Cooperative Soil Survey Page 3 of 3 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB M ap Unit Description: Udorthents-Urban land corn{Iex,2 to 15 percent slopes---Avery County, North Carolina Avery County, North Carolina UdC—Udorthents-Urban land complex, 2 to 15 percent slopes Map Unit Setting National m ep unit sym Lol: Idc7 Elevation: 1,090 to 3,500 feet Mean annual precipitation: 60 to 68 inches Mean annual air tem prrature: 46 to 57 degrees F Frost-free period: 100 to 176 days Farm and classification: Not prim efarm land Map Unit Corn position Udorthents and sim tar soils: 50 percent Urban land:40 percent Mnor corn penents: 10 percent Estim des are based on observations, descriptions, and transects of the m anunit. Description of Udorthents Setting Down-slope shape: Linear, convex Across-slope shape: Convex Parent m aerial: Loam yand clayey m he spoil or earthy fill derived from m etasedim eltary rock Typical profile C- 0 to 80 inches: channery loam Properties and qualities Slope: 2 to 15 percent Depth to restrictive feature: M cre than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the m ast lim ting layer to transm t water(Ksat): High (1.98 to 5.95 in/hr) Depth to water table: M cre than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: M cderate (about 7.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil G pup: A Hydric soil rating: No USDA Natural Resources Web Soil Survey 5/31/2022 Conservation Service National Cooperative Soil Survey Page 1 of 3 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB M ap Unit Description: Udorthents-Urban land corn{Iex,2 to 15 percent slopes---Avery County, North Carolina Description of Urban Land Setting Parent material: Streets, parking lots, buildings, and other structures Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8s Hydric soil rating: No M nor Corn ponents Lonon Percent of m unit:2 percent Landform:Fans on coves, drainageways on coves Landform position (two-dim ensional): Footslope, toeslope Landform position (three-dim ensional): M cuntainbase, base slope Down-slope shape: Linear Across-slope shape: Concave, linear Hydric soil rating: No Brasstow n Percent of m gp unit:2 percent Landform:Ridges Landform position (two-dim ensional): Sum mi, shoulder Landform position (three-dim ensional): I nterfluve Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No Junaluska Percent of m unit:2 percent Landform:Ridges Landform position (two-dim ensional): Sum mi, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No Thurm ont Percent of m unit:2 percent Landform:Drainageways, coves Landform position (two-dim ensional):Toeslope Landform position (three-dim ensional): M cuntainbase, base slope Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: No Tsali Percent of m unit:2 percent Landform:Ridges, ridges Landform position (two-dim ensional): Sum mi, shoulder Landform position (three-dim ensional): M cuntaintop, interfluve USDA Natural Resources Web Soil Survey 5/31/2022 Conservation Service National Cooperative Soil Survey Page 2 of 3 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB M ap Unit Description: Udorthents-Urban land corn{Iex,2 to 15 percent slopes---Avery County, North Carolina Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No Data Source Information Soil Survey Area: Avery County, North Carolina Survey Area Data: Version 27, Jan 21, 2022 USDA Natural Resources Web Soil Survey 5/31/2022 Conservation Service National Cooperative Soil Survey Page 3 of 3 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Map Unit Description:Crossnore-Jeffrey complex,30 to 50 percent slopes,very stony---Avery County, North Carolina Avery County, North Carolina CrE—Crossnore-Jeffrey complex, 30 to 50 percent slopes, very stony Map Unit Setting National map unit symbol: Id96 Elevation: 2,640 to 4,080 feet Mean annual precipitation: 48 to 60 inches Mean annual air temperature: 46 to 57 degrees F Frost-free period: 100 to 150 days Farmland classification: Not prime farmland Map Unit Composition Crossnore, very stony, and similar soils:45 percent Jeffrey, very stony, and similar soils:40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Crossnore, Very Stony Setting Landform: Mountain slopes, ridges Landform position (two-dimensional): Summit, backslope Landform position (three-dimensional): Mountainflank, mountaintop, side slope, nose slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metasedimentary rock that is affected by soil creep in the upper solum Typical profile A -0 to 7 inches: gravelly sandy loam Bw- 7 to 22 inches: gravelly sandy loam C-22 to 30 inches: gravelly loamy sand Cr-30 to 80 inches: weathered bedrock Properties and qualities Slope: 30 to 50 percent Surface area covered with cobbles, stones or boulders: 1.6 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Drainage class:Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 3.3 inches) Interpretive groups Land capability classification (irrigated): None specified USDA Natural Resources Web Soil Survey 3/14/2023 Conservation Service National Cooperative Soil Survey Page 1 of 2 DocuSign Envelope ID:77B84443-26A2-483E-81 EA-BC16A9AB34AB Map Unit Description:Crossnore-Jeffrey complex,30 to 50 percent slopes,very stony---Avery County, North Carolina Land capability classification (nonirrigated): 6s Hydrologic Soil Group: B Ecological site: F130BY003WV- Mesic Residuum Cool Aspect Hydric soil rating: No Description of Jeffrey, Very Stony Setting Landform: Mountain slopes, ridges Landform position (two-dimensional): Summit, backslope Landform position (three-dimensional): Mountainflank, mountaintop, side slope, nose slope Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metasedimentary rock that is affected by soil creep in the upper solum Typical profile A -0 to 9 inches: gravelly sandy loam Bw-9 to 31 inches: gravelly sandy loam R-31 to 80 inches: unweathered bedrock Properties and qualities Slope: 30 to 50 percent Surface area covered with cobbles, stones or boulders: 1.6 percent Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class:Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 3.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6s Hydrologic Soil Group: B Ecological site: F130BY003WV- Mesic Residuum Cool Aspect Hydric soil rating: No Data Source Information Soil Survey Area: Avery County, North Carolina Survey Area Data: Version 28, Sep 7, 2022 USDA Natural Resources Web Soil Survey 3/14/2023 Conservation Service National Cooperative Soil Survey Page 2 of 2