HomeMy WebLinkAboutSW5220801_email_20220725 Peck, Kaitlin From:Farkas, Jim J Sent:Monday, July 25, 2022 1:47 PM To:Matt Lowder; gventers@vanguardpg.com Cc:Valentine, Thad Subject:Dollar General - Chapel Hill Good Afternoon, We received your application for a new post-construction stormwater permit on 6/29/2022. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 8/24/2022) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  Contact information (email address and phone number) for the Property Owner. This item is required per 15A NCAC 02H .1042(2)(a)(ix).  1x hard copy of the complete Application Form. This item is required per 15A NCAC 02H .1042(2)(a). An original, notarized signature is required in Section IX of the Application (since the Property Owner is not the Applicant).  1x hard copy of the property deed. This item is required per Section VI, 10 of the Application.  2x signed & sealed hard copies of a plan sheet showing the following:  Drainage areas to the proposed SCM. This item is required per Section VI, 8o of the Application and 15A NCAC 02H .1042(2)(g)(iv). It is noted that the drainage area is included in the calculation booklet, however, this requirement specifies that the drainage area delineation must be included in the main set of plans. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. - You may wish to reach out to Orange County as they may implement the post-construction program within the unincorporated portions of Orange County that are also within the Jordan Lake Watershed. If Orange County is not implementing the Jordan Lake Rules at this time, the State will handle the review. NOTE: Please do not send submittal materials to the Regional Offices, doing so delays the review process. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. 1 Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 2