HomeMy WebLinkAboutNCC231869_ESC Approval Submitted_20230707 ROY COOPER d°.STATE' '
Governor
ELIZABETH S.BISER r 1- t
Secretary
y`�xn
BRIAN WRENN "
Director NORTH CAROLINA
Environmental Quality
January 27,2022
LETTER OF APPROVAL
Burleson Development Group,LLC
Attention: Joseph Burleson
248 Market Street
Locust,North Carolina 28097
RE: Project Name: Forrest Creek Phase 3B(Express Review)
Acres Approved: 10.1
Project ID: STANL-2022-023
County: Stanly
City: Oakboro
Address: Hatley Burris
River Basin: Yadkin
Stream Classification: Other
Submitted By: Burleson Development Group,LLC
Date Received by LQS:January 25,2022
Plan Type: New
Dear Mr. Burleson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval.The enclosed Certificate of Approval must be posted at the job site. This plan approval shall
expire three(3)years following the date of approval, if no land-disturbing activity has been undertaken,as is required by
Title 15A NCAC 4B .0129. ,
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI)form requesting a Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the
form is reviewed and found to be complete,you will receive a link with payment instructions for the$100 annual permit
fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the
FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eN01 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
D.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Mooresville Regional Office I G 10 East Center Avenue,Suite 301 I Maorrsville,North Carolina 28115
704-663-1699
iamb
Letter of Approval
Burleson Development Group, LLC
January 27, 2022
?age 2 of 2
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO 1 permit and the COC,once it is received.
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural
resources and adjoining properties. If,following the commencement of this project,the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations,and rules.In addition, local city or county ordinances or rules may also apply to this land-disturbing activity.
This approval does not supersede any other permit or approval.
'lease note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility
r'orm,which you provided.You are requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
James Moore
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGO I Fact Sheet
em: bfay@american-ea.com
cc:Inspection Department
F------ : : 14 ut ti.bi 4tti
: to CJ +,
csl. et •_, _.) ; 1,-4
°a 1 \..,.,..) o
® O 4 M CV qw)gcn ' N
M.. ' r-; A ct .rr Q
^ '
'' t -..s a.) ii• „) aZ ''Itic
® II1
Cl� O Q O Q ��
7 � V\i)
pp/ 0 ,-.4 - w) .....f
pq
e:'' �p,y „ . r•.0 i -rr .,0 .jai (� l
C -.v ti,-,,,-- -) le
ram, L�ae CC (.. .4..) J
rdi O CV rl •.4
41t 1 P-1 al..)
•~ 'V J
•� O
1
° L �L.
. =
v V o `� E
E"� '
•o ,> u ? N 4
y 6' L, CC O • Q v
w U Z" O V ^ v 4, CC
L.,
V) .+ .
- •: = n =f o
4.4 .+.d •- O V
CV Lo