Loading...
HomeMy WebLinkAboutNCC231981_Site Plan or Location Map_20230707 o CONSTRUCTION SCHEDULE \ ,0' / / . Obtain all necessary penults and plan approvals Erosion and Sediment Control / /^ // TV (E&BC)permit and a COO,.of Coverage(CAC)moat be obtained before any land Nenubing activities \ ,M ..s 8\ occur.A copy of the E&SC permit,the COC and a hard copy of the plan moat be kept on site,preferably in a ........ \ \ \ /• / / //`- / / b Permits box,and eta timle during IsIf ,lion. \ \ \ \ / / / 2. matall gravel annarroetinn enrcanere ems Nm silt fences,reinforced out Anne outlets and wattles 4. Beginiagradinganexca aaonectiv areas nn the lnmaamey are started. SODDING \ \ \ / � io, 5. Begin or continue with house construction activities. \ /J 6. Pinish all rough)padivg and homaz conawction. (/ I/po ]. install drivewaYa,walks and Patios. �� LEAVESPACESAND0.0 \ \ ✓ II/4P9 'TA° 8. Begin fine grading of lot areas ^^'� \ \ \ \ �� / I I ,)0�' 9. Final grassing,mulching and lace tiring of of i In most cases this will involve the installation of sod on the lot % 6 t The silt fence will remain in place until the lot is sodded or gassing is stabilized and lakes hold. �� cxos FOR TUCKING DOWN TNE enor„lalrnixa vlcccs. \ 3. fP 10. The contactor shall conduct self-inspections of the erosion and sedimentation control measures and complete I Q the following combined self-inspection form found on the DEMLR webs, IMAM e - \ \ Fs hoop//fi / deq/Enerm%20Mmeral%20avd%20Land%20Resourees/S MPDES%20 \ I SITE Gen I/20P DEMLR CSW MoniWdng Fo ins Rev Aug st 8 2019pdf.Twelve h (complete D \ e 'nsp f M1 II b kep [e end available for inspec' II f dN copy be \ N L keptperm.' b (G5113A 541()15A NCAC 04B 013E NCGOI Pao III Sections A dA) �/ " I] Self-Inspections f d N 1 b performed I every seven r+` \ / / p� calendar daysd -ti 24h f every t of greater h eainch.Ay needed p- hall be f \ 11\ �Tp mad immediately de goad All ESCshallb d specified in / / / i }�a`PS--` the dem'1 N plan.A gauge shall b [ailed h protectf rig 12. Inspectiond final p I Whenh protect complete,h p shall DEMLA to 1 clo he E&SC PI After DEMLR informs the nomineeof the protect I inspection report �� f111 / thepermhttee shall visit daq vc.govMI;A01'to submit an el Nonce of termination(a NOT)Ag100 ,« l ''. , FAETTE LE AD U - annual general permit fee will be charged until the NOT has been tilled out Il;e� JOHNSONM9tRa pI„�aul ,h,Nli / v GROUND STABILIZATION wlmrxaarla .:ro �.` _" mow wilEN THE SOD IS Mowaa \ / / \\\ SITE AREA STABILIZATION EXCEPTIONS wa lax APPEARANCE OF GOOD SOD wE / \\ / / / VICINITY MAP DESCRIPTION TIME FRAME / \\ N.T.S. PERIMETER DIKES, 7 DAYS NONE L. / / \\ / SWALES, DITCHES ., \ &SLOPES `� as°"`. / \\\\ ��(� \�\ HIGH QUALITY 7 DAYS NONE tiara \\ (P5(S \\ \ �,, WATER ZONES reewe'oP.°'°'"`"' `/ (HOW) oaa ra re".�aanraer — —> L. \ \ \\ �(P \\ r a-msar�,xwTM n°°a aawaa. N/ \ SLOPES STEEPER 7 DAYS IF SLOPES ARE \ \\ i \\ _/ / A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10'OR LESS IN L I \ \\ `( \\ NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE \\ rG \ COMPLETED AS AN EXCEL SPREADSHEET. NOT STEEPER GeneralErosion Control Notes / /^� I `� \\ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 / \ \ /�{��' \ /�— EROSION AND DAYS ARE 1.Only the areas shown shall be disturbed. I \ \ \\ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED 2.All disturbed areas shall be grassed and \ I I \\ \\ NCAC 04B.0131 STATES MEAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY mulched ass n as possible and maintained \ \ I \\ \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR until pemanent cover Is established. APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER \ \ \ \\ \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN \\ 1 PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION LENGTH \\\ I I 1 \ \\ CONTROL PLAN." swintki ALL OTHER AREAS 14 DAYS NONE(EXCEPT \ II I I \ I \ \ \ 1 �\ WITH SLOPES FOR PERIMETERS 1 FLATTER THAN 4:1 AND HOW ZONES) BROOKSTONE PARTNERS,LLC t I I 1 \ DB 1436,PG 854 \ (FUTURE DEVELOPMENT) r I I I \ / DATE PAGE: / / / r BROOKSTONE PARTNE•5 LLC S S /virtue 8 5 / ll rvoT DATE: PAGE: \ FLow-.1t.7 �I �I t tar OB 1436 PG 8 qqII�� a PIS 4173 PG r EMI II.. eh. Il�I (FUTURE DEVELO' ENT) I II-:IIF z.2Z Pintto the deslred le..such that logs do nat deform �(' �I Stakes I ' Stakes 3. 1 1 should be installed parallel to ^' e c p C 7, 1 / SECTION SECTIOgraopeN (U we ff� ll Jl � �a--� r qL'S i ��. P-✓� -�� / �"� �1 �� � land kflat minimum edallowupsl located � ff _� � �.� �_� �0 r NO. 00. m.w.going around Me end of the RW 4 Oak or other durable hardwood stakes with a 2 R ll ll ^°s a \ \ 'L HI Inch x 2 inch cross sectlon should be Omen verhcally plumb,through the center of the al" ti („;\ f0 R �RAV Z2AV �RAv �R? AV z RINAV RAY �RZD V / \ \ \/ $,c_ IO0 �P an \ Trench in \ /Wood Mulch \ \ or Com ground a Min. Ire Bata° paced in ed into Le°ae°rcuae Notes: / /2 height of 9 5 xenie when Il nee ys� CU INLET 1.Ifneeded,Tree Protection fendng should be installed along the butter zone,wetland \ \ \ 1 / 9-1 \ INconcrete blocks shall be used behind.silt boundary and/or around protected trees,providing a radius of at least 1.25 feet for each 1 / \ \ 1 '"'°'""`""°"""""°'°`°'®"""`m'°°""`"'°""""'"'X1z' oida place d g off events. LEGEND inch of trunk diameter. \\ \ / \\`., Lot Plan \ / ISOMETRIC VIEWMAINTENANCE 2.Install Silt Fence on the low elevafion sides of each lot.Install Silt Fence outlets shown on 1 \ \ //I' °N'" N schematic/diagram and field adlusted,if necessary,for placement at low points.If lots are \ \ BROOKSTONE PARTNERS,LLC _ ontiguous and have tlifferent land owners or builders.each lot should have individual Silt \ \ \ \ ^0 \ 98 De,436.PGB54Mulch or°mom ant oa wino now RAIEs ea a Fences. I`\ zj - ' \ [Plan / ORE 172,PPG 007 O nr Ontrenened Area To Be Prote g=tll. (,6 s(wo�m)(oln4(lt, a(�sD 2' age must be replaced R clogged or IY 3.Install requTed Slit Fence within l0 feet of property line tin ensure there is nD conflict with ` \ \ \ Lot Plan o„F„ IFO ENT) N�needed to albw for adequate rim) nml ENTwm septicsystem.ItiameresponslbirtyofthebuildertoensuretheInstatiaurnofsediment \ 411k73 72 \.. "q^ \ N l Sheet Flow—� t seek control measures does not impact the septic system and repair area(s). \ \ \ \ \ O M IJ Silt Sock/xLenyuhm(axj (iasrmj(usrm) I`Mo Ike„ 1`ssxto 2 e CURB INLET q.At least Construction Entrance/Exit to be installed [ O, Wattle (.Tin m) fees m) (am m) - per o. `y Work Are "y°'°„II`n'. s soon bee.den adumulam 5.Waste bins and other areas dedicated for managing building material waste shall be at \ \\ �,[l, � —� q Z B "• 7%a of„,‘,.- Im%a m%a m%a mmpeleeinsp and eced above the least 50feet away from storm drain inlets or drainage ditches unless it can be shown that \ V m.ov n a m9 (( (ea rh/r (a74 a disturbance tint tab/'d no other alternative exists.If this separation cannot be achieved,these areas must be ` \ \ \ \ �1 \ ///;;; \ \ • / \ /m/m) /m/m) /m/m) /m/m) /m/m) contained behind Silt Fence. \ \ \ \b �'dk j \"c=Enar°rt me°t°Ljpe9 ILT SOCK/WATTLE FOR PERIMETER AND INLET ePROTECTION &Inlets downstream of disturbances should be protected;streets should be swept when ` N. \ \ I 100 sediment from the construction activity is present. ..\NC-En vironmen tol.jpeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are \ \ \ \ \\ \ \ \ provided on additional sheets Erosion and sediment Control details are not drawn to scale. 7.U1 \ TYPICAL LOT LAYOUT WITH CURB AND GUTTER ^ DATE: - -° Filter Fabric PAGE: \\ \ \ \�\ \" \ \\ 101 Steel Pon DATE: PAGE: ) 7I 1 \ \ Wire B ckflll trench \ \ \e Wire Fence , I' and thorou Compact B8�T \ \ a •J k Steel Posthly / \ \ MA8 ER ASSpCIENGINC\ ` \ /I' DB41 T3DDNN B8]\ \\ 41 k tom Up slope . - ,PPSP111111' -w.e ties 036 ,i t \ \ \ \ t t r Sd a4� darogw • a�in Qv�;`c / '� pM w'F,Mm \� ��� \ �\ \ \ 7 \ Fabric _ e�h v v F CROSS SECTION VIEW / ��• \\ `\\ \\\ \ \ \ G91a38,PG 851 1 \\ \ \ \ 3.PG 00] e.:em..,..d za eu. wm:.°•nKo•"n...cue,went. ...a°xl kite, � • W r.• \M \ w. (FUTURE DEVELOPMENT) I e°a°wba°n. 6Mn I 11 -�' \` \\ \ \ I I \ \ \ \ \ l\ . an• inn P .w•.,..n.•a.,e� / � dde%` \ \ `6 a afmlwe� 0„,4 .l. d°em�mr raw compactsetl ion cam"marmnure yy y \ \11 \ 1 \ \ \ \\ \ me��mn ,r e. Hwd,�drmd 1.Clear the entranceraneettotoolyta ea e of roe gB agMSandthherobjectioebe pen da�reach,mm�rgeaterlafaConstrued.. MaIntenance 1 �� \\ \ \ \ ) the hown Me 4macsmo eN«galanitnowa<Iam or a Hoaxe make any required repavil ate sped washed tracked \ \ \ \ \ ) / NG_EnY al.jpeg mkt,. P or kWh le,Ianle_h 4 me,ew 11 1 v ) Pm III11 � \ \ \ \ \ l lid SILT FENCE tie ° ( I C5 1 vie-6ivirl inieldul.jpey ) I 1 \ \ \\ \ \ I \ I ' DATE: PAGE CONSTRUCTION ENTRANCE/EXIT / I I I I ,/ I 1 \ \ \ ` \ \ 1 1 i I l Il/ I PAGE 1 of 2 MIN. _ /sioerENCE + TOTAL DISTURBED ACREAGE: 0.74 ACRES T , L .11111111.11111111.111111111 ` - MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOT EROSION CONTROL PLAN I i • — — LOTS 90-92 & 98 General-All measures will be inspected and corrections made after runoff producing rainfalls or at least once per week minimum.The builder will insure that the construction activities on an articular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates,measures will be p p g p any y y BROOKSTONE VILLAGE TxE wasNED I j - relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. - I - Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all PHASE 1 STEEL FENCE ST objectionable materials spilled,washed,or tracked onto public roadways. ................._ FOR WIRE FEN HARDWARE CL TH FRONT VIEW Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure .._...._...._... � Y WIRE FENCE, FILTE that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. CAV I N E S S & CAT E S BUILDING WASHED sroSET MAX CLOTH IN TRENCH APAR Sodding-The sod should be property maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth AND DEVELOPMENT CC). AND HARDWARE FILTER oF� GROUND FD FABRIC GROUND MIN 18.INTO Soto and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. ON MCLAUCHLIN TOWNSHIP HOKE COUNTY ems_reth e.should Stoneon Iow elewnon ama.mainlenm inchesld overlay the slit fence at least 1P Grassing and Mulching-The area to receive grassing and mulching should be properly feAilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be _ 0o`17�� on.conditions. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. SCALE:1"=1 00' JUNE 2023 GRAPHIC SCALE 1.Per NOG°,inspect outlet at lest once a week ,nr et �e1 inch Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed BURY WIRE FENCE AND RARDWA CLOTH NLTEREABRIc'''''''E....EOB`'rO ranee. sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. -too o 5u men meek tree eons prortoe nee,.now 4 Rooms moment..half Wad..outlet is covered II 5.Replace atone as needed m facilitate de-watering. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all q"" SECTION VIEW fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) J.. ���deg SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC.1115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 -r.-r NC-En C Enrrr enL PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:6/1/2023 6:57 AM LAST PLOTTED:6/I/2023 8:01 AM PLOTTED BY.Dennis Gabel FILENAME:G\CURRENT JOBS\CAMNESS AND CATES DEVELOPMENT INC\23-2017-01 BROOKSTONE VILLAGE-EC\PLANS\BROOKSTONE EC-LOTS 90-92&98.DWG