Loading...
HomeMy WebLinkAboutSW5221101_Cover Letter & Permit_20230213 ROY COOPER Governor ELIZABETH S.BISER afi Secretary DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality February 13, 2023 Hurt, LLC Attn: Michael Hurt PO Box 9038 Rocky Mount, NC 27804 Subject: Stormwater Management Permit No.SW5221101 Cedar Creek Apartments High Density Project Franklin County Dear Mr. Hurt: The Raleigh Central Office received a complete State Stormwater Management Permit Application for the subject project on November 16, 2022. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit Number SW5221101 dated February 13, 2023, for the construction of the built-upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until February 13,2031 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter, attachments,and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the ing fee(if a filing fee is required) and/or the details of the filing process at 6714 Marl Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Bill Denton at the Raleigh Regional Office at(919)791-4206, or by email: bilLdentonn 2�nedenr.�=ov. Sincerely, Jim Farkas Environmemal�neer Division of Energy, Mineral and Land Resources Enclosures: Application Documents Certification Forms cc: micnaelihmiG?hm4ore.c_o_m_ phi I Igo n m tck,~•<i�n 2.cotn 'i�m_f tih iz it-ncdencaa� Raleigh Regional Office Stoanwater File North Carolina Department of Envii.ranernal Quality l Division of Energy,Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington,North Carolina 27889 o. c�re�.:aga:u.,,w awn 252.946.6481 , STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143,General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Hurt, LLC 201 N. Winstead Ave,Suite D Rocky Mounty, NC FOR THE construction,management, operation and maintenance of built-upon area draining to one wet pond ("stormwater control measures" or "SCMs") discharging to Brandy Creek, Class B- NSW waters as outlined in the application, approved stormwater management, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the"Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved?Tans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until February 13, 2031 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification,transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 62,547 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCM has been designed using the runoff treatment method to handle the runoff from 62,547 square feet of BUA within the delineated drainage area. This permit does not provide any allocation of BUA for future development within the delineated drainage area. North Carolina Department of Environmental Quality Dni,For.of Cne qii— Y ,Mir eral and Land Resources _ Washiogtran Reyfonal Office 1943 WaslaF9ron Sqn reMall= Washings North Carolina M89 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCM is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This SCM must be provided and maintained at the design condition. b. FOUNTAINS. At this time,a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. c. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. 4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 30-foot wide vegetative setback must be provided and maintained in grass or other vegetation adJ'acent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers,and from the mean high waterline of tidal waters, perpendicular to the shoreline. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs,and maintenance accesses must be located in public rights of way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of- way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS.The final recorded plats-must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. North Carolina Deparfi ento Environmental Quality Div Monof Energy:Mineoal and Land Reoource5 ~�^ Washington Regional Office Was'ungton North Carolma27BS9 a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM,the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8. MODIFICATIONS. No person or entity including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans,specifications,and calculations including, but not limited to,those listed below. For changes to the projector SCM that impact the certifications,a new or updated certifications), as applicable,will be required and a copy must be submitted to the appropriate D Q regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition,lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating,redirecting, regrading, or resizing of any component( the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material within the common areas to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 5; North Carolina Department of Enviromnental Quaut Divlslnf Energy Mineral and Land Resources _ 25 Wasfim9ten Regional Office t 9?34Y sNngron Squat e Dull: Washangton North Carolina 27889 251.4466481 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans,then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement, iii. Unless already provided,a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approd plans,the permittee shall submit an application to modify the permit with iven 30 days of completion of the project or provide a plan of action,with a timeline,to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement,to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions.. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date,activity,name of person performing the work and what actions were taken. 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate appplication, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information U date A lication Form to the Division within 30 days to making any one or more of the fo owing changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. y', Noa'thC.,ro(ina Departmentor@nvCoomental Quaity Divisienof Energy.Mireratm.d land Resources 1/ Washir gton^aegioeal Office i 3 3 W'ashmaton Square Mail ! Washington,Ncath Carolina 27889 YY 257,9466481 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate appplication, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted uponoccurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part; ii. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; iii. Bankruptcy; iv. Foreclosure, subject to the requirements of Session Law 2013-121. b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved pplans, application, supplement, operation and maintenance agreement,all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. d. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. i Noetn Carolina Deparfrcenr or Eavironmen[il Qualitti Division or Erie Gy.§lineial and Land Resources 'D_E Was;iinat on Reg onal Crtrice i 943 War ing en Squar Nell; Washinaton.Noi th Carolina 27889 �.0 252446_0481 f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances,which are imposed by any other Local, State or Federal government agency having jurisdiction.Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1,and subject to enforcement procedures pursuant to NCGS 143-215.6. g. ANNUAL CERTIFICATION: The Permittee shall electronically submit to the Division an annual certification, completed by either the permittee or their designee, confirming the projects conformance with permit conditions. Permit issued this the 13th day of February 2023. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION .,Doug Ansel, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW5221101 r (( North Carolina Deparnnent of Environmental Quality ; Drvislor,fi°ne qy Mineral a a and Resources Washington Regional Office ; 943 W i_hing[on Square Mali i WasLi�g cr,Vorhh Carolina 27889 252946b481