Loading...
HomeMy WebLinkAbout20230580 Ver 1_More Info Received_20230706lake Lo N4 (AtFUflAGrtOi/ ialWaWrloivel) V,J1*4e7 LAIV(4 loot H� &WAw7� n f UII Pond/ NarMr ShaI Uf/�e Le i 14' Age ma's i "6q7 ,�e 4Pa106sAI_ SITS' A?ZtV, - oV A please apProxf adelysicetch the following information on this flan (pro�rid� dirrens►n r�er, Such �s �� ftac �oO,tJ=: rrsforesch� �! . All PMPOsed vegetation clearing . Location of rip rep or if to be placed above the Full Pond/°Normal Water Level el 3. ' Location of rip rap 06 filf to be Placed below the Pull Pond/ Normal Water Lev evatlon • location ®fariy proposed ructures such as buildings; "retaining walls, docks, etc elevation 5- Location Of any excavation or dredging below the Pull Pond/ Normal Water revel elev 6° LocatfGn Of construction access corridors atlon FORM: SSCP '± c-2013 page 3 a1 3