HomeMy WebLinkAboutSW6230701_Supplement-EZ Form_20230706 SUPPLEMENT-EZ COVER PAGE FORMS LOADED 'PROJECT INFORMATION 1 Project Name Dunn Operations Center 2 Project Area(ac) 34.32 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 1.48 5 Is this project High or Low Density? _ High g Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 I Width of vegetated setbacks provided(feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StornFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jeremy Wooster,PE,Technical Manager 28 Organization: McAdams 29 Street address: 621 Hillsborough St.Ste 500 30 City,State,Zip: Raleigh,NC 27603 31 Phone number(s): 919-361-5000 32 Email: wooster@mcadamsco.com Certification Statement: I certify,under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 0t)tli/f17�, ..\4\\ CA• 0, ``OEss/• ' �2 '� • A. SEAL r • - w Designer � Des' ner • 048394 _ /c . FHGINti:' �: //� JI I IINOO\\` - ZQ 2.3 Seal Date DRAINAGE AREAS 1 I Is this a high density project? Yes 2 ! If so.number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so.number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 'Type of SCM Wet Pond Wet Pond 5 I Total drainage area(so ft) 958,748 266,723 6 1 Onsite drainage area(sq ft) 958,680 191,901 7 IOffsite drainage area(sq ft) 68 74,822 B Total BUA in project(sq ft) 947430 sf 856572 sf 113805 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 947430 sf 856572 sf 113805 sf 11 Offsite BUA(sq ft) 12632 sf 5961 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 686862 sf 686862 sf -Sidewalk(sq ft) 175937 sf 70702 sf 105235 sf -Roof(sq ft) 101617 sf 99008 sf 2609 sf -Roadway(sq ft) -Future(sq ft) -Other,please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided 13 lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 63% 86% 40% 19 Design storm(inches) 6.8 in 6.8 in 6.8 in 20 Design volume of SCM(cu ft) 65556 cf 6942 d 21 Calculation method for design volume SA/DA SA/DA ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1'i Drainage area number A B 2fMinimum required treatment volume(Cu ft) 65556 cf I 6942 cf GENERAL MDC FROM 02H.1050 31,Is the SCM sized to treat the SW from all surfaces at build-out? I Yes Yes 4 Is the SCM located away from contaminated soils? I Yes Yes 51 What are the side slopes of the SCM(H:V)? 3:1 3:1 6'Does the SCM have retaining walls,gabion walls or other engineered No No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? Is there an overflow or bypass for inflow volume in excess of the Yes Yes 8 design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes yes 15 Is there an O&M Plan that complies with General MDC(12)? 1 yes yes 16 Does the SCM follow the device specific MDC? yes yes 17IWas the SCM designed by an NC licensed professional? yes yes WET POND MDC FROM 02H.1053 18i Sizing method used SA/DA SAIDA 191 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 210.00 221.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 210.50 222.00 22 Elevation of the bottom of the vegetated shelf(find) 215.00 227.00 23 Elevation of the permanent pool(fmsl) 215.00 227.00 24 Elevation of the top of the vegetated shelf(fmsl) 216.00 228.00 25 Elevation of the temporary_pool(fmsl) 217.53 227.38 26 Surface area of the main permanent pool(square feet) 22906 22722 27 Volume of the main permanent pool(cubic feet) _ 88969 cf 67633 cf 28 Average depth of the main pool(feet) 3.88 ft 3.26 ft 29 Average depth equation used Equation 2 Equation 2 301 If using equation 3,main pool perimeter(feet) 31 If using equation 3,width of submerged veg.shelf(feet) 32 Volume of the forebay(cubic feet) 17603 cf 13524 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 6 in 12 in 35lDesign volume of SCM(cu ft) 376936 cf 330137 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 3'Lx0.5'H 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.41 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes Yes 43 Depth of forebay at entrance(inches) 60 in 60 in 44 Depth of forebay at exit(inches) ` 40 in 40 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft _ 6 ft 47 Slope of vegetated shelf(H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the Yes Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes yr,24-hr storm? Are fountains proposed?(If Y,please provide documentation that No No 50 MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? I Yes Yes 53 Species of turf that will be used on the dam and embankment I See Plans See Plans 54 Has a planting elan been provided for the vegetated shelf? Yes _ Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Species of turf will depend on when it is planted,see sheets C9.04 and C9.09 in the Plans for more information.