Loading...
HomeMy WebLinkAbout20190788 Ver 2_Minor Variance_20230705K�ZWcucr C' I I I � T - I 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Protection and Maintenance of Riparian Areas Rules - Variance Application E-FORM: VAR 10-2018 Submittal Application dated 7/5/2023 A. General Project Information For instructions on how to fill out this form, see the Major and Minor Variance Help Document posted on DWR's 401 & Buffer Permitting page. Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. 1a. Is this a transportation project?* Yes No B. Please Identify Which Riparian Area Protection Rule Applies: ......... ......... ......... ............. 1. Type of Variance: Major Variance Minor Variance Link to the 401 and Buffer Permitting Statues and Rules: https://deq.nc.gov/about/divisions/water-resources/water-resources-rules/401- certification-express-review-statutes-rules-guides Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) C. Applicant/Owner Information Who is submitting the application: * Primary Contact: Primary Contact Email Owner Applicant other than Owner Agent Check all that apply. Kevin C Martin This is for who should be notified if a payment is required. kmartin@sandec.com 1. Property Owner: 1a. Name:* New Trinity Missionary Baptist Church 1b. Title: Deacon (Michael Sims) I 1 c. Mailing Address:* Street Address 115 S. Robertson St. Address Line 2 City Clayton Postal / Zip Code 27528 1 d. Telephone: * 919-606-5012 1e. Email Address:* michael@ttcreativegroup.com 3. Agent Information: 3a. Name:* Kevin C Martin State / Province / Region NC Country Johnston 3b. Company Affiliation: * Soil & Environmental Consultants, PA 3c. Mailing Address: * Street Address 8412 Falls of Neuse Rd., ste 104 Address Line 2 City Raleigh Postal / Zip Code 27615 3d. Telephone:* 919-270-7941 3e. Email Address: * kmartin@sandec.com 3f. Attach an agent authorization form.* Click the upload button or drag and drop files here to attach document signed owner cert agent auth.pdf 261.56KB PDF Only D. Project Information 1. Project Name: * 2. County(ies)* Johnston State / Province / Region NC Country United States New Trinity Misionary Baptist Church - New Sanctuary Building (Subdivision, facility, or establishment name) 3. Property Location: , ^ 3a. Property Address:* Street Address 347 W. Main St. and 317 W. Second St. Address Line 2 City Clayton Postal / Zip Code 27528 3b. Latitude: 35.655078 State / Province / Region NC Country United States 3c. Longitude: -78.462967 3d. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the s ite. Click the upload button or drag and drop files here to attach document USGS 2019.pdf 885.11 KB PDF Only * USGS Topo look up 3e. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document SoilSurvey.pdf 3.88MB PDF only Link to Soil Surveys for North Carolina Counties. (Please see instructions in the Help Document to determine the most recent published version.) 4. Property Information: � � .................................................................................................................................................................................................................................................................................................................................................................................................................................................... 4a. Parcel Identification Number (PIN) 165916-93-7608 165916-93-7577 4b. Date Property Purchased: 04/11 /2006 mm/dd/yyyy 4c.Type Book# Page# of Book E:1 L!!9-- E7 r-� Lmap IL IL I 4d. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document P D F_PRI NT_MAP_1560193147. pdf 638.25KB PDF Only 4e. Is your project in one of the 20 Coastal Counties covered under the Coastal Area Management Act (CAMA)? * Yes No 4f. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* Yes No Unknown 5. Stream associated with riparian buffer to be impacted by the proposed activity: Name IL Water Quality Classification UT of Little Creek C;NSW J 7. List any permits/approvals that have been requested or obtained for this project in the past. Date Applied Date Received Permit Type 6/12/2018 F7/7/2019 Buffer Minor Variance E. Proposed Activity 1. Provide a detailed description of the proposed activity including its purpose: * Redevelopment of existing Church and commercial property to allow for expansion of church. Specifically, a new larger Sanctuary to meet the needs of an expanding congregation. 2. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document buffer variance impacts -New Trinity_6-7-2019.pdf 237.54KB PDF only ** Below is a link with instructions on what you will need to show on your site plan. http://edocs.deq.nc.gov/WaterResources/O/doc/402224/Pagel.aspx F. Proposed Impacts and Mitigation Information 1. Individually list the square footage of each proposed impact to the protected riparian buffers: la. Site# - Reason 1b. Buffer 1c. Stream Name 1d. Mitigation 1f. Zone 1 1g. Zone 2 Impact* Required? Proposed 1 Story Church Permanent UT Little Creek Yes 0.00 774.00 Bldg (P) Square Feet Square Feet Map label (e.g. Road Crossing 1) Bioretention Cell Permanent UT Little Creek Yes 0.00 268.00 Map label (e.g. Road Crossing 1) (P) Square Feet Square Feet Map label (e.g. Road Crossing 1) Temporary 0.00 0.00 (T) Square Feet Square Feet 1 h. Total Zone 1 Impacts: 0.00 1i. Total Zone 2 Impacts: 1,042.00 1j. Total Buffer Impacts: 1,042.00 1 k. Comments: Calculated Mitigation 11. Zone 1 Total Impact Multiplier Required Mitigation 0.00 3 0.00 Square FeetJ Square Feet 1 m. Zone 2 Total Impact -=F Multiplier Required Mitigation 1,042.00 Square Feet 1.50 1,563.00 Square Feet 2. Mitigation Information 2a. What is the mitigation plan proposed for this project? * Payment to private mitigation bank Payment to Division of Mitigation (DMS) Permittee responsible mitigation 2d. Attach statement of availability from mitigation provider.* New Trinity Baptist Church - Buffer Transfer Certificate 8-16- 536.45KB 19.pdf 2f. Comments: The variance was previously approved in 2019 and the mitigation has been paid, see attached mitigation transfer certificate. The project is exactly the same as previously approved, but the work could not be completed due to delays associated with COVID shutdowns. G. Stormwater 1. Provide a description of how diffuse flow will be maintained through the protected riparian buffers (e.g., re -planting vegetation or enhancement of existing vegetation, gutter splash pads, level spreader to control of runoff from impervious surfaces, etc.). * Danny Smith and Stephanie Goss previously evaluated the site and determined the limits of existing uses (specifically parking, buildings and driveways) that are exempt from the buffer rules and can continue to be used for their existing use so no stormwater plans are provided for those areas. However the new impervious area will be treated by a bioretention cell (see attached impact maps for location) which will discharge to an existing stormwater collection system. Calculations for the bioretention cell are attached. A significant portion of the new sanctuary will be constructed where existing buildings or other imperviuos surfaces exist. 2. Show the location of diffuse flow measure(s) on your site plan. Click the upload button or drag and drop files here to attach document New Trinity Missionary Baptist-bioretention cell.pdf 156.94KB PDF only 3. Attach a completed Level Spreader Supplement Form or BMP Supplement Form with all required items for each proposed measure. Click the upload button or drag and drop files here to attach document PDF Only 4. Attach an Operation and Maintenance (O&M) Form for each proposed level spreader or BMP. Click the upload button or drag and drop files here to attach document PDF Only H. Demonstration of Need for a Variance The variance provision of the riparian buffer rules allows the Division or the Environmental Management Commission to grant a variance when there are practical difficulties or unnecessary hardships that prevent compliance with the strict letter of riparian buffer protection. 1. Explain how complying with the provisions of the applicable rule would prevent you from securing a reasonable return from or make reasonable use of your property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance. The Division will consider whether the variance is the minimum possible deviation from the terms of the applicable Buffer Rule that shall make reasonable use of the property possible.* The sanctuary expansion is need to accommodate the increasing congregation size. The existing sanctuary will remain in use during construction of the new sanctuary then it will be demolished and the new parking lot will go where the old sanctuary was Iocated.They are not even meeting minimum parking requirements for town requirements but are applying for a special use permit for less parking and having shared parking with the church across the street. If not for this even more buffer impact would be required 2. Explain how the hardship results from application of the Buffer Rule to the property rather from other factors such as deed restrictions or other hardships (e.g. zoning setbacks, floodplains, etc). * The small areas requested to be impacted are actually separated from the undisturbed stream buffer by areas of driveways and parking. Therefore the function of these areas as far as nutrient removal are limited. In addition the areas are currently maintained as a lawn. 3. Explain whether the hardship was caused by the applicant knowingly or unknowingly violating the applicable Buffer Rule. * The site is not currently in violation of the buffer rule 4. Explain how the hardship results from physical nature of the property, such as its size, shape, or topography, which is different form that of neighboring property.* As described above, this is a developed site in downtown Clayton, much of the buffer contains buildings, parking or driveways built long before the rules were adopted. Because of the need to expand the church and the limited area available to do so in proximity to existing church buildings, the proposed expansion is the minimum size that will meet the current and projected needs of the church. The building has been designed to minimize impact size and located so that the least functional area of the zone 2 buffer is impacted. In addition, stormwater from new impervious is being treated by a bioretention cell. Were it not for the variance the Town of Clayton would only require stormwater quantity , not quality, control. 5. Explain how the hardship is rare or unique to the applicant's property, rather than the result of conditions that are widespread. * The segment of stream that is exposed is unique in that upstream of the property the stream is piped in its entirety and down stream it is piped for at least 1200'. For Neuse, Tar -Pamlico, Jordan Lake and Goose Creek only: 6. Did the applicant purchase the property after the effective date of the applicable Buffer Rule and then request a variance?* Yes, but the property has been in existence for so long there are no recorded maps of the property, just deeds. I. Sign and Submit .................................................................................... Deed Restrictions By your signature of this application, you certify that all structural stormwater BMPs required by this variance shall be located in recorded drainage easements, that the easements will run with the land, that the easements cannot be changed or deleted without concurrence from the State, and that the easements will be recorded prior to the sale of any lot. Applicant's Certification I, certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans and that the deed restrictions will be recorded with all required permit conditions. * By checking the box and signing the box below I certify that By digitally signing below, I certify that: d 1 have given true, accurate, and complete information on this form; d I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit this form. Print Name:* Kevin C Martin Signature* CIA t r &e;Wta r Submission Date: Automatically filled in Initial Review Is the project accepted Yes No for review?* Is the project located Yes No Unknown within a NC DCM Area of Environmental Concern (AEC)?* Is this a public -funded Yes No transportation project?* ID#* 20190788 Version * 2 Reviewing Office* Raleigh Regional Office - (919) 791-4200 Select Reviewer* Cherri Smith:Cheri.Smith Has payment been No Payment Needed received?* Fee Received Need Fee- send electronic notification HOWILDLDILANNGDS OO Mitigation Credit Transfer Certificate August 16, 2019 New Trinity Missionary Baptist Church Attn: Michael Sims 115 S. Robertson St. Clayton, NC 27529 RE: Bank Name: Old Savannah Nutrient Offset & Buffer Bank Bank Sponsor: Wildlands Holdings II, LLC (wholly owned by Wildlands Engineering, Inc.) DWR Project #: 2016-0611 Riparian Buffer Credits Purchased: 1,563 sq. ft. Neuse 03020201 River Basin Project name: New Trinity Missionary Baptist Church New Sanctuary Building Applicable Local Government/Municipality jurisdiction: NC Division of Water Resources Dear Mr. Sims: You have elected to fulfill your permitted riparian buffer mitigation requirements for the above mentioned project by paying into the Old Savannah Nutrient Offset & Buffer Bank sponsored by Wildlands Holdings II, LLC, wholly owned by Wildlands Engineering, Inc. ("The Bank"). The applicant has received an authorization certificate for riparian buffer impacts and is required to mitigate as part of the Consolidated Mitigation Rules 15A NCAC 02B .0295. Payment into a private mitigation bank is acceptable per this rule. NCDWR specified and verified the amount of the riparian buffer offset necessary for approval of the permit as 1,563 sq. ft. of Buffer Mitigation credits. Wildlands Holdings II, LLC has receipt of a copy of the 401 Water Quality Certification Authorization Certificate (Minor Variance Approval) from the NC Department of Environmental Quality approving the Riparian Buffer mitigation purchase from the Bank. The Bank has received full payment for mitigation for the above referenced project. You must also comply with any other state, federal or local government permits or authorization associated with this activity including SL 2009-337, and Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions regarding the purchase of these credits, please contact me at (704) 332-7754 ex. 120 or ihazelhoff@wildlandseng.com. Wildlands Holding II, LLC • Wildlands Engineering, Inc • 312 West Millbrook Road, Suite 225, Raleigh, NC 27609 Sincerely, � z Ian M. Hazelhoff Wildlands Engineering, Inc. Land Acquisition ihazel hoff@wild landseng.com 0: (704) 332-7754 ex.120 M: (205 807-0800 Cc: Ms. Katie Merritt, NC Division of Water Resources (bi-annually) Kevin Martin, Soil & Environmental Consultants Wildlands Holding II, LLC • Wildlands Engineering, Inc • 312 West Millbrook Road, Suite 225, Raleigh, NC 27609 I QM�Oo� ��.. ------------------------� HIS N019NI113 Q i ®I I � O2 I I r.j ,I jn Z Z j II ME gZ U O= --- ------,—.—L-----. WU UU 3 N O Z � LLJ II m Rpz - EXIST. CRAtlEL DRIVE ® I W l •\•\ \ i I j`_ W z W ' j w .N m fS4�o \ 1lVHdSV 03SOd0ad (n IV ✓ b� �tl3atl 3SN 9NLVS 3 N \b� 301(I 11ltlHdStl 8 03SOd0ad �e w n ice\ o z r -N (i) LyXj W a a3JJf19 Ntllavdla J b3�''n\y�,btlbn�'VIIS/N3 ul Wo Oo ■ N a - OF 3SN ONILSIX3 OwU i _ am \•�� I' p U 313M0N00 '1SIX3 LLJ D m m W -1 ^ c � I lltlM N001S 'SIX3 � , II I 4 l p Z r l > I mop s a l lz 0- Gov z Y lltlM N0018 ]NITS EXISTING CHAIN LINK FENCE aw Naz~ W v WZ N I�I Z E�z Q wo- (n o4° wm - �p l v ZIS z a lz z > J o Z W �_ cr) a X W �I o Z 30N31 3tlIM OnuSI%3 , II ;I I QM�Oo� ��.. ------------------------� HIS N019NI113 Q i 02 o I L� rF u ---I II I a d z Z I z ME U O O zz _ $o LLJ m - EXIST. DRIVE 1 \. z oop y l� W — ' z wRol W ` m / I ry\4 �• W 1IVHdSV 03SOdONd _ '�1T sm�. fig° O (n z _ X \nB Nbi 1 • '�� CD I \do „ � •\ fs43 �ma G O O n zo57-z \J zl- •\ cn_ w � O 0 X W H r C� < � N L 213J,nll NV18tldW J •j '��� 3Sn �Nu G W r a I/ \ \b!bba/yam N3 ■ N - �• \.~_ �• `JNIL51X3�� _ a 3XIII IIIII I 333a3Nm '3SIX3RZ — LLJ m &� r LiL_= N cn nvm NGole 'iSIX3 w z W IL Q a o a a z 'o lltlM N3018 5NILSIX3 EXISTING CHAIN UNK FENCE W o m Y 0� QW� Q N D= ZELLA cn CRAKL (.) w J z i W - EXIST. r W � lrn �o X W z Q —33 3tlIM ]w-3 I 00 __ ¢o; _�N� Stormwater Calculations New Trinity Missionary Baptist Church Clayton, NC Johnston County Owner: New Trinity Missionary Baptist Church 115 S. Robertson St. Clayton, NC 27528 June 10, 2019 6/ 10/ 19 B. R. KORNEGAY, INC. LAND SURVEYING • ENGINEERING • PLANNING 300 E. Walnut Street Goldsboro, North Carolina 27530 (919) 735-5886 Fax: (919) 580-9053 Firm No. F-1054 www.kornegaysep.com PROJECT: New Trinity Missionar Baptist Church WORK ORDER: 160283 DATE: March 21, 2019 POST DEVELOPMENT( Bioretention pond ) 0.80 acres = WATERSHED AREA USED FOR CALCULATIONS, A 445 ft = HYDRAULIC LENGTH OF WATERSHED, L 12.7 ft = HEIGHT OF MOST REMOTE POINT ON WATERSHED, H 3.36 min =TIME OF CONCENTRATION, Toc =((L^3/H)^0.385)/128 0.00 min =multiply Toc by 2 if overland flow, grassed surface 1.35 min = multiply Toc by 0.4 if overland flow, paved surface 0.00 acres = undisturbed WATERSHED AREA 0.20 = undisturbed RUNOFF COEFFICIENT, C 0.42 acres = managed WATERSHED AREA 0.30 = managed RUNOFF COEFFICIENT, C 0.38 acres = impervious WATERSHED AREA 0.90 = impervious RUNOFF COEFFICIENT, C 0.59 =weighted RUNOFF COEFFICIENT, C 0.80 acres = TOTAL AREA, A 1-YEAR, 24-HOUR STORM: 112 = g 20 = h 5.25 in/hr= INTENSITY, I =g/(h+Toc) 2.5 cfs = PEAK RUNOFF, Qpre = CIA BIORETENTION POND RUNOFF VOLUME (First Flush): 0.48 Runoff Coefficient, Rv= 0.05+0.9-(la) [la=acres, imp./acres, total] 1.0 in. = Design storm rainfall depth, Rd 1393.9 cf= Required volume of runoff= 3630 x Rd x Rv x Area SURFACE AREA OF BIORETENTION POND (First Flush) 12.0 in = Depth of storage allowed in bioretention pond 1393.9 sf = Required surface area of bioretention pond (volume/depth) 1400.0 sf = Proposed surface area of Bioretention Pond, A B. R. KORNEGAY, INC. LAND SURVEYING - ENGINEERING -PLANNING 300 East Walnut St. Goldsboro, N.C. 27530 phone: (919) 735-5886 fax: (919) 580-9053 Watershed Model Schematic Hydraflow Hydrographs by Intelisolve v9.23 1 - bioretention cell 2 - bioretention cell E Project: New Trinity bioretention cell.gpw Tuesday, Jun 11, 2019 Hydrograph Return Period Recap Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. Hydrograph type (origin) Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 2 Rational Reservoir ------- 1 2.517 0.065 ------- ------- ------- ------- ------- ------- 4.064 0.118 ------- ------- ------- ------- 5.349 0.162 bioretention cell bioretention cell Proj. file: New Trinity bioretention cell.gpw Tuesday, Jun 11, 2019 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 2.517 1 1 151 ---- ------ ------ bioretention cell 2 Reservoir 0.065 1 2 124 1 319.68 147 bioretention cell New Trinity bioretention cell.gpw Return Period: 1 Year Tuesday, Jun 11, 2019 Hydrograph Report 4 Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 1 bioretention cell Hydrograph type Storm frequency Time interval Drainage area Intensity OF Curve Q (cfs) 3.00 2.00 1.00 I Hyd No. 1 = Rational = 1 yrs = 1 min = 0.800 ac = 5.333 in/hr = Wayne County_Raleigh.idf bioretention cell Hyd. No. 1 -- 1 Year 1 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact Tuesday, Jun 11, 2019 = 2.517 cfs = 1 min = 151 cuft = 0.59 = 1.00 min = 1/1 Q (cfs) 3.00 2.00 1.00 "- 0.00 2 Time (min) Hydrograph Report 5 Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Hyd. No. 2 bioretention cell Hydrograph type = Reservoir Peak discharge = 0.065 cfs Storm frequency = 1 yrs Time to peak = 2 min Time interval = 1 min Hyd. volume = 124 cuft Inflow hyd. No. = 1 - bioretention cell Max. Elevation = 319.68 ft Reservoir name = bioretention cell Max. Storage = 147 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 3.00 2.00 1.00 0.00 0 20 — Hyd No. 2 bioretention cell Hyd. No. 2 -- 1 Year 40 60 80 100 120 140 160 180 200 Hyd No. 1 Total storage used = 147 cuft Q (cfs) 3.00 2.00 1.00 0.00 220 Time (min) Pond Report s Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Pond No. 1 - bioretention cell Pond Data Trapezoid - Bottom L x W = 40.0 x 35.0 ft, Side slope = 0.00:1, Bottom elev. = 319.50 ft, Depth = 7.85 ft, Voids = 60.00% Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 319.50 1,400 0 0 0.79 320.29 1,400 659 659 1.57 321.07 1,400 659 1,319 2.36 321.86 1,400 659 1,978 3.14 322.64 1,400 659 2,638 3.93 323.43 1,400 659 3,297 4.71 324.21 1,400 659 3,956 5.49 325.00 1,400 659 4,616 6.28 325.78 1,400 659 5,275 7.06 326.57 1,400 659 5,935 7.85 327.35 1,400 659 6,594 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 4.00 15.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 4.00 15.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 319.50 323.67 0.00 0.00 Weir Type = --- --- --- --- Length (ft) = 7.00 5.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 1.00 1.00 0.00 n/a N-Value = .010 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 1.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 319.50 0.00 0.00 --- --- --- --- --- --- 0.000 --- 0.000 0.79 659 320.29 0.33 is 0.00 --- --- --- --- --- --- 0.035 --- 0.366 1.57 1,319 321.07 0.50 is 0.00 --- --- --- --- --- --- 0.038 --- 0.536 2.36 1,978 321.86 0.62 is 0.00 --- --- --- --- --- --- 0.041 --- 0.662 3.14 2,638 322.64 0.72 is 0.00 --- --- --- --- --- --- 0.043 --- 0.768 3.93 3,297 323.43 0.81 is 0.00 --- --- --- --- --- --- 0.046 --- 0.861 4.71 3,956 324.21 0.90 is 0.71 oc --- --- --- --- --- --- 0.049 --- 1.659 5.49 4,616 325.00 0.97 is 2.74 oc --- --- --- --- --- --- 0.051 --- 3.760 6.28 5,275 325.78 1.04 is 7.20 is --- --- --- --- --- --- 0.054 --- 8.293 7.06 5,935 326.57 1.10 is 8.90 is --- --- --- --- --- --- 0.057 --- 10.06 7.85 6,594 327.35 1.16 is 10.33 is --- --- --- --- --- --- 0.060 --- 11.55 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 4.064 1 1 244 ---- ------ ------ bioretention cell 2 Reservoir 0.118 1 2 208 1 319.79 237 bioretention cell New Trinity bioretention cell.gpw Return Period: 10 Year Tuesday, Jun 11, 2019 Hydrograph Report 0 Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 1 bioretention cell Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.800 ac Intensity = 8.610 in/hr IDF Curve = Wayne County_Raleigh.idf Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 � 0 Hyd No. 1 bioretention cell Hyd. No. 1 -- 10 Year 1 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact Tuesday, Jun 11, 2019 = 4.064 cfs = 1 min = 244 cuft = 0.59 = 1.00 min = 1/1 Q (cfs) 5.00 4.00 3.00 2.00 1.00 � 0.00 2 Time (min) 9 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Hyd. No. 2 bioretention cell Hydrograph type = Reservoir Peak discharge = 0.118 cfs Storm frequency = 10 yrs Time to peak = 2 min Time interval = 1 min Hyd. volume = 208 cuft Inflow hyd. No. = 1 - bioretention cell Max. Elevation = 319.79 ft Reservoir name = bioretention cell Max. Storage = 237 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 -F 0 20 40 Hyd No. 2 80 Hyd No. 1 bioretention cell Hyd. No. 2 -- 10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 100 120 140 160 180 200 220 Time (min) Total storage used = 237 cult Hydraflow Rainfall Report 10 Hydraflow Hydrographs by Intelisolve v9.23 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 112.0004 20.0000 1.0000 -------- 2 0.0000 0.0000 0.0000 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 105.7041 16.8000 0.8710 -------- 25 118.9252 17.6000 0.8582 -------- 50 0.0000 0.0000 0.0000 -------- 100 157.1769 19.6000 0.8692 -------- File name: Wayne County_Raleigh.idf Intensity = B / (Tc + D)^E Tuesday, Jun 11, 2019 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.48 3.73 3.20 2.80 2.49 2.24 2.04 1.87 1.72 1.60 1.49 1.40 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 7.22 6.03 5.19 4.57 4.09 3.71 3.40 3.13 2.91 2.72 2.56 2.41 25 8.19 6.90 5.98 5.29 4.75 4.32 3.97 3.67 3.41 3.20 3.01 2.84 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 9.71 8.27 7.22 6.42 5.79 5.28 4.86 4.50 4.20 3.93 3.70 3.50 Tc = time in minutes. Values may exceed 60. Precip. file name: Sample.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 2.20 0.00 3.30 4.25 5.77 6.80 7.95 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff -1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 3.33 1.75 0.00 2.80 3.90 5.25 6.00 7.10 D o V1 N W o V1 [ N CC 7 N U o U N L .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 0 '_a y H d N N N 0 a H d N N N ft4 0 a ® ® Qzz ® E d d d -a -a -azz d d d O O O O w a k wO y �, 1 0 v�� o ro a �y� o so°r N v r r2 = Flo �5 ti l N w J C t O�lco N �O .`�� h h� 5'0l c h co Lq v, CL 0 CNI M d � r 08 o a O. O I �� /co\ ��� ll�J `l, O , �° t� x l ,� • ,� �w'��, N L S� Sol ° 1 -A �• Ln o r G� C a U I, �� b�� H ° � SC �� IC a) r o /, �� � x �h �a r� d t J �o \�� o Ati o SO 00 �� 8� a 2 �� a 6 Qa E x c+7 W O� E x 3 12 MU O 1-0 � ti �� / N ti N O S8 err J /rolJ -,' p y N E E 7 ,y`S Sl . O l� x m LO n m N ♦ m ) C* E CO 1 N ti v (� \ CDF °� • �l \ CN n� l Ln � /mil � � �Gj \ Ln S N o o r- S� so 1 (� Z N N a 00 m OM) , N c o� N S titi J G • _ (n O jr o O IN S OD 6I w l l ' 0� �� FI 1 h \ S o I i / L\ ^ hO �l Y /o \� i / CO O o�� Eli • o`� � Ol � I. � l r� o �o . A OST Owl � 6 l `Or , SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: 0 Please print: Property Owner: Property Owner: f/ i Fes-- PARCEL ID: l � �� " �� 00 I to 5c\ l (o - 4 -7-57 7 y S -� � 0 The undersigned, registered property owners of the above noted property, do hereby authorize L _ cG t Yi , of 1 O 1 a f"A V 1 Y\1 oAr- ti (Contractor /Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than prop��e``rty above):-L � 1 Ca. Telephone: 0L �-"""' YV1 i Ci h.Q G'L sue. i, e—c;; ei—V We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Date: ' ' ,�- r C(G'!, Authorized Signature Date: �11 J 1 1 1 09 F id 't r ■ � �� AC4 1 1 IJd 1 7 a L i do ,. cod or Project Number: 13399.W4 Project Manager: KM Scale: 1=500' Date: 07/03/2023 '%' � •16 I %L Ilk ' * E lot y , 9-1 to Map Title: Figure 2 - Soil Survey Map Johnston County, NC Source:NRCS Soil Survey Johnston Co. Sheet 1 ir '`dd r 1 1 NG Cementer for Geagr&hic Information & Analysis N 0 500 1,000 Feet Soil & Environmental Consultants, PA 8412 Falls of N— Road, Suite 104, Raleigh, NC 27615 • Phone: (919) 846-5900 • Fax: (919) W-9467 —d—.. 'Ail ter. ! ° i 4y5 5 yk1 `f i' "i /� ! r I } Lai l r t {'rJ f l Bus 70 GD �Y ord l em • ! - ` ' +NC Center for - o rap lhlh cl..forniati - n' & Analysi Project Number: Map Title: N 13399.W4 0 1,000 2,000 Project Manager: Figure 1 - USGS Map I�i�IIiII KM Wake County, NC Feet Scale: 1 " = 1000' EVOL • soil & Environmental Consultants, PA Date: Source: 2019 USGS Q/u�ad 0 7 / 0 3 /2 0 2 3 Clayton, N /'� 8412 Falls of Neuse Road, Suite lOQ Raleigh, NC 27615 •Phone: (919) 846-5900 •Fax: (919) 846-946 smdee.eom