HomeMy WebLinkAbout860028_Inspection_20230612 Division of Water Resources
Facility Number "�—❑ - Q Division of Soil and Water Conservation
Q Other Agency
Type of Visit: Compliance Inspection Operation Review Q Structure Evaluation Q Technical Assistance
Reason for Visit: 10 Routine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access
Date of Visit: Arrival Time: Departure Time: T56 County:y�1111((1/ Region:(0-�C-)
Farm Name: CMS Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: I Integrator:
Certified Operator: y Certification Number. Y l S l 3(
Back-up Operator: �C�m Y V Y I T L/ Certification Number: wd bvl y-S
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I ILayer I Dairy Cow
Wean to Feeder I INon-Layer I Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
' Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
ET_ Other
Discharizes and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No 0 NA ❑NE
2.Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: 9K - Date of Inspection:
Waste Collection& Treatment
4. is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes XNo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: `AC ao
Spillway?: _V
t�
Designed Freeboard(in):
Observed Freeboard(in):
� ��
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement? 0
11. is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes V1 No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn, etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): i 1
IA
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records &Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ( ] No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes l No ❑ NA ❑ NE
the appropriate box.
❑WUP El Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? ❑ Yes No ❑ NA ❑ NE
AWaste
Application Weekly Freeboard Waste Analysis Soil Analysis I$Weather Code
/Rainfall Stocking Crop Yield �120 Minute Inspections Worithly and V Rainfall Inspections ❑Sludgesu y
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ( No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 7❑ No NA ❑ NE
Page 2 of 3 511212020 Continued
41
Facility Number: - Date of Inspection: 21°
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes 10 No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes XNo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE
permit? (i.e.,discharge, freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑NE
Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
r� k��-� v<SYNLas
D�S
as
Reviewer/Inspector Name: [% �� P �� Phone.
Reviewer/Inspector Signature: Date: c�
Page 3 of 3 511212020