Loading...
HomeMy WebLinkAbout20230937 Ver 1_Corps Delineation Concurrence_email_02.23.2023 (002)_20230630Karagosian, Adam H. From: Michelle Savage-Measday, PWS <MMeasday@ecslimited.com> Sent: Thursday, March 2, 2023 2:36 PM To: Karagosian, Adam H.; 'Brian Hall (bhall@SametCorp.com)' Cc: Tony Whitaker; Steve Sanchez; Gupton, Everett Subject: FW: SAW-2014-01632 / Chatham - Siler City Advanced Manufacturing Site / HWY 64 / Siler City/ Chatham County, NC - DELINEATION CONCURRENCE Attachments: Chatham County Map Packet Final 2.1.23.pdf All, Forwarding the Corps verification of the delineation, as requested. Michelle MICHELLE SAVAGE-MEASDAY, PWS I Environmental Senior Project Manager ECS SOUTHEAST, LLP I T 919.861.9910 D 919.861.9821 C 919.441.2437 MMeasday@ecslimited.com I www.ecslimited.com Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient. From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Thursday, February 23, 2023 12:50 PM To: Michelle Savage-Measday, PWS <MMeasday@ecslimited.com> Subject: [EXTERNAL] SAW-2014-01632 / Chatham - Siler City Advanced Manufacturing Site / HWY 64 / Siler City / Chatham County, NC - DELINEATION CONCURRENCE Dear Michelle, Reference is made to ORM ID SAW-2014-01632, please reference this number on any correspondence regarding this action. On January 14, 2022, we received information from you requesting the Wilmington District, Regulatory Division review and concur with the boundaries of an aquatic resource delineation. Site visits occurred on November 7-8, and December 6-7, 2022. Revised final aquatic resource mapping was received on February 2, 2023. We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e- mail, are confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and reliable representation of the location and extent of aquatic resources within the identified review area. The location and extent of these aquatic resources are shown on the attached delineation maps (12 pages), labeled JC Teague Road Potential Waters of the U.S. and dated January 19, 2023. Regulatory Guidance Letter (RGL) 16-01 https://usace.contentdm.ocic.org/utils/getfile/collection/p16O2lcoll9/id/1256 provides guidance for Jurisdictional Determinations (JD) and states "The Corps generally does not issue a JD of any type where no JD has been requested". At this time we are only verifying the delineation. This delineation may be relied upon for use in the hermit evaluation process, including determining compensatory mitigation. "This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey.