HomeMy WebLinkAbout20230538 Christopher Bell page 3 shoreline app7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permar ent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Tempor impacts in square feet: 9. Total amount of impacts above the normal pool lake level /Normal Water Level and 50 feet land -ward Perm ent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: v� ill �- C p V. cuf ) Te � rary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request wn the applicable reasonable period of time Owner/Agent's Signature` [15A NCAC 02H .0502(f)] Date *Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of S