Loading...
HomeMy WebLinkAboutSW3220302_email_20220822 Peck, Kaitlin From:Kennedy Wilson <Kennedy@hensonfoley.com> Sent:Monday, August 22, 2022 3:46 PM To:Farkas, Jim J Subject:\[External\] RE: Denver Defense; 1417 NC-16 Business, Denver, Lincoln County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hey Jim, Hope you are doing well. If you feel your response will to this email would be easier over the phone, feel free to give me a call. So we got all the approvals for this project and ownership was about to start construction when they purchased a property down the road that already had a warehouse on it. That being said, they still want to do all the updates as shown below but they do not want to building the warehous, loading area, and parking as shown below crossed out in red. This obviously would be a change to the stormwater permit and wanted to see what that process would be. The plan now would actually not be adding much more impervious than what is already there. Is it possible that they no longer need a water quality device or a detention pond. Is there a certain threshold we can stay under? If we do end up needing the pond no matter what, would it almost be easier to just call everything out shown in red, as future (maybe grey it out on plans) and leave the pond as designed so that if they ever do want to build this piece, it is already permitted. The owner is fine with doing this since it did already get approved and would likely result in the least amount of stormwater permit application changes. But he is also open to the idea of just removing it completely from the plans. 1 Thanks. Kennedy Wilson, E.I. 121 Gilead Road Huntersville, NC 28078 o: 704.875.1615 2 c: 828.284.6862 www.hensonfoley.com From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Friday, June 17, 2022 8:47 AM To: julian.wilson@jjech.com; ben.wilson@jjech.com; John Pincelli <john.pincelli@jjech.com> Cc: Jay Henson <jay@hensonfoley.com>; Kennedy Wilson <Kennedy@hensonfoley.com>; Khan, Zahid <zahid.khan@ncdenr.gov>; Jeremiah Combs <jcombs@lincolncounty.org> Subject: RE: Denver Defense; 1417 NC-16 Business, Denver, Lincoln County Good Morning, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on June 10, 2022. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW3220302, dated June 17, 2022, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permits that may be required. The original signed permit package and plans are being mailed to the permittee, Julian Wilson, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): PSA Denver, LLC Attn: Julian Wilson, Manager 3850 Fernandina Road Columbia, SC 29201 I will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, they will be kept on file at the Mooresville Regional Office. If you have any questions, or need additional information concerning this matter, please contact me at jim.farkas@ncdenr.gov. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov 3 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Monday, March 7, 2022 3:12 PM To: julian.wilson@jjech.com; ben.wilson@jjech.com; Kennedy Wilson <Kennedy@hensonfoley.com>; jay@hensonfoley.com; John Pincelli <john.pincelli@jjech.com> Cc: Khan, Zahid <zahid.khan@ncdenr.gov> Subject: RE: Denver Defense; 1417 NC-16 Business, Denver, Lincoln County Good Afternoon, We received your post-construction stormwater permit application for the above mentioned project on 3/3/2022. Reviews under the standard permitting process generally take 45 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 45 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW3220302 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 4 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Farkas, Jim J Sent: Friday, February 18, 2022 9:44 AM To: julian.wilson@jjech.com; ben.wilson@jjech.com; Kennedy Wilson <Kennedy@hensonfoley.com>; jay@hensonfoley.com Cc: Moore, James <james.moore@ncdenr.gov> Subject: Denver Defense; 1417 NC-16 Business, Denver, Lincoln County Good Morning, We received your application for a new post-construction stormwater permit on 2/17/2022. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 3/21/2022) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. - 1x complete hard copy of the Supplement-EZ Form. This item is required per Section V & VI, 3 of the Application. NOTE: This form uses macros to generate the correct pages, depending on what is entered into the cover page. The complete form should have a cover page, drainage areas page, and a sand filter page (only the cover page was provided). - 1x complete O&M Agreement Form. This item is required per Section V & VI,3 of the Application and 15A NCAC 02H .1042(2)(j). Similar to the Supplement-EZ Form, this form uses macros to generate the correct pages (describing the maintenance requirements that the Applicant is agreeing to perform). NOTE: You may wish to get a second version of this form notarized for the Applicant to keep (since the Register of Deeds will require an original for recording). - 1x complete hard copy of the signed & notarized Application. Section X (Applicant’s Certification) of the Application must be signed and notarized by the Applicant. Per 15A NCAC 02H .1040(1), if the Applicant is an LLC, the signing official (listed in Section III, 1a and signed Section X of the Application) must be by a manager or 5 company official (Ben Wilson is not listed on the Secretary of State’s website (https://www.sosnc.gov/online_services/search/by_title/_Business_Registration) as a manager or company official for PSA Denver, LLC). Please do one of the following: 1) Have Julian Wilson listed as the Applicant (Section III, 1a) and sign the Applicant’s Certification (Section X) since he is listed with the Secretary of State as a manager for PSA Denver, LLC or 2) provide official documentation from an acceptable individual (such as Julian Wilson) stating that Ben Wilson has signatory authority for PSA Denver, LLC and have Ben Wilson sign the Applicant’s Certification (Section X). Since the Applicant is also the Property Owner, Section IX of the Application should not be signed. - It is noted that the SHWT elevation information was not provided, but will be provided at a later date (per the Application). Please be aware that the permit will not be able to be issued until this information is received and reviewed. - 2x signed & sealed hard copies of a plan sheet showing the following: o Delineated drainage areas to the proposed sand filter (Required per Section IV, 8o of the Application and 15A NCAC 02H .1042(2)(g)(iv)). It is noted that one full sized copy of the drainage area map was provided as part of the calculations, however, we require this to be provided in the main plan set (You can just provide an additional hard copy and I will slip-sheet them into the plan sets). o Wetland delineation or a note on the plans stating that there are no wetlands located on-site (Required per Section VI, 8m of the Application and 15A NCAC 02H .1042(2)(g)(iii)). Please also list the name of the individual that made this determination in a note on the plans. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review): - While not required to be addressed for administrative completeness… o it appears as though the old design standards may have been used to design the proposed sand filter (the sand filter calculation page references Chapter 11 of the BMP Manual which was revised in 2017 due to a rule change). The current design standards can be found at the following link: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design Please ensure that the latest design requirements are met. o there does not appear to be a stormwater maintenance/access easement around and leading to the proposed sand filter (required per General MDC 8 & 9). o per the guidance in Part C-6 of the Manual, the surface of the filter of the sand filter should be covered in sand, not sod (bottom of page 6). NOTE: This is not a requirement, but a recommendation (It helps with maintenance and helps prevent clogging of the sand filter). If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process generally take 30 – 45 calendar days, but can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant so this review will probably be closer to 45 days than 30). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. 6 Thank you, Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 7