Loading...
HomeMy WebLinkAboutSW6221002_email_20220930 Peck, Kaitlin From:Don Curry <don@curryeng.com> Sent:Friday, September 30, 2022 2:05 PM To:DeBerry, Margie Cc:Lawyer, Mike; Farkas, Jim J; efw@weavercompanies.com Subject:\[External\] RE: Avonlea Subdivision, Dunn, Harnett County Attachments:2022-09-30 Avonlea SCM Esmt.pdf; 2022-09-30 NCDEQ Submittal Pkg.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Margie, I am sending the attached package to your office for Monday delivery. Thanks, DON CURRY, PE President Curry ENGINEERING 205 S. Fuquay Ave. Fuquay-Varina, NC 27526 wk (919) 552.0849 x101 dir (984) 225.4149 cell (919) 880.9857 don@curryeng.com www.curryeng.com From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, September 27, 2022 10:29 AM To: efw@weavercompanies.com; Don Curry <don@curryeng.com> Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: Avonlea Subdivision, Dunn, Harnett County Good morning, We received your application for a new post-construction stormwater permit on 9/22/2022. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 10/27/2022) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  1x hard copy of the complete, original Supplement-EZ Form (This item is required per Sections V & VI, 3 of the Application). This form can be found on our website at the following address: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. – It is noted that a Supplement form was provided, however it is an older version of the required form. Please provide the most recent version of the form, available at the web address above.  2x signed & sealed hard copies of a plan sheet showing the following: 1  Stormwater maintenance access and easement. This item is required by General MDCs 8 & 9 (15A NCAC 02H .1050(8) & (9)). The easements should encompass the entire SCM system, be at least 10 ft wide (25 ft recommended for wet ponds) and extend to the nearest right-of-way. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Margie DeBerry at Margie.DeBerry@ncdenr.gov or 919-707-9209. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 2