Loading...
HomeMy WebLinkAboutWQ0000484_Monitoring - 06-2023_20230705Monitoring Report Submittal ..................................................... Permit Number#* WQ0000484 Name of Facility:* Mountaire Farms Inc Month: * June Year: * 2023 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR June DMR's.pdf 8.98MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * rjackson@mountaire.com Name of Submitter: * Robert Jackson Signature: Date of submittal: 7/5/2023 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* WQ0000484 Is the monitoring report accepted?* Yes No Regional Office* Fayetteville Reviewer: _anonymous Review Date: 7/5/2023 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 1 of-j- Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc. County: Robeson Month: June Year: 2023 Field Name: A Field Name: B Field Name: C Field Name: D Field Name: E Area (acres): 8.25 Area (acres): 6.75 Area (acres): 13.6 Area (acres): 3.5 Area (acres): 4.7 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES EINO Field Loaded? ❑ YES NO Field Loaded? ❑ YES No Field Loaded? ❑ YES M NO Field Loaded? ❑ YES EINO d c. z a ' a. z�. > � E a E >a z° C c ' a z @ a aU � z , a CL m E > aC. z �cc ' z a a o > � Z a a E > z cz aa 0 ' a U> a� a > � Z a a >m E zmc a IL 0 a Ma z «°E�_z D �'U" �> zE Ea ac Month gal mg/L lbs/ac Ibslac gal mg/L Ibs/ac Ibslac gal mg/L lbs/ac lbs/ac gal mg/L Ibs/ac Ibslac gal mg/L Ibs/ac Ibslac July 1,134,000 16.85 19.3 19.3 1,134.000 16.85 23.6 23.6 1,548.000 16.85 16.0 16.0 16.85 16.85 August 778,500 14.21 11.2 30.5 706,500 14.21 12.4 36.0 2,790,000 14.21 24.3 40.3 14.21 14.21 September 873,000 16.43 14.5 45.0 873.000 16.43 17.7 53.7 1,872.000 16.43 18.9 59.2 16.43 16.43 October 828,000 14.27 11.9 56.9 828.000 14.27 14.6 68.3 2,412,000 14.27 21.1 80.3 14.27 14.27 November 900,000 14.13 12.9 69.8 945,000 14.13 16.5 84.8 1,980,000 14.13 17.2 97.4 14.13 14.13 December 882,000 17.77 15.8 85.6 882,000 17.77 19.4 104.2 1,512,000 17.77 16.5 1 113.9 17.77 17.77 January 625,500 12.59 8.0 93.6 1 625,500 12.59 9.7 1 113.9 1,710,000 12.59 13.2 127.1 12.59 12.59 February 535,500 12.85 7.0 100.6 733,500 12.85 11.6 125.6 2.016,000 12.85 15.9 143.0 12.85 12.85 March 337,500 15 5.1 105.7 481,500 15 8.9 134.5 2,664,000 15 24.5 167.5 15 _ 1 15 April 688,500 14.02 9.8 115.4 760,500 14.02 13.2 147.7 1,296,000 14.02 11.1 178.6 14.02 14.02 May 468,000 12.26 5.8 121.2 544,500 12.26 8.2 155.9 1 2,268.000 1 12.26 17.1 195.7 12.26 12.26 June 553,500 1 17.48 12 Month Floating PAN Load (Ibs/aclyr): 9.8 131.0 131.0 441,000 17.48 9.5 165.4 165.4 11 1,044,000 17.48 11.2 206.9 264.00 1 206.9 17.48 0.0 50.00 17.48 0.0 350.00 Annual PAN Load Limit (lbslaclyr): 350 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page L of n Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc. County: Robeson Month: June Year: 2023 Field Name: F Field Name: G Field Name: H Field Name: I Field Name: J Area (acres): 26.53 Area (acres): 47.489 Area (acres): 14.19 Area (acres): 13.58 Area (acres): 58.22 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES ❑Q NO Field Loaded? ❑ YES FZI NO Field Loaded? ❑ YES ❑✓ NO Field Loaded? ❑ YES [] NO Field Loaded? ❑ YES NO CI a m 0 C a p d > o Q V Z 0-.0Ro T Mp m J E ' CL Q > Z CZ; Qp fL a ` Ap o m J E m aZaCQ > p tm C 6 ` Q Z L D -_j ca ; J EZ a Q ° > Z Q0 C a CC > Q V Z T m Ja > 2 J Fz dZZ Q 3o j 0 m vZ - o Q Q n NJQ c Jv f ; Ma EZ a Month gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac lbs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibslac Ibslac July 4,415,000 16.85 23.4 23.4 3,630,000 16.85 10.7 10.7 1,362,000 16.85 13.5 13.5 2.375,000 16.85 24.6 24.6 7,742,000 16.85 18.7 18.7 August 4,945,000 14.21 22.1 45.5 6,810,000 14.21 17.0 27.7 1,152,000 14.21 9.6 23.1 2,412,500 14.21 21.1 45.6 6,639,500 14.21 13.5 32.2 September 4,416,000 16.43 22.8 68.3 4.980,000 16.43 14.4 42.1 1,116,000 16.43 10.8 33.9 2,175,000 16.43 21.9 67.6 6,517,000 16.43 15.3 47.5 October 4,002,000 14.27 18.0 86.2 7.920,000 14.27 19.8 62.0 1,260,000 14.27 10.6 44.5 2,650,000 14.27 23.2 90.8 6,515,000 14.27 13.3 60.9 November 3,956.000 14.13 17.6 103.8 6,300,000 14.13 15.6 77.6 978,000 14.13 8.1 52.6 2.075,000 14.13 18.0 108.8 5,684,000 14.13 11.5 72.4 December 4,853.000 17.77 27.1 130.9 7,440,000 17.77 23.2 100.8 1,116,000 17.77 11.7 64.2 1,712,500 17.77 18.7 127.5 6,296,500 17.77 16.0 88.4 January 4,048.000 12.59 16.0 146.9 5,010,000 12.59 11.1 111.9 1 756,000 12.59 5.6 69.8 1.650,000 12.59 12.8 140.3 6,076,000 12.59 11.0 99.3 February 3,496,000 12.85 14.1 161.1 5.460,000 12.85 12.3 124.2 984,000 12.85 7.4 77.3 1,525.000 12.85 12.0 152.3 4,018,000 12.85 7.4 106.7 March 4,209,000 15 19.8 180.9 6,690,000 15 17.6 141.8 1,218,000 15 10.7 88.0 2,075.000 15 19.1 171.4 4,067,000 15 8.7 115.5 April 3,289,000 14.02 14.5 195.4 1 4,650,000 14.02 11.4 153.3 1 1,182,000 14.02 9.7 97.7 1.875,000 14.02 16.1 187.5 11 5,635,000 1 14.02 11.3 126.8 May 3,726,000 12.26 14.4 209.8 11 4,875.000 1 12.26 10.5 163.8 894,Wsi .2 1.862,500 12.26 14.0 201.6 5,341,000 12.26 9.4 136.2 June 3,059,000 17.48 12 Month Floating PAN Load (Ibslac/yr): Annual PAN Load Limit (Ibs/ac/yr): 16.8 226.6 350 226.6 5,700,000 17.48 17.5 181.3 350.01 181.3 912,.5 850,000 17.48 9.1 210.7 350.00 210.7 5,586,000 17.48 14.0 150.2 350.00 150.2 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 3 of FI Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc. County: Robeson Month: June Year: 2023 Field Name: K Field Name: L Field Name: M Field Name: N Field Name: O Area (acres): 9.86 Area (acres): 24.94 Area (acres): 23.07 Area (acres): 78.87 Area (acres): 19.9 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES EINO Field Loaded? ❑ YES FZI NO Field Loaded? ❑ YES 0 NO Field Loaded? ❑ YES [I No Field Loaded? ❑ YES Q N0 •Qm+ C 13 a Qd > Z4 a NmCA M C> QV a "o 0 o Z ;o J Z U a Q o > Z aa C) C Q Z "D A o ' ma 0 J Z U a L o > o ) > j Z 0. MJ oZ o M � o a Q N o > z oZ a �a Cl > Z Bd -o D ,e m 0 Z Q. o > ao " 0L> > V Aa. v N; Z Ja m >ate mJ oo 2J Uo Month gat mg/L Ibs/ac Ibs/ac gal mg1L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mglL Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac July 223,000 16.85 3.2 3.2 2.795.000 16.85 15.7 15.7 2,200,000 16.85 13.4 13.4 12,111,000 16.85 21.6 21.6 2,436,000 16.85 17.2 17.2 August 1,292,000 14.21 15.5 18.7 3,094,000 14.21 14.7 30.5 1,980,000 14.21 10.2 23.6 9,141,000 14.21 13.7 35.3 2,436,000 14.21 14.5 31.7 September 1,564,000 16.43 21.7 40.4 3.068,000 16.43 16.9 47.3 2,585,000 16.43 15.4 38.9 6,666,000 16.43 11.6 46.9 2,256,000 16.43 15.5 47.2 October 1,292,000 14.27 15.6 56.0 3.016,000 14.27 14.4 61.7 2,255,000 14.27 11.6 50.6 8,382,000 14.27 12.6 59.5 2,328,000 14.27 13.9 61.2 November 1,232,500 14.13 14.7 70.8 2,457.000 14.13 11.6 73.3 1,265,000 1 14.13 6.5 1 57.0 10,989,000 14.13 16.4 76.0 2,460,000 14.13 14.6 1 75.7 December 1,207,000 17.77 1 18.1 88.9 1,833,000 1 17.77 10.9 84.2 2,447,500 17.77 15.7 72.7 9,207,000 1 17.77 17.3 93.3 2,340,000 17.77 17.4 1 93.2 January 1,377,000 12.59 14.7 103.6 2,353,000 12.59 9.9 94.1 1,155,000 12.59 5.3 78.0 11,121,000 12.59 14.8 108.1 2,496,000 12.59 13.2 106.3 February 1,071,000 12.85 11.6 115.2 1.664,000 12.85 7.2 101.3 2,970,000 12.85 13.8 91.8 9,207,000 12.85 12.5 120.6 2,268,000 12.85 12.2 118.5 March 1,555,500 15 19.7 134.9 1.911,000 15 9.6 110.8 3,217,500 15 17.4 109.2 10,362,000 15 16.4 137.0 2,700,000 15 17.0 135.5 April 1,207,000 14.02 14.3 149.3 2,249,000 14.02 10.5 121.4 3,135,000 14.02 15.9 125.1 11,715,000 14.02 17.4 154.4 2,784,000 14.02 16.4 151.9 May 867,000 12.26 9.0 158.3 2,301,000 12.26 9.4 130.8 2,200,000 12.1!1 10,494,000 12.26 13.6 168.0 2,640.000 12.26 13.6 165.4 June 1,343,000 17.48 19.9 178.1 2,080,000 17.48 12.2 143.0 2,696,000 17. 12.540,000 17.48 23.2 191.2 3,024,000 17.48 22.2 187.6 12 Month Floating PAN Load (Ibs/ac/yr): Annual PAN Load Limit (Ibs/ac/yr): 178.1 350 143.0 . 191.2 350.00 187.6 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page T ofr Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc. County: Robeson Month: June Year: 2023 Field Name: P Field Name: Q Field Name: R Field Name: S Field Name: T Area (acres): 28.64 Area (acres): 23.8 Area (acres): 19.16 Area (acres): 12.74 Area (acres): 6.25 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES [21 NO Field Loaded? 1 YES (J NO Field Loaded? ❑ YES 0 No Field Loaded? ❑ YES EINO Field Loaded? ❑ YES [A NO Z a (D aU Z cc o O m J Z U n a Q ° 0 Z o CU C) � C >U Z t p > 'n m z d Zm a u > C aU O m Z E U a. Q 2 ZR n � C > Z Q a LOZ O > J E 7 L aaa a - ZQa C> >U Zo Qa o �-+E O m7>> J aa ZJE U Month gal mg/L Ibslac ' 2.7 Ibs/ac gal mg/L Ibslac Ibslac gal mg/L Ibslac lbs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac July 4,626,000 16.85 22.7 4,150,000 16.85 24.5 24.5 2,724,000 16.85 20.0 20.0 1,999,500 16.85 22.1 22.1 894,000 16.85 20.1 20.1 August 3,636,000 14.21 15.0 37.7 3,285,000 14.21 16.4 40.9 2,268,000 14.21 14.0 34.0 1,767,000 14.21 16.4 38.5 697,500 14.21 13.2 33.3 September 3,420,000 16.43 16.4 54.1 3,120,000 16.43 18.0 58.8 2,232,000 16.43 16.0 50.0 2,170,000 16.43 23.3 61.8 828,000 16.43 18.2 51.5 October 2,880,000 14.27 12.0 66.1 2,790,000 14.27 14.0 72.8 2,112,000 14.27 13.1 63.1 1,240,000 14.27 11.6 73.4 711,000 14.27 13.5 65.0 November 4,716,000 14.13 19.4 85.5 3,330,000 14.13 16.5 89.3 2,640,000 1 14.13 16.2 79.3 2,697,000 14.13 24.9 98.4 576,000 1 14.13 10.9 75.9 December 3,600,000 17.77 18.6 104.1 3,030,000 17.77 18.9 108.1 2,184,000 17.77 16.9 96.2 1,798,000 17.77 20.9 119.3 549,000 17.77 13.0 88.9 January 3,438,000 12.59 12.6 116.7 3,330,000 12.59 14.7 122.8 2,448,000 12.59 13.4 109.6 2,247.500 12.59 18.5 137.8 603,000 12.59 10.1 99.0 February 3,690,000 12.85 13.8 130.5 3,375,000 12.85 15.2 138.0 2,376,000 12.85 13.3 122.9 2,464.500 12.85 20.7 158.5 387,000 12.85 6.6 105.7 March 3,924.000 15 17.1 147.7 2.550,000 15 13.4 151.4 1,284,000 15 8.4 131.3 2.294,000 15 22.5 181.1 396,000 15 7.9 113.6 April 2,808,000 14.02 11.5 159.1 3,390.000 14.02 16.7 168.1 2,568.000 14.02 15.7 147.0 2,588.500 14.02 23.8 204.8 913.500 14.02 17.1 130.7 May 3.384,000 12.26 12.1 171.2 3.585.000 12.26 15.4 183.5 1 2,472,000 12.26 13.2 160.2 1,240,000 12.26 10.0 214.8 607,500 1 12.26 9.9 140.6 June 4,464,000 17.48 22.7 193.9 3,840,000 17.48 23.5 207.0 2,568,000 17.48 19.5 179.7 1,317,500 17.48 15.1 229.8 873,000 1 17.48 20.4 1 161.0 12 Month Floating PAN Load (Ibs/ac/yr): 193.9 207.0 179.7 229.8 161.0 Annual PAN Load Limit (lbs/ac/yr): 2 350,00 350.00 0 350.00 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of ' L Permit No.: WQ 0000484 Facility Name: Mountaire Farms Inc. County: Robeson Month: June Year: 2023 Field Name: U Field Name: V Field Name: W Field Name: X1 Field Name: X2 Area (acres): 3.65 Area (acres): 14.7 Area (acres): 11.08 Area (acres): 25.83 Area (acres): 11.55 Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ YES EINO Field Loaded? -] Yes NO Field Loaded? ❑ YES E]NO Field Loaded? ❑ YES ❑ No Field Loaded? ❑ YES 0 NO Z aO Z Z Z Za> Z Z aO d Z Z > C>>m o a n o a n a ;o 0 n AZ aa o o vA m oo 0m Qm7 CO m >(D6 0 L Z O v_ 7 C R J J E Z cc .2 J E Z J E OC>• rO.a,O J ZJE E E m V eO Q cO Q c , Q E oO o a > a U ° O a > > QO U O ° > QO V OU > > O aU a i> > > > Month gal mg/L lbs/ac 18 " 10.1 Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg1L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac July 481,500 16.85 18.5 1,700,000 16.85 16.3 16.3 1,500,000 16.85 19.0 19.0 2,772,000 16.85 15.1 15.1 1,218,000 16.85 14.8 14.8 August 310,500 14.21 28.6 2,142,000 14.21 17.3 33.5 1,890,000 14.21 20.2 39.2 2,508,000 14.21 11.5 26.6 1.102,000 14.21 11.3 26.1 September 319,500 16.43 12.0 40.6 2,142,000 16.43 20.0 53.5 1,890,000 16.43 23.4 62.6 3,729,000 16.43 19.8 46.4 1,638,500 16.43 19.4 45.6 October 342,000 14.27 11.2 51.8 1,666,000 14.27 13.5 67.0 1,470,000 14.27 15.8 78.4 3,960,000 14.27 18.2 64.6 1,334,000 14.27 13.7 59.3 November 270,000 14.13 8.7 60.5 2,584,000 14.13 20.7 87.7 2,280,000 14.13 24.2 1 102.7 3,399,000 14.13 15.5 80.1 1,493,500 1 14.13 15.2 1 74.5 December 126,000 17.77 5.1 65.6 1,292,000 17.77 13.0 100.7 1,110,000 17.77 14.8 117.5 3,036,000 17.77 17.4 97.5 1,334,000 17.77 17.1 91.7 January 310,500 12.59 8.9 74.5 2,771,000 12.59 19.8 120.5 2,745,000 12.59 26.0 143.5 2,706,000 12.59 11.0 108.5 1.189,000 12.59 10.8 102.5 February 207,000 12.85 6.1 80.6 2,278,000 12.85 16.6 137.1 1,860,000 12.85 18.0 161.5 3,366,000 12.85 14.0 122.5 1,508,000 12.85 14.0 116.5 March 144,000 15 4.9 85.5 1.326.000 15 11.3 148.4 870,000 15 9.8 171.3 7.029,000 15 34.0 156.6 2,726,000 15 29.5 146.0 April 193,500 14.02 6.2 91.7 11 3,791.000 14.02 30.2 178.6 1 2,835,000 1 14.02 29.9 201.2 1 1,188,000 1 14.02 5.4 161.9 1 522,000 14.02 1 5.3 151.3 May 229,500 12.26 6.4 98.2 3,604.000 1 12.26 1 25.1 1 203.E 11 2,460,000 1 12.26 22.7 1 223.9 11 2,805,000 1 12.26 11.1 173.0 1 1,522,500 1 12.26 13.5 164.8 June 263,250 17.48 10.5 1 17.48 20.4 224.0 1,665,000 17.48 21.9 1 245.9 3,234,000 17.48 18.3 191.3 1,421,000 17.48 17.9 182.7 12 Month Floating PAN Load (Ibs/ac/yr): 108.7 M8.7057,000 224.0 245.9 191.3 182.7 Annual PAN Load Limit (lbslac/yr): 35 3350.00 350.00 350.00 350.00 FORM NDMLR 10-13 ~ NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page-6--of S Permit No.: WQ 0000484 Facility Name: MOUntalre Farms Inc. county: Robeson Month: June Year: 2023 Field Name: Y Field Name: Z Field Name: Field Name: Field Name: Area (acres): 3.21 Area (acres): 7.1 Area (acres): Area (acres): Area (acres): Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Cover Crop: Coastal/Oats Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ] YES ❑ NO Field Loaded? _ YES NO Field Loaded? ❑ YES ❑ NO Field Loaded? ! YES L NO Field Loaded? [_ YES [ NO a a 0 Q Q 0 Q a a Q a 2 Q > Q° QT > U a @0. Q a m Q a. Q U a a ti A OQ p U E f` U .L-. O J J 7 Z U R U t 0 J J O Z U L p J 7 Z E U U O y 0 J J Q U U m C @ L 0 J J E U C o C o 7 a V a E U C > o C o 7 a V a E U C > o C o a v a E U U > o C o Q v a E U > o C o Q v a o Q v o Q V o Q v o ¢ U o Q f-) Month gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibs/ac gal mg/L Ibs/ac Ibslac gal mg/L Ibslac Ibs/ac July 315,000 16.85 13.8 13.8 16.85 16.85 16.85 16.85 August 285,000 14.21 10.5 24.3 14.21 14.21 14.21 14.21 September 423,750 16.43 18.1 42.4 16A3 16.43 16.43 16.43 October 255,000 14.27 9.5 51.9 14.27 14.27 14.27 14.27 November 157.500 14.13 5.8 57.6 14.13 14.13 14.13 14.13 December 345.000 17.77 15.9 73.6 17.77 17.77 17.77 17.77 January 307,500 12.59 1 10.1 83.6 1 12.59 12.59 12.59 12.59 February 322,500 12.85 10.8 94.4 12.85 12.85 12.85 12.85 March 536,250 15 20.9 115.3 15 15 15 15 April 135,000 14.02 4.9 120.2 14.02 14.02 14.02 14.02 May 311,250 12.26 9.9 130.1 12.26 12.26 12.26 12.26 June 367,500 17.48 16.7 146.8 17.48 17.48 17.48 17.48 12 Month Floating PAN Load (Ibs/ac/yr): 146.8 1 0.0 0.0 0.0 0 0 3 . Annual PAN Load Limit(lbs/ac/yr): 350 "�' 350.00 350.00 350.00 350.00 FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page _q_of 11 Did the mass loading rates exceed the limits in Attachment B of your permit? El Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Inc Certification Number: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMLR? ❑ Yes 0 No Phone No.: 910-359-5275 Permit Exp.: 9/30/30 7/3/23 f 713/23 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page �_ of Permit No.: L1�1r�L 't Facility Name: MOuntalre Farms Inc County: Robeson Month: .tune Year: 2023 Did irrigation Field Name: A Field Narne: B Field Name: C Field Name: D occur Area (acres): 8.2 Area (acres): 6,75 Area (acres): 13.6 Area (acres): 3.5 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: p� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: p� Coastal/Rye Y e YES NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 78 Weather Freeboard Field Irrigated? YES NO Field Irrigated? YES I I NO Field Irrigated? YES NO Field Irrigated? YES -1 NO d 'D ami � F- C O ` a d N .nQ Ta R ,n w E "O 'o o T o x o = J -a n _ 7 J E _ .J a � Q o E E oo E .2m N _O F T C aa O J E x7E �o ` vCmCaa =J(9 1 °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 81 6 2 C 84 6 3 C 90 7 4 C 71 8 5 C 80 8 99.000 660 0.44 0.04 99,000 660 0.54 0.05 6 C 86 8 7 R 86 0.2 7 360,000 600 0.97 0.10 8 C 82 7 9 C 83 7 90,000 600 0.40 0.04 90,000 600 0.49 0.05 10 C 88 7 11 R 90 1.25 16 12 R 88 0.3 6 13 C 86 6 14 C 1 86 6 72,000 480 0.32 0.04 72,000 480 0.39 1 0.05 15 C 88 6 252.000 420 0.68 0.10 16 C 88 6 72,000 480 0.32 0.04 72,000 1 480 0.39 0.05 17 C 89 7 18 C 91 8 19 C 90 0,75 7 20 R 1 77 1 6 21 CL 74 0.1 6 76,500 510 0.34 0.04 22 R 81 0.9 6 23 PC 83 6 24 C 88 6 25 C 92 6 26 R 1 92 1.25 5 27 C 90 6 288,000 480 0.78 0.10 28 C 90 6 108,000 720 0.49 0.04 108.000 720 0.59 0.05 29 C 91 6 30 C 91 6 36,000 240 0.16 0.04 144,000 240 0.39 0.10 31 Monthly Loading: 553,500 2.49 ua; 441.000 2.41 1,044,000 2.83 ,; 0 0 00 12 Month Floating Total (in): 35.34 48.86 62.59 1 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W4 L1QCk, _nL.+ I Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2023 Did irrigation Field Name: E Field Name: F Field Name: G Field Name: H occur Area (acres): 4.7 Area (acres): 26.53 Area (acres): 47.489 Area (acres): 14.19 at this facility? Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye Cover Crop: Coastal/Rye YES NU Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 78 Annual Rate (in): 78 Annual Rate (in): 91 Annual Rate (in): 91 Weather Freeboard Field Irrigated? _ YES n NO Field Irrigated? YFs NO Field Irrigated? YES iNO Field Irrigated? YES No > o o UL v a a F- c ° ` n. o N m.0 1ME Qo u, :t dv a � rn E E= =o x p = E c a i Q J E T E o p J E a � Q d J E m cTc X p o 2J Ed o Q _ >, m 13 _jN cE =a mc E va c o J °F „A ft ftv gal min in in gal min in in gal min in in gal min in in 1 C 81 6 480,000 480 0.37 0.05 2 C 84 6 540,000 540 0.42 0.05 3 C 90 7 4 C 71 8 5 C 80 8 506,000 660 0.70 0.06 6 C 86 8 7 R 86 0.2 7 720,000 720 0.56 0.05 144,000 1 720 0.37 0.03 8 C 82 7 600,000 600 0.47 0.05 9 C 83 7 460,000 600 0.64 0.06 600,000 600 0.47 0.05 120,000 600 0.31 0.03 10 C 88 7 11 R 90 1.25 6 121 R 88 0.3 6 13 C 86 6 14 C 86 6 368,000 480 0.51 0.06 120.000 600 0.31 0.03 15 C 88 6 600,000 600 0.47 0.05 16 C 88 6 368,000 480 0.51 0.06 480,000 480 0.37 0.05 17 C 89 7 18 C 91 8 19 C 90 0.75 7 120,000 600 0.31 0.03 20 R 77 1 6 21 CL 74 0.1 6 391.000 510 0.54 0.06 540,000 540 0.42 0,05 108,000 1 540 0.28 0.03 22 R 81 0.9 6 168,000 840 0.44 0.03 23 PC 83 6 24 C 88 6 25 C 92 6 26 R 92 1.25 5 27 C 90 6 600,000 600 0.47 0.05 28 C 90 6 552,000 720 0.77 0.06 132,000 660 0.34 0.03 29 C 91 6 414,000 540 0.57 1 0.06 540,000 540 0.42 0.05 30 C 91 6 31 Monthly Loading: 0 0.00 3,059,000 4.25 5,700,000 4.42 912,000 2.37 12 Month Floating Total (in): 0.00 67.22 53.87 33.55 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _ of Permit No.: �y((* L>ii"I 4?`f Facility Name: Mountalre Farnls Inc County: Robeson Month: June Year: 2023 Did irrigation occur Field Name: I Field Name: J Field Name: K Field Name: L Area (acres): 13.58 Area (acres): 58.22 Area (acres): 9.86 Area (acres): 24.94 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: P� Coastal/Rye e Y Cover Crop: p� Coastal/Rye e Y Cover Crop: P: Coastal/Rye Y e YES ro Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 91 Annual Rate (in): 91 Annual Rate (in): 91 Annual Rate (in): 91 Weather Freeboard Field Irrigated? YES NO Field Irrigated? YES I NO Field Irrigated? YES NO Field Irrigated? = : YES JI NO U t 0 E C)a F- C ° 12- ) N :n 0. U T 0 Ln- a) ' E 2' -a � ~ O J E cr, J a E T Z) 7 Q ~ iii E a) -o E,a z i ~ E a J E a Q Em ~ E Jrn _T C 7E M= 3: °F in ft ft gal min in in gal min in in gal min in in gal I min in in 1 C 81 6 392,000 480 0.25 0.03 136,000 480 0.51 0.06 2 C 84 6 441,000 540 0.28 0.03 3 C 90 7 4 C 71 8 5 C 80 8 6 C 1 86 8 490,000 600 0.31 0.03 1 260.000 600 1 0.38 0.04 7 R 86 0.2 7 250.000 600 0.68 0.07 8 C 82 7 490.000 600 0.31 0.03 170,000 600 0.63 0.06 9 C 83 7 10 C 88 7 441,000 540 0.28 0.03 153,000 540 0.57 0.06 234,000 540 0.35 0.04 11 R 90 1.25 6 12 R 88 0.3 6 13 C 86 6 14 C 86 6 490,000 600 0,31 0.03 170.000 600 0.63 0.06 15 C 88 6 175.000 420 0.47 0.07 260,000 600 0.38 0.04 16 C 88 6 392,000 480 0.25 0.03 208,000 480 0.31 0.04 17 C 89 7 18 C 91 8 19 C 90 0.75 7 490,000 600 0.31 0.03 260,000 600 0.38 0.04 20 R 77 1 6 187.000 660 0.70 0.06 21 CL 74 0.1 6 22 R 81 0.9 6 686.000 840 0.43 0.03 238,000 840 0.89 0.06 364.000 840 0.54 0.04 23 PC 83 6 24 C 88 6 25 C 92 6 26 R 92 1.25 5 441,000 540 0.28 0.03 27 C 90 6 200,000 480 0.54 0.07 260,000 600 0.38 0.04 28 C 90 6 539,000 660 0.34 0.03 187,000 660 0.70 0.06 29 C 91 6 225,000 540 0.61 0.07 1 234,000 540 0.35 0.04 30 C 91 6 294,000 360 0.19 0.03 102,000 360 0.38 0.06 31 Monthly Loading: 850.000 1 t62.99 5,586.000 3.53 1.343,000 5.02 2.080.000 3.07 12 Month Floating Total (in): 44,42 60.74 42.82 r FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page �-� of Permit No.: WO, 0-<r- 41, 1+ I Facility Name: Mountaire Farms Inc County: Robeson Month: June Year: 2023 Did irrigation occur Field Name: M Field Name: N Field Name: O Field Name: P Area (acres): 2307 Area (acres): 78.87 Area (acres): 19.9 Area (acres): 28.64 at this facility? Cover Crop: P� Coastal/Rye e Y Cover P� Coastal/Rye e Y Cover p� Coastal/Rye e Y Cover p� e Coastal/Rye Y YES I I NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 52 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? YES No Field Irrigated? YEs NO Field Irrigated? YES ❑ NO Field Irrigated? _ YES NO > o ° U y a a) ° io - ° w n ° ru 2 - ° E m > Q v m° E ~ rn ' c a J E T m ° c E a c9 S J m E 3) ° � Q v °= E ~ rn � c - •v 0 E T a� ° c E � M 2 J m o E d ° J Q �� E F °) � � _ 0 E a m ° ° E v R 2 J d° E a i Q v v °3 E ~ r � c v J E a rn ° c E v (U S J °F in ft ft` gal min in in gal min in in gal min in in gal min in in 1 C 81 6 660,000 600 0.31 0.03 240,000 600 0.44 0.04 360,000 600 0.46 0.05 2 C 84 6 495,000 540 0.79 0.09 858,000 780 0.40 0.03 3 C 90 7 726,000 660 0.34 0.03 264,000 660 0.49 0.04 4 C 71 8 5 C 80 8 726.000 660 0,34 0.03 264.000 660 0.49 0,04 396.000 660 0.51 0,05 6 C 86 8 550,000 600 0.88 0.09 7 R 86 0.2 7 660,000 600 0.31 0.03 240,000 600 0.44 0.04 360,000 600 0.46 0.05 8 C 82 7 9 C 83 7 660.000 600 0.31 0.03 360.000 600 0.46 0-05 10 C 88 7 1 594,000 540 0,28 0.03 11 R 90 1.25 6 12 R 88 0.3 6 312,000 780 0.58 0.04 13 C 86 6 504,000 840 0.65 0.05 14 C 86 6 924,000 840 0.43 0.03 336,000 840 0.62 0.04 15 C 88 6 550.000 600 0.88 1 0,09 660,000 600 0.31 0.03 1 360,000 600 0.46 0,05 16 C 88 6 528,000 480 0,25 0.03 17 C 89 7 18 C 91 8 19 C 90 0.75 7 792,000 720 0.37 0.03 288,000 720 0.53 0.04 432,000 720 0.56 0.05 20 R 77 1 6 605,000 660 0.97 0,09 660.000 600 0.31 0.03 21 CL 74 0.1 6 528.000 480 0.25 0.03 192,000 480 0.36 0.04 22 R 81 0.9 6 312,000 780 0.58 0.04 468.000 780 0.60 0.05 23 PC 83 6 726,000 660 0.34 0.03 241 C 88 6 25 C 92 6 26 R 92 1.25 5 495,000 540 0.79 0,09 660.000 600 0.31 0.03 240,000 600 0.44 0.04 360,000 600 0.46 0.05 27 C 90 6 462,000 420 0.22 0.03 28 C 90 6 924,000 840 0.43 0.03 336,000 840 0.62 0.04 504.000 840 0.65 0.05 29 C 91 6 792,000 720 0.37 0.03 30 C 91 6 360.000 600 0.46 0.05 31 Monthly Loading:1 2.695,000 4.30 #fit### 5.86 3.024,000 5.60 4.464,000 5.74 12 Month Floating Total (in): 44.87 56.94 55.83 1 57.34 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of '1 Permit No.:VQ L xy) ' d"1 Facility Name: Mountalre Farms Inc County: Robeson Month: June Year: 2023 Did irrigation Field Name: Q Field Name: R Field Name: S Field Name: T occur Area (acres): 23.8 Area (acres): 19.16 - Area (acres): 12.74 Area (acres): 6.25 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: P: Coastal/Rye a Y Cover Crop: P� Coastal/Rye e Y Cover Crop: p� Coastal/Rye Y e YES ❑ NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? tips _ NO Field Irrigated? I'I YrS _i NO Field Irrigated? _ YrS NO Field Irrigated? ] YES ❑ NO �. o Q 0 U m M N n1 E E d F- C ° af0+ a ` d f0 o (n a a n V T- M as p �p a) -o E N a o a i Q a) .�.. E m H _ rn ?+ C p J E T rn 7 C E n v = 0 J m a E Q o a Q v a) y E •m _ m T C a 0 0 J E a m 7 C E 5 v = 0 J v a E N � Q o Q Q v a7 „�•, E j- °� _ rn T C F 0 0 J E T rn 7_ C E» = 0 J a, U7 a o a i Q v a) Q1 E rn _ rn T C - -� o 0 J E T rn 7_ C E» = 0 J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 81 6 300,000 600 0.46 0.05 240,000 600 0.46 0.05 2 C 84 6 117,000 780 0.69 0,05 3 C 90 7 4 C 71 8 5 C 80 8 330,000 660 0.51 0.05 264,000 660 0.51 0.05 99,000 660 0.58 0.05 6 C 86 8 325.500 630 0.94 0.09 7 R 86 0.2 7 300.000 600 0.46 0.05 240,000 600 0.46 0.05 90,000 600 0.53 0.05 8 C 82 7 9 C 83 7 300.000 600 0.46 0.05 10 C 88 7 11 R 90 1.25 6 12 R 88 0.3 6 390,000 780 0.60 0.05 312,000 780 0.60 0.05 117,000 780 0.69 0,05 13 C 86 6 434,000 840 125 0.09 14 C 86 6 420,000 840 0.65 0.05 336,000 840 0.65 0.05 126.000 840 0.74 0-05 15 C 88 6 16 C 88 6 240,000 480 0.37 0.05 248.000 480 0.72 0.09 17 C 89 7 18 C 91 8 19 C 90 0.75 7 360,000 720 0.56 0.05 288,000 720 0,55 0.05 20 R 77 1 6 310,000 600 0.90 0.09 90,000 600 0.53 0.05 21 CL 74 0.1 6 22 R 81 0.9 6 390,000 780 0.60 0.05 312,000 780 0.60 0.05 23 PC 83 6 24 C 88 6 25 C 92 6 26 R 92 1.25 5 300,000 600 0.46 0.05 240,000 600 0.46 0.05 27 C 90 6 210,000 420 0.32 0.05 28 C 90 6 336,000 840 0.65 0.05 126,000 840 0.74 0.05 29 C 91 6 108,000 720 0.64 0.05 30 C 91 6 300.000 600 0.46 0.05 31 Monthly Loading: 3,840'000 5.94 2,568.000 4.94 1,317,500 3.81 873.000 5.14 12 Month Floating Total (in): 62.78 53.58 68.87 47.33:j FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ? of Permit No.: 4 311 Facility Name: MOUntalre Farms Inc County: Robeson Month: June Year: 2023 Did irrigation occur Field Name: U Field Name: V Field Name: W Field Name: X1 Area (acres): 3.65 Area (acres): 14.7 Area (acres): 11.08 Area (acres): 25.83 at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: P� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: P� e Coastal/Rye Y YE S -, Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? Yes I NO Field Irrigated? YES NO Field Irrigated? YES NO Field Irrigated? YES ❑ No a d d H ° d m n U T o a C? M N w v p Q % '0 m rn ° J C EE vo) 0i J ° a ° Q -_o d E 0) C v 0 J E cn C J EN ° °_ Q C,Ev 0 J E 0) o 0 J E d ° °. > Q N a T 0)C 0 -1 7E 0)0 E a JC 0a) °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 81 6 2 C 84 6 390,000 780 1.30 0.10 3 C 90 7 726,000 660 1.04 0.09 4 C 71 8 5 C 80 8 6 C 86 8 47.250 630 0.48 0.05 357.000 630 0.89 0.09 315,000 630 1.05 0.10 7 R 86 0.2 7 8 C 82 7 528.000 480 0.75 0.09 9 C 83 7 10 C 88 7 40.500 540 0.41 0.05 11 R 90 1.25 6 12 R 88 0.3 6 EE 13 C 86 6 476.000 840 1.19 0.09 420,000 840 1.40 0.10 14 C 86 6 63.000 840 0.64 0.05 15 C 88 6 1 1 660.000 600 0.94 1 0.09 16 C 88 6 272,000 480 0.68 0.09 240.000 480 0.80 0.10 17 C 89 7 18 C 91 8 19 C 90 0.75 7 20 R 77 1 6 340,000 600 0.85 0.09 300,000 600 1.00 0.10 21 CL 74 0.1 6 528,000 480 0.75 0.09 22 R 81 0.9 6 23 PC 1 83 6 1 49,500 660 0.50 0.05 374,000 660 0.94 0.09 24 C 88 6 25 C 92 6 26 R 92 1.25 5 27 C 90 6 238,000 420 0.60 0.09 28 C 90 6 63,000 840 0.64 0.05 29 C 1 91 6 1 792.000 720 1.13 0.09 301 C 91 6 31 Monthly Loading: 263,250 2.66 2,057,000 5.15 1.665.000 5.53 3.234,000 4.61 12 Month Floating Total (in): 32.26 68.53 75.03 56.65 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page � of_> Permit No.: ipJQ (1�) )o r lTq T Facility Name: Mountalre Farms Inc County: Robeson Month: June Year: 2023 Did irrigation Field Name: X2 Field Name: Y Field Name: Z Field Name: occur Area (acres): 11.55 Area (acres): 3.21 Area (acres): 7.1 Area (acres): at this facility? Cover Crop:Coastal/Rye Y e Cover Crop: P� Coastal/Rye e Y Cover Crop: P� Coastal/Rye e Y Cover Crop: p� Coastal/Rye Y e YFS Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Annual Rate (in): 86 Weather Freeboard Field Irrigated? Yrs No Field Irrigated? Yes I NO Field Irrigated? YES No Field Irrigated? YES _ No U r a E ° •a y a ° fn a O 4 v v ° Q i Q _ 0 0 J EE rn 2 0 J a) -° E ° 7 Q '0m ~' _ 0)o 0 J EE rno ' cE' 2 0 J m_0 a ° i Q E_0@ ° a ~ _ c v J EE v m 2 0 J a)v E.�E ° a > Q E m ~ '� D O@ 0 E ' Trnc E v m 2 0 � °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 81 6 2 C 84 6 3 C 90 7 319,000 660 1.02 0.09 82,500 660 0.95 0.09 4 C 71 8 5 C 80 8 6 C 86 8 7 R 86 0.2 7 8 C 82 7 232.000 480 0.74 0.09 60.000 480 0.69 0.09 9 C 83 7 10 C 88 7 11 R 90 1.25 6 12 R 88 0.3 6 13 C 86 6 141 C 1 86 6 15 C 88 6 290.000 600 0.92 0.09 75,000 600 0.86 0.09 16 C 88 6 17 C 89 7 18 C 91 8 19 C 90 0.75 7 201 R 77 1 6 21 CL 74 0.1 6 232,000 480 0.74 0.09 60,000 480 0.69 0.09 22 R 81 0.9 6 23 PC 83 6 24 C 88 6 25 C 92 6 261 R 92 1.25 5 27 C 90 6 28 C 90 6 29 C 91 6 348,000 720 1.11 0.09 90,000 720 1.03 0.09 30 C 91 6 31 Monthly Loading: 1,421.000 4.53 367,500 4.22 0 ';-' 0.00 0 000 12 Month Floating Total (in): 53.91 1 43.15 1 0.00 1 10.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of-z-- Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? 0 Compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant D Compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director Of Processing Has the ORC changed since the previous NDAR-1? ❑ yes 0 No Phone Number: 910-359-5275 Permit Exp.: 9/30/30 7/3/23 4 713/23 Signature Date Signature Date By this signature. I certify that this report is accurate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page -3- of Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2023 PPI: 001 Tlow Measuring Point: ] Influent 1-1 Effluent ❑ No flow generated771 Parameter Monitoring Point: L. Influent ❑ Effluent [ Groundwater Lowering Surface Water Parameter Code 0 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 o a ` a Q E c 0 E r, (n U O 3 o " = E N p O 1O o E E Q a 6 'a-F N n o E o LL o U c a) Y Z2 @- O ~ ° a m °_ CL dO > cn > aZ U Y U _c N 24-hr hrs GPD su I mg/L rng/L mg/L mg/L #/100 mL mg/L mg/L rng/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0630 10 3,090,000 7.6 3.09 34.4 36.1 16.3 3600 41.9 0.847 0.001 0.001 0.689 226 3.23 0.00923 0.0134 2 0630 10 3,090,000 7.3 3 0800 4 320,000 4 370,000 5 0630 10 2.990,000 6.6 6 0630 10 3,120,000 7.5 7 0630 10 2.880,000 7.6 8 0630 10 2,980,000 6.8 26.8 24.6 17.2 5800 28.3 1.85 0.174 9 0630 10 3.010,000 7 2 10 0800 4 370,000 11 600,000 12 0630 10 3,120,000 7.6 13 0630 10 3,080,000 7.3 141 0630 10 3.060,000 6.9 15 0630 10 3,080.000 7.1 16 0630 10 2,870,000 7.3 17 0800 4 520.000 18 320.000 19 0630 10 3,090,000 7.2 201 0630 10 3,200,000 6.7 21 0630 10 3,110,000 7.2 22 0630 10 3,190,000 6.8 23 0630 10 2,640,000 6.9 24 0800 4 100,000 25 360,000 261 0630 1 10 2,900,000 7.1 27 0630 10 3,080,000 6.9 28 0630 10 2,900,000 6.9 29 0630 10 3,040,000 7.2 30 0630 10 2,880,000 7.1 31 Average: 2,312,000 3.09 30.60 30.35 16.75 4,569.46 35.10 1.35 0.00 0.00 0.43 226.00 3.23 0.01 0.01 Daily Maximum: 3,200,000 7.60 3.09 34.40 36.10 17.20 5,800.00 41.90 1.85 0.00 0.00 0.69 226.00 3.23 0.01 0.01 Daily Minimum: 100,000 6.60 3.09 26.80 24.60 16.30 3,600.00 28.30 0.85 0.00 0.00 0.17 226.00 3.23 0.01 0.01 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _ of - -, Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2023 PPI: 001 Flow Measuring Point: f`J Influent fJll Effluent No flow generated Parameter Monitoring Point: ]Influent n Effluent n Groundwater Lowering Surface Water Parameter Code ► 50050 01042 00931 WQ09 70300 50060 00940 00600 o ` O F 0 c 0 m E F U) U 0 3 t0 CL O U c o E' o c a. O is U) Q s d c c� L .� O` aQ'z a m- -o O N '0 morn @ 0 c c m O 'y O ~XU m O 0 c d m rn p 0 ~'z 24-hr hrs GPD mg/L I Ratio mg/L mg/L mg/L mg/L mg/L 1 0630 10 3,090,000 0.00433 21.37 20.06 0 42.7 2 0630 10 3,090,000 0 3 0800 4 320,000 0 4 370.000 0 5 0630 10 2,990,000 0 6 0630 10 3,120,000 0.48 7 0630 10 2,880,000 0.53 8 0630 10 2,980.000 14.89 0.83 30.2 9 0630 10 3,010,000 0.93 10 0800 4 370,000 0 11 600,000 0 12 0630 10 3,120,000 0.66 13 0630 10 3,080,000 0.56 14 0630 10 3,060,000 0.17 15 0630 10 3,080.000 0.18 161 0630 10 2,870,000 0.34 17 0800 4 520,000 0 18 320,000 0 19 0630 10 3,090,000 0.48 20 0630 10 3,200,000 0.51 21 0630 10 3.110,000 0.15 22 0630 10 3,190,000 0 23 0630 10 2,640,000 0.27 24 0800 4 100,000 0 25 360,000 0 26 0630 10 2,900,000 0.53 27 0630 10 3,080,000 0.58 281 0630 10 2,900,000 0.18 29 0630 10 3,040,000 0.1 30 0630 10 2,880,000 0.63 31 Average: #REF! #REF! 21.37 17.48 0.27 36.45 Daily Maximum: #REF! #REF! 21.37 20.06 0.93 42.70 Daily Minimum: #REF! #REF! 21.37 14.89 0,00 30.20 Sampling Type: Recorder Grab Calculated Calculated Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous Monthly Monthly 2xlvlonthly 3xYearly 5xWeek 3xYear 2x Month FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _2> of 3 Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes 0 No Phone Number: 910-359-5275 Permit Expiration: 9/30/2030 f 7/3/2023 1 a1v 7/3/2023 Signature Date Signature Date By this signature. I certify that this report is accurrato and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the Information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information. including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page � of Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2023 PPI: 7TT71ow Measuring Point: E Influent I t ffluent No flow generated Parameter Monitoring Point: Influent n Effluent ❑ Groundwater Lowering ❑ Surface Water Parameter Code ► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 E O O E c) LL CL E LO O C p E E Q E O � Mm d 2 O H m c J E m U o a 0 aO E � u UE Z N 24-hr hrs GPD su 1 mg/L mg/L mg/L mg/L 1 #/100 mL rng/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0630 10 3,090,000 7.6 2 0630 10 3,090,000 7.3 3 0800 4 320,000 4 370,000 5 0630 10 2,990,000 6.6 6 0630 10 3,120,000 7.5 7 0630 10 2,880,000 7.6 8 0630 10 2,980,000 6.8 9 0630 10 3,010,000 7.2 10 0800 4 370.000 11 600,000 12 0630 10 3.120,000 7,6 131 0630 10 3,080,000 7.3 14 0630 10 3,060,000 6.9 15 0630 10 3,080,000 7.1 16 0630 10 2,870,000 7.3 17 0800 4 520,000 18 320,000 19 0630 10 3,090,000 7.2 20 0630 10 3,200,000 6.7 21 0630 10 3,110,000 7.2 22 0630 10 3,190,000 6.8 23 0630 10 2,640,000 6.9 24 0800 4 100,000 25 360,000 26 0630 10 2,900,000 7.1 27 0630 10 3,080,000 6.9 28 0630 10 2,900,000 6.9 29 0630 10 3,040,000 7.2 301 0630 1 10 2,880,000 7.1 31 Average: 2,312,000 Daily Maximum: 3,200.000 7.60 Daily Minimum: 100,000 6.60 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xfvlonthly 2xMonthly 2xhlon0hly 2xMonthly 2xMont111y 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly rclonthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page-1—of a r Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 21 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes El No Phone Number. -5275 Permit Expiration: 9/30/2030 liiA�� 7/3/2023 :910-3 4d 7/3/2023 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of taw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fines and Imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ) of-4, Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June near: 2023 PPI: 003 Flow Measuring Point: Influent[ J Effluent [ J No flow generated Parameter Monitoring Point: Influent j • effluent ❑Groundwater Lowering []Surface Water Parameter Code ► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 m Q E O c O U O ° rL. = E N O �p O O E E Q o ' -o , F- a o En c U) m EO - u- O U r a I� m Y 2 "' A Z O I- m :_ Z a° J E R U in OE o L o o- F- O O a >E � O >En U Y u Z u c N 24-hr hrs GPD su mg/L mg/L mg/L mg/L #/100 mL mg1L mg/L mg/L mg/L mg1L mg/L mg1L mg/L mg/L 1 0630 10 26,400 7.6 2 0630 10 25,600 7.3 3 0800 4 7,900 4 11,300 5 0630 10 26,700 6.6 6 0630 10 27,400 7.5 7 0630 10 26,800 7.6 8 0630 10 28,700 6.8 9 0630 10 26,600 7.2 10 0800 4 9,100 11 12.300 12 0630 10 27,400 7.6 13 0630 10 27,500 7.3 14 0630 10 28,400 6.9 15 0630 10 27,000 7.1 16 0630 10 26,700 7.3 17 0800 4 10,000 18 8,400 19 0630 10 28,700 7.2 20 0630 10 31,700 6.7 21 0630 10 31,400 7.2 221 0630 1 10 30.900 6.8 23 0630 10 22.100 6.9 24 0800 4 11,200 25 11,100 26 0630 10 22,200 7.1 27 0630 10 30,200 6.9 28 0630 10 27,700 6.9 29 0630 10 27,800 7.2 30 0630 10 27.000 7.1 31 Average: 22,873 Daily Maximum: 31,700 7.60 Daily Minimum: 7,900 6.60 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xroonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ;_� of 2— Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 21 Compliant ❑ Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Official's Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes El No Phone Number: 910; 359-5275 Permit Expiration: 9/30/2030 `.! Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. IV4/ 7l312023 Signature Date 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ) of _;I_ Permit No.: W00000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2023 PPI: 004 Flow Measuring Point: ❑ Influent ❑ Effluent " No flow generated Parameter Monitoring Point: Influent —1 Effluent ] Groundwater Lowering Surface Water Parameter Code --► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 O > �' Q E 1- O C O E V7 0 3 o LL o E u c p O m m o E E Q m m 'o o m N- fn N o cui = LL 0 .0 m e m 0) Y Q Z 0 Z � m J E E U V) _ o a NO (L > o t0 > X Z u c_ N 24-hr hrs GPD su mg/L rng/L mg1L mg/L #/100 mL mg/L mg/L mg/L mg/L mg1L mg/L mg/L mg/L mg/L 1 0630 10 9,079 2 0630 10 10,240 3 0800 4 0 4 31,660 5 0630 10 10,660 6 0630 10 9,417 7 0630 10 8,148 8 0630 10 14,034 9 0630 10 0 10 0800 4 0 11 57,460 12 0630 10 28,507 13 0630 10 19,730 14 0630 10 21,291 15 0630 10 21,049 16 0630 10 32,737 17 0800 4 0 18 32,930 19 0630 10 12,070 20 0630 10 21,609 21 0630 10 43,171 22 0630 10 1,541 23 0630 10 144,633 24 0800 4 0 25 68.230 26 0630 10 285.841 27 0630 10 19,497 28 0630 10 30,002 29 0630 10 81,036 301 0630 1 10 0 31 Average: 33,819 Daily Maximum: 285.841 Daily Minimum: 0 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2.550,000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly 2xMonthly Monthly Monthly 2xMonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ;), of Sampling Person(s) Certified Laboratories Name: Robert Jackson Name: Cameron Testing Name: Joshua Simmons Name: TBL Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ Yes No Phone Number: 910-359-5275 Permit Expiration: 9/30/2030 N;a2� ` ut7!3l2023 713l2023 Signature Date Signature Date By this signature. I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page I of Permit No.: VVQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2023 PPI: 005 Flow Measuring Point: LJ Influent ❑ Effluent ❑ No Flow generated Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑ Groundv ater Lowering D Surface Water Parameter Code -► 50050 00400 00927 00310 00610 00530 31616 00625 00620 01051 01027 00665 00929 00916 01067 01092 o ` O U O C O E O H U p 3 lO = n. E zo c m O m m O E E Q M 'C U p a o t' U)rn rn 1Q d LL 0 L ° O Y 2 mZ F0 f0 .- Z 0 m V In ` O L ~ a o a O o 7 O Y U Z C N 24-hr hrs GPD su I mg/L mg/L mg/L I mg/L #/100 mL mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L mg/L 1 0630 10 3,090,000 7.6 2 0630 10 3.090,000 7.3 3 0800 4 320,000 4 370,000 5 0630 10 2,990,000 6.6 6 0630 10 3,120,000 7.5 7 0630 10 2,880,000 7.6 8 0630 10 2,980,000 6.8 5.14 <2.00 <0.100 <10 0.291 51.9 <0.001 <0.001 <0.050 130 9.44 0.00216 0.0134 9 0630 10 3,010,000 7.2 10 0800 4 370,000 11 600,000 12 0630 10 3,120,000 7.6 13 0630 10 3,080,000 7.3 14 0630 10 3,060,000 6.9 15 0630 10 3,080,000 7.1 16 0630 10 2,870,000 7.3 17 0800 4 520,000 18 320,000 19 0630 10 3.090,000 7.2 20 0630 10 3.200,000 6.7 21 0630 10 3,110,000 7.2 22 0630 10 3,190,000 6.8 23 0630 10 2,640,000 6.9 24 0800 4 100,000 25 360,000 26 0630 10 2.900,000 7.1 27 0630 10 3.080,000 6.9 28 0630 10 2,900,000 6.9 29 0630 10 3,040,000 7.2 30 0630 10 2,880,000 7.1 31 Average: 2,312,000 5.14 0.00 0.00 1.00 0.29 51.90 0.00 0.00 0.00 130.00 9.44 0.00 0.01 Daily Maximum: 3,200,000 7.60 5.14 2.00 0.10 10.00 0.29 51.90 0.00 0.00 0.05 130.00 9.44 0.00 0.01 Daily Minimum: 100,000 6.60 5.14 2.00 0,10 10.00 0.29 51.90 0.00 0.00 0.05 130.00 9.44 0.00 0.01 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: Daily Limit: 2.550.000 Sample Frequency: Continuous 5xWeekly Monthly 2xMonthly 2xMonthly 2xtlonthly 2xMonthly 2xMonthly 2xMonthly t✓lonthly Monthly 2xr;lonthly Monthly Monthly Monthly Monthly FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page J_ of _3 Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: June Year: 2023 PPI. 005 Flow Measuring Point: Influent ]Effluent ] No flow generated Parameter Monitoring Point: L,`lu nt rff(ient ❑Groundwater Lowering CI Surface Water Parameter Code 0 50050 01042 00931 WQ09 70300 50060 00940 00600 > m `O d ¢ E U i= U c d E U� O 3 o u p a CL o U E. O s o o o n W rn-o G C ,n C) c m rn U. o a az ) f/1 m a 6 0• F oEn l9 r) p C m o o 0 ~�U d 0 U C G m m 6 2 ~z 24-hr hrs GPD mg/L Ratio mg/L mg/L mg/L mg/L mg/L 1 0630 10 3,090,000 2 0630 10 3,090,000 3 0800 4 320,000 4 370.000 5 0630 10 2,990,000 6 0630 10 3,120,000 7 0630 10 2,880,000 8 0630 10 2,980,000 0,00176 52.2 9 0630 10 3,010,000 10 0800 4 370,000 ill 600,000 12 0630 10 3,120,000 13 0630 10 3,080,000 14 0630 10 3.060,000 15 0630 10 3.080,000 16 0630 10 2,870,000 171 0800 4 520.000 18 320,000 19 0630 10 3,090,000 20 0630 10 3,200,000 21 0630 10 3,110,000 22 0630 10 3,190,000 23 0630 10 2,640,000 24 0800 4 100,000 25 360,000 261 0630 10 2,900,000 27 0630 10 3,080,000 28 0630 10 2,900,000 29 0630 10 3,040,000 30 0630 10 2,880,000 31 Average: #REF! #REF! 52.20 Daily Maximum: #REF! #REF! 52.20 Daily Minimum: #REF! #REF! 52.20 Sampling Type: Recorder Grab Calculated Calculated Grab Grab Grab Grab Monthly Limit: Daily Limit: 2,550,000 Sample Frequency: Continuous Monthly Monthly 2xMonthly 3xYearly 5xWeek 3xYear 2x Nlonth FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page S of ":a Sampling Person(s) Name: Robert Jackson Name: Joshua Simmons Name: Cameron Testing Name: TBL Certified Laboratories Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑r Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective taKen. Hnacn aaalnonai sneets It necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Robert Jackson Permittee: Mountaire Farms Certification No.: 1008145 Signing Official: David White Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing Has the ORC changed since the previous NDMR? ❑ yes E) No Phone Number: 910-359-5275 Permit Expiration: 9/30/2030 d 7/3/2023 7/3/2023 Signature Date Signature Date By this signature. I certify that this report Is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617