Loading...
HomeMy WebLinkAboutNCC232035_Site Plan or Location Map_20230705 Li a a a 0 a0 N O C Z 7 DEVELOPMENT PLANS • l O 45 I I. I d °' o a d g U aa`� • a' E "171 . m z "a L m O > o S U d i1 FOR ghl ima MOSSY RIDGE MHP & STORAGE YCC Q Q o D- Q W o- U W 1 0 0 C� v=i ICI = Q Z 0 WEST ROCK INVESTMENTS, LLC o 0 W I- z 2 D ( < i_ MR. JOHN LEHOTSKY o Q D Li Q z P. 0. BOX 3291 z `,, CASHIERS, NORTH CAROLINA 28717 REVISED JUNE 16, 2023 cL !— GENERAL NOTES W W w 1. THE PROJECT IS NOT LOCATED WITHIN A 100-YEAR FLOOD HAZARD AREA. Sheet List Table 0 2. THE LOCATIONS OF KNOWN UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND ' ` '^ C/) HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR Sheet No. Sheet Title V SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE C-1 COVER SHEET CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILTIES. C-2 MASTER PLAN 3. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION PRIOR TO CONSTRUCTION AND MAINTENANCE/REPAIRS DURING CONSTRUCTION OF SEDIMENT CONTROL MEASURES AS REQUIRED TO C-3 PLAN-PROFILE: MOSSY RIDGE ROAD RETAIN ALL SEDIMENTS AND EROSION ON THE SITE OF DEVELOPMENT. THE PROVISIONS AS SHOWN HEREON REPRESENT THE MINIMUM EROSION CONTROL MEASURES TO BE TAKEN. ' 4111111L. �: C-4 PLAN-PROFILE: MOSSY RIDGE ROAD 4. CONTRACTOR SHALL NOTIFY EXISTING UTILITY OWNERS OF ANY WORK INVOLVING THEIR FACILITIES AT _,.�-� IF LEAST 72 HOURS IN ADVANCE. aift�t/ C-5 PLAN-PROFILE: MOSSY RIDGE CIRCLE 5. CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOWS AS BUILT ���1 % C-6 PLAN-PROFILE: MOSSY RIDGE LOOP CONDITION OF ALL WORK. THESE RECORD DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER. ,��',�6. ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION WILL BE REPAIRED BY THE CONTRACTORC-7 EROSION CONTROL PLAN PRIOR TO FINAL "ASOBUILT" SIGN-OFF FROM THE ENGINEER OF RECORD. C-8 EROSION CONTROL DETAILS 7. NOTIFY NORTH CAROUNA 811 CENTER 48 HOURS IN ADVANCE PRIOR TO DIGGING WITHIN R/W; 1-800-632-4949. li I// � C-9 EROSION CONTROL NOTES Revisions 8. NO DEVIATIONS OR REVISIONS FROM THESE PLANS BY THE CONTRACTOR SHALL BE ALLOWED WITHOUT �]'�, ., /' PRIOR WRITTEN APPROVAL FROM THE DESIGN ENGINEER. �' +�\ +��/ C-10 SITE DETAILS/NOTES Dote Description 9. CONSTRUCTION SEQUENCE: ��-r��/ 9.1. INSTALL SILTATION FENCE WHERE SHOWN. 9.2. INSTALL TRAFFIC CONTROL MEASURES WORK ZONE BY WORK ZONE. 9.3. INITIAL CLEARING - REMOVE TREES, SHRUBBERY AND OTHER ITEMS SHOWN ON DEMOLJTION PLAN. ja,....,� 4/‘f�„.,„, 9.4. INSTALL UTILITY IMPROVEMENTS. Ir� ,. 1,.' Designed By. 9.5. CONSTRUCT NEW ROADWAYS AND PRIVATE DRIVEWAYS. 9.6. INITIATE LOT GRADING AND EROSION CONTROL FOR LOTS ON AN AS NEEDED BASIS. ' , /,. D P J 9.7. CONSTRUCT RESIDENTIAL UNITS. 4* Drawn By. 9.8. STABILIZE AND LANDSCAPE DEVELOPED LOTS AS WORK PROGRESSES. SEE SEEDING SCHEDULE ON 'k\ D P J EROSION CONTROL NOTES/DETAILS - SHEET 9. Checked By: DPJ Job No.: VICINITY MAP Date: 190015 5/25/23 Scale: AS SHOWN Sheet No.: C-1 1 OF 9