Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4220501_Cover letter & permit_20220728
STATt ROYCOOPER S" Governor ELIZABETH S.BISER Secretary BRIAN WRENN NORTH CAROLINA July 28, 2022 Director Environmental Quality Watauga County Attn: Deron Geouque 814 W King St. Boone,NC 28607 Subject: State Stormwater Management Permit No. SW4220501 Valle Crucis School High Density Project Watauga County Dear Deron Geouque: The Raleigh Central Office received a complete, State Stormwater Management Permit Application for the subject project on May 9, 2022. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in 15A NCAC 2H.1000 amended on January 1, 2017 (2017 Rules). We are hereby forwarding Permit No. S W4220501 dated July 28, 2022, for the construction of the built-upon areas (BUA), vegetated conveyances and stormwater control measures (SCM) associated with the subject project. This permit shall be effective from the date of issuance until July 27, 2030 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be tiled with the OAH within thirrttyy (30) da s of receipt of this permit. You should contact the OAH with all questions relgarding the Filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Carl Dunn in the Washington Regional Office, at(252) 948-3959 or carl.dunn@ncdenr.gov. Sincerely, William Carl Dunn, PE Division of Energy, Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Application Documents cc: Gregory Hoffman—Civil design Concepts,PA(ghoffman@cdcgo.com) Watauga County Inspections—Christopher Grubb(p&i@watgov.org) Washington Regional Office Raleigh Central Office D rl 0% North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources �J Washington Regional Office 1 943 Washington Square Mall I Washington,North Carolina 27889 wam cnrcu ` V _' ""nh1�\ / 252.946.6481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Watauga County Valle Crucis School 2756 Broadstone Road, Banner Elk, Watauga County FORTHE construction, management, operation and maintenance of built-upon area draining to two ADS Bayfilter systems ("stormwater control measures" or "SCMs") discharging to Class B;TR;HQW waters as outlined in the application, approved stormwater management, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until July 27, 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 185,012 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCM labeled System A has been designed using the runoff treatment method to handle the runoff from 163,350 square feet of BUA within the delineated drainage area. The SCM labeled System B has been designed using the runoff treatment method to handle the runoff from 21,662 square feet of BUA within the delineated drainage area. The pipe collection network for both systems has been oversized to provide additional underground detention prior to reaching the Bayfilter Systems.. System A and System B do not contain any allocation for future BUA. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCM is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This SCM must be provided and maintained at the design condition. 4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. S. VEGETATED SETBACKS. A 30-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights-of- way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of- way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS.The final recorded plats must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable,will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material within the common areas to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline,to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143- 214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated conveyances must be accessible for inspection, operation, maintenance and repair as shown on the approved plans. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions. g. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice,the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. h. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances,which are imposed by any other Local, State or Federal government agency having jurisdiction.Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 28th day of July 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Anbvt- ;�Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW4220501 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As-Built Permittee Certification • As-Built Designer's Certification General MDC • As-Built Designer's Certification for Bayfilter Project A separate certification is required for each SCM. These blank certification forms maybe copied and used, as needed,for each SCM and/or as a partial certification to address a section or phase of the project. I AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. ❑ Check here if this is a partial certification. Section/phase/SCM Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature 1, a Notary Public in the State of County of do hereby certify that personally appeared before me this day of 20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Permittee's Certification NCAC .1042(4) Completed/ N A Provided A. DEED RESTRICTIONS BUA RECORDS 1. The deed restrictions and protective covenants have been Y or N recorded and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective Y or N covenants has been rovided to the Division. 3. Records which trac t e BUA on each lot are being kept. (See Y or N Note 1 B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection Y or N conveyance system are located in recorded drainage easements. 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y or N have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N 2. Atypical detail for the SCM. Y or N 3. A note that the SCM is require to meet storm water regulations and that the lot owner is subject to enforcement action as set Y or N forth in NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The 0&M Agreement is referenced on the final recorded plat. Y or N 2. The 0&M Agreement is recor e with the Register o Deeds an y or N a ears in the chain of title. OPERAXION AND MA N A -maintenance records are being kept in a known set location for each SCM and are available for Y or N review. G. DESI R SCERTIFICATION FOR - as been provided to y or N Division. Note 1-Acceptable records include ARC approvals,as-built surveys,and county tax records. Provide an explanation for every requirement that was not met, and for every"N/A" below. Attach additional sheets as needed. AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM Check here if this is a part of a Fast-Track As-Built Package Submittal per.1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date SEAL: Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: I O Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this SCM or project. Consultant's Certification NCAC.1003((3) &General ON MDC.1050OAs-built E/ ON/A A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runo f from of site areas and/or existing BUA is Y or N b assed. 4. Runoff from o Ifsite areas aII or existing BUA is Y or N directed into the permitted SCM and is accounted for at the full build-out potential. T e project controls runoff through an oftsite Y or N permitted SCM that meets the requirements of the MDC. 6. T e net area of new BUA increase tor an existing Y or N project has been accounted for at the appropriate desi n storm level. 7. T e SCM(s) meets all the speci is minimum design Y or N criteria. B. VEGETATED SETBACKS BUA 1. T e wi t o t e vegetated—setback has been Y or N measured from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. T e vegetated setback is maintained in grass or of er Y or N ve etation. 3. BUA t at meets t e requirements of NCGS 143 214.7 Y or N b2 2 is located in the setback. 4. BUA t at oesnotroCeLL11tLecluirements o NCGS Y or N 143-214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water-de endentstructures c. Minimal footprint uses (utility poles, signs, security li htin and appurtenancesl S. Stormwater that is not U eated in an SCM is released Y or N at the edge of the setback and allowed to flow through the setback as dispersed flow. OO As built ME/ OO N/A ORMWAT R UT ETS—t e out et an es t e pea Y or N flow from the 10 upnr storm with no downslo a erosion. D. VARIATIONS 1. A variation (alternative) from trie stormwater rule Y or N rovisions has been implemented. 2. T e variation provides equal or better stormwater control and equal or better protection of surface Y or N waters. M L W HOT ER E U T Y Y or N has been met. F. SIZING- e vo ume o t e C to es t o runo rom a surfaces into account and is sufficient to handle the Y or N re uired storm de th. G. CONTAMIN T S IL —in trating S s are not Y or N located in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1V. Y or N 2. Si e s opes inc u e retaining wa s, ga ion wa s, or Y or N other surfaces that are steeper than 3HAV. 3. Vegetated side slopes are steeper tflan 3H:1V Y or N (provide supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. T e out et oes not cause erosion owns ope o t e y or N discharge point during the peak flow from the 10 year storm. J. E CE FLOWS- n over ow ypass has een rovided. Y or N K. E ATE ING- met o to raw own stan ing water Y or N has been provided to facilitate maintenance and inspection. L. LE 0 T AF )een Y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. T e access oes not inc u e atera or inc ine s opes y or N >3:1. N. DESIGNER QU U—F 1U TIONS FAST-TF K P RMIT The designer is licensed under Chapters 89A, 89C,89E, or Y or N 89F of the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E", below.Attach additional pages as needed: i i AS-BUILT DESIGNER'S CERTIFICATION FOR BAYFILTER PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the requirements of NCAC 02H.1050(15), has been approved by the Division under the New Stormwater Technology MDC, meets the recommended MDC listed in Chapter D-4 of the Stormwater Design Manual, and has been constructed in accordance with the permit documents, plans and specifications on file with and provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM EJ Check here if this is part of a Fast-Track As-Built Package Submittal per.1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date SEAL: Consultant's Mailing Address: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan/permit. If N is circled,provide an explanation on page 2 OO N/E=not evaluated(provide explanation on page 2) (I)N/A= not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification MDC .1050(15) OO As- OO N/ ©N/ built E A A. Inlets Pretreatment 1. Inlets are located per the approved plans. Y or N 2. A minimum 4' diameter by 2' deep sump is provided. Y or N B. Volume/ Elevations/Construction 1. The provided width, length and height oft e detention area, including the piped storage, are consistent with the Y or N Trod plan. 2. T e bottom elevation oft e detention area is consistent y or N with the approved plans. 3. The bypass elevation is consistent with the approved plan. Y or N 4. The over ow elevation is consistent wit t e approved y or N plan. The vo ume o water store in t e etention area is at y or N least 0.75 times the treatment volume. C. BayFilter Media and System 1. The as-built system meets the manufacturers y or N Wications. 2. en umber of cartridges provi ed is consistent with the y or N a roved laps. 3. T e BayFilter EMC media cartri ge size is consistent wit y or N the approved plans and s ecifications. 4. For metals removal applications, cartridges containing t e y or N granular activated carbon GAC media have been used. 5. The BayFilter Media has a flow rate of 0.5 UFNI/ttL or y or N media surface. Provide an explanation for every MDC that was not met, or for every deviation from the permitted condition below: