HomeMy WebLinkAboutSW6230602_Stormwater Narrative_20230705 $P\ 4Dsite
; solutions
civil engineering I land surveying
B&B Loop & Blueberry Lane Improvements Storm Water Narrative
The site is currently being used in the capacity of an unpaved road. The purpose of this
project is to improve the roadway to NCDOT standards. The site drains to a stream that
exists to the south of the property.
The site meets the qualifications of a low-density development. The average density for
the development is 0 units/acre compared to the maximum of 2 units/acre to satisfy the
requirements set forth by NCDEQ. The roads within the development will convey storm
water via open conveyances. The roads are designed in accordance with NCDOT.
This site is somewhat unique in that the right-of-way for this roadway is an existing 60'
corridor. The project area is constrained to this corridor with the exception of the outfall
for the stormwater where an easement from the adjacent land owner will be required.
Based on our study and review of the NCDEQ BMP manual and NC Session Law 2006-
246 Section 9 paragraph c, B&B Loop & Blueberry Lane Improvements meets and/or
exceeds the requirements and intent for low density development.
409 Chicago Drive, Suite 112, Fayetteville, NC 28306
office 1910-426-6777 fax 1910-426-5777
On time,every time. I www.4Dsitesolutions.com