Loading...
HomeMy WebLinkAboutWQ0044545_Application_20230703Initial Review Reviewer nathaniel.thorn burg Is this submittal an application? (Excluding additional information.) * Yes No Permit Number (IR) * WQ0044545 Applicant/Permittee Princess Holdings, LLC Applicant/Permittee Address Princess Holdings, LLC; 1430 Innovation Ave.; Morrisville, NC 27560 Is the owner in BIMS? Yes ) NO Is the facility in BIMS? Yes NO Owner Type Facility Name County Fee Category Single -Family Residence Is this a complete application?* Yes No Signature Authority Signature Authority Title Signature Authority Email Document Type (if non -application) Email Notifications Organization 8901 Morning Song Ct. SFR Wake Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Fee Amount Complete App Date 07/03/2023 $60 Below list any additional email address that need notification about a new project. Email Address Comments to be added to email notfication Comments for Admin Comments for RO Comments for Reviewer Comments for Applicant Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. Name* John R Harman, PE Email Address* jackharman53@gmail.com Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other Phone Number* 9198182077 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edoes.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Applicant/Permittee* Princess Holdings, LLC Applicant/Permittee Address* Princess Holdings, LLC; 1430 Innovation Ave.; Morrisville, NC 27560 Facility Name* 8901 Morning Song Ct. SFR Please provide comments/notes on your current submittal below. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. (Application Form, Engineering Plans, Specifications, Calculations, Etc.) DWR Submittal Packet -Lot 8 Bartley Point SFR 062323.pdf 9.44MB Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature Submission Date 6/28/2023 JOHN R. ]H[ARMAN, P.E. PROFESSIONAL CONSULTING ENGINEER 2112 White Oak Road..... Raleigh, North Carolina.....27608 919.818.2077.................jackharman53@gmaiI.com June 23, 2023 COVER LETTER Re: Submittal Package Information -Application for Non -Discharge Permit for a Five Bedroom Single Family Residence; Lot 8 Bartley Point Subdivision 8901 Morning Song Court(New Hill, NC)., Wake County, NC To NCDENR-DWR Plan Review Section: Purpose: The intent of this correspondence is to supply necessary information pursuant to obtaining a Non -Discharge Permit for the construction and operation of a wastewater treatment and surface application system for a proposed 5 bedroom single family residence situated at the above referenced location, and illustrated on the enclosed documents. Project Narrative: The Owner of the subject property desires to procure an Authorization to Construct a wastewater treatment and surface application system consisting of the standard pretreatment and surface drip irrigation components, all as illustrated in the accompanying documents. The domestic strength wastewater from the house will receive an advanced level of wastewater treatment through the installation of an EZ Treat 600 GPD (recirculating polystyrene media) Filter. The EZ Treat component is in common use in North Carolina and nationally, for providing advanced pre-treatment of wastewater prior to surface and subsurface dispersal. Attached herewith are supporting documents, as applicable and requested by the DWR review checklist, to wit: Section 1: Supporting Documents -DWR Form SFRWWIS 06-16 Application -Copy of O&M Agreement -Property Deed Showing Ownership & Capacity to Act for Corporations -County Health Dept Septic Denial Letter -Vicinity Map Showing Project Location -Recorded Setback Waivers -Natural Heritage Program Comments -Soils Report & SFR Worksheet Section 2: Engineering Calculations Section 3: General Specifications Section 4: Product/Manufacturers Cut Sheets Section 5: Plans Sheet 1 of 7: Cover Sheet, Vicinity Map, Lot Location Map, etc. Supplemental Exhibit Sheet Sheet 2 of 7: Overall Site Plan Sheet 2A of 8: House Plan Area Sheet 3 of 7: Enlarged Field Area Layout Sheet 4 of 7: Hydraulic Profile, Treatment & Tank Details, etc. Sheet 5 of 7: Pump Details -Drip Dispersal System Sheet 6 of 7: Drip System Miscellaneous Details Sheet 7 of 7: Component Details, O&M Schedule, Electrical, etc. If any questions arise regarding this matter, please do not hesitate to call. Consulting Engineer 919-818-2077 -A r Page 2 of 2 0 t_aq State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02T .0600 — SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEMS INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION The Division of Water Resources will not accept an application package unless all instructions are followed. Plans, specifications and supporting documents shall be prepared in accordance with 15A !NCAC 02L .0100, 15A NCAC 02T .0100, 15A NCAC 02T .0600, I5A NCAC 1 SA .1900, Division Policies and good env -in cringy practices. Failure to submit all required items may result in the application being returned, and will necessitate additional processing and review time. For more information, visit the Water Quality Permitting Section's Non -Discharge Permitting Unit m)ebsite General — When submitting a non -discharge application to the Water Quality Permitting Section's Non -Discharge Permitting Unit, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time by assisting the reviewer in locating the required materials and potentially reducing the amount of requested additional information. Unless otherwise noted, the Applicant shall submit one original and at least two copies of the application and supporting_ documentation. A. Cover Letter (All Application Packages): ® List all items and attached supporting documentation included in the application package, as well as a brief description of the requested permitting action. B. Application Fee (All New and Major Modification Application Packages): ® Submit a check, money order or electronic funds transfer made payable to: North Carolina Department of Environmental Quality (NCDEQ). ® The appropriate fee amount for new and major modification application packages may be found at: Standard Review Project Fees. C. Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) Application (All Application Packages): ® Submit the completed and appropriately executed Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) application. Any unauthorized content changes to FORM: SFRWWIS 06-16 shall result in the application package being returned. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ® If the Applicant Type in Item I.2. is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2. is a partnership, sole proprietorship, trade name, or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The facility name in Item I1.2. shall be consistent with the facility name on the plans, specifications, agreements, etc. ® The Professional Engineer's Certification on Page 6 of the Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 6 of the Single -Family Residence Wastewater Irrigation Systems (FORM: SFRWWIS 06-16) application shall be signed in accordance with 15A NCAC 02T .01�. Per 15A NCAC 02T .01061c?, an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). ❑ If this project is for a renewal without modification, use the Non- Dischur e System Renewal FORM: NDSR application. D. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., compliance schedules, permit description, monitoring, permit conditions, etc.). E. Property Ownership Documentation (All Application Packages): ® Per 15A NCAC 02T .0604Ie1, the Applicant shall demonstrate they are the owner of all property containing the wastewater treatment, storage and irrigation facilities: ® Legal documentation of ownership (i.e., contract, deed or article of incorporation), or ❑ Written notarized intent to purchase agreement signed by both parties with a plat or survey map, or ❑ Written notarized lease agreement that specifically indicates the intended use of the property and has been signed by both parties, as well as a plat or survey map. Lease agreements shall adhere to the requirements of 15A NCAC 02L .01.07. ® Provide all agreements, easements, setback waivers, etc. that have a direct impact on the wastewater treatment, conveyance, storage and irrigation facilities. INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 1 of 4 F. Soil Evaluation (All Application Packages that include new irrigation sites): ®Per I ?A NCAC 02T .0604(b) and current Division Policy, submit a detailed soil evaluation that has been signed, sealed and dated by a North Carolina Licensed Soil Scientist and includes at a minimum: ® The report shall identify all the sites/fields with project name, location, and include a statement that the sites/fields were recommended for the proposed land application activity. ❑ Note, if the soil evaluation was performed more than one year prior to the submittal of this application package, a statement shall be included indicating that the site has not changed since the original investigation. ® Field delineated detailed soils map meeting all of the requirements of the Soil Scientist Evaluatipti Policy. ® Soil profile descriptions meeting all of the requirements of the Soil Scientist Evaluation Poi. ® Provide all soil boring logs performed at the site. ® Standard soil fertility analysis conducted no more than one year prior to permit application for each map unit in the soil map legend for the following parameters: ❑ Acidity ❑ Exchangeable sodium percentage (by calculation) ❑ Phosphorus ❑ Base saturation (by calculation) ❑ Magnesium ❑ Potassium ❑ Calcium ❑ Manganese ❑ Sodium ❑ Cation exchange capacity ❑ Percent humic matter ❑ Zinc ❑ Copper ❑ pH Note: The number of samples will vary depending upon the project size and past land use history. Multiple samples for each map unit are required if the irrigation zones are separated, and cropland, pasture, hay land and wooded areas shall be sampled separately for the same map unit due to past differences in soil fertility management. ® Saturated hydraulic conductivity (KSAT) data that shall include at a minimum: ® A minimum of three KSAT tests shall be conducted in the most restrictive horizon for each soil series in the soil map. ® All KSAT tests shall be conducted in areas representative of the site. ® All KSAT tests shall be run until steady-state equilibrium has been achieved. ® All collected KSAT data shall be submitted, including copies of field worksheets showing all collected readings. ® Submit a soil profile description for each KSAT data point that shall extend at least one foot below the tested horizon. ® Soil evaluation recommendations shall include at a minimum: ® A brief summary of each map unit and its composition and identification of minor contrasting soils. ® Maximum irrigation precipitation rate (in/hr) for each soil/map unit within the proposed irrigation areas. ® Identification of areas not suitable for wastewater irrigation. ® Recommended geometric mean KSAT rate to be used in determining the SFR Loading Rate Group for each soil/map unit based upon in -situ measurement of the saturated hydraulic conductivity from the most restrictive horizon. ® Recommended annual hydraulic loading rate (in/yr) for each soil/map unit within the proposed irrigation areas based upon in -situ KSAT measurements form the most restrictive soil horizon. The recommended loading rate must be in accordance with the 5ingle-Family Residence Wastewater Irrigation System Loading hate Calculation Policy. ® A completed copy of the Single -Family Residence Loading Rate Workbook (i.e., Project Information, Potential Evapotranspiration, Precipitation, and Irrigation Area Calculations). G. Engineering Plans (All Application Packages): ® Per I iA NCAC 02T .0604(c)(l), submit standard size and 11 x 17-inch plan sets that have been signed, sealed and dated by a North Carolina licensed Professional End. ® At a minimum, the engineering plans shall include the following items: ❑ Table of contents with each sheet numbered, as well as cross-referenced with the appropriate application items. ❑ A general location map with at least two geographic references, vicinity map, topographic map and site map. ❑ A process and instrumentation diagram showing all flow, recycle/return, electrical paths, etc. ❑ Plan and profile views of all treatment and storage units, including their piping, valves, and equipment (i.e., pumps, etc.), as well as their dimensions and elevations. ❑ Details of all piping, valves, pumps, precipitation/soil moisture sensors, etc. ❑ A hydraulic profile from the treatment plant headworks to the highest irrigation point. ❑ The irrigation area with an overlay of the suitable irrigation areas depicted in the Soil Evaluation. ❑ Each nozzle/emitter and their wetted area influence, and each irrigation zone labeled as it will be operated. ❑ Locations within the irrigation system of air releases, drains, control valves, highest irrigation nozzle/emitter, etc. ® Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the plans may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 2 of H. Specifications (All Application Packages): ® Per I5A NCAC 02T .0604(c)(3), submit specifications that have been signed, sealed and dated by a ;North Carolina licensed Professional Enginzer. ® At a minimum, the specifications shall include the following items: ❑ Table of contents with each section/page numbered, as well as cross-referenced with the appropriate application items. ❑ Detailed specifications for each treatment/storage/irrigation unit, as well as all piping, valves, equipment (i.e., pumps, etc.), nozzles/emitters, precipitation/soil moisture sensor, audible/visual high water alarms, liner material, etc. ❑ Site Work (i.e., earthwork, clearing, grubbing, excavation, trenching, backfilling, compacting, fencing, seeding, etc.) ❑ Materials (i.e., concrete, masonry, steel, painting, method of construction, etc.) ❑ Electrical (i.e., control panels, etc.) ❑ Means for ensuring quality and integrity of the finished product, including leakage, pressure and liner testing. ® Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. I. Engineering Calculations (All Application Packages): ® Per 15A NCAC02T .0604(c)(1), submit engineering calculations that have been signed, sealed and dated by a North Carolina licensed Professional Lnyincer. ® At a minimum, the engineering calculations shall include the following items: ❑ Hydraulic and pollutant loading calculations for each treatment unit demonstrating how the designed effluent concentrations in Application Item V.I. were determined (Note: "black box" calculations are unacceptable). ❑ Sizing criteria for each treatment unit and associated equipment (i.e., pumps, etc.). ❑ Total and effective storage calculations for each storage unit. ❑ Friction/total dynamic head calculations and system curve analysis for each pump used. ❑ Manufacturer's information for all treatment units, pumps, irrigation system, etc. ❑ Flotation calculations for all treatment and storage units constructed partially or entirely below grade. ❑ Demonstrate the designed maximum precipitation and annual loading rates do not exceed the recommended rates. ❑ Demonstrate the specified auxiliary power source is capable of powering all essential treatment units. ❑ A properly completed and executed Sinp-le-Family Residence Loading Rate Workbook. J. Site Map (All Application Packages): ® Per 15A NCAC 02T .0604(d), submit standard size and 11 x 17-inch site maps that have been signed, sealed and dated by a North Carolina licensed Professi nal Engineer and/or Professional Land Surve or. ❑ For clarity, multiple site maps of the facility with cut sheet annotations may be submitted. ® At a minimum, the site map shall include the following: ❑ A scaled map of the site with topographic contour intervals not exceeding two feet and showing all facility -related structures and fences within the wastewater treatment, storage and irrigation areas. ❑ Soil mapping units shown on all irrigation sites. ❑ The location of all wells (including usage and construction details if available), streams (ephemeral, intermittent, and perennial), springs, lakes, ponds, and other surface drainage features within 500 feet of all wastewater treatment, storage and irrigation sites. ❑ Delineation of the compliance and review boundaries per 15A NCAC 02L .010 and .0108. ❑ Setbacks as required by 15A NCAC 02T .0606. ❑ Site property boundaries within 500 feet of all wastewater treatment, storage and irrigation sites. ❑ All habitable residences or places of public assembly within 500 feet of all treatment, storage and irrigation sites. K. Operation and Maintenance Plan (All Application Packages): ® Per 15A NCAC 02T .0604(f), submit an operation and maintenance (O&M) plan encompassing all wastewater treatment, storage and irrigation systems that at a minimum shall address: ❑ How to perform routine inspections. ❑ A maintenance schedule. ❑ A troubleshooting guide. ❑ A layman's explanation of the wastewater treatment, storage and irrigation systems. ❑ A crop maintenance and management plan. ❑ Note a final O&M Plan may be submitted with the partial and/or final Engineering Certification required under 15A NCAC 02T .0116, however, a preliminary O&M Plan shall be submitted with each application package. L. Operation and Maintenance Agreement (All Application Packages): ® Per 15 A NCAC 02T .0604(h), submit a notarized Operation and Maintenance Agreement that has been signed and dated by all deeded property owners. INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 3 of 4 M. County Health Department Denial Letter (All New Application Packages): ® Per 15A NCAC 02T .0604ig1, provide a written letter from the local County Health Department denying the site for all subsurface systems. N. Floodway Regulation Compliance (All Application Packages where any portion of the wastewater treatment, storage and irrigation system is located within the 100-year floodplain): ❑ Per 15A NCAC 02T .01051-c_ii_8_I, provide written documentation from all local governing entities that the facility is in compliance with Article 2I Part 6 of Chapter 143 of the General Statutes (i.e., § 143-215.51. through § 143-215.61.). O. Threatened or Endangered Aquatic Species Documentation (All Application Packages): ® Per 15A NCAC 0?7' .0105 c 10), submit documentation from the Department's Nlatural Heritage Program demonstrating the presence or absence of threatened or endangered aquatic species within the boundary of the wastewater treatment, storage and irrigation facilities. ❑ If the facility directly impacts such species, this documentation shall provide information on the need for permit conditions pursuant to 15A NCAC 02B .0 110. P. Other Environmental Permits (All Application Packages that include stream or wetland crossings): ❑ Per 15A NCAC 02T _0105 c 0 , submit a copy of either the approved permit/certification or a letter from the appropriate review agency acknowledging receipt of the application for the following applicable permits/certifications: ❑ Division of Water Resources' Water uali Permitting Section — Wctlands 401 CertiFcation ❑ US Army Carps of Engwincers South Atlantic Division — Nationwide 12 or Section 404 Permit ❑ Per 15A NCAC 02T .0105(0({ J, this application shall be considered incomplete or the resulting permit may be issued conditionally, if a pending issuance of any of the aforementioned permits/certifications directly impact the facility herein. THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 807-6464 By Courier/Special Delive 512 N. SALISBURY 5T. RALEIGH. NORTH CAROL,INA 27604 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: SFRWWIS 06-16 & SUPPORTING DOCUMENTATION Page 4 of 4 DWR State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02T .0600 — SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEMS FORM: SFRWWIS 06-16 I. APPLICANT INFORMATION: 1. Applicant's name as appears on deed, contract or lease agreement: Princess Holdings LLC 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership 3. Signature authority's name: Steve Jones per 15A NCAC 0.2T .0106ib1 Title: Manager 4. Applicant's mailing address: 1430 Innovation Ave. City: Morrisville State: NC Zip: 27560- 5. Applicant's contact information: Telephone number: (919) 795-0356 Fax number: (_) = Email Address: _ II. FACILITY INFORMATION: 1. Facility name: Surface Dri Irrigation Dis. o al .S stem For a Five Bedroom Residence-8901 Morning Song Court -Wake Co. NC 2. Facility status: ❑ Existing or ® Proposed 3. Facility's physical address: 8901 Morning Song Court City: New Hill State: NC Zip: 27562- County: Wake 4. Wastewater Treatment Facility Coordinates: Latitude: 35' 35' 56" Longitude: -78' 56' 48" Provide the following latitude and longitude coordinate determination information: Datum: NAD83 Level of accuracy: Nearest second Method of measurement: Navigation quality GPS 5. USGS Map Name: Cokesbury III. CONSULTANT INFORMATION: 1. Engineer's name: John R Harman, PE License Number: NC #9810 Engineer's mailing address: 2112 White.Oak Road City: Raleigh State: NC Zip: 27608-919 Telephone number: (919) 818-2077 Fax number: (_) 2. Soil Scientist's name: Christopher Murray License Number: 1284 Soil Scientist's mailing address: 216 S. Swing Rd., Suite 1 City: Greensboro State: NC Zip: 27409- Telephone number: (336) 662-5487 Fax number: (_) IV. GENERAL REQUIREMENTS —15A NCAC 02T .0100: 1. Application type: ® New ❑ Major Modification If a modification, provide the existing permit number: WQ00 2. Application fee: $60 Firm: Self Email Address: iiekhannan53@.gmaii.com Firm: Piedmont Environmental Assoc., PA Email Address: chris(Rpiedm.ontsoi[.co ❑ Minor Modification and most recent issuance date: 3. Describe the origin of the wastewater and provide a brief project description:. Septic and Advanced Pretreatment via Recirculating Media Filter, & Storage prior to Surface Drip Application 4. Wastewater flow: 600 GPD FORM: SFRWWIS 06-16 Page 1 of 6 IV. GENERAL REQUIREMENTS — 15A NCAC 02T .0100 (CONTINUED): 5. Using 15A NCAC' O2-I' .01 14, explain how the total wastewater flow was determined: Establishment Type Flow Basis Flow 1 Per Unit Number of Units Flow Single Family Residence gal/Bedroom 120 5 600 GPD gal/ GPD Total 600 GPD 6. Per 15A NCAC 02T .0105(c)(6), if the project includes any stream or wetland crossings, what is the status of the following applicable permits/certifications? Permit/Certification Date Droved ate Permit/Certification No. Agency Reviewer Submitted A Nationwide 12 or 404 Wetlands 401 7. What is the nearest 100-year flood plain elevation to the facility? 232 feet mean sea level. Source: FRIS.NC.GOV Are any treatment, storage or irrigation systems located within the 100-year flood plain? ❑ Yes or ® No If yes, has documentation of compliance with Article 21 Part 6 of Chapter 143 of the G.S. been provided? ❑ Yes or ❑ No V. DESIGN CRITERIA AND SETBACKS— 15A NCAC 02T .0605 & .0606: 1. Provide the estimated influent and designed effluent concentrations from the engineering calculations to verify conformance with 15A NCAC 02T .0605(b.) for the following parameters: Estimated Influent Designed Effluent Minimum Required Parameter Concentration Concentration Degree of Treatment (monthly avera a Prior to Storage Biochemical Oxygen Demand 350 mg/1 <10 mg/1 :530 mg/1 (BODO Total Suspended Solids (TSS) 350 mg/1 <10 mg/1 <_30 mg/1 Ammonia Nitrogen (NH3-N) 30 mg/1 <10 mg/1 <_15 mg/1 Fecal Coliforms <200 per 100 ml :!�200 colonies/100 ml + 2. Per 15A NCAC 02T .0605{c), is the effluent placed directly in contact with GA classified groundwater? ❑ Yes or ® No If yes, have predictive calculations demonstrating such placement will not contravene GA groundwater standards been provided? ❑ Yes or ❑ No 3. Per 15A NCAC 02T .0605 d , are any of the treatment or storage units excavated into bedrock? ❑ Yes or ® No If yes, has a 10 millimeter synthetic liner been provided? ❑ Yes (Plan Sheet: & Specification Page: ) or ❑ No 4. In accordance with 15A NCAC 02T .0605(e), are any earthen treatment and storage facilities provided? ❑ Yes or ❑ No 5. In accordance with 15A NCAC 02T ,0605(f), have any by-pass or overflow lines been provided? ❑ Yes or ® No 6. If any treatment, storage or irrigation systems are located within the 100-year flood plain, in accordance with 15A NCAC 02T .0605(g), which systems are affected and what measures being taken to protect them against flooding? 7. In accordance with 15A NCAC 02T .0605(h), has an operation and maintenance plan been submitted? ® Yes or ❑ No 8. In accordance with 15A NCAC 02T .0605 i , how will restricted access to the irrigation system be provided? 2-Strand Fence Are all treatment units and control panels locked to prevent entry? ® Yes or ❑ No 9. In accordance with 15A NCAC 02T .0605 , do the designed irrigation loading rates (see Application Item VIIA.) exceed the soil scientist recommended loading rates (see Application Item VII.3.)? ❑ Yes or ® No 10. In accordance with 15A NCAC 02T .0605(k), does the septic tank design adhere to 15A NCAC 18A .1900? ® Yes or ❑ No FORM: SFRWWIS 06-16 Page 2 of V. DESIGN CRITERIA AND SETBACKS — 15A NCAC 02T .0605 & .0606 (CONTINUED): 11. In accordance with 15A NCAC 021- ,0605 (1), what is the specified method of disinfection? Ultraviolet If chlorine, specify contact detention time provided: - minutes and where contact time occurs: If UV, specify the number of banks: 1, total lamps: 1 and maximum flow capacity: 10 GPM. 12. In accordance with 15 A NCAC 02T _0605_(m ), has a minimum of five days of storage based on average daily flow between the pump off float and inlet invert pipe been provided? ® Yes or ❑ No 13. In accordance with 15A NCAC 02T .0605(n), have all tanks containing pumps been provided with audible and visual alarms that are external to any structure? ® Yes (Plan Sheet: 4 of 7 & Specification Page: ) or ❑ No 14. In accordance with 15A NCAC 02T .0605(o), has a precipitation or soil moisture sensor been provided? ® Yes (Plan Sheet: 4 of 7 & Specification Page: ) or ❑ No 15. In accordance with 15A NCAC 02T .0605(2), has a minimum of 18 inches of vertical separation between the apparent seasonal high water table (SHWT) and the ground surface been provided? ® Yes or ❑ No 16. In accordance with 15A NCAC 02T .0605 has a minimum of 12 inches of vertical separation between any perched seasonal high water table (SHWT) and the ground surface been provided? ® Yes or ❑ No 17. In accordance with 13A NCAC 02T .0does the designed annual loading rate exceed 50 inches? ❑ Yes or ® No 18. Does the project comply with all setbacks found in the river basin rules (15 A NCAC 02B _0200)? ❑ Yes or ❑ No If no, list non -compliant setbacks: 19. Per 15:A NCAC 02T .0606, verify setback compliance by providing the minimum field observed distance (ft) from the facility's irrigation system and treatment/storage units to each listed setback parameter (Note: Distances greater than 500 feet shall be marked N/A): Setback Parameter Irrigation S stem Treatment / Storage Unit Any habitable residence or place of assembly under separate ownership or not to be maintained as part of the project site >100' >100' Any habitable residence or place of assembly owned by the Permittee to be maintained as art of the project site >15 Any private or public water supply source >100' >100, Surface waters (streams — intermittent and perennial, perennial waterbodies, and wetlands) N/A N/A Groundwater lowering ditches (where the bottom of the ditch intersects the SHWT) N/A Subsurface groundwater lowering drainage systems N/A Surface water diversions (ephemeral streams, waterways, ditches) >25' Any well with exception of monitoring wells >100, >100' Any property line 10' 50' Top of slope of embankments or cuts of two feet or more in vertical height 25' Any water line from a disposal system 10' Any swimming pool N/A Public right of way N/A Nitrification field N/A Any building foundation or basement >15' 20. Are any setback waivers proposed for this facility? ® Yes or ❑ No If yes, in accordance with 15A NCAC 02T .0606(c), submit the appropriate setback waivers (FORM: NDWSW) that have been notarized, signed by all parties involved and recorded with the County Register of Deeds. Waivers involving the compliance boundary shall be in accordance with 15A NCAC 02L .0107. FORM: SFRWWIS 06-16 Page 3 of VI. WASTEWATER TREATMENT & STORAGE FACILITY DESIGN: 1. Type of treatment system: Septic Tank / EZ Treat 2. Provide the requested information for each treatment/storage unit and its associated mechanical equipment; a. PRELIMINARY / PRIMARY TREATMENT (i.e., physical removal operations): Treatment Unit No. of Units Manufacturer or Material imensions (ft) / PS2acins (in) Volume al Plan Sheet Reference Specification I Reference Septic Tank I Shoaf PreCast I O'x4.7'x4.6' 1500 4 of 7 Select Select b. SECONDARY TREATMENT (i.e., physical, biological and recirculation processes): Treatment Unit No. of Units Manufacturer or Material Dimensions (ft) Volume (gal) i Plan Sheet Reference Specification Reference EZ Treat 1 EZ-Treat 600 +/-7'x4.5' N/A 4 of 7 Recirculation Tank 1 Shoaf PreCast 12' x6' x4. 8' 2500 4 of 7 Select c. DISINFECTION: Treatment Unit No. of Manufacturer or Dimensions (ft) Volume Plan Sheet Specification Units Material al Reference Reference Ultraviolet 1 EZ Treat Model UV 101 10 GPM 4 of 7 Select d. PUMP/STORAGE TANK: Manufacturer or No. of Total Effective Effective Plan Sheet Specification P Material Units Dimensions (ft) Volume Volume Storage Reference Reference (gal) al) (days) Shoaf PreCast 1 12' x6' x6. 6' 3500 4039* 6.7 4 of 7 Calcs *Partial Use with Recirc Tank e. PUMPS: No. of Manufacturer / Capacity Plan Sheet Specification Location Pumps Purpose Type Reference Reference GPM TDH 2500 Gal Recirc 1 Dose EZ Treat Pod StatRite Step20 20 100' 4 of 7 Goulds 3500 Field Dose 1 Field Dosing PUTB 1512112 16 122' 4 & 5 of 7 Tank W f. BLOWERS: Location No. of Blowers Units Served Manufacturer / Ty e Capacity (CFM) Plan Sheet Reference Specification Reference g. MIXERS: FORM: SFRWWIS 06-16 Page 4 of 6 Location No. of Mixers Units Served Manufacturer / Tv a Power (h) Plan Sheet Reference Specification I Reference FORM: SFRWWIS 06-16 Page 5 of VII. IRRIGATION SYSTEM DESIGN: 1. Are there any artificial drainage or water movement structures within 200 feet of the irrigation area? ❑ Yes or ® No If yes, please explain if the Soil Evaluation addresses artificial structures and indicate if these structures are to be maintained or modified: 2. What is the proposed cover crop? Ex is Ling Woodlands to Remain to the Fullest Extent Practical 3. Soil Evaluation recommendations: Soil Series Fields within Soil Area Minimum Observed Depth to SHWT ft Recommended Loading Rate in/hr Recommended Loading Rate in/vr Creedmoor/Green Level All 4 12 <0.3 19.49 4. Irrigation System Information (Note — this table may be expanded for additional fields): Area Dominant Designed Designed Latitude Longitude Waterbody Field (acres) Soil Series Rate Rate (DMS) (DMS) Stream Index Z Classification (in/hr) (in/yr) No. 1 0.42 Creedmoor/Green 0.15 19.27 35035' 56" -78056' 48" 18-7(3) WS-V Level O 1 11 O 1 11 O 1 11 O 1 11 O 1 11 O 1 11 O 1 11 O 1 11 O 1 11 O 1 11 Total 0.42 Provide the following latitude and longitude coordinate determination information: Datum: NAD83 Level of accuracy: Nearest 10 seconds Method of measurement: Map intelpretation by extraction -' For assistance determining the waterbody stream index number and its associated classification, instructions may be downloaded at: li s://ncdenr.s3.amazonaws.com s3fs- ubIic; Waler%2 ual ity/Aq uifer°'�20Protection, LAU, A reemcnt,, WSCA'%2008-13. dF, Spray Irrigation Design Elements Drip Irrigation Design Elements Nozzle wetted diameter: ft Emitter wetted area: 6.75 ft- Nozzle wetted area: ft'- Distance between laterals: 3.31 ft Nozzle capacity: GPM Distance between emitters: 2.0 ft Nozzle manufacturer/model: / Emitter capacity: 0.61 GPH Elevation of highest nozzle: ft Emitter manufacturer/model: Netafim / BioLine Specification Reference: Elevation of highest emitter: 261 ft Specification Reference: Sheet 7 of 7/Calcs FORM: SFRWWIS 06-16 Page 6 of 6 Professional Engineer's Certification: I, John _R. Harman,_PE attest that this application for (Professional Engineer's name from Application Item III.1.) SUL"M.tn IrrinatInn DI.s.posaI Systsm.for a.Fiv- e Bedrnam Resuidence,8901 Mamirig lr n_ Court-WakQ CQ, NC (Facility name from Application Item H.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions, as well as all applicable regulations and statutes. Although other professionals may bave developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged 4 to be consistent with the proposed design. Note: In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. - North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC 02T .0106(hl: A R D"100'••. 5�•,`Q�` �Essr'pN �� 'sw Sires- , _ gg10 , r FNG1NE� •rQH N R ' H a r► �4IIIAHul1HH0 I Scott Jones ..Mane for Princaas -Holdings. LLC atest that this application for (Signature Authority's name & title from Application Item I.3.) Surface Drip hTigation_Visposal System-_-for'a dye Bedroom Residence4M-llornin n GOurt-Walks Go.�NC (Facility name from Application Item IT.1.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package arenot completed and that if a]1 required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that the applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do not have any overdue annual fees per 15A NCAC 02T .010 Note: In accordance with General Statutes 143-2I5.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil ties up to $25,000 per violation. Signature: �— V Date: FORM: SFRWWIS 06-16 Page 6 of 6 1-�T S PROJECT VICINITY MAP FOLLOW THIS PAGE PROPERTY OWNERSHIP INFORMATION CAPACITY TO ACT FOR PROPERTY OWNERS O&M AGREEMENTS FOLLOW THIS PAGE 8 � ¢ •acmc] agrd �a � wit 94 a I r-v� l4CS � Igo- --- ---------- - -- -------- Soomm��h.RY_B-S�S�hnXR�hY�B„`.�Y�m:�o'roS.Be-FlAr�r«.rmS„��SR��YN wmm=mm=mom ___ ._ =.N f <¢ <� m _¢ =a H E U = O Z 3=m3O N W W rJ µj W W Q W GO a W "� n w tr�I=--Z J� Z a <Y¢Ua a. a¢U U �N w U 0 = O O WW Gi �¢yy riles? rti11�II Y o Wa Q�vaiYY33 az nW O O U i l•� �j �1 LL O '- F--1 z W 1 m m = W _� Way-00��W NZ ¢ H 01 -W 0 z= Y a- m F 0 0or y � h q�p=2m a ¢ O O U 0,vzxZ1 J _D1 aQuz�n Z z a =�Za� no Sca i-wc1,� ?xm,oz ma-o=o- 0 0 zo Z o 0 U W Z Y � F U 0 a4 � I N I to Q I � W W O O J (n Y 0 5 m � cl Cl 00 wW R BKO18774PGO0217 WAKE COUNTY. MC 116 TAMMY L. BRUMMER REGISTER OF DEEDS PRESENTED & RECORDED ON 10/2912021 14:17:45 STATE OF MC REAL ESTATE EXCISE TAX: $2.908.00 BOOK:019774 PAGE:e0217 - 00223 NORTH CAROLINA SPECIAL WARRANTY DEED Excise Tax: $2,800.00 Wake County; Excise Tax: $6.00 Chatham Coun Parcel Identifier Nos. in Wake County: 0463522, 0463524, 0463525, 0463526, 0463527 and 0463528 Parcel Identifier No. in Chatham County; � 85381 Verified by County on the _ day of , 2021 Verified by County on the _ day of , 2021 By- Mail/Box to: This instrument was prepared by: Smith, Anderson, Blount, Dorsett, Mitchell & Jernigan, L.L.P. (CAY), Post Office Box 2611, Raleigh, North Carolina 27602-2611 13rief description for the Index: Lots 1, 2, 3, 4, 5 and 6. i3ook of Maps 2018 Page 2400, Wake County Registry and Book of Maps 2018, Page 325, Chatham County Registry THIS DEED made this day of October, 2021, by and between GRANTOR Billy Ray Powell and wife, Cynthia P. Powell, an undivided 25% interest Sidney S. Smith and wife, Kimberly A. Smith, an undivided 25% interest Ronald J. Currin, widow, an undivided 25% interest John M. Hiester and wife, Lisa K. Hiester, an undivided 25% interest all as Tenants in Common 4808 Tannenhill Trail Holly Springs, North Carolina 27540 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH; that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot, parcel of land situated in the Buckhorn Township, Wake County, North Carolina and Cape Fear Township, Chatham County, North Carolina and more particularly described as follows: GRANTEE Princess Holdings, LLC a North Carolina limited liability company 1430 Innovation Ave Morrisville, North Carolina 27560 H Special Warranty Deed 9482657 2.Docx NC Bar Association Form No. 6 © 1/1/2010, 2013 This standard form has been approved Printed by Agreement with the NC Bar Association North Carolina Bar Association — NC Bar Form No. 6 BK018774PGO0218 See Exhibit A attached hereto and incorporated herein by reference for legal description. The property hereinabove described was acquired by Grantor in Book 18087, Page 1817 and Book 12955, Page 646, both Wake County Registry and in Book 2147, Page 440 and Book 1385, Pave 515, Moth Chatham County Registry. All or a portion of the property herein conveyed _ includes or X does not include the primary residence of a Grantor. A map showing the above described property is recorded in Book of Maps 2018, Page 2400, Wake County Registry and Book of Maps 2018, Page 325, Chatham County Registry. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by, under or through Grantor, other than the following exceptions: 1. 2022 Ad valorem taxes, not yet due and payable. 2. Easements, restrictions and rights of way of record affecting the subject property, if any. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. State of North Carolina - County of WAKE Grantor: Bi y Rly Po e � Cynthia P. Powell 1, the undersigned Notary Public of the State aforesaid, certify that Billy Ray Powell and wife; Cynthia P. Powell, personally appeared before me this day and acknowledged the due execution of the foregoing instrument a purposes therein expressed. Witness my hand and Notarial stamp or seal, this 28thday of October, 2021. r--,) L - My Commission Expires: 01 /25/2026 ADCo ��,_ .........,,car 0 oiAR1- (Affix Seal) U 50cou v # Special Warranty Deed 9482657 2.Doc>rrrroirawr.11 NC Bar Association Form No. 6 © 1 /1 /2010, 2013 Printed by Agreement with the NC Bar Association 6 of Notary Public John B. Adcock Notary's Printed or Typed Name This standard form has been approved by: North Carolina Bar Association — NC Bar Fonn No. BKO18774PGO0219 IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. Grantor: Sidney S. Smit Jimberly A. mith State of North Carolina - County of Old 1, the undersigned Notary Public of the State aforesaid, certify that Sidney S. Smith and wife, Kimberly A. Smith, personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal, this T. 4tay of October, 2021. My Commission Expires: 10 -1%4- LO L3 (Affix Seal) BENJAMIN H. HERVEY NOTARY PUBLIC WAKE COUNTY, NORTH CAROLINA My Commission Expires 10-14-2023 N Special Warranty Deed 9482657_2.Docx NC Bar Association Form No. 6 © i/I/2010, 2013 Printed by Agreement with the NC Bar Association 6 zga'roaf Lary Public ' u.l Notary'strinted or Typed Name This standard form has been approved by: North Carolina Bar Association — NC Bar Form No. BKO18774PGO0220 IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. State of lwforth Carolina - County of WAIF Gra Ronald J. Currin 1, the undersigned Notary Public of the State aforesaid, certify that Ronald J. Currin, personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal, this 28th day of October, 2021. My Commission Expires: 01/25/2026 `.1t1 t I II t1l0 % (Affix Seal) 1*`��, PaCOC�''�,�. ,0 PR Y `_� PUS # Special Warranty Deed 9482657 2.Docx NC Bar Association Form No. 6 © t/l/2010, 2013 Printed by Agreement with the NC Bar Association Notary's Printed or Typed Name This standard form has been approved by: North Carolina Bar Association— NC Bar Form No. BKO18774PGO0221 IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written State of North Carolina - County of ot'kz kJ I . Hiester Lisa K. Hiester 1, the undersigned Notary Public of the State aforesaid, certify that John M. Hiester and wife, Lisa K. Hiester, personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal, this day of October, 2021. My Commission Expires: 10 - SM '1oz3 zSiganof.Nvotrny Public Affix Seal) BENJAMIN H. HERVEY NOTARY PUBLIC WAKE COUNTY, NORTH CAROLIN.A L_,My Commission Expires 10-14-2023 # Special Warranty Deed 9482657 2.Docx NC Bar Association Form No. 6 © 1/l/2010, 2013 Printed by Agreement with the NC Bar Association 6 e Notary's Prtrtted or Typed Name This standard form has been approved by: North Carolina Bar Association — NC Bar Forrn No. BKO18774PGO0222 Exhibit A Legal Description BEING all of Lot Nos. 1, 21 3, 4, 5 and B as shown upon that map entitled, "Exempt Division Survey For Billy Ray Powell Sidney S Smith Ronald J. Curd John M, Hiester Edward J. Lummey, Ill" prepared by Benton W. Dewar and Associates Professional Land Surveyor, dated October 25. 2018 and recorded in Book of Maps 2018, Page 2400, Wake County Registry and also in Book of Maps 2018, Page 325. Chatham County Registry. 9 Special Warranty Deed 9482657-2.Docx NC Bar Association Form No. 6 © 1/l /2010, 2013 This standard form has been approved b Printed by Agreement with the NC Bar Association North Carolina Bar Association — NC Bar Form No.. 6 5/24/23, 7 17 PM North Carolina Secretary of State Search Results File an Annual Report/Amend an Annual Report v Upload a PDF Filing 3 Order a Document Online - Add Entity to My Email Notification List View Filings , Print a Pre -Populated Annual Report form , Print an Amended a Annual Report form Limited Liability Company Legal Name Princess Holdings, LLC Information Sosid: 1966078 Status: Current -Active O Date Formed: 3/23/2020 Citizenship: Domestic Annual Report Due Date: April 15th CurrentAnnuaL Report Status: Registered Agent: Eldreth Law Firm, PLLC Addresses Reg Office Reg Mailing Mailing Principal Office 115 S. Saint Mary's St., Ste. C 115 S. Saint Mary's St., Ste. C 1430 Innovation Ave. 1430 Innovation Ave. Raleigh, NC 27603-1785 Raleigh, NC 27603-1785 Morrisville, NC 27560 Morrisville, NC 27560 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Managing Member Managing Member Nguyet Bach James Scott Jones 1430 Innovation Avenue 1430 Innovation Ave. Morrisville NC 27560 Morrisville NC 27560 r` �= Seeretan of State iF Elaine F. Marshall Home I Wart To Divisions https://mxnAt,sosnc gov(online_services/search/Business_Registration_Results IN 6/24/23, T 13 PM yorth Carolina Secretaryof State Search Results Upload a PDF Filing - Order a Document Online - Add Entity to My Email Notification List - View Filings Non -Profit Corporation Legat ?dame Bartley Point Land Owners Association, Inc. lnforrn•abon Sosid: 2590900 Status: Current -Active O Date Formed: 3/8/2023 Citizenship: Domestic Annual Report Due Date: Registered Agent: York, C Allen Addresses Mailing Principal Office Peg Office 1430 Innovation Avenue 1430 Innovation Avenue 150 Fayetteville Street, Suite 2300 Morrisville, NC 27560-6414 Morrisville, NC 27560-6414 Raleigh, SIC 27601 Peg Mailing c/o Smith Anderson Law Firm Post Office Box 2611 Raleigh, NC 27602-2611 Officers Secretary of State El'-a/!?e F L(ars?!,J' Horne i War-t To - Divistans https:/A,vw,v sosnc gov/online_senjices/search/Business_Registration_Results im INCUMBENCY CERTIFICATE PRINCESS HOLDINGS, LLC The undersigned, as Manager of PRINCESS HOLDINGS, LLC, a North Carolina limited liability company (the "Company"), hereby certifies as of this the 30th day of May, 2023, that J. Scott Jones, Manager of the Company, has been duly appointed to execute documents on behalf of the Company. IN WITNESS WHEREOF, the undersigned has executed this Incumbency Certificate as of the day first above written. 4� J. Scott Jones, Manager RA-3027450 vt BARTLEY POINT LAND OWNERS ASSOCIATION, INC. CONSENT OF INITIAL BOARD OF DIRECTORS May 1, 2023 We, the undersigned, being the initial directors of Bartley Point Land Owners Association, Inc., a North Carolina nonprofit corporation (the "Corporation"), do hereby waive notice of the organizational meeting of the Board of Directors of the Corporation and do hereby adopt the following resolutions by signing our written consent hereto, pursuant to the provisions of Section 55A-8-21 of the North Carolina Nonprofit Corporation Act. Election of Officers RESOLVED, that the following persons be, and they hereby are, elected as officers of the Corporation, to serve as such until their successors shall have been duly elected and qualified: Name Title James Scott Jones President Nguyet (Mimi) Bach Vice President Banldng Resolutions RESOLVED, that the Board of Directors of the Corporation hereby authorizes and directs that the persons from time to time holding the position of President or Vice President of the Corporation is hereby authorized to open any necessary corporate bank accounts from time to time; and RESOLVED FURTHER, that in order to effectuate the foregoing resolution there shall be deemed to be adopted "in haec verba" resolutions required by any bank or banks in which corporate bank accounts will be maintained, and that the President of Vice President of the Corporation is authorized to certify such resolutions as having been adopted "in haec verba." Fiscal Year RESOLVED, that the fiscal year of the Corporation shall end on December 31 st of each year. Tax Exempt Status Determination RESOLVED, that the appropriate officers of the Corporation be, and they hereby are, authorized and directed to prepare and file on behalf of the Corporation appropriate forms, including an application to the Internal Revenue Service, and ruling requests seeking qualification of the Corporation as an organization exempt from federal income tax pursuant to Section 501(c)(3) of the Internal Revenue Code and to which contributions will be deductible for Federal income, estate, and gift tax purposes, such officers being further authorized and directed to execute and deliver all other documents and do all other things deemed by such officers necessary or desirable in connection with such application or ruling request. State and Local Tax Exemption # Bartley Point Land Owners Association loc. -Consent Of initial Board Of Directors -Nonprofit - NC(10928157.2)(02) RESOLVED, that the.appropriate officers of the Corporation be, and they hereby are, authorized and directed to execute and file all necessary applications and do all other things deemed by such officers necessary or desirable to secure for the Corporation appropriate exemptions from state and local income, sales, real property, and other taxation. Miscellaneous Items RESOLVED, that the President, Treasurer, or any other proper officer be authorized to pay, aT cause to be paid, all fees and expenses, including attorneys' fees, incident and necessary to the organization of the Corporation and the preparation of these resolutions; FURTHER RESOLVED, that the President or any other proper, officer be authorized and directed to negotiate for, enter into, execute, and deliver such contracts, agreements, and other written instruments which are necessary and appropriate to carry on the business the Corporation was formed to conduct; and FURTMER RESOLVED, that the officers of the Corporation be, and they hereby are, authorized and directed to do and perform all acts and things necessary and appropriate to commence and carry on the ordinary course of the Corporation's business. We do hereby consent that this document be filed with the Minutes of the Corporation, and that the actions set forth in the foregoing resolutions shall have the same force and effect as if taken at the duly constituted organizational meeting of the initial directors of the Corporation. This action is effective as of the 30th day of May, 2023. 4� James Scott Jones, Director { Nguyet (Mimi) Bach, Director PERMITEE 0 & M AGREEMENT FOLLOWS THIS PAGE PERMITEE 0 & M AGREEMENT FOLLOWS THIS -PAGE nro State of North Carolina Department of Environment and Natural Resources Division of Water Resources DWR 15A NCAC 02T .0600 — SINGLE-FAMILY RESIDENCE WASTEWATER IRRIGATION SYSTEMS OPERATION AND MAINTENANCE AGREEMENT Division of Water Resources FORM: SFRWWIS O&M 08-13 Permit No. Not Yet Assigned County: Wake Property owner(s) as appearing on the recorded deed: Princess Holdings, LLC Mailing address: 1430 Innovation Ave.; Morrisville, NC 27560 Facility address: 8901 Morning Song Court.; New Hill, NC 27562 Irrigation Method: ❑ SPRAY ® DRIP I / We agree to operate and maintain the single-family residence wastewater treatment and irrigation system as follows: 1. The Permittee is responsible for the operation and maintenance of the entire wastewater treatment and irrigation system including, but not limited to, the following items: a. The septic tank shall be checked annually and pumped out as needed. b. The septic tank effluent filter shall be checked and cleaned annually. c. Accessible sand filter surfaces shall be raked and leveled every six months and any vegetative growth shall be removed manually. d. ❑ The tablet chlorinator shall be checked weekly. Wastewater grade tablets (calcium hypochlorite) shall be added as needed to provide proper chlorination (pool chlorine tablets shall not be used), OR ® The ultraviolet disinfection unit shall be checked weekly. The lamp(s) and quartz sleeve(s) shall be cleaned or replaced as needed to ensure proper disinfection. e. All pump and alarm systems shall be inspected monthly. f. The irrigation system shall be inspected monthly to ensure that the system is free of leaks, that all irrigation equipment is operating as designed, that vegetative growth does not interfere with the system inspection or operation, that the soil is assimilating the disposed treated wastewater with no visible runoff or ponding, and that no objectionable odors are being generated. 2. Failure to pay the annual fee shall be cause for the Division to revoke the permit pursuant to 15A NCAC 02T .0105(e)(3). 3. The Permittee's failure to properly operate this system is subject to a penalty up to $25,000 per day. 4. Failure to meet the permit conditions or violation of the State's surface water or groundwater regulations may void the permit. All owners appearing on the legally recorded rp erty deed shah si n this Operation & Maintenance Agreement I / We understand the above requirements and agree to these terms as part of the issued permit. Owner Signature: Date: fa, Prince Holdings, LLC Owner Signature: Date: FORM: SFRWWIS O&M 08-13 Page 1 of 1 4p-T COUNTY DENIAL LETTERS FOR SEPTIC SYSTEMS FOLLOW THIS PAGE J� J WAKE Environmental COUNTY Services June 1, 2023 TEL 919 856 7400 FAx 919 743 4772 Water Quality Division 336 Fayetteville Street • Raleigh, NC 27602 www.wakegov.com FIRST CLASS MAIL/CERTIFIED MAIL -RETURN RECEIPT REQUESTED Chris Murray 216 S. Swing Rd., Suite 1 Greensboro, NC 27409 Reference: Denial of TBD, Bartley Holleman Rd, NC 27562 PIN # 0617538361 Bartley Point Lot 8,VW-102925-2023 Dear Chris Murray: This letter is to inform you that a site evaluation was conducted on the above referenced property on 5/31/2023. This property was determined to be Unsuitable for the use of a subsurface sewage treatment and disposal system in accordance with the "Regulations Governing Wastewater Treatment and Dispersal Systems in Wake County" (and 15A, Subchapter 18A, Sections .1901-.1969 of the North Carolina Administrative Code, adopted by reference in the Wake County Regulations). The site evaluation findings revealed the following limiting factors: ❑ Unsuitable topography and/or landscape position, .1940 ® Soil Characteristics Morphology, .1941 Expansive clay was encountered at 10 inches. ® Soil Wetness Condition, .1942 Soil wetness observed at 18 inches. ❑ Soil Depth, .1943 ❑ Restrictive Horizons, .1944 ❑ Available Space, .1945 ❑ Other: Please refer to the enclosed soil evaluation form and site plan for additional information related to limiting factors. The Regulations allow for the reclassification of unsuitable sites to provisionally suitable status if the conditions of 15A NCAC 18A, Section .1948 (d) are met. "A site classified as UNSUITABLE may be used for a ground absorption sewage treatment and disposal system specifically identified in Rules .1955, .1956, or .1957 of this Section or a system approved under Rule .1969 if written documentation, including engineering, hydrogeologic, geologic or soil studies, indicates to the local health department' that the proposed system can be expected to function satisfactorily. Such sites shall be reclassified as 1 Wake County Environmental Services Department PROVISIONALLY SUITABLE if the local health department determines that the substantiating data indicate that: (1) a ground absorption system can be installed so that the effluent will be non-pathogenic, non- infectious, non -toxic, and non -hazardous; (2) the effluent will not contaminate groundwater or surface water; and (3) the effluent will not be exposed on the ground surface or be discharged to surface waters where it could come in contact with people, animals, or vectors." You have two options available. First, you may hire a soil scientist to evaluate your property (PIN # 0617538361) and submit a proposal (layout and wastewater design) to Wake County Environmental Services. Second, you may also appeal this decision with submission of adequate substantiating documentation under the provisions of North Carolina General Statute (NCGS). 130A-24(b)&(c) and Wake County Human Services -Environmental Health Division Rules of Appeal by letter to: Wake County Human Services Center Attn.: Debra Baker, Executive Assistant 220 Swinbume Street Raleigh, North Carolina 27620 and Wake County Department of Environmental Services Attn: Joseph Threadcraft, Ph. D., P.E., Director Waverly Akins Wake County Office Building P.O. Box 550 Raleigh, North Carolina 27602 The Department asks that you send copies of the request for an appeal hearing to both parties to ensure prompt processing of your request. An appeal must be made within 30 days of receipt of this letter or your appeal rights are forfeited. If you have any questions or wish to setup a meeting, please contact John Kase at (919) 500-9564 or via email atjohn.kase@wake.gov or Daniel Potts at (919) 880-7371 or via email at daniel.potts@wake.gov Monday through Friday between 8:30 a.m. and 5:15 p.m. Sincerely, Daniel Potts, REHS, On -Site Wastewater Enclosures: cc: Kenneth R. Murphy, Esq., Wake County's Attorney's Office Joseph Threadcraft, Ph. D., P.E., Director, Wake County Department of Environmental Services Justin M. Milstein, LSS, REHS, Environmental Health Program Manager — On -Site Wastewater Wake County Planning, Inspections and Development Division File Additional NATURAL HERITAGE PROGRAM RESOURCE REPORT FOLLOWS THIS PAGE Lam-& ■R�0 INC DEPARTMENT OF ■■ iRmw NATURAL AND CULTURAL RESOURCES # fiE June 14, 2023 John Harman, PE Consulting Engineer 2112 White Oak Rd Raleigh, NC 27608 RE: CIR-301 Dear John Harman, PE: -, :­-j a,i;on.Secretary ibl,-:'/ °u(:-3na, Deputy Director, Natural Heritage Program N CN H D E-22291 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above_ A query of the NCNHP database indicates that there are records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. These results are presented in the attached 'Documented Occurrences' tables and map. The attached 'Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is documented within the project area or indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: I� r r w QfL�_ r r. P; - f r = 7 Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission... Also please note that the NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or an occurrence of a Federally -listed species is documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rodnekbuber: n-_dCLQQv or 919-707-8603. Sincerely, NC Natural Heritage Program Df Y,••. „4AL 4V0 :�_L�Jf�A_ 4c5;J'��C�S June 14, 2023 Managed Area (MAREA) Suffered Project Boundary Project Boundary NCNHDE-22291: CIR-301 Page 4 of 4 Natural Heritage Element Occurrences, Natural Areas. and Managed Areas Intersecting the Project Area CIR-301 June 14, 2023 N CN H D E-22291 Element Occurrences Documented Within _ Area Taxonomic EQ ID Scienti#Ec Name Common Narne Last Element" Aii 1=ederal State Global State Grouo Observation Occurrence Status Status Ralik Rank Date Rank Fres lwater Fish42891 Fur-dul!'s cf diapi'anus _ake Ph•21ps Kiililisi 70i0-03 %!. N.�i,m --- gniFcai t'- G1Q 51 Rare No Natural Areas are Documented within the Project Area Areas Documented Within Project Area Harris Game.Land NC Wildlife Resources Cornrslission State NOTE: If the proposed project intersects with a conservation/managed area, please contact the landowner directly for additional information If the project intersects with a Dedicated Nature Preserve (DNP). Registered Natural Heritage Area (RHA), or Federally -listed species. NCNHP staff may provide additional correspondence regarding the project Definitions and an explanation of status designations and codes can be found at htto,//ncnhde nat reserve oro/hero. Data query generated on June 14 2023: source: NCNHP, Spring (Ali 2023 Tease resubmit your information request if more than one year elapses before project initiation as new nformaoon is continually added to the NCNHP database Page 2 of 4 Natural Heritage Element Occurrences. Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area CIR-301 June 14, 2023 NCNHDE-22291 Element Occurrences Documented Within a One -mile Radius of the ?r--eci :AI'aa State Global Stare Taxonomic EO TE) Scientific flame Common Name Last Element F.ccuracy Federal SEatus Sratus Rank Rank Group � • — � 06serva[ion ticeurrence , �f =; bate. Rank faro nf? or 32343 g° y Cpryphaaschna my^ers ?agai Darner 2004-Pre iH? 3-Very SignIFican[ly G5 ]2 Low Rare Damselfly Freshwater Fish42891 Fundulus cf- diaphanus Lake Phelps Killifish 2010-05-26 E 3-Medium — Significantly G1Q S1 Rare No Natural Areas are Documented Within a One -mile Radius of the Project Area Managed Areas Documented Within a One -mile Radius or the Project Area Harris Game Land NC lA1i[dINq Resources Commission state Da[3 query generated on June 14. 2023: sourca: NCNH?, Sorng ;ApriD 2023 oiease 7ef,ninons and 3n expi3nat,on of ;t3tu; designanons and codes:: an be `ountl at . s,bm,t yo: .nform3tion reo,est `more than one year elaoses before orolect rntiat on a; new information s cont:nuaiiy added to the NCN -P database Page 3 of 4 SETBACK WAIVER DOCUMENTS FOLLOW THIS PAGE Lot b BOOR:019366 PAGE.00035 - 00041 NORTH CAROLINA Please retain yellow trailer page It is part of the recorded document and must be submitted with the original for re- recording. Tammy L. Brunner Register of Deeds Wake County Justice Center 300 South Salisbury Street, Suite 1700 Raleigh, NC 27601 [t New Time Stamp Additional Document Fee This Customer Group 0 --1 # of Excessive Entities # of Time Stamps Needed ❑ $25 Non -Standard Fee Additional Reference Fee This Document # of Pages eP__ WAKE COUNTY, NC 40 TAMMY L. BRUNNER REGISTER OF DEEDS PRESENTED & RECORDED ON 9612212023 11:56:06 BOOK:019366 PAGE:B6835 - 00041 State of North Carolina Department of Environmental Quality Division of Water Resources NON -DISCHARGE WASTEWATER SYSTEM WAIVER AGREEMENT TO WAIVE SETBACKS AS REQUIRED BY 15A NCAC 02T .0506(a), .0506(b), .0606(a), .0706(a) AND .1006(a) I, SCo , Jones (printed name), certify that I am a deeded owner or an authorized agent of the property located at: Lot 6 Address: 8909 Morning Song Court Parcel No.: Bartley Point Subd City: New Hill State: NC Zip Code: 27562 County: Wake Furthermore, I certify that I am authorized to make decisions regarding this property, and that I do hereby agree that the setback distances cited below be granted to the Applicant/Permittee listed on the following page. I understand the setback requirements set forth in 15A NCAC 02T. For the parcel identified above, I consent to the following reduced setbacks: Wastewater Irri ation/Infiltration Setback to Property Lines The required setback of 50 feet is reduced to 10 feet, thereby allowing wastewater effluent irrigation or infiltration no closer than 10 feet from my property line. ❑ Wastewater Irrigation/Infiltration Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing wastewater effluent irrigation or infiltration no closer than feet from my residence(s) or place(s) of assembly. ❑ Wastewater Treatment and Storage Unit Setback to Property Lines The required setback of feet is reduced to feet, thereby allowing the construction of Oa wastewater treatment and storage units no closer than feet from my property line. 1- ❑ Wastewater Treatment and Storage Unit Setback to Places of Assembly .-� The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my residence or place of assembly. Signature- Date: `� 3 FORM: NDWSW 02-19 Page 1 of 2 Applicant/Permittee: PI!EICGSS 11oldim,,_.LLC permit No.: Not Yet Assigned Lo8 Address: 8-90-w0Parcel Bartley Point Subd City: Now Hill State: NC Zip Code: 27562 county: Wake NORTH CAROLINA, (k) Q JU COUNTY I, C a n &tQCL d , ,5 k a r1 ridV? , a Notary Public for Uja 1Q County, North Carolina, do hereby certify that _jAjP1 eS +� -L PAeS personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the I St day of J u Y} & , 202 SEAL �a ]fu u all,d-'3ce C Shannon Signature of Notary Public Notary Publicke County, N•C. My commission expires Nocem & y / 3�;` q (� Once notarized, this form shall be recorded at the Register of Deeds in the county or counties in which the described properties are located. A copy of the recorded waiver shall be sent to the following address: Division of Water Resources Non -Discharge Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDWSW 03-17 Page 2 of 2 04 V_ A !L State of North Carolina �T-, _ . L ,�� Department of Environmental Quality Ar F 'T Division of Water Resources NON -DISCHARGE WASTEWATER SYSTEM WAIVER AGREEMENT TO WAIVE SETBACKS AS REQUIRED BY 15A NCAC 02T .0506(a), .0506(b), .0606(a), .0706(a) AND .1006(a) I, Scott Tones (printed name), certify that I am a deeded owner or an authorized agent of the property located at: All Private Roads & Common. Jan Space Address: Proper Lines of Bartley Poinpd Owners Assoc_, in Parcel No.: Bartley Point $Ubd city: New Hill State: NC Zip Code: 27562 County: Wake Furthermore, I certify that I am authorized to make decisions regarding this property, and that I do hereby agree that the setback distances cited below be granted to the Applicant/Permittee listed on the following page. I understand the setback requirements set forth in 15A NCAC 02T. For the parcel identified above, I consent to the following reduced setbacks: Wastewater Irri ation/lofiltration Setback to Property Lines The required setback of 50 feet is reduced to 20 feet, thereby allowing wastewater effluent irrigation or infiltration no closer than 20 feet from my property line. ❑ Wastewater Irriation/Infiltration Setback to Places of Assembl The required setback of feet is reduced to feet, thereby allowing wastewater effluent irrigation or infiltration no closer than feet from my residence(s) or place(s) of assembly. ❑ Wastewater Treatment and Storage Unit Setback to Proserty Lines The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my property line. ❑ Wastewater Treatment and Storage Unit Setback to Places of Assembl The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my residence or place of assembly. Signature: _ _ Date: FORM: NDWSW 02-19 Page 1 of 2 Applicant/Perrnittee: PrincesS Holdings, LL Address: 8901 Morning Soncl Court city: New Hill Permit No.: Not Yet S d ❑t Parcel No.: Bartigy Point Subd State: NC Zip Code: 27562 County: Wake NORTH CAROLINA, _ __W Q JU COUNTY I, . a Notary Public for WOt t(J County, North Carolina, do hereby certify that Ja M e5 -Of+_.)Q ° S personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the 154%day of JUn+P SEAL !/Zr C andeace C Shannon Signature of Notary Public Notary Public My commission expires QL) ev 3iI" U21O Wake County, N.C. Once notarized, this form shall be recorded at the Register of Deeds in the county or counties in which the described properties are located. A copy of the recorded waiver shall be sent to the following address: Division of Water Resources Non -Discharge Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDWSW 03-17 Page 2 of 2 00 �h VL State of North Carolina Department of Environmental Quality Division Division of Water Resources NON -DISCHARGE WASTEWATER SYSTEM WAIVER AGREEMENT TO WAIVE SETBACKS AS REQUIRED BY 15A NCAC 02T .0506(a), .0506(b), .0606(a), .0706(a) AND .1006(a) I, SCO iMBS (printed name), certify that I am a deeded owner or an authorized agent of the property located at: Address:8901 Momina Sang Court city: New Hill Lot 8 Parcel No.: B dWPO_fint $ubd State: NC Zip Code: 27 662 county: Wake Furthermore, I certify that I am authorized to make decisions regarding this property, and that I do hereby agree that the setback distances cited below be granted to the Applicant/Permittee listed on the following page. I understand the setback requirements set forth in 15A NCAC 02T. For the parcel identified above, I consent to the following reduced setbacks: Wastewater Irriaationllnrdtration Setback to Property Lines The required setback of 50 feet is reduced to 10 feet, thereby allowing wastewater effluent irrigation or infiltration no closer than 10 feet from my property line. ❑ Wastewater Irri ation/Infiltration Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing wastewater effluent irrigation or infiltration no closer than feet from my residence(s) or place(s) of assembly. ❑ Wastewater Treatment and Stora a Unit Setback to Pro ertti° Lines The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my property line. ❑ Wastewater Treatment and Storage Unit Setback to Places of Assembly The required setback of feet is reduced to feet, thereby allowing the construction of wastewater treatment and storage units no closer than feet from my residence or place of assembly. Signature: _ ff=-'W�M- FORM: NDWSW 02-19 Date: Page 1 of 2 Applicant/Permittee: ft cs-4s Hold1juasALC permit No.: Not Yet Assigned Address: '� �Morning Sing you Lot 8 Parcel No.: BadjeV Point Sybd City: aw _ i 1 State: NC Zip Code: 27 662 County: Wake NORTH CAROLINA, J(L COUNTY I, S 1'IUn , a Notary Public for (jjjj ((-( County, North Carolina, do hereby certify that JalMeS�5(-j!3j+ j0n PS personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the g day of _ J00 a 20Z . SEAL C--1- E!M Signatureof Notary Public ublic v (�ZU ty, N.C. My commission expires Pam& � �� Once notarized, this form shall be recorded at the Register of Deeds in the county or counties in which the described properties are located. A copy of the recorded waiver shall be sent to the following address: Division of Water Resources Non -Discharge Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDWSW 03-17 Page 2 of 2 NATURAL HERITAGE PROGRAM RESOURCE REPORT FOLLOWS THIS PAGE June 14, 2023 Managed Area Buffered ?roject 3ounda.y ?-oject 3oundary NCNHDE-22291 -. CIR-301 Page 41 Jr 1 3- 9.1 NC DEPARTMENT OF NATURAL AND CULTURAL RESOURCES ITIR June 14. 2023 John Consulting Engineer 2112 White Oak Rd Ra'eigh NC 27608 RE: CIR-301 Dear Johr Harman, PE: _ „ _ 'e"IIfarf oeput', ccu Na!! al H2rit3�2 , ,r3:n NCNHDE-22291 The North Carolina Natura' Heritage Program NCNHP) appreciates the opportunity to provide nformat on about natural heritage resources for the project referenced above. A query of the NCNHP database indicates that there are records for rare species, important natural, commur ties, natural areas, and/or conservation/managed areas within the proposed project boundary These results are presented in the attached 'Documented Occurrences' tables and map The attached Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary The proximity or" these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is documented within the project area or indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here v,,,F!• a �, ff•r rn�^r'7r•.. _-.i�r rm7-r ]' Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not Intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. A so o'ease note that the NC Natural Heritage Program may fo''ow this 'etter with additional correspondence lfa Ded'caed Nature Preserve.r Registered He;'tage Area, Land and Water Fund easement..or an occurrence of a Federally-I*131-ed species ',s documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at npclnZ'.r• or 919-707-8603. Sincerely, INC Natural Heritage Program ear -,,' `.4�_ A` _ _ L'.1?�_ QE"GI-4. ES 4 _1 Nalu'a; 41-93s aid Ma;i A'eaS hterseC-:gig r'ne �.pin-r Area I•�-3D1 Jung tit, 2D23 N:�NHD--22291 errent Dccur2nces Docurr e.�'ed Within P J �l Tornmon blame Last Element A4_' Observatic+n (3CCLIrmnc.q, aT Mank. )r), t-r Fsh42891 Fundulus cf. dUaphanuslLake v:halp��{Hlfish 3 1i:] 2a 35 = - - 5.191�1F ari[I.y �tL� 5d - F2ar e NJ �\iatural Areas are Documented wlthr) '_he ?role-`_ A: ea Managc!d Areas Documented Within Project Area Harris Game Lard NC Wildift Re$purces Commiss[on State N0-5 IF the proposed orOlect intersects with a conservation/managed area, pease contact the andowner aract y `or addit onai nformat,on If the protect intersects with a Ded•ca:ed',arura preserve JNoi, Rep,stereo tier Cage Area (RHA), or=edera!;y-fisted species NCNH? staff may orov ae ado"- ona: Oorrespondence regarding the protect Ce` o , ons ano an a<o,anat on Dr slats desgnat:ons and codes can be fond at '�is-,� _ - -- - - �' �+ Data zi ery generated on June 14 2023 so.rce NC"D Spr ng f4or ) 2023 yo_r n: or -^a: on r_o.._s more ^han one year aiapses beFore oroIll. •' at•on as new in -Dr., on src7nt n„a y adoed to the NCNHo database NaiJ.e 2 Dr 4 Element Occurre Vat_, a �enta�a t Occuir�ac_s Vat ra'' Areas I,I ^a^ageo Areas O e ri a Rad s o _ne D o;ec_ Area �I'R-3D1 na 14, 2D23 v N'1D--222a' mented Within a One -mile Radius of the Pr.)Iet r Area Darrselfly ashwa'_e sh42391 Fundulus cf diaohanus Lake Dnelos Killifish 201D-03-2o No Natural Areas are Documented Within a One -mile Radius of the Project Area Low 3-Medium Managed Areas Documented Within a One -mile Radius of the Projee: Area Harr€s Game -and ONE,""" Resources Cor--- �r state GI [pal Staff` plonk Rank Significantly G5 _-- Rare Significaniiy 310 S1 Rara 31 3KJ 3n3r 3.)X S'3-s Jas'ana' Jn, 3nb 37J35 _an b `J'.:o�_'� 51, 3 ��"y �.�� Jn n= Ic 2�'3 s�•�r_ ���r�J So: �� Ar r 7�23 _»J ^ ` yJ_.: 'F:) ^a: Jn-a]_as- - —Z)-a :h3n Jne ye=Ir a!3Ji as baFJ: a J; D;a-; n' 3" J.l a5 -3 " 3:::1-D "J :fly V�Vi� Ja:3bai2 Page 3 or 3 DETAILED SOILS REPORT KSAT & S F R LOADING WORKSHEET INFORMATION FOLLOWS THIS PAGE 6/20/23 Bartley Point, LLC c/o: Mr. Pat O'Neal 1430 Innovation Ave. Morrisville, NC 27560 PIEDMONT ENVIRONMENTAL ASSOC I A T E S, P. A Project Number: 3618 Soils Report for Proposed Residential Surface Drip Wastewater Irrigation System Project Name: Bartley Point, Lot 8 Location: Off of Bartley Holleman Rd., Wake County, NC (PIN: 0617538361) A detailed soil evaluation on the above referenced tract was conducted to determine suitability for a subsurface or surface wastewater system. This report is being prepared to satisfy the requirements set forth by 15A NCAC 02T.0600 concerning the soils report for single family surface wastewater systems since this property does not contain enough suitable soils to support a 5-bedroom subsurface septic system. The location and characteristics of a site that is potentially useable for a surface drip irrigation wastewater system was identified. This report details our findings and provides the necessary soil/site information needed for a surface irrigation system to be designed by a professional engineer. This fieldwork was completed in Winter, 2023. The potentially useable soil area was located in the field and is shown on the accompanying soils map (Attachment 1). The proposed disposal area is compliant with buffers for surface wastewater systems. The map also shows the locations where measurements of saturated hydraulic conductivity (Ksat) were performed. This site is located in the Triassic Basin geologic unit of Wake County. Soils in the proposed irrigation area are generally similar to the Creedmoor/Green Level complex. These soils have expansive clay mineralogy and may have indications of soil wetness present in the subsurface horizons. The Creedmoor/Green Level complex soils are generally unsuitable for conventional subsurface septic systems. However, the favorable soil characteristics of the surface horizons offer the opportunity for surface application of treated wastewater. Soil Evaluation The soil condition of the proposed wastewater area is described with the borings shown on the attached soils map and described in Table 1 below, as well as in the accompanying Ksat location soil profile descriptions (Attachment 2). 216 S. Swing Rd., Suite 1 9 Greensboro, NC 27409 • 336-662-5487 Table 1. - Bartley Point Lot 8 - Soil Boring Logs Boring #: Depth to Exp. Clay Depth to SHWT " 8-1 15 16 8-2 12 12 8-3 13 13 8-4 15 20 8-5 16 18 The landscape position for the proposed irrigation field is on a broad side slope (5-7% maximum) with a sandy loam A/AB horizon. We recommend a maximum instantaneous irrigation rate of 0.3 in/hr for design purposes. Saturated Hydraulic Conductivity Ksat Analysis The constant head well permeameter technique (also known as shallow well pump -in technique and borehole permeameter method) was utilized to complete the ksat tests. This procedure is described in Methods of Soil Analysis, Part 1., Chapter 29 — Hydraulic Conductivity of Saturated Soils: Field Methods, 29 — 3.2 Shallow Well Pump In Method, pp. 758-763 and in the Soil Science Society of America Journal, Vol. 53, no. 5, Sept. — Oct. 1989, "A Constant -head Permeameter for Measuring Saturated Hydraulic Conductivity of the Vadose Zone" and "Comparison of the Glover Solution with the Simultaneous — Equations Approach for Measuring Hydraulic Conductivity." A volume of water was applied and measured with time until a steady state of water flow was achieved. This volume/time with steady state was used to calculate the saturated hydraulic conductivity of the subsoil by the Glover equation. Measurements of saturated hydraulic conductivity (Ksat) were conducted within the Bt horizon at three sites within the proposed wetted area. The Bt was the only soil horizon measured since it was obviously the least restrictive horizon. This determination was made based on the expansive clay mineralogy present in the majority of the Bt horizons and the fact that underlying horizons (where present) were lighter in texture. Additionally, the soil horizons underlying the Bt were too poorly structured and/or too thin to quantify accurately with a Ksat test. The geometric mean Ksat of the Bt horizon was 0.072 in/hr. Geometric mean Ksat calculations and field data are shown in Attachment 3. Sin le Family Loading Rate Worksheet A single-family water balance calculation was conducted per the above referenced regulation. Based on the geometric mean Ksat and our field observations, these soils fall under Loading Rate Group SFR-A and could therefore be loaded from 26-50 in/yr. Parameters utilized in the SFR Irrigation Area Calculation Worksheet are described below: Potential Evapotranspiration (PET) and 80th Percentile Irrigation: Data from a nearby site (RDU International Weather Station) for a 58 year period was utilized in the model per NC DWQ policy guidelines for these parameters. This data is shown in the attached SFR Irrigation Area Calculation Worksheet (Attachment 4). Drainage Rate and Discussion of Drainage Coefficient Utilized in the SFR Irrigation Area Worksheet: We are proposing a drainage coefficient of 7.2%, which results in an actual Annual Hydraulic Loading Rate of 19.49 inches/year. We feel that this is a reasonable drainage rate given the surface texture and thickness of the A horizon, as well as the landscape position of the proposed spray field (broad side slope). Standard Fertility Analysis Soils within the proposed spray area were also analyzed for current fertility conditions. Because of similar landscape type and management conditions, one composite sample was used to infer soil fertility status within the proposed dispersal area. The standard soil fertility analysis was completed by Waypoint Analytical Laboratories, Inc. Soil sample results are included in "Soil Analysis Report" provided by Waypoint Analytical (Attachment 5). Base saturation and exchangeable sodium percentage were determined to be 52% and 4.81% respectively. Appendix 5 also contains information on other soil parameters such as specific nutrient indices and pH. Conclusions Site disturbance could create unsuitable conditions for the proposed system and should therefore be minimized prior to construction. A permanent vegetative cover should be immediately established and/or maintained over the entire application field after installation. An individual septic system permit will be required for this property prior to obtaining a building permit. This will involve a detailed evaluation by the state to determine, among other things, system size and layout, drive/parking and building location. Only after developing this information can a final determination be made concerning specifics of system design and site utilization. A letter of denial regarding subsurface septic systems from the county health department will also be required by NC DEQ as part of the application for a surface application system If you have any further questions, please feel free to call (336) 662-5487. Sincerely, G. Christopher Murray, MS NC Licensed Soil Scientist Piedmont Environmental Associates, PA List of Attachments: Attachment 1 - Soil Map Attachment 2 — Soil Profile Descriptions Attachment 3 - Ksat Summary and Field Data Attachment 4 - SFR Irrigation Area Workbook Pages (Including Project Information, Potential Evapotranspiration Worksheet, 80 Percentile Precipitation Worksheet and Irrigation Area Calculation Worksheet) Attachment 5 - Standard Fertility Analysis 6 Legend House Block Final Surface Disposal Areasdw Propsed Wells, Surface Lots (100' Buffer Shown) NJ NC DEQ Soil Borings Ksat Locations L A" 16 51 + qO A A +: J& to er 04 Nk. ANk -Aft V **40( Owl j V do jW ILI' m, E3 IL N5 �.1 > O J 0 O 3 = CD m = M C ` N 0 X y -ov n N "- O E 0 o x U 4 o r m�C7�UU R O ai c >, ai iri o r co J F o U Y\> N cc U O 'vr .Q C� y O O 00 m o J OO c a a� o �Z y m U) � m Y O U) O d V Q Imm SSaIlI]Ial;s C >w diCL N tl7 U rn� C ate+ IG � ° 5CL Ua;Slsu00 ;slaw 3dAl � v c 0- fn V1 U !G ❑ � {17 �EjEc 3Z15 - aan;ani}g m cn (D UA noo`o �cZa E O 0) lr_- a U (D �' ` u1"!D - ain;ag CD ycu�Eo E o 4" > > -ai 1 U 6 . ajn;xa E EI EI EI 8pl•OUO3 xapaa 1 06 � U U arlg aluo E E ?pungd 511167wEl El o o � W un � in tC1 S JOIOO al;;ow 0 0 cM coo I iz co co cc �OIo3lioevc, 000C) N co SO4ouio N N M CO CO M 'L N co UOZI.IQHQlmlm101W- ,C U U � O i C a)` 7 co m C co rn0)> E E c w mrn o 03 ca C0 rn a a cc.) m w w E cm ca n a co 0 O E Y vc c o cu 3 E n C7 U 2 3 E ., U N E E 0 >, E o E cu cC O >, >, U N C cu Y cu cc 0 O A fn U V ch in N C d ~ VJ — •(n •co U U cn N J �mJs Z 1" a 0W„ W z 0�� W5, _ � N dWe r�1 a) > O O J OCD 3 c c = Q CM L C N CL N X to � a`)v a E = w o X a) UUU coo V O CL o in a) Cc j o m'D0'a) cq Y Cl) > U) c R U O .Q v 0 co d o J O c N a aN >,Z o y mY yr U Y a) acc t Q Mar;S c > > B � U H � m su00 #sIOWk-1�ll�I 3dAl - alnjanJIS ` oli cc 0 0a ry E E U - ain;aru}5 N N U) N N E c cc 0 0 3 E E 0 � z, Z, - ain#anJ;g U);� C E y 9 C a) v� U y aJ njxa '«- E cam>w> C L Y o o o m U a ajn}sloW g E E E O` O ca L a) L V N 3 L `m rn U CU c m E c c rn > E 7 M v) O c� c E E 1 06 otS u0 XOPON U O 0)a o. 0 m w w E a) az15 alljow rn a o. C N N E oo as nq►dall a)mvo o L 3 E N C7 ao co Lo L75 U? U c.i a U .�L. 3 Y E m 7109 OW M DIOD xi.I W E 0 E 000 E o coMM p M yaui t I I ffa0 a)� E a) U ° m ca O >.A V N +, a x N N y U U fA M M c a) uOzlaOH Q m m v N— '� En U y �+ 'co J r•1 'D > O J O 2 C� C) C ` N x CL 0 a (D •' o E C o X U (D O O ui c >, a) (n J o w as `m U) O U > c U) Y 0 O O :r .Q V d Oo O o J Oc ch a (LN c a)Z y E y � m Y 04 1.r U N U) O d V u Q n;lORSeld F Q I LL' v ssaulmogs 'E >CL ID N °' m C � i� ` ram-. O li va;srsuo�;slOW `5 - aln;ana;s `o m I n m�oy� ry� E E E U !Is - aan;Oru;s N_ N � N N N N C N E 0 E E YE 3 c� z, z, 3 - a�n;Ong;s C O y •O N E N 0 > w > ro c-) ain;xa 4" Y o o U -Sue i;e;s ajn;sioyy o E E E > o c o c rno> EE cm U c ,w o rncn � co cc . c Co y rn o a 'w E ad U 06 U 1 Il'ouoo xopaa c°� cca U E E ails elljo rn a Q m N' E can o o m a� m c !pungd almoW o o 2 �3 Ecn ao L o s AalO:D alIloW U') U 3 E n r _o r o_ M Co It r-coco .10100 xl.J;eW } } cEa 0 m 0 00 >,E o Ef°o> E 4W ap CO d � � M t M m — o+ N O E ° >, ,SOWUl N m cc O N X CoN O y .y U U N N Z a uOZIJOH Q m m U I y— 'gin '�, U J Bartley Holeman Rd. Project, Wake County, NC NC DEQ Surface Drip Ksat Data, Winter 2023 Nest Ksat inlhr) N1, St 0.049 Lot 8 N2, Bt 0.067 N3, Bt 0.070 Geomean Ksat: 0.061 IKAI W of c 0 C L C u1 of u1 In O u1 In M o In O o O of o O In O o 0 w m E O a P. n %D of a s %D 00 n N O O 00 Q a 1!1 M 00 O ':t a M 00 O 00 O 00 0 U M M O M N .i M O N .i O rl O a -I O a -I O O rl ri rl L i+ Y D: 10 3 L E 3-0 nana+oo�Ou+�Nnnnaam�D�D�DtDoo N rn C1 M 1% en M 01 N N 1!1 lA 00 m N M v w 00 1D O) N M a .i 0 .-i rl ei l0 01 0 N Ln n cn 00 eel N a a 00 Cf N n N n v CT N O .-1 M 1% M� Ln .-1 l0 A n Ln o+ r H O U w E 7 y n n N N O N n n O n N O o n 0 Ln n 0 0 0 N p w LA 1D .-1 9D W} M %D .-1 RT N o N1 o N wl "? 0 A N N 00 > E 1C -f O O N %D a 4 N N a -* O N 00 �D w N .= 13 Ln ai U1 M N Ln a -I M N N N N ai rl ei O C U. U ate. E N ... 3 y n W eMl M O M n N n N 0 0 0 O O ao O O O N E M w .-I w O M O N N 0 O M O N N m M O ." I N N C N C 2 O C C O O O O C O O C O O C O C O O C O YI C r e � e ai o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 as JII W L d M 3 E Ln F% in N Ln N a Ln I n a� Ln Ln Ln N tj 1D W Ln Ln N Ln Ln n cn N L p y O 0 O ' 1 N O N` O N M O 09 On1 M q v o O-a Ono v eNn In M O LA o If1 0 1!1 o � O a-1 0 0 0 r1 a -I 0 wl o 0 o a-1 .i ei 0 0 0 .I •i ei a-1 01 J YI i d 01 01 01 m 01 m 01 m O1 a1 o m 01 01 01 m m M!m 01 01 m 00 M 00 M 00 M 00 M 00 M 00 M 00 M a M 00 M 00 M 00 M N a IA ai N a Ln .i N a Y1 ei N a Ln ei N a 1 Y1 ei N a rl ri a -I N I N N N M M M !!1 tf1 Y1 IA 1A 1D 10 lD ei ei d ei I awl ai ai awl d ai rl ei a -I ai �i eel T4 �i awl d ri ai E 00 00 00 00 00.00 00 00 00 00 00 00 OD 00 00 00 OD w 00 00 00 00 O \\\\!\1\\\\\\\\\\\\\\\\ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ri ri d .� ..i ai ei ei r1 ei ei .i • ri ei ei 'i a-1 .i ei ei .i .i .� .� rl ei .i .i rl d .i sl ei ai T4 ei .i ei rl rl .i d .4 a-1 N N N N N N N N. N N N N N N N N N N N N N N N N N N N N N NI N N N N N N N N N N N N N N 0 0 0 0 0 a o 0 0 0 0 0 0 0 0 0 0 N 0 N 0 N 0 N 0 N 0 N N N N N N N N N N N N N N N N N W E 7 Z �D n W 01 O rl N M Rt Yf 1D n 00 N M a N {O ai N M !r Y1 iy V4 �y i„1 �y iy N N N N N C A I I p I -,--Ll a 0 0 0 0 N a --I a 0 0 0 0 N a --I �E E a V 0 ai O � N cc i O CL E F a = o U N L � 3 a 0 0 0 0 N DPW ei o a Ln M ui N LQ e-I 1!1 O M N rl O i 2 a ►1 0 0000000 0 lD m * M N a -I 1-1 W N qQ1 m N A 00 N Ln ill n' tlR Q1 C G .i a at ti M .i N ri dJ E u u E a W cr�i -;j J W 0 J. ` e O N d y d p t 0 F O T m A N lY0 N a co 46 N m C 0 i C 0 t7 � (D c� 3 o d C U � d � L � N r U 1- 0 7 ov� o _- N � L U o m c a `6 E II � N . Cn CD a dio d N N m 0-0 3 Co t II N O a J N u .. a R 23cCvL M, u W ad C O a .0 E m N m m 4 N 0 0 0 N O O O O O O O O N N N O N w 10 m M 00 10 N n 10 W N .i 00 n m W " e'1 00 n rn 0 W 4 N w 14 N C: E; V00 N M n 10 M 1G m ri N n M ai N O PI m N ei N r1 N W .-I O N N O M ei ei rl ei O) 4a L 3 M n N o0 o N 4 !i 10 N N N o a a In N uM 00 ai n w 3 m N en M N m M P. N 10 O M N O N a ^ M u1 O N E 00 M Ln O 1n N 00 "` W 00 " N n N n O N In n m= m N N N m n N 10 m M W O N M a0 0 0 o ei ai ri ai 4. N ri M 4 N N 10 n n n 00 O m m m m .i .� � C v I w aI N n N 4 0 0 n N 0 0 0 N N 0 0 N N n 0 00 p 0) a ei m m X 4 M 1n 4-w M ei 0 q* ei W M N M W > E 00 N ei N 4 lti 10 N M 0 M 4 I* N M N M 4 N N wi 4 tf N M N ei 0 Ln 10 N N N 4 N N N 3 7 M N 0 m n n Ln C _O LJ6to t. 3 y N N N 00 N N O O Co N 00 O N N 0 N M N 0o O 00 E 4 In N ei m or n 4 M N 4 4 M a-1 N 4 ai 10 M N M N Z N ei ei ei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 YI 41 c 0 c °1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F= ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui ui d VI CL W O) O1 �+ 3 E I N M M N. N N N N N M et n N N N N N N n N N N N N n M N N m N 0, 4 00 G N 4 m ap m n M n -! a7 u1 d N 10 evi m 4 4 N 0 G n 0 e.1 O m 0 0 ai 1O ei ei N N N ei M rl sl d �' d d O ri .i ri d ei d ei ei rl d ei �1 1G 10 10 1D 10 1D 10 1D 1D 10 1D 10 1D 1D 10 10 w W W W w W' W 0 0 0 0 cc 0 0 0 0 0 O O O O O O O O O O1 0 00 M 00 M ao lilt 06I M 10o I M 0o M 0o M 0o M 00 M 0o M 00 M o0 N N' ri N 'Q 1lf e 1 JI N If1 d N I f 1n rl N� N ai N iI lIl ei ei ai N N N I N M M M M 4 4 J 4 .0 Ln Ln 1n N W W WW ri ei ei ai ei ei ai f �i ai ei wt awl d ei d ti rl Tq ai ri rl d 1-1 E coo 0 o 11 cooa o o v�o'o 0 0 0 0 0 0 0 0 0 0 0 0 0 ei rl ei ei ei N rl e+ a -I ri rl ei ai rl rl ei ei rl ai ei ei ei rl \ \ \ \ \ \ \ \ \ \ \1\ \ N N N N rJ N N N N N \ N \ N \ N \ N \ N \ N \ N \ N \ N \ N N N N N N N N N N N nd N N N N N N N N N N N N N N N O O O O O C? O G O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N Ni N N N N N N N N N N N N N N N N N N N G► I m E Z N 10 n ao m O rl NM 4 OWN W N M 4 N W n r, ei ei wl ei rl ei .i N N N N N N A 2 a a O V 0 E c V L m 3 m O O O O O O O O O ei rl rl r PEA P-0 K- W LD p0 N A r4 N N^ Rr N m M V L 0 ID a ca ca 3 E: o m 0 a cc U q d: II y N m [6 O; L N 7 N �n m fA CX ( S~ II rn O .0 .0 L — L U N o Q) c a cW 9�oNE co a, v 0 `m q �! a) ' m 073 3 O m .0 41 J II a lII \L I W a. us !0 i 0 ul C O CL In E O n IO M P M M 00 O .i M 00 .i OD N C1 M 1It of 1� ei 00 N IO .i N Ill M N O w ri m N N w N C . U M N M N M N o N It e q O .'1 pj L � 3 L EQ1 y 41 m .p o^ a� n m M 00 oo o a IA LA o .� N a N n oo w 0l r1 v a Io w M o M a Io w O o± O N m M o o W u1 00 4 n a; O IO cd nj ei ei IV a eV N 1� fV u1 Y N Ln OM1 V ei 00 ei M N N N OO N M M w M 00 M m m N Rr w m N u1 le m w u1 00 u1 ei w M w O U E 'O O N N N N N m m N N IA O N IA N O N m 0 a -I m p 01 N -e ID u1 V7 of ei u1 M m el M N N M * N N 1A a -I * i E IG OC C N IC N N a IG ID eV 4 00 O O IV 00 C a u1 M 7 Mc" u1 �-4-e .4 -0 N N ei N e I N M f" .i N N N N O C LL U L ^ El 3 a O 1� M M oo N Ill IA M M IA O N IA 00 O N IA 0 �- 01 1� a W Ln IA IA V"1 IA M en r1 !A N N rY, a N N fA fA N ZE 3 O O O O O O O O O O O O O O O O O O O O O d C, C ul I ; e T aI o 0 0 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 EI o 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 H ui ui Ili ui ui Ili ui Ili ui ui Ili ui ui ui ui ui vi Ili ui ui Ili v H N N N ti 14 N 1 a eo LY I I ^I P% l u1 u1 u1 eq ut N 3 P 1! Ib N G1 N 1n N 1% u1 N N VQ N 1� N P r A IA u1 w IA E L O � ai � M N � Y1 .i P Ol • N ; ui � O � IO cn N IA o0 p y .Oy O e 1 O IV O M m D a O d O ei O O O O a O of O L O ai IC O tD O O ai O O O O a'1 iy ub y o°c I 1 f ei I ri awl e 1 14 .. inInT�T�I�.j1L,LnIn������� .i i W co .� I w .i w .i w r+ w N Io ri Io IA ei • N : IA T!, N Y1 T! i N v u1 r 1 N -a IA ei N IA en m M m.0 4 4 4 IA ►A of IA G 6 �D G O1 r1 e'I ei a'1 .i ei ei ei E 00 00 00 00 00 00 00 OD 00 00 00 OI O O O O O O o O: O O 00 O OD O 00 O 00 O 00 O 00 O 00 O 00 O 00 O 00 O 00 O \`\ \ \ \ \ \ \I\ \ \ \ \ \ \ \ \ \ \ \ \ \ .^I .y ei ."I e'I ei d .y .� ei d d ei ei d .� a-1 ."I ei ei ei ei ei ei ."1 ei N N N N N N N N• N N N N N N N N N N N N N N N N N N N N N,N NIN;NlN'N N N N N N N N N N 0 O O O O o. 0 O O O O o N N N N N N, N N• r4l N N' O N O N o N 0 N 0 N 0 N 0 N 0 N 0 N 0 N N { d! E! Z' O .'' N !A 42 IA O n 00 M N M rM V7 ID I� 00 N M u1 -1 ei .-1 i„ 1 .i i„ 1 .�i wo a l N N N N N C+ �,a � �1 r i a 0 _ o 0 0 N ei Q O O O O N rl i Q V dJ o N Y^� i �A A E .� Q N O u CD N 4-0 3 Q O 0 0 fV Q O O M M ul N Ln �i Ln .;t C o 0 a -I 10 w E N c O u L 3 m o O O O O O O O F. lD LI'1 T N a -I F §._A■-R-. cn 0 :3 §,i m % 2 \ � k � 2 � � Ca 7)7 $ ,0 , ,.) c / / \ \ \� §§§\ d \ \ ) /\ƒ\ /« :i$4)j 2$tE \$\ It�2£ =�o� : 02=— • D kca�\ „)27 _»,_ Ch ca u Project Name: Bartley Point, Lot 8 Facility Address: Off Bartley Holleman Rd., Wake County, NC County: Wake Prepared by: G. Christopher Murray, L.S.S. Project Design Flow = 600 gal/day # of Bedrooms Required Flow 2 bedrooms 240 gal/day 3 bedrooms 360 gal/day 4 bedrooms 480 gal/day 5 bedrooms 600 gal/day 6 bedrooms 720 gal/day SFR-LRW 9-08 Potential Evapotranspiration Worksheet (Thornthwaite method) Project Name: Bartley Point, Lot 8 Location of Temperature Data: RDU Int. Airport - Raleigh, NC Starting Year of Data Record: 1948 Ending Year of Data Record: 2006 Period of Record (years): 58 Source of Data: State Climate Office of North Carolina Site Latitude (degrees) 35.00 within range Calculated PET: 33.38 inches Mean Monthly Temperature (degrees F) Daylight Hours 112 Heat Index Calculated PET (inches) January 41.1 0.87 1.02 0.29 February ".8 0.85 1.70 0.51 March 51.2 1.03 3.15 1.20 April 59.4 1.09 5.40 2.30 May 67.6 1.21 8.02 3.94 June 75.6 1.21 10.90 5.52 July 79.0 1.23 12.21 6.36 August 77.7 1.16 11.71 5.73 September 71.1 1.03 9.24 3.92 October 60.6 0.97 5.76 2.20 November 1 51.5 0.86 3.22 1.03 December 42.6 0.85 1.28 0.37 Total = 73.61 33.38 SFR-LRW 9-08 SFR Precipitation Worksheet Project Name: Bartley Point, Lot 8 Location of Precipitation Data: RDU Int. Airport - Raleigh, NC Starting Year of Data Record: 1948 Ending Year of Data Record: 2006 Period of Record (years): 58 Source of Data: State Climate Office of North Carolina 80th Percentile Annual Precipitation: 54.48 Total = Mean Monthly Precipitation % of Mean Annual Precipitation 80th Percentile Monthly Precipitation 3.60 8.21 4.47 2.88 6.57 3.58 4.30 9.80 5.34 3.06 6.98 3.80 2.26 5.15 2.81 2.93 6.68 3.64 5.51 12.56 6.84 5.00 11.40 6.21 5.81 13.25 7.22 2.90 6.61 3.60 2.75 6.27 3.42 2.86 6.52 3.55 43.86 100.00 54.48 SFR-LRW 9-08 Project Name: Bartley Point, Lot 8 Annual Hydraulic Design Flow = 600 gallday Loading Rate = 19.49 inch/yr SFR Loading Rate Group: SFR-B Limiting Soil Ksat = 0.061 inch/hour Irrigation Area = 18,020 square ft Drainage Coefficient = 0.072 = 0.41369 acres Drainage Rate = 0.105763974 inch/day (Formula: K,,t * Drainage Coefficient * 24) Number of Days in the Month PET in/mo Vertical Drainage (in/mo) 80th Percentile Monthly Precipitation (in/mo) Maximum Allowable Irrigation (in/mo) Maximum Allowable Irrigation (gallons/day) Maximum Allowable Irrigation ( allons/month) January 31 0.29 3.28 4.47 0.00 0 0 February 28 0.51 2.96 3.58 0.00 0 0 March 31 1.20 3.28 5.34 0.00 0 0 April 30 2.30 3.17 3.80 1.67 626 18,769 May 31 3.94 3.28 1 2.81 4.42 1,600 49,603 June 30 5.52 3.17 3.64 5.06 1,894 56,827 July 31 6.36 3.28 6.84 2.80 1,014 31,431 August 31 5.73 3.28 6.21 2.80 1,013 31,407 September 30 3.92 3.17 7.22 0.00 0 0 October 31 2.20 3.28 3.60 1.87 679 21,045 November 30 1.03 3.17 3.42 0.79 295 8,844 December 31J 0.37 3.28 3.55 0.10 35 1.075 TOTAL= 365 33.38 38.60 54.43 99.49 /705.31 c1W1uvu Formulas: (Max. Allowable Irrigation) = (PET) + (Drainage) - (Precipitation) SFR Loading Rate Table SFR Maximum Annual Geometric Mean Loading Loading Rate Ksat Range Rate (in/yr) (in/hr) Group Low - High Low - High SFR-A 26.0 - 50.0 >0.05 SFR-B 19.5 - 26.0 0.015 - 0.06 SFR-C 13.0 -19.5 0.003 - 0.015 SFR-D 0.0 -13.0 0.0 - 0.003 Assignment to a SFR Loading Rate Group for each 15A NCAC 02T .0600 permit application shall be determined by the geometric mean of insitu saturated hydrualic conductivity data collected in the most restrictive horizon for each soil mapping unit within the irrigation area. Required Flow 2 bedrooms 240 gal/day 87,600 gal/yr 3 bedrooms 360 gal/day 131,400 gal/yr 4 bedrooms 480 gal/day 175,200 gal/yr 5 bedrooms 600 gal/day 219,000 gal/yr 6 bedrooms 720 gal/day 1 262,800 gal/yr Maximum allowable irrigation: 219,000 gal/yr The Maximum Allowable Irrigation number must be greater than or equal to the required flow. SFR-LRW 9-08 Waypoint-0 ANALYTICAL Client: Piedmont Enviromental Assoc., P. A 216 South Swing Road Suite 1 Greensboro NC 27310 I_ah Nn- 92n55 2850 Daisy Lane, Wilson, NC 27896 Main 252-206-1721 ° Fax 252-206-9973 "Every acre... Every year®' www.waypointanalytical.com Grower : Report No: PIEDMONT ENVIRONMENTAL Cust No: Date Printed: Date Received PO: Farm: BARTLEY Page i-mia: SOIL ANALYSIS 23-170-0522 06526 06/21/2023 06/19/2023 Sample ID: BART LOT 8 3 of 6 Test Soil pH Method 1:1 Results 4.8 SOIL TEST RATINGS Calculated Cation Exchange Capacity 2.1 meq/100g Low Medium O timum L _ _ a Buffer pH BPH 6.83 %saturation Phosphorus (P) M3 6 ppm %sat meq K 4.6 0.1 Ca 27.6 0.6 H 17.5 . 0 42.1. 3 Na .3 0 Potassium (K) M3 38 pprn Calcium (Ca) M3 116 ppm Magnesium (Mg) M3 44 ppm Sulfur (S) M3 8 ppm Boron B) M3 0.1 ppm Copper Cu) M3 0.2 ppm K1Mg Ratio: 0.26 Iron (Fe) M3 155 m Manganese (Mn) M3 69 ppm Ca/Mg Ratio: 1.58® Zinc (Zn) M3 0.8 ppm Sodium (Na) M3 11 pprn Soluble Salts Organic Matter LOI 2.8% Estimated N Release 103 Ibs/acre Nitrate Nitrogen SOIL FERTILITY GUIDELINES Cron - Rec Units: (Ibs) LIME (tons) N P20. K 20 Mg S B Cu Mn Zn Fe Crop : Rec Units: Comments : M3 - Mehlich 3 BPH - Lime Index HM - Humic Matter LOI - Loss On Ignition 1:1 -Water pH Analysis prepared by: Waypoint Analytical Carolina, Inc. 6.*1 ItT CALCULATIONS FOLLOW THIS PAGE ENIGNEERING CALCULATIONS FOR WASTEWATER COLLECTION, TREATMENT, & SURFACE DRIP DISPERSAL FACILITIES FOR A FIVE BEDROOM RESIDENCE PRETREATMENT FOR 600 GPD; • SURFACE DRIP FOR 600 GPD LOT 8 8901 MORNING SONG COURT BARTLEY POINT SUBDIVISION @ HARRIS LAKE WAKE CO. N.C. OWNER: PRINCESS HOLDINGS, LLC SCOTT JONES, MANAGER OR, PATRICK O'NEAL 1430 INNOVATION AVENUE MORRISVILLE, NC 919-795-0356 DESIGN ENGINEER: JOHN R. HARMAN, PE 2112 WHITE OAK ROAD RALEIGH, N.C. 27608 (919) 818-2077 JUNE 23, 2023 J O H N R. i---IARmAlei P. E. CONSULTING ENGINEER 2112 White Oak Road Raleigh, North Carolina 27608 (o) 919.818.2077 (f) 919.779.0826 email= iackharmai153Cagmailxom June 23, 2023 Re: Engineering Calculations, System Component Sizing Documents, and Supporting Manufacturer's Cut Sheets Related to a Proposed Wastewater Pre -Treatment for 600 GPD and Dispersal by Surface Drip Irrigation Application @ 600 Gallons per Day for a Five (5) Bedroom Residential Lot. Conceptual Basis of Desien: Project Description_ The project is described as providing a wastewater collection, septic tank, advanced pre- treatment (NSF40, or better) components, UV Disinfection, a Flow EQ field dose pump tank, and surface dispersal by drip irrigation to four (4) field zones. All system Pre -Treatment components (Septic Tank, EZ Treat Recirc Media Filter, etc) will be suitable for treating 600 gallons per day of domestic strength wastewater from a five (5)) bedroom residential facility, and dispersal to a surface drip application area for an Average Daily Flow of 600 Gallons per Day. Summary of System Description: When approved the permit might read: "For the construction and operation of a wastewater collection and treatment for 720 gallons per day (GPD) from a compound of two single family residences. Surface dispersal by means of drip irrigation system is limited to 600 gallons per day. The system shall consist of: a 1,500 gallon baffled septic tank with an effluent filter, a 2,500 gallon (two compartment) Recirculation/Storage Pump Tank, a Model 600 (600 GPD) EZ Treat Polystyrene Recirculating Media Filter, dosed by a 20 gallon per minute (GPM) recirculation pump, a flow splitting device, a io GPM UV disinfection unit, a 3,500 gallon Field Dose Tank, a 0.42 acre drip irrigation area with a minimum of 5,400 linear feet (LF) of drip line, 270o emitters, a rainfall sensor to prevent irrigation during inclement weather, and all associated piping valves, controls, and appurtenances to serve the single family residential compound at 89o1 Morning Song Court -Bartley Point Subdivision (Wake County, NC) with no discharge of wastes to surface waters, pursuant to the application received, and in conformity with the Division approved plans and specifications considered to be a part of this permit. Component Sizin • Septic Tank Sizing: 1,5oo Gallon The Septic Tank proposed for use will be equal in respects to NCDHHS Approval STB-390, for a 1,5oo Gallon Septic Tank. See Drawings for details. • Recirc Tank & Simplex Pump for EZ Treat Media Dosing per the NCDHHS A rrovah As a minimum, equal in size to the Average Daily Flow (600 GPD). The Reeirc Pump Tank proposed for use is a 2,50o Gallon 2 Compartment) Pump Tank equal in res ects to NCDHHS Approval PT-2103. See Drawings for details. • Field Dose Tank: The Field Dose Tank proposed for use is aa,50o Gallon Pump Tank e ual in respects to NCDHHS Approval PT -eta . See Drawings for details. • Anti -Buoyancy Calculations For Tanks: -1 o❑ Gal Septic Tank: (ST-390; Shoaf PreCast Inc.)= 10.25' x 5.83' x 5.5' x 62.4 #/cf =-20,509 # (Upward) Dead Wt. of Tank (Shoaf PreCast, Inc): 13,000# (Downward) Weight of Soil on Top of Tank: 2.5' x ((10.25' x 5.5')- (2 x 3.14 x 1^2)) x 110pcf = 13,776# Determine Sliding Resistance (K, Ratio of Lateral to Vertical Earth Pressures ,=0.33; Coefficient of Friction Against Side of Trench, = 0.5; from Table 3, ACI DD41) Rs=(o.33)x(o.5)x 1/2 x(110- 62.4)(5.0^2)= 98#/l.f. acting along circumference which gives a "Mired In" resistance of 98# x (2 x 10.25 + 2 x 5.5') =3o87# (Downward) Total Upward Force:-20,509 # Total Downward Forces : 1 000# + 13776# + 08 # = 2 86 # Net Downward Forces: 9,354# Safety Factor: [29863/20509]= S.F. >1.45 O.K. -2.S00 Gal Recirc Tank: (PT-2103 Shoaf PreCast, Inc.)= 12.50' x 6.5' x 5.5o h' x 62.4 #/cf = -27885# (Upward) Dead Wt. of Tank (Shoaf PreCast, Inc): 16000# (Downward) Weight of Soil on Top of Tank: 2.5' x ((12.5' x 6.5')- (2 x 3.14 x 1^2)) x 110pcf = 2o616# Determine Sliding Resistance (K, Ratio of Lateral to Vertical Earth Pressures ,=0.33; Coefficient of Friction Against Side of Trench, = 0.5; from Table 3, ACI DD41) Rs=(0.33)x(o.5) x 1/2 x(110- 62.4)(5.5A2)= 119#/l.f. acting along circumference which gives a "Mired In" resistance of 119# x (2 x 12.5 + 2 x 6.5) =4522# (Downward) Total Upward Force: -27885 # Total Downward Forces : 16000# + 2o616# + 22# = 11 8# Net Downward Forces: 13253# Safety Factor: [41138/27885]= S.F. >1.48 O.K. -3,soo Gal. Field Dose/Storage Tank :Buoyancy (PT-2105; Shoaf Precast, Inc.)= 12.5' x 6.5' x 7.33' x 62.4 #/cf =-37163# (Upward) Dead Wt. of Tank (D. Brantley & Sons, Inc): 19640# (Downward) Weight of Soil on Top of Tank: 3.0' x ((12.5' x 6.5)- (2 x 3.14 x 1^2)) x 11Opcf = 24740# Determine Sliding Resistance (K, Ratio of Lateral to Vertical Earth Pressures ,=0.33; Coefficient of Friction Against Side of Trench, = 0.5; from Table 3, ACI DD41) Rs=(o.33)x(0.5)x 1/2 x(110- 62.4)(7.33^2)=211#/l.f. acting along circumference which gives a "Mired In" resistance of 211# x (2 x 12.5' + 2 x 6.5') =8o18# (Downward) Total Upward Force: -37163 # Total Downward Forces : 1 6 of + 2 0# + 8 018# = 2 8# Net Downward Forces: 11,535# Safety Factor: [52,398/37,163]= S.F. >1.41 O.K. • Pressure Dosing to Media Filter: • -Per manufacturer recommendations: Minimum of 4 times ADF to Media Filter: 4 x 600 gpd = 2400 gpd to Media Filter. The Filter is dosed by; 8 sprayers @ 1.7 gpm = 13.6 gpm... dose volume is +/-40 gallons per dose x 6o doses (max) per day = 2400 gpd (4 times DDF). Timer: "On" time = L40 gal/dose / 13.6 gpm] = 2.94 min, or 176 seconds. "Off' time = 30 min -2.94 minutes = +/- 27.o6 minutes, or 1624 seconds. Recirc Ratio = 4. Dosing to the Media Filter will be by means of the EZ Treat Sta-Rite 0.5 Hp, 20 gpm pump Flow Equalization E Tank Field Dose Tank- Sizing: Field Application = 600 GPD -Using Guidance of 5-Day Storage Requirement; 5 x 600 gpd =3000 gallon (Min.) Requirement -Bottom "Dead" Storage Requirement for Pump: 18"; Pump Off Elev = 254.0 -Using the Engineer specified 2,500 gallon Pre -Cast Tank: Recirc Vol for EZ Treat: 46" length = 72o Gallons; (Note: Required for PreTreatment of 600 GPD) Balance of this Tank Available for Field Storage: Field Storage Compartment=96" Emergency Volume Available in 250o Gal Tank above Pump Off Elev, to Inlet of UV: ((258.5-254.0) x 4.5'x 6.o'x8')x 7.48=i615 Gals -In Addition.... Using the Engineer specified 3,500 gallon Pre -Cast Tank: Emergency Volume Available above Pump Off Elev, to Inlet of UV: ((258.5-254•0) x 12.o'x6.o')x 7.48=2423 Gals Total Volume Available for Emergency Storage Above Pump Off: 4039 Gallons: Equals 6.7 Days (W 600 GPD -Vertical Distance for `Dose Enable" Float above "Off': Use 4"= Elev. 254.33 -Set "Peak Float" +/- 12" above "Dose Enable" Float = Elev. 255.33 • Drip Dispersal Unit. Use a Four (4) zone residential style model as produced by American Manufacturing Co.and equal in all respects to provisions of IWWS -1-R61ior Engineer Approved Equal. Estimated Required Pump Conditions: 16 al min 122 ft. TDH• Suggested PumR is PUTURS i5i2fi2W. as supplied by American Manufacturing Co., or approved equal. Calculations of Pollutaint Removal of PreTreatment Unit: The EZ Treat Model 600 Pretreatment System is an Innovated and Approved product sanction for use in North Carolina under the NCDHHS-Division of Public Health for meeting TS-2 level of wastewater renovation and pollutant removal (IWWS 2015-03-R2) and is incorporated herein by reference. It is also approved as meeting the less stringent levels of NSF 40 parameters of treatment (which is the level only required for surface application systems). The constituent levels required under Technical Standard 2 (TS-2) are as follows: a. Biochemical oxygen Demand, 5-day (BOD ) <10 mg/l. b. Total suspended solids < 10 mg/l. c. Ammonium -nitrogen < 10 mg/1. d. Either a 50% reduction of total nitrogen (organic + ammonium + nitrate forms) concentration in the septic tank effluent or a total nitrogen concentration in the effluent from the pretreatment unit < 15 mg/l. e. Fecal coliform bacteria densities < 10,000 colonies/ 100ml. (Standards are arithmetic means, except fecal coliform is a geometric mean). Field Application In€ormation. Application Area (Coverage): 18,230 S.F.; ADF= 600 GPD; Lineal Feet of Drip Tubing=540o L.F. Effective Hyd Loading Rate=600/18230=0.033 gpd/sf; Avg. Lateral Spacing: 18230 sf/5400 If= 3.37 ft. Emitter Discharge Rate=o.61 gal/hr.; Area Covered by Each Emitter: 2.0' o.c. x 3.37'=6.75 sq. ft. Instantaneous Loading Rate to Soil: o.61 gph/6.75 s.f.= 0.0121 cf/hr per sf or 0.15 inch/hr. Does not exceed Soil Scientist Umiting Value of o.3 WAY-) -End of Design Calculations John R. Harman, PE Consulting Engineer A Template for Estimating Critical Flushing Flows & TDH by Comparative Zone Evaluation Method -rev 101813 Surface Drip-TDH Calcs John R. Harman, PE _ QLR LEGEND 2112 White Oak Road I CIE C Raleigh, North Carolina 760 = DESIGNER I L {319} 818-267? E-mail: tackharMan.53Cagmail.com = AUTO CALULD VALUE - = Constant Recommended Project: BARTLEY POINT SUB'); LOT 8 .� date: 4/15/202 rrgr: 1 R. MAN, PE �EfGH,NC E O # o uses i e: H OR LOT 9-BAR P if UB'D- KE COU-N Zone Lin. Ft. Lats Per Da i one 1500 7 2 Classi ication: esi en is Zone 2 15 7 2 Daily Flaw.: 9Pd.: i 60 ne 3. 1500 7 Treatmentone o s: buUU Design Appficatio a [�PD/Sq.Ft.: 0.033 Actual TAR y Layout: ( /sf) 29 TOTAL # OF SINGLE Z 600 # OFF ER DAY: I dual Dripper Lengt r # OF DOSES PE SINGLE E: N/A (#OF DOSES PER ET OF ;;;i 1, 1-AUZORtSy 0 umps OFF" Elev.= 25*See Plans r FIELD ZON TO AL : E 7 NE 2 E 3 Z E 1500 1500, eof Dripper line n - 000 500 MO Line 8pacing (Spec g Between tares, ft): 3.0D3.1T 3. See ans Application Area o ones (sq 4558 4558,4558 455 Emitter Spacing (It: 2i 2[ 2 2 Emitter F ow .61 GP m. er 1017 101 11 101 101 Dosing Flow (Normal ose) m ripnet : 7. 7 .47 7.47 .47 Return Flushing ow (from npnet): 88 . 8 8. 8 Tote mit_ter & Flush ng Flow orn npnet): 1 16. 16. 16. 33 Total Hea , ) oss • ru Dripper System (from Dripnet : 81.70 81.70 81.70 81.70 Doses Per Day Per Zone: Z 2 2 2 a er ose per one °'o o erm1 J 75.0 75.0 .0 75.0 Volume in Latera s ani olds rom DripNet): tl.0 Z0. 2 . 20. LT Zone Drainage Volume between doses ssume 6 0 126 12.0 12.0 12.0 Min. Dose for 5 times Drainage Volume: 60.0 60.0 60.0 , 60.0 Pump Run Tfme'Per Dose m n): If Running Single Zone 10.0 10.0 10.0 I Suppy ain Inside ia. (,Rem: 3" or2 1/2"Sch 4 C 1. 1.5b 1.5 1.50 Supply Main Flow ( s): [ usn-9 Episode] I 0.036 0.0364 0.0364 .03 Supply @. Flui (ps): 3.0 3.63.0 .0 apply ain velocity During Dossing psi .4 1.4 Return ain Inside Dia. in): I Kem: 3 1.25 1.25 1.25 1.25 Return Main ow cfs): I 019 .0198 0.6198 .0198 Re -turn main velocity (fps): PUMP DESIGN CRITERIA: apply esign Flow (gpm) at Flushing: 16. 5 16.E 6. 16.35 Return Design Flow (gpm : 8.88 8.88 8. 8 8.8 r coon Coefficient: JC=l 2Q Gonserv, C=140 Piccpt le To DE 30 130 1 0 Supply -en [ft): 14 12 80 28 Supply HeadLass (ft): 4.60 3.81 Z.52 .88 Return Length � 6 1171 z7 Return Head Loss 3. 2.89 1.85 . 0.67 High Pt Elev in one �ZZON 251.5254 58 261 tatic ead (ft): ELEV. LIFT PUMP OFF O H. -2.5 0.06 4.0 7.00 Drip ystem Head Lass ( m Dnpnet); 81.70 81.70 . 81.70 81.70 Idea ss Thru ydraulic Unit AIEo vance. 7 psi 6.10 16.1 .10 16.1 Desired Lat.Di�ssure Req'd=7 psi (Berk -Rite Factor) 16.20 16.20 16.2 TOTAL DYNAMIC HEAD ESTIMATE (ft): 116.10 117.81 120.52 121.88 Pump perating on Itlons 16.35 gpm [ �_TD ON Usa American mifid Co. nPUTU 1512112W Turbine Pam BARTLEY POINT LOT 8 TYPICAL FOR ALL ZONES SUMMARY OF INPUTS: NUMBER OF LATERALS - 5 INPUT FILE NAME: BAR 8 Z4.TXT TOTAL LAT. LENGTH, FEET = 1500 OUTPUT FILE NAME.: BAR 8TYP.OUT INSIDE DIAMETER INCHES = 0.57 EMITTER SPACING FEET - 2 EMITTER FLOW GPH - 0.61 MIN. SCOUR VEL. = 2 INLET LAT. NUM. = 1 OUTLET LAT. NUM = 5 PRECISION HARDY CROSS = 2.36E-04 OVERALL - 0.005 HEAD LOSS ADJ. FACTORS SUP. MAN. = 1 RET. MAN. = 1 LATS. = 1 LATERAL FEEDERS HEI 1 LATERAL NETWORK DETAILS LATNUM LENGTH NUMLPS INFLOW EMFLOW OUTFLOW OUTVEL 1 300 2 3.143738 1,494497 1.649241 2.071898 2 300 2 3.207303 1.494497 1.712806 2.151752 3 300 2 3.265684 1.494497 1.771187 2.225095 41 300 2 3.339448 1.494497 1.844951 2.317764 5 300 21 3.402329 1.494497 1.9078331 2.39676 TOP -FED MANIFOLD TECHNIQUE DETAILS LATNUM IINFLATDIAINFLATLENRETFLATD RETFLATLELATVOLUNTOTFLATVOL 1 0.5 45 0.5 45 3,976776 0.918 2 0.5 34 0.5 36 3.976776 0.714 3 0.5 25 0.5 261 3.976776 0.5202 4 0.5 14 0.5 15 3.976776 0.2958 5 0.51 5 0.5 7 3.976776 0.1224 MANIFOLD NETWORK DETAILS MANNUM INDIA INLEN INFLOW INVEL OUTDIA OUTLEN OUTFLOW OUTVEL 1 1.05 0.33 13.21476 4.892319 1.05 0.33 -1.64924 -0.61057 2 1.05 0.33 10.00746 3.704923 1.05 0.33 -3.36204 -1.24468 3 1.05 0.33 6.741777 2.495915 1.05 0.33 -5.13322 -1.9004 41 1,051 0.33 3.402329 1.259597 1.05 0.33 -6.97817 -2.58343 SUMMARY OF OUTPUTS: FLUSHING FLOW SUPPLY SIDE GPM = 16.3585 EMITTER FLOW GPM = 7.4725 RETURN FLUSHING FLOW GPM 8.886003 MANIFOLD VOLUME GALLS = 0.118753 LATERAL VOLUME GALLS = 19.88388 FEEDER LA 2.5704 TOTAL NETWORK VOLUME GALLS = 1 22.57303 NETWORK FILLTIME MINS. = 1.379896 LONGEST LATERAL DETENTION TIME WHEN FLUSHING MINUTES. - 2.234008 FLUSHING CONDITIONS: SUPPLY MAN. HL. FEET = 6.86E-02 RETURN MAN. HL. FEET = 2.03E-02 LAST LAT. HL. FEET = 81.25723 FIRST LAT. HL. FEET = 81.67759 CLOCKWISE LOOP HL. = 81.32581 COUNTER -CLOCKWISE HL = 81.69786 MEAN TOTAL HEAD LOSS = 81.51184 VARIANCE = 4.56E-03 IRRIGATION CONDITIONS: SUPPLY MAN. HEAD LOSS = 1.56E-02 LONGEST LATERAL HL. = 11.75462 TOTAL NETWORK HL = 11.77022 RUN DATA TOTAL ITERATIONS 1 371 INITIAL ITERATIONS = 5 NUM. OF FLOW INCREMENTS 1 3 1 TOTAL FLOW INCREMENT GALLS. = 0.925953 PROJECT SPECIFICATIONS FOLLOW THIS PAGE I� Design Specifications Five Bedroom Single Family Residence PreTreatment, Disinfection. & Surface Driu Analication un/,3, 2023 i SE& Y� Site Preparation e 1. The contractor shall smooth the disturbed land surfaces after installation of all components of the wastewater treatment system have been completed, and shall leave the surface neatly shaped to shed rainwater. All disturbed areas and the discharge area shall be seeded with grass and covered with straw/mulch. 2. If illustrated on the Drawings, the drip irrigation field shall be protected from surface flow through the use of surface swales and/or interceptor drains. Surface swale and interceptor drain shall follow the slope of natural grade (1-2% slope) and at no point have less than 1 % slope. They are to be located no closer than 25 feet from the irrigation application area. . 3. All utilities including phone, electric and water lines shall be located prior to installation. If utilities interfere with the system design and components, the designer shall be contacted. 4. Any additions or removal of soil or other site alterations designated as active and /or repair drip dispersal areas, shall receive prior approval from the Engineer or Soil Scientist. 5. After installation of the drip lines, no disturbances such as tilling, plowing or other potentially destructive activity shall occur in the drip dispersal fields without prior approval from the Engineer. 6. The project engineer and soil scientist shall inspect and approve or deny all site modifications after they have been made. Pipe Installation Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 1 of 7 7. All wastewater piping connecting the residence, septic tank, recirculation tank, and pump tank shall be 4-inch diameter Schedule 40 PVC sewer pipe laid at 1.0% minimum grade. Septic Tank, Recirculation Tank, and Pump Tank 8. The septic tank shall be State approved. The tank will be a 1,500 gallon capacity, reinforced precast concrete tank with full baffle (Shoaf PreCast STB-390), and shall have easy access to each chamber from ground level for checking and pumping. The first chamber of the septic tank will contain 2/3 to 3/4 of the volume of the total tank and the baffle shall contain a horizontal opening across the tank at about midway its height. The tank shall be placed at the location and elevation as required by plans and specifications. The tank shall be properly sealed using 1" diameter butyl rubber pliable sealant as approved by the tank manufacturer. 9. At the outlet opening of the precast concrete septic tank, install one Orenco Residential Biotube° effluent filter (FT-JP-04-NC) or its Engineer Approved equivalent, and provide easy access to the filter from ground level for checking and cleaning. The filter shall be provided by the Septic Tank provider and installed accordance with the manufacturer's recommendations. Substitutions shall be approved by the engineer in advance. 10. The recirculation tank for the EZ Treat filter dosing shall be State approved and provided by Shoaf PreCast (PT-2103), or engineer approved equal. The tank will be a two (2) compartment tank with an internal baffle wall (floor to ceiling) as indicated on the Drawings with an overall rating of 2500 holding capacity as approved by the State, and bear the imprint of its DEH approval number clearly on the exterior outlet end of the tank. Access shall be provided for entry into the tank directly over the recic pump location and over the splitter valve, and extend the access openings to 6 inches above final grade. Both sections of the tank shall be properly sealed using 1-inch diameter butyl rubber pliable sealant as approved by the tank manufacturer. After joining the tank sections together, plaster along the joint with hydraulic cement, cement mortar, or other approved waterproofing sealant. All pipe penetrations in the tanks shall be booted with a State approved boot and stainless steel strap. 11. The Field Dose pump tank shall be provided by Shoaf PreCast (PT-2105) or engineer approved equal. and shall be State approved. The tank will be a 3500 gallon capacity (minimum) tank with access directly over the effluent pump and tank inlet. The access risers shall be 6 inches above finished grade. Both sections of the tank shall be properly sealed using 1-inch diameter butyl rubber pliable sealant as approved by the tank manufacturer. After joining the tank sections together, plaster along the joint with hydraulic cement, cement mortar, or other approved waterproofing sealant. All pipe penetrations in the tanks shall be booted with a State approved boot and stainless steel strap. Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 2 of 7 12. Before backfilling around all tanks, and after all piping has been connected with and sealed against the tanks, all tanks shall be filled to the outlet level with water, and shall be observed for 24 hours for leakage. If the water level within the tanks has changed more than 112 inch during the 24-hour inspection period, the tank leakage tests are considered to have failed, and the tank must not be used until the sources of the leaks have been found, the leaks properly sealed, and the tanks retested and the leakage tests are passed. The engineer or his representative shall be allowed to observe the installed tank/system confi uration prior to backfillina around the tanks. Approved vacuum testing (4 inch Hg for 5 minutes) of any or all tank(s) may be used in lieu of leakage testing. EZ Treat Recirculation Pump and Control Panel 13. The recirculation tank will contain the recirculating splitter valve and the turbine dosing pump. The forcemain shall have a drainback configuration without a pump check valve. The pump vault consists of a high -head effluent pump (Sta-Rite STEP 30-115 volt for a two pod; or, 20-115 volt for a single pod system), three float switch assembly all as provided by the EZ Treat Distributor. 14. The control panel shall be as provided for by the EZ Treat Distributor and in strict conformance with the NC IWWS Approval requirements. A combination EZ Treat Recirc and Drip Headworks control panel may also be used, if compatible with State IWWS Approval. EZ Treat Pretreatment Unit and Recirculation Tank 15. The EZ Treat pretreatment unit shall be as configured and constructed as described in North Carolina IWWS 2015-03-R1 for the 600 gpd rated modules. The Model 600 has a surface area of approximately 30 square feet and 42 inches in depth. It shall be timed dosed by pressure pipe distribution network using wide angle spray nozzles above the media. 16. Two air vents shall be installed for each pod. One air vent shall be located on the pod, and the other shall be located on the discharge cleanout. 17. The recirculating tank shall dose every 30 minutes for 3.0 minutes at approximately 126 gallons per dose for a two pod system, or 40-60 gallons per dose for a single pod system; Under peak water usage, it is the intent that the re- circulating tank will dose the filter 4 to 6 times for every 1 dose to the disposal site. Ultraviolet (UV) Disinfection Unit (if Required) 18. If required by permit requires a TS-2 level of pretreatment or if disposal is by means of surface drip application, the wastewater will flow by gravity to a single bulb UV-101 disinfection unit. The UV disinfection unit shall be provided by the Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 3 of 7 EZ Treat Distributor and shall be installed according to the manufacturer's specification. Perc-Rite Headworks Unit, Dosing Pump, and Control Panels 19. The headworks unit shall be a Three Zone Residential Drip Hydraulic Unit . The headworks unit contains a flow meter, solenoid valves, disk filter and check valve. The unit shall be provided by American Manufacturing Company, Inc. or other approved distributor. 20.The flow meter shall be as manufactured by Master Meter or other, as provided by the headworks unit provider. 21.The filter flush line, return line and each supply manifold for will have a normally - closed solenoid valve (DH-SOLVLV1) associated with each of them. The solenoid valves shall be provided by American Manufacturing Company, Inc. or other approved distributor. 22.The Disk Filter (DF-100-140) shall be placed in the headworks unit between the pump and drip field to screen out any debris. The filter shall be provided by American Manufacturing Company, Inc. or other approved distributor. 23. The control panel shall be as provided by the drip system integrator for specific application to its product and shall comprise of features required in its specific NC IWWS Approval. A rain sensor (Mini-Clik, Rain-Clik, etc.) shall be provided for Surface Drip Irrigation projects, and shall be wired into a "Dose Cut-out" relay to prevent field dosing applications during inclement weather. 24.The drip dosing pump shall be a high head effluent pump and pump 16 gal/min against 122 ft (TDH). The pump shall be a multi -stage effluent pump provided by American Manufacturing Company, Inc. (PUTURB1512122W). 25.A 3/8 inch or larger nylon rope shall be used to lift and lower the pump into place. The rope shall remain tied to the pump and to the outlet pipe at the threaded union for easy access. If a Flow Collar/Cool Guide is to be used, it shall not to be fixed to the bottom of the tank. This would prevent removal for maintenance. 26. Wire grips, duct seal, or other suitable material shall be used to seal around wire and wire conduit openings inside tanks and control panel. 27.All metal in tanks shall be stainless steel unless otherwise approved by the Engineer. 28. All control and power wiring for the entire wastewater disposal system shall be in compliance with all local, state, and federal regulations, codes and ordinances, and shall be confined on the site generally to the area of the pump, control floats, automatic valves, control panel, alarm panel, and related wiring systems. The Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 4 of 7 installation contractor shall be responsible for the costs of obtaining all power and control wiring for this system and shall coordinate his work with the owner. Manifolds and Drip Irrigation Lines 29. The supply lines and return line shall be Schedule 40 PVC, size as noted of plans. 30. Supply and return lines shall be sleeved using ductile iron or encased in concrete at the point of any drainage way crossing extending 5' on both side of the crossing 31.Air/vacuum release valves shall be placed at the ends of supply and return manifolds, and housed in plastic valve boxes, extending to ground level. 32. Return Pressure Assembly (if needed) shall be protected by an at grade valve box. 33. The supply and return manifold shall be 1.0-inch schedule 40 PVC. 34. Each supply and return manifold shall have an air/vacuum release valve. The air/vacuum release valves (AIRRELEASE1) shall be provided by American Manufacturing Company, Inc. 35.The air/vacuum release valves and manifolds shall be protected by valve boxes (DH-VALVEBOX) and easily accessible from the ground surface for maintenance. 36.The supply manifold (ditto for return manifold) shall consist of one saddle (or tee) per lateral connection, one ball valve, and one air/vacuum release valve. The ball valve shall be placed at the inlet of the manifold such that the effluent will pass through the ball valve prior to entering the saddles (or tees) (see design detail). This ball valve will also be used for pressure testing the supply or return mains at startup inspection. The saddles (or tees) shall be placed 4 to 6 inches apart and, the air/vacuum release valve shall be placed at the outlet end of the manifold. The air release valve shall be removable for use as a cleanout. 37.The Perc-Rite Pressure Compensating Dripline (08WRAM.6-24V) shall be installed a minimum of 6 inches below natural ground surface (for sub -surface systems, or at ground level for Surface Irrigation systems) on contour. The drip line shall be installed on sub -surface systems with a chain trencher, or vibratory plow. No heavy machinery shall be used in the drainfield area. 38. No trafficking in the irrigation application area. 39. The Engineer (and the Local Health Department, if applicable) shall be notified 48 hours in advance of intent to install dripper lines to arrange for inspection. Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 5 of 7 40. The drip emitters shall be placed 2 feet apart along the dripline. The emitters shall be Netafim Pressure Compensating type and 0.61 gal/hr rated. 41. Driplines shall have a minimum 2 feet horizontal spacing from adjacent driplines, or as indicated otherwise on the Drawings. 42. The Perc-Rite Pressure Compensating Dripline shall be connected to the supply and return manifolds using Bioline Insert Adapters (BIOINSERT1 2X1 2), Female Adapter SXT SCH 40, '/2" x'/2" (PVCPRFIP12X12), '/2" PVC Flex Tubing (PVC12FLEX), and Bioline Repair Coupling'/2" (BIOCOUP). 43. The return manifold shall consist of one air/vacuum release valve, one saddle (or tee) per lateral connection, one check valve, and one ball valve. The saddles (or tees) shall be placed 4 to 6 inches apart and are preceded by an air/vacuum release valve (see design details). A 1-inch brass check valve and a PVC ball valve shall be placed following the last saddle (or tee) connection and the return supply line. The air release valve shall be removable for use as a cleanout. Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 6of7 System Specification Summary Daily Wastewater Flow 5 Bedroom) 600 gpd Septic Tank Size 1,500 gal min Recirculation Tank Size 2500 gal Two compartment -See Drawings) Field Dose Pump Tank Size 3,500 gal Gravity Sewer Line (Septic Tank to Recirc. Tank +/+ 5 ft 4 in SCH 40 PVC Primary Pretreatment Unit StateApproved Septic Tank Secondary Treatment Unit -State Approved Media One EZ Treat 600 GPD Pod Pretreatment Unit Flow Rating Max 600 gpd (max); UV Disinfection: 10 GPM Pretreatment Dose Method Timer Controlled Pretreatment Dose Volume 40 al/dose @ +/- 13.6 Gal/Min Pretreatment Dose Duration 176 sec; or 2.94 minutes Pretreatment Dose FreguenGy 60 doses/day -Dispersal Unit American Perc-Rite ; or Equal -Average Daily Flow 100% Design Flow 600 gpd Dose Method Timer Controlled Average Volume Per Dose 75 al/dose Avera a Dose Frequency 8.0 doses/day Five Bedroom Single Family Residence PreTreatment, Disinfection, & Surface Drip Wake Co., NC Page 7 of 7 PRODUCT INFORMATION MANUFACTURERS 0 & M INFORMATION FOLLOWS THIS PAGE Ad m c U) V v lu r C Z .— OZO 2 r U Z Y N v W 0 ¢ rID U7 Wr .U+ a m CO m w uW W } N N m V) ti W r N m N U W H I� r W Q 7 Z m 0 U z U p r d O O W r Z o M Q m Z OW v o r) 0 W 0 W 3 Z W m Vl 11 as v 3 IT un U 10 W ¢ I r d W V J d Q Z O Cl) Z 0 0 0 O o r iv J W W N I ¢ ~ r I r LO W W W U U ¢J r In o r r 0 2 aL > o Y Y r .rr r Z Z A r a 3 Q o o U W W m 2 f f 2 0 Y Or r 0 W a Z r H Z M ¢ o o w J r m m J V1 v, r oZ 00 m v rm O W H W Z 7 Z �iv..o0 I r LOA rn w rZ zo W - zZ Z W W zo O 7 .Z. �' ¢q Wr �' f � 3a j3 0 r ar C3W � .m m N 01 U f r w O O !2 Y U I o r J 2 W N 0 A W a 3 U I W r Y r W Z Q J Q r r r ti 0 0 of ob o d 7 r r W Z Z L x Z .. W W W r U 0 W p W W Z Z U N o w r ID Z W U o�)rr W 0 (YQ'J` of W Q m W N �p tiW�0 J r U Y Q W Cl) Z V) ovi����rn O H z U wv,�z NWr ¢ WO- zu 000UZ WUrO¢Z O QK R'-j0 Z2V) 0 z Uo W r z o U 40 O Q.2o i I 0 WOL (M rw< I ¢a0m ra_m V QV)V W �r w ?U0r . r 0 W In 0 0 0r w. f W 0 m OF r r 7 O m, O � r m u7 � cn I 0 N 30 O � � J = I\ Wr Zr ow J r� r W/� ~ L13 m J f J � z 7 1:7 Ol O Lf') m (7 oW �- o E Z oTREAT Re -Circulating Synthetic Filter Indiana Manual DesignGuide and Installation Manual NSF Models bearing the NSF mark are certified Class I to one or more of the following standards: NSF/ANSI 40 NSFIANSI 245 NSFIANSI 350 E-Z Treat 12/2020 J L 1 F � � u eS w ■ d n 96 TABLE OFCONTENTS 1.0 Treatment Process Overview 2.0 Design 2.1 Re -circulation Tank Sizing 2.2 Filter Performance 2.3 Operating Costs 2.4 E-Z Treat Loading Rates 2.5 System Overview 2.6 Spray Manifold System 2.7 Filter Media Mattress Material 2.8 Decentralized Design Options for Commercial, Community, or Large On -site Systems 3.0 Installation Instructions 3.1 Pre -construction Meeting 3.2 Off Loading Treatment System 3.3 Excavating and Installing the Pod 3.4 Piping the E-Z Treat Pod Supply and Return 3.5 Installing the By -Pass Valve 3.6 Installing the Re -circulation Pump 3.7 Setting Pump Control Floats 4.0 Start-up Appendix 1: Model 600 & Model 750 Configurations Appendix 2: Model 1200 Configurations Appendix 3: Typical Commercial Configurations Appendix 4: High Strength Waste Case Study 1 1 1 2 2 2 3 7 7 L., 12 12 12 13 13 13 14 14 15 18 20 22 24 0 fD t0 n (D A� Q N r-r ly A� O PU C Pi 1.0 Treatment Process Overview The E-Z Treat Re-circu lating Synthetic Filtersystem operates as afixed media, packed bedfilter system. In these treatment systems, larger solids contained in the applied effluent are retained within the media byfiltration, typically in the upper level of the filter media. A bacterial film forms on the surface of media grains and provides for removal of soluble organic material and small colloidal matter by absorption by the bacteria in the film. Decomposition of the absorbed material occurs during rest periods in the filter, when there is no application of effluent. The organic material becomes an energy source for the bacteria to maintain them- selves and produce new cells. Overtime, as the filter matures, the film layer forms through- outthe depth of the filter media and by-products ofthe biological process pass out of the fil- ter. Re -circulation of the water leaving the filter back through the filter surface provides for additional treatment by the bacteria in the media bed, as well as a mechanism for moving par- tially decomposed organic materials, bacterial waste products and other debris from the fil- ter. This keepstheporespaceswithinthemediafrom clogging. Treatmentusing recirculating mediafiltration systems is generally anaerobic process and re -aeration of the media, which occurs during the resting (non -dosing) periods, is essential for proper treatment. 2.0 Design Many types of media are used in packed bed filters. Washed, graded sand was the most common. Other granular media used include crushed glass, garnet, anthracite, plastic, expanded clay, expanded shale, open -cell foam, extruded poly- styrene, and bottom ash from coal-fired power plants. Media characteristics can limit the number of doses possible. Media re -aeration must occur between doses. As the Table 1 Indiana Septic Tank Sizes ll&ws le) Emy que lank shall hair a minimum capaei below tk waler line as gccif�d m TAc ill as TaWc III — RNwrcd Minlm CMKitics for Talks Nombcr of WMM in Nclling Capaeity of Talk id C, km uz kss 1S4 t 1,000 3 1'3 S 1,500 1,s1111 ploy 3W nm lliokd by tk nlenher of hdom o�cr 3 EZ Treat/Indiana required recirculation tank/chamber Tank/ chamber ,4e'sminimum of 1X the design flow. effective size of the media decreases, the time for drainage and re -aeration of the media increases. The BOD5 loading should decrease with decreasing effective size of the sand. Call: 703.753.4770 orvisit: eztreat.net 2.1 Re -circulation TankSizing For single-family home systems, the re- circulation tank is typically sized to be equal to 1 times the design peak daily flow. 12/2020 E-Z 2.2 Filter Performance When treating domestic strength sewage (300 mg/I BOD5 or less) up to the design flows and loads, a properly maintained E-Z Treat Re -circulating Synthetic Filter will typically perform better than the 30-day average requirements of NSF Standard 40 Class 1 (25 mg/I CBOD5 and 30 mg/I TSS). Reductions in the CBOD5 and suspended solids (TSS) influent concentrations will be attained within a fewweeks of commissioning and should be consistently achieved over the lifetime of the styrene media. CBO D5 and suspended solids (TSS) treatment performance in the styrene media is not subject to significant variation with ambient air temperature fluctuations. 2.3 Operating Costs Power costs for pumping at3to4 kWh/day are in the range of $9 to $12/month. The E-Z Treat Re -circulating Synthetic Filter system incorporates technology resulting from years of independent research in re -circulation sand bio-filtration. Our system applies each area of this technology in a pre- packaged system. This ensures consistent field performance in reducing BOD, TSS and Total Nitrogen. The system addresses media size and composition, drainage and ventilation, optimum dosing cycles per hour, depth of filter media, pre-treatment of effluent, pre -filtering ofeffluentto ensure particle size, even distribution ofeffluent over the media, and piping design that optimize treatment within thesystem. Call: 703.753.4770 orvisit: enreat.net Table 2 NSF Testing Performance Summary BADS 2 mgn T55 2 mgrl 00 3.3 mg ?I Turbidity 2 NTU E. coh' 2 WN100ml PH 6.8 --7.5 Total Nitrogen Reduction 64% .with optional UV disinfection 2.4 E-Z Treat Loading Rates In accordancewith the EPA Design Guidelines and field testing of the E-Z Treat Re -circulating Synthetic Filter Model 600 can be continuously loaded at 750 GPD and 2lb BOD. Model 1200 can be continuously loaded at 1400 GPD and 4 lb BOD. EPA research and testing has proven that system designs, such as the E-Z Treat Re -circulating Synthetic Filter system, will produce a high quality effluent at loading rates in excess of 25 gal/ft2/day. 1212020 E-Z 2.5 System Overview Priorto entering the re -circulating pumptank the effluent will be treated in an anaerobic chamber fitted with an effluent filter; this filter should remove any solids greater than 1/8" manufacturer recommends 1/16". The second chamberwill be a re -circulation chamberfitted with afloat ball by-passvalveand re -circulation pump. The float ball by-pass valve connects, insidethe re -circulation tank, to the 4" return line from 0 CD LA LQ In fD tQ_ El LA o' C a the pod. The float by-pass valve maintains a constant liquid volume in the re -circulation tank. The float by-pass valve allows the efFluentto be constantly re -circulated through the syntheticfilterdischarging only the daily forward flow volume after it has passed through the pod. In designs using an external splitter box the float by-pass valve would be eliminated from the re -circulation chamber. Standard Model 600 Package: Item Descrip—tionEm 1 Model 600 Pod 2 STEP-30 Re -circulation Pump,1/2 HP 3 Float By -Pass Valve 4 Control Panel 5 Septic Tank Effluent Filter (supplied by others) Standard Model 750 Package- 1 Model 750 Pod 2 STEP -20 Re -circulation Pump, % HP 3 Float By -Pass Valve 4 Control Panel 5 Septic Tank Effluent Filter (supplied by others) Call: 703.753.4770 orvisit: eztreat.net 12/2020 E-z 3 STEP-20 Re -circulation Pump Table 3 Pump Specifications item ptio Shell Stainless steel Discharge 10, 20 and 30 GPM models: fiberglass -reinforced thermoplastic; 50 GPM models: stainless steel Discharge Bearing Nylatron' Impellers Delrin® Diffusers Polycarbonate Suction Caps Polycarbonate with stainless steel wear ring Thrust Pads Proprietary specification Shaft and Coupling Stainless steel 300 grade Intake Fiberglass -reinforced thermoplastic Intake Screen Polypropylene Jacketed Cord 300 volt "SOOW jacketed 10" leads (2-wire with ground); optional 20", 30", 50" and 100" lengths available Delrin® is a registered trademark ofE.l Dupont de Nemours &Company Nylatron® is a registered trademark of Polymer Corporation S.T.E P Plus® is a registered trademark of Pentair Water In order to provide the best products possible, specifications are subject to change. Refer to Appendix A for Pump Curves Call: 703.753.4770 orvisit: eztreat.net 12/2020 E-Z 0 rD N L• I n rD t0_ LA r-r >y r--r O A� E-Z Treat Float Ball By -Pass Valve WEIR 1 E-Z Treat Re -circulation Pump Control Model EZ SR-12 Re -circulation pump power source terminals T1 & T2 INLET OUTLET I �r OUTLET T A A High Level Alarm (top float) connects to terminals #5 and 6 Low Level Alarm (bottom float) connects to terminals #1 and 2 Wide Angle Pump "ON" & "OFF' timer activation (middle float) terminals 93 and 4 Call: 703.753.4770 orvisit: eztreat.net 1212020 E-Z 5 E-Z Treat Re -circulation Pump Control Model EZ SR-12 E-Z TREAT 1 P. 22 At ` LEVEL N 1s1, � �ws .... __� 1 � Mi 1cc O0 L, x- isvteuJ 1L r,MOTOR RATING tt � 1L2i AQ1 • 115V/1PH/ 1/2hP 6A max fT41 PBYP • 2JOV/1PH/2hp/IBA mox r2 M19P N IUD ` • O TR1 GND rr4 N HIGH LEVEL rj e"h L �J O-OFF/TIMER ENABLE 0 SEE NOTES 3 & 4 C �•rREDUNDANT OFF _ LOW LEVEL ALARM 3-4" TETHER-' MOTOR RAii 115N/IPH/ 1/21hp ^' zMV/1P11/av) CONTROL/ALARM 115V/1PH/5OHx SOAMP MIN. PROTECTION PUMP 115 or 230V 1PH/SOHZ 20AMP FAIN. PROTECTION 6 [r 9 a 1: EXAMPLE: TIMER MOWN SET FOR 10 min. RUN TIME EVERY 21vs. TO SET THE TIMER, USE A SCRENORIVER TO CHANGE TIMER INCREMENTS (hrsmin,see) UNTIL THE DESIRED INCREMENT IS DISPLAYED Bi WINDOW ABOVE THE "ON" & "OFF' ADJUSTMENT SCREWS - THE DIAL RANGE CAN BE ADJUSTED FROM THE LOVIEST {0-1.2) To THE HIGHEST (0-30) RANGE BY ADJ17 14G THE LOWER LEFT ADJUSTMENT SCREW. SELECT AS SMALL A RANGE AS POSSIBLE THAT WILL ALLOW 'ON' AND 'OFF' TIMES TO BE CONTAINED WITHIN IT. USE THE LARGE DIAI, (green polo 1'.) TO SET VIE -OFF" TIME, AND IKE SMALL DIAL (red pafaler) TO SET THE -O4" TIME. THE GREEN INDICATOR 4WLL LIGHT 01JFSNG THE *OFF' PERIOD. THE REO INDICATOR VALL LIGHT DURING THE ON. PERIOD. TOROUF SETTINGS: TERMINALS' VARE SIZE' TORQUE: PI, ILL 1L2 1T2 4-14owg a -Ibz 10-18aw 22 In-Ibs P2 8-22awg 18-201n-Ibs T81 1-4 10-22awg 7-8 in-Ibs •- TER41NA1.S 10-22awg 7-8 in-Ibs Call: 703.753.4770 orvisit: eztreat.net 1212020 E-Z 6 6 1110 i 0 rD Vn CO n Q. fD CL vn rr O iy 2.6 Spray Manifold System To maximize the effectiveness of every cubic inch of the media material, the Model 600employs aspray manifold with 8 evenly spaced wide-angle spray nozzles and Model 1200 employs 12 nozzles. The nozzles are plastic construction with a free passage of 0.0625" in diameter; this large free passage helps prevent nozzle clogging while maintaining a consistent misting spray. The manifold is assembled with a pressure gauge and valves allowing for flow rate adjustments. 2.7 Filter Media Mattress Material 3i4' BAIL VALVE PRESSURE--....�' GAUGE i 1 BALL VALVE ; 1 ` 4 � _ f Model1200 _ The E-Z Treat Re -circulating Synthetic Filter system employs a manufactured synthetic media which is encapsulated in a mattress like container. The mattress is fabricated from a non -biodegradable; chemically resistant, loose weave polypropylene material with a weave pattern at 90-degree intersections creating 0.078 square openings allowing effluent and air to flow freely while containing the media material. This media is very uniform and provides ample surface area for biological growth. The media also has enough voids to accommodate good air and liquid flow. These void spaces also allow the passage of very small solids that would clog many filters. The media is very lightweight making it resistant to compaction which can lead to poor air and liquid flows, a problem that plagues many mediafilters. The media consists of lightweight, non - biodegradable plastic spheres. Call: 703.753.4770 orvisit: eztreat.net 3PP. -i NOZZLE Polypropylene Mattress Material Styrene Media 1212020 E-Z 0 CD N lQ. n CL N I--F Pu r--F O� A� 2.8 Decentralized Design Options for Commercial, Community, or Large On -site Systems BIG-EZ3L BIG-EZ4L 1" SUPPLY LINE M. 4" RETURN LINE 1" MANIFOLD 1 1 /4" MANIFOLD r 11 a'. 4" RETURN LINE Call: 703.753.4770 orvisit: eztreat.net 1212020 E-Z BIG-EZ5L 242 00 BIG-EZ6L 0 0 a 1 1/Y SUPPLY LINE L 4" RETURN LINE I • —11 v uue 4" RETURN LINE Call: 703.753.4770 orvisit: eztreat.net 1 112" MANIFOLD 1 1/2" MANIFOLD 12/2020 E-Z 0 fD 'A LO n Q rD ly CL �n r--r rr O K Golf Club (Haymarket, VA.) Effluent Dispersal Method: Low Pressure Pipe This systemwasinstalled attheclub Daily Flow: 20,000 GPD in 2009. Treated Effluent Parameters: BOD5:10 mgl TSS: 10 mgl TN: 20 mg/I Residential Cluster (Lake James, NC) This system services a lake -side complex consisting ofsinglefamily homes, apartments, community center and swimming pool. Call: 703.753.4770 orvisit: eztreat.net Effluent Dispersal Method: InfiltratorChambers Daily Flow: 25,000 GPD Treated Effluent Parameters: BOD5:10 mgl TSS: 10 mgl TN: 20 mg/I 1212020 E-Z 10 Motor Home Park (SmokeyMountains) Call: 703.753.4770 orvisit: eztreat.net Effluent Dispersal Method: Infiltrator Chambers Daily Flow: 30,000 GPD Treated Effluent Parameters: BOD5:10 mgl TSS: 10 mgl TN: >60% 12/2020 E-Z 3.0 Installation Instructions E-Z Treat Company or its representative will conduct anon -site training with each installer before they are certified to install E-Z Treat systems. The Design & Installation Manual, the Operation & Maintenance of the E-Z Treat technology will be discussed on site with the person(s) pursuing certification. If more than 3 people are being trained on the E-Z Treat technology SDH must be informed in writing 10 days in advance of the event. The training sessions is required for those that will be designing, installing, servicing, and permitting the technology. 1 Thetraining will include instruction on proper site prep, locating pod, equipment handling, excavation, pod placement, piping, wiring and startspoftheE-ZTreatsystem.Annual classroom training will be a requirementfor installers to maintain their certification. Asa condition of E-Z Treat certification, contractors must have properstate and local licenses and appropriate insurance policies. E-ZTreat distributorswill only sell or authorize installations by E-Z Treat certified installers. The E-Z Treatment pod will ship pre -assembled, requiring only field piping of the pod supply line and discharge line, installing the re -circulation pump, 4" float by-pass valve and the re -circulation control. When installing the E-Z Treat system the order of components installation is not critical and each segment can be installed independently. 0 (D N 3.1 Pre -construction Meeting A pre -construction meeting required for a t1 contractor's first installation and recommended for future installations before any construction commences. This meeting rD Pi is an opportunity for the owner, builder, � engineer/designer, local regulatory agencies, Q service provider and installer to clarify =3 property lines, building location, system u7 location, power sources, drainage areas, final r-r su site grading and answergeneral questions. 3.2 Off Loading Treatment System The E-ZTreat Re -circulation Synthetic Filter pod is injection molded polyethylene weighing about 300 pounds. Because of the relative light weightand toughnessofthe material, special handling is not required. Two people can easily unloadthepod. Ifmachineryis usedtooffload the pod or transport it to the excavated hole; nylon straps, chainsorcables used to liftthe pod should be in good condition and ratedfor atleast 1000 pounds. The re -circulation pump and controlwill be shipped infactorysealed cardboard box, these items are notfragile but should be handled with reasonablecare not dropped orthrown. Call: 703.753.4770 orvisit: eztreat.net 1212020 E-z 3.3 Excavating and Installing the Pod The first consideration when installing the E-Z Treat pod is to assure the pod is not located in a drainage area and the pod is located above the seasonal highwater table, this will protect the pod from floating and prevent surface water infiltration. Excavate a hole approximately 6'W x 9'L x 4'H. Place 3/4" to 1 " stone or equal to a height of 4" in the bottom of the excavation forming a level base for the pod to set, this will prevent settling of the pod and allow for 0 leveling of the pod. fD N - Backfill the pod with clean fill soil, free of tQ rocks and foreign material. Do not compact the fill, allow the soil to settle naturally. n Once the pod is placed in the excavation adjust the pod to slope 1" toward the 4" fD PVC outlet this assure proper drainage. PJ Q =3 3.4 Piping the E-ZTreat Pod Supply L^ .--r and Return Pi Once the pod is placed and leveled, connect 4" PVC pipe between the outlet p of the pod and the by-pass valve located in the re -circulation tank. Pi - Attach 1 " PVC supply line between the 1 " inletonthe pod and the re -circulation pump. s= ly 3.5 Installing the By -Pass Valve The by-pass valve is located in the re- circulation tank and one side is connected to the 4" PVC drain line coming from the pod and the other side is connected to the 4" PVC effluent discharge line or into the effluent pump tank. Model600 Pod Flog 4" Outlet Weir Call: 703.753.4770 orvisit: eztreat.net 12/2020 E-z 13 3.6 Installing the Re -circulation Pump Connect the 1 " PVC pipe between the inlet of the pod and the re -circulation pump. Always provide a quick disconnect device for removing the pump, this can be accomplished with a union, camlock coupler or pitless adapter. DO NOT i nstal I a checkvalve in the pump supply line this will prevent the supply line to the pod spray manifold from draining and may causefreezing. (D N L0' 3.7 Setting Pump Control Floats (seepages) Cl The control panel will come with three liquid level floats: Q (D 1. Low Level Alarm Float protects the ¢) pump from run dry damage byturning =3 off the pump and sound an audible 0_- and visual alarm. Set float to activate if the effluent level drops to 4" above r--r the pump intake. ly 2.Timer Enable Float activates the r-r pump run time and assures the pump O only runs when there is sufficient effluent in the re -circulation tank. Set floatto activate when effluent level in p� the recirculation tank is filled to50%. 3. High Level Alarm Floatwill sound an audible and visual alarm when the effluent in the re -circulation tank is too high. Set float to activate when the effluent level in the in the re- circulation tank is level with the top of the by-pass valve. FloatSettings 60% Liquid Level Wide An ' Float Low Level Alarm Float 4" above pump inlet High Level Float Call: 703.753.4770 orvisit: eztreat.net 1212020 E-z 14 0 CD Vn t0 n fD A�► CL W e-r Pi �-r O� 4.0 Start-up Septic Tank and Re -circulation Tank The septic and re -circulation tankshall be inspected prior to startup to: 1. Verify the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holesorcracks. Thesys- tem must remain watertight to perform properly. 2. Inspect the outlet effluent filter installation to insure it is installed in accordance with the effluent filter manufacturer's specifi- cations. 3. Inspect the liquid level in the recirculation tank, the liquid should be sufficient to activate the Timer Enable Float. 4. Inspect the location of the float controls. They should be securely attached to the float bracket, free to float without obstructions and the location of the floats should correspond with thefloat diagram on page 10. Power Supply 1. Verify the main power supply to the re- circulation panel has properly sized breakers, the proper voltage and is installed in protection watertight conduit. 2. Check the voltage and motor amp draw. If the readings are beyond the limits speci- fied on the pump have an electrician check the main service line feeding the system control panel. By -Pass Valve 1. Verify the main power supply to the re- circulation panel has properly sized breakers, the proper voltage and is installed in protection watertight conduit. 2. Check the voltage and motor amp draw. If the readings are beyond the limits specified on the pump have an electrician check the main service line feeding the system control panel. Call: 703.753.4770 orvisit: eztreat.net Flush the Spray Manifold 1. At initial system start-up, remove the end capsfrom the spray manifold. Operatethe re -circulation pump by turning the pump control to the "HAND -ON" position. Let the pump run forone minutethen turn the pump control to the "OFF" position repeat this procedure three times to flush any construction debris such as dirt or pipe shavings from the spray manifold. Replace the end caps hand tight —do not use wrenches or pliers. Re-setthe pump con- trol selector switch to the "AUTO" position. 2. Using the ball valve located in the manifold supply line adjust the manifold pressure to 20 to 25 PSI. 3.Observe the system as it re -circulates. Visually verify all liquids flows freely through thesystem. Setting the Re -circulation Pump Control 1. Check the functions of the E-Z Treat Re -circulating Synthetic Filter control panel. Control: Main Control "ON/OFF" switch Function: Turns power ON or OFF Control: System Setting Switch "MANUAL ON" and "AUTO ON" Function: "MANUAL ON" overrides all float switches and time clock switches. "AUTO ON" allows for normal operations dictated by the time clock and float switches. Control: Timer "MINUTES ON" and "MINUTES OFF" Function: Controls run time of re -circulation pump i.e. GPD re -circulated through media Control: High and Low Water Alarm "ALARM ON", "ALARM AUTO" and "ALARM SILENCE" Function: "ALARM ON" will manually turn on the audio/visual alarms. "ALARM AUTO" is the normal operational setting and "ALARM SILENCE" turns off the alarms. 2. Check re -circulation pump. Place the system in the manual mode byturning the re -circu- lation pump switch to "ON". The re -circula- tion pump should begin to supply effluent to the spray nozzles in the treatment pod. 12/2020 E-Z Control Panel/Pumps/Alarms 1. Place the system in the normal operating mode byturning the re -circulation pump switch to "AUTO". Verify the timer ON/OFF setthe ON/OFF time to match Table 5below. 2. Verifythe accuracy of the system 0 N/O FF Timer. To accomplish this use a stop watch and verify the length of time the re -circulation pump is OFFthen verifythe time the re -circulation pump is ON. Those times should match the ON/OFF Timer settings in the control panel. 3. Confirm the operation of the visual and audible "HIGH" and "LOW" wateralarms. The control has an alarm switch clearly marked Alarm "ON", Alarm "AUTO" and Alarm "SILENCE". PlacetheAlarm Switch in the "ON" position, you will hear a loud buzzer and see a red flashing light. Move the switch to the Alarm" SILENCE" position the red light and buzzer will go dormant. Once the alarms have been triggered return all settings to their original position of Alarm "AUTO" ' Verify the floats are operational by manually raising and lowering thefloats to simulate thesystems normal operation. Verifyproper operation of "High Level Float" by lifting the float while the system timer is in the "OFF" time mode, there -circulation pump should turn on overriding the "OFF" timer, the Visual and Audible alarms should activate. Return the float to its normal position the re -circulation pump will turn off. Resetthe alarms and manually lower the "Low Water Float" with timer in the "ON" mode, the re -circulation pump will turn off and thevisual/audible alarmswill activate. Return the float to the normal position and the re -circulation pump will run. Reset the Alarms. 5. Verify all control breakers are in the "ON" position and all control switches are in the "AUTO" position before closing and securing the system. Timer Settings default settings for 600, 750, 1200 are 2.5 minutes ON , 12 minutes OFF These settings may need to be adjusted based upon homeowner usage, refer to manufacturer for adjustment of settings. Call: 703.753.4770 orvisit: eztreat.net 1212020 E-Z 0 fD V1 lQ n i Q CD Q Ln r--r Di rr O� K Re -circulation PumpTimer example Light will burn Green to indicate Re -circulation Pump is OFF I Light will burn RED to indicate Re -circulation Pump is ON. —► fi Rotate dial to desired minutes ON. — Clock face screw will change the clock Face from a maximum 0MQ In H3cn time of 15 units to a maximum of 30 units. Always set the clock face to 30. Call: 703.753.4770 orvisit: eztreat.net Window will display OFF "SEC', "MIN" or "HR". Rotate OFF screw until "MIN" appears in window. I M �P OFF screw displays seconds, minutes or hours. Window will display ON "SEC", "MIN" or "HR". Rotate screw until "MIN" appears in window. ON screw displays seconds, minutes or hours. Rotate dial to desired minutes OFF. 12/2020 E-Z 17 0 1/1 0— N r-r A� r-r 9U I D Appendix 1 Model 600 & Model 750 Typical Configurations Note: Not a complete library of possible configurations. Contact E-Z Treat for more information Drawings are available in CAD and PDF 1-Pod / 2-Tank with Simplex Timed Dose Re -Circulation Pump ,-c�L _ 8� L----_--- ----� g _-_�----- �- (& M— m 2-Pod / 2-Tank with Simplex Timed Dose Re -circulation Pump Call: 703.753.4770 orvisit: eztreat.net 7_..__ 1 l" dam' �101� aaz1 sss rP: 12/2020 E-Z Operation and Maintenance E-Z Treat Sand/Media Filter 1-7113-7i3-4770 E-Z Set Company requires regular inspection and maintenance of the E-Z Treat Re - Circulating Sand/Media Filter, as a condition of purchase and ongoing operation compliance. The mandatory service contract will include a performance based system inspection. The service provider must be trained and certified by E-Z Set Corn anv. All inspection and maintenance reports must be forward, along with any additional documentation, to E-Z Set Company, the local authorized 1 -Z Treat Dealer and all required or designated regulatory agencies. The following is a list of the routine maintenance and cleaning procedures that are required by E-Z Set Company. Failure to perform the required system maintenance could reduce the desired performance of the system and will void the warranty on the E-Z Treat Sand Filter System. Semi-annual inspect ions the first veer of operations And annu:a! ins ection� thereafter. E-Z Treat Re -Circulating Sand/Media Filter Model # 0600 Capacity of Model #0600 - 700 GPD Residential Strength Effluent I E-Z Treat Re -Circulating Sand/Media Filter Model # 1200 Capacity of Model 41200 — 1400 GPI? Residential Strength Effluent Septic Tank The septic and re -circulation tank shall be inspected annually to ensure they are operating properly. Remove the access covers over the tank openings to perform the inspection. 1. Verify the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks. The system must remain watertight to perform properly. 2. Remove, clean and replace the outlet effluent filter in accordance with the instructions provided by the effluent filter manufacturer. 3. Inspect the liquid level in the septic tank, it should be level with the bottom of the outlet pipe. 4. Inspect the effluent and scum layers in the septic tank. Look for oil or any other contaminants that are not normal. 5. Verify the tank has received its scheduled pumping and cleaning. Check the solids layer in each of the tanks. If the solids layer is excessive have the tank pumped. Re -Circulation Tank The re -circulation tank shall be inspected annually to ensure it is operating properly. Remove the access covers over the tank openings to perform the inspection. Verify that the lid and riser assemblies are watertight. Check for any damaged, water weeping marks, holes or cracks, the system must remain watertight to perform properly. Operation and Maintenance E-Z Treat Sand/Media Filter Re -Circulation Tank I. Inspect the liquid level in the re -circulation tank, it should be level with the bottom of the outlet pipe. 2. At initial Starting -Up of the system remove the end caps from the spray manifold. Operate the re-circ pump by turning the pump control to the "Hand - On" position. Let the pump run for l (one) minute the turn the pump control to the "Off' position repeat this procedure three times to flush any construction debris such as dirt or pipe shavings from the spray manifold. Replace the end caps "Hand Tight" do not use wrenches or pliers. Re -set the pump control selector switch to the "Auto" position. 3. Inspect the float by-pass valve. Manually start the re -circulation pump and observe the float ball valve, the ball should drop as the liquid in the re- circulation tank drops the effluent returning from the sand filter pod should flow back into the re -circulation tank and should not flow out the discharge pipe. 4. Verify that all the re -circulation pump floats are in good condition, properly secured to the float bracket and are able to move freely within the re- circulation tank. 5. Observe the system as it re -circulates. Visually verify all flows thru the system. Control PanellYumps/Alarms 1. Check the functions of the E-Z Treat Sand Filter control panel. Control: Main Control "On/Off Switch" Function: Turns Power ON or OFF Control: System Setting Switch "Manual ON" and "Auto On" Function: "Manual ON" overrides all Float Switches and Time Clock Switches "Auto On" allows for normal operations dictated by the Time Clock and Float Switches. Control: Time Clock "Minutes On" and "Minutes Off' Function: Controls run time of re -circulation pump i.e. GPD re -circulated thru media Control: High and Low Water Alarm "Alarm On", "Alarm Auto" and "Alarm Silence". Function: "Alarm On" will manually turn on the audio/visual alarms. "Alarm Auto" is the normal operational setting and "Alarm Silence" turns off the alarms. 2 Operation and Maintenance E-Z Treat Sand/Media Filter 1-703-753-4770 Check re -circulation pump. Place the system in the manual mode by turning the re- circulation pump switch to "ON". The re -circulation pump should begin to supply effluent to the spray nozzles in the treatment pod. 2. Check the voltage and motor amp draw and record the readings. If the readings are beyond the limits of the NEC recommendations, have an electrician check the main service line feeding the system control panel. 3. Place the system in the normal operating mode by turning the re -circulation pump switch to "AUTO". Verify the Time Clock ON/OFF settings are the same as set at system start-up. Record those timer settings in the system log. 4. Verify the accuracy of the system ON/OFF Timer Clock. To accomplish this use a stop watch and verify the length of time the re -circulation pump is OFF then verify the time the re -circulation pump is ON, those times should match the ON/OFF Timer Clock settings in the control panel. Re -Circulation Pump Time Clock Window Will Display OFF Sec., Min. or Hr. Light Will Burn Green to Indicate Re- Rotate OFF Dial Until Min. Appears in Window Circulation Pump is OFF OFF Dial Seconds, Minutes or Hours Light Will Bum RED to Indicate Re -Circulation Pump is ON iWindow Will Display ON Sec., Min. or Hr. 1 Rotate ON Dial Until Min. Appears in Window ON Dial Seconds, Minutes or Hours Rotate Dial to Desired Minutes ON ' Rotate Dial to Desired Minutes OFF Clock Face Dial Will Change the Clock Face From a Maximum Time of 1.5 Units to a Maximum of 30 Units. Always Set the Clock Face to 30. 5, Confirm the operation of the visual and audible "I 11GH" and "LOW ' water alarms. The control has an alarm switch clearly marked Alarm "ON", Alarm "Auto" and Alarm "Silence" Place the Alarm Switch in the "ON" position, you will hear a loud buzzer and see a red flashing light. Move the switch to the Alarm" Silence" position the red light and buzzer will go dormant. 6. Once the alarms have been triggered return all settings to their original position of Alarm "AUTO" (If applicable, verify the operation of the telemetry unit by checking the alarm notations on the website.) 7. Veri Fy the floats are operational by manually raising and lowering the floats to simulate the systems normal operation. Verify proper operation of "High Level Float" by lifting the float while the system Timer Clock is in the "OFF" time mode, the re -circulation pump should turn on over riding the "OFF" timer, the Visual and Audible alarms should activate. Return the float to its normal position the re -circulation pump will turn off. Reset the alarms and manually lowerthe "Low Water Float" with Timer Clock in the "ON' mode, the re -circulation pump will turn off and the visual/audible alarms will activate. Return the float to the normal position and the re -circulation pump will run. Reset the Alarms. S. Properly re -install and secure all tank accesses! F-Z'freat Sand/?Media Filter The E-Z Treat Sand Filter should be inspected to ensure it is operating properly. Remove the pod cover to perform this inspection. Take a grab sample of the effluent check for: a. Odor, the effluent may have an earthy or musty smell there should be no strong or offensive odors present. b. Color, the effluent should be clear and absent of any color. c. Solids, there should be no visible suspended solids d. Solids, let sample set for 15 minutes, there should be no visible settling of solids. e. Test the pli, it should measure 6.9 to 7.5 If there is odor, color or solids clean the media. If the Ph is below 6.9 reduce the re -circulation rate by increasing to "Off' time on the Time Clock Control. Recheck the Ph in 90 days. 2. Observe the spray distribution nozzles during operation. If a nozzle appears to be clogged or if the spray pattern is not uniform, remove the nozzle and clean the nozzle using a pipe stem cleaning brush. Operation and Maintenance E-Z Treat Sand/Media Filter 1-703-7i3-4770 3. Record the pressure rcading on the distribution manifold gauge. Compare that pressure to the pressure recorded at the previous inspection. The pressure should read 18 to 27 PSI. a. Verify the pressure gauge on the spray distribution manifold is performing properly. b. Verify the flow rate at the spray nozzles (it should be 1.75 to 2 GPM). c. Verify the re -circulation pump is the same make and model pump that was specified for the original installation. d. Verify the re -circulation pump is performing in accordance to the pump manufacturers' specifications including amp draw and flows at specific pressures. e. If the pressure is above the prior recording or above the start up setting, open the ends of the distribution manifold lines, manually start the re -circulation pump and allow it to run for 5 minutes. This should flush out the spray distribution lines. if the pressure remains too high, after cleaning the spray nozzles and flushing the spray distribution lines, adjust the pressure to the desired P51 using the ball valve on the main spray distribution supply line. f. If the pressure/flow is too low check for cracks, breaks or obstructions in the main distribution supply line. 4. Verify the treatment pod is properly draining; by looking down the pod side wall vents, there should be no standing water, the bottom of the pod should be visible. 5. Visually inspect the surface of the treatment media for: a. Holes, tears, loose seams b. Foreign material c. Black color on media (media should have light brown tint) d. Excessive bio mat growth e. Ponding F. Clumping of the media. Note: If -any of these conditions exist the media needs to be cleaned or rep laced. 6. Lift the corners of the media mattress and visually inspect the sides and bottom of the treatment media for: a. Holes, tears, loose seams b. Black color on media (media should have light brown tint) c. Excessive bio mat growth d. Clumping of the media. Note: Ifany ofthese conditions exist the media needs to be cleaned or replaced. U eratit>n .and Maintenance E-Z Treat Sand/Media Filter 1-703-753-4770 Cleaning the Filter Media Depending upon influent strength and influent volumes, excessive biological growth can accumulate inside and on the surface of the media filter after 3 to 5 years of use. Cleaning of the media is a very simple and easy 10 step process. Step One: Turn off power to any discharge pump. Step Two: Remove the treatment pod cover and remove the spray distribution manifold. Step Three: Connect wash down hose to the main spray distribution supply line. Step Four: Manually turn on the re -circulation pump. Step Five: Pressure wash the surface of the media mattress, the wash water will drain into the re -circulation tank and will be re -used as wash water. Step Six: Roll the media mattress and wash the sides and bottom of the media mattress. Step Seven: After the media is completely cleaned properly place the media mattress in the treatment pod. Step Eight: Re -Install the spray distribution manifold. Step Nine: Pump out and clean the Re -Circulation Tank removing all the wash down water. Pump out the Septic Tank. Step Ten: Turn on power to discharge system and return the treatment system from Manual mode to Automatic mode. Operation and Maintenance. C-Z Treat Sand/Media Filter 1-7U3-753-4770 Re alacenieni of Media Nrlattress If the Filter Media is exposed to excessive concentrations of petroleum products, paints, glues, waxes etc. it will become necessary to replace the media. The replacement process it is a very fast and simple. Removing the media mattress should be performed by service agents that are trained and certified by E-Z Set. Step One: Turn off power to recirculation pump, discharge pump and controls. Step Two: Pump the Septic tank and re -circulation tank to assure continued service by residence during the replacement. Step Three: Remove the spray distribution manifold. Step Four: Lift the media mattress out of the filter pod. Step Five: Place the mattress into the fiberglass Transport Container provided by E-Z Set Company. The Transport container is easily hauled in a pickup truck or on a light duty trailer. Step Six: Install new Filter Media and replace distribution manifold. Step Seven: Reset all system control settings to "AUTO" and turn the main power switch to the ON position. Once the mattress is returned to E-Z Set the material will be sent to the nearest re -cycler to be reprocessed and sold on the open styrene market, disposal of this product is easy and economical. 7 �-OlAMERICAN Manufacturing Company, Inc. DRIP DISPERSAL SYSTEMS RESIDENTIAL PERC-RITE° PERC-RITE® is a unique fluid handling system for the dispersal of septic tank effluent wastewater into soil. The system incorporates filtration, time dosing and low rate drip distribution tubing. In conditions where aerobic dispersal; such as low pressure distribution of septic effluent, is required or where land application with the use of conventional soil absorption fields is not acceptable, PERC-RITE® offers a method for subsurface & surface dispersal of the wastewater PERC-RITE® accommodates all pretreatment processes including septic tanks, aerobic treatment units, lagoon, and media filtration. Only primary treatment; the removal of large settled solids, of the sewage is necessary for the operation of the system. Local soil and site conditions may require additional treatment for excessive organics, nutrients, F.O.G or other contaminants. American Manufacturing works with manufacturers of all quality septic tanks, NSF40 and NSF245 equivalent treatment systems. Cost -Effective and Economical • Scalable (As your family and house grows) • Reduced engineering time due to pre- engineered & integrated components • Smaller drain field area • Low operation and maintenance costs Green and Sustainable • Low energy consumption • Minimal site disturbance • Reduces sediment runoff • Groundwater recharge • Nutrient reduction TN & P • Landscape and tree preservation A high head submersible pump installed inside a Coolguide'" delivers effluent to the filtration unit. To minimize operational costs the disc filters automatically back flush at the beginning of each dose and periodically during dosing. Accumulated solids from the filters are returned to the pretreatment unit. PERC-RITE® drip dispersal systems provide a user friendly operator interface. Each mechanical component has a Hand -Off -Auto switch which may be used to manually override and test the system. PERC-RITE® control panels may also be equipped with optional equipment including blower and treatment system controls. Remote alarm notification, monitoring and remote control is provided as an option through; CONNECT-RITETM, our integrated cellular, Wi-Fi or Satellite communications package. MR Bioline— drip tubing regulates the amount of effluent to be discharged from each emitter. The emitters maintain a constant flow rate over pressure ranges of 7 to 70 psi which guarantees equal distribution across the dispersal area. 1.0 0.9 Qfi d 0.7 `-� 06 tR 0.5 0.4 c 03 0.2 0.1 0 DRIPPER FLOW RATE VS. PRESSURE 20 30 40 50 60 70 PRESSURE (psi) Drip dispersal fields with discernable slopes must be designed with the American Manufacturing Top Feed Manifold system to control drain down which may overload the lower laterals in a zone after the pump shuts off. Patent Nos. 5,200,065 • No. 5,984,574B • 6,261,452B1 CONTROLS American Manufacturing Company, Inc. can design and build almost any onsite wastewater or water system control panel. Our staff is comprised of professional engineers, designers, soil scientists, and technically trained sales people with extensive experience in control systems. Our objective is to provide reliable, economical, and efficient control devices for fluid handling. We inventory many standard control panels and are able to manufacture special panels in a very timely manner due to our modular design and manufacturing methods. PACKAGES American Manufacturing Company, Inc. manufactures many specialty On -Site Wastewater sys- tem packages including Recirculating Sand Filters, pump stations and the PERC-RITE® drip dispersal system. American can also fabricate skid mounted pump and control systems, test them in house and ship the complete assembly ready for installation. CATALOG American Manufacturing Company, Inc. manufactures specialty On -Site Wastewater products including the Bull RunTM Valve, Dial-A-FlowTM, Cool GuideTM, and Poly Distribution Boxes. If you need a product or information not shown in our catalog or on our website please contact our sales or engineering team and we will do our best to get you what you need. 22011 Greenhouse Rd, Elk wood VA 22718 IV 14v' L4f.an101'iCa11Onr ;i W-COM 1-8D45-3132 (I4E) AMERICAN ONSITE CONTROLS AMERMAN MANUFACTURING COMPANY INC. P,0 BOX 97 ELKWOOD, VA 22718-0097 (800) 345-3132 vwww.americanQnsite.cam MP PRETREAT OHS C�W"TR0L5 1, p2 1LI Fin �— 2LI 'lZe [0 CD Q D 3L20 TT1ia PRETREAT PUMP sh res1a"3m sT7lm •15VI rjAp/max :3rW/ aFp /16A man 2T;� DRIP PUMP L � ; u PRETREAT TS L FLOATS FS TB1 MCC 9 I 11 ICI 1 I I I I - Fill N HIGH LEVEL HIGH LEVEL DOSE ENABLE REDUNDANT OFF 3-+ TC111ER- v PEAK ENAFJLi ■ DOSE ENABLE REDUNDANT OFF J-+r TLD+E:1- OR UV LAMP < uV LAMP RAIINC 115V/fPH�56A Inn% ALL POWER SUPPLY BRANCH CIRCUIT PROTECTION PROVIDED BY OTHERS 1I3v/IPH/601{z 14.V+P Wrt, W.6.E L _ PRETREAT PUMP 115�7u.M WN/PB01�ZffD+'+2 DRIP PUMP 115 or 230V/T:9nGHzDN YOANP 16ff. PRO 11V LA �4P 1 i 5V/T PH /SC'ii2 ALIP NN, PROTEcnOlL WARE I FI. PP}»PURPLE Srml-Mm- SOLENOID rALWES ": Z .tr ra: 1 y��LE SlAPE F1 = FILTER 01 2-2- R!f)-tea�YA u�/RED STRIPE: F2 = FILTER #2 ZY � �N :/ MTE/aULE SM1PE Z7 =ZONE yt �= Yf1,LDW 6/W. /yLS ..pA.OM/YaLOW STRIPE Z2 ZONE jf2 �. BL LLIE /g1,S _µLaTg/UUE STRIPE Z3 a ZONE 03 YN. DK -9LAI -WRILTE/SLACK STRFPE Z4 = ZONE VASTER ZONEFpRGUE SETTINGS: ZR ZONE RETU TERMINALS: WIRE Elf: TOR - ow ALL BREAKERS w 5 Irl-- - w O n- s 22a i. 0-w IB-20 W_Ihs T91 1-27 }0-2.2 n 7- 1n the THT P — 37a COMBINATION SIMPLEX 2TANK 1N5TAUA7TT]N GUIDE FOR'CDPI' SERIES COMBINATION CONTROLSYSTEM 1 PHASE OPTIONS A„),L,R,X(30,36,UV) (2TANIQ NOTES: 5, PLEASE REVIEW ALL PAGES AND I�LSERTS IN THIS I ANUAL BEFORE ATTEMPTING TO INSTALL NNY CONTROL EQUIPMENT. 2. DASHED LINES MAY REPRESENT OPTIONAL EQUIPM= T. r� uS 3. REFER TO BACKPL ATE LAYOUT ON PAGE o FOR DETAILED COMPONENT TORQUE SPECIFICATIONS 4. THE pOPTIO AL PEEA%, AME555OVERRIDE FLOAT MUST BE BE FILE PA COPYRIGHT @) 2008 AMERICAN MANUFACTURING COMPANY,INC CDP124—SA 1124—AJLRX(30,36,UV) ANK X9307—UV — AWN 9Y: PROBED 10/19/16 SPC AGE CONSTRUCTION PLANS FOR A WASTEWATER TREATMENT 0 SURFACE DRIP IRRIGATION DISPOSAL SYSTEM FOR A FIVE BEDROOM RESIDENCE LOT 8; 8901 MORNING SONG COURT; WAKE COUNTY, NC V27123, 8:25 AM NC 0n.Wp Parcels with SW —id. Swdard'Dad ADdbw.s ,Ion Il0 httpxlln"aneinap Inapsar<gls.wmfappsfwehappviaw ifinde hvnl?ida45fB04bc d84751b63dOwd„436b2S ,J, NTS 'NOTES: 1) SITE DATA WHICH INCLUDES PROPERTY BOUNDARIES, TOPO, UTILITIES, ROADS, AND OTHER SITE FEATURES WERE OBTAINED FROM WAKE COUNTY GIS DATA AND ARE SHOWN TO DISPLAY GENERAL SITE CONDITIONS AND ARE PRESUMED TO BE ACCURATE. LOCATIONS OF PROPOSED STRUCTURES (HOUSES, DRIVEWAYS, AND WELLS) ARE SUBJECT TO MODIFICATION IF WITHIN THE CONTEXT OF APPLICABLE RULES FOR SETBACKS. 2) ALL SEPTIC SYSTEM COMPONENTS TO INCLUDE TANKS, PUMPS, MANIFOLDS, AND SYSTEM CONFIGURTION ARE APPROXIMATE AND AS SUCH NO SPECIFIC ACCURACY EITHER VERTICAL OR HORIZONTAL IS IMPLIED. SUITABLE SOIL/DISPOSAL APPLICATION AREAS HAVE BEEN LOCATED BY PIEDMONT ENVIRONMENTAL ASSOCIATES, P.A. (OAK RIDGE, NC) (SOIL SCIENTISTS). 3) PROPERTY AND EASEMENT BOUNDARIES SHOWN ON THIS SITE SKETCH ARE APPROXIMATE AND ARE NOT INTENDED FOR LOCATING PROPERTY OR IDENTIFYING PROPERTY LINES , CORNERS, OR EASEMENTS. THIS IS NOT A SURVEY. OWNER: Princess Holdings, LLC c/o Steve Jones, Manager 1430Innovation Ave. Morrisville, NC 27S60 (919) 795-0356 Pf12HJM►JWA9fr SUNDF ION PL" - aALMM" PCIArr ..eer.mrriarmscr THIS PLAN PROPOSES TO SWDMDE 97.55 ACRES INTO 23 SINGLE FAMILY HONE PARCELS WITH ASSOCIATED PRIVATE ROWSANDSTORM DRNNALR" E. WATERAND SEWER WILL BE FIAMED Otl EACH INDIVIDUAL. HOME LOT. i LOT 8 SITE DATA OMER. PIRICESS HMNM TLC 143D INNIM1 N ATE IRTiR16L01E NC UNO na417.44H PREPARM INFO: MIL/- 6 DM-L a AMOCIATIRL PA 1mu 9E MAYNAfD MAD mm 2m CARP NC 47DI TIMtn0.497N7GR FAX DIl461A75-S 717% MUM 17.1 AC 00 01W4, PO 00217) ZDNINM R-11) PROPOSED M ORILE FAMILY HALES n,0POED Ha LOT& 23 PROPOSED AREA N LORA ;3 ..0 SF (7Q89 AC� AVERAGE ANFA of WM 111,135 SF ;2i9 A6j UNEAR F0111M OF MVATE VIM 41M IF TATIRM WE FEAR TON119P suoom TOTAL I PO W NIS MFA ICAIS M/M AA (114 + nnw HOMES YMNE muNEY PN 1; M?.F3,M17 0 1T.Mew Dn7.s4= (o17.211.0m 051IMM4 0017.51211114 NOTE: ALL LOTS SHOWN WITHIN THIS DEVELOPMENT ARE PRESENTLY OWNED BY "PRINCESSS HOLDINGS, LLC." ALL HOUSES, WELLS, AND WASTEWATER DISPOSAL SYSTEM SYSTEMS SHOWN HEREIN ARE PROPOSED AID NOT YET CONSTRUCTED NOTE: ALL LOTS WITHIN THE DEV�ELOPMENT ARE TO BE SERVED BY INDIVIDUAL WELLS & ONSITE WASTEWATER DISPOSAL SYSTEMS. t LL ROADS WITHIN THE DEVLEOPMENT ARE PRIVATE ROADS, O-w-AIFQ & MAINT-AINED BYT'BABSLEY POINT LAND OWNERS ASSOCIATION, INC." 1 A GENERAL LOCATION MAP OF SUBDIVISION LOTS SCALE AS NOTED BY BAR SCALE O 0 Z�x w y� FZ u Z — v O a` LVE N tLa) I-- U j� O z U S' U o W Joe� Z Q _ _ ° L, u Z �a o cc z W Joe O U J zz Z O r z u00 �° 0 .° J W W c a v N ❑' a O m u 3 • W 00 p CN W � N �-I O U 00 En r N'N 0 N a_ SEAL r 9810 `o F— c = 3 � O L THERE ARE NO z ° z � Ij �� d v s KNOWN WELLS � � uj 44 WHICH EXIST WITHIN Z � 5 i 500' OF THE TRACT i CL ) � TRACT BOUNDARY (TYP.) 0 BOUNDARY. O MiLn n w ij U CL ® ca 73 Z Z) V) z z a.o Q ILu � 14 � NOTE: ALL HOUSES, WELLS, AND UJI W � 5 7 WASTEWATER DISPOSAL SYSTEM v Z I � SYSTEMS SHOWN HEREIN ARE PROPOSED Lu OC o s NOT YET CONSTUCTED. 0 �� ANLDLOTS SHOWN WITHIN THIS L m G DEVELOPMENT ARE PRESENTLY OWNED 16 ��` t �� BY "PRINCESSS HOLDINGS, LLC." (SCOTT 1 2 , a�� � JONES, MANAGER). • 00 I NOTE: ALL ROADS, OPEN SPACES, AND z ��E`�.. G SQP�ti � � COMMON SPACES SHOWN WITHIN THIS + N DEVELOPMENT ARE PRESENTLY OWNED 18 0 BY "BARTLEY POINT LAND OWNERS ^ 0 S aSeP I ASSOCIATION, INC. ,� Z U 0(SCOTT JONES, DESIGNATED MANAGER) nc� NOTE: ALL LOTS WITHIN THE -� 0 DEVELOPMENT ARE TO BE SERVED BY 4 . Q�j 119 9 INDIVIDUAL WELLS & ONSITE 0 00 co WASTEWATER DISPOSAL SYSTEMS. ALL . CD Lo Io LOTS ARE PRESENTLY OWNED BY O� crS �P 0�v PRINCESS HOLDINGS, LLC. (SCOTT _)z JONES, CORPORATE MANAGER) ITI +, p 0 cd23 GENERAL SUBDIVISION PLAN SCALE 1" =250" 2 CA 250i 1 NORTH 125 0 2501cq TRACT BOUNDARY (TYP.) i l ❑ �r r � Or a O + Z o cV rj Iz `Wkp V - - • . s l' LU O = Ln 0 CL :ram- ■ + 1 �r 1r 7 • �� l O"' U — �► 2-ST ANP WIRE4FENCE 2- 11ND APPLI ATION, AREA - - �- Z Z \ L [5 DETAIL} 4 O O Z > o w U f / %'�co LU Is a 1 , W PROPOSED 7, ' 3 1 WELL ` a� CATION •� ry � � �'� �, l''�IN• r � w 00 o N00 • a1 z °' A, A ; O 0 '110_. ;;► ft ■ ��, ••. . ' '� 9 '•. ,! e 000 SCALE ,1 \ SEAL 1 I / 9 810 to NORTH ••°;�' RHN �� . / 7 (4) 1 I/ 2`-P V C S 0P­L Y LINES &( I 1 *1./ PVC RETURN- L-I N E- - (M 1-t,4--- -3-(Yl B U Y ) r3500 GAL FIELD DOSE TANK 0 - - + 2500 GAL �♦ - RECIRC TANK I 0 C 1$00 GAL SEPTIC/` ' f )NNK 1 MIN. PROPOSED WELL LOCATION ----_,,D■ SCALE I =20; ■ i . 20' io, o � zo' • j NORTH �C O 0 ^ lL o c'V Z O a V ) J W O� z pC U v' p o ZQ = V) O= W z a_ Z� �D �Z Z v D . Z O o O �J hi � w r 0oa J m w o2o 00 W ° �U� 0 U N a- C) ��zrrrrrrrrrr •��.••�y, = Q SEAL r 9810 4� :, �, LNG II��F' •'y - nom E-Z TREAT POD MODEL 1200 r i BACKF FREE OF FIN. G 1-1/2" A. SUPP LINE 4" . RI TU LIN E EXISTING GRADE SECTION THRU EZ TREAT POD_ _ NTS 4" SERVICE LINE FROM FACILITY SUMC FLOW 10' MINIMUM 10h, EFFLUENT FILTER E-Z SET RISERS II • Iq" i r I 5/4 TREX BOARD Z TYPICAL 0 3/4"0 RECIRC NOTE: TWO ACCESS RISERS SHOWN CAN BE COMBINED TO A SINGLE 30" DIA E SET BYPASS VALVE 24"0 E-Z SET RISER WITH COVER. — 20 TURBINE -PUMP 4" PVC END CAP NOTE: DO NOT GLUE ONTO RISER PIPE DRILL 1/4" FIN. GRADE ` VENT HOLE IN CAP 4" PVC RISER PIPE - EXTEND ABOVE BOTTOM OF TANK LID -�" FROM FILTERS L 4" TO FIELD DOSING TANK 4" PVC TEE E-Z SET BYPASS VALVE ALL TANKS REQUIRE A 6" THICK STONE BASE SECTION THRU RECIRC TEE NTS 24"0 E-Z SET RISER WITH COVER (TYP) OPTIONAL 2- VENT CARBON F&TER (IF 4" REQ. PER LOCAL — caBE) UV UNIT 24"0 E-f fET RISER WITH (TYP) 0=- TURBINE PUjr FOR DRIP DOSING III TREATED EFFLUENT LINE TO 4" SCH 40 PVC BOTTOM L�LoW CONNECTION OF TANKS CONTROL PANEL FOR EZ TREAT UV !FIELD DOSE TANK Iv I" DRIP FILTER 6ACKVVASH/FIELD FLUSH RETURN FROM DRIP HYDRAULIC UNIT SEPTIC TANK RECIRC. TANK FIELD DOSE TANK NC DHHS APPROVED 2500 GAL. PUMP TANK NC DHHS APPROVED 3500 GAL. PUMP TANK NC DHHS APPROVED 1500 GAL SEPTIC TANK PT-2103 OR EQUAL PT-2105 OR EQUAL ST-390 OR EQUAL PLAN NTS — FIN.ELEVATION GRADE: ELEV. "A" (SEE NOTE: FIELD TANK VERIFY PRIOR - 30"0 E-Z SET RISER WITH COVER SCHEDULE) -3W BALL VALVE TO ORDERING 24"0 E-Z SET RISER WITH COVER.- -CLEAN-OUT 24"0 E-Z SET RISER RISERS MAXMIN., I WITH COVER PP�� M (TYP)- - 314 MCIRC LINE FIN.GRADE: ELEV. "A" + 4' PV INV.IN= WATER IN OUT=ELEV- HIG "C" J INV. IN=ELEV -IO'FLIJENT FILTER (SIZED PER DESIGN aQSE = c•• Is' FLOW) AFa E w,u,L�4s�• R'f t00 GAL MTN17 COMPARTMENT r� ALARM LIGHT - NOTE: POWER TO WITH COVER SET RISER - YTHIS PANEL IS 230 VAC WITH (TYP) Jl-------- CONTROL PANEL (LOCATED - WITHIN 10-FEET OF TANKS) FIN.GRADE: �fli'kFseluvo"oELEV. "A" v¢[iloS OR APPROVED EQUAL U-V- NV- I = 1 1/2" SCH 40 PVC SUPPLY LINES -7 fO DISPOSAL FIELD 1 1/4" SCH 40 PVC RETURN LINE CONTROL PANEL FOR DRIP 3 ZONE DRIP HYDRAULIC FILTER & VALVE UNIT (REFER TO SITE PLAN FOR NUMBER OF ZONES) RAIN SENSOR (IRRIGATION CUT OFF); MINI-CLIK, RAIN-CLIK, HUNTER INDUSTRIES, OR EQUAL 4" x 4" TREATED POST DRIP CONTROL PANEL 36" MIN WITH ALARM CONDUIT FOR PUMP �1FIN.GRADE: ELEV. "A" V-'D" -`�'- - y TO DISPOSAL ER VALVE 4" PVC FROM BYPASS JTELEV."G" EMERG, STORAGE VOL VALVE TO UV UNIT= -1- 4039 GALS (IN BOTH TANKS) EMfRGENC7 STORAGETHISCOMPARTMEM'& BOTTOMHIGHvVATERALARM-&- FIEL➢ DOSE TANK 4039 GALLONS CONNECTf:(•1 TANKSPEAK ENABLE= ELEV. rWrrH T 4"SCH 40 PVC 96" (&0') AND WATER-TIGHT'eooTs DOSE ENABLE= ELEV.'I" _ E FLOOR= ELEV."G" IGHTED MERCURY FLOA FLOOR= ELEV. III HP, I ISV, 20 GPM �6" STONE BASE SEPTIC TANK TURBINE PUMP FOR RECIRC. & STORAGE (p57 WALED DOSING EZTREAT OR @RUALI — 1500 GALLON SEPTIC TANK POD NOT SHOWN 2500 GALLON RECIRC PUMP & STORAGE TANK STB-390 SHOAF PRECAST CONCRETE, OR EQUAL +/ 44 GALS PER INCH SHOAF PRECAST CONCRETE, OR EQUAL SECTION VIEW NTS FIELD DOSE TANK 3500 GALLON PUMP TANK +/- 47 GALS PER INCH PT-2105 SHOAF PRECAST CONCRETE, OR EQUAL TANK ELEVATION SCHEDULE ELEV. "A" 262.50 ELEV. "B" 259.00 ELEV."C" 258.80 ELEV.I'D" 258.70 ELEV. "E" 258.50 ELEV.'IF" 259.50 ELEV. IV' 252.50 ELEV. "H" 254.00 ELEV, ''1" 254.33 ELEV. "J'I 255.33 ELEV. I'K" 252.50 `c O 0 Z z dX , Z v I— w vi z J o� U— o G ZQ °= N w z ❑ Z U -co Z oC D N Z �Z o Z � 0 O Go J LU LU a o n a` J m W O 0 C�Ey CN uj O N w 0000 �^ "Q r N _ 0 O L110 J'Z yl�E� ff.11 CARS •+. (SESS `er SEAL 9810 f '•+V R t �pF;• MODMODEIL in Control Single phase, simple, molorconticlor-Mml The Model 112 control panel pm bdee a mXabk mail- rahyyuN pne 12D. 200, b, 240 VAG eingle phase pump uI m:mp chambem, sump pump basho, ImPunin ayioamo, an•: lift rM Ana The wnwo: hrdchp adivak a maBrwGc mewl com t.r IR Mn b. pmy w nlaofl. If an Mawlr: "o'hihan o[aum .,' aaal000r "John e.o1o, as uahia tha a:!�vlaur rn,n syare!e COMPONENTSPANEL 1. Encloeum measureaBXBX4 incfiee (2032 X20.A lult—il Gtipg NEMA1(sbelfarindwr'wel, oe NEMP4X ,or illelemnt. Ilatrmcolralic with removable lmgry�np Joel rot ,pY,ppr or in0oa use). la 'l • OBhona xletnd may inveaaa oloaure sue and dlenge component Joy.u, i rlagnelk WW 04r ", cpnnbola puny t, Awadnr elador uo� 3- HOP Swhch Iw manual pump w"bal (mounted on circuit board) -- 4 Gwen Pump Run lndlcalpr Ugh (mmmd on urouil board) * Float Swlhh Tamil.I Block (mounted on clout board) f Alann avnd C,no"I Foen lmou,1W yr:Loua tomdy. 7- Araml and Coonol Powar lndioarom(moulted on 6—d board). RYy J 9 Oround Lug 9 CImuN Brealrtr (oplional) provides pump diswnnea anti bn e, o,wd Modal Shawn 1121WIl prmaon STANDARD ALARM PACKAGE 0®m 10. Rpl A4rm swam psmbda 3GL" vlsaY iniQ e! Hum coMiEh Nebl NEW 1 elyN NIIYA¢a doar.mr,. — ndieouy o lieu eta boron. 11. AUnn, Hpm Pmndaa ando aumV i or la amdlba . (63'a AE deohel niti Nola )NEMA 1 style u lo— on 1--gy mounted buuer in lieu orhom 12 Eati,d rAlarm Tealflyomul/Sll"" Sw@h allows nom and light to be and in an m wndiRam a11 pn Ram Would and hom to be auwalum resew once'talm coMdu, hits been ckarod 13. Hom Silence Raley (moumd on arou0 baed) NOTE: omer option,, tiltk ■ Entire con not eyekm (panel eM avnlaee) IFuL LIstM to meet and! or eased Fy, Saraly standards ■ Doi only eaoandnn our —Hoot t1Nka Nh Canada S Sknderd package Nckdas three W WE SgnalMi ater' eonhol switches j Comprk wilh alep-0y-skp monallatlon inalmctiona IF Thme_year limiRE wa"anty Rh pus PO Boa M11, Oeholl Laken, lAN 56502 Ili) -0IALSWE - 1-21&a47-1317 1-210d 7A 17 Fax SEEBACKSIDE FOR COMPLETE LISTING OF AVAILABLE OPTIONS. email: jeK�sjerhombus cum SEE PRICE BOOK FOR LIST PRICE. www.51erhombaS.CB1rl 112 1 n T HMODEL 11I `- ALARM�Ao XAtaE e o a I+An.mne..m, pawbe wmpatlaBe [rcworc».e�o�l�,xak]N•r ee-nil glif nem:r n.r; ENCLa'SYeER4T�1¢ =IMmr NENA, I w; e W^YYIWnammelN Xkrgrv"eetl.nf±oPsercJ WARrNOLTEVpi- 1 = gnrkmotorwnlacm 11m 40V 9=magnati—tor inch avMy P¢ W e4r_LLaAo ®0 -ii­7Fl,A , 2 •1610ya M9nP0(.C¢NKECr9 a =raw ullownnea 4 =w 120V(aele V(.A .STMVICEopl ICE. Mn ,20200rz10V (sekdSTPRTINGOEVICEopW n l above) }LOAT"Nf[Cl1APPl1GATm Bjf or,.=p::mpdvwh "M.,ra"11N17.pV.n) X•mhul. Prf[Hahm,pld,w Vrt[ ioam,p-1 " OPtitlHB tw Fn l!).JRFl ElF - I, you sekded3pr mare of ire*o0loo-. drdz "N • ornFOma inn— uji ¢ ha -WY Reply. p 11AA au v u oni, !nit m,d:c nnoa Ixl 1lYpYh meads"/ ItL NEIYV : apse pv!n Iyn:,,r sac uaen ea, O IO Xan on11 I norra �ItY NENA aR tl� NK: •-art ,r„K xy' dA: rRmluxc) (must sexct 1E it "rots iMvay) ��A.M•• II la"n mrcwc �:am y.. rc.•'b m,wc• do« E* IE Hann noel13 o-M rFh A 20.30 . , �nL,$�kalam. Reel �� Cmaol !alum dra4 Geekv �* 4A N ,aA M „n.:r. i.n, r I yrn rnaS fsehY: ppponhaD n!!opY inNUGedI ,s6 ss' �,e •, ai M Ins• tnx!• �r c6 Sra mdunawrt oS xd.abi a ma,mluo 1a .a.a ti .I p ry" rual nl,nµ ej 1aD .[•say.• 1W w•cot O a0 le.eWaanl el hat 1)P Y syxervrhr lm�+^c,Imp. slvan O �al:uaJ I) aol:ml o R.'E S.•wNW„^ r exv,-ay ue*•aC'a I6Y'.W! M. SA 17C Sy:odr sa:ur•: inva. mow- i'An puaE sal (lei pumpk wrcnwm.I" .,"i Ieaal O �u,nap f-tel• eurmay "ngl'lA I- no lCxa O##SE Seel Invu^ "•all a and :npva" (2 a1ro1 ,TE sanlm r,®Y Wr: PIw w,::a. ICM e.,r! SA AavmR m„m e>.1:aa, taro, a 7F an,v- nv,:r M.� I x.>,�-., +ar,•w . w.•aA,er O* SC I ,mna O ,IT Tw CTtl P, apn :Ymy ►fps• e[MJ pin mmuer # aD E-. o, ad FIT TOA DM wwmecc7 s.MM erA pomp r,n p #+s_A r..=Fo p�Iopa acer H,mla a ,her nv,ntie: B !dlmvad by feller'A• 0 .9 OA (aMrO•lAaRmal,c) a,nrp a+d pump rvn On: mmasn �r::•..:z amp puaa D aro: aa4a„e +.o-ss Eu +az Dap- moupr,!!<mF tin i,z.• 31-3p yfJ- O 21A WE rvrdYMr u •au W aoln wlmlm • O Laara NEMA SIE ^Irallerlsl pu in w: of gri;,1 anvle,. 0 mE L,�aNe enM NEMA t O Su Yn91d• in Neu o' aJM 4r F� A �a;nF L:9hM.i�nr [eetlfl pvrtq cant Croaked � 210 Wilde "loot` in lu d prv4n ,vnkrez . a Al. �rl�u ihv v. .Mec,mnreuv-edvadd A,aacayaan heMlu:n-W,.A-11 lha fa y,bre Wool— Ey4rseiindcli2bm..RmtAmlf.� SAMPLE IMlOF1 1 4 elnam H ]A SA y7A An,m Fapkay Enu" ddanlap Ull P.,u,p FLew Amps pamv gi,eemlaal Opt— pt-AppllElirl am ft F,a4yN,. Flepaae Tlme alrn, !AP 9fav41lM4rr pip. ,tamp COOL GUIDE FLOW COLLAR (COOL GUIDE The laminar flow collar shall be made of non -corrosive, glueable PVC and have sufficient holes In the outer guide tube to assure laminar flow for the rated capacity_ The Inner flow collar shall extend near the bottom to provide sufficient coaling flow for the motor. The dimension between the Inner collar and the pump motor shall not restrict flow to the pump intake, but will provide for scouring of surfaces. The lominar flow collar shall be a "Cool Guide" as manufactured by American Manufacturing Company, Inc. Patent # 6.262,689. "COS GUIDE INSTALLATION INSTRUCTIONS 1. Measure the dietance from the bottom of the tank to 6• down from the tap of the riser. Cut the extension pipe (by others) to the length necessary to reach this height Cut 1/2 of the pipe down 12 to 18" away from the top of the pipe for pump discharge pipe. 3. Glue the extension coupling (by others) to the extension pipe and to the Cool Guide. 4. For repairs: glue on the Coal Guide flat cap and place the Cool Guide firmly in the of the tank. Attach the extension to the riser, with the anchors as shown. 5. For new construction: Anchor the flat cap to the bottom of the tank In the proper location to hold Cool Guide and extension. The cap may or may not be glued to the device. Attach the extension to the riser with the anchors as shown. 6. Place the pipe dope on the Cool Guide adapter threads and thread them Into pump discharge. 7. Attach cooling collar to adapter with set screw provided. 8. Glue pipe into flow collar and with pump attached, lower Into the guide tube. 9. Attach to discharge pipe, valves, and Connect electrical as specified. ADAPTER COOLING COLLIE -1-1 bUPLINGH 40 INLETS 1 0 0 0 ° o 0 0 0 0 boo g •o 0 00 0 000 SDR 35 PVC 11 FLAT CAV,"tt Cool Guide Patent No. 6,262,689 rc� LL a� �u i +4 Q) Q) li c Z 41 41 0 PUMP CURVE 2 220- 210 - 200-- 190 - 180- 170 - 160- 150 - 140 — 130 - 120- 110 - 100- 90 - 80 70 73- 60 — 50 - 40 — 30 - 20 — 10 - 15 GPM TO 25 GPM THI$ PUMP NG C NDI IONS 1@ 12'TDH 2 I 8 ' 16 I 24 I 32 ' 4U ' 4 12 20 28 36 44 Gallons Per Minute 3 � O Z v : • S rob In v Z o Z 6n O p = — c: 11 LU J Ln 0 z J US 0 Qza 0LU LUrt Q c Z U EL m I..L oZ Z 00 00>- Z 0 O 00 J ~LU C S a � J m 0 I4 0 00 0 •,� ON � I0 ` 00 �-y1'� W �N� O 00 Nz I 2 0') CZ N N r � 0 U N arz Airlv* - tyytEtf rE/12TjPI, +. +b� GAR '•. �Q r� SEAL 9810 v rVVt}U �•. .: SIDE FEED OPTION FLAT SITES ONLY. PVC — REDUCING TEE a. PVC FIP 1 ADAPTER z RAM INSERT ADAPTER 6" MIN DRIPPER r I SEPARATION LINE PVC PIPES w o N LIMIT OF I — I MANIFOLD EXCAVATION DRIP LINE CONNECTION TO MANIFOLD NTS 1 /2" FLEX PVC (4' typ.) \(� PVC FIP ADAPTER RAM INSERT ADAPTER DRIPPER 6" MIN LINE r SEPARATION'S BURIED DRIP LOOP CONNECTION NTS Install De Supply line is below fro Jo ITFOR SURFACE OR , NEAR SURFACE INSTALLATIONS USE WIRE WICKETS TO SECURE DRIP TUBING AND FLEX IN INSTALLED POSITION AND LOOP FLEX AS SHOWN 4" WIRE MICKET UNE 1/2^ FLEX PVC ( 6'+ TYP. 4" WIRE WICKET RAM INSERT ADAPTER PVC FIP ADAPTER ELEVATED LOOPS (MIN. 2") DRIPPER LINE -\ 12 MIN I SEPARATION NEAR SURFACE DRIP LOOP CONNECTION ON SLOPING SITES NTS TOP FEED MANIFOLDS USE ON ALL SITES WITH A DISCERNIBLE SLOPE i ni1 TO CONTROL DRAIN DOWN FROM UPPER LATERALS .OWER LATERALS AFTER PUMP SHUTS OFF. etum YP) AIR RELEASE Return VALVE Manifold • 44 PRESSURE i *44 i4 DRIPPERTUBING k 4 4i i4 44 4+ i + BELOW FROST LINE RESIDENTIAL n R. Harman onsu njz EnRineer P.E. 2112 White Oak Road —Raleigh, NC 276o8 Tel. No. 9 ig.8 x8.2o77 eMail: jackharman53@gmail.com 4 + k CHECK i i+ i k i VALV 1/2" PVC 1/2" PVC RIGID FLEX COMMON RETURN PIPE Patent No. 5,984,574B Install insulation for shallow systems in freezing climates See diagram above. �N CARQ; •.,•. IES -- SEAL 9810 �'•' R. t iA'i a_ Q O 0 Z v d X dti d Z Z u a v� n a`Z J O U cn Z o O n' w % ` Q_ O Lu Z 4-J Z O ZZ 0 O 0% CL r Z j00 O 0 J �II.— LU � O 0 3 L y, �./� a J W J w a Mqr 00 l ` N O 7� 1�-'1 U �J N Cd 00 � L ' CN br-i i-- aaM P4zA . IJ W. (3)� N EHRALNOTES FOR SFRSURFACE SPRAY SYSTEM: MAINTENANCE SCHEDULE ITEM �~ FREQUENCY TASK SEEDING SPECIFICATIONS SEPTIC TANKS 3 4• MONTHS CkfClt SOLIDS ACC4ItilULATfON, APPLIES TO ALL DISTURBED AREAS OUTSIDE DRIPPER FIELD p O 1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO ALL NCDWR-.2T RULES, COUNTY I BLQGXK LTRA:Ti[sN. BAFFLE DAMAGE. _ d •. L{]Ak;ES. CHECK THE Fil.TER. �?� €G MIXTURE � ENVIRONMENTAL HEALTH CODES, AND STATE SOARD OF HEALTH SEWAGE HANDLING AND DISPOSAL REGULATIONS - ; 3- 5 YEARS PUI4P SEPTAOE IF REQUIRELS w a r d v Z v PERTAINING THERETO WITH REGARD TO THE PERMITTING OF TH15SITE. ALL FE RATE (LB;'AC100 a or O r ALL FESCiIE 2. THE INSTALLATION OF THIS SYSTEM SHALL BE IN ACCRO➢ANCE WITH SPECIFICATON5 AND GUIDANCE PROCEDURES OF PUMP TANKS 3 - 4 MONTHS CHECK SOLIDS ACCUMULA.TON, ERILLA LESPEDEZA. 30 L PUMP CRTI SOLIDS IF REOl1fRED. vBE LESPEDEZA 10 r LV J THEMAN UFACT URERSOFTHEEQ.UIPMENTORPRODUIT. CHECK CHECK EN5ACCLe. BAHIAGRASS 50 3. ALL PVC PIPE AND FTITINGS SHALL BE SCHEDULE 40, TYPE I, RATED FOR PRESSURE APPLICATIONS. ALL GLUED JOINTS FOR PROPEPLY OPERATING FLOATS. +< %4 LPL s vi SHALL BE CLEANED AND PRIMED WITH PURPLE (DYED) PRIMER PRIOR TO GLUING. CHECK HIGH WATER ALARM EFGIAFTER NR SEPTPT 1 1. EMBER 1 USE UNSCARIFIE:D SERiC,I=A SEED, O Z 4. ALL CUTTING OF PVC PIPE, AND FLEXIBLE PVC PIPING OR TUBING SHALL BE ACCOMPLISHED BY PIPE CUTTERS. NO EQUIPMENT & CONTROLS 3 - 4 MONTHS CHECK FL,CIAT CtNTROLS ALARMS, - WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA .AND INCREASE KOBE TO 40 V! U in F Dtl:()W MANIUFACTURER'S S.ERViCE G ,.ACRE. . � SAWING OF PVC 0R TUBING WILL BE ALLOWED. REQUIREMENTS. A'+'ER-SEED 50 LB/ .ACRE OF I ALL FESCUE. EACH FALL, UNTIL WELL ESTABLISHED. Cid 0 O 5. NO ACTIVITY SHALL TAKE PLACE ON THE E F FL U E NT APPL I CATION AREA OTHER THAN THE MINIMUM REQUIRED FOR THE U`tSE PLANTS = FORCE MAINS & 6 MONTHS CHECK FOR LEAKS & RE-MEASURE+"� Z Q INSTALLATION OF THE SYSTEM. THE I NSTALLER SHALL USE ONLY EQUIPMENT OF THE APPLICATION AREA THAT WILL SUPPLY MANIFOLDS FLOW IF NECESSARY. CHECK FOR CTWEEN APRIL 15 AND AUGUST I OR ACID 10 LB/ACRE GERMAN MILLET OR 15 LEI/ACRE( vl EISI�.osm PIPE. f-lldflAIJGRA55. PRIOR TO M.41' 1 OR AFTER AUGUST 15, ADD 40 LB/ACRE RYE ( RAIN). O = W PROVIDE THE LEAST 501L DISTURBANCE AND WILL MINIMIZE GROUND CONTACT. ALL IS BEST FOR TALL. FESCUE AND LATE WINTER FOR I_ESPEDEZAS. OVERSEEDING OF � � U 6. A LEAKAGE TEST SHALL BE PERFORMED ON EACH P R E- CAST CONCR ETE TANK. THI5 CAN EITHER ACCOMPLISHED BY A 2 OBE LESPEDELAS pyER TF1E FALL SEEDED TALI_ FESCUE IS VERY EFFECTIVE USE V, FIELDS 3 - 4 MONTHS CONTROL VEGETATIVE GR0'&fH FOR 1NHULLED BERMUDAGRA35 SEED IN FALL. MINUTE TEST WHERE A VACUUM OF 5 INCHES IS HELD FOR 2 MINUTES; OR, A HYDROSTATIC WATER LEVEL TEST PROPER INSPECTIONS- CHECK FOR S III- AMENDMENTS � Z 0 00- WHERESYR DROP OF ONE HALF INCH 15 NOT EXCEEDED WITHIN A 24 HOUR PERIOD. EROSION, PONDING OF WATER, APPLY LIME ANT} FERTILIZER .ACCORDING TO TESTS, OR APPLY 4,000 LB/ACRE GROUND 5URi ACING OF' EFFLUENT. GRICUI.TURE LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. 7. T TREES ARE NECESSARY TO BE REMOVED FROM SITE, CUT STUMPS FLUSH WITH GROUND, REMOVE CUTTINGS BY HAND. ^^'' D MEDIA FILTER 6 MONTHS MEASURE PLOW BY TIMING DRAW PPLY W O (n 8. A TWO STRAND WIRE FENCE SHALL BE IN5TALLED SURR ON DI NG THE EFFLUENT APPLICATION AREA. DOWN IN FHE PROCESSING TANK. JLCH 4 4n¢3 MATERIAL ANCHOR STRAW, OR TACKING WITH COVER OF kOANa SUITABLE 1JLCHIN� hIATEF�IAL. ANCHOR MULCH $Y� FACR1Ni= WITH ASPHALT, RONNG OR NETTING. � U CHFl-K FOR. PONDING/CLOGQING. "NG IS THE PREFERRED ArgCHORING METHOR ON STEEP- SLOPES. � Z 9. ALL AUDIBLE AND VISUAL ALA RM5 FOR TH E TREATIVI ENT AN D DISP05ALSYSTEM 5HALL BE EXTERNAL TO ANY O Z STRUCTURE- 12 MONTHS SAMPLE !DISCHARGE: WASTEWATER. FER FIJAfCCE r EFLR fILIZf IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE NO r DRAW LLABORATORY SAMPLES AND NCE OR TWICE .A YEAR, BUT MOWING IS NOT NECESSARYf. RESEED, FERTILIZE AND 10. A RAIN SENSOR (MINI-CLIK BY HUNTER INDUSTRIES) OR RAIN -CHECK (RAINBIRD IRRIGATION), OR EQUAL SHALL BE REPORT TO .A�-L.NCIES. LILT H DAMAGED AREAS IMMEDIATELY. � � O � INSTALLED AT THE FIELD DOSING CONTROL PANEL, AND SHALL BE WIRED IN WITH THE OPERATIONAL CONTROLS WHICH CAN PIT FIR THE ACTIVATION OFTHE FIELD DOSING PUMP DURING EXTREME WET WEATHER CONDIONS. GENERAL NOTES. 11- ALL CONTROLPAN ELENCLOSURE5FORTHEWASTEWATERTREATMENT ANDDOS INGCOMPONE NTS5HALL BENEMA4X. I. HOUSING AND OTHER STRUCTURES AS MIGHT BE SHOWN ON THESE PLANS ARE BASED UPON 00 12. ALL SURFACE RUNOFFRUNOFFSHALLBEDIVERTEDFRO MTAN KS, RISERS, ETC. TO P R EVE NT PC N DI N G OR WET INFORMATION AVAILABLE. LOCATION OF DWELLING AND STRUCTURES ARE SUBJECT TO CHANGE OTeTiCa�AILLINDI51nfcCtiQn Lfllt E Y DURING CONSTRUCTION. PUMPS, HEAD LOSS CALCULATIONS, ETC. MAY NEED TO BE RE-EVALUATED "P"°�' LCM1d° " ~ Q A Q CCNDITI0N5 NEAR OR AROUND THE TREATMENT, STORAGE, AND CONTROL PANEL AREAS: _ 13. ALLTANK RISER LIDS SHALL BE A MINIMUM OF 6 INCHES ABOVE FIN15HED GRADE. ALL RISER LIDS, AND CONTROL PANEL IF ALTERATIONS TO SUCH LOCATIONS ARE REQUIRED. _ ^ - T _ _ a Cal J ENCLOSURES,SHALL 8ELOCKABLEORSECURED IN5OMEFASH [ON TOPREVENT UNAUTHORIZED ENTRY. 2. LAYOUT OF THE APPLICATION AREA IS BASED ON FIELD DELINEATION OF SOILS AREA PERFORMED -• SY PIEDMONT ENVIRONMENTAL ASSOCIATES, P.A. ANY CHANGE IN LAYOUT, BY THE SYSTEM INSTALLER. OUTSIDE OF THIS AREA WILL NEED TO BE APPROVED BY THE SOILS CONSULTANT AND THE W ENGINEER. CLEARING OF VEGETATION & TRESS .LESS THAN 2" DIAMETER 15 PERMITTED. "" �°'°' �°� • CEN'£R4L NOTES, 3. THERE ARE NO KNOWN EXISTING WELLS, BUILDINGS, OR STRUCTURES WITHIN THE REQUIRED BUFFERS. 1. TWO SEPARATE PANELS AR REQUIRED. ONE SHALL BE FOR THE PRE- DO 0 TREATMENT, AND ONE FOR THE DRIP DISPOSAL SYSTEM. 4. THERE ARE NO AREAS WITH THE APPLICATION AREA THAT ARE WITHIN THE 100 YEAR ;� uwWd.1r. y ()!� 0 2. EACH CONTROL PANEL SHALL BEANE•MA4XSTYLE ENCLOSURE. FLOODPLAIN. n•swlcaaea�a,� �� AND AS FABRICATED BY THE COMPONENT SUPPLIER. ex-e" • - 3. EACH CONTROL PANEL SHALL BE LOCATED AS CLOSE AS POSSIBLE +� N TO THE COMPONENT IT SERVES, MOUNTED A MINIMUM OF 36 INCHES 5. THE APPLICATION AREA SHALL BE MAINTAINED AS A WOODED OR "NATURAL" AREA SITE c W 0 U00 ABOVE GRADE, AND FASTENED SECURELY TO A POST OR BOARD. 4. THE TNSTALLERSELECTRICIAN SHALL MAKE THE INTERNALPANEL 6. A LEAKAGE TEST SHALL BE PERFORMED ON ALL TANKS WHEREBY AN EXFILTRATION RATE SHALL...s,_ (I) z� ., CONNECTIONS FOR TE CONTROL CORDS (INPUT & OUTPUT, AND NOT EXCEED A ONE-HALF INCH DROP IN A 24-HOUR PERIOD, AS OBSERVED AND CERTIFIED BY THE - ^� GROUNDING ROD). EACH CONTROL PANEL SHALL CONTAIN A ENGINEER. WIRING SCHEMATIC IDENTIFYING THE INTERNAL AND EXTERNAL CONNECTIONS. 7. ALL PRESSURE PIPING SHALL BE SCH. 40 PVC AND PRESSURE TESTED TO AN INITIAL PRESSURE OF 55 �� - j (�J Q) 5. POWER CONTROL CIRCUITS TO THE PRETREATMENT CONTROL nmmnas�cogcrrucuw f�y�, ij C PANEL AS WELL AS THE DRIP DISPOSAL CONTROL PANEL SHALL PSI, AND A 5 PSI DROP IN A 2 HOUR PERIOD IS NOT EXCEEDED. y Q REQUIRE TWO CIRCUITS: ONE FOR THE PUMP OR BLOWER: AND, ONE FOR THE. ALARM AND CONTROL CIRCUITRY. �b� U a_ 6. A MINIMUM CONDUIT SIZE OF 1 1/2 INCH SHALL BE USED FOR - CONNECTIONS FROM PANEL TO PUMP TANKS, 7. EACH CONTROL PANEL SHALL BE PROPERLY GROUNDED BY A y� O PROPERLY SIZED CONDUCTOR SECURELY FASTENED TO A GROUND ROD AT THE BASE OF THE CONTROL PANEL LOCATION. I -� 8. OPEN CONDUIT ENDS SHALL HAVE REMOVABLE CLAY -TYPE DUCT SEAL EMBEDDED AT IT ENDS TO PREVENT GASSES AND MOISTURE FROM ENTERING THE CONTROL PANELS. II NOT USE SILICONE UR ��rrrfrrrrrr� EXPANED FOAM PRODUCTS. - H Cmq •'+ 9. THE PUMP POWER CORDS AND FLOAT SWITCH CABLES SHALL BE / SUPPLIED IN A LENGTH SUITABLE SUCH THAT NO SPLICES WILL 9'r,'� OCCUR WITHIN THE PUMP TANKS. IF A SPLICE MUST BE MADE. IT y SHALL OCCUR MADE .ABOVE GRADE IN A NEMA 4X JUNCTION BOX, i Q WITH ALL CABLE CLEARLY LABELED. I SEAL 10.ALARMS SHALL BE AUDIBLE .AND VISIBLE. 9810