HomeMy WebLinkAboutNCC213504_NOT Closeout Documents_20230630 MOrn1ROY COOPER
Governor
ELIZABETH S.BISER t^` JUN 2 r r�r
2023
Secretary 4, 1'.;��o ,
�. SWINER I ON BUILDERS
BRIAN WRENN SAN DIEGO
Director NORTH CAROLINA
Environmental Quality
Dear Sir or Madam:
Attached is a copy of the inspection report which was prepared following an on-site inspection of the
subject site. This report is intended to provide you with information concerning the status of the site
as it relates to compliance with the North Carolina Sedimentation Pollution Control Act on 1973.
Please review this report carefully as it may contain corrective actions needed or comments which will
assist you in meeting the required performance standards of the Act.
It is our desire that any and all possible problems be discussed and resolved at the earlies possible
time. To facilitate this effort, please contact the named inspector at the address shown on the
inspection report if you have any questions.
Sincerely •
Land Quality Section
Mooresville Regional Office
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
704-663-1699
•
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704)663-1699
•
County: Cabarrus Project: Speedway Solar River basin: Yadkin-PeeDee
Person financially responsible:Swinerton Builders-David Grubb Project#: CABAR-2021-017
Address: 16798 WEST BERNARDO DR,SAN DIEGO CA 92127,
1. Project Location: Wallace Road,Midland
Pictures: No
2. Weather and soil conditions: Sunny,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations: •
6. Is the site in compliance with NPDES Permit NC:G010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): John Mashburn Title: Site Superintendent
Inspection report: Sent Report Date given/sent: June 20,2023
9. Corrective action needed:
IS
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGOI)must be requested by the pennittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Matthew Gigante Others present:
Date of inspection: June 13,2023 Time arriving on site: 9:00 AM Time leaving site: 9:50 AM
cc:
CI