HomeMy WebLinkAboutNCC202706_NOT Closeout Documents_20230629 Sedimentation'Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Cabarrus Project: The Mills Phase 2C River basin: Yadkin-PeeDee
Person financially responsible:NVR,Inc.-Kevin Connery,Vice President Project#: CABAR-2020-082
Address: 13924 Professional Center Drive,Suite 100,Huntersville,NC 28078
1. Project Location: Waterwheel Street,Concord
Pictures: No
2. Weather and soil conditions: Sunny,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Luke Huther Title: Manager
Inspection report: Sent Report Date given/sent: June 19,2023
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is,in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGO 1)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Matthew Gigante Others present:
Date of inspection: June 13,2023 Time arriving on site: 10:15 AM Time leaving site: 10:30 AM
CC: