HomeMy WebLinkAboutSAW-2023-00858 Besancon Floodplain Restoration_PERMIT VERIFICATIONU.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW-2023-00858 County: Henderson GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Conserving Carolina / Attn: David Lee Address: 847 Case Street Hendersonville, NC 28792 Telephone Number: 828-697-5777 Location description: The project site is located on a tract of land (PIN 9528-13-9941) north of intersection of Pleasant Grove Road & Justus View Drive in Etowah, Henderson County, North Carolina (35.30064,-82.61408). Description of projects area and activity: This permit verification authorizes 50 linear feet of permanent stream impacts to the French Broad River associated with the consrtuction of a backwater fish habitat slough and 0.137 acres of permanent wetland impacts to W1 associated with wetland restoration activities. NOTES: Per the attached letter from the North Carolina Wildlife Resources Commission (NCWRC) dated May 9, 2023, the trout moratorium has been waived for this project. Please consider the NCWRC recommendations to further reduce effects to fish and wildlife resources. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 27 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions, above noted special conditions, and your submitted application and attached information dated April 19, 2023. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide/regional permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide/regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide/regional permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Shannon Healy at 828-271-7980, ext. 4233 or shannon.healy@usace.army.mil. Corps Regulatory Official: Date: June 27, 2023 Shannon Healy Expiration Date of Verification: March 14, 2026 CF (via email): Andrew Moore; NCDEQ-DWR Andrea Leslie; NCWRC David Brown; Jennings Environmental Action ID Number: SAW-2023-00858 County: Henderson Permittee: Conserving Carolina / Attn: David Lee Project Name: Besancon Property Pleasant Grove Road Floodplain Restoration Date Verification Issued: June 27, 2023 Project Manager: Shannon Healy Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: Shannon Healy 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at hqps://regulatoKy.ops.usace.qM.mil/customer-service-survey FRENCH BROAD RIVER - FLOODPLAIN RESTORATION BESANCON PROPERTY HENDERSONVILLE, HENDERSON COUNTY, NORTH CAROLINA PROJECT DIRECTORY LANDOWNERS BRUCE BESANCON 4029 LITTLE RIVER RD KATHRYN BESANCON HENDERSONVILLE, NC 28739 PROJECT SPONSOR CONSERVING CAROLINA .. DAVID LEE CONSERVING PROJECT MANAGER CAROLINA DAVID@CONSERVINGCAROLINA.ORG DESIGN TEAM ENGINEER JENNINGS ENVIRONMENTAL PLLC Jennings GREG JENNINGS, PHD, PE PRESIDENT Environmental GREG@JENNINGSENV.COM SURVEYOR PILOT SE, INC. r*Hj P I LOT CORY GEORGE, PE, PLS SURVEYING AND ENGINEERING PRESIDENT CORY@PILOTSE.COM CONSTRUCTION NORTH STATE ENVIRONMENTAL, CONTRACTOR INC. BRANDON SPAUGH NorthilrState.PROJECT MANAGER E N V I R O N M E N T A L B.SPAUGH@NSENV.COM SHEET INDEX COVER SHEET 0.1 GENERAL PROJECT NOTES AND SPECIFICATIONS 0.2 NCG01 CONSTRUCTION GENERAL PERMIT 0.3 - 0.4 OVERALL SITE PLAN 1.0 GRADING PLANS 1.1 - 1.2 DESIGN DETAILS 2.0 EROSION AND SEDIMENTATION CONTROL 3.0 - 3.2 RE -VEGETATION 4.0 - 4.1 GROVE R ROADI�GE SITE �. LOCATION f; PLEASANT / ,1 011 PERMIT DRAWING ..A� cy eRo qp RIVER NOT FOR CONSTRUCTION APRIL 17, 2023 0 500 1000 SCALE IN FEET GENERAL PROJECT NOTES AND SPECIFICATIONS 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. LANDOWNERS: BRUCE BESANCON; KATHRYN BESANCON 1.3. PROJECT MANAGER: CONSERVING CAROLINA 1.4. ENGINEER: JENNINGS ENVIRONMENTAL PLLC 1.5. SURVEYOR: PILOT SE, INC. 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCGO1000 2.3. GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 2.4. GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134 2.5. THE CONSTRUCTION DOCUMENTS 3. NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6. THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE. 7. EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE OWNER OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8. THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9. THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT OWNER PRIOR TO USE. 10. NO NON -PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STABILIZATION AND GRADING WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE. 11. SITE SHOULD BE "STORM READY" AT THE END OF EACH WORKDAY AND WORKWEEK. TOPOGRAPHIC NOTES AND SPECIFICATIONS 12. HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 13. A TOPOGRAPHIC SURVEY OF THE WORK AREA WAS COMPLETED BY PILOT SE INC. IN AUGUST 2022. 14. THE DESIGN ELEVATIONS AND GRADES SHOWN IN THE DRAWINGS ARE BASED ON THE EXISTING GROUND SURFACE FROM THE AUGUST 2022 SURVEY AND NC SPATIAL DATA DOWNLOAD DIGITAL ELEVATION MODEL DATA FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. DISCREPANCIES BETWEEN THE SURVEYED EXITING GROUND SURFACE AND FIELD CONDITIONS AT THE TIME OF CONSTRUCTION CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THESE VARIATIONS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. FLOODPLAIN RESTORATION NOTES AND SPECIFICATIONS 15. FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE DRAWINGS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE CONTRACTOR TO ADDRESS ANY FIELD CHANGES. 16. IN -STREAM ROCK STRUCTURES MAY BE SUBSTITUTED WITH WOOD STRUCTURES WITH WRITTEN APPROVAL FROM THE ENGINEER. 17. THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. 18. CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO ADJACENT SIGNIFICANT TREES. 19. CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION STRUCTURES. 20. DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS. 21. IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 22. BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL BE WITHIN 0.1' OF DESIGN ELEVATIONS. 23. AFTER THE STRUCTURE IS COMPLETE AND NORMAL FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 24. THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 - 6" OF SOIL OR APPLYING 3 - 6" OF TOPSOIL TO THE DESIGN ELEVATIONS AND APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR STREAMBANK STABILIZATION MUST BE CERTIFIED WEED -FREE STRAW OR OTHER NATURAL WEED -FREE / NON -PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 25. TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR TO EXCAVATION AND GRADING AND RE -APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4" OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE DRAWINGS. EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS. 26. ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NCDEML'S NG01 CONSTRUCTION GENERAL PERMIT. 27. ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 28. ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT PHASE IS COMPLETED [15A NCAC 02H .0506 (13)(2)]. 29. THE CONTRACTOR SHALL USED A STANDARD CONSTRUCTION ENTRANCE AT ALL SITE ACCESS POINTS TO PREVENT SEDIMENT FROM BEING TRACKED ONTO PUBLIC ROADS. 30. THE CONTRACTOR SHALL USED TEMPORARY SILT FENCE ALONG THE DOWNSLOPE SIDE OF ALL STAGING AREAS AND TEMPORARY STOCK PILE AREAS. 31. THE TURBIDITY STANDARD OF 50 NTUS (NEPHELOMETRIC TURBIDITY UNITS) SHALL NOT BE EXCEEDED AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE SEDIMENT AND EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS STANDARD. [15A NCAC 02B .0211 (21)]. 32. EQUIPMENT SHALL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHOULD NOT TAKE PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION BY FUEL AND OILS. [15A NCAC 02H .0506 (13)(3) AND 15A NCAC 02B.0211(12)]. 33. CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 34. THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF IN -STREAM STRUCTURES. [15A NCAC 02H .0506(B)(1) AND (2)]. 35. THE STREAM BANKS, IN -STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN -STREAM DIVERSIONS AND PUMP AROUNDS ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 36. EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED, AND/OR MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. [15A NCAC 02B .0201] 37. IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING GRADING OPERATIONS, AN APPROVED EROSION AND SEDIMENT CONTROL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. [15A NCAC 04B .0110]. QUANTITIES AND MATERIALS NOTES AND SPECIFICATIONS. 38. THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 39. COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 40. THE EROSION CONTROL MEASURES DEPICTED ON THE DRAWINGS SHALL BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE DRAWINGS) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE PROJECT OWNER AND ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 41. ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE PROJECT OWNER AND ENGINEER. 42. THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 43. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE PROJECT OWNER. THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE PROJECT OWNER AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE PROJECT OWNER. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY THE PROJECT OWNER. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. X d X d Q Q w 0 Q X o 9 w Y U w w = o U m z Q > 0 uj ; Z O_ Q � 0 Z I- C) D w 0 U z�0 Q U) Q � WW � Z 00p0 0 0 0� z J W W Q LLZ=U O Lj J W Z J > < 0 � W Z 0 m cf) Q O � � W � m Z 2 W U 2 Z W LL W Z 0 Q U_ LL U W n W 0 Z Q W W 0 Z U LU J Q W Z W CD PERMIT DRAWING me U Z 0 U 0 LL 0 Z NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): NTS SCALE (17X11 "): NTS NOT TO SCALE SHEET NUMBER 0.2 OF 13 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. SANDBAGS(TYP.) OR STAPLES ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER HIGH COHESIVE & LOW FILTRATION SOIL BERM 10 MIL SILT FENCE 1:1 PLASTIC SANDBAGS (TYP.) SIDE SLOPE LINING OR STAPLES (TYP J O Z JG Q NJ CLEARLY MARKED SIGNAGE SECTION A -A CONCRETE NOTING DEVICE (18"X24" MIN.) NOTES: WASHOUT T. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3 CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS a MA %r-7 o� SANDBAGS(TYP.) OR STAPLES HIGH 10 MIL COHESIVE & PLASTIC LINING LOW FILTRATION -1:1 SIDE SLOPE SOIL BERM (TYP_) SANDBAGS(TYP.) NOTES- OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKED SIGNAGE 2. THE CONCRETE WASHOUT STRUCTURES CONCRETE NOTING DEVICE (18"X24" MIN.) SHALL BE MAINTAINED WHEN THE LIQUID WASHOUT AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. X d X d o Q Lu 0 0 Q X� r 0 w 0� , Y = Q U 2 m Z Q > w o Of Z O Q � � O� Z (n O W LU W 0� U J Z z�� � O Q�(0Q W U a_ 0-�zw Z) DOp0 (D Z 0� Z U) _J 0 Z LL Z O O U � J 1--U 0 WZJ0 co W Z O 00 0 Z O O 00 � U Z � W 0 o oo Z U = W U C) = Z F� TF PERMIT DRAWING NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): NTS SCALE (17" X111'): NTS NOT TO SCALE SHEET NUMBER 0.3 of 13 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a . Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated e A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. X d X d o a w 0 a. a X o 9 w O� , Y U w w U � m z Q > 0 LU ; Z 0 Q 0 Z U) w O U z�0 Q Cn Q � Ww � Z 0000 OO Z � J w Q LLZ=U O J l­- w Z J 0� ><�0 � w Z 0 00 Cn Q O � w 0 00 Z 2 w U 2 Z w LL C� G w a_ J Q w Z w Z 0 I- U Cn Z 0 U O U Z PERMIT DRAWING Me U Cn Z 0 U 0 LL I- 0 Z NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): NTS SCALE (17X11 "): NTS NOT TO SCALE SHEET NUMBER 0.4 OF 13 R�PGN E FRENCH BROAD RIVER SHEET 1.3 - ROAD FILL / , � __ •, �... _TALLSyROAD CUCCT 4 7 _ \A/GTI ANTI / / 1 I x x 0 w O ct IL d Q I! I! I! I! I! I! I C� G m z \ Q > W o � Z 0 Q � 0 Z I- D U) 0 Nw U 0. Z 0 Q U) Q � Ww � Z 0000 OZ � O 0 w Q L Z = U 0U Lj wzJ� ><5;0 �wz Om0 Q cf) 0 ry 0� w m � z 2 w U 2 Z w ry L.L I! I! I! I! I iI iI iI iI iI i Z 0 Z Q U w w (f) Z 0 J U Q � � O w > LL O ~O z PERMIT 0 60 120 D RAW I N G SCALE IN FEET NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): ill = 60' SCALE (17"X11"): 1" = 120' 0 60 120 SCALE IN FEET SHEET NUMBER 1.0 of 13 k VA �I? \\ ---(2074) (2075) (2070) \ (2065) 1\ \ Q FRENCH BROAD RIVER BED ELEVATION AT MOUTH OF FISH PROP. WETLAND GRADING 5\\ 2 HABITATSLOUGH SEE SHEET 1.2 (2064)_ FISH HABITAT SLOUGH 0 20 40 PLAN VIEW SCALE IN FEET X X d d Q 0 w 0 CL Q X o9 Y U Luw U m z Q> �uJ 0 z 0 O ~ z � Lu 0 O� U z�0 Q U)Q -j W� � Z �000 0 0 �z� 0- Lu Q L Z = U OLLi J Lu Z J > Q 0 �U)zz omo U) Q O � LJJ m Z 2 LLJ U 2 Z L LI ry H 0 0 U) Q m Q U) L.L Z J cD z 0 Q PERMIT DRAWING Z 0 U U) z 0 U 0 LL 0 z NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): ill = 20' SCALE (1 TV 1 "): ill = 40' 0 20 40 SCALE IN FEET SHEET NUMBER 1.1 of 13 f LAY BACK � BANKS AT 10:1 -- --- TOP - � OF BANK: �� - ------(2072)- - - -- _ - - - 2072.5± FRENCH BROACH RIVER BERM BREACH PLAN VIEW 0 20 40 SCALE IN FEET PLUG EXISTING WETLAND AT TRIB CONFLUENCE SETTLED TOP: 2072 ( f I - RAISE WETLAND BOTTOM TO 2' BELOW TOP OF BANK 2070.5±. o = EX. BOTTOM: 2070.0± WETLAND GRADING PLAN VIEW 0 30 60 SCALE IN FEET X X d d Q Q w O ct IL d Q X O H w Y (� U (q W W 2 p U 2 } m Z Q p W Z 0 L.L 0 z I— vJ 0 w 0 U z�0 Q�UQ � Ww � Z 0000 OO Z � J w Q LLZ=U O Lj J w Z J > < 0 � w Z 0000 Q O/ � L.f_ w m Z w U 2 Z w ry LL 0 Z w 06 U Q w m w 00 Z Q Z 0 NQ (D PERMIT DRAWING NOT FOR CONSTRUCTION Z 0 U H U) Z 0 U 0 LL 0 Z DATE: 04/17/2023 SCALE (34"X22"): AS NOTED SCALE (17"X11 "): AS NOTED SCALE AS NOTED WETLAND GRADING TYPICAL SECTION SHEET NUMBER 1.2 0f 13 C 2090 2085 2075 D 2090 2085 2075 0+00 1 +.00 FILL PLACEMENT - TYPICAL SECTION A -A' TYPICAL SECTION FILL PLACEMENT o 40 80 PLAN VIEW SCALE IN FEET Q 2090 2085 J 2090 2085 MI 0+00 1 +.00 1 +25 FILL PLACEMENT - TYPICAL SECTION 6-6' TYPICAL SECTION X X d d Q Q w O ct IL d Q X O H W Y (� U (q W W 2 p U 2 } m Z Q p W � z 0 I..L 0 z I— D U) 0 � C J z z�� � O Q U) Q Q U � � w z 0 � 00C)0 0 w < z U) i z=C Q 0z 1 0 Lei 2 _j C fl� C Luz_ (D 0 >Q>O z LL �LUzz o 0000 < O 0 � 0 z Ld_ LU 0 m z = LU C 2 z LL I ry LL PERMIT DRAWING NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): ill = 40' SCALE (17"X11"): 1" = 80' SCALE AS NOTED SHEET NUMBER 1.3 of 13 BERM BREACH AREA AREA: 0.22 AC. VOLUME: 705 CY <CUT> FRENCH BROAD RIVER LOD --- LOD FISH HABITAT SLOU( `OD LOD LOD — LO0 \ AREA LOD <oo VOLUME: 6,900 C TEMPORARY CONSTRUCTION ROUTE vo lo \ —� LOD LIMITS OF DISTURBANCE LOD LOD LOD LOD LOD LOD — LOD � w✓ 0 1111 LOD — LOD LOD - LOD LOD \ LOD LOD LOD �_ LOD — WETLAND GRADING AREA \ ° AREA: 0.64 AC. \ VOLUME: 325 CY <CUT> o° ROAD FILL AREA AREA: 1.53 AC. LOD LOD LOD LOD VOLUME: 7,930 CY <FILL> LOD LOD iiLOD / �o TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY STAGING AND STORAGE AREA �10 0 O O J �o O LOD P;x EX. GRAVEL ENTRANCE FROM PLEASANT GROVE ROAD .ARY S I LT 0 60 120 SCALE IN FEET EROSION AND SEDIMENTATION CONTROL (ESC) PLAN LEGEND LOD LIMITS OF DISTURBANCE CONSTRUCTION ACCESS ROUTE TEMPORARY STAGING AREA —SF— - SILT FENCE i■■■■■■■■■■■■■■� - • • • - • X X d d Q w O ct a d Q X O o � Y (� w w = o U 2 } 00 Z 0 W Z 0 Q � 0 Z U) w � U z�0 Q U) Q 0- LLJ ly z O p 0 0 0'Z0� J 0- w Q LLZ=U O Lj J W Z J > < > 0 0� W Z 0000 cf) Q O � � W 0 m Z 2 W U 2 Z W LL J 0 Z 0 U z 0 Q Z Z W Q J O W 'W^ v! 0 Z Q Z 0 0 W PERMIT DRAWING NOT FOR CONSTRUCTION z 0 U vJ Z 0 U 0 LL I- 0 z DATE: 04/17/2023 SCALE (34"X22"): ill = 60' SCALE (17"X11"): 1" = 120' 0 60 120 SCALE IN FEET SHEET NUMBER 3.0 of 13 EXISTING ROADWAY I A EXISTING ROAD`"'^" DETAILED PLAN NOT TO SCALE A' 12' MINIMUM 50' MINIMUM STANDARD CONSTRUCTION ENTRANCE NOTES AND SPECIFICATIONS 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION ROOTS, AND OTHER OBJECTIOABLE MATERIAL AND PROPERLY GRADE THE AREA. 2. PLACE THE 2"-3" STONE TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLAND AND SMOOTH IT. 3. USE GEOTEXTILE FABRICS TO IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR A HIGH WATER TABLE. 4. INSTALL SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 5. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE LENGTH OF THE CONSTRUCTION ENTRANCE SHALL BE INCREASED. 6. SEE SECTION 6.06.1 OF NC DEMLR'S EROSION AND SEDIMENT CONTROL DESIGN MANUAL (2013) FOR ADDITIONAL INFORMATION, NOTES AND SPECIFICATIONS. DETAILED CROSS-SECTION A - A' NOT TO SCALE STANDARD CONSTRUCTION ENTRANCE DETAIL NEW CONSTRUCTION ::F EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS DURING PROJECT IMPLEMENTATION, EROSION CONTROL MEASURES WILL BE IMPLEMENTED TO REDUCE SEDIMENTATION INTO WETLANDS, THE FRENCH BROAD RIVER AND ITS TRIBUTARIES. THE PROPOSED DESIGN AND EROSION AND SEDIMENTATION CONTROL PLAN ATTEMPTS TO MINIMIZE SEDIMENTATION AND OTHER POTENTIALLY NEGATIVE IMPACTS DURING CONSTRUCTION THROUGH THE FOLLOWING PRACTICES: 1. ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NC DEMLR'S NG01 CONSTRUCTION GENERAL PERMIT. 2. ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 3. EQUIPMENT SHALL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING OPERATIONS SHALL BE PERFORMED IN A CONTAINED AREA AWAY FROM SURFACE WATER. 4. ALL WORK ADJACENT TO STREAMS AND WETLANDS SHALL BE CONDUCTED IN A DRY WORK AREA TO THE EXTENT POSSIBLE. 5. CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 6. THE RIVERBANKS, IN -STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN -STREAM DIVERSIONS ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 7. ALL WASTE SOIL SHALL STAY ON SITE AND WILL BE DISPOSED OF IN AREAS DESIGNATED ON THE PLANS. 8. TO THE EXTENT PRACTICABLE, DO NOT EXPOSE FISH HABITAT SLOUGH TO BASEFLOWS OR STORMFLOWS FROM THE FRENCH BROAD RIVER UNTIL THE MAJORITY OF THE SLOUGH HAS BEEN EXCAVATED AND STABILIZED WITH SEED, MULCH, AND EROSION CONTROL MATTING. 9. DO NOT REMOVE HEALTHY, NATIVE VEGETATION FROM AREAS WHERE NO GRADING OR STRUCTRE INSTALLATION WILL OCCUR. STOCKPILE VEGETATION FOR REPLANTING AS APPROPRIATE. MIN. 10 GA. LINE WIRES 8' MAX. VARIABLE AS DIRECTED BY THE ENGINEER Tm [IT SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP ��� X� III IIIF IIII 'III 0 M 0 N DETAILED FRONT NOT TO SCALE STEEL POST -WOVEN WIRE FABRIC FILL SLOPE GRADE SILT FENCE GEOTEXTILE FABRIC DETAILED SIDE NOT TO SCALE CONSTRUCTION SEQUENCE 1. OBTAIN AND REVIEW THE FRENCH BROAD RIVER - FLOODPLAIN RESTORATION PROJECT, EROSION AND SEDIMENTATION CONTROL PLAN AND ALL OTHER APPLICABLE PERMITS. 2. FLAG THE WORK LIMITS AND STAKE OUT THE LIMITS OF DISTURBANCE (LOD) OF THE PROJECT. THE TOTAL PROJECT LOD IS 5.49 AC. 3. LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORK AREA. 4. INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS. 5. HOLD PRE -CONSTRUCTION MEETING WITH THE PERMITTEE, ENGINEER AND CONTRACTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. 6. INSTALL ALL EROSION AND SEDIMENTATION CONTROL BMPS AS SHOWN IN THE DRAWINGS AND DETAILS. 7. INSPECT EROSION PREVENTION AND SEDIMENT CONTROL BMPS DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. KEEP ALL LOGS AND RECORDS UP-TO-DATE. 8. ACQUIRE AND STORE MATERIALS FOR SITE (E.G. ROCK, LOGS, EROSION CONTROL MATTING AND FILTER FABRICS) IN THE TEMPORARY STAGING AREAS. 9. CLEAR EXISTING VEGETATION REQUIRED TO COMPLETE THE WORK TAKING CARE NOT TO DISTURB DESIRABLE VEGETATION TO REMAIN INTACT. 10. GRADE THE RIVER BANKS AND INSTALL BANK STABILIZATION STRUCTURES ACCORDING TO THE PLANS AND DETAILS. WHEN POSSIBLE, PERFORM WORK FROM THE RIVER BANKS TO MINIMIZE TIME SPENT WORKING IN THE CHANNEL. 11. WHEN WORKING IN THE CHANNEL, UTILIZE A TEMPORARY IN -STREAM DIVERSION. 12. INSTALL TEMPORARY SEEDING, PERMANENT SEEDING AND EROSION CONTROL MATTING ON ALL DISTURBED RIVER BANKS AND GRADED SLOPES AS SHOWN ON SHEETS 4.0 AND 4.1. 13. INSTALL TEMPORARY AND PERMANENT SEEDING AND MULCH TO ALL AREAS DISTURBED FOR CONSTRUCTION ACCESS AS SHOWN ON SHEET 4.0 AND 4.1. 14. ONCE THE WORK AREA IS STABILIZED AND CONSTRUCTION ACTIVITIES ARE COMPLETED, REMOVE AND DISPOSE OF ALL NON -BIODEGRADABLE EROSION AND SEDIMENTATION CONTROL BMPS. 15. NOTIFY THE PERMITEE AND THE ENGINEER FOR A FINAL INSPECTION AND WALK THROUGH TO VERIFY FINAL STABILIZATION OF THE SITE. 16. WHEN SEASONALLY APPROPRIATE, INSTALL PERMANENT PLANTINGS ON RIVER BANKS AND WITHIN THE RIPARIAN ZONES AS SHOWN ON SHEETS 4.0 AND 4.1. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED DAILY AND AFTER SIGNIFICANT RAIN EVENTS BY THE CONTRACTOR. THE CONTRACTOR WILL ASSURE THAT ALL INSTALLATIONS ARE FUNCTIONING PROPETY AT THE END OF EACH WORK DAY. INSPECTION REQUIREMENTS, AS DETAILED IN THE STORMWATER SECTION, WILL BE FOLLOWED. ONCE THE SITE IS STABILIZED, ALL NON -BIODEGRADABLE EROSION CONTROL MEASURES SHALL BE REMOVED AND PROPERLY DISPOSED OF BY THE CONTRACTOR. TEMPORARY SILT FENCE NOTES AND SPECIFICATIONS 1. CONSTRUCT THE SILT FENCE WITH STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. SUPPORT THE STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE PLASTIC OR / WIRE TIES UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 3. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FT APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 2 FT. MIN. 12-1/2 GA. 4. EXTRA STRENGTH FILTER FABRIC WITH 6 FT POST SPACINGS DOES NOT REQUIRE WIRE MESH INTERMEDIATE SUPPORT FENCE. WIRES 5. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSE LINE OF POSTS AND UPSLOPE OF THE BARRIER. GRADE 6. PLACE 12 INCHES OF FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. II1II-III 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. 9. CONSTRUCTION SITE RUNOFF SHALL NOT RUN PARALLEL WITH THE FENCE. 10. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 11. SEE SECTION 6.62.1 OF NC DEMLR'S EROSION AND SEDIMENT CONTROL DESIGN MANUAL (2013) FOR ADDITIONAL INFORMATION, NOTES AND SPECIFICATIONS. x a , x a 0 a LLI 0 of 0.. a x H Lu , Y U LU LU U � m z Q > LU I I I I I I I I 0of Z 0 Q � 0 Z I- C) D w 0 U Z 0f^ VJ Q � Ww � Z 0 O p 0 O O 0 Z � w Q LLZ=U O Lj J w z J ><5;0 0� w Z 0000 cf) Q 0 0� 0� w 0 00 z = w U 2 z w LL J OJ Z I- OW U 0 Z 0 Oz � Q Z Z w � Q LU U U 0 U z w Q 0- Z (l)- Ow Cn F___ 00 0�z LU PERMIT DRAWING NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): NTS SCALE (17"X11 "): NTS NOT TO SCALE Z 0 U z 0 U 0 LL I- 0 Z TEMPORARY SILT FENCE DETAIL SHEET NUMBER 3.1 OF 13 EROSION CONTROL WATTLE NOTES AND SPECIFICATIONS TEMPORARY FORD CROSSING NOTES AND SPECIFICATIONS INSTALL WATTLE PERPENDICULAR TO SLOPE DISTURBED AREA ELV. 120 ELV. 115 10.0' MIN ELV. 110 30 L.F. PER END PLACED AT A 30' ANGLE TO PREVENT — � r END -AROUND FLOW ELV. 105 ELV. 100 2" X 2" X 36" WOODEI. STAKES PLACED 8' O.C. DISTURBED AREA I91➢LTA IIkI PROTECTED AREA DETAILED PLAN NOT TO SCALE 5.0' MAX DETAILED CROSS-SECTION NOT TO SCALE 2" EROSION CONTROL WATTLE PROTECTED AREA 1. WATTLES MAY BE INSTALLED ALONG CONTOURS, IN DRAINAGE CONVEYANCE CHANNELS, AND AROUND INLETS TO HELP PREVENT OFF -SITE DISCHARGE OF SEDIMENT -LADEN STORMWATER RUNOFF. 2. WATTLES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER, OR HARDWOOD MULCH. STRAW, PINE NEEDLE, AND/OR LEAF MULCH -FILLED SEDIMENT TUBES ARE NOT PERMITTED. 3. THE OUTER NETTING OF THE WATTLE SHALL CONSIST OF SEAMLESS, HIGH -DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH -DENSITY POLYETHYLENE NON -DEGRADABLE MATERIAL.. 4. WATTLES SHOULD BE STAKED USING WOODEN STAKES (2-INCH X 2-INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) AT A MINIMUM OF 26-INCHES IN LENGTH PLACED ON 8-FOOT CENTERS. 5. INSTALL ALL WATTLES TO ENSURE THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE TUBE. MANUFACTURER'S RECOMMENDATIONS SHOULD ALWAYS BE CONSULTED BEFORE INSTALLATION. 6. THE ENDS OF ADJACENT WATTLES SHOULD BE OVERLAPPED 6-INCHES TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. 7. SEDIMENT TUBES SHOULD NOT BE STACKED ON TOP OF ONE ANOTHER, UNLESS RECOMMENDED BY MANUFACTURER. EROSION CONTROL WATTLE DETAIL 5.0' MAXIMUM BANK HEIGHT � li I \IryI^I� o yvW O ° 0 � °° °oo/ °[y-� o ACCESS RAMP WITH NC �W ° (�(��O� O0 ° /0 0 O 0 0 'z" °Op0 DOT CLASS A STONE NIIII I 111 0 00 0 a'0 °Oio° o J �P �G c- DETAILED PLAN NOT TO SCALE ACCESS RAMP SECTION 5:1 MAXIMUM SLOPE I Illi�l DIVERSION i�lI'II CHANNEL I. III IIV� I IIV� I 116�1 SURFACE FLOW ORIGINAL RIVER BANK DIVERSION -iii— RIVER CHANNEL ARMOUR ACCESS RAMP WITH NC DOT CLASS A STONE EDGE OVERLAP MIN. 4" WITH DOUBLE ECO-STAKES AT 2' O.C. — GRAVEL AND COBBLE FROM RIVER DETAILED CROSS-SECTION NOT TO SCALE SURFACE FLOW l� DIVERSION X IL I I I I I I I I X IL o Q 1. KEEP CLEARING AND EXCAVATION OF THE RIVER BANKS AND APPROACH SECTIONS TO A MINIMUM. W 2. DIVERT ALL SURFACE WATER FROM THE SITE ONTO UNDISTURBED AREAS NEXT TO THE RIVER. O w IL 3. KEEP CROSSING AT A RIGHT ANGLE (PERPENDICULAR) TO THE RIVER. IL Q 4. ALIGN ROAD APPROACHES WITH THE CENTERLINE OF THE CROSSING FOR A MINIMUM DISTANCE OF 30 FT. 5. STABILIZE ALL DISTURBED AREAS SUBJECT TO FLOWING WATER INCLUDING THE RIVER BANKS AND X Z O PLANNED OVERFLOW AREAS. 6. ALL STREAMBANKS AND BED MATERIAL DISTURBED DURING INSTALLATION OF THE CROSSING SHALL � 0 U BE STABILIZED WITH TEMPORARY SEEDING AND EROSION CONTROL MATTING OR RIPRAP. COIR W W EROSION CONTROL WATTLES SHALL BE INSTALLED AT ALL INGRESS AND EGRESS POINTS AS SHOWN = 0 IN THE DRAWINGS. U 7. REMOVE TEMPORARY STREAM CROSSINGS IMMEDIATELY WHEN THEY ARE NO LONGER NEEDED. RESTORE THE STREAM CHANNEL TO IT ORIGINAL CROSS-SECTION, AND SMOOTH AND APPROPRIATELY STABILIZE ALL DISTURBED AREAS. 2 8. RE -DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING REMOVAL OF THE CROSSING AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. m 9. SEE SECTION 6.70.1 OF NC DEMLR'S EROSION AND SEDIMENT CONTROL DESIGN MANUAL (2013) FOR z Q ADDITIONAL INFORMATION, NOTES, AND SPECIFICATIONS. W > W I I I I I I Z O O Z 0� U) (I) D z J w � O� Uw Z 0 0 z Q0�U)Q 00 LL 0 00p O � Z � Z z _j < w 0 LLZ=U 10 LL= 0 Q �CU_ Luc) wZJ U)- >��O 0 LL w Z Z w 0 W O < 0— (IfZ O TEMPORARY FORD STREAM CROSSING DETAIL w O U) 00 0 w z O1­ = w (If0 U = w Z Z 1I­AAr1Aw1 wAATT111w111/� A&IM DETAILED PLAN NOT TO SCALE VERTICAL OVERLAP MIN. 12" WITH DOUBLE ECO-STAKES DETAILED STAKING PLAN NOT TO SCALE 1. EROSION CONTROL MATTING IS USED TO PROTECT RECENTLY CONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILL REMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES, PROVIDING CRITICAL BANK PROTECTION. A' 2. EAST COAST EROSION CONTROL ECC-213 EROSION CONTROL PRODUCT, OR AN EQUIVALENT APPROVED BY THE ENGINEER SHALL BE USED. EROSION CONTROL MATTING MATERIAL SPECIFICATIONS: 2.1. MACHINE DIRECTION TENSILE STRENGTH: 223 LB/FT 2.2. TRANSVERSE DIRECTION TENSILE STRENGTH: 150 LB/FT 2.3. APPARENT OPENING SIZE: 0.50" x 1.00" 2.4. LIGHT PENETRATION: 13% 2.5. MASS: 322.1 G/M2 3. BEFORE INSTALLING EROSION CONTROL MATTING, RAKE SOIL LEVEL, ADD TEMPORARY AND/OR PERMANENT SEED, SOIL PREPARATION, AND MULCH. 4. EROSION CONTROL MATTING SHALL BE PLACED ALONG THE LENGTH OF GRADED AREAS FROM THE TOE OF SLOPE TO A MINIMUM OF 4.0' BEYOND THE TOP OF BANK ELEVATION. 5. SECURE MATTING IN PLACE BY STAKING AND OVERLAPPING AT THE SEEMS WITH A SHINGLE -TYPE METHOD SUCH THAT THE OVERLAPPING PIECE IS IN THE SAME DIRECTION AS THE STREAM FLOW AS SHOWN IN THE DETAIL. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTOR AT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOIL MORE THAN ONE INCH UNDER A REASONABLE PULL. 6. EROSION CONTROL MATTING USED ON ALL STREAM BANKS SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. 3ANKFULLSTAGE EROSION CONTROL MATTING 31NGLE 12" ECO-STAKES JFFSET ROWS AT 2'-3' O.C. EROSION CONTROL MATTING DETAIL SECURE MATTING WITH 4" OVERLAP AND DOUBLED ECO-STAKES EROSION CONTROL MATTING BANKFULL STAGE EXISTING GROUND ECO-STAKE MIN 12" LENGTH TURN DOWN MATTING MIN. 6" DETAILED SECTION A - A' NOT TO SCALE I I I I Lu 0. LL Jennings Environmental PERMIT DRAWING NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): NTS SCALE (17"X11 "): NTS NOT TO SCALE SHEET NUMBER 3.2 OF 13 "„ STREAMBANKS (0.22 AC.) ZONE 2: STREAMBANKS (0.42 AC.) ZONE 1: WETLAND (0.27 AC.) W y y y y y y y y y y y W y y y y y y y y y y W IP IP � � W W W � � 41 W y y IV I W W W y y 41 4, W � y ZONE 1: WETLAND (0.08 AC.) ZONE 2: STREAMBANKS (0.29 AC.) ZONE 3: RIGHT-OF-WAY POLLINATOR MIX (1.53 AC.) W W W W y y W y y y W y 0 60 120 SCALE IN FEET RE -VEGETATION PLAN LEGEND 00000000000o ZONE 1 -WETLAND ZONE 2-STREAMBANKS ZONE 3 - RIGHT-OF-WAY POLLINATOR MIX GENERAL RE -VEGETATION AND PLANTING NOTES 1. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING. SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN THE BANK MANAGER, ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE PROCUREMENT OF PLANT/SEED STOCK. 2. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE BED AND BANK STABILIZATION AND COVER OR NESTING HABITAT ON THE FLOODPLAIN. ANY EXCESS WOODY MATERIALS MAY USED TO BACKFILL OLD CHANNELS. 3. ALL DISTURBED AREAS WILL BE STABILIZED USING TEMPRORY AND PERMERMANET SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED E&SC PLANS. 4. SUPPLEMENTAL PLANTING ACTIVITIES MAY BE REQUIRED WITHIN THE CONSERVATION EASEMENT. TEMPORARY SEEDING AND MULCHING NOTES 5. TEMPORARY SEEDING AND MULCHING SHALL BE APPLIED TO ALL AREAS AND ACCESS ROUTES DISTURBED DURING CONSTRUCTION. 6. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 7. ALL DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY SEED AND MULCHED WITH WHEAT STRAW. SEEDING WILL BE PERFORMED USING A BROADCAST SPREADER. OTHER METHODS MAY BE USED BUT MUST BE APPROVED BY ENGINEER IN ADVANCE OF INSTALLATION. 8. MAINTENANCE OF SEEDED AREAS SHALL CONSIST OF WATERING, WEED AND PEST CONTROL, FERTILIZATION, EROSION REPAIR, RESEEDING, AND INCIDENTAL OPERATIONS AS NECESSARY TO ESTABLISH A HEALTHY, VIGOROUS, WEED FREE AND DISEASE FEE UNIFORM STAND OF GRASS. ALL AREAS WHICH FAIL TO SHOW A UNIFORM STAND OF GRASS FOR ANY REASON SHALL BE TREATED REPEATEDLY UNTIL A UNIFORM STAND OF AT LEAST 90% COVERAGE IS ATTAINED WITH NO BARE AREA GREATER THAN FIVE (5) SQUARE FEET. PERMANENT SEEDING NOTES 9. PERMANENT SEEDING SHALL OCCUR IN CONJUNCTION WITH TEMPORARY SEEDING WHERE APPLICABLE. IDEALLY, PERMANENT SEEDING SHALL OCCUR DURING THE PLANTING SEASON FOR EACH SEED TYPE. AREAS FERTILIZED FOR TEMPORARY SEEDING SHALL BE SUFFICIENTLY FERTILIZED FOR PERMANENT SEEDING; ADDITIONAL FERTILIZER IS NOT REQUIRED FOR PERMANENT SEEDING. 10. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 11. THE CONTRACTOR SHALL LOOSEN THE SOIL TO A MINIMUM DEPTH OF 4-INCHES AND GRADE TO A SMOOTH, EVEN SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. THE AREAS TO BE SEEDED ARE THEN TO BE ROLLED AND RAKED TO REMOVE RIDGES AND FILL DEPRESSIONS TO MEET FINISH GRADES. THE CONTRACTOR IS TO LIMIT SUB GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS ARE TO BE RESTORED IF ERODED OR OTHERWISE DISTURBED AFTER FINE GRADING AND BEFORE PLANTING. 12. SEED SHALL BE SOWN WITH A SPREADER OR A SEEDING MACHINE. SEED IS NOT TO BE BROADCAST OR DROPPED WHEN WIND VELOCITY EXCEEDS 5 MPH. SEED SHALL BE EVENLY DISTRIBUTED BY SOWING IN TWO DIRECTIONS AT RIGHT ANGLES TO EACH OTHER. WET SEED OR SEED THAT IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR STORAGE IS NOT TO BE USED. AFTER BEGIN SOWN, THE SEED SHALL BE RAKED INTO THE TOP 1/4 INCH OF THE TOPSOIL, LIGHTLY ROLLED, AND WATERED WITH FINE SPRAY. SEEDED AREAS ON STREAM BANKS SHALL BE PROTECTED WITH COIR FIBER MATTING. ZONE 1: STREAMBANK 13. LIVESTAKES AND HERBACEOUS PLUGS LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 4,840 STEMS PER ACRE (3.0' O.C.) FROM TOE OF THE RESTORED CHANNEL TO 3.0' OUTSIDE THE BANKFULL STAGE. HERBACEOUS PLUGS SHALL BE PLANTED ALONG THE TOE OF THE CHANNEL IN THE OUTSIDE OF THE POOL MEANDER BENDS. ZONE 2: RIPARIAN BUFFER 14. WOODY SPECIES LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 440 STEMS PER ACRE (10.0' O.C.) FROM 3.0' OUTSIDE THE BANKFULL STAGE TO THE GRADING LIMITS. EXACT PLACEMENT OF THE SPECIES SHALL BE DETERMINED BY THE CONTRACTOR'S VEGETATION SPECIALIST PRIOR TO SITE PLANTING AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS. SEEDING SCHEDULES TEMPORARY SEEDING DATE TYPE APP. RATE (LBS / AC) JAN 1 - APR 30 RYE GRAIN (Secale cereale) 120 COMMON OATS (Avena sativ) 100 RED CLOVER (Trifolium incarnatum) 20 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 MAY 1 - JUL 31 GERMAN MILLET (Setaria italica) 50 COMMON OATS (Avena sativ) 100 RED CLOVER (Trifolium incornatum) 20 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 AUG 1- DEC 31 RYE GRAIN (Secale cereale) 120 WINTER WHEAT (Triticum aestivum) 100 RED CLOVER (Trifolium incarnatum) 20 GROUND AG. LIMESTONE 2,000 10-10-10 FERTILIZER 750 STRAW MULCH 4,000 PERMANENT RIPARIAN SEEDING - 25 LBS / AC SPECIES COMMON NAME PERCENT Juncus effusus COMMON RUSH 5% Coreopsis lanceolate LANCE LEAF TICKSEED 10% Agrostis perennons AUTUMN BENTGRASS 5% Elymus virginicus VIRGINIA WILDRYE 10% Andropogon Berardi BIG BLUESTEM 10% Schizachyrium scoporium LITTLE BLUESTEM 5% Panicum virgatum SWITCH GRASS 15% Tripsacum dactyloides EASTERN GAMAGRASS 5% Sorghastrum nutans INDIAN GRASS 5% Rudbeckia hirta BLACK-EYED SUSAN 10% Chcimaecristo (Cassia) fosciculata SHOWY PARTRIDGE PEA 10% Bidens aristosa SHOWY BIDENS 5% Helianthus angustifolius SWAMP SUNFLOWER 5% TOTAL 10Q% ZONE 1: STREAM BANKS ZONE 1 - STREAMBANK - 3' O.C. (4,840 STEMS / AC) SPECIES COMMON NAME T_%_O F STEMS LIVE STAKES Cornus amomum SILKY DOGWOOD 40% Solix sericea SILKY WILLOW 30% Sambucus conadensis ELDERBERRY 15% Physocarpus opulifolius NINEBARK 15% TOTAL 100% HERBACEOUS PLUGS Juncus effusus COMMON RUSH 60% Carex alata BROADWING SEDGE 40% TOTAL 10Q% ZONE 2: BUFFER RE-ESTABLISHMENT SPECIES COMMON NAME % OF STEMS OVERSTORY Platonus occidentalis SYCAMORE 15% Acer rubrum RED MAPLE 15% Nyssa s yl vatica BLACK GUM 10% Liriodendron tulipifera YELLOW POPLAR 10% Betula nigra RIVER BIRCH 5% Quercus stellate POST OAK 5% Quercus alba WHITE OAK i 5% UNDERSTORY Carpinus caroliniana IRONWOOD 10% Prunus serotina BLACK CHERRY 5% Asimina triloba PAWPAW 5% Hamamelis virginiana WITCH HAZEL 5% Lindera benzoin SPICEBUSH 5% Alnus serrulata HAZEL ALDER 5% TOTAL 100% x x w 0 a. Q x x 0 w Y U w U Z 0 Q 0 I— U) Lu Z_ Q 0- 0 0 0 J LL Lu 0 Q 0 m 2 U Z LLJ LL Z 0 U w 0 w W 0- 0 z 0 U Z Q W m Z D 0 U Z OQ Z W J 00 Z 0� W Q 2 U LIJ = J > 0 Z Z 0 W 0 Z W 2 Z 0 Q LU CD W W 0 LLJ W U U) 0 Z Q C� W 0 Z PERMIT DRAWING NOT FOR CONSTRUCTION DATE: 04/17/2023 SCALE (34"X22"): NTS SCALE (17"X11 "): NTS NOT TO SCALE SHEET NUMBER 4.1 of 13