HomeMy WebLinkAbout20230094 Ver 1_More Info Received_20230629 (3)Revised Proposed Impacts Inventory (June 2023)
Wetland Impacts
2a. Site #
2a1. Reason
2b. Impact type
2c. W. name
2d. W. name
2e. Forested
2f. Type of Jurisdiction
2g. Impact area
WA
Pipe crossing 1
T
PFO
W1
Yes
Both
0.28
WB
Maintenance corridor 1
P
PFO
W1
Yes
Both
0.53
WC
Pipe crossing 2
T
PSS
W2
No
Both
0.09
WD
Maintenance corridor 2
P
PSS
W2
Yes
Both
0.14
WE
Pipe crossing 3
T
PEM
W3
No
Both
0.13
WF
Pipe crossing 4
T
PSS
W4
No
Both
0.09
WG
Maintenance corridor 3
P
PSS
W4
Yes
Both
0.24
WH
Limits of disturbance 1
T
PEM
W5
No
Both
0.005
Stream Impacts
3a. Reason for impact
3b. Impact type
3c. Type of impact
3d. S. name
3e. Stream type
3f. Type of jurisdiction
3g. S. width
3h. Impact length
51
Pipe crossing 1
T
Excavation
SA
Perennial
Both
7
82
S2
Intake impact 1
T
Dewatering
Cape Fear River
Perennial
Both
247
133
S3
Intake impact 2
P
Fill
Cape Fear River
Perennial
Both
5
52
S4
Pipe crossing 2
T
Excavation
SB
Intermittent
Both
4
69