HomeMy WebLinkAboutSite Inspection 6.28.23 Br 84 StuckeysWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210552
TPB NCDOT - Replace Bridge 84 on SR 1234
(BR-0033)McDowell
TPB NCDOT - Replace Bridge 84 on SR 1234 (BR-0033)
NC DOT Division 13
6/28/2023
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 08' 37''+35° 38' 11''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on June 28, 2023 by Kevin Mitchell with the Asheville Regional Office. Jerry Romine
was present during the inspection.
- Station L 10+00 RT Stormwater Outlet. Stream bank needs to be stabilized and 57 stone removed from the Catawba
River high flow channel. This was completed on 6.30.23 with photo documentation received.
- Station L 11+00 LT - Lateral base ditch was installed in intermittent stream.
- Station L 14+50 RT - Stormwater inlet needs maintenance.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210552
6/28/2023
Bryan, Roger D
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Stream banks on the Catawba River need to be stablized per NPDES cover requirements. 57 stone
needs to be removed from the high flow channel of the Catawba River. Completed on 6.30.23.
Comment:
page:2