Loading...
HomeMy WebLinkAboutSW3230606_Stormwater Narrative_20230630 SECTION 2 - PROJECT NARRATIVE Crescent Communities is a proposing to develop a site at Lincoln County Industrial Park within Lincolnton, North Carolina. The proposed development will include a single ±175,000 sf facility on the 24.8 acre parcel. The site is located in Lincoln County on Finger Mill Road, north of Maiden Hwy and south of Lincoln County Parkway. It should be noted that this site is adjacent to Larkard Creek and a variance to Article 7 of the Lincoln County UDO was approved by the Lincoln County Board of Adjustment for this development. Site encroaches on the 100-year floodplain and CLOMR permitting is being pursued with FEMA. The majority of the site is currently grassy and woodland. There is an existing gravel road along the southern edge of the parcel that serves as an access path to a Lincoln County sewer lift station located near the southwest corner of the site. Pre-development run-off is discharged into an existing FEMA Floodplain and Larkard Creek. The pre-development drainage basins have been delineated and are illustrated on the Pre-Development Drainage Exhibit found at the end of this report. For the purpose of this report, we will compare the pre-development runoff rates to the post development runoff rates as shown in the summary at the beginning of this report. Pre- development basins will be routed through one wet detention pond during post development conditions and outfall into the floodplain and creek. The post-development sub-basins were delineated and are illustrated on the Post-Development Drainage Exhibit found at the end of this report. All design information for the wet pond and associated drainage pipes and structures can be found in the appendices of this report. The soils on this site consist of type [B, B/D] hydrologic soil groups which are shown on the attached NRCS soils map within Appendix A. SECTION 3 - PURPOSE The purposes of this report are: 1. To delineate all pre-development basins that are within this project and determine which drainage basins will be affected by the proposed development. 2. To develop a stormwater model that will: a. Be in compliance with the NCDEQ stormwater regulations. b. Simulate the pre- and post-development conditions for the project. c. Predict water elevations for the proposed pond. d. Provide design flows (under future build out conditions) for the major drainage structures that can be used to properly size improvements, if needed. 3. To document that the stormwater management measures and equipment installed on site will be adequate for all existing and proposed development on the site. Two drainage models are included in this report; • Pre-Development: examines the drainage basin prior to any development within the site. H THOMAS & HUTTON Page 4