Loading...
HomeMy WebLinkAbout20230735 Ver 1_More Info Received_20230621From: dlutheranCalseai.us To: "Beecher. Gary H CIV USARMY CESAW (USA)" Cc: "Joseph Barklow"; Snider, Hollev; Meilinaer. Michael J; Montalvo, Sheri A Subject: [External] RE: Corps PCN review comments for South Harbor Townhouses in Brunswick County, NC (SAW-2022- 00488) Date: Wednesday, June 21, 2023 7:27:59 PM Attachments: image001.p_na image002.png OAK HARBOR VILLAGE COMPLETED RCW SLOPES 6-2123.pdf OAK HARBOR VILLAGE IMPACT AREA 1 DETAIL DRAWINGS 6-21-23.odf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hello, Gary. Please find the response to your request for additional information below. As always, feel free to call, should you have any questions. Dana Southern E_nvironmental 6oup, Inc. 5515 South College }load, Suite E- Wilmington, NC 2841 2. Phone: 910.452.271 1 Mo6ile:910.228.18+1 (Preferred) www.segi.us From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Sent: Thursday, June 15, 2023 1:42 PM To: Dana A. Lutheran <dlutheran@segi.us> Subject: Corps PCN review comments for South Harbor Townhouses in Brunswick County, NC (SAW- 2022-00488) Dana, I've attached my PCN review comments for the South Harbor Townhouse project in Brunswick County, NC below; USACE Project ID: SAW-2022-00488 -RCW Slopes: This project will take place within one of the designated RCW slopes agreement areas. Please fill out the paper work for the slopes agreement. (see attached document) Please find the completed SLOPES Agreement attached. -MITIGATION: A statement from Stone Farm Mitigation Bank is required to ensure that they have the required 1.0 credits available for purchase. A request was submitted to the Stone Farm Mitigation Bank and will be forwarded upon receipt, which should be within the next day or two. -CULVERT DRAWING by impact #1(1A-1B): A diagram/drawing (with dimensions) of the proposed culvert that will be installed for the road crossing at impact #1 (1A-113) is required. Please find the detail drawings for Impact Area #1 attached. -N LEB: I'll log in using the IPAC record locator (557-126736188) to produce the NLEB Concurrence letter. This will be sent to USFWS for a 15 day Review. Understood. Will you please update us with the status of the submission? Respectfully, Gary US Army Corps, of Engineers '.%'Nrnin.gfO-1 R15iritt Gary Beecher USACE Wilmington Field Office Regulatory Project Manager Office (910) 251-4694 Cell (910) 473-7045 gary.h.beecher(@usace.army.mil Q� Virus-free.www.avast.com