Loading...
HomeMy WebLinkAboutNCC212513_NOT Closeout Documents_20230627 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Surry Project: Stony Knoll Substation River basin: Yadkin-PeeDee Person financially responsible:Swinerton Builders Project#: SURRY-2021-010 Address: 16798 WEST BERNARDO DR,SAN DIEGO CA 92127 1. Project Location: Robert Burrus Rd.,Stony Knoll Pictures: Yes-Digital 2. Weather and soil conditions: 70's,Rain Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): John Mashburn Title: Project Manager Inspection report: Sent Report Date given/sent: June 09,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. ***Repair of a rill and overseeding of bare areas are scheduled.This will be transferred to SURRY-2021-007 Stony Knoll.*** Reported by: Kimberly Turney Date of inspection: June 07,2023 Time arriving on site: 10:00 AM Time leaving site: 11:00 AM