Loading...
HomeMy WebLinkAbout20161200 Ver 3_Notice of RPOT/ Corps Receipt of Individual 401 WQCCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning, North Carolina Division of Water Resources (NCDWR): After review of the submitted Pre-Construction Notification (PCN)/APPLICATION for the above referenced project, dated 06/19/2023, it appears that an individual 401 water quality certification (WQC) is required from the NCDWR for the proposed activities. The complete PCN/APPLICATION, received by our office on 06/20/2023, constitutes the Corps initial receipt of the 401 WQC application. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days from the date of the complete 401 request. Unless NCDWR is granted a time review extension, a waiver will be deemed to occur if you do not act on this request for certification within the RPOT. The date upon which the waiver will occur if you do not act on the certification is 10/18/2023. Please note that this is a request for a reauthorization of the permit issued July 16, 2020 to begin Phase II of the project. Applicant/Consultant: Please note, should we finalize our review prior to receiving the 401 WQC, you will receive a NWP27 provisional general permit verification from the Corps NLT 08/04/2023. Once a 401 WQC is issued or waived by the NCDWR, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 WQC has been issued or waived AND until a final general permit verification has been provided to you. Please let me know if you have any questions. Sincerely, Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers (919) 750-7397 work cell BUILDING STRONG ®