HomeMy WebLinkAbout20230918 Ver 1_CAMA Application_20230628ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Director
MEMORANDUM:
NORTH CAROLINA
Environmental Quality
June 28, 2023
FROM: Curt Weychert, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
curt.wevchert(a).dea.nc.gov
SUBJECT: CAMA Major Permit Application Review
Applicant: R.E. Investment Inc. Bryan Josemans
Project Location: 1 Shipwreck Drive Belhaven NC 27810
Proposed Project: Proposes to install 6'x120' pier, 16'x16' L-Head platform, 12'x16' stepdown,
5'x54' finger pier, 16'x32' boathouse.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Curt Weychert at the address above by July 19, 2023. If you have any questions
regarding the proposed project, contact Ashley Grandy (252) 948-3854 when appropriate, in-depth
comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
**Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
DATE
D North Carolina Department of Environmental Quality I Division of Coastal Management
EQ ��
Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889
DepawtnfEnvi nmenm lry 252.946.6481
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Director
MEMORANDUM:
NORTH CAROLINA
Environmental Quality
June 28, 2023
FROM: Curt Weychert, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
curt.wevchertna dec.nc.00v
SUBJECT: CAMA Major Permit Application Review
Applicant: R.E. Investment Inc. Bryan Josemans
Project Location: 1 Shipwreck Drive Belhaven NC 27810
Proposed Project: Proposes to install 6'x120' pier, 16'x16' L-Head platform, 121x16' stepdown,
5'x54' finger pier, 16'x32' boathouse.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Curt Wevchert at the address above by July 19, 2023. If you have any questions
regarding the proposed project, contact Ashley Grandy (252) 948-3854 when appropriate, in-depth
comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME
AGENCY
SIGNATURE
DATE
� w.meooiwnin
North Carolina Department of Environmental Quality I Division of Coastal Management
Washington Office 1943 Washington Square Mail I Washington, North Carolina 27889
252.946,6481
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: R.E. Investments Inc.
2. LOCATION OF PROJECT SITE: 1 Shipwreck Dr./ Lot 51 Bailey Point near Belhaven in Beaufort Co.
NC
Location - 35' 25' 5 1 " N 760 38' 52" W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —June 13, 2023
Was Applicant Present — NO
5. PROCESSING PROCEDURE: Application Received — June 22, 2023
Office — Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Beaufort County
Land Classification from Beaufort County LUP — land (residential), water (estuarine waters)
(B) AEC(s) Involved: E.W, PTA
(C) Water Dependent: YES
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - N/A
Planned — N/A
(F) Type of Structures: Existing — Rip Rap shoreline, Retaining wall
Planned — Pier, Boathouse, platforms
(G) Estimated Annual Rate of Erosion: NA
Source -NA
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
1590 ft.' shaded
(A) open water
new pier,
platforms,
boathouse
1590 ft2
B Shallow bottom
(C) Low Marsh
360 ft2 Access Pier
(D) Total Area Disturbed: - 1950ft2
(E) Primary Nursery Area: yes
(F) Water Classification: SA;HQW,NSW Open: No
8. PROJECT SUMMARY: The applicant proposes to install 6' X120' pier, 16' X16' L-Head platform, 12'
X 16' Stepdown, 5' X 54' finder pier, 16' X 32' Boathouse
R.E. Investments Inc. 6/23/23
1 Shipwreck Dr./Lot 51 Bailey Point
Belhaven, NC
Beaufort Co.
Project setting:
R. E. Investments Inc. has submitted a CAMA Major Permit application to install a pier/platform
and boathouse on the property at 1 Shipwreck Dr. in the Bailey Point subdivision on Ross Creek near
Belhaven, NC in Beaufort Co. The 1.2 acre lot with ±413 ft. of shoreline, consist of coastal wetland,
various trees, an existing retaining wall and single family residence under construction. Approximately
180 ft. of the shoreline is stabilized by riprap. The current water depth at NWL where the pier is
proposed ranges from 3.2 ft. to 6.5ft. at the proposed waterward end.
Adjacent to the property upstream is an undeveloped residential lot and downstream is a
developed residential lot. Ross Creek is listed as Joint waters and classified as SA:HQW,NSW by the
Environmental Management Commission. It is in the Tar -Pam River basin and listed as a PNA by NCDMF.
No SAV was observed during the site visit on 6/14/23.
Project Description:
Applicant proposes to install 6' X 120' pier with 60' of that being landward access, 16' X 16' L-
Head platform, 5' X 54' finger pier around 16' X 32' boathouse and a 12' X 16' stepdown platform. This
would give the applicant a total of 1230 ft.' of platform area. The boathouse would be 560 ft.2 and the
structure would contain one formalized boat slip. The applicant has provided comment that the size of
vessel requires a larger boathouse.
Project Impact:
The project would create localized turbidity from installing the pier structure. A total platform
area proposed is 1230 ft.2 of shaded area.
May 30, 2023
Mr. Kelly Spivey
District Manager
Division of Coastal Management
943 Washington Square Mall
Washington, North Carolina 27889
Mr. Spivey:
DECEIVE[)
JUN 01 2023
DCM-WARQ
Enclosed is a Major CAMA permit application that I am submitting on behalf of R.E. Investments
Inc. for the construction of pier, platforms and boathouse proposed on lot 51 in the Bailey Pointe
subdivision on Bailey and Ross Creek at Shipwreck Point near Belhaven in Beaufort County,
North Carolina.
The applicant is proposing to construct a 6' x 120' pier to a 16' x 16' L-head platform, 12' x 16'
stepdown and a 5' x 54' finger pier around a 16' x 32' boathouse. In contemplating the design,
the applicant used the specific use standards for piers and boathouses found in the North Carolina
Administrative Code (NCAC) 15A 7H.0208(b)(6)(B) and (D). The exterior dimensions of the
boathouse exceed 400 ftz but is the minimum needed to adequately house a 26' open center console
boat. Water depths in Bailey Creek reach minus 6.5' below the normal water level and are more
than adequate to support navigation of 26' outboard powered center console boat. The applicant
also has over 400' of shoreline and has designed the total shaded impact to be well below the
maximum allowed.
The upland area shoreline on Bailey Creek was stabilized with a granite riprap revetment
authorized by CAMA/Dredge and Fill general permit no.72462-B issue on June 25, 2019. Land
clearing activities undertaken during installation resulted in a violation of the Tar -Pamlico River
Basin rule. A buffer restoration and monitoring plan was approved on May 24, 2023, by NC
Division of Water Resource staff documented by enclosed email from DWR 401/buffer staff Mr.
Allen Stewart. Minor CAMA permit no.03-20 issued on March 18, 2020, authorized construction
of a retaining wall and single-family residence. The retaining wall has been constructed and the
residence is nearing completion at the time of this application submittal.
Per the latest guidance from the Division of Water Resources I have submitted the electronic
meeting request on May 15, 2023, for this project regarding obtaining the 401 Water Quality
Certification and have included the email documentation in this application package. A
confirmation email was not received. I have spoken with USACE Project Manager, Mr. Raleigh
Bland, and the corps will utilize RGP 291 for which a General Water Quality Certification 4501
has been issued and no written concurrence from NC DWR is needed for this project. I certify
that all information contained in this application package is true, accurate and complete to the best
of my knowledge and belief. 1 hereby request that the certifying authority review and take action
on this CWA 401 certification request within the applicable reasonable period of time.
Mr. Kelly Spivey, District Manager
DCM Washington Regional Office
May 30, 2023
Page Two
Enclosed are the MP -I and MP-4 forms, receipts for payment to mail the complete application
package to the adjacent riparian property owners, agent authorization from the applicant and a
check covering the $250.00 application fee. I will mail you the original signed green cards when I
receive them. If you require any further information or have any questions, please let me know.
Thank you for your time and guidance in processing this application.
L
e
Steve Trowell
stevejtrowell@gmail.com
(252)402-4015
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: R.E. Investments INC. C/O Bryan Josemans
Mailing Address: Post Office Box 58, Dogue, Va. 22451
Phone Number: (540) 379-3086
Email Address: bjosemans@gmail.com
I certify that I have authorized Steve Trowell
Agent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
pier, platorm and boathouse construction
at my property located at lot 51off
in Beaufort
County.
Drive in the Bailey Point subdivision
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property
Signature
R.E. Investments Inc, C/O Bryan Josemans
Print or Type Name
O (r a1 t`%—
Title
2-07-3
Date
This certification is valid through I I
RECEIVED
AN 01 2023
DCM-WARD
BBM MP4
APPLICATION for
Major Development Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1, Primary Applicant/ Landowner Information
Business Name
R.E. Investments Inc.
Project Name (if applicable)
R.E. Investment Inc. Pier and Boathouse
Applicant 1: First Name
Bryan
MI
Last Name
Josemans
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
Post Office Box 58, Dogue, Va. 22451
PO Box
58
City
Dogue
State
Va.
ZIP
22451
Country
us
Phone No.
(540)379-3086 ext.
FAX No.
Street Address (if different from above)
City
State
ZIP
Email
bjosemans@gmail.com
2. Agent/Contractor Information
Business Name
Coastal Environmental Solutions LLC
Agent/ Contractor 1: First Name
MI
Last Name
Steve
J.
Trowell
Agent/ Contractor 2: First Name
MI
Last Name
N/A
Mailing Address
PO Box
City
State
102 East Watson Street
N/A
Windsor
NC
ZIP
Phone No, 1
Phone No. 2
27983
(2527402-4015 ext.
N/A ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
stevejtrowell@gmail.com
<Form continues on back>
NGVG1VED
JUN 01 2023
252.808.2808 .. 1_088-412CUAST .. www.ncceastaimanagemenDyaM-W/ RO
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Beaufort County
1 Shipwreck Drive
off SR 1725
Subdivision Name
city
State
Zip
Bailey Pointe
I Belhaven
NC
27810
Phone No.
Lot No.(s) (if many, attach additional page with list)
N/A - ext.
51 , I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Tar -Pamlico
Bailey and Ross Creek
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Pamlico River
e. Is proposed work within city limits or planning jurisdiction?
I. If applicable, list the planning jurisdiction or city limit the proposed
❑Yes 21No
work falls within.
N/A
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sci t.)
Approximately 408'
1.37 acres
c. Size of individual lolls)
d. Approximate elevation of tract above NHW (normal high water) or
NIA
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
3' to 8' ❑NHW or gNWL
e. Vegetation on tract
The site was subject of Gearing for installation of a riprap revetment for shoreline stabilization and retaining wall. Volunteer vegetation consist of grounsel bush,
sweetbay magnolia, sweet gum and loblolly pine. Zone 1 and 2 of the riparian buffer to be planted the fallMinter 2023 with red cedar, sweetbay magnolia, live oak a
flowering dogwood.
L Man-made features and uses now on tract
A retaining wall and single family residence (currently under construction).
g, Identify and describe the existing land uses ad'acent to the proposed project site.
Project site is located within a residental waterfront subdivision.
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
N/A
❑Yes ❑No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No []NA
National Register listed or eligible property?
<Form continues on next page>
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes []No
(ii) Are there coastal wetlands on the site? ®Yes ❑No
(!it) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes Iy7, No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Residential structure will be serviced by onsite septic system.
o. Describe existing drinking water supply source.
Beaufort County
p. Describe existing storm water management or treatment systems.
None
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Govemment
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The purpose of this project is to provide water access for a single family home and secure mooring space for a 26' outboard powered center
console boat. The project has been designed to allow for safe access to and around the boathouse that will house a 13' x 13% 10,000 Ib or 16,0
lift. The size of boathouse roof Is the minimum necessary to protect the boat from the elements.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
The pier and boathouse will be constructed by equipment operating from a spud steel work barge. An excavator will drive pilings in the creek and through the dparia
buffer to the existing retaining wall. Construction of the pier is scheduled for the late summer -early fall 2023, prior to the scheduled riparian buffer planting to occur i
December 2023.
d. List all development activities you propose.
Propose to construct a 6' x 120' pier to a 16' x 16' L-head platform and a 12' x 16' stepdown platform. A 16' x 32' boathouse is proposed with a
x 54' finger pier around the boathouse. The 12' x 16' stepdown platform is positioned to assist with loading and loading of passengers and gear.
e. Are the proposed activities maintenance of an existing project, new work, or both?
New work.
f. What is the approximate total disturbed land area resulting from the proposed project? ®Sq.Ft or []Acres
100 fF
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Surface runoff.
I. Will wastewater or stonnwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
j. Is there any mitigation proposed? []Yes ®No ❑NA
If yes, attach a mitigation proposal.
Ito
<Form continues on back> RECEIVED
JUN 01 2023
252-808-2808 .. 1.888-4RCOAST .. www.nccoastalmanagement. Ld CM-9tlAR0
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name William Wilson Phone No.
Address 2 Shipwreck Drive, Belhaven, NC 27983
Name Timothy E. Force Phone No.
Address 3201 Chestnut Street NW Washington DC 20015-1411
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Minor CAMA permit no.03-20 issued March 18, 2020 for house and retaining wall.
CAMA/Dredge and Fill GP no.72462-e issued June 25,2019
It. Signed consultant or agent authorization form, if applicable.
I. Wetland delineation, if necessary.
I. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
1 further certify that the information provided in this application is truthful to the best of my knowledge.
Date May 23, 2023 Print Name Steve Teo well Agent for R.E. Inve�ejlts Inc
Signature
Please indicate application attachments pertaining to your proposed project.
❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
❑DCM MP-3 Upland Development
®DCM MP-4 Structures Information
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (1) Is the docking facility/marina:
❑Commercial ❑Public/Govemment ®Private/Community
[]This section not applicable
b. (!)Will the facility be open to the general public?
[--]Yes ®No
c. (i) Dock(s) and/or piers)
d. (i) Are Finger Piers included? ®Yes []No
(11) Number 1
If yes:
(III) Length 120'
(ii) Number 1
(iv) Width 6'
(Ili) Length 54'
(v) Floating ❑Yes ®No
(iv) Width 51
(v) Floating []Yes ®No
e. (i) Are Platforms included? ®Yes ❑No
f. (i) Are Boatlifts included? ®Yes ❑No
If yes:
If yes:
(ii) Number 2
(ii) Number 1
(iii) Length 16'
(iii) Length 13'
(iv) Width 16�. 12'
(iv) Width 13�
(v) Floating []Yes ®No
Note: Roofed areas are calculated from dripfine dimensions.
g. (i) Number of slips proposed
h. Check all the types of services to be provided. N/A
1
❑ Full service, including travel lift and/or rail, repair or
(if) Number of slips existing
maintenance service
N/A
❑ Dockage, fuel, and marine supplies
❑ Dockage ("wet slips") only, number of slips: _
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps: _
❑ Other, please describe:
I. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout,
❑ Land cut and access channel charter boats, sail boats, mixed types).
[]Open water; dredging for basin and/or channel 26_open center Console
®Open water; no dredging required
❑Other; please describe:
k. Typical boat length: 26' I. (1) Will the facility be open to the general public?
❑Yes ®No
m. (i) Will the facility have tie pilings?EC CG I` V / C D
❑Yes ❑No G
(ii) If yes number of tie pilings?
JUN 01 2023
0CM-WARt`�
252-808.2808 :: 1-888-4RCOAST :: www.ficcoastalniqqAqgqlqtkt.net revised: 12/27/0G
Form DCM MP-4 (Structures, Page 2 of 4)
2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: _; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (1) Give the location and number of "No Sewage Discharge' signs proposed.
(ii) Give the location and number of "Pumpout Available' signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided? I
RECEIVED
UN 01 2023
DCM-WAR4
252-800-2808 :: 1-888-4RCOAST :: www.nccoastaleuan:iyernr. nY.ne% revised: 12/27/06
Form DCM MP-4 (Structures, Page 3 of 4)
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
®Yes ❑No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ®No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
p. Is the proposed marinatdocking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ❑This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Govemment ®Private/Community
(ii) Number 1
(III) Length 32'
(iv) Width 16_
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. if a rock groin, use MP-Z Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(III) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s):
❑Commercial ❑PublictGovemment ❑Private/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing _
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
JUN p .1 2023
25: kfOB-2008:: 1-888-4RGOASI :: ws�w.nccuas_tnlm:�n agem en[.ne[ _S: :.ARGn
Fonva ncm MP-4 (Structures, Page 4 of 4)
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
250', 180'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
C. Width of water body
719'
e. (i) Will navigational aids be required as a result of the project?
[]Yes ®No [INA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
374', 334'
d. Water depth at waterward end of structure at NLW or NWL
-6.5'
8. OTHER ®This section not applicable
a. Give complete description:
May 23, 2023
Date
R,E. Investments Inc. Pier and Boathouse
Project Name
Steve Trowel] Agent for R.E. Investments Inc.
Applicant e
Applicant Signature
RECEIVED
JUN 0 12023
252-808•2808 . ;-888af{Co al" _
Site Location Map
R.E. Investments Inc. Lot 51 Bailey Point Subdivision PIN 7601-09-7937
1 Shipwreck Drive, Belhaven, NC
Sheet 1 of 4 JUN p r 2023
Date: May 23, 2023
11
=1
(Jt
x
W
N
LM
x
FD'
s
N
O
N
p
Ln
OD
7o
(D
v
T
W
z
C
(D
N
O
C
(D
rr+
N
m
—
luj
M
ON
N
r+O
�
vi
v,
N
cn
(/)
W
(D
-
O
�
r+
LA
O
S
(D
O
v
co
O
v
r+
S
O
C
V)
(D
13ECEIVED
JUN p 12023
bCM-I/VARO
v
(D
0
(D
(')
Q
(D
lJ
(TD
N
in
rD
..
rD
v
-
O
--j
(D
--,
G
VI
(D
r+
4�h`a'3
DM
p
(D
t/i
W
N
V
vi
O
?
to
(FD
O
un
(DD
N
O
O
OD
O
v
rt
S
O
C
LA
(D
RECEIVED
M 01 2023
i)CA4aWARO