Loading...
HomeMy WebLinkAboutSWA000202_phasing_06292023 I► Alfred Benesch&Company 10 benesch 2359 Perimeter Pointe Parkway,Suite 350 Charlotte,NC 28208 www.benesch.com F 704-521-9880 704-521-8955 April 17, 2023 Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov Re: Virginia Foil -Future Sequence Phasing Statement Mr. Farkas, This letter is to serve to clarify the future sequence phasing for the Virginia Foil Park project in Mt. Pleasant,NC. As outlined in the stormwater narrative, this project involves the construction of a new county park with a library, parking lots, sidewalks, multiple shelters, restrooms, maintenance facility, softball/baseball and soccer fields, fitness station, walking trail, and a playground. Utility improvements include new water, electric, fire and sanitary sewer to serve the library, the multiple shelters, restrooms and maintenance facility. Sanitary Sewer will be extended to connect to the existing sanitary sewer system located in"C" Street. Project construction will take place on parcel number 56704401870000, located at 1111 North Washington Street, Mt. Pleasant, NC 28124 and encompasses±29.11 acres. The current property owner is Cabarrus County, who will be the financially responsible parry. The area to be disturbed is approximately±25 acres. This project will be completed in a single phase, and not future development on this property is anticipated as part of this project or in any current planning for the area. If any additional information is required to help expedite this review,please don't hesitate to reach out to me or my office. I can be reached via phone (704-831-5686: Office or 443-285-1499: Cell), or via email at MBlackmon(&benesch.com. Sincerely, X 87 ALFRED BENESCH & COMPANY Matthew Blackmon, PE MBlackmon(-,benesch.com