Loading...
HomeMy WebLinkAboutSWA000202_EZ_06292023 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 1 Project Name Virginia Foil Park 2 Project Area(ac) 24.02 3 1 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) �v 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Matt Blackmon, Project Manager 28 Organization: Benesch 29 Street address: 2359 Perimeter Pointe Parkway,Suite 350 30 City,State,Zip: Charlotte,NC 28208 31 Phone number(s): 704-831-5686 32 Email: MBlackmon@Benesch.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,���Ktf�nlp�Mr \A C A R O •�.d4POF�ss,0'- .0 S _ �' Signature of Designer t Date DRAINAGE AREAS 1 Is this a high density project? Yes j 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No CLICK TO LOAD FORM WETPOND 11 Drainage area number BMP-1 BMP-2 2 Minimum re wired treatment volume cu ft GENERAL MDCTROM 02H.1050 751 71sthe SCM71ocat7edaway at the SW from all surfaces at build-out? Yes Yes SCM from contaminated soils? Yes Yes What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 81Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Other Other 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15;Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16j Does the SC follow the device specific MDC? Yes Yes 171 Was the SCM designed by an NC licensed rofessional? Yes Yes WET POND MDC FROM 02H.1053 181 Sizing method used SA/DA SA/DA 191 Has a stage/storage table been provided in the calculations? Yes Yes 20�Elevation of the excavated main pool depth(bottom of sediment 607.00 586.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 608.00 587.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 611.00 591.00 231 Elevation of the permanent pool(fmsl) 1 611.50 591.50 24 Elevation of the top of the vegetated shelf(fmsl) 612.00 592.00 25 Elevation of the temporary pool(fmsl) ( 613.16 593.50 26 Surface area of the.main permanent pool(square.feet) q,590 sf 14,729 sf 27 Volume of the main permanent pool(cubic feet) 12419 cf 19960 cf 28 Average depth of the main pool(feet) 3.60 ft 4.67 ft 29 Average depth equation used Equation 3 Equation 3 301 If using equation 3,main pool perimeter(feet) 5237.0 ft 8661.0 ft 31 i If using equation 3,width of submerged veg.shelf(feet) 32,Volume of the forebay(cubic feet) 2243 cf 19960 cf 33,Is this 15-20%of the volume in the main pool? Yes Yes 341 Clean-out depth for forebay(inches) 12 in 12 in 351 Design volume of SCM(cu ft) 9427 cf 24850 cf 361 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 2 in 2 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.5 3 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes Yes 43 Depth of forebay at entrance(inches) 36 in 48 in 44 Depth of forebay at exit(inches) 36 in 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 471 Slope of vegetated shelf(H:V) 6:1 6:1 48�Does the orifice drawdown from below the top surface of the Yes Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 531 Species of turf that will be used on the dam and embankment SOD SOD 541 Has a lantin Ian been orovided for the ve ietated shelf? Yes Yes ADDITIONAL I NFORMATION 55 Please use this space to provide any additional information about the wet pond(s): The spreadsheet rounded the SCM-1 Orifice of 1.5 to 2.1.5 Is called out on the SCM- 1 Plans,See Sheet C310 of Plan Set. Wet Pond 3 1:29 PM 3/28/2023