Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Britt and Hales Ledger - 6/29/2023
*Credits shown below are only for mitigation credits approved by the UMBI, BPDP, and As-Built. Sale/ Release Date Purchaser or % Credit Release Project w/ HUC #Gov't Requiring Square Feet Acres Square Feet Acres Square Feet Acres 06/23/23 Credit Release Tasks 1 & 7 (25%)n/a 83,238.250 1.911 83,238.250 1.911 DWR 02/22/24 28,810.000 0.661 54,428.250 1.250 DWR 05/23/24 Credit Release Tasks 2 & 3 (15%)n/a 49,756.550 1.142 104,184.800 2.392 DWR 07/29/24 Raleigh-Durham Airport Authority RDU 5L-23R Runway Replacement (PARTIAL)83,238.250 1.911 20,946.550 0.481 DWR 08/23/24 Alice Buckner 3110 Sussex Rd. - Addition 4762.000 0.109 16,184.550 0.372 Wake County 09/12/24 Raleigh-Durham Airport Authority RDU 5L-23R Runway Replacement (PARTIAL)16,184.550 0.372 0.000 0.000 DWR Credits Released/Available to Bank Credits Debited/Sold From Bank Buffer Credit Balance DWR Approved Transfer to Britt & Hales Nitrogen Nutrient Offset Ledger Eco Terra, LLC –Britt & Hales Mitigation Banking Instrument Britt & Hales (HUC 03020201) Buffer Restoration Credit Ledger Date Last Updated: 11/11/2024 DWR Bank Parcel Project #: 2022-0293v2 Total Credits Released To Date: 132,994.800 sqft *Credits shown below are only for mitigation credits approved by the UMBI, BPDP, and As-Built. Sale/ Release Date Purchaser or % Credit Release Project w/ HUC #Gov't Requiring Square Feet Acres Square Feet Acres Square Feet Acres 06/23/23 Credit Release Tasks 1 & 7 (25%)n/a 354.196 0.008 354.196 0.008 DWR 05/23/24 Credit Release Tasks 2 & 3 (15%)n/a 234.152 0.005 588.348 0.014 DWR 09/12/24 Raleigh-Durham Airport Authority RDU 5L-23R Runway Replacement (PARTIAL)588.348 0.014 0.000 0.000 DWR Credits Released/Available to Bank Credits Debited/Sold From Bank Buffer Credit Balance Eco Terra, LLC –Britt & Hales Mitigation Banking Instrument Britt & Hales (HUC 03020201) Buffer Preservation Credit Ledger Date Last Updated: 11/11/2024 DWR Bank Parcel Project #: 2022-0293v2 Total Credits Released To Date: 588.348 sqft *Credits shown below are only for mitigation credits approved by the UMBI, BPDP, and As-Built. Sale/ Release Date Purchaser or % Credit Release Project w/ HUC #Gov't Requiring Pounds of Nitrogen Acres Pounds of Nitrogen Acres Pounds of Nitrogen Acres 06/23/23 Credit Release Tasks 1 & 7 (25%)n/a 8,287.427 3.646 8,287.427 3.646 DWR 07/31/23 CLH Design Wake Co. Public Health Bldg - Case No. SPR-0126-2023 (03020201)60.360 0.027 8,227.067 3.619 Raleigh 08/22/23 The Site Group 3120 Mid Pines Dr - Case No. SPR-0200-2022 (03020201110020)348.818 0.008 7,878.249 3.466 Raleigh 10/02/23 Greenleaf Christian Church Greenleaf Christian Church - Storm- water Discharge Permit NCS00396 619.570 0.014 7,258.679 3.193 Goldsboro 10/09/23 S. Dillon Wooten 1920 US Hwy 70W - Stormwater Discharge Permit NCS00396 1,374.600 0.032 5,884.079 2.589 Goldsboro 01/31/24 RBV Mill LLC Browning Mill Project (Project ID JC#22-081 -P)1,588.000 0.036 4,296.079 1.890 Johnston County 01/31/24 Meritage Homes Oak Manor Phase 4 Project (Permit ID SB-20-02)1,084.500 0.025 3,211.579 1.413 Town of Garner 01/31/24 Meritage Homes Oak Manor Phase 5 Project (Permit ID SB-20-02)1,837.800 0.042 1,373.779 0.604 Town of Garner 02/26/24 1,503.344 0.661 2,877.123 1.266 DWR 02/27/24 Concept 8 Holdings, LLC Buffalo Townhomes Project (Permit ID SP-22-14)1,725.110 0.759 1,152.013 0.507 Town of Garner 03/08/24 Thales Academy Thales Academy Raleigh Buffaloe Road (SPR-0110-2022)1,152.000 0.507 0.013 0.000 Raleigh 05/23/24 Credit Release Tasks 2 & 3 (15%)n/a 4,972.112 2.187 4,972.125 2.187 DWR 08/21/24 First Flight Storage First Flight Storage, 185 NC 581 S (03020201) 234.000 0.103 4,738.125 2.085 Wayne County 08/29/24 Blue Ridge Atlantic Parkside Apartments (SPR-0143- 2024) (03020201)742.500 0.327 3,995.625 1.758 Raleigh 09/13/24 Cary Christian School Cary Christian School -- Turf Field & Parking Expansion (21-DP-10409-B)235.180 0.103 3,760.445 1.654 Town of Cary 09/23/24 Charlie Heritage Cross Link Apartments (SPR-0113-2024)225.000 0.099 3,535.445 1.555 Raleigh 11/07/24 Nowell Farm Ventures Triangle Road Extension (SPR-0090- 2023) (PARTIAL)3,535.445 1.555 0.000 0.000 Raleigh Credits Released/Available to Bank Credits Debited/Sold From Bank Nutrient Credit Balance DWR Approved Transfer from Britt & Hales Buffer Ledger Eco Terra, LLC –Britt & Hales Mitigation Banking Instrument Britt & Hales (HUC 03020201) Nitrogen Offset Credit Ledger Date Last Updated: 11/11/2024 DWR Bank Parcel Project #: 2022-0293v2 Total Credits Released To Date: 13,259.539 lb-N