Loading...
HomeMy WebLinkAbout20230564 Ver 1_More Info Received_20230629T. Describe proposed wort (include discussion as to how hardening of shoreline has been avoided, or why n is necessary): Construct a new timber moral morning wall, backlill immediately, behind wall with crushed concrete. Place 6" rip rap on lake side of wall to protect wall soil from erosion. Length ofsrabilivsean will be 228 fen. S. How will the work be done?* ®From Land From Water 9. Total amount of disturbance below the, normal pool lake leveg normal water level: * pna emg.11 ownt. here III, eta,. np me meant als, eel a .quaintest 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 Net land. ward:* rete�ir9wre.eel chain real 11. please describe the vegetation above the normal pool lake level/ normal water level and 50 Not lantlwant to be impacted:* (10,W a veer, wtInam) There are no trees on this lot. The only vegmtion is grass. 4/18/23, 6:45 PM IMG_9272.jpg https:Hmail.google.comlmaillul0/?tab=rm&ogbl#inboxlFMfcgzGsmDrQkhvvgQBKmggLcBSGKGbg?projector=l&messagePartId=0.l 1/1 k dx 3 S i l 'w 1�� � !( )f f{ 1 ■m l;z1f!| \(}ig