Loading...
HomeMy WebLinkAboutSite Inspection 6.28.23 Br 84 Stuckeys Non-compliantWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210552 TPB NCDOT - Replace Bridge 84 on SR 1234 (BR-0033)McDowell TPB NCDOT - Replace Bridge 84 on SR 1234 (BR-0033) NC DOT Division 13 6/28/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 08' 37''+35° 38' 11'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on June 28, 2023 by Kevin Mitchell with the Asheville Regional Office. Jerry Romine was present during the inspection. - Station L 10+00 RT Stormwater Outlet. Stream bank needs to be stabilized and 57 stone removed from the Catawba River high flow channel. - Station L 11+00 LT - Lateral base ditch was installed in intermittent stream. - Station L 14+50 RT - Stormwater inlet needs maintenance. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210552 6/28/2023 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Stream banks on the Catawba River need to be stablized per NPDES cover requirements. 57 stone needs to be removed from the high flow channel of the Catawba River. Comment: page:2