HomeMy WebLinkAboutSW3221007_Supplement-EZ Form_20230629 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION r6 1 Project Name Dollar General Store#24556 2 Project Area ac 6.7 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this ro'ect High or Low Density? High Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 c-d? I N/A 10 1 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration S stem 1 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader-Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Ba filter 26 lFilterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Justin Church,PE-Principal Engineer 28 Or anization: BREC,PA 29 Street address: 1520 Meadowview Drive 30 City,State,Zip: Wilkesboro,NC 28697 31 Phone numbers : 336 844-4088 32 Email: justin@brec.biz Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision,that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete,and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer W � Sign a of Designer 05/08/2023 Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this roject have low density areas? No 4 If so number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM - Infiltration 5 Total drainage area(sq ft 291837 46905 6 Onsite drainage area(sq ft 291837 46905 7 Offsite drainage area(sq ft 0 0 8 Total BUA in project(sq ft 34566 sf 34095 sf New BUA on subdivided lots(subject to 9permitting) s ft sf sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 34566 sf 34095 sf 11 Offsite BUA(sq ft sf sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft 21721 sf 21250 sf -Sidewalk(sq ft 1940 sf 1940 sf -Roof(sq ft 10905 sf 10905 sf -Roadway s ft sf sf -Future(sq ft sf sf -Other,please specify in the comment box below(sq ft sf sf New infiltrating permeable pavement on 13 subdivided lots(sq ft sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft sf sf Existing BUA that will remain(not subject to 15 ermitting)(sq ft sf sf 16 Existing BUA that is already permitted (sq ft sf sf 17 Existing BUA that will be removed(sq ft sf sf 18 Percent BUA 12% 73 0 19 IDesign storm inches 1.0 in 20 IDesign volume of SCM cu ft 2753 cf 21 lCalculation method for design volume Shueler ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): INFILTRATION SYSTEM 1]Drainage area number 1 2 1 Minimum required treatment volume cu ft 2753 cf GENERAL MDC FROM 02H.1050 76 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located awayfrom contaminated soils? Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical'for trencher)? 3:1 Does the SCM have retaining walls,gabion walls or other en ineered side slopes? No 7 Are the inlets,outlets,and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? N/A 11 Does the maintenance access comply with General MDC 8? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC 10? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Ils there an O&M Plan that complies with General MDC 12? Yes 16 IDoes the SCM follow the device specific MDC? Yes 17 lWas the SCM designed by an NC licensedprofessional? Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface{%) 00 19 jAre terraces or bafflesprovided? No 20 IType ofpretreatment: Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation(fmsl) 811.00 23 Depth to SHWT per soils report in 72.00 24 Ground elevation at boring in soils report(fmsl) 817.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 ISoil infiltration rate(in/hr) 1.00 27 lFactor of safety FS 2 is recommended): 2.00 Elevations 29 Bottom elevation fmsl 813.0 ft 30 IStorage elevation(fmsl) 816.5 ft 31 (Bypass elevation fmsl 816.83 ft For Basins Only 32 1 Bottom surface area(ft) 33 IStorage elevation surface area(ft) For Trenches Only 34 Length(ft) 50 ft 35 Width ft 21 ft 36 Perforated pipe diameter,if applicable(inches) 4 in 1 37 Number of laterals 2 38 Total length of perforated piping 106 ft 39 Stone type,if applicable #57 40 Stone porosity(%) 32% 41 Is stone free of fines? Yes 42 Is the stone wrapped in geotextile fabric? Yes 43 Has at least one inspection port beenprovided? Yes Volumes/Drawdown 44 IDesign volume of SCM cu ft 2753 cf 45 ITime to draw down hours) 62.5 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 3 5:30 PM 2/2/2023