Loading...
HomeMy WebLinkAboutSite Inspection 6.28.23 Ruth BypassWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20200362 NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA)Rutherford NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA) NC DOT Division 13 6/28/2023 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-81° 56' 60''+35° 22' 43'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on June 28, 2023 by Kevin Mitchell with the Asheville Regional Office. Ross Straup, Jon Osipovitch, and Jesse Martinez were present during the inspection. - Station L3 969+00 LT - Cleanup complete from May 30 sediment loss. - Station L3 882+00 LT - Off site sedmiment has been removed. Sediment did not impact JS. - Station L3 875+00 LT - Cleanup of high water box culvert at Site 10 is complete from May 30 report. - Station L3 867+00 RT - Fine sediment observed in JS at outlet. The sediment is not believed to have originated from the site; however, DWR recommends looking at the inside of the pipe to ensure there is not a void in any of the joints. - Station Y6 32+00 LT (Site 18) - Remove rip rap and check from JS per permit plans. Work is ongoing around junction box. Ensure measures are in place at the end of the day and before forecasted rain. Ensure the project is meeting the NPDES cover requirements including areas where the rye grass is dying. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20200362 6/28/2023 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2