Loading...
HomeMy WebLinkAbout20230425 Ver 1_Provisional Permit NWP29 (SAW-2022-00799)_20230628From: Stock, N Carmela CIV USARMY CESAS (USA) To: bford.lomonacoinvestments(a)amail.com Cc: Homer, Seren M; David Brame Subject: [External] NWP 29 and SAW-2022-00799, Trollingwood Townes Date: Wednesday, June 28, 2023 10:37:14 AM Attachments: NWP 29.odf NWP 29 WOC.odf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning, Brian, This e-mail serves to notify you that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived AND until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Notification to DWR AND the applicant SAW-2022-00799 / Trollingwood Townes / NWP 29 / Corps Receipt of Individual 401 WQC North Carolina Division of Water Resources (NCDWR): After review of the submitted Trollingwood Townes permit application, dated March 21, 2023, and the enclosed Nationwide Permit 29 Water Quality General Certification 4256, dated December 18, 2020, it appears that an individual 401 water quality certification (WQC) is required from the NCDWR for the proposed activities. The ePCN received by our office on March 21, 2023, provided the 9 required elements for an individual WQC. This permit application/ePCN, dated March 21, 2023 (received March 21, 2023), constitutes the Corps initial receipt of the 401 WQC application. Unless NCDWR is granted a time review extension, a waiver will be deemed to occur if the NCDWR fails to act on this request for certification within 120 days from the date of the complete 401 request. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days. The date upon which the waiver will occur if you fail or refuse to act on the certification is July 19, 2023. If our assumption is incorrect and this proposed activity does not require an Individual WQC, please respond to this notification as soon as possible in order for our office to meet the Corps' Nationwide Permit 45-day review requirement. Applicant/Consultant: Please note, should we finalize our review prior to receiving the 401 WQC, you will receive a provisional general permit verification from the Corps. Once a 401 WQC is issued or waived by the DWR, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 WQC has been issued or waived AND until a final general permit verification has been provided to you. Thanks! N. Carmela Stock Biologist Regulatory Project Manager U.S. Army Corps of Engineers SAD Technical Regional Execution Center 100 W. Oglethorpe Ave. Savannah, GA 31401 Email: Nichelle. C.Stock cni= usace.army.miI Telephone: (912) 724-8979 To assist us in improving our service to you, please complete the survey found at https://regulatory.ops.usace.army.mil/customer-service-survQy/