HomeMy WebLinkAboutNCG520119_Compliance Evaluation Inspection_20230619
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
June 19, 2023
Jason C Deck
Ameri-Con Materials Inc
Email: daddyjed37@yahoo.com
SUBJECT: Compliance Inspection Report
Hines Road Pit
NPDES WW Permit No. NCG520119
Rutherford County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Hines Road Pit on
5/31/2023. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NCG520119. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Lauren Armeni with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
lauren.armeni@ncdenr.gov.
Sincerely,
Lauren Armeni, Environmental Specialist II
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche
DocuSign Envelope ID: CC30ED54-15C4-4CAA-BA5F-272B72853DFC
DocuSign Envelope ID: CC30ED54-15C4-4CAA-BA5F-272B72853DFC
1 Page#
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 2 5 3 NCG520119 11 12 23/06/01 17 18 C 19 S 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 70 71 72 N 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Hines Road Pit
505 Hines Rd
Mooresboro NC 28114
Entry Time/Date
10:30AM 23/06/01
Permit Effective Date
21/03/01
Exit Time/Date
11:30AM 23/06/01
Permit Expiration Date
25/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted Jason C Deck,2554 Deep Gap Farm Rd Mill Spring NC 28756//828-863-0444/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintena Self-Monitoring Program Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
6/19/2023
Lauren E Armeni DWR/ARO WQ/828-296-4500/ 6/19/2023
Rachel Rose DWR/ARO WQ/828-296-4500/
Brett Laverty DWR/Division of Water Quality/828-296-4500/ 6/19/2023
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
6/19/2023
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSign Envelope ID: CC30ED54-15C4-4CAA-BA5F-272B72853DFC
2 Page#
NCG520119
NPDES yr/mo/day
3 11 12
Inspection Type
17 18 (Cont.) 1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Lauren Armeni, Brett Laverty, and Rachel Rose, with the Asheville Regional Office, conducted a
Compliance Evaluation Inspection of Hines Road Pit on June 1, 2023. The inspection was conducted
to determine if the system is being operated and maintained in compliance with General NPDES
Permit No. NCG520000. Mr. Jason Deck (owner) was present during the inspection.
At the time of the inspection, the facility was not in operation. Mr. Deck indicated that the facility has
not been in operation since prior to 2021, but that they would be in operation in the next couple
months. The settling basin appeared full, but Mr. Deck stated they will remove four feet of sediment
prior to their next dredging event. The settling basin is cleaned out approximately one to two times
per year. Mr. Deck also indicated that signage is in place upstream and downstream of the dredging
operation to warn canoeists and other recreational water users of the operation.
Upstream and downstream turbidity sampling will be conducted when the facility is in operation
moving forward, as the facility has not been in operation since before 2021. Sampling for turbidity
was a requirement starting with the effective date of the Certificate of Coverage under the 2021
permit renewal for the NCG52 General Permit. Mr. Deck indicated that average effluent flow is 2.3
MGD, and that he will send turbidity sampling results and a flow estimate next time the facility is in
operation.
23/06/01 C
DocuSign Envelope ID: CC30ED54-15C4-4CAA-BA5F-272B72853DFC
Hines Road Pit
Compliance Evaluation
Owner - Facility:
Inspection Type:
Permit: NCG520119
Inspection Date: 06/01/2023
3 Page#
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment: At the time of the inspection, the facility had not been in operation for two years, so
there was no discharge. When the facility is in operation, the settling pond enters a
concrete ditch which then discharges to surface water.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment: The facility has not been in operation since before 2021. Mr. Deck indicated that
average estimated flow at the effluent of the facility is approximately 2.3 MGD when in
operation.
Upstream / Downstream Sampling Yes No NA NE
DocuSign Envelope ID: CC30ED54-15C4-4CAA-BA5F-272B72853DFC
Hines Road Pit
Compliance Evaluation
Owner - Facility:
Inspection Type:
Permit: NCG520119
Inspection Date: 06/01/2023
4 Page#
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type,
and sampling location)?
Comment: The facility has not conducted US/DS sampling for turbidity because they have not
been in operation since before 2021. See summary for details.