Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3230605_Design Calculations_20230627
Rogers Pond Subdivision Site Address: 8624 Old Waxhaw Monroe Road Town of Waxhaw, NC 28173 Owner/Developer: Smith Douglas Homes 4297 NC HWY 24/27E Suite B Midland, NC 2107 Stormwater Calculations FOR: Rogers Pond Subdivision March 23, 2023 BY: American Engineering Associates — Southeast, PA. 8008 Corporate Center Drive, Suite 110 Charlotte, NC 28226 www.American-EA.com ic\ AMERICAN Engineering American Engineering Associates-Southeast, PA. AMERICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations ENGINEER CERTIFICATION I HEREBY CERTIFY THAT SPECIFICATIONS CONTAINED HEREIN AND THE ACCOMPANYING CALCULATIONS WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION. rJ AA SIGNED, SEALED AND DATED THIS Z3 DAY OF /`�`arC1/1 �Z3 < NGASs �111111f11/�� 4",s:/ kAG1NE4/ °(,, fit! EC !! 2tf PD to 'dtt GLRT.NO �" ! :a E 4 3881 in B�.AL r: _ < n 52340 ° /l1il f I I H P BY: BLAKE H. ESTRIDGE COMPANY: AMERICAN ENGINEERING ASSOCIATES - SOUTHEAST, PA TITLE: PROJECT ENGINEER American Engineering Associates-Southeast,PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Table of Contents Title Page No. Narrative 5 Construction Sequence 9 Vicinity Map 10 Soils Map 11 USGS Quad Map 15 Flood Map 16 Storm Drain Calculations 17 System A - 10-Year Analysis Hydraflow Results 18 System B - 10-Year Analysis Hydraflow Results 22 System C - 25-Year Analysis Hydraflow Results 25 System D - 10-Year Analysis Hydraflow Results 27 System J - 10-Year Analysis Hydraflow Results 29 Gutter Spread Calculations 31 Culvert E Calculations 34 Culvert F Calculations 36 Culvert K Calculations 38 Pre vs Post Development Drainage Area Maps 40 BMP Calculations 43 Wet Pond 1 - Water Quality Calculations 44 Wet Pond 1 - SA/DA Calculations & Forebay Sizing 45 Wet Pond 1 - Anti-Floatation Calculations 46 Wet Pond 1 - Pond Permanent Pool Drain Calculations 47 Wet Pond 2 - Water Quality Calculations 48 Wet Pond 2 - SA/DA Calculations & Forebay Sizing 49 Wet Pond 2 - Anti-Floatation Calculations 50 Wet Pond 2 - Pond Permanent Pool Drain Calculations 51 Sand Filter 3 - Water Quality Calculations 52 Sand Filter 3 - Anti-Floatation Calculations 54 Hydraflow Hydrograph Results and Pond Reports 55 American Engineering Associates-Southeast,PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Erosion and Sediment Control Calculations 112 Skimmer Sediment Basin No. 1 - Phase 1 113 Skimmer Sediment Basin No. 1 - Phase 2 116 Skimmer Sediment Basin No. 2 - Phase 1 119 Skimmer Sediment Basin No. 2 - Phase 2 122 Skimmer Sediment Basin No. 3 - Phase 1 125 Skimmer Sediment Basin No. 3 - Phase 3 128 Skimmer Basin No. 4 - Phase 1 131 Skimmer Basin No. 5 - Phase 1 133 Riprap Apron Calculations 135 Appendices 146 Drainage Area Map 147 Erosion and Sediment Control Plan Phase 1 148 Erosion and Sediment Control Plan Phase 2 149 Erosion and Sediment Control Plan Phase 3 150 List of Tables Wet Pond No. 1 Tributary Areas 6 Wet Pond No. 2 Tributary Areas 6 Sand Filter 3 Tributary Areas 6 Undetained Tributary Areas 6 Pre vs Post Discharge Rates Summary Table 7 Outlet Velocity Table 7 Hydrologic Soil Group 13 American Engineering Associates-Southeast,PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Site Narrative The proposed project, Rogers Pond Subdivision, is a 124-lot townhome development located in Union County, North Carolina, in the Town of Waxhaw.The proposed project is a 61.57-acre development, with approximately 44 acres of denuded area.The proposed development is located along Old Waxhaw Monroe Road, north of the intersection of Old Waxhaw Monroe Road and Waxhaw Farms Road.The northeastern boundary of the site is Blythe Creek.The southern and southeastern boundaries of the site are low density single family residential lots. The western boundary of the site is Old Waxhaw Monroe Road. The northern boundary of the site is the Wysacky Park residential subdivision. This construction site includes the clearing and grubbing of existing wooded land,grading of the existing site, and the construction of 124 single family residential homes, roads, sidewalks, and associated improvements. Site development and grading will occur in three phases.All sediment basins have been designed for both stages of construction. Erosion and sediment control measures were sized using North Carolina Department of Environmental Quality(NCDEQ) requirements. Pre-Development Conditions The project site is located within an area having a zone designation AE by the Federal Emergency Management Agency (FEMA) on Flood Insurance Rate Map (FIRM) Number 3710448200J, with a date of identification of October 16, 2008.The existing property consists of an existing pond,woods and open space with several structures. Existing stormwater drains off the site to the northeast toward Blythe Creek as shown on the pre development drainage map located in the appendix. The soil types identified within the project area are CeB2 (Cecil gravelly sandy clay loam) and CeC2 (Cecil gravelly sandy clay loam).The soil types identified were used in determining Curve Numbers (CNs)for the onsite and offsite runoff. Post-Development Conditions The proposed site will consist of paved streets with curb &gutter and concrete sidewalks.The 124 lots will consist of single family homes with concrete driveways. Common open areas are located throughout the proposed development.The site will be mass graded and the denuded area is approximately 44 acres. 5 American Engineering Associates-Southeast, PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations The hydrologic analysis conducted for the proposed project included the study of both onsite and offsite drainage areas for the wet pond. The analysis was conducted using the Soil Conservation Service (SCS) Hydrograph Method, as outlined in SCS Technical Release 55 (TR-55). Hydrographs calculated using Hydraflow software were used to compute peak rates of runoff for the pre-development and post-development conditions. The wet ponds and sand filter have been designed to meet pre-construction conditions for the 2-year and 10-year storm events and minimum 80%trapping efficiency as required by the NCDEQ and the Town of Waxhaw. Post-development drainage conditions can be viewed on the drainage area map located in the appendix. Development of the site will include two wet ponds and a sand filter to account for water quality storage volumes. The wet ponds will maintain a permanent pool of water, with storage volumes provided above these elevations. The wet ponds will promote sedimentation and pollutant treatment of stormwater runoff. Treated flow will be discharged back toward Blythe Creek. The sand filter will treat pollutants from stormwater runoff through the sand filter media cell and discharge treated flow back toward Blythe Creek.The total tributary area draining to the proposed wet pond 1 is 21.98 ac. The total tributary area drainage to the proposed wet pond 2 is 14.15 ac. The total tributary area draining to the proposed sand filter 3 is 5.51 ac.The tributary areas for the BMPs are summarized in the tables below. The undetained areas are also listed in a table below. The undetained areas are areas that drain to the points of analysis that are not routed through the ponds. These areas are modeled and added to the areas routed through the ponds to get a total post development runoff. WET POND NO. 1 TRIBUTARY AREAS Impervious Open TOTAL TO WET POND 1 Drainage Area (ac) 6.91 15.07 21.98 WET POND NO.2 TRIBUTARY AREAS Impervious Open TOTAL TO WET POND 2 Drainage Area (ac) 6.03 8.12 14.15 SAND FILTER NO. 3 TRIBUTARY AREAS Impervious Open TOTAL TO SAND FILTER 3 Drainage Area (ac) 2.29 3.22 5.51 UNDETAINED TRIBUTARY AREAS Impervious Open TOTAL UNDETAINED Drainage Area (ac) 0.71 24.31 25.02 6 American Engineering Associates-Southeast,PA. i AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Pre vs Post Discharge Rates Summary Table Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 39.12 117.71 175.05 225.00 281.07 Pre Dev 2 SCS Runoff 43.31 87.46 117.50 142.58 169.61 Post Dev Det BMP1 3 SCS Runoff 35.45 66.39 86.77 103.37 121.10 Post Dev Det BMP2 4 SCS Runoff 13.20 25.05 32.94 39.37 46.26 Post Dev Det BMP3 5 SCS Runoff 16.37 46.73 68.69 87.91 109.25 Post Dev Undetained 6 Reservoir 2 2.519 13.99 41.44 73.71 98.40 Wet Pond 1 7 Reservoir 3 3.336 26.89 58.25 71.12 85.69 Wet Pond 2 8 Reservoir 4 1.503 9.356 25.33 34.30 41.83 Sand Filter 3 9 Combine 5,6,7, 20.85 96.34 188.47 260.52 325.93 Post Dev Combined 8 Outlet Velocity Table Outlet ID Velocity (ft/s) A-45 8.99 B-39 7.38 C-21 6.03 D-2 3.58 E-2 5.98 F-2 5.78 J-3 3.85 K-2 4.19 The contents of this Stormwater Pollution Prevention Plan (SWPPP) were prepared for Smith Douglas Homes as the primary permittee seeking coverage under North Carolina's National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from Construction (CGP). Unless required by the owner,this plan may also be used by secondary permittees to obtain coverage under the CGP. 7 American Engineering Associates-Southeast,PA. i AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Summary The stormwater control measures have been designed to meet pre-and post-development requirements for the 2-year and 10-year storm events. Furthermore,the stormwater control measures have been designed to achieve a minimum 80%trapping efficiency as required by the NCDEQ and meet the latest NPDES General Permit for Stormwater Discharge requirements. Upon removal of the sediment basins, level spreader devices shall be installed at the proposed storm drainage outfalls. Upon exiting the level spreader devices, stormwater from the various systems will discharge into off the site at the western boundary. In conclusion, due to the existing site conditions and proposed runoff control measures,the proposed project is not anticipated to have any negative impacts on any downstream or adjacent properties. 8 American Engineering Associates-Southeast,PA. A AM E.R I C A N 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Construction Sequence 1. Obtain grading/erosion control plan approval from the Town of Waxhaw Engineering Department. 2. Set up an on-site pre-construction conference with erosion control inspector of the Town Engineering Department to discuss erosion control measures. Failure to schedule such conference 48 hours prior to any land disturbing activity is a violation of chapter 17 of the town code and is subject to fine. 3. Install silt fence, inlet protection, sediment basins, diversion ditches, tree protection and other measures as shown on plans, clearing only as necessary to install these devices. 4. Call for on-site inspection by inspector. When approved, inspector issues the grading permit and clearing and grubbing may begin. 5. The contractor shall diligently and continuously maintain all erosion control devices and structures. 6. For phased erosion control plans, contractor shall meet with erosion control inspector prior to commencing with each phase of erosion control measures. 7. Stabilize site as areas are brought to finished grade. 8. Coordinate with erosion control inspector prior to removal of erosion control measure. 9. All erosion control measures shall be constructed in accordance with the NC Erosion and Sediment Control Planning and Design Manual, US Dept of Agriculture,Town of Waxhaw Erosion Control Ordinance. 9 American Engineering Associates-Southeast,PA. i AM E RI CAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations / Iil wolyttir 44,,,o0 libwawa NIS igNIIIMII d;" 'ROAD WNROP CMS0 �p P£ 1.£ �a /1 ots 0AO N Location Map—Not to Scale 10 American Engineering Associates-Southeast,PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Hydrologic Soil Group—Union County,North Carolina 3 S 524417 524500 524800 52000 524800 524933 525000 525100 34°55'13-N 34°5513•N a r I• • / � >� a M / 1 i—ik! .... a• ik: - +.,. CeB2 C)` I. tea.. ( . �a CeB2 i e5 CeC2 yam •* Y. ti CeB2 8 `1 CeB2 illif I r A - .1:c40\. ' ;,.,iv..;t , 1 ...NaJ may not be ya IN ate IC w,i 34°54'37N - 34,54'37'N 524400 524500 7224503 5247C0 524000 5249C0 527020 525100 3 3 b t. C Map Sde:1:5,400 ifptitbedan A portrait(8.5"x 11")sheets - N Mks m N 0 00 103 200 310 N r� o zso sn ¢D 1�7 I sp pIOJe]bn:VO+b MacaNx'Cana coordinates:W(584 EAgetla:UIM Zone 17N W5384 USDA Natural Resources Web Soil Survey 5/16/2022 Conservation Service National Cooperative Soil Survey Page 1 of 4 11 American Engineering Associates-Southeast,PA. AM E. RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Hydrologic Soil Group—Union County,North Carolina MAP LEGEND MAP INFORMATION Area of Interest jAop C The soil surveys that comprise your A01 were mapped at Area of merest(Aoq 1:24,000. • ciD soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons 0 A G Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil 0 A,D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed B O Transportation scale. RID 1-14 Rails Please rely on the bar scale on each map sheet for map C ono Interstate Highways measurements. 0 Cal ti US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) 0 Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines projection,which preserves direction and shape but distorts , Background A distance and area.A projection that preserves area,such as the Aerial Photography Albers equal-area conic projection,should be used if more r✓ wo accurate calculations of distance or area are required. N B This product is generated from the USDA-NRCS certified data as rti B/Dof the version date(s)listed below. ..�i C Soil Survey Area: Union County,North Carolina Survey Area Data: Version 22,Jan 21,2022 ,•v CID Soil map units am labeled(as space allows)for map scales D 1:50,000 or larger. a. Not rated or not available Date(s)aerial images were photographed: Jul 18,2011—Nov Soil Rating Points 25,2017 O A The otthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O ND imagery displayed on these maps.As a result,some minor B shifting of map unit boundaries may be evident. •▪ BiD >i is Natural Resources Web Soil Survey 5/16/2022 Conservation Service National Cooperative Soil Survey Page 2 of 4 12 American Engineering Associates-Southeast,PA. A \ A ME RI CAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Hydrologic Soil Group—Union County,North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil gravelly sandy clay B 21.2 27 7% loam,2 to 8 percent slopes,moderately eroded CeC2 Cecil gravelly sandy clay B 53.9 70.5% loam,8 to 15 percent slopes,moderately eroded W Water 1.4 1.8% Totals for Area of Interest 76.6 100.0% USDA Natural Resources Web Soil Survey 5/16/2022 Conservation Service National Cooperative Soil Survey Page 3 of 4 13 American Engineering Associates-Southeast,PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D).The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands.These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet.These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture.These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet.These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture.These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet.These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material.These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher 14 i \ American Engineering Associates-Southeast,PA. AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 Engineering OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations I c E 5 1 \.tf.,4 HOWIE i411NE•RD H MAIN 5 —FSpG Cr- TIV ih� o r SOJ.* 6 " bh Si. O POPLAR GROVE CIR j � / � 9 AWOL \ b0� WAXHAW 19o� -aZ - L''N-7------ 40 i.i Waxhaw . c r 0�oa City Cern �a J �� SNpR 1 tNDp Kph oR PAP44, (-) i % O W -.\ //) o AXHA W,ggRMsRO v C. y, siP P A---.N__/% �� l �m � �� � so Ic A N..0 1/‘ Piney Grove r i./-6so Church Cem /Z PN K it USGS Topographic Map Portion of WAXHAW QUADRANGLE — 7.5 Minute Series 15 American Engineering Associates-Southeast,PA. A AM E RICAN 8008 Corporate Center Drive,Suite 110 Charlotte,NC 28226 E n g i n e e r i n g OFFICE: 704.375.2438 www.American-EA.com Rogers Pond Subdivision Stormwater Calculations National Flood Hazard Layer ta'.'. FEMA Legend 00.43'47'W 34°55.13"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR DAM PAPEL LAYOUT / Without Base Flood Elevation(BFE) + ry` �4� , SPECIAL FLOOD Zane A V,ASS With BFE or Depth Zone AP.at Ax,YE,Ali II J+ i� II Z 5SY,,.ES L s ,rp`�., HAZARD AREAS Regulatory Floodway II �+ - h 0.2%Annual Chance Flood Hazard,Areas v of J.%anneal chance flood wkh average .rAlli II 5 6 3v10 8300J depth less than one foot or with drainage areas of less than one square mile ZOO A �. off.10/16/2008 Future Conditions i%Annual }„ FLOODWAY ��Chance Flood HazaM zonex • ,� ZfOPtC�_ Area.:ise Nouced Rood Rlakdueto 58. 3 Levee. e Notes.zone x �� OTHER ARAS OF lossit w �=� .ZO rt��la. FLOOD HAZARD Area wi Flood Risk due to Leveewm o �S F,, �'i• rvosCrEENAreaofinimal Flood Hazard zw�ex iET I— I Effective LOMRs 7gFT OTHER AREAS —_ Area of Undetermined Flood Hazard zonvo rGENERAL - - Channel,Culvert,or Storm Sewer [� STRUCTURES IIIIIll Levee.Dike.orFloodwall ,llor),..41 _ seas r�y�} 7 Obs,/Ft�7� ��'L's�� 0--� `� ,0,-- -, Cross Sections with l%Annual Chance ,� ) c':_]aIti.ItIc�r s? is D; _ILL Water Surface Elevation 1 AREA OF MINIMAL FLOOD HAZARD Coastal Tweed tTigli /.� Qg «L1FD E•D) le �� • �.�I. --Base Flood Elevation Line(BFE) 1Y+�*-'s"-' •l ZODE X —Limit of Study III + 592 FEEZ Jurisdiction Boundary �(�: Coastal Transact Baseline 1 `' Et A OTHER - — Profile Baseline 5D5g4ZE FEATURES HydrographicFeature 1 a • Digital Data 0.vallable �� ' �` `37104482001 No Dlgdal Data Available K.: S9B F• t eff.10/16/2008 f MAP PPAANELS Unmapped li Ii\ ` T The pin displayed on the map is an approximate / 1 1\ Lpoint selected try the user and does not represent ....."411r4t�(LF.t an authoritative property location. p y9D5y / This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. Ai The base map shown complies with FEMA's basemap 7-Fst.i accuracy standards �, • �7 � � ili; The flood hazard information is derives directly from the • _ authoritative NFHL web services provided by FEMA.This map ;l �., ��� 't t was exported on 5/16/2022 at 147 PM and does not �((( �. reflect changes and eRedmeme subsequent t0 this date and 1 t time.The NFHL and effective iMonnatfon may change or IA'S become superseded by new data over time. tDIP(G60 This map image is void if the one or more of the following map byfs•/ llS„. elements do not appear.basemap Imagery,flood zone labels. /// legend,scale bar,map creation date,community identifiers, FIRM panel number,and FIRM effective date.Map images for 80.439'A'34"5144 N Feet 1:6;000 unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2.000 regulatory purposes. Basemap:USGS National Map:Ortholmagery.Data refreshed October,2020 FEMA Flood Map Portion of Panel No. 3710448200J 16 STORM DRAIN CALCULATIONS Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan A10 A9B • 41 A9A 40 39 46 38 Al2 A9 All 37 A31 1 3 A5 Al 8 A6135 7 A7 6 A315 5d 3 A38 A13 A4 2 A36 1 A44 •Outfall 12 24 44 A32 43 A33 42 • 2 A3 8 A31 Al 4 Aq6 A22 13 23 A4 25 29 14 , 36 Al5 A29 1 16 A 22 A21' A27 33 21 'i 30 18 Agt Al25 17 27 A20 A41 Alb 19 31 A41 20 A19 32 Al 8 A39 Project File: Storm A.stm Number of lines:46 Date:3/22/2023 Storm Sewers v2021 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total !nor Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 37.153 0.00 19.52 0.00 0.00 10.40 0.0 14.9 5.2 54.33 66.69 8.99 36 1.00 632.50 632.87 634.89 635.26 635.92 642.64 A44-A45 2 1 54.413 0.00 16.40 0.00 0.00 8.98 0.0 14.8 5.2 47.05 86.70 8.06 36 1.00 632.87 633.42 635.26 635.65 642.64 647.52 A38-A44 3 2 126.500 0.04 16.40 0.70 0.03 8.98 5.0 14.5 5.3 47.43 66.69 8.39 36 1.00 633.42 634.68 635.65 636.92 647.52 646.99 A37-A38 4 3 22.817 0.74 14.23 0.70 0.52 7.81 5.0 14.4 5.3 41.32 50.23 10.30 30 1.50 640.46 640.80 642.18 642.95 646.99 647.56 A36-A37 5 4 41.000 0.37 13.49 0.70 0.26 7.29 5.0 14.4 5.3 38.66 50.23 8.69 30 1.50 640.80 641.41 642.95 643.51 647.56 647.37 A35-A36 6 5 120.608 0.33 1.73 0.70 0.23 1.04 5.0 7.9 6.5 6.72 7.91 6.69 15 1.50 643.12 644.93 644.01 645.97 647.37 649.78 A7-A35 7 6 182.949 0.36 1.40 0.60 0.21 0.81 0.0 7.2 6.7 5.37 9.13 5.17 15 2.00 644.93 648.59 645.97 649.53 649.78 657.72 A6-A7 8 7 153.191 0.04 0.77 10.70 0.03 0.40 5.0 6.1 6.9 2.76 12.91 6.26 15 4.00 653.45 659.57 653.84 660.24 657.72 665.53 A4-A6 9 8 22.000 0.11 0.73 0.40 0.04 0.37 5.0 5.9 7.0 2.61 12.91 3.99 15 4.00 659.57 660.45 660.24 661.10 665.53 665.53 A3-A4 10 9 78.454 0.08 0.63 0.70 0.06 0.33 5.0 5.2 7.2 2.37 9.13 3.82 15 2.00 660.45 662.02 661.10 662.64 665.53 669.87 A2-A3 11 10 22.000 0.55 0.55 0.50 0.27 0.27 5.0 5.0 7.2 1.97 6.46 4.17 15 1.00 665.40 665.62 665.88 666.18 669.87 669.87 A1-A2 12 5 142.464 0.24 10.83 0.70 0.17 5.61 5.0 14.0 5.4 30.02 50.23 7.23 30 1.50 641.41 643.55 643.51 645.42 647.37 651.34 A34-A35 13 12 211.106 0.25 9.21 0.70 0.18 4.75 5.0 8.9 6.3 29.73 35.76 11.25 24 2.50 644.05 649.33 645.44 651.19 651.34 656.86 A31-A35 14 13 116.413 0.07 8.63 0.70 0.05 4.34 5.0 8.7 6.3 27.42 35.76 9.08 24 2.50 649.33 652.24 651.19 654.05 656.86 659.81 A28-A30 15 14 87.500 0.06 8.56 0.70 0.04 4.29 5.0 8.5 6.3 27.24 35.76 9.10 24 2.50 652.24 654.43 654.05 656.24 659.81 662.01 A27-A28 16 15 44.295 0.29 8.24 0.70 0.21 4.09 5.0 7.1 6.7 27.33 35.76 9.13 24 2.50 654.43 655.53 656.24 657.35 662.01 663.49 A24-A27 17 16 25.543 0.44 7.23 0.70 0.31 3.38 5.0 7.0 6.7 22.65 27.70 8.91 24 1.50 656.25 656.63 657.63 658.33 663.49 663.45 A21-A24 18 17 57.021 0.29 1.37 0.70 0.21 0.64 5.0 6.0 7.0 4.42 6.46 4.45 15 1.00 657.26 657.83 658.33 658.68 663.45 664.19 A20-A21 19 18 133.733 0.00 1.07 0.00 0.00 0.43 0.0 5.1 7.2 3.09 9.13 3.90 15 2.00 657.83 660.50 658.68 661.21 664.19 667.23 A19-A20 20 19 20.980 1.07 1.07 0.40 0.43 0.43 5.0 5.0 7.2 3.11 6.46 4.77 15 1.00 662.98 663.19 663.59 663.90 667.23 666.86 A18-A19 21 17 136.500 0.83 5.42 0.45 0.37 2.44 5.0 6.6 6.8 16.61 22.62 6.29 24 1.00 656.63 658.00 658.33 659.47 663.45 663.28 A17-A21 22 21 109.000 0.98 3.24 0.45 0.44 1.46 5.0 6.3 6.9 10.05 16.72 6.90 18 1.50 658.37 660.01 659.47 661.23 663.28 664.65 A15-A17 Project File: Storm A.stm Number of lines:46 Run Date: 3/22/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021.00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total !nor Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 161.000 1.03 2.26 0.45 0.47 1.02 5.0 5.8 7.0 7.14 10.28 6.69 15 1.50 660.26 662.67 661.23 663.74 664.65 667.09 A14-A15 24 23 156.000 1.23 1.23 0.45 0.55 0.55 5.0 5.0 7.2 4.00 10.28 4.17 15 1.50 662.67 665.01 663.74 665.82 667.09 668.90 A13-A14 25 16 165.771 0.26 0.72 0.70 0.18 0.50 5.0 5.2 7.2 3.60 9.13 5.79 15 2.00 657.76 661.08 658.31 661.84 663.49 665.91 A23-A24 26 25 22.000 0.46 0.46 0.70 0.32 0.32 5.0 5.0 7.2 2.31 6.46 3.42 15 1.00 661.08 661.30 661.84 661.90 665.91 665.91 A22-A23 27 21 56.000 1.35 1.35 0.45 0.61 0.61 5.0 5.0 7.2 4.41 8.39 4.97 15 1.00 658.62 659.18 659.47 660.03 663.28 664.15 A16-A17 28 1 233.806 0.43 3.12 0.50 0.22 1.42 5.0 6.8 6.7 9.61 15.71 10.73 15 3.50 638.58 646.77 639.29 647.94 642.64 651.99 A43-A44 29 28 120.481 0.68 2.69 0.45 0.31 1.21 5.0 6.5 6.8 8.25 11.87 6.99 15 2.00 646.77 649.18 647.94 650.30 651.99 654.18 A42-A43 30 29 207.273 0.53 2.01 0.45 0.24 0.90 5.0 5.8 7.0 6.32 11.87 5.68 15 2.00 649.18 653.32 650.30 654.34 654.18 658.21 A41-A42 31 30 78.587 0.00 1.47 0.00 0.00 0.66 0.0 5.5 7.1 4.70 18.77 4.76 15 5.00 653.32 657.25 654.34 658.13 658.21 674.37 A40-A41 32 31 118.369 1.47 1.47 0.45 0.66 0.66 5.0 5.0 7.2 4.79 14.54 5.18 15 3.00 657.25 660.80 658.13 661.69 674.37 666.16 A39-A40 33 15 22.000 0.19 0.26 0.70 0.13 0.16 5.0 8.1 6.4 1.03 6.46 2.40 15 1.00 655.64 655.86 656.24 656.25 662.01 662.01 A26-A27 34 33 31.712 0.07 0.07 0.40 0.03 0.03 5.0 5.0 7.2 0.21 6.46 1.29 15 1.00 655.86 656.17 656.25 656.35 662.01 661.67 A25-A26 35 7 22.650 0.28 0.28 0.70 0.20 0.20 5.0 5.0 7.2 1.41 6.46 3.78 15 1.00 653.47 653.70 653.87 654.17 657.72 658.00 A5-A6 36 13 22.000 0.32 0.32 0.70 0.23 0.23 5.0 5.0 7.2 1.64 6.46 3.95 15 1.00 652.39 652.61 652.82 653.12 656.86 656.86 A29-A30 37 3 149.892 0.22 2.13 0.70 0.15 1.14 5.0 9.1 6.2 7.09 15.99 3.57 24 0.50 635.00 635.75 636.92 636.69 646.99 643.24 Al2-A37 38 37 22.500 0.14 1.92 0.70 0.10 0.99 5.0 8.9 6.3 6.18 15.99 4.44 24 0.50 635.75 635.86 636.69 636.74 643.24 643.24 A11-Al2 39 38 71.221 0.37 1.05 0.50 0.18 0.53 5.0 8.5 6.4 3.34 14.44 7.00 15 5.00 637.56 641.12 637.97 641.86 643.24 646.68 A9-A11 40 39 153.000 0.29 0.68 0.50 0.15 0.34 5.0 7.2 6.7 2.28 18.77 3.46 15 5.00 641.12 648.77 641.86 649.38 646.68 653.05 A9A-A9 41 40 153.000 0.39 0.39 0.50 0.20 0.20 5.0 5.0 7.2 1.43 18.77 2.90 15 5.00 648.77 656.42 649.38 656.90 653.05 660.70 A9B-A9A 42 12 65.924 0.40 1.38 0.50 0.20 0.69 5.0 13.7 5.4 3.71 6.46 5.03 15 1.00 644.80 645.46 645.48 646.24 651.34 648.93 A33-A34 43 42 106.800 0.87 0.97 0.50 0.43 0.49 5.0 13.1 5.5 2.68 8.39 3.72 15 1.00 645.46 646.53 646.24 647.18 648.93 651.59 A32-A33 44 43 151.643 0.11 0.11 0.50 0.05 0.05 5.0 5.0 7.2 0.38 20.56 1.46 15 6.00 646.53 655.63 647.18 655.87 651.59 666.17 A31-A32 Project File: Storm A.stm Number of lines:46 Run Date: 3/22/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021.00 Storm Sewer Tabulation Page 3 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total !nor Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 45 5 22.000 0.56 0.56 0.70 0.39 0.39 5.0 5.0 7.2 2.85 6.46 4.65 15 1.00 643.12 643.34 643.70 644.02 647.37 647.37 A8-A35 46 38 30.889 0.73 0.73 0.50 0.36 0.36 5.0 5.0 7.2 2.63 6.46 4.54 15 1.00 636.61 636.92 637.17 637.57 643.24 641.90 A10-A11 Project File: Storm A.stm Number of lines:46 Run Date: 3/22/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021.00 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan B24 3625 30 29 B B16 B26 28 23 B19 B20 24 20 B29 21 623 27 B17 22 19 B30 B18 34 18 ::33 B22 B32 2 Outfall B5 35 4 1 B1 B3 12 9 B15 11 a4 621 8 32 B2 B37 5 37 B36 33 B6 38 7 B14 B35 B34 B8 6 16 B9 B123 15 14 B11 25 B10 Project File: Storm B.stm Number of lines:38 Date:3/12/2023 Storm Sewers v2021 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To !nor Total Inv* Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 47.928 0.00 11.25 0.00 0.00 6.55 0.0 13.1 5.5 35.93 47.49 7.38 36 0.51 594.50 594.74 596.45 596.70 597.92 607.03 B38-B39 2 1 143.405 0.56 9.89 0.70 0.39 5.93 5.0 12.6 5.6 33.02 47.16 5.98 36 0.50 594.74 595.46 597.54 597.32 607.03 609.12 B33-B38 3 2 22.000 0.14 9.33 0.70 0.10 5.54 5.0 12.6 5.6 30.90 41.01 7.81 30 1.00 595.46 595.68 597.32 597.57 609.12 609.12 B32-B33 4 3 91.941 0.37 3.65 0.70 0.26 2.22 5.0 12.2 5.6 12.54 22.62 6.66 24 1.00 604.12 605.04 605.18 606.31 609.12 610.78 B15-B32 5 4 204.188 0.09 3.28 0.70 0.06 1.97 5.0 11.4 5.8 11.39 22.62 5.56 24 1.00 605.04 607.08 606.31 608.29 610.78 614.37 B14-B15 6 5 66.761 0.27 3.19 0.70 0.19 1.91 5.0 11.1 5.8 11.12 22.62 6.42 24 1.00 607.58 608.25 608.57 609.44 614.37 617.02 B13-B14 7 6 240.724 0.34 1.35 0.70 0.24 0.86 5.0 10.2 6.0 5.18 12.91 7.64 15 4.00 611.72 621.35 612.27 622.27 617.02 626.66 B7-B13 8 7 209.056 0.02 0.60 0.70 0.01 0.34 5.0 8.4 6.4 2.16 11.18 3.03 15 3.00 621.35 627.62 622.27 628.21 626.66 633.91 B5-B7 9 8 68.888 0.03 0.59 0.70 0.02 0.33 5.0 7.8 6.5 2.14 10.21 3.79 15 2.50 627.62 629.35 628.21 629.93 633.91 637.11 B4-B5 10 9 52.409 0.09 0.37 0.70 0.07 0.18 5.0 6.9 6.7 1.18 6.46 3.59 15 1.00 632.27 632.79 632.63 633.22 637.11 639.23 B2-B4 11 10 74.598 0.27 0.27 0.40 0.11 0.11 5.0 5.0 7.2 0.79 6.46 2.48 15 1.00 632.79 633.54 633.22 633.88 639.23 637.54 B1-B2 12 9 21.771 0.19 0.19 0.70 0.13 0.13 5.0 5.0 7.2 0.95 6.46 3.37 15 1.00 632.63 632.85 632.96 633.23 637.11 637.10 B3-B4 13 6 22.226 0.44 1.57 0.70 0.31 0.85 5.0 9.2 6.2 5.28 15.99 4.42 24 0.50 608.63 608.74 609.44 609.55 617.02 616.89 B12-B13 14 13 136.500 0.36 1.13 0.50 0.18 0.54 5.0 8.5 6.4 3.45 4.57 4.09 15 0.50 609.49 610.17 610.30 610.99 616.89 617.22 B11-B12 15 14 256.403 0.19 0.62 0.50 0.10 0.29 5.0 5.9 7.0 2.00 14.54 2.76 15 3.00 610.17 617.87 611.25 618.43 617.22 627.18 B9-B11 16 15 61.566 0.42 0.42 0.45 0.19 0.19 5.0 5.0 7.2 1.37 14.54 5.38 15 3.00 622.61 624.46 622.87 624.92 627.18 629.44 B8-B9 17 7 24.166 0.40 0.40 0.70 0.28 0.28 5.0 5.0 7.2 2.05 6.46 4.21 15 1.00 622.41 622.65 622.89 623.22 626.66 627.06 B6-B7 18 3 39.130 0.16 5.54 0.70 0.11 3.22 5.0 8.5 6.3 20.40 22.62 7.82 24 1.00 596.18 596.57 597.67 598.19 609.12 608.42 B31-B32 19 18 120.000 0.16 3.58 0.70 0.11 2.00 5.0 7.6 6.6 13.09 22.62 6.76 24 1.00 603.14 604.34 604.23 605.64 608.42 611.83 B23-B31 20 19 101.879 0.52 2.07 0.60 0.31 1.28 5.0 7.3 6.6 8.47 13.70 9.49 15 4.50 605.71 610.30 606.42 611.43 611.83 616.59 B20-B23 21 20 238.233 0.14 1.09 0.60 0.09 0.65 5.0 6.3 6.9 4.45 13.70 4.39 15 4.50 610.30 621.02 611.43 621.87 616.59 627.42 B18-B20 22 21 22.060 0.42 0.95 0.70 0.30 0.56 5.0 6.1 6.9 3.87 6.46 4.52 15 1.00 621.02 621.24 621.87 622.03 627.42 627.44 B17-B18 Project File: Storm B.stm Number of lines:38 Run Date: 3/12/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021.00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 106.604 0.52 0.52 0.50 0.26 0.26 5.0 5.0 7.2 1.90 6.46 2.99 15 1.00 621.24 622.30 622.03 622.85 627.44 627.37 B16-B17 24 20 22.000 0.46 0.46 0.70 0.32 0.32 5.0 5.0 7.2 2.35 6.46 4.38 15 1.00 612.12 612.34 612.64 612.95 616.59 616.59 B19-B20 25 14 56.000 0.15 0.15 0.50 0.08 0.08 5.0 5.0 7.2 0.55 8.39 1.53 15 1.00 610.17 610.73 611.25 611.02 617.22 614.98 B10-B11 26 18 22.000 0.42 1.81 0.70 0.29 1.11 5.0 8.5 6.4 7.08 10.50 5.93 18 1.00 597.43 597.65 598.33 598.68 608.42 608.42 B30-B31 27 26 26.870 0.02 1.39 0.70 0.01 0.82 5.0 8.4 6.4 5.24 6.46 5.61 15 1.00 599.65 599.92 600.50 600.84 608.42 607.80 B29-B30 28 27 135.389 0.29 1.37 0.70 0.20 0.81 5.0 7.8 6.5 5.24 6.46 5.37 15 1.00 599.92 601.27 600.84 602.20 607.80 605.74 B28-B29 29 28 76.787 0.23 0.77 0.50 0.12 0.38 5.0 7.3 6.6 2.55 14.44 4.25 15 5.00 601.61 605.45 602.20 606.08 605.74 609.91 B26-B28 30 29 117.486 0.11 0.54 0.50 0.05 0.27 5.0 6.0 7.0 1.86 14.54 3.49 15 3.00 605.50 609.03 606.08 609.57 609.91 613.87 B25-B26 31 30 75.395 0.43 0.43 0.50 0.21 0.21 5.0 5.0 7.2 1.55 14.54 3.24 15 3.00 609.03 611.29 609.57 611.78 613.87 616.15 B24-B25 32 1 72.483 0.29 1.36 0.50 0.15 0.61 5.0 8.5 6.4 3.91 29.40 5.27 24 1.00 597.57 598.30 598.07 598.99 607.03 610.48 B37-B38 33 32 112.774 0.26 0.26 0.50 0.13 0.13 5.0 5.0 7.2 0.94 8.39 3.75 15 1.00 605.88 607.01 606.16 607.39 610.48 611.80 B34-B37 34 19 77.838 0.26 1.35 0.45 0.12 0.61 5.0 5.5 7.1 4.30 6.46 5.27 15 1.00 605.09 605.87 605.84 606.71 611.83 610.12 B22-B23 35 34 92.849 1.09 1.09 0.45 0.49 0.49 5.0 5.0 7.2 3.54 8.39 4.29 15 1.00 605.87 606.80 606.71 607.56 610.12 611.90 B21-B22 36 28 22.000 0.32 0.32 0.70 0.22 0.22 5.0 5.0 7.2 1.61 6.46 2.57 15 1.00 601.27 601.49 602.20 601.99 605.74 605.74 B27-B28 37 32 84.526 0.49 0.80 0.40 0.20 0.34 5.0 6.6 6.8 2.29 16.00 2.93 24 0.50 598.30 598.72 598.99 599.25 610.48 603.72 B36-B37 38 37 55.500 0.31 0.31 0.45 0.14 0.14 5.0 5.0 7.2 1.01 7.43 2.93 18 0.50 599.09 599.36 599.46 599.74 603.72 603.61 B35-B36 Project File: Storm B.stm Number of lines:38 Run Date: 3/12/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021.00 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan C8 15 C7 16 14 C6 C9 C1d3 7 6 17 C12 Outfall 8 C11 C13 C5 1 9 C20 5 2 C4 C17 12 C3 3 C14 20 4 18 10 C15 6 C2 C19 11 19 Cl C18 Project File: Storm C.stm Number of lines:20 Date:3/12/2023 Storm Sewers v2021 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To !nor Total Inv* Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 77.127 0.00 4.69 0.00 0.00 2.76 0.0 13.3 5.5 15.09 15.99 6.03 24 0.50 593.00 593.39 594.40 594.98 595.33 598.41 C20-021 2 1 85.976 0.00 4.48 0.00 0.00 2.66 0.0 10.4 6.0 15.86 58.81 5.81 24 4.00 593.39 596.82 595.45 598.26 598.41 606.62 C17-C20 3 2 58.655 0.42 4.48 0.70 0.29 2.66 5.0 10.2 6.0 15.95 45.24 6.60 24 4.00 596.82 599.17 598.26 600.61 606.62 607.53 C16-017 4 3 22.000 0.22 4.06 0.70 0.15 2.37 5.0 10.2 6.0 14.23 22.62 6.51 24 1.00 599.34 599.56 600.61 600.92 607.53 607.53 C15-C16 5 4 165.849 0.02 3.02 0.70 0.01 1.80 5.0 9.4 6.2 11.10 39.18 6.01 24 3.00 599.83 604.80 600.92 606.00 607.53 612.63 C13-C15 6 5 27.916 0.37 2.82 0.70 0.26 1.67 5.0 9.3 6.2 10.31 22.62 5.40 24 1.00 604.80 605.08 606.00 606.23 612.63 613.41 C11-C13 7 6 22.000 0.25 2.46 0.70 0.17 1.41 5.0 9.2 6.2 8.75 10.50 6.35 18 1.00 605.58 605.80 606.63 606.95 613.41 613.41 C10-C11 8 7 115.664 0.17 1.23 0.70 0.12 0.74 5.0 8.7 6.3 4.65 12.91 7.37 15 4.00 606.53 611.16 607.05 612.03 613.41 617.60 C5-C10 9 8 95.999 0.35 1.05 0.60 0.21 0.62 5.0 8.3 6.4 3.95 12.91 4.53 15 4.00 611.16 615.00 612.03 615.80 617.60 622.23 C4-05 10 9 120.691 0.00 0.42 0.00 0.00 0.21 0.0 6.6 6.8 1.42 12.92 2.53 15 4.00 615.00 619.82 615.80 620.29 622.23 628.02 C2-C4 11 10 117.973 0.42 0.42 0.50 0.21 0.21 5.0 5.0 7.2 1.51 6.46 3.50 15 1.00 619.82 621.00 620.29 621.49 628.02 626.70 C1-C2 12 9 22.000 0.28 0.28 0.70 0.20 0.20 5.0 5.0 7.2 1.42 6.46 3.79 15 1.00 617.76 617.98 618.16 618.45 622.23 622.23 C3-C4 13 7 26.870 0.03 0.99 0.70 0.02 0.50 5.0 6.4 6.8 3.42 6.46 4.06 15 1.00 606.05 606.32 606.95 607.07 613.41 613.65 C9-C10 14 13 100.755 0.00 0.96 0.00 0.00 0.48 0.0 5.8 7.0 3.35 6.46 4.42 15 1.00 606.32 607.33 607.07 608.07 613.65 613.41 C8-09 15 14 73.307 0.12 0.96 0.50 0.06 0.48 5.0 5.4 7.1 3.41 14.44 4.50 15 5.00 607.33 610.99 608.07 611.74 613.41 615.37 C7-C8 16 15 54.152 0.83 0.83 0.50 0.42 0.42 5.0 5.0 7.2 3.01 18.77 4.12 15 5.00 610.99 613.70 611.74 614.40 615.37 617.87 C6-07 17 5 22.000 0.17 0.17 0.70 0.12 0.12 5.0 5.0 7.2 0.87 6.46 3.29 15 1.00 607.96 608.18 608.28 608.55 612.63 612.63 C12-C13 18 1 133.319 0.12 0.21 0.50 0.06 0.10 5.0 9.6 6.1 0.64 16.79 1.59 15 4.00 593.89 599.22 595.45 599.53 598.41 607.81 C19-C20 19 18 75.298 0.09 0.09 0.50 0.05 0.05 5.0 5.0 7.2 0.33 8.39 2.78 15 1.00 602.90 603.65 603.07 603.88 607.81 608.11 C18-C19 20 4 47.461 0.82 0.82 0.50 0.41 0.41 5.0 5.0 7.2 2.98 6.46 4.71 15 1.00 601.50 601.98 602.10 602.67 607.53 605.20 C14-C15 Project File: Storm C.stm Number of lines:20 Run Date: 3/12/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021.00 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan D1 1 Outfall Project File: Storm D.stm Number of lines: 1 Date:3/12/2023 Storm Sewers v2021 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total !nor Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 70.000 0.54 0.54 0.50 0.27 0.27 5.0 5.0 7.2 1.96 4.55 3.58 15 0.50 668.87 669.22 669.43 669.80 670.39 672.37 D1-D2 Project File: Storm D.stm Number of lines: 1 Run Date: 3/12/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021 00 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan • Outfall 1 J2 2 J1 Project File: Storm J.stm Number of lines:2 Date:3/12/2023 Storm Sewers v2021 00 Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To !nor Total !nor Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 25.550 0.14 0.45 0.70 0.10 0.31 5.0 5.3 7.2 2.23 6.51 3.85 15 1.02 606.93 607.19 607.53 607.79 608.46 609.81 J2-J3 2 1 22.913 0.31 0.31 0.70 0.22 0.22 5.0 5.0 7.2 1.56 6.46 3.08 15 1.00 607.19 607.42 607.79 607.91 609.81 609.89 J1-J2 Project File: Storm J.stm Number of lines:2 Run Date: 3/12/2023 NOTES:Intensity=88.24/(Inlet time+15.50)^0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2021 00 GUTTER SPREAD CALCULATIONS PROJECT: Rogers Pond Subdivision COMPUTED BY: BHE LOCATION: Waxhaw,NC CHECKED BY: DATE: 3/12/2023 RAINFALL INTENSITY =4.0 in/hr(On Grade Conditions-Roadway) RAINFALL INTENSITY =8.41 in/hr(Sag Conditions-Roadway) Trib. C Sag St SI Single/Double Struct.Number Area Factor Condition Cul-de-sac Flow Cross Slope Long.Slope Grate T D K Qcap Qbypass Contributing Structures/Flow Qadd (ac) (Y/N) (Y/N) (cfs) (ft/ft) (ft/ft) (S/D) (ft) (in) (cfs) (cfs) - (cfs) (cfs) Al 0.55 0.50 N N 1.10 0.03125 0.0150 S 5.24 0.16 21.13 1.03 0.07 0.00 A2 0.08 0.70 N N 0.22 0.03125 0.0150 S 2.88 0.09 21.13 0.38 0.00 0.00 A3 0.11 0.40 N N 0.18 0.03125 0.0500 S 2.10 0.07 29.93 0.32 0.00 (�00) 0.00 A4 0.04 0.70 N N 0.11 1 0.03125 0.0500 S 1.77 0.06 29.93 0.24 0.00 0.00 A5 0.28 0.70 N N 0.78 0.03125 0.0500 S 3.68 0.12 29.93 0.81 0.00 (0 00) 0.00 A6 0.36 0.60 N N 0.86 0.03125 0.0500 S 3.82 0.12 29.93 0.87 0.00 (�00) 0.00 A7 0.33 0.70 N N 0.92 0.03125 0.0500 S 3.92 0.12 29.93 0.90 0.02 (�00) 0.00 A8 0.56 0.70 N N 1.57 0.03125 0.0200 D 5.67 0.18 23.35 1.30 0.26 (�00) 0.00 All 0.14 0.70 N N 0.66 0.03125 0.0250 S 3.92 0.12 24.60 0.74 0.00 (0 26) 0.26 Al2 0.22 0.70 N N 0.62 0.03125 0.0250 S 3.83 0.12 24.60 0.71 0.00 0.00 (0.00) A20 0.29 0.70 N N 0.81 0.03125 0.0200 S 4.43 0.14 23.35 0.86 0.00 0.00 A21 0.44 0.70 Y N 2.74 0.03125 0.0000 D 6.12 0.19 -- -- -- A20 A22 0.15 (0.00) (0.15) A22 0.46 0.70 N N 1.29 0.03125 0.0150 S 5.56 0.17 21.13 1.14 0.15 0.00 A23 0.26 0.70 N N 0.73 0.03125 0.0150 S 4.49 0.14 21.13 0.80 0.00 0.00 A24 0.29 0.70 N N 0.81 0.03125 0.0078 S 5.28 0.17 16.74 0.83 0.00 A23 0.00 (0.00) A26 0.19 0.70 N N 0.53 0.03125 0.0250 S 3.62 0.11 24.60 0.65 0.00 0.00 A27 0.06 0.70 N N 0.17 0.03125 0.0250 S 2.35 0.07 24.60 0.32 0.00 0.00 (0.00) A28 0.07 0.70 N N 0.20 1 0.03125 0.0250 S 2.49 0.08 24.60 0.35 0.00 A27 0.00 (0.00) A29 0.32 0.70 N N 0.90 0.03125 0.0250 S 4.41 0.14 24.60 0.90 0.00 0.00 (0.00)A28 A30 0.25 0.70 N N 0.70 0.03125 0.0250 S 4.02 0.13 24.60 0.77 0.00 0.00 (0.00) Page 1 of 3 GUTTER SPREAD CALCULATIONS PROJECT: Rogers Pond Subdivision COMPUTED BY: BHE LOCATION: Waxhaw,NC CHECKED BY: DATE: 3/12/2023 RAINFALL INTENSITY =4.0 in/hr(On Grade Conditions-Roadway) RAINFALL INTENSITY =8.41 in/hr(Sag Conditions-Roadway) Trib. C Sag St SI Single/Double Struct.Number Area Factor Condition Cul-de-sac Flow Cross Slope Long.Slope Grate T D K Qcap Qbypass Contributing Structures/Flow Qadd (ac) (Y/N) (Y/N) (cfs) (ft/ft) (ft/ft) (S/D) (ft) (in) (cfs) (cfs) (cfs) (cfs) A34 0.24 0.70 N N 0.67 0.03125 0.0250 S 3.96 0.12 24.60 0.75 0.00 0.00 (0.00) A35 0.37 0.70 Y N 2.20 0.03125 0.0450 S 6.71 0.21 -- -- -- A34 A7 0.02 (0.00) (0.02) A36 0.74 0.70 N N 2.07 0.03125 0.0250 S 6.04 0.19 24.60 1.53 0.55 0.00 (0.00) A37 0.04 0.70 N N 0.66 0.03125 0.0250 S 3.93 0.12 24.60 0.75 0.00 0.55 (0.55) B2 0.09 0.70 N N 0.25 0.03125 0.0450 S 2.45 0.08 29.14 0.40 0.00 0.00 B3 0.19 0.70 N N 0.53 0.03125 0.0450 S 3.25 0.10 29.14 0.64 0.00 0.00 B4 0.03 0.70 N N 0.08 0.03125 0.0450 S 1.62 0.05 29.14 0.20 0.00 (0 00) 0.00 B5 0.02 0.70 N N 0.06 0.03125 0.0200 S 1.62 0.05 23.35 0.16 0.00 0.00 i B6 0.40 0.70 N N 1.12 0.03125 0.0400 S 4.39 0.14 28.35 1.03 0.09 (0 00) 0.00 B7 0.34 0.70 N N 0.95 0.03125 0.0400 S 4.13 0.13 28.35 0.93 0.02 0.00 (0.00) B12 0.44 0.70 N N 1.32 0.03125 0.0400 S 4.66 0.15 28.35 1.14 0.17 (0 09) 0.09 B13 0.27 0.70 N N 0.77 0.03125 0.0400 S 3.82 0.12 28.35 0.82 0.00 (0 02) 0.02 B14 0.09 0.70 N N 0.25 0.03125 0.0175 S 2.93 0.09 22.24 0.41 0.00 0.00 (0.00) B15 0.37 0.70 N N 1.04 0.03125 0.0175 S 4.98 0.16 22.24 1.00 0.04 0.00 (0.00) B17 0.42 0.70 N N 1.18 0.03125 0.0450 S 4.37 0.14 29.14 1.06 0.12 (0 00) 0.00 B18 0.14 0.60 N N 0.34 0.03125 0.0450 S 2.73 0.09 29.14 0.48 0.00 0.00 B19 0.46 0.70 N N 1.41 0.03125 0.0450 S 4.68 0.15 29.14 1.18 0.23 (012) 0.12 B20 0.52 0.60 N N 1.25 0.03125 0.0450 S 4.47 0.14 29.14 1.10 0.15 0.00 (0.00) B23 0.16 0.70 N N 0.60 0.03125 0.0450 S 3.40 0.11 29.14 0.69 0.00 (0?5) I 0.15 B27 0.32 0.70 Y N 2.16 0.03125 0.0000 S 6.62 0.21 (02733 ) 0.27 B28 0.29 0.70 Y N 1.71 0.03125 0.0000 S 5.67 0.18 (0.00) 0.00 B29 0.02 0.70 N N 0.24 0.03125 0.0175 S 2.88 0.09 22.24 0.40 0.00 (039) 0.19 Page 2 of 3 GUTTER SPREAD CALCULATIONS PROJECT: Rogers Pond Subdivision COMPUTED BY: BHE LOCATION: Waxhaw,NC CHECKED BY: DATE: 3/12/2023 RAINFALL INTENSITY =4.0 in/hr(On Grade Conditions-Roadway) RAINFALL INTENSITY =8.41 in/hr(Sag Conditions-Roadway) Trib. C Sag St SI Single/Double Struct.Number Area Factor Condition Cul-de-sac Flow Cross Slope Long.Slope Grate T D K Qcap Qbypass Contributing Structures/Flow Qadd (ac) I (Y/N) (Y/N) (cfs) (ft/ft) (ft/ft) (S/D) (ft) (in) (cfs) (cfs) (cfs) (cfs) B30 0.42 0.70 N N 1.40 0.03125 0.0200 S 5.44 0.17 23.35 1.22 0.19 (0 23) 0.23 B31 0.16 0.70 Y N 0.94 0.03125 0.0000 S 3.81 0.12 -- -- -- B23 B32 0.00 (0.00) (0.00) B32 0.14 0.70 N N 0.43 0.03125 0.0175 S 3.57 0.11 22.24 0.58 0.00 0.04 (0.04) B33 0.56 i 0.70 N N 1.57 0.03125 0.0175 S 5.81 0.18 22.24 1.30 0.27 0.00 C3 0.28 0.70 N N 0.78 0.03125 0.0500 S 3.68 0.12 29.93 0.81 0.00 0.00 C4 0.35 0.60 N N 0.84 0.03125 0.0500 S 3.78 0.12 29.93 0.85 0.00 0.00 C5 0.17 0.70 N N 0.48 0.03125 0.0500 S 3.05 0.10 29.93 0.60 0.00 (0 00) 0.00 C9 0.03 0.70 N N 0.08 1 0.03125 0.0100 S 2.15 0.07 18.90 0.21 0.00 0.00 C5 C9 C10 0.25 0.70 Y N 1.47 0.03125 0.0000 S 5.13 0.16 -- -- -- 0.00 (0.00) (0.00) C11 0.37 0.70 N N 1.04 0.03125 0.0200 S 4.85 0.15 23.35 1.01 0.03 (�00) 0.00 C12 0.17 0.70 N N 0.48 0.03125 0.0300 S 3.36 0.10 25.85 0.60 0.00 0.00 C13 0.02 0.70 N N 0.08 0.03125 0.0300 S 1.76 0.06 25.85 0.21 0.00 0.03 (0.03) C15 0.22 0.70 Y N 1.30 0.03125 0.0000 S 4.71 0.15 -- -- -- (�off) 0.00 C16 0.42 0.70 Y N 2.47 0.03125 0.0000 D 5.72 0.18 -- -- -- 0.00 (0.00) J1 0.31 0.70 N N 1.04 0.03125 0.0200 S 4.86 0.15 23.35 1.01 0.03 (���) 0.17 B13 J2 0.14 0.70 N N 0.39 0.03125 0.0200 S 3.37 0.11 23.35 0.55 0.00 0.00 (0.00) Page 3 of 3 Hydrology Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Mar 14 2023 Culvert E Hydrograph type = Rational Peak discharge (cfs) = 64.66 Storm frequency (yrs) = 50 Time interval (min) = 1 Drainage area (ac) = 27.300 Runoff coeff. (C) = 0.4 Rainfall Inten (in/hr) = 5.921 Tc by User (min) = 20 IDF Curve = Waxhaw.IDF Rec limb factor = 1.00 Hydrograph Volume=77,589(cuft); 1.781 (acft) Runoff Hydrograph Q (cfs) 50-yr frequency Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 5 10 15 20 25 30 35 40 Time (min) Runoff Hyd - Qp = 64.66 (cfs) Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Mar 14 2023 Culvert E Invert Elev Dn (ft) = 599.10 Calculations Pipe Length (ft) = 118.50 Qmin (cfs) = 64.66 Slope (%) = 0.69 Qmax (cfs) = 64.66 Invert Elev Up (ft) = 599.92 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 48.0 Shape = Circular Highlighted Span (in) = 48.0 Qtotal (cfs) = 64.66 No. Barrels = 1 Qpipe (cfs) = 64.66 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 5.98 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 8.11 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 602.31 HGL Up (ft) = 602.35 Embankment Hw Elev (ft) = 603.61 Top Elevation (ft) = 611.00 Hw/D (ft) = 0.92 Top Width (ft) = 26.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(6) Culvert E Hw Depth(0) 613.00 13.08 611.00 11.08 609.00 9.08 607.00 7.08 605.00 - - 5.08 603.00 ............. ICI etcontrcd 308 601.00 1.08 JIMA 599.00 !.- -0.92 597.00 -2.92 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 Circular Culvert HGL Embank Reath 00 Hydrology Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Mar 14 2023 Culvert F Hydrograph type = Rational Peak discharge (cfs) = 25.71 Storm frequency (yrs) = 25 Time interval (min) = 1 Drainage area (ac) = 12.040 Runoff coeff. (C) = 0.4 Rainfall Inten (in/hr) = 5.339 Tc by User (min) = 20 IDF Curve = Waxhaw.IDF Rec limb factor = 1.00 Hydrograph Volume=30,854(cuft);0.708(acft) Runoff Hydrograph Q (cfs) 25-yr frequency Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 5 10 15 20 25 30 35 40 Time (min) Runoff Hyd - Qp = 25.71 (cfs) Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Mar 14 2023 Culvert F Invert Elev Dn (ft) = 593.06 Calculations Pipe Length (ft) = 103.50 Qmin (cfs) = 25.56 Slope (%) = 3.63 Qmax (cfs) = 25.56 Invert Elev Up (ft) = 596.82 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 30.0 Shape = Circular Highlighted Span (in) = 30.0 Qtotal (cfs) = 25.56 No. Barrels = 1 Qpipe (cfs) = 25.56 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 5.78 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 7.09 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 595.17 HGL Up (ft) = 598.54 Embankment Hw Elev (ft) = 599.54 Top Elevation (ft) = 608.00 Hw/D (ft) = 1.09 Top Width (ft) = 51.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) Culvert F Hw Depth(ft) 611.00 14.18 608.00 11.18 605.00 8.18 602.00 5.18 TIIiii Atduw 6J 599.00 2.18 596.00 -0.82 593.00 -3.82 590.00 -6.82 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Circular Culvert HGL Embank Reach(ft) Hydrology Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Mar 14 2023 Culvert K Hydrograph type = Rational Peak discharge (cfs) = 4.658 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 1.430 Runoff coeff. (C) = 0.45 Rainfall Inten (in/hr) = 7.238 Tc by User (min) = 5 IDF Curve = Waxhaw.IDF Rec limb factor = 1.00 Hydrograph Volume=1,397(cuft);0.032(acft) Runoff Hydrograph Q (cfs) 10-yr frequency Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 5 10 Time (min) Runoff Hyd - Qp =4.66 (cfs) Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Mar 14 2023 Culvert K Invert Elev Dn (ft) = 607.30 Calculations Pipe Length (ft) = 32.30 Qmin (cfs) = 4.66 Slope (%) = 1.24 Qmax (cfs) = 4.66 Invert Elev Up (ft) = 607.70 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 15.0 Shape = Circular Highlighted Span (in) = 15.0 Qtotal (cfs) = 4.66 No. Barrels = 1 Qpipe (cfs) = 4.66 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 4.19 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 5.08 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 608.36 HGL Up (ft) = 608.57 Embankment Hw Elev (ft) = 609.11 Top Elevation (ft) = 609.50 Hw/D (ft) = 1.13 Top Width (ft) = 5.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) Culvert K Hw Depth(th 610.00 2.30 609.50 - 1.80 609.00 1.30 608.50 0.80 608.00 -0.30 607.50 -020 607.00 -0.70 606.50 -1.20 0 5 10 15 20 25 30 35 40 45 50 55 CircularCulvert HGL Embank Reach(ft) PRE VS POST DRAINAGE AREA MAPS . III ., �> / ,t-,_)---,',,, 7:;111. ‘.11:A1,r; r• , ___,_ 4 ) ,..,J. (4 I i-' 4:.,',f////I '" ,���■■ - Moms • ■ ,--..,-„, '. M., .. 41, ai r L:1112 Caj" ��c /r �R -;„/,,,, ' '- :�'///�rlfi°>�/ MtIntcgym f �gs9m/fww wcasiFR 6ti/ - ,}? d U P/N 05087035 '�°/Y C y N 4,' T OB3175 PG434 ,. i"� �J � ' /- ,y w�� W y Tiii 4/ (��P� ZON/NG Rt\ ` � ) _�/ ...., 37"QAK ! g I',I � $ O \ ) 9„\"" y r(!` ".alp �1NUODED ,. ,) - ' � d co.,,m /1 Jy�T�\\ ti'\?' "o`'�"'.s4`'y-f` 3netvNE- J ` / J a o /��.._'' t7 L\"�A ���� - � � v• w)�l�dY j� �� 1, � �� ,s= N „ rrruu�. 1. �/ `o T��� ter'" N. / `` \\ \ c J/s(( =� \/�_' / f / I \ 1 LOCATION MAP ;2 ERICAN`°q y s /' ,..-----/,, // •J ,,� s \/ (\\''',..,,,,,)-'..\ \\, L•.1 f I J/7 \ \ �_ J E1` S./ t)PiSfr' _n°ENGINEERING e z c /' � o` ) 1 // ���,,, ' ) �I 1j 1 �I �•'rr\ �- _/`4 Ii� f /,.�<,I� rsJ>1f N ! tc"� \< s 'a S�OU�HIAEasr �e - \ ` �� ! �,.�a�� I�Jl,Jj 1 �lr - tC / r !! •Y -1 va�1/4'�' t � °e?( � ., -1!J I L-� f- � l � Jt � c3estw�.'�`" p/W \ � '�w N� �f "�fo°/r?,A.J Jt t ofI � �d,� / 1 / n !� `\ � 's,9 ° spa=�,•IL�,��� , J,' -,. � / 2� ,� s, 5 j ) \1';.� 7,�Irll I � I l .. 1" T 1 \�\ r. \ �\ l/ 6B'pgBpG.�%' 1A�. 1 '6w rr,h,0, - /� � I t� )•t�� t t >,� \ iV\ 1 � of Ate.�, y �v / I( �� ` `' '�� s�r)ii t 1 I , )- > >r.v I s�,�t / r�, v_. vt� �� �/ PREDEVELOPME ,,•�•,✓ s'>r3 /7 20� ,t �' \ / / / I{ / ${ i / ) \ DRAINAGEAREA 66.66 AC/-- / f t ry"°: ` - �,} r fh Y /. �: ( )( T J ) ) 0 1\ \ IMPERVIOUSAREA=0.62AC �nµi�i `I 1 '/ /'/ �'9 . .� /' k_1-c,;'7 ,i`' �i / y _ r '�� ;? l ��� \ CN=61 n'D� - `Y1 1 ) /' y\ �,' /�� ... T ..�4 / ,•� // rF l 1 f !/{r f !, �\ \\ �\ Tc=14.3MIN .o,44/ > sa / im ` t`.' il it - / < /r3•)))ri )crt t \ \ll \, •4 SEA( r,, =/�( J ��� '� v / II TEE(/aa �I �,1�\LEI /. �// �� �� -`�� � � � // r�'I /o ��{,qir�clNt �,�.�r� "' ,,F, I Ill as .,z, \ . / i,rj �l\(1 DgNALP/N;QSL1i6-0 AT' / / r/ rFL}t\�\ "._ / f!-fi, o`' o '/• '• _ �� T • \ \ I //j ' W2rErctcefii ll I / 9 y � ��� �C4 r J •^' �r.. r - -S' L=857FT / 6f l t 1 I\\is: \ \ r2 / /'/ /o�� �� // v/ J4�+ CFANNELPLO:3-,,,j ' I ItI `i L�J�j / r �--'/ .� � S. / / / f r>'l ///'s„ Fy�.r ,/d,, oS. . �� I \ l< ` \ I 1/ > :,.r // - \\�-- / I I ('A / '' ' } ,� --,•;. t fz ., -r- II^ ECA JI 1/�C \ „.. \�\\ � �(Q'i\�/ , y, r' -�5.- .„"-' / 1 fl.,°�t ,� � - c/�! ti• /-/ r ,,'� / 1FSECAREA 5F� /�/ C .V A�v ( 1 j. } t / 1 : / \/, 9 g :'�/ \ \ '4.- I f { \ WP 1114FT // / \r t 1 I ,I 2 .14. '\ ? d s \ 1, /I i(\`V1r'd/ � v t1 \ '� �.\\l \\ 'SHALLOW C01)ICENYRATEDFLOWI 03 • 1.61^ C" \ t1`))I/��\\` tB\y` \`\.\\��Y \ \ // a -\� \\1 1{t \zo\\4 �zo,., ;,.\\\ -` :It J., �1, �` -, w I L 565FT / �. �W000ED - '"_1�\\\\\\ ;l 1`\\\ Pre Development �1 1 / .F, _ ?1 T•• i651 \ �t S .3 / .yi\\\\ "\\�)\ a t \ Is,'a% \,,, \ \\ \\ OVERALLCNVALUES --,,, �;..� . C f 660,_ i, \a I. \ <yJ 1 d 6. % /. / .\\ .. ( 1 \ rAMASEEFaAo C�� � - a G' / \ ) l \ '1 \ \,��- t �,Al \ \\ \\\ Il ` SOILS CN PER COVER TYPE %OF AREA 6a vue[/CR/W `` ) _ g$ ' ' ' 1r � , `J / r,�,...\:, \\ \\ \�{ GROUP OPEN IMPERVIOUS Pc/EG'4sa� �- /.._� ..... 2-s" - ..>✓'' .SHEET FLO '''r" 1 M,.2„,'I r` g,/ \-/ '�� \./, 1 ) I( \,\ l 35 a4k\. ri�jf'4 \\... _' r _t\_-t- __-__ �. �r ;)/../ �''�•.... I`6 1 r„' r l� / (c". t / �"' ^='J B 61 98 100.(P/ \( \ . 9-eos, , q_i . 111 j.2� \ �b 1'}i/ / -._,.1._..,� ._.-/... 0�/// //f '►• -.'\ 7 •r� ��/ / \•!mom A \.... i; \\\\\$ . l •g- o� M , n=a.4o "r!/ / -----4',:-_--- 4 -� : 1 +\\1 \ -., _ a $��� = _ '�, '� _ PRE DEVELOPMENT % - "�/! r o / 't I \/ \ Pre Development .v . 2�s - / , /r p \ \\It o -t/1" s\\\\\�\ s,,Ar„-1 ymr � l „r ._-, ,\"�"/ �'� DRAINAGEAREA �.J�- 1/ \,\. ?'�.... `l ,,, o '§rya -- - `.640--- - / -r- _ s +�( J�. ,i... I ',- .i i..-.� ) ivo,-,o ! t / 1 /J / sr.\.. COVERAGEANDCN VALUES r e .'` ',- r _ / _ mE WE.,\ WOODED ( y J / I' \/L LAND GROUP \t� oy /! \� y f/ ''_X - .- :24'001 r, . °.. 0 \ .;./ //// ,11 USE AREA B CN AREA x CN POND ll \t y' x` . _ + _ /J ) t i /1 I/I I(/I I INFEX (ac) lac/CN) o i\'•, f i ti •_ ���� j ! 1 t 1\ \\ \ OPEN 66.04 66.04 61 4028.44 w vAlv ,• ��,> l-` T'c '( 1 § \\\ V v;:g>�jrs3w 61 P l \ ' y r T ro B navmuti r \ I \ C '-` \ \ ` \ •1 - ,�, , i'- ,� 'ti-,._ `` �� \ 1 \ IMPERVIOUS 0.62 0.62 98 60.76 --oe-�oe L 22 oe- oeo \_ \ is "' � \ �s :w\d \ I 7 98 o \ J/ �a�\de- 9' cue')-og--a B Or.\- °. i ` - , OI IE °E be„ er iS Y..''_' br ,�,f�// -i20 =� - \ //// / TOTAL 66.66 61 4089.20 0 -ar mar- o¢ - - . Ci ( \ "- 04 0 °E - oe oe- oe -ar E _ a wde ) //%� \\ \\ \ \ ''�oc ```'`6' :,li, --i_ .� +, *:a� \ \ �1 1J/r{,� E� .- E4E! 1 ° ,: / STIPULATION FOR REUSE )'� �. \ \� \\ \', \\'\ \l �`" - j 1�) / ,3 / •I ' THIS DRAWING WAS PREPARED FOR USE • ON THE SPECIFIC SITE,NAMED HEREON, \ 1 o- \' ,, '`t'`-'�/J / 4 I I / f-/ y J t ) j �� �_\\ t 4 / CONTEMPORANEOUSLY WITH ITS ISSUE \ I ( \ r, / / ) ) ! / ) ) / L ,\' //// / �+ (1 /r63A '_ '1 \\ ` /`�- DATE AS USTED,HEREON AND IT LS NOT 1 w1 • \ \' ` " ) S / / i / ,, ./ I if.,,,/I / \1 t f//f �• \,. /f/ __`-,-1 \\ \\�7/' TR55 Tc Worksheet SUITABLE FOR USE ON A DIFFERENT �\ '\� , -r,, / ! ( / • 1,7`I 1 f�/ / /f FP:: _\ 4i`'` 1 I`; t rf'' \ // \� ( / PROJECT SITE OR ATALATER TIME.USE OF 6 I c L k I / /,_ v 1 v A , > �/,, - v ) awe«x an, THIS DRAWING FOR REFERENCE OR E awe 10V -!f -l-tx 1' •-- t GL/ :w S A\'•\)e Y l y "`7rr J C \. N1 \ \ \ /-� I I / \ j j .�j f V ' Hyd.No.1 5 RVICCEES OF PROPERLY REQUIRES UCENSED VN�pV 1 4� / 1 ( y� 5 \.A ///,,/ _-_s A \`V J .. {)' ..,,,,,,,,,,-,....1/rr \ /'/�V / AFTHIS ANDDRAWING ENGIKEERS.REPRODOcnON \ \t ,\.\ o 1J • I f I I �I 1 ,/ rl 1.\ \ )� / �// \\\,\\\( �`f/I�l/tI;35"M4" s \ t> .f/ /I L \ N /'' Pre Dev OF THIS DRAWING FOR REUSE ON Y' 7 J \ )ICJ / / / j� "1 t ANOTHER PROJECT IS NOT AUTHORIZED \ /,, / t {r. \ \ t'- `` �/ / // °/� '�.,7 oescdotion A D 1 Taals AND MAY BE CONTRARY TO THE LAW. ,ri ti ' / r5 ) ) (. , //� \) \ /1-1 )1 / / // Sheet Flow \ r J 1/ \ R %/// \ f)! r y //) /�» y� Mannngsn-value =0.400 0.011 0.011 Q •\ °'` ° I/ / / // // ) C ;h \ /f ,' /1 J~'K (I I L r 1_,,J6".CRR7. //1t/• �� //• \ \ ' do LNT//r/N1/ESTMENTPAR/NERFLLC' /,' Flow length(R) =50.0 0.0 0.0 Qr 3N�O `'N/F�\�RpNE° 1 r / / ( /C { !^\ I ) �/// / 1/l r Ct' _^ ( ///� \ �_ P/N05G8L7N Two-year 24-hr PreaP.(Ln) =3.50 0.00 0.00 O WFJIFwWFAR�60 RM1N 6 D,NT^"�NNypN\ + \ t -y�/j'y''"'�.660 ) - \ // / \ \ /� 886173PGW7 Land slope(%) -2.70 0.00 0.00 [4 1A1 x 6.N A ,, \ \ ^. 1 i /' /,�;1'" , •t l C ,s,-. -jfi f lr-i '/ ,, \ / zwv/NG:'x-muN/(�NCnuNIr W APO ' I p ,DSL8�jg6g .��,, \� \~ \` 11( �*,./. '' ` /:` ' '.%•sNa<Laa(r/M.` '` °0' j111' /-' \ /'' Travel Time(min) i 70.37 + 0.00 + 0.00 = 10.37OM 1L �� 1 Y y• (i I / a l+- t -: J £` /// i '.. ' Shallow Concentratetl FlowCD �`` \4Iflvl y //f' .... • t' , I/l` //� i-�\\ FlowrcoarHe Sl8.300.600.00 '7•" (17" .\ \1 ( Ill . / v1-;:,,.."--..-' / L\ v- \ Watercourse slope(%) 8.30 0.00 0.00 /'1 0 N 00 t1Npaesoc l\ `I g \ •,, ) p• ,,/ram:(C\ ,,,a. '°� ! ) \\l-„� Ag / \ Surface description =Un5.paved Paved Paved ,c, C..7 1 j j�o \UN p6/ L` I-, }� ) , / f �- 1r . T 4 \�-�`-' �� ✓AA''7NA7ThPWEN, / Average velocity(R/s) =4.05 0.00 0.00 W 3h614"\ �\, \i )l r/ -l '�, 1' /-.71�,NA1a090907 RRr (f� ?j Z /° ) \\ A1\ \ `,, .1 T \( `\ I /// /-''�\ ifs.' r ) \'--- �' ~ /r OBT490 ZA4 , \ /'' Travel Time(min) =2.33 + 0.00 + 0.00 = 2.33 Q' E \ I%c \ _ ..\\ (I 1( \-.qt.,/ \r Y's y (• ZONING.R-2D UN/ONCOUNIY AMER TRUST x �y Channel Flow NNN< ��.Z n\ / \ Q \_. \\11 \\ (�� l I / �..-" no_ yn.�_ ( ,Y` �� v' X sectional p.Raw area(sgft) = 611.2022. 200 0.000.00 0.000.00 w r x F11 \n \Ty,EFS r.gp • \�\".., �'lj �6/ \ -, -i\ ,smlMSYCWA7Y , Chennelslome(/(R) =3504 0.00 0.00 (YY�� �,,C7 P '-> , A -.�\\Z\\ 14 f r•� O `� \ Velocity(R[s)value -8.9730 0.015 0.015 O Q ___. \ G:kl 1. 0 f \ �4L7 N. d' 8 17 4• } . -t „O ✓` „:- \ \y' Flow length(ft) ({0})857.0 0.0 0.0 a \ \ ' .� \ \s.r. -j•) I Pd]AKNCRU7lEDGENE/RS / '' N� V AC,- 4� AGREE SPA A ▪`\) V -.r' ♦� L_ d P/N.OSGSYWx / OB.20 NGLSB \ /'i $ '1\ t REB DE 9 \ (\e,�\`'f„ ! ,./..,,,,,,,, / c, lr . / ,R-70UN/ONCOUNIY Travel Time(min) =1.59 + 0.00 + 0.00 = 1.59 E t OR 4EG 3\\', { C^r�, ) /✓/E \ Total Travel Time,7c 14.30 min JOB NUMBER: C220016 �y aF I GGR SET/I[EScw- n \ '-- /,�p_` /MAevtoumtLEsoN CHECKED BY: BHE P/N asoo.99971 \ DRAWN BY: BHE GRAPHIC SCALE ♦\ / $" UB-20UN/NC /'' 03-22-2023 " 350 0 ]5 150 300 AtMGO/pN\\ \ 1RL ¢ '" 'ON/NG.'R-ZOUN/L7NCOUNTY / DATE: 5 m \ Pl 0 7" N , N/E \ ` ,' SHEET TITLE:PRE OB� ' CURT/SE TOLLCyON, J \\// t n L R-1 "' JNARYLOUTOLLESON J (IN FEET) �,- P/ 7i DEVELOPMENT 1 1 inch=150 ft. - .,,\ae{rv4 xr /' 1 �� �BrB57PGy North DRAINAGE MAP 04 Carolona 8�y s t \ \ /zawNaN /' • NOM Grolim 611 \\ ••3Days Before Digging••• SHEET NO.: Ill C1-80f46324949 Remote Ticker Entry ?: hapArc811.org/remotet ckateetry.htm J i i 1 0 1_0-- /Z___ / I' r r I. taAa ;,,A, **At At d /� J / j l / r✓,/ // W W "= �,- � f r�Or/ / z�� "��r/ I R A°ff�iVA�A i 1 II W•- -'o ,' �J/ /.A /„.../„. J o ai ,. ,,./ ,,,„, / ga7m/fww MUSTER {' I ,V '- , a / d U vi,osoR�o-ss ,. /;17, r DP/B:SvG43a ,I UNDETAINED _ . ""µ°"mo ' vc7vG45az.�• �. j AREA\ \ `�.... `--s L. l 411 / w gi ( ,. Larass '-',\ � / �i ! L m ai ,\ \\ P� ZON/NG Rt\ •/ ���0����I 8 hr U 4 "---- '(;f p Ai\-' 16'1-�,,e":0, ' ` \\\ "`..4• �'I� Fall {l -- - E s t N �J //,�(\ 11-a \. \ 4, .J� ��\T �t `.Q1?� ENGINEERING e/'' / /1.' 'o` T�� ' 'f' \ �,]fi BMP3DRAINAGE `r� ���/I -/ . ?` LOCATION MAP ;2 ERICAN° v /'' / ./ H � �'���h AREA �V\p A��>. � � l}'L' r ii S t s _n, ASSOCIATES °o g. /' l '/ y • �� �>%`T"'/ ��\ .�`��� l J /f 1 f f' { t'tC't \< 5 a SOUTHEAST d j R ,, p- / n\ � ,-iG_sr g,4+or ``" ;#474 li��*Ak 1�1 ralt1�MA / 1'�{ 1't f IA 1 1�)r 1 .ti`\N l ��"'9 c3Bat pti: UBLIL T \ ,/ a). - / s�f�'' :J! 1 1 I�i1 •l E j \ t��( \ \t\ 7r. \\i\\ \ / ,��'iTf OF A NO`,,,°� /'' PO / \ Y\41 I J' •, II' '� /, 'i )t' 1,1( )rit ,n " ti / l 1t\\V� / �vI / �i ,` �r��r � .;' 111 �i�e I ?, {a r��l Y L� ,t� r .- v v POST-DEVELOPMENT ,ncimEAs,,,, / / \1 I 4,'e � b ''L '"+ ►1e /1 1 S�`I J \ ) / 1 \ TOTAL AREA 17.36 AC i i F� l/ fj ' ° ., �s ?f /'."--i%6 / 1��11r" ' (trio, { • ,•' J "y�f 1 J., \ \\ H O / ' / 1 '/ ' /, c �.q / '' ► �- 'I 1 Ig ,' L j I J�•y ; ,, / / 1 1 � V \, DETAINED AREA-BMP1 �J 1 1 1J �/ / r "r / /�UNDETAINED -- / I. %® / f r„"s - !,. � if / . r /, �� 1 f l \6 \ \ \/ '3`/ , my // AREA _- - ����/, < i7Y l ! 1 30� \ \- SEA( /1 Y 1�� '� , � / t\ f 1• , � \ \ PERVIOUS: 15.07AC( - - j s, ` 1 ,\\t 1�,t '�'' �,'~ _..�ti I.1 1 TOTAL: 21.98 AC CN=73 -22 Y13 ,-/ i / J ' ,J ` -, - '. - ! f \ 1 \\, , / _.NJE'` .,. J TC=SMIN m • GJN, �. �� �/ i L.. 90 ,a.4. ` / / - 1\ ' l /�/ 11.j� /. ,_,/ "��" "1uNvarErALRoussuu,` /�r/ /D DETAINED AREA-BMP2 '�r��H.FBT\o` .// I / Y Z p� I / 11111 l f�J :, OONALOG ROUSSEAU/ `/ '// \ a 9 // 11„ .''/ -" - l'i1 v/Nasavouma /\ IMPERVIOUS: 6.03 AC r;rtN1r1 / / r"' 'v',$ , v ill l/Ili :0 / jJ i/T� �,1 } g-�S � � � 7� ��� ,� ," PERVIOUS: 8.12 AC (` I / / / �U'„-,r / ly ` / '� sr ,..�.r =r � i.II1; L, I �. _ZON G-ZO UN/ONCOUNI„Y - �''l '+, d a ;�0 `�� � � -- , c \ i i 1 1 r/ 1 i TOTAL: 14.15 AC CN-77 ' I f /, PF� y �/ iI� � �%��r I , i\, LY r > ;y..- /� ----]'--- TC=SMIN -Et��. J j 1 � g; 1° \ ,•"'fie,�I -.. � ,t A, ♦A\ � t\ t " C I r _ DETAINED AREA-BMP3 }s �'`, � �:14:11•0):.//, 1)`;1,,� i A1s+ 1 j \2;y.� z,at �}' IMPERVIOUS: 2. Ms- /e - / 1 {iJrl i (� y \' PERVIOUS: 3.22AC � ' \ e �44,.„4���� /ate B D / !' ` I \l l t 11 1' \� �_.A\ \ _���0 '+-- ., \ ,.. TOTAL; 5.51 AC CN=76 /%'� �1 A ` ����i/��� � UNDETAINEDi.I 1V AA\ .r�^'�. A TC=SMIN i1 / t'� E �' i /. J )���/ `'�9;'\;C�.,� It AREA •1/ \ 1\\\ \, -,�`,) \ \ \ r,/, l\.�._. �. ` . \, / / / ,, \�j\ \ \ \\\ UN MERVIOUS: 0.71AC \ L ' 1 . <'`,\/ ,-. \--. .mo w`/ s � : ( I \ 1 \ 1r /-�"- `'�� / ~' � ' J 1 \ ` PERVIOUS: 24.31 AC YAMASEEFOAD `4 \ `. d 2 '� \���Ra ./ , ( ) ` \ ) \ IL•�6ORUBUCR/W ) _ _ g'g��s 6/,.. . ��� "rV�V �, ) Vv ,-VA A,i=\ v{ TOTAL: 25.02AC CN= 4i ---- vc/,?_asa7 '�. , g• o�' �1 / �. � �� �� � %"� 7 am TL=14.3 MIN \, 1 / r ,//I, ,,, y��c','_ /II 1J -�� 'x \ ' II �`� � 7 J m \" a;i v \�ti v�• 9`�ms��" / / * \A °• � % fir/ f , j V// n 1 ✓'\r k \ Iry '�a s. y _ - ro" / �� ° / �\ ,VA V1.. ter, y''4,9 mr '� / -r• , 'li V ti i r 1 ,, I S a' �A.-� ,ti tidy�- - `/ - -� ° 1 (--Y- �iA���� / I i / {.,. v t n o¢sue P \ 1 ))d -` r / / pia �,_•A \ \ 11 \\/� \�.o.:� \/ /I \ o POND , ' . ,/. , -)-f r I4 (\ I o � \ ",I '/ > ��� )����e /. ) , j y\\v ;;pit t UNDETAINED ._ �• ti i . \ \ \ m A od v ) \ \ ae �� __ AREA ,, 4, ��� ��\d V A I /7J// L V n\y \�E„ 0e bss <a k- � 1 �- 1// / 1 r 'II Of �aF • d oe�0e ae-\ r'r - e J o. o - > /� -\ \ \ \ / \\ 6-\ \ `\T'€,,,,, of 'j E ce ', N- 0 r J _� ° /� of 0 /j/ 0[ \\ \V Av \\'' V F �� �� � a _. --•- ii / - STIPULATION FOR REUSE '\ ... `y`` �� �� �.,,,,,...,..- /-i OTHIS DRAWING WAS PREPARED FOR USE \ T 4 \".� � = '..-'�= ===`C����E�r I i"020 _ .1)V1' CONTEMPORANEOUSLY ON THE ERAN OUCIFIC SY WITH OnSERSSUE ® /' DATE AS USIED,HEREON AND IT LS NOT _����0: �`�- / 1/ SUITABLE FOR USE ON A DIFFERENT \ I i• I �' PROJECT SITE OR ATAIATER TIME.USE OF b 1 t ( \,r ��tiokizz .. i.,, /// - \ / / THR DRAWNG FOR REFERENC OR ENMTIE V 1 nA- i >.�/k( / ) AON ANO➢ER PROJECT REQUIRES THE C , i tlt // \3 i' \ //' SY UCENSED APl}I CffECR AND ENGIEEEI6ES OF LREPR000CDIXir p > fJ \ OF THIS DRAWING FOR REUSE ON \\\\ \ 1` J// ' �` �� � 1 � / ///J 1 \ \`� ` Post Development Detained BMP 1 Post Development Detained BMP 3 \ MIA _�.'i ��1 _. nw - t' HI J D 1 I J Z p ANOTHER PROJECT IS NOT AUTHORIZED \ \ \ / /r/' J111� �� \ ':. ®�® ®�o�® -y� I�(i • ' I r �J: AND MAY BE CONTRARY TO THE LAW. V \`�41 J l R ��•"y /ii» a�� �� r il l /• I '�� OVERALL CN VALUES / ♦ --s.•---" 2 J /7i/ /� / OVERALLCN VALUES SOILS CN PER COVER TYPE \ \\\ /f' \\\ „ ! - �s 'C Il�.l`! .� 1 /� ///� Ja/��`•"�( % /....- GROUP OPEN SOILS CN PER COVERTYPEMPERVIOUS %OFARFJt %OF AREA A ,1 WW II , / I • GROUP OPEN IMPERVIOUS \ \ �w �� PIDRAINAGE II /�1� 4 /1/"ti // .,\1\ twm/NYESIMENrvARINERf[[C' p'f15HO4O F N,AN i„� ` AREA �a � f f r i \ MN7N B 61 98 100.0'/n B 61 98 100.0°k •LNovfA 6BRhN \;;wo. nAN �_ AT 1 itiL .d 't // J -'V ��/+�'.�' OSEI73PG547W CBpN7A�`,, AO G NpaA " �, ���. J� / /' ".,. \ / Z(AY/NG:'RSOUN/ONCOUN/Y7W (@ p3;15 \ , ,5 Y�� / `�"�/ �./-�� PostDevelo Development I� O M s 290 9i �\ ` `_ � �� �ll: \ •., p Post Development Detained BMP M %\ 1QNINGR �� � �*� ������/��� ♦ j)1�£ �eS4 /�'_.'�.V�� COVERAGE AND CN VALUES COVERAGE AND CN VALUES z \ �1 /- \ \ LAND GROUP __ J'ti p 1 O I' (/ \'-C� i'-� -./) \ \ LAND GROUP /1 fV � Fil ' P Lj `N7HGMP5oN `\\\� '\\1;. \ /A/ICJ �/ \\-:---2--------/ AX>• USE AREA B CN AREA x CN �,7 USE AREA B CN AREA CN \ / (ac) (ac/CN) V Z V dPN 3W3 Vt't 1 �ii���1 ���� 1 / uAHn+ulvGVYEx (ac) (ac/cN) `� I. I // Jf/�NAS'MAT77/FWPFRRY '�' /• ,\ OB 11GLB�1\ \\\\� v ®�` i ® �/♦ ....- ,.1_` - /�__ P/d/V0A atll 18.07 3.22 ( E t\ �\\X�\ ". A� �`i�s'� ,. l+. r\ -.t oeY4vovGzaf OPEN 15.07 61 61 919.27 OPEN 3.22 61 196.42 • / -r- (� ZONING.R ZO UN/ONCOUNIY 61 _ Q n ( \ Q ;mo t �'��� �!j �, 6.91 2.29 W \�11.aq 4 \ el'erN- ! '� /'} ti ` IMPERVIOUS 6.91 9801 98 677.18 IMPERVIOUS 2.29 98 98 224.42 \ G:R1 ') �`� ���y�/ „o`. TOTAL 21.98 73 1596.45 TOTAL 5.51 76 420.84 a \� 71' \ '"\,� _as I /'// \ - vfaee&tCRo7lSV?C /RS Post Development Detained BMP 2 Post Development Undetained N 'T016 \ TIR REBE !SDEGREE \\'� \ -/ y ) d / oe0r51vGLs8 \ OVERALL CN VALUES OVERALL CN VALUES cc ` ! 11 ZNGR-ZaUNLONmL/MY SOILS CN PER COVER TYPE SOILS CN PER COVER TYPE \ \ Otl� �j\\O \ -\ // .IT ,.( NA' / ^\ % AREA %OF AREA \ m .'/I CURnSE roaEsav,- / - IMPERVIOUS IMPERVIOUS C2 MARY[GU/DL1ESON GROUP 061N PE9810 100.0% GROUP OPEN PE9810 100.0% CHECKED BYR 20BHE ` GRAPHIC SCALE �! \ e / `" v/Nosaamovvb' \ R \ \\� m� a. oetzaiv�tER \ • DRAWN BY: BHE \ ¢" -. 'ON/NG'R-ZO UN/ONCUUNTY \ sso 0 /s sso 3m leifig LNON \ \ ' / /', Post Development Detained BMP 2 Post Development Undetained DATE: 03-22-2023 I� .. /cunr/SEroo[EWN / \ COVERAGE AND CN VALUES COVERAGE AND CN VALUES 5 ===-- \ r� s N� \ SHEET TITLE: n jpVIN�RZ� AfARYLGUT()L[E4oN r i (IN FEET) t R _ _ =- ----\ / , LAND GROUP LAND GROUP _ `s'^` _ P/N.OSORILYJ9B0 - \/\ t .... / USE AREA B CN AREA x CN USE AREA B7. CN AREA x CN 1 1 inch=150 ft. .,, ae{zv4 .1Ae' \" / 3 \ R1 / A(all lac/CN) (ac) (ac/CN) DEVELOPMENT n N/wan., �.\ y 8 R v/N:OSN9Gd7� pg1957vGOL7 �• \ \ OPEN 8.12 61 61 495.32 OPEN 24.31 51 61 1482.91 North8' DRAINAGE MAP ,1 ZpN/NGR-I /'' 6.03 071 Carolina ,t IMPERVIOUS 6.03 98 590.94 IMPERVIOUS 0.71 98 69.58 B0f0:n mnm\�/ t \ /,' NOM Carolim 611 g 98 98 •^3Days Before Digging••• SHEET NO.: \ TOTAL 14.15 77 1086.26 TOTAL 25.02 62 1552.49 811 a t-800.632-0949 Remote Ticket Entry 3 htlpl m/m811.ag/ioteticketamy.Mm BMP CALCULATIONS Project Name: Rogers Pond Subdivision Project#: C220016 Date: 3/12/2023 Location: Town of Waxhaw,NC Water Quality Calculations: Wet Pond 1 Rv =0.05 + 0.9 * la Where: Rv= Runoff coefficient(unitless) la= Impervious fraction (unitless) DV=3630* Rd * Rv*A DV= Design volume (cu ft) Rd= Design storm depth (in) A=Drainage area (ac) Drainage Area= 21.98 ac Impervious Area = 6.91 ac la= 31.4 % Find Treatment Volume for 1" of rainfall: Rv= 0.05+0.9* 0.314= 0.333 DV= 3630 * 1 in * 0.333 * 21.98 ac= 26,564 cu ft WQv= 26,564 cu ft Size the bleed down orifice to discharge the WQv between 2 and 5 days. WQv Stage from Pond Design: 633.53 ft Water Surface Elevation: 632.50 ft Average Depth: 0.51 ft Q=C*A*(2gh)°5 Where: C=0.6 A=Orifice Area in sf g=32.2 ft/sec2 h=Average Depth over Orifice in ft Q=Orifice Dischage in cfs Target Average Release Rate= 0.15 cfs (48 hour draw down time) A=Q/(C*(2gh)°•5)= 0.044 sf = 6.41 sq in Circular Orifice Diameter= 2.86 in Round to Nearest Pipe Size, Use: 2.5 in Acutal Release Rate= 0.12 cfs Actual Drawdown time= 2.61 days Secondary bleeders and/or the control structure overflow shall be set above the WQv stage. POND NO.1 SA/DA Calculations Pond Bottom Elevation: 627.00 Water Surface Elevation: 632.50 Bottom of Planting Shelf Elevation: 632.00 Forebay Main Pond Vol. Vol. Vol. Vol. Vol. Stage Area Incr. Cumulative Area Incr. Cumulative Total (sf) (cf) (cf) (sf) (cf) (cf) (cf) 627.00 892 0 0 11,434 0 0 0 628.00 1,314 1,103 1,103 12,426 11,930 11,930 13,033 629.00 1,817 1,566 2,669 13,461 12,944 24,874 27,542 630.00 2,400 2,109 4,777 14,540 14,001 38,874 43,651 631.00 3,062 2,731 7,508 15,663 15,102 53,976 61,484 632.00 3,804 3,433 10,941 16,830 16,247 70,222 81,163 632.50 4,543 2,087 13,028 18,499 8,832 79,054 92,082 Forebay Total Volume: 13,028 cf Main Pond Total Volume: 79,054 cf Forebay Volume % of Main Pond: 16.5% Ok Water Surface Stage Elevation = 632.50 ft Main Pond Water Surface Stage Area = 18,499 sf Main Pond Water Surface Storage Volume = 79,054 cf Average Depth = Main Pond Volume/Main Pond Area Average Depth = 4.27 ft Percent Impervious Tributary to Pond = 31.4% SA/DA Ratio : 0.92 Tributary Area to Pond = 21.98 ac Main Pond Surface Area Required = 8,785 sf Main Pond Surface Area Provided at Permanent Pool = 18,499 sf WET POND ANTI-FLOTATION BLOCK SIZING Project Information Project Name: Rogers Pond Wet Pond 1 Project#: Designed by: BHE Date: 3/14/2023 Revised by: Date: Revised by: Date: Sizing of Antiflotation Block: Width (If) = 5.0 Length (If) = 5.0 Wall Thickness (in) = 6.0 Top of Structure = 635.5 Bottom of Structure = 630.1 Ground Elevation = 632.0 Bottom Slab Lip (in) = 12.0 Bottom Slab Thickness (in) = 12.0 Volume of Structure (cf) = 123.5 Weight of Structure (Ib) = 18,526 Volume of Water Displaced (cf) = 259 Weight of Water Displaced (lb) = 16,147 Volume of Soil Over Lip (cf) = 53.48 Sumerged Weight of Soil Over Lip (Ib) = 2010.848 Weight of Structure (Ib) = 18,526 Weight of Soil (Ib) = 2,011 Total Weight (Ib) = 20,537 Weight of Water Displaced (lb) = 16,147 Factor of Safety= 1.27 Permanent Pool Drawdown Calculations:Wet Pond 1 Permanent Pool Volume = 92,082 cf Drawdown Time = 0.53 days Release Rate (Q) = 2.011 cfs A= Q/(C*2GH)^0.5) Average Depth (H) = 2.75 ft C= 0.6 G = 32.2 ft/secA2 A= 0.20 sf 28.09 sq in 5.98 in Use: 6 in Project Name: Rogers Pond Subdivision Project it: C220016 Date: 3/12/2023 Location: Town of Waxhaw,NC Water Quality Calculations: Wet Pond 2 Rv =0.05 + 0.9 * la Where: Rv= Runoff coefficient(unitless) la= Impervious fraction (unitless) DV=3630* Rd * Rv*A DV= Design volume (cu ft) Rd= Design storm depth (in) A= Drainage area (ac) Drainage Area = 14.15 ac Impervious Area= 6.03 ac la = 42.6 Find Treatment Volume for 1" of rainfall: Rv= 0.05+0.9* 0.426= 0.434 DV= 3630 * 1 in * 0.434* 14.15 ac= 22,268 cu ft WQv= 22,268 cu ft Size the bleed down orifice to discharge the WQv between 2 and 5 days. WQv Stage from Pond Design: 595.99 ft Water Surface Elevation: 594.50 ft Average Depth: 0.75 ft Q=C*A*(2gh)°5 Where: C=0.6 A=Orifice Area in sf g=32.2 ft/sec2 h=Average Depth over Orifice in ft Q=Orifice Dischage in cfs Target Average Release Rate= 0.13 cfs (48 hour draw down time) A=Q/(C*(2gh)°5)= 0.031 sf = 4.47 sq in Circular Orifice Diameter= 2.38 in Round to Nearest Pipe Size, Use: 2 in Acutal Release Rate= 0.09 cfs Actual Drawdown time= 2.84 days Secondary bleeders and/or the control structure overflow shall be set above the WQv stage. POND NO.2 SA/DA Calculations Pond Bottom Elevation: 589.00 Water Surface Elevation: 594.50 Bottom of Planting Shelf Elevation: 594.00 Forebay _ Main Pond Vol. Vol. Vol. Vol. Vol. Stage Area Incr. Cumulative Area Incr. Cumulative Total (sf) (cf) (cf) (sf) (cf) (cf) (cf) 589.00 199 0 0 3,964 0 0 0 590.00 452 326 326 4,715 4,340 4,340 4,665 591.00 777 615 940 5,540 5,128 9,467 10,407 592.00 1,173 975 1,915 6,447 5,994 15,461 17,376 593.00 1,642 1,408 3,323 7,445 6,946 22,407 25,729 594.00 2,184 1,913 5,236 8,471 7,958 30,365 35,600 594.50 2,674 1,215 6,450 9,877 4,587 34,952 41,402 Forebay Total Volume: 6,450 cf Main Pond Total Volume: 34,952 cf Forebay Volume % of Main Pond: 18.5% Ok Water Surface Stage Elevation = 594.50 ft Main Pond Water Surface Stage Area = 9,877 sf Main Pond Water Surface Storage Volume = 34,952 cf Average Depth = Main Pond Volume/Main Pond Area Average Depth = 3.54 ft Percent Impervious Tributary to Pond = 42.6% SA/DA Ratio : 1.46 Tributary Area to Pond = 14.15 ac Main Pond Surface Area Required = 8,984 sf Main Pond Surface Area Provided at Permanent Pool = 9,877 sf WET POND ANTI-FLOTATION BLOCK SIZING Project Information Project Name: Rogers Pond Wet Pond 2 Project#: Designed by: BHE Date: 3/14/2023 Revised by: Date: Revised by: Date: Sizing of Antiflotation Block: Width (If) = 5.0 Length (If) = 5.0 Wall Thickness (in) = 6.0 Top of Structure = 597.5 Bottom of Structure = 592.2 Ground Elevation = 594.0 Bottom Slab Lip (in) = 12.0 Bottom Slab Thickness (in) = 12.0 Volume of Structure (cf) = 122.3 Weight of Structure (Ib) = 18,345 Volume of Water Displaced (cf) = 255 Weight of Water Displaced (Ib) = 15,900 Volume of Soil Over Lip (cf) = 50.4 Sumerged Weight of Soil Over Lip (Ib) = 1895.04 Weight of Structure (Ib) = 18,345 Weight of Soil (Ib) = 1,895 Total Weight (Ib) = 20,240 Weight of Water Displaced (Ib) = 15,900 Factor of Safety= 1.27 Permanent Pool Drawdown Calculations:Wet Pond 2 Permanent Pool Volume = 41,402 cf Drawdown Time = 0.55 days Release Rate (Q) = 0.871 cfs A= Q/(C*2GH)^0.5) Average Depth (H) = 2.75 ft C= 0.6 G = 32.2 ft/secA2 A= 0.08 sf 12.17 sq in 3.94 in Use: 4 in Water Quality Calculations: Sand Filter 3 Sand Filter Area to Treat Design Volume Rv =0.05 + 0.9*la Where: Rv= Runoff coefficient(unitless) la= Impervious fraction(unitless) DV=3630*Rd*Rv*A Where: DV= Design volume(cu ft) Rd= Design storm depth(in) A=Drainage area(ac) Drainage Area= 5.51 ac Impervious Area= 2.29 ac la= 41.6 Find Treatment Volume for 1"of rainfall: Rv=0.05+0.9*0.416= 0.424 DV=3630*1 in*0.424*5.51 ac= 8,481 cu ft Deisgn Volume shall be 0.75 times the runoff produced by the first inch of rainfall. DV= 6,361 cu ft Compute Sand Filter Area to Treat Water Quality Volume based on Darcy's Equation Af=(WQv*Df)/(K*(Hf+Df)*Tf) Where: Surface Area of Filter Bed(Af) Filter Bed Depth(Df)= 1.5 ft Design Volume Elevation= 593.92(where the design volume is provided,see stage storage) Average Height of Water Above Filter Bed(Hf)= 0.46 ft Design Filter Bed Drain Time(Tf)= 2 days Coefficient of Permeability of Filter Media(K)= 3.5 ft/day Af= 696.09 sf Round to Even Dimensions Length= 35 ft Width= 20 ft Af= 700 sf Filter Media Capacity Find Stage Discharge at Average Height of water Above Filter Bed Where: Discharge Through Filter Media(Qo) Substituting Into Darcy's Equation: Qo=Af*((K)*(Hf+Df)/(Df)) Where: Filter Bed Depth(Df)= 1.5 ft Surface Area of Filter Bed(Af)= 700 sf Height of Water Above Filter Bed(Hf)=varies by stage Coefficient of Permeability of Filter Media(K)= 3.5 ft/day Stage Storage Discharge: At Hf=Oft Qo= 0.000 cfs At Hf=1ft Qo= 0.047 cfs At Hf=2ft Qo= 0.066 cfs At Hf=aft Qo= 0.085 cfs At Hf=Oft Qo= 0.104 cfs At Hf=5ft Qo= 0.123 cfs Perforation Capacity Sand Filter Area= 700 sf length of pipes= 60 ft N=(number of pipes)*(length of pipes)*(4 rows/ft)*(4 holes/row) N= 480 holes (assume 50%clogging) Capacity of each hole=CA(2gh)2 Where: Diameter of holes= 0.375 in Area(A)= 0.0008 ft2 Orifice Coefficient(C)= 0.6 h= 1.96 ft (g)= 32.2 ft/s2 Capacity of each hole= 0.0052 cfs OK(greater than filter media discharge and Qtotal=N*Capacity of Each Hole 2.48 cfs drawdown) Underdrain Pipe Capacity Calculate Underdrain Pipe Size D=16*(((Q*n)/(S^0.5))^0.375) Where: Diameter of single pipe(in) Roughness factor(n)= 0.011 Internal Slope(S)= 0.005 ft/ft Underdrain Design Flow(Q)= 0.43 cfs Q=Flow Rate Through Media Design Volume Elev= 593.92(where the design volume is provided,see stage storage) Flow Rate Through Media= 0.043 cfs Q= 0.43 cfs D= 5.82 in A minimum of 2-6"pipes are required per NCDEQ Stormwater Design Manual Chapter A-5 Table 2 2-6"pipes provided SAND FILTER ANTI-FLOTATION BLOCK SIZING Project Information Project Name: Rogers Pond Sand Filter 3 Project#: Designed by: BHE Date: 3/14/2003 Revised by: Date: Revised by: Date: Sizing of Antiflotation Block: Width (If) = 5.0 Length (If) = 5.0 Wall Thickness (in) = 6.0 Top of Structure = 595.5 Bottom of Structure = 585.8 Ground Elevation = 593.0 Bottom Slab Lip (in) = 12.0 Bottom Slab Thickness (in) = 12.0 Volume of Structure (cf) = 170.7 Weight of Structure (Ib) = 25,605 Volume of Water Displaced (cf) = 413 Weight of Water Displaced (Ib) = 25,784 Volume of Soil Over Lip (cf) = 201.6 Sumerged Weight of Soil Over Lip (Ib) = 7580.16 Weight of Structure (Ib) = 25,605 Weight of Soil (Ib) = 7,580 Total Weight (Ib) = 33,185 Weight of Water Displaced (Ib) = 25,784 Factor of Safety= 1.29 Block Width (If) = 7.0 Block Length (If) = 7.0 Block Depth (If) = 1.0 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk,Inc.v2021 ero llig ale9 Legend Hyd. Origin Description 1 SCS Runoff Pre Dev 2 SCS Runoff Post Dev Det BMP1 3 SCS Runoff Post Dev Det BMP2 4 SCS Runoff Post Dev Det BMP3 5 SCS Runoff Post Dev Undetained 6 Reservoir Wet Pond 1 7 Reservoir Wet Pond 2 8 Reservoir Sand Filter 3 9 Combine Post Dev Combined Project: Pre vs Post Detention.gpw Wednesday, 03/22/2023 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 39.12 117.71 175.05 225.00 281.07 Pre Dev 2 SCS Runoff 43.31 87.46 117.50 142.58 169.61 Post Dev Det BMP1 3 SCS Runoff 35.45 66.39 86.77 103.37 121.10 Post Dev Det BMP2 4 SCS Runoff 13.20 25.05 32.94 39.37 46.26 Post Dev Det BMP3 5 SCS Runoff 16.37 46.73 68.69 87.91 109.25 Post Dev Undetained 6 Reservoir 2 2.519 13.99 41.44 73.71 98.40 Wet Pond 1 7 Reservoir 3 3.336 26.89 58.25 71.12 85.69 Wet Pond 2 8 Reservoir 4 1.503 9.356 25.33 34.30 41.83 Sand Filter 3 9 'Combine 5,6,7, 20.85 96.34 188.47 260.52 325.93 Post Dev Combined 8 Proj. file: Pre vs Post Detention.gpw Wednesday, 03/22/2023 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 39.12 2 724 141,532 Pre Dev 2 SCS Runoff 43.31 2 718 86,794 Post Dev Det BMP1 3 SCS Runoff 35.45 2 718 71,038 Post Dev Det BMP2 4 SCS Runoff 13.20 2 718 26,421 Post Dev Det BMP3 5 SCS Runoff 16.37 2 724 56,995 Post Dev Undetained 6 Reservoir 2.519 2 784 82,735 2 634.09 41,920 Wet Pond 1 7 Reservoir 3.336 2 748 68,406 3 596.61 33,232 Wet Pond 2 8 Reservoir 1.503 2 742 25,143 4 594.57 11,597 Sand Filter 3 9 'Combine 20.85 2 726 233,279 5,6,7, Post Dev Combined 8 Pre vs Post Detention.gpw Return Period: 2 Year Wednesday, 03/22/2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge = 39.12 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 141,532 cuft Drainage area = 66.660 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Dev Q (cfs) Hyd. No. 1 --2 Year Q (cfs) 40.00 40.00 j 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 1 A - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Hyd. No. 1 Pre Dev Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.56 0.00 0.00 Land slope (%) = 2.70 0.00 0.00 Travel Time (min) = 10.37 + 0.00 + 0.00 = 10.37 Shallow Concentrated Flow Flow length (ft) = 565.00 0.00 0.00 Watercourse slope (%) = 6.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =4.05 0.00 0.00 Travel Time (min) = 2.33 + 0.00 + 0.00 = 2.33 Channel Flow X sectional flow area (sqft) = 12.00 0.00 0.00 Wetted perimeter (ft) = 12.64 0.00 0.00 Channel slope (%) = 3.50 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) =8.97 0.00 0.00 Flow length (ft) ({0})857.0 0.0 0.0 Travel Time (min) = 1.59 + 0.00 + 0.00 = 1.59 Total Travel Time, Tc 14.30 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 2 Post Dev Det BMP1 Hydrograph type = SCS Runoff Peak discharge = 43.31 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 86,794 cuft Drainage area = 21.980 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP1 Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 3 Post Dev Det BMP2 Hydrograph type = SCS Runoff Peak discharge = 35.45 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 71,038 cuft Drainage area = 14.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP2 Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 4 Post Dev Det BMP3 Hydrograph type = SCS Runoff Peak discharge = 13.20 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 26,421 cuft Drainage area = 5.510 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP3 Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — - ` 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 5 Post Dev Undetained Hydrograph type = SCS Runoff Peak discharge = 16.37 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 56,995 cuft Drainage area = 25.020 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.30 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Undetained Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — I \ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 6 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 2.519 cfs Storm frequency = 2 yrs Time to peak = 784 min Time interval = 2 min Hyd. volume = 82,735 cuft Inflow hyd. No. = 2 - Post Dev Det BMP1 Max. Elevation = 634.09 ft Reservoir name = Wet Pond 1 Max. Storage = 41,920 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 6 --2 Year 0 (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 2 1111111 Total storage used =41,920 cuft Pond Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Pond No. 1 - Wet Pond 1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=632.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 632.50 23,042 0 0 0.50 633.00 25,569 12,146 12,146 1.50 634.00 28,385 26,962 39,108 2.50 635.00 31,102 29,730 68,838 3.50 636.00 33,684 32,381 101,220 4.50 637.00 36,321 34,991 136,210 5.50 638.00 39,014 37,656 173,866 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 42.00 2.50 0.00 0.00 Crest Len(ft) = 20.00 2.00 20.00 0.00 Span(in) = 42.00 2.50 0.00 0.00 Crest El.(ft) = 635.50 633.60 636.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El.(ft) = 630.09 632.50 0.00 0.00 Weir Type = 1 Rect Broad --- Length(ft) = 92.00 1.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 632.50 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.50 12,146 633.00 27.79 oc 0.10 ic --- --- 0.00 0.00 0.00 --- --- --- 0.103 1.50 39,108 634.00 27.79 oc 0.19 ic --- --- 0.00 1.69 0.00 --- --- --- 1.879 2.50 68,838 635.00 27.79 oc 0.25 ic --- --- 0.00 11.03 0.00 --- --- --- 11.29 3.50 101,220 636.00 47.85 oc 0.30 ic --- --- 23.55 24.31 s 0.00 --- --- --- 48.16 4.50 136,210 637.00 101.25 oc 0.34 ic --- --- 80.82 s 20.42 s 18.38 --- --- --- 119.97 5.50 173,866 638.00 113.82 ic 0.38 ic --- --- 95.76 s 18.02 s 95.53 --- --- --- 209.69 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 7 Wet Pond 2 Hydrograph type = Reservoir Peak discharge = 3.336 cfs Storm frequency = 2 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 68,406 cuft Inflow hyd. No. = 3 - Post Dev Det BMP2 Max. Elevation = 596.61 ft Reservoir name = Wet Pond 2 Max. Storage = 33,232 cuft Storage Indication method used. Wet Pond 2 Q (cfs) Hyd. No. 7 --2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 L0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) Hyd No. 7 Hyd No. 3 1111111 [ Total storage used = 33,232 cuft Pond Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Pond No. 2 - Wet Pond 2 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=594.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 594.50 12,526 0 0 0.50 595.00 14,493 6,748 6,748 1.50 596.00 16,730 15,597 22,345 2.50 597.00 18,909 17,807 40,151 3.50 598.00 20,974 19,931 60,082 4.50 599.00 23,087 22,020 82,102 5.50 600.00 25,257 24,161 106,263 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 36.00 2.00 0.00 0.00 Crest Len(ft) = 20.00 2.00 20.00 0.00 Span(in) = 36.00 2.00 0.00 0.00 Crest El.(ft) = 597.50 596.00 598.50 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El.(ft) = 592.20 594.50 0.00 0.00 Weir Type = 1 Rect Broad --- Length(ft) = 41.00 1.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 594.50 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.50 6,748 595.00 16.10 oc 0.07 ic --- --- 0.00 0.00 0.00 --- --- --- 0.068 1.50 22,345 596.00 16.10 oc 0.13 ic --- --- 0.00 0.00 0.00 --- --- --- 0.125 2.50 40,151 597.00 16.10 oc 0.16 ic --- --- 0.00 6.66 0.00 --- --- --- 6.823 3.50 60,082 598.00 42.38 oc 0.19 ic --- --- 23.55 18.84 0.00 --- --- --- 42.58 4.50 82,102 599.00 76.96 ic 0.22 ic --- --- 63.19 s 13.77 s 18.38 --- --- --- 95.56 5.50 106,263 600.00 85.01 ic 0.24 ic --- --- 72.72 s 12.29 s 95.53 --- --- --- 180.79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 8 Sand Filter 3 Hydrograph type = Reservoir Peak discharge = 1.503 cfs Storm frequency = 2 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 25,143 cuft Inflow hyd. No. = 4 - Post Dev Det BMP3 Max. Elevation = 594.57 ft Reservoir name = Sand Filter 3 Max. Storage = 11,597 cuft Storage Indication method used. Sand Filter 3 Q (cfs) Hyd. No. 8 --2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 — 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 8 Hyd No. 4 1111111 Total storage used = 11,597 cuft Pond Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Pond No. 3 - Sand Filter 3 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=593.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 593.00 6,377 0 0 1.00 594.00 7,523 6,941 6,941 2.00 595.00 8,756 8,131 15,072 3.00 596.00 10,063 9,401 24,473 4.00 597.00 11,417 10,732 35,205 5.00 598.00 12,829 12,115 47,320 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 0.00 0.00 0.00 Crest Len(ft) = 20.00 1.00 20.00 0.00 Span(in) = 24.00 0.00 0.00 0.00 Crest El.(ft) = 595.50 594.00 596.50 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El.(ft) = 585.80 0.00 0.00 0.00 Weir Type = 1 Rect Broad --- Length(ft) = 60.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 593.00 0.00 --- --- --- 0.00 0.00 0.00 --- --- --- 0.000 1.00 6,941 594.00 37.66 ic --- --- --- 0.00 0.00 0.00 --- --- 0.047 0.047 2.00 15,072 595.00 37.66 ic --- --- --- 0.00 3.33 0.00 --- --- 0.066 3.396 3.00 24,473 596.00 37.66 ic --- --- --- 23.55 9.42 0.00 --- --- 0.085 33.05 4.00 35,205 597.00 48.14 ic --- --- --- 43.42 s 4.71 s 18.38 --- --- 0.104 66.63 5.00 47,320 598.00 50.58 ic --- --- --- 46.63 s 3.94 s 95.53 --- --- 0.123 146.22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 9 Post Dev Combined Hydrograph type = Combine Peak discharge = 20.85 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 233,279 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 25.020 ac Post Dev Combined Q (cfs) Hyd. No. 9 --2 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 i-- ":'- llI;l'.'--'''-\—"—' 0.00 '- 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hyd No. 8 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 117.71 2 724 351,706 Pre Dev 2 SCS Runoff 87.46 2 718 176,006 Post Dev Det BMP1 3 SCS Runoff 66.39 2 716 134,407 Post Dev Det BMP2 4 SCS Runoff 25.05 2 716 50,651 Post Dev Det BMP3 5 SCS Runoff 46.73 2 724 138,432 Post Dev Undetained 6 Reservoir 13.99 2 728 171,815 2 635.22 75,930 Wet Pond 1 7 Reservoir 26.89 2 722 131,721 3 597.79 55,998 Wet Pond 2 8 Reservoir 9.356 2 724 49,355 4 595.61 20,804 Sand Filter 3 9 'Combine 96.34 2 724 491,323 5,6,7, Post Dev Combined 8 Pre vs Post Detention.gpw Return Period: 10 Year Wednesday, 03/22/2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge = 117.71 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 351,706 cuft Drainage area = 66.660 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Dev Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 2 Post Dev Det BMP1 Hydrograph type = SCS Runoff Peak discharge = 87.46 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 176,006 cuft Drainage area = 21.980 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP1 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 3 Post Dev Det BMP2 Hydrograph type = SCS Runoff Peak discharge = 66.39 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 134,407 cuft Drainage area = 14.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP2 Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 70.00 70.00 — — 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 4 Post Dev Det BMP3 Hydrograph type = SCS Runoff Peak discharge = 25.05 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 50,651 cuft Drainage area = 5.510 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP3 Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 5 Post Dev Undetained Hydrograph type = SCS Runoff Peak discharge = 46.73 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 138,432 cuft Drainage area = 25.020 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.30 min Total precip. = 5.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Undetained Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — � 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 6 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 13.99 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 171,815 cuft Inflow hyd. No. = 2 - Post Dev Det BMP1 Max. Elevation = 635.22 ft Reservoir name = Wet Pond 1 Max. Storage = 75,930 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 6-- 10 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 - 10.00 0.00 1_ 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) Hyd No. 6 Hyd No. 2 1111111 [ Total storage used = 75,930 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 7 Wet Pond 2 Hydrograph type = Reservoir Peak discharge = 26.89 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 131,721 cuft Inflow hyd. No. = 3 - Post Dev Det BMP2 Max. Elevation = 597.79 ft Reservoir name = Wet Pond 2 Max. Storage = 55,998 cuft Storage Indication method used. Wet Pond 2 Q (cfs) Hyd. No. 7-- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 =•• -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 1111111 Total storage used = 55,998 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 8 Sand Filter 3 Hydrograph type = Reservoir Peak discharge = 9.356 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 49,355 cuft Inflow hyd. No. = 4 - Post Dev Det BMP3 Max. Elevation = 595.61 ft Reservoir name = Sand Filter 3 Max. Storage = 20,804 cuft Storage Indication method used. Sand Filter 3 Q (cfs) Hyd. No. 8-- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 4— — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 I 1 1 1 1 1 Total storage used = 20,804 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 9 Post Dev Combined Hydrograph type = Combine Peak discharge = 96.34 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 491,323 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 25.020 ac Post Dev Combined Q (cfs) Hyd. No. 9-- 10 Year Q (cfs) 100.00 I 100.00 90.00 90.00 80.00 80.00 70.001 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 'j 20.00 I1 I 10.00 \ _ 10.00 0.00 ��� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hyd No. 8 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 175.05 2 724 508,217 Pre Dev 2 SCS Runoff 117.50 2 716 237,424 Post Dev Det BMP1 3 SCS Runoff 86.77 2 716 176,817 Post Dev Det BMP2 4 SCS Runoff 32.94 2 716 66,955 Post Dev Det BMP3 5 SCS Runoff 68.69 2 724 198,563 Post Dev Undetained 6 Reservoir 41.44 2 724 233,182 2 635.91 98,448 Wet Pond 1 7 Reservoir 58.25 2 720 174,112 3 598.20 64,398 Wet Pond 2 8 Reservoir 25.33 2 720 65,650 4 595.90 23,489 Sand Filter 3 9 'Combine 188.47 2 722 671,507 5,6,7, Post Dev Combined 8 Pre vs Post Detention.gpw Return Period: 25 Year Wednesday, 03/22/2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge = 175.05 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 508,217 cuft Drainage area = 66.660 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Dev Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 180.00 I 180.00 150.00 1 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 2 Post Dev Det BMP1 Hydrograph type = SCS Runoff Peak discharge = 117.50 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 237,424 cuft Drainage area = 21.980 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP1 Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 120.00 120.00 100.00 I 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 3 Post Dev Det BMP2 Hydrograph type = SCS Runoff Peak discharge = 86.77 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 176,817 cuft Drainage area = 14.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP2 Q (cfs) Hyd. No. 3--25 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 4 Post Dev Det BMP3 Hydrograph type = SCS Runoff Peak discharge = 32.94 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 66,955 cuft Drainage area = 5.510 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP3 Q (cfs) Hyd. No. 4--25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 - 15.00 10.00 10.00 5.00 5.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 5 Post Dev Undetained Hydrograph type = SCS Runoff Peak discharge = 68.69 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 198,563 cuft Drainage area = 25.020 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.30 min Total precip. = 6.22 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Undetained Q (cfs) Hyd. No. 5--25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 II 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 6 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 41.44 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 233,182 cuft Inflow hyd. No. = 2 - Post Dev Det BMP1 Max. Elevation = 635.91 ft Reservoir name = Wet Pond 1 Max. Storage = 98,448 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 6--25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 1111111 Total storage used = 98,448 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 7 Wet Pond 2 Hydrograph type = Reservoir Peak discharge = 58.25 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 174,112 cuft Inflow hyd. No. = 3 - Post Dev Det BMP2 Max. Elevation = 598.20 ft Reservoir name = Wet Pond 2 Max. Storage = 64,398 cuft Storage Indication method used. Wet Pond 2 Q (cfs) Hyd. No. 7--25 Year Q (cfs) 90.00 I 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 II I I I I I [ Total storage used = 64,398 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 8 Sand Filter 3 Hydrograph type = Reservoir Peak discharge = 25.33 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 65,650 cuft Inflow hyd. No. = 4 - Post Dev Det BMP3 Max. Elevation = 595.90 ft Reservoir name = Sand Filter 3 Max. Storage = 23,489 cuft Storage Indication method used. Sand Filter 3 Q (cfs) Hyd. No. 8--25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 1 l - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 1111111 [ Total storage used = 23,489 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 9 Post Dev Combined Hydrograph type = Combine Peak discharge = 188.47 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 671,507 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 25.020 ac Post Dev Combined Q (cfs) Hyd. No. 9--25 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 , 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hyd No. 8 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 225.00 2 722 644,277 Pre Dev 2 SCS Runoff 142.58 2 716 288,968 Post Dev Det BMP1 3 SCS Runoff 103.37 2 716 211,964 Post Dev Det BMP2 4 SCS Runoff 39.37 2 716 80,498 Post Dev Det BMP3 5 SCS Runoff 87.91 2 722 250,643 Post Dev Undetained 6 Reservoir 73.71 2 722 284,695 2 636.31 112,019 Wet Pond 1 7 Reservoir 71.12 2 720 209,247 3 598.50 71,139 Wet Pond 2 8 Reservoir 34.30 2 720 79,189 4 596.02 24,641 Sand Filter 3 9 'Combine 260.52 2 722 823,774 5,6,7, Post Dev Combined 8 Pre vs Post Detention.gpw Return Period: 50 Year Wednesday, 03/22/2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge = 225.00 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 644,277 cuft Drainage area = 66.660 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Dev Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 240.00 240.00 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 2 Post Dev Det BMP1 Hydrograph type = SCS Runoff Peak discharge = 142.58 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 288,968 cuft Drainage area = 21.980 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP1 Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 - 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — J 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 3 Post Dev Det BMP2 Hydrograph type = SCS Runoff Peak discharge = 103.37 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 211,964 cuft Drainage area = 14.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP2 Q (cfs) Hyd. No. 3-- 50 Year Q (cfs) 120.00 1 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 — .-- (*" - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 4 Post Dev Det BMP3 Hydrograph type = SCS Runoff Peak discharge = 39.37 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 80,498 cuft Drainage area = 5.510 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP3 Q (cfs) Hyd. No. 4-- 50 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 — ---4-- 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 5 Post Dev Undetained Hydrograph type = SCS Runoff Peak discharge = 87.91 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 250,643 cuft Drainage area = 25.020 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.30 min Total precip. = 7.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Undetained Q (cfs) Hyd. No. 5-- 50 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 6 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 73.71 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 284,695 cuft Inflow hyd. No. = 2 - Post Dev Det BMP1 Max. Elevation = 636.31 ft Reservoir name = Wet Pond 1 Max. Storage = 112,019 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 6-- 50 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 I I 20.00 20.00 .0.00 — 1 � .- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 II I I I I I [ Total storage used = 112,019 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 7 Wet Pond 2 Hydrograph type = Reservoir Peak discharge = 71.12 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 209,247 cuft Inflow hyd. No. = 3 - Post Dev Det BMP2 Max. Elevation = 598.50 ft Reservoir name = Wet Pond 2 Max. Storage = 71,139 cuft Storage Indication method used. Wet Pond 2 Q (cfs) Hyd. No. 7-- 50 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 Lamomemw vielJ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 1111111 Total storage used = 71,139 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 8 Sand Filter 3 Hydrograph type = Reservoir Peak discharge = 34.30 cfs Storm frequency = 50 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 79,189 cuft Inflow hyd. No. = 4 - Post Dev Det BMP3 Max. Elevation = 596.02 ft Reservoir name = Sand Filter 3 Max. Storage = 24,641 cuft Storage Indication method used. Sand Filter 3 Q (cfs) Hyd. No. 8-- 50 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 L 0.00 - — — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 1111111 [ Total storage used = 24,641 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 9 Post Dev Combined Hydrograph type = Combine Peak discharge = 260.52 cfs Storm frequency = 50 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 823,774 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 25.020 ac Post Dev Combined Q (cfs) Hyd. No. 9-- 50 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 L 40.00 40.00 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hyd No. 8 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2021 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 281.07 2 722 796,537 Pre Dev 2 SCS Runoff 169.61 2 716 345,247 Post Dev Det BMP1 3 SCS Runoff 121.10 2 716 250,010 Post Dev Det BMP2 4 SCS Runoff 46.26 2 716 95,182 Post Dev Det BMP3 5 SCS Runoff 109.25 2 722 308,772 Post Dev Undetained 6 Reservoir 98.40 2 722 340,947 2 636.69 125,479 Wet Pond 1 7 Reservoir 85.69 2 720 247,281 3 598.84 78,492 Wet Pond 2 8 Reservoir 41.83 2 718 93,869 4 596.12 25,745 Sand Filter 3 9 'Combine 325.93 2 720 990,869 5,6,7, Post Dev Combined 8 Pre vs Post Detention.gpw Return Period: 100 Year Wednesday, 03/22/2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 1 Pre Dev Hydrograph type = SCS Runoff Peak discharge = 281.07 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 796,537 cuft Drainage area = 66.660 ac Curve number = 61 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.30 min Total precip. = 7.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Dev Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 320.00 320.00 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 - — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 2 Post Dev Det BMP1 Hydrograph type = SCS Runoff Peak discharge = 169.61 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 345,247 cuft Drainage area = 21.980 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP1 Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 3 Post Dev Det BMP2 Hydrograph type = SCS Runoff Peak discharge = 121.10 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 250,010 cuft Drainage area = 14.150 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP2 Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 i 100.00 I 80.00 80.00 60.00 60.00 40.00 40.00 II 20.00 20.00 I 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 3 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 4 Post Dev Det BMP3 Hydrograph type = SCS Runoff Peak discharge = 46.26 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 95,182 cuft Drainage area = 5.510 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Det BMP3 Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 5 Post Dev Undetained Hydrograph type = SCS Runoff Peak discharge = 109.25 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 308,772 cuft Drainage area = 25.020 ac Curve number = 62 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.30 min Total precip. = 7.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Dev Undetained Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 6 Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 98.40 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 340,947 cuft Inflow hyd. No. = 2 - Post Dev Det BMP1 Max. Elevation = 636.69 ft Reservoir name = Wet Pond 1 Max. Storage = 125,479 cuft Storage Indication method used. Wet Pond 1 Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 11 20.00 20.00 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 2 1111111 Total storage used = 125,479 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 7 Wet Pond 2 Hydrograph type = Reservoir Peak discharge = 85.69 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 247,281 cuft Inflow hyd. No. = 3 - Post Dev Det BMP2 Max. Elevation = 598.84 ft Reservoir name = Wet Pond 2 Max. Storage = 78,492 cuft Storage Indication method used. Wet Pond 2 Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 140.00 - 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 I 60.00 I I 40.00 40.00 il 20.00 20.00 0.00 - — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 3 II IIIIHTotal storage used = 78,492 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 8 Sand Filter 3 Hydrograph type = Reservoir Peak discharge = 41.83 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 93,869 cuft Inflow hyd. No. = 4 - Post Dev Det BMP3 Max. Elevation = 596.12 ft Reservoir name = Sand Filter 3 Max. Storage = 25,745 cuft Storage Indication method used. Sand Filter 3 Q (cfs) Hyd. No. 8-- 100 Year Q (cfs) 50.00 - 50.00 40.00 40.00 30.00 30.00 20.00 • 20.00 10.00 10.00 0.00 - — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 1111111 Total storage used = 25,745 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Hyd. No. 9 Post Dev Combined Hydrograph type = Combine Peak discharge = 325.93 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 990,869 cuft Inflow hyds. = 5, 6, 7, 8 Contrib. drain. area = 25.020 ac Post Dev Combined Q (cfs) Hyd. No. 9-- 100 Year Q (cfs) 350.00 I 350.00 300.00 300.00 250.00 • 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 �Jl 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hyd No. 8 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2021 Wednesday,03/22/2023 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:Waxhaw.IDF Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 I 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. Precip.file name:W:\2022\C220016-Smith Douglas Waxhaw Rogers Site\Calculations\Waxhaw.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.95 3.56 0.00 4.47 5.20 6.22 7.04 7.91 SCS 6-Hr 1.00 2.54 0.00 3.17 3.67 4.35 4.90 5.46 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 1.00 2.54 1.03 0.00 3.67 4.35 4.90 5.46 EROSION AND SEDIMENT CONTROL CALCULATIONS SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 1 Phase 1 Basin Type= Sediment (Per NCDNER EC Manual Ch. 6, Sec.6.61) Drainage Area(ac)= 22.46 Disturbed Area(ac)= 22.46 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 85.5 (Q=c*i*drainage area) Required surface area(sf)= 37,175 (435 sf per cfs of Q10 peak inflow) Required Storage(cf)= 40,428 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes(x: 1 )= 3.0 Storage Depth"Z"(ft)= 3.00 Bottom Dimension= 150.0 ft x 160.0 ft Top Dimension(sediment storage elevation)= 168.0 ft x 178.0 ft Top of Dam Dimension= 183.0 ft x 193.0 ft Storage Provided (cf)= 80,856.0 Surace Area Provided (sf)= 29,904.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 632.5 23,699 0 633 26,100 12,450 634 28,579 39,789 635 37,419 72,788 636 40,138 111,567 637 42,913 153,092 _ 638 45,745 197,421 Designed Storage Elevation (ft)= 635.50 Designed Surface Area(sf)= 38,779 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 92,178 O.K.>Minimum Required Storage Bottom Elevation (ft)= 632.5 Top of Dam Elevation (ft)= 638.0 Emergency Spillway Elevation(ft)= 636.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch.6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size(in)= 4 1.5 0.125 Head on Skimmer(ft)= 0.333 2 0.167 Dewatered Volume(cf)= 40,428 2.5 0.208 Dewatering Time(days)= 3.4 3 0.25 Calculated Orifice Size(in)= 2.99 4 0.333 Actual Orifice Size(in)= 3.00 5 0.333 6 0.417 8 0.5 !Basin#1 -Phase 1 (Cont.) Sizing of Riser Overflow: Qriser(cfs)= 85.5 (Q10) Riser Diameter(in)= (Use permanent control structure dimensions) Spillway Length (ft)= 20.0 5'x5'precast control structure Spillway Crest Elevation(ft)= 635.5 (spillway set from permanent pond design) Design High Water Depth Over Spillway(in)= 15 (Cw=3.0) Velocity Over Spillway(fps)= 3.4 Emergency Spillway Elevation(ft)= 636.5 Freeboard (ft)= 1.0 (1 ft minimum to emergency spillway elev) Filter Width(ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 638.0 (Top of Basin Elevation) Sizing of Emergency Spillway: Qspillway(cfs)= 85.5 Spillway Length(ft)= 20.0 (20 ft minimum spillway length, Cw=2.6) Spillway Crest Elevation(ft)= 636.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 15 Velocity Over Spillway(fps)= 3.4 Freeboard (ft)= 1.5 (1 ft minimum) Top of Berm Elevation (ft)= 638.0 (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft)= 5 Inside width (ft)= 5 Wall Thickness(in)= 6 Top of Structure= 635.5 Bottom of Structure= 630.1 Bottom Slab Lip(in)= 12 Bottom Slab Thickness(in)= 12 Volume of Structure(cf)= 60 Weight of Structure(Ib)= 8,926 Volume of Water Displaced(cf)= 194.8 Weight of Water Displaced(Ib)= 12,153 Bottom Slab Size: Bottom Slab Lip(in)= 12 Thickness(in)= 12.00 Weight of Anchor(Ib)= 7,350 Factor of Safety= 1.3 Check Culvert Capacity: Invert Elevation Down(ft): 629.63 Invert Elevation Up(ft): 630.09 Pipe Length(ft): 92.00 Slope(ft/ft): 0.0050 Pipe Diameter(in): 42 Mannings: 0.013 Q10(cfs): 85.5 See attached Culvert Analysis Velocity Q10(fps): 9.3 O.K.Velocity< 10 fps Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday, Mar 15 2023 SB1 PH1 Invert Elev Dn (ft) = 629.63 Calculations Pipe Length (ft) = 92.00 Qmin (cfs) = 85.50 Slope (%) = 0.50 Qmax (cfs) = 85.50 Invert Elev Up (ft) = 630.09 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 42.0 Shape = Circular Highlighted Span (in) = 42.0 Qtotal (cfs) = 85.50 No. Barrels = 1 Qpipe (cfs) = 85.50 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 9.29 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 10.10 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 632.82 HGL Up (ft) = 632.97 Embankment Hw Elev (ft) = 635.57 Top Elevation (ft) = 638.00 Hw/D (ft) = 1.57 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) SB1 PHI Hw Depth(ft) 639.00 8.91 637.00 6.91 Inlet control 635.00 4.91 J 633.00 2.91 631.00 0.91 629.00 - - -1.09 627.00 3.09 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Circular Culvert HGL Embank Reach(ft) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 1 Phase 2 Basin Type= Sediment (Per NCDNER EC Manual Ch. 6, Sec.6.61) Drainage Area(ac)= 21.98 Disturbed Area(ac)= 21.98 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 83.6 (Q=c*i*drainage area) Required surface area(sf)= 36,381 (435 sf per cfs of Q10 peak inflow) Required Storage(cf)= 39,564 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes(x: 1 )= 3.0 Storage Depth"Z"(ft)= 3.00 Bottom Dimension= 150.0 ft x 160.0 ft Top Dimension(sediment storage elevation)= 168.0 ft x 178.0 ft Top of Dam Dimension= 183.0 ft x 193.0 ft Storage Provided (cf)= 80,856.0 Surace Area Provided (sf)= 29,904.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 632.5 23,699 0 633 26,100 12,450 634 28,579 39,789 635 37,419 72,788 636 40,138 111,567 637 42,913 153,092 _ 638 45,745 197,421 Designed Storage Elevation (ft)= 635.50 Designed Surface Area(sf)= 38,779 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 92,178 O.K.>Minimum Required Storage Bottom Elevation (ft)= 632.5 Top of Dam Elevation (ft)= 638.0 Emergency Spillway Elevation(ft)= 636.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch.6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size(in)= 4 1.5 0.125 Head on Skimmer(ft)= 0.333 2 0.167 Dewatered Volume(cf)= 39,564 2.5 0.208 Dewatering Time(days)= 2.4 3 0.25 Calculated Orifice Size(in)= 3.52 4 0.333 Actual Orifice Size(in)= 3.50 5 0.333 6 0.417 8 0.5 !Basin#1 -Phase 2(Cont.) Sizing of Riser Overflow: Qriser(cfs)= 83.6 (Q10) Riser Diameter(in)= (Use permanent control structure dimensions) Spillway Length (ft)= 20.0 5'x5'precast control structure Spillway Crest Elevation(ft)= 635.5 (spillway set from permanent pond design) Design High Water Depth Over Spillway(in)= 15 (Cw=3.0) Velocity Over Spillway(fps)= 3.4 Emergency Spillway Elevation(ft)= 636.5 Freeboard (ft)= 1.0 (1 ft minimum to emergency spillway elev) Filter Width(ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 638.0 (Top of Basin Elevation) Sizing of Emergency Spillway: Ospillway(cfs)= 83.6 Spillway Length(ft)= 20.0 (20 ft minimum spillway length, Cw=2.6) Spillway Crest Elevation(ft)= 636.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 15 Velocity Over Spillway(fps)= 3.3 Freeboard (ft)= 1.5 (1 ft minimum) Top of Berm Elevation (ft)= 638.0 (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft)= 5 Inside width (ft)= 5 Wall Thickness(in)= 6 Top of Structure= 635.5 Bottom of Structure= 630.1 Bottom Slab Lip(in)= 12 Bottom Slab Thickness(in)= 12 Volume of Structure(cf)= 60 Weight of Structure(Ib)= 8,926 Volume of Water Displaced(cf)= 194.8 Weight of Water Displaced(Ib)= 12,153 Bottom Slab Size: Bottom Slab Lip(in)= 12 Thickness(in)= 12.00 Weight of Anchor(Ib)= 7,350 Factor of Safety= 1.3 Check Culvert Capacity: Invert Elevation Down(ft): 629.63 Invert Elevation Up(ft): 630.09 Pipe Length(ft): 92.00 Slope(ft/ft): 0.0050 Pipe Diameter(in): 42 Mannings: 0.013 Q10(cfs): 83.6 See attached Culvert Analysis Velocity Q10(fps): 9.1 O.K.Velocity< 10 fps Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday, Mar 15 2023 SB1 PH2 Invert Elev Dn (ft) = 629.63 Calculations Pipe Length (ft) = 92.00 Qmin (cfs) = 83.60 Slope (%) = 0.50 Qmax (cfs) = 83.60 Invert Elev Up (ft) = 630.09 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 42.0 Shape = Circular Highlighted Span (in) = 42.0 Qtotal (cfs) = 83.60 No. Barrels = 1 Qpipe (cfs) = 83.60 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 9.12 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 9.97 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 632.80 HGL Up (ft) = 632.94 Embankment Hw Elev (ft) = 635.43 Top Elevation (ft) = 638.00 Hw/D (ft) = 1.53 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) SB1 PH2 Hw Depth(ft) 639.00 8.91 637.00 6.91 Inleteontrol 635.00 4.91 633.00 2.91 631.00 - 0.91 629.00 - - -1.09 627.00 3.09 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Circular Culvert HGL Embank Reach(ft) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 2 Phase 1 Basin Type= Sediment (Per NCDNER EC Manual Ch. 6, Sec.6.61) Drainage Area(ac)= 8.01 Disturbed Area(ac)= 8.01 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 30.5 (Q=c*i*drainage area) Required surface area(sf)= 13,258 (435 sf per cfs of Q10 peak inflow) Required Storage(cf)= 14,418 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes(x: 1 )= 3.0 Storage Depth"Z"(ft)= 3.00 Bottom Dimension= 90.0 ft x 180.0 ft Top Dimension(sediment storage elevation)= 108.0 ft x 198.0 ft Top of Dam Dimension= 123.0 ft x 213.0 ft Storage Provided (cf)= 56,376.0 Surace Area Provided (sf)= 21,384.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 594.5 13,135 0 595 14,987 7,031 596 16,912 22,980 597 23,685 43,279 598 25,925 68,084 599 28,219 95,156 600 30,569 124,550 Designed Storage Elevation (ft)= 597.50 Designed Surface Area(sf)= 24,805 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 55,681 O.K.>Minimum Required Storage Bottom Elevation (ft)= 594.5 Top of Dam Elevation (ft)= 600.0 Emergency Spillway Elevation(ft)= 598.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch.6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size(in)= 4 1.5 0.125 Head on Skimmer(ft)= 0.333 2 0.167 Dewatered Volume(cf)= 14,418 2.5 0.208 Dewatering Time(days)= 2.7 3 0.25 Calculated Orifice Size(in)= 2.00 4 0.333 Actual Orifice Size(in)= 2.00 5 0.333 6 0.417 8 0.5 !Basin#2-Phase 1 (Cont.) Sizing of Riser Overflow: Qriser(cfs)= 30.5 (Q10) Riser Diameter(in)= (Use permanent control structure dimensions) Spillway Length (ft)= 20.0 5'x5'precast control structure Spillway Crest Elevation(ft)= 597.5 (spillway set from permanent pond design) Design High Water Depth Over Spillway(in)= 8 (Cw=3.0) Velocity Over Spillway(fps)= 2.4 Emergency Spillway Elevation(ft)= 598.5 Freeboard (ft)= 1.0 (1 ft minimum to emergency spillway elev) Filter Width(ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 600.0 (Top of Basin Elevation) Sizing of Emergency Spillway: Qspillway(cfs)= 30.5 Spillway Length(ft)= 20.0 (20 ft minimum spillway length, Cw=2.6) Spillway Crest Elevation(ft)= 598.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 8 Velocity Over Spillway(fps)= 2.3 Freeboard (ft)= 1.5 (1 ft minimum) Top of Berm Elevation (ft)= 600.0 (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft)= 5 Inside width (ft)= 5 Wall Thickness(in)= 6 Top of Structure= 597.5 Bottom of Structure= 592.2 Bottom Slab Lip(in)= 12 Bottom Slab Thickness(in)= 12 Volume of Structure(cf)= 58 Weight of Structure(Ib)= 8,728 Volume of Water Displaced(cf)= 190.4 Weight of Water Displaced(Ib)= 11,883 Bottom Slab Size: Bottom Slab Lip(in)= 12 Thickness(in)= 12.00 Weight of Anchor(Ib)= 7,350 Factor of Safety= 1.4 Check Culvert Capacity: Invert Elevation Down(ft): 592.00 Invert Elevation Up(ft): 592.21 Pipe Length(ft): 41.00 Slope(ft/ft): 0.0051 Pipe Diameter(in): 36 Mannings: 0.013 Q10(cfs): 30.5 See attached Culvert Analysis Velocity Q10(fps): 5.0 O.K.Velocity< 10 fps Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday, Mar 15 2023 SB2 PH1 Invert Elev Dn (ft) = 592.00 Calculations Pipe Length (ft) = 41.00 Qmin (cfs) = 30.50 Slope (%) = 0.51 Qmax (cfs) = 30.50 Invert Elev Up (ft) = 592.21 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 30.50 No. Barrels = 1 Qpipe (cfs) = 30.50 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 5.04 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.94 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 594.39 HGL Up (ft) = 594.00 Embankment Hw Elev (ft) = 594.92 Top Elevation (ft) = 600.00 Hw/D (ft) = 0.90 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) SB2 PHI Hw Depth(ft) 601.00 8.79 600.00 7.79 599.00 6.79 598.00 5.79 597.00 4.79 596.00 3.79 595.00 cp„uy 2.79 594.00 1.79 593.00 0.79 592.00 -021 591.00 -1.21 0 5 10 15 20 25 30 35 40 46 50 55 60 65 Circular Culvert HGL Embank Reach(ft) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 2 Phase 2 Basin Type= Sediment (Per NCDNER EC Manual Ch. 6, Sec.6.61) Drainage Area(ac)= 14.15 Disturbed Area(ac)= 14.15 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 53.8 (Q=c*i*drainage area) Required surface area(sf)= 23,421 (435 sf per cfs of Q10 peak inflow) Required Storage(cf)= 25,470 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes(x: 1 )= 3.0 Storage Depth"Z"(ft)= 3.00 Bottom Dimension= 90.0 ft x 180.0 ft Top Dimension(sediment storage elevation)= 108.0 ft x 198.0 ft Top of Dam Dimension= 123.0 ft x 213.0 ft Storage Provided (cf)= 56,376.0 Surace Area Provided (sf)= 21,384.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 594.5 13,135 0 595 14,987 7,031 596 16,912 22,980 597 23,685 43,279 598 25,925 68,084 599 28,219 95,156 600 30,569 124,550 Designed Storage Elevation (ft)= 597.50 Designed Surface Area(sf)= 24,805 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 55,681 O.K.>Minimum Required Storage Bottom Elevation (ft)= 594.5 Top of Dam Elevation (ft)= 600.0 Emergency Spillway Elevation(ft)= 598.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch.6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size(in)= 4 1.5 0.125 Head on Skimmer(ft)= 0.333 2 0.167 Dewatered Volume(cf)= 25,470 2.5 0.208 Dewatering Time(days)= 2.2 3 0.25 Calculated Orifice Size(in)= 2.95 4 0.333 Actual Orifice Size(in)= 3.00 5 0.333 6 0.417 8 0.5 !Basin#2-Phase 2(Cont.) Sizing of Riser Overflow: Qriser(cfs)= 53.8 (Q10) Riser Diameter(in)= (Use permanent control structure dimensions) Spillway Length (ft)= 20.0 5'x5'precast control structure Spillway Crest Elevation(ft)= 597.5 (spillway set from permanent pond design) Design High Water Depth Over Spillway(in)= 11 (Cw=3.0) Velocity Over Spillway(fps)= 2.9 Emergency Spillway Elevation(ft)= 598.5 Freeboard (ft)= 1.0 (1 ft minimum to emergency spillway elev) Filter Width(ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 600.0 (Top of Basin Elevation) Sizing of Emergency Spillway: Ospillway(cfs)= 53.8 Spillway Length(ft)= 20.0 (20 ft minimum spillway length, Cw=2.6) Spillway Crest Elevation(ft)= 598.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 11 Velocity Over Spillway(fps)= 2.9 Freeboard (ft)= 1.5 (1 ft minimum) Top of Berm Elevation (ft)= 600.0 (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft)= 5 Inside width (ft)= 5 Wall Thickness(in)= 6 Top of Structure= 597.5 Bottom of Structure= 592.2 Bottom Slab Lip(in)= 12 Bottom Slab Thickness(in)= 12 Volume of Structure(cf)= 58 Weight of Structure(Ib)= 8,728 Volume of Water Displaced(cf)= 190.4 Weight of Water Displaced(Ib)= 11,883 Bottom Slab Size: Bottom Slab Lip(in)= 12 Thickness(in)= 12.00 Weight of Anchor(Ib)= 7,350 Factor of Safety= 1.4 Check Culvert Capacity: Invert Elevation Down(ft): 592.00 Invert Elevation Up(ft): 592.21 Pipe Length(ft): 41.00 Slope(ft/ft): 0.0051 Pipe Diameter(in): 36 Mannings: 0.013 Q10(cfs): 53.8 See attached Culvert Analysis Velocity Q10(fps): 8.1 O.K.Velocity< 10 fps Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday, Mar 15 2023 SB2 PH2 Invert Elev Dn (ft) = 592.00 Calculations Pipe Length (ft) = 41.00 Qmin (cfs) = 53.80 Slope (%) = 0.51 Qmax (cfs) = 53.80 Invert Elev Up (ft) = 592.21 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 36.0 Shape = Circular Highlighted Span (in) = 36.0 Qtotal (cfs) = 53.80 No. Barrels = 1 Qpipe (cfs) = 53.80 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 8.05 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 8.95 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 594.69 HGL Up (ft) = 594.59 Embankment Hw Elev (ft) = 596.52 Top Elevation (ft) = 600.00 Hw/D (ft) = 1.44 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) $62 PH2 Hw Depth(ft) 601.00 8.79 600.00 7.79 599.00 6.79 598.00 5.79 597.00 4.79 ' Inl,4nnntrol 596.00 3.79 595.00 2.79 594.00 1.79 593.00 0.79 592.00 -021 591.00 -1.21 0 5 10 15 20 25 30 35 43 45 50 55 60 65 Circular Culvert HGL Embank Reach(ft) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 3 Phase 1 Basin Type= Sediment (Per NCDNER EC Manual Ch. 6, Sec.6.61) Drainage Area(ac)= 5.51 Disturbed Area(ac)= 5.51 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 21.0 (Q=c*i*drainage area) Required surface area(sf)= 9,120 (435 sf per cfs of Q10 peak inflow) Required Storage(cf)= 9,918 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes(x: 1 )= 3.0 Storage Depth"Z"(ft)= 3.00 Bottom Dimension= 60.0 ft x 120.0 ft Top Dimension(sediment storage elevation)= 78.0 ft x 138.0 ft Top of Dam Dimension= 90.0 ft x 150.0 ft Storage Provided (cf)= 26,946.0 Surace Area Provided (sf)= 10,764.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 593 6,377 0 594 7,523 6,950 595 8,756 15,090 596 10,063 24,499 597 11,417 35,239 598 12,829 47,362 Designed Storage Elevation (ft)= 595.50 Designed Surface Area(sf)= 9,410 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 19,794 O.K.>Minimum Required Storage Bottom Elevation (ft)= 593.0 Top of Dam Elevation (ft)= 598.0 Emergency Spillway Elevation(ft)= 596.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch.6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size(in)= 3 1.5 0.125 Head on Skimmer(ft)= 0.25 2 0.167 Dewatered Volume(cf)= 9,918 2.5 0.208 Dewatering Time(days)= 2.1 3 0.25 Calculated Orifice Size(in)= 2.02 4 0.333 Actual Orifice Size(in)= 2.00 5 0.333 6 0.417 8 0.5 !Basin#3-Phase 1 (Cont.) Sizing of Riser Overflow: Qriser(cfs)= 21.0 (Q10) Riser Diameter(in)= (Use permanent control structure dimensions) Spillway Length (ft)= 20.0 5'x5'precast control structure Spillway Crest Elevation(ft)= 595.5 (spillway set from permanent pond design) Design High Water Depth Over Spillway(in)= 6 (Cw=3.0) Velocity Over Spillway(fps)= 2.1 Emergency Spillway Elevation(ft)= 596.5 Freeboard (ft)= 1.0 (1 ft minimum to emergency spillway elev) Filter Width(ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 598.0 (Top of Basin Elevation) Sizing of Emergency Spillway: Qspillway(cfs)= 21.0 Spillway Length(ft)= 20.0 (20 ft minimum spillway length, Cw=2.6) Spillway Crest Elevation(ft)= 596.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 6 Velocity Over Spillway(fps)= 2.1 Freeboard (ft)= 1.5 (1 ft minimum) Top of Berm Elevation (ft)= 598.0 (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft)= 5 Inside width (ft)= 5 Wall Thickness(in)= 6 Top of Structure= 595.5 Bottom of Structure= 585.8 Bottom Slab Lip(in)= 12 Bottom Slab Thickness(in)= 12 Volume of Structure(cf)= 107 Weight of Structure(Ib)= 16,005 Volume of Water Displaced(cf)= 349.2 Weight of Water Displaced(Ib)= 21,790 Bottom Slab Size: Bottom Slab Lip(in)= 12 Thickness(in)= 12.00 Weight of Anchor(Ib)= 7,350 Factor of Safety= 1.1 Check Culvert Capacity: Invert Elevation Down(ft): 585.50 Invert Elevation Up(ft): 585.80 Pipe Length(ft): 60.00 Slope(ft/ft): 0.0050 Pipe Diameter(in): 24 Mannings: 0.013 Q10(cfs): 21.0 See attached Culvert Analysis Velocity Q10(fps): 7.0 O.K.Velocity< 10 fps Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday, Mar 15 2023 SB3 PH1 Invert Elev Dn (ft) = 585.50 Calculations Pipe Length (ft) = 60.00 Qmin (cfs) = 21.00 Slope (%) = 0.50 Qmax (cfs) = 21.00 Invert Elev Up (ft) = 585.80 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 21.00 No. Barrels = 1 Qpipe (cfs) = 21.00 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 7.00 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.68 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 587.32 HGL Up (ft) = 587.87 Embankment Hw Elev (ft) = 588.91 Top Elevation (ft) = 598.00 Hw/D (ft) = 1.56 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) SB3 PH1 Hw Depth(ft) 599.00 I 13.20 597.00 11.20 595.00 9.20 593.00 7.20 r 591.00 - 5.20 589.00 -imawnuA 3.20 587.00 1.20 585.00 -0.80 583.00 -2.80 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 CircularCulvert HGL Embank Reach(ft) SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.61) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 3 Phase 2 Basin Type= Sediment (Per NCDNER EC Manual Ch. 6, Sec.6.61) Drainage Area(ac)= 5.51 Disturbed Area(ac)= 5.51 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 21.0 (Q=c*i*drainage area) Required surface area(sf)= 9,120 (435 sf per cfs of Q10 peak inflow) Required Storage(cf)= 9,918 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes(x: 1 )= 3.0 Storage Depth"Z"(ft)= 3.00 Bottom Dimension= 60.0 ft x 120.0 ft Top Dimension(sediment storage elevation)= 78.0 ft x 138.0 ft Top of Dam Dimension= 90.0 ft x 150.0 ft Storage Provided (cf)= 26,946.0 Surace Area Provided (sf)= 10,764.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 593 6,377 0 594 7,523 6,950 595 8,756 15,090 596 10,063 24,499 597 11,417 35,239 598 12,829 47,362 Designed Storage Elevation (ft)= 595.50 Designed Surface Area(sf)= 9,410 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 19,794 O.K.>Minimum Required Storage Bottom Elevation (ft)= 593.0 Top of Dam Elevation (ft)= 598.0 Emergency Spillway Elevation(ft)= 596.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch.6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size(in)= 3 1.5 0.125 Head on Skimmer(ft)= 0.25 2 0.167 Dewatered Volume(cf)= 9,918 2.5 0.208 Dewatering Time(days)= 2.1 3 0.25 Calculated Orifice Size(in)= 2.02 4 0.333 Actual Orifice Size(in)= 2.00 5 0.333 6 0.417 8 0.5 !Basin#3-Phase 2(Cont.) Sizing of Riser Overflow: Qriser(cfs)= 21.0 (Q10) Riser Diameter(in)= (Use permanent control structure dimensions) Spillway Length (ft)= 20.0 5'x5'precast control structure Spillway Crest Elevation(ft)= 595.5 (spillway set from permanent pond design) Design High Water Depth Over Spillway(in)= 6 (Cw=3.0) Velocity Over Spillway(fps)= 2.1 Emergency Spillway Elevation(ft)= 596.5 Freeboard (ft)= 1.0 (1 ft minimum to emergency spillway elev) Filter Width(ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 598.0 (Top of Basin Elevation) Sizing of Emergency Spillway: Ospillway(cfs)= 21.0 Spillway Length(ft)= 20.0 (20 ft minimum spillway length, Cw=2.6) Spillway Crest Elevation(ft)= 596.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 6 Velocity Over Spillway(fps)= 2.1 Freeboard (ft)= 1.5 (1 ft minimum) Top of Berm Elevation (ft)= 598.0 (Top of Basin Elevation) Sizing of Antiflotation Block: Inside Length (ft)= 5 Inside width (ft)= 5 Wall Thickness(in)= 6 Top of Structure= 595.5 Bottom of Structure= 585.8 Bottom Slab Lip(in)= 12 Bottom Slab Thickness(in)= 12 Volume of Structure(cf)= 107 Weight of Structure(Ib)= 16,005 Volume of Water Displaced(cf)= 349.2 Weight of Water Displaced(Ib)= 21,790 Bottom Slab Size: Bottom Slab Lip(in)= 12 Thickness(in)= 12.00 Weight of Anchor(Ib)= 7,350 Factor of Safety= 1.1 Check Culvert Capacity: Invert Elevation Down(ft): 585.50 Invert Elevation Up(ft): 585.80 Pipe Length(ft): 60.00 Slope(ft/ft): 0.0050 Pipe Diameter(in): 24 Mannings: 0.013 Q10(cfs): 21.0 See attached Culvert Analysis Velocity Q10(fps): 7.0 O.K.Velocity< 10 fps Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday, Mar 15 2023 SB3 PH2 Invert Elev Dn (ft) = 585.50 Calculations Pipe Length (ft) = 60.00 Qmin (cfs) = 21.00 Slope (%) = 0.50 Qmax (cfs) = 21.00 Invert Elev Up (ft) = 585.80 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 21.00 No. Barrels = 1 Qpipe (cfs) = 21.00 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 7.00 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.68 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 587.32 HGL Up (ft) = 587.87 Embankment Hw Elev (ft) = 588.91 Top Elevation (ft) = 598.00 Hw/D (ft) = 1.56 Top Width (ft) = 10.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) SB3 PH2 Hw Depth(ft) 599.00 I 13.20 597.00 11.20 595.00 9.20 593.00 7.20 r 591.00 - 5.20 589.00 -imawnuA 3.20 587.00 1.20 585.00 -0.80 583.00 -2.80 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 CircularCulvert HGL Embank Reach(ft) SKIMMER SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.64) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 4 Phase 1 Basin Type= Skimmer (Per NCDNER EC Manual Ch. 6, Sec. 6.64) Drainage Area (ac)= 3.52 Disturbed Area (ac)= 3.52 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 13.4 (Q=c*i*drainage area) Required surface area(sf)= 4,353 (325 sf per cfs of Q10 peak inflow) Required Storage(cf)= 6,336 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes ( x: 1 )= 3.0 Storage Depth "Z" (ft)= 1.50 Bottom Dimension = 100.0 ft x 40.0 ft Top Dimension (sediment storage elevation)= 109.0 ft x 49.0 ft Top of Dam Dimension = 124.0 ft x 64.0 ft Storage Provided (cf)= 7,005.8 Surace Area Provided (sf)= 5,341.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 614 3,979 0 615 4,821 4,400 616 5,720 9,671 617 6,676 15,869 618 7,688 23,051 Designed Storage Elevation (ft)= 616.50 Designed Surface Area (sf)= 6,198 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 12,770 O.K. > Minimum Required Storage Bottom Elevation (ft)= 614.0 Top of Dam Elevation (ft)= 618.0 Emergency Spillway Elevation (ft)= 616.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch. 6, Sec. 6.64 Skimmer Head on Size Skimmer (Inches) (Feet) Skimmer Size (in)= 2 1.5 0.125 Head on Skimmer(ft)= 0.167 2 0.167 Dewatered Volume (cf)= 6,336 2.5 0.208 Dewatering Time(days)= 3 3 0.25 Calculated Orifice Size (in)= 1.50 4 0.333 Actual Orifice Size(in)= 1.50 5 0.333 6 0.417 8 0.5 !Basin#4-Phase 1 (Cont.) Sizing of Emergency Spillway: Qspillway(cfs)= 13.4 (Q10) Spillway Length (ft)= 20.0 (20 ft minimum spillway length, Cw=3.0) Spillway Crest Elevation (ft)= 616.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 4 (6 in. maximum, Cw=3.0) Velocity Over Spillway(fps)= 2.0 Freeboard (ft)= 1.2 (1 ft minimum) Filter Width (ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 618.0 (Top of Basin Elevation) SKIMMER SEDIMENT BASIN (per NCDENR EROSION AND SEDIMENT CONTROL MANUAL SECTION 6.64) Project Information Project Name: Rogers Pond Project#: Designed by: BHE Date: 3/15/2023 Revised by: Date: Revised by: Date: Basin# 5 Phase 1 Basin Type= Skimmer (Per NCDNER EC Manual Ch. 6, Sec. 6.64) Drainage Area (ac)= 0.61 Disturbed Area (ac)= 0.61 Runoff Coefficient(c)= 0.50 (Smooth bare packed soil) Rainfall Intensity"i"(in/hr)= 7.61 (5 min time of concentration-10 Year Storm) Flow(Q10)(cfs)= 2.3 (Q=c*i*drainage area) Required surface area(sf)= 754 (325 sf per cfs of Q10 peak inflow) Required Storage(cf)= 1,098 (1800 cf per acre of disturbed area) Schematic Storage Dimensions: (may not be actual size or rectangular shape) Basin Side Slopes ( x: 1 )= 3.0 Storage Depth "Z" (ft)= 1.50 Bottom Dimension = 25.0 ft x 100.0 ft Top Dimension (sediment storage elevation)= 34.0 ft x 109.0 ft Top of Dam Dimension = 49.0 ft x 124.0 ft Storage Provided (cf)= 4,654.5 Surace Area Provided (sf)= 3,706.0 Designed Storage Dimensions: Elev(ft) Area(SF) Volume(CF) 592 2,517 0 593 3,322 2,920 594 4,190 6,676 595 5,115 11,328 -1,510,385 Designed Storage Elevation (ft)= 593.50 Designed Surface Area (sf)= 3,756 O.K.>Minimum Minimum Surface Area Designed Storage Volume(cf)= 4,798 O.K. > Minimum Required Storage Bottom Elevation (ft)= 591.0 Top of Dam Elevation (ft)= 595.0 Emergency Spillway Elevation (ft)= 593.5 Sizing of Skimmer Orifice Diameter: Table 6.64a, EC Manual Ch. 6, Sec. 6.64 Skimmer Head on Size Skimmer jInches) (Feet) Skimmer Size (in)= 1.5 1.5 0.125 Head on Skimmer(ft)= 0.125 2 0.167 Dewatered Volume (cf)= 1,098 2.5 0.208 Dewatering Time(days)= 2.4 3 0.25 Calculated Orifice Size (in)= 0.75 4 0.333 Actual Orifice Size(in)= 0.75 5 0.333 6 0.417 8 0.5 !Basin#5-Phase 1 (Cont.) Sizing of Emergency Spillway: Qspillway(cfs)= 2.3 (Q10) Spillway Length (ft)= 20.0 (20 ft minimum spillway length, Cw=3.0) Spillway Crest Elevation (ft)= 593.5 (1.0 ft min. above sediment storage depth) Design High Water Depth Over Spillway(in)= 1 (6 in. maximum, Cw=3.0) Velocity Over Spillway(fps)= 1.4 Freeboard (ft)= 1.4 (1 ft minimum) Filter Width (ft)= n/a (8 ft minimum) Top of Berm Elevation (ft)= 595.0 (Top of Basin Elevation) Appendices A45-FES 36" Diameter Q10 = 54.33 cfs La = 20' d50 = 7.2" W = 23' 3 o 3Do = 9' ,:.: : !Ill t = 1.4' I ;i ,1, Outlet W = Do + La Il la l I Itjl l : , +.ii{}:t1 90 --h- ;1 I fling 1 1 - pipe I : i :. iI Hip i1 1 "�.,.I diameter (Do) I ll 11! :. I ili�I if': j.,nl La --+1 80 • olio i;�� _ =T.ilwater < 0.5D0 1 : j 1 1_. I • I 11 ` i=in t,I pi;+iil/�wei1 a*k\)' 71 Li i i 1 a +:i I. 1 '.051/1;Iriri ff ✓n. �P�o60� I -t I liI t-fib ' .. 1 Ii- 1 I 1 .isiii �' .: , " 0vmac I III' 1. - I 1 �'L' �ii,i ii .��'1 I� I` J��'e� ii HI � � I II ' { co.', l r 1 it,1,Ili III -II i! I ...Ado r 0‘'CN ' 50 : HI, { tr ; • ;_ �' ' .• .q1` . , ;l;i��n o Ri1 i1 I- f. i, , I , ;i l lif� nuI mm 1 1 I (-- + I L 1-I 1 1!1- 1 i, ! I I it i ill, i- p - �' a_i�mili 1 1 1111■p 40 _ I ; {+ l t-a'' :: AO ; MiiUM AI r i' l'�,�;1. 4 1( I 1IIHM 1V.,,IIVII I �- t �' 1' l ! f fi i a� 1=II111 1 Iti 1,�'-: _. {4` { -f: 1. I i .I„ t 1 ,. 10 a aiii;.1; I ` T lil _ . I. -I .I_. i ,,,, ,I / nit�i i� i iii1I1 I.Illlimir I I 30 I r a %d� I 1 II 11111111111/11�111�11 1F- I I ' ' 0-. 01' r - - - ti 1111111 11iI1i 1111 i1dP 20 - q ,�..'.d �ii N 01� III I� f T J�i I�11111JAinlArIVII } ` I 9 ..: a F - a'.1•II�� i11i11-ar�' 1lF4r 3 dill 1 -I I_ 10 _ bil I i i. I I f J hI I_ g_'./ .u1111!r111/1 .I11111* _N -1 O �11 1111IIIIL11111!11! -- _ . . II' l ,/��/ �)� �i ,iri11111d1'O�II6 f 2 Cn l— , 1 ,1 f!1 1- -1. law . %.uI1.1!1�1%ivii 1 i - l•f I$ _, Or b Il11ri,z ►Ili:o.; 1II I, .. I tI I.I .I ): 1.100 / �//=1r,111 iliNt!IIGIIII IF17 co — 1 '.fir •' � J�-/_.:/ 1�1IIIIi1/1111111111,11QJG Q L- I I V ■I_'. �I I 11 dill 1 11111■II: :rl� ,_ I ► Li iE[Y„ . ,��, 11: �r ! ioi 1 1 III 01 iron EC -- — --1 I i.,. .. 11 I� I I� I I ' ���=�I� liilll � IIII■ I v.=ZO l . .d _ .1.116P. il II1 i111 11111I1ii11� :3 5 d ' 1 , } 1 } I i v 15 ��� + I f 4 l 1Ili'- i I .' Vi �i10 -, r 1 1 !. .. I' I .1. :- " III v ....1 I 1 r1I'' I is i 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) 54.33 cfs Curves may not be extrapolated. Figure 8.O6a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices B39-FES 36" Diameter Q10 = 35.93 cfs La = 20' d50 = 7.2" W = 23' 3 0 3Do = 9' i T t = 1.4' i l li ;i I, Outlet W = Do + La it la i I Itll l : , III ;'I 90 -- - • fill Ipipej; i :: ai ,. i; i ..',diameter (Do) , ; I III- is I ' II'Ira,80 un •.,,,,Ap La -- at : ; I . „ I I ",A 1,.rirar �+ T.ilwater < 0.5D0 I 1-.I ;_i . . I: I . ` I;l ` i iin t,l pi;+iil�Ilill4 1, n II", .,li roilli� � I ft jj , mr IC�I I t fi I • ;f... ..1� , I 1 :iisiiipd5H : tin I r° 60 i i - I 1 _ , Fifi 1511 . '',1 - Cl,II. ''� i , I,I+-� I tl 'I - i i,1 Iti,,,,, , „,„1, - I �11 ,,,e g i 0i , ICI _„ IE! : - çc'` 5Q l I } l ,_ 1, bli,'�ii, 1� :151 ii ii1�llili1 I • t ,Ili , * .li ,11111lIIIIIINI } i . I 1.11 hi. ,Lit I. !.i I I j;,I, I. i ,., p a_I ll'Mi911 1 Ilirnnlr 40 ,-- f I; 1 I t-d' .. , .114 tiiiiimm 1 11=it, 1.. I ' of I umll DA.,irvl, 4 I,1+— 1 ' i' ill; is ii s'' a� 111111 J 1;r111'1 t I II i„ I� 14� 11 l.uiu1 niii;Irr;1i 1' - i I ii � I imi i�liliill= �linnn mil 30 � � ' I i �,; ,•i�:l�i d -.:"r.'ii/0.I�����.� 1 n mnulln;u�;mu� .l - , .- I 1 . _.__ _�_ _ I Z, =�I�P�IC'�� _ _ ■IIII 1 11�I1i IIIN IG� ___I__ I } ` Id 1 11 i, .. j..' i� / _i:�. --t L -35 r�-.mpg l'..,�ii.a , 1 s��'1��� T II 91 WIII Erillmil,, 20 N _ % ,b. I/e0 ighirdIlili Till I ■ Jtlll}I�IIIliS� nl■IIPI ui';eli n1U11t11 3 a'i'j/'11"(tr' 1 . ■ n In-I'n 1 r 4n•, i, Ai -__WI 2 •eri !1 ii t C� 1 -- ,�'.i,eii �►� '� 10 Elm= a um IN 'i , 1111111 -L = .'Agri}4.�.,� ^ imisqw..._,.-,0.11. ,I J r1 1 ir i 1- ,i1 it,i liiil- il - - •Nl*. ��1�i�„n115 IAnP ►,I �_ II: H �'� i:ullll'111111i Il;llt' 0 t__ II IJIllutL � IrI1SIIlIL11111�!11! • 1� N I q iiii-oio=inry—b--/,,,14, riI1111i11'IRllli II 2 u) — l— tH i i i_, i �rlirri.' ;Ioili dim a III - I _ t 11 Ili ' t 1 : IrdW. Al AR °-1r1 Kill•ri.o.; 111111 RI iI i I IGIIII //�.IIGIIIII�IIIIII '_ �Iliginiwir� =1,npr III,em 1 awliinll a 70, 11 i 1 } ;.., 1 "�� um!mu '= a Ir 1 t. 1 1 t idLIIII 1 ( EL er. I ;! its v 5 . YI� • I 'i �!: :ii. .. .. ., i I. 1 i' II. 0 3 5 10 20 35.93 cfs 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(TN<0.5 diameter). Rev.12/93 8.06.3 Appendices C21-FES 24" Diameter Q10 = 15.09 cfs La = 14' d50 = 6" W = 16' 3 0 3Do = 6' I T t = 1.2' III! ;i; I, : Outlet W = Do + La . , 1I li i 11tll l : , III i I 90 -- - linimpipe I i :: al ,. 11l= lis '�diameter (Do) - 1 I Ili ': I ': ii11 iI'1 r.,: 80 • Iln •.fi:111 La -- at , , I . „ I 1 " r,. irar �+ T.ilwater < 0.5D0 , I : j-.I. I-t . _ I: I . ` , III `' iiii"f-,I pi;+il�t�{IIr{ 1, n II", „Arid" • V jj ff ,imr I�P�o�` , I. ' .C�I Ift t fi l • ,. . , I 1 ,,i1i1iiii „ Ili i I ro 60 i 1-. - I' , ai / 'nrwl r '',1 C t e 0 t ' ' ,_ 1 1 d 11{11 ��- i � I II ' ii, ail • mil I V I I i z •i SJ ' Ib71111 11{i111111 5Q I p yelp r ' • I/I[II 1111111 ml WN\ !-1- i. ' i!l l f it '' „i l j t- - • i� '' 111,11111i 111111in1{Iil G it 7-II- , -I if'. i tI !.I I I i1I i I I 0 i!�,���D-t�lll�I 1 1 It111111� �, iiii1 1 1 1 Ilil L-_ l; f I 1 � t � .iiii� , �nui1=���� {i=;�fi1 40 .1.(. I d r �w 1111111/ oA.,4IIIPd, 4 ,...__.. '; � � / � � r 1 11 III J 14111'f l�rr-•- � i!li t h fl! 1. ._.- ill: I; 11 .i„ i' k . l 161 ail{i111:1{ 30 - • ,!i- •-- . --- r 1 ;I,, :'l'Ili' I'N d .••r.'ii�i roads i ii ramilniim i� .� 1 n mnullniw;nl111 1 — - I. 1 .•F r'' . 1111111 Ir nr nIN 1111P II! ,/� ' � �� I.�Adi11, :III i - }. - . I la liNl/,���i.I��,A" T ii31111 IJIli1111111I 20 • q 15. _Id�•�%ei ai�l!illliili■1iii���I� I II JtiiiiirAmiiii ulow1 ■ t - '''s�r1[g•, .0 I • 11 n rna n' 1► + i, 3 _ = 2 =err=!� ii t C i ; _ - '{ iel::` :ru 1 ! l - IIP I,0— - It.. — - ..111 i �llfI i t �1I -1 -- L=- .: 1. 1le iiii !••-H -"i ' I I i ; H r _ ilIrI ! li 11 i Jr_.r ru11111;11/A .11:111• ,,, 0 -1 1 IjIllItL O .mil..; 1111:1111L11/e11! 1� 1v = -- i- ._. .4. I I' I :,i , ' ,��/ �).�"�i riI1111i11•11,11ri "111 2 Cn ---- I- tll Iis .• �;r IIIIi1:1�17�`;i,�11111 t. ... I i 'ai �� a ludirimi;.n�/rli!,--14 hn111 .- i ... f. I t' !i r , i I /!'1r,111�i1�11�!IIGIIIII 1 IIIII 0,, • AI /_../r it:111151/4111111111 11111 �.. I V � L -_ alb :_ ;_ .;; ! :Li 14, •, Agg: 'i";diura rii{{''im {1i{°{{°Rim i{i{'� • -_ 1111111:;1. t -- II ;i 1 1: r r: i row i{duIn1111 0 - ' --- V=20, .41t/!!'� wltsIP. ��i .;:uII 111111 {FF 'n — lig 1 i ilii1 4 1' ! .I ILii.iol 15 1edl .0 t. f I i .. 11 V_5;,i! It� • ty .. ! III _ 1' 3 5 10 20 50 100 200 500 1000 15.09 cfs Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices D2-FES 15" Diameter Q10 = 1.96 cfs La = 10' d50 = 6" W = 11.25' 3 0 3Do = 3.75' 1 ,� t = 1.2' Ill. !i I, : Outlet W = Do + La . , Il l;f I Itjl ': ill ;II pipe . lI.:. i . i i ,. Hip i I, i: ..�� diameter (Do) • I il�- l: I I:Ih1 I iI' ,.' 80 uuu •.fi:nfl' La -- at I - „ I = I 1 ',,� I,. iri I. Imo+ T.ilwater < 0.5no l 1 I I4. . _ I: I . ` 1 lil ` 1111111I,I pro/01101,:41 n 11 , .tii:riilii� jf ,imr �(=# , 1_ '11 .t�1 0ft t LI . f... : I I , ` .drAIi°AI : ,III r° 6o i I.. III • III I - i 1 rkti,�i °I°i i -it I ti_ 4 ,6 05 II, 11iii Ifll 1 v 5 b •i �.ii `4 ' nia rail tc' Q _ I r• ■, , '� 141111111111111110141 \N\ '-I I is ill I I ii ,Ili 1 j t- - - -' / 11 1F p i.11�'1111111111111N1111 ( i 1 I I I;I i i j !.i i 10 a-Iml i1==1��� I �I=�■■r O - f. I, ' . t t d .,�i�i� LII 1un11 1 11.,grai li.. i I �N 1 Mull oA.,mvl 4 1„" i I, I ;�i l �a'� ; a�' -HI In 4 1;.111'1 I i. . f I li I:; 1 li II ill nii�;l.n;1I — i f ul l I�I �,�.'.- I I II fr1111d�:AI:,R 30, l.__ _ I t_. I i '1.•..r''/��1 ��� — I �� I PO °iii4ipl �I- +I' j =,iiili�dN�/�� _-+�: .91 I4.1t:.rdu. I }. 1 9 ...p/ T tt 5 6. :I/11�NillitiO till nil v g In11 igi1III:IIPI 20 n -__ _.._ �' � � i ■ tlilll� r';nii n1U11111 3 11 _ 2 ive•�r01 li 14 CI 1 ; ' - ran"! : ���, 10 emu'- u --` -L- iofii o�,�iI1�7,6:;ot tr•z..-H -"i IL i I i . 4 3Agirlir .�jT lirmunlr� . 1 l; ii 1i , n llni mn/ I.i. �I+ I 1 I r 0i!,,.i11S rAni ►,I- t , 1._ 'r_.� .uIIlLiIII/I .Ilill•Mill r I� III O �11 1111:IIII/IIli1 11. 1 t _ I I i i riI1111i1Pll�llri n111 2 1"1 l�ni;'lirrii ;IIi'inmat I ff _ I� Plieri:005."57b:Oilidii. 1::Ln�1111„ IIIIIil I ,- ,i ,, I 14 iu':Iupl�1/�r11G11111�1�11111 td Il .11-= -1!IF1-. - - � j— 1. ,u i_-.r 1111'1/i■uulu 11111, LI 1_ Li l v =25 .:ir ,�" -•_: 1lwa rail'drainHiIiIiIillIJfflrliP h} , . F . ri Iin., _. I��lI� 20� � �, a Il,l ;1 .1." 6,,d7:;0000/11115015MOM t Illit- i illy tl _VI liio ,d15.1 - vattfOr' r , I i ! LiIl - ipm .i'; II i •v 5 . Yr� I 'i r!i. .. • , .. :I. • 3 5 10 20 50 100 200 500 1000 1.96 cfs Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(TN<0.5 diameter). Rev.12/93 8.06.3 Appendices E2-HW 48" Diameter Q50 = 64.66 cfs La = 26' d50 = 10.8" W = 30' 3 o 3Do = 12' i t� t = 2' [ill ;i; I, Outlet w = Do + La Il la 1I Itjl l': , +.ii ; I 90 --I-- ;1.,Inm , pipe . 1 . i ;. i i . rill l= i Ii iL ..,,, diameter (Do) 1 • I jig ': I �:iiii�l iI' L,; 80 IIn •4:nib La -- at I . 1, t 1 I 1,.iira I. . T.ilwater < 0.5D i ' ' '` ' I; I ` mint,I ro/1110474 =gin o 1. ft fL I�o .�_17 1 I 1 i t 1 ,/AN-iniiipd,,AmnoH ' j1Ii I ok 6o i I 1 1 , • help/P. ,I - h g<r I,t+ 1 I ;ii I, 1.„. I ,-Il ! jt • �� �, A q Ili Illtll li v b i it `1r FAa11 111 50 _ I Mr rrr r 1. . Ir1111111111111111 0�\ I-I- I. 111 1111 t � „1' 1 ' .j t. - 1 i r p 1 Ari 11111�11I iminum ( i-! I I I ICI; 'ii i, ! I I r♦ j III i i 1 0 �r a-rmliiHH911 1 mini 40 t d .i i a , nu ii 1 ei/ 4 ,.... i.. I li; 1 on 1 In ,DA.,ilnrl ,�. l: ,t L if fit , ., a� r 1=Il nl . I,.Ilrl 1 ' •_. .._ -.. . 1..I_ l„ 1 lif nui � .nii�;Inn;1i 30 " t �'j,'-: i. _ i i f: I 1l I I' 'li 14 d '._:•r.'ii%I . I Wpm! J -I II II fr11lma 1.; �� .i IIIIIIIural'dinaD/ 1 Z. .�� P' ri 111111! 11 IV AIN III I_ ._ - i + ill • -/'A ;r' i/ I� - —_ - 1. .35 I��AdiI �11i11 19 s 1 p- �" -i + 91tt1JIII;dIhlfl/.i I u ` Ed iln�dN1�0 T` J �g=�111115� nlln'lIP1 20 _ ; �5 �/.Ire1�N ii .H. __ it I! °�I '��II' 10 IIIII' , ij i }I ' IHill . ��ii!';'��'r d11i,1!n!!� �i I i I t k 1VIL _. . 9 _ ..=mdr,rp. r_, 1 nE I.i i. I I I t ' I �� r Ii!,!.in! rAnl ►,Ii ; t I I IS - +- li: �'/ rullll!1111%1 Ilil11' 0 IjlllIIr 11.��� !II;IIIIr111�11!11! • 1� 2 •_N -- -1-- - .- II H. .II ,1 , 11. iiiiiigir5tr�i, , iI1111i11'IRllli "III__. I . f 11iI - q 41-iIIIII�/%�'ri IIIIII Q I ......__ _ t .. t1 I 4 _ I- - ii II::L n 11.11!:aI uIlli11 L i 1 Air. ' I I �'1u1111'I�1%tind1111 1mlii1 co ,I I 1 I - .o../_-.::.1� g i.dI151/%1111111111 mum 8_ �0, ':_`�!"=i"i ram ,iL : i I 1 _ I/l . ►' I .dgrAlPi iiighili I IG 1 1 i tl , 1 ' ji Ii It11'1'15 Z� idi ,.I r I f. 1 '. . v 10 a. ' IIIIIi II II _ i v=5 i . . . II 'i 1 '11 . 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) 64.66 cfs Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices HW-F2 30" Diameter Q25 = 25.71 cfs La = 16' d50 = 6" W = 18.5' 3 0 3Do = 7.5' I tt- t = 1.2' Ill. ;1; I, : Outlet W = Do + La Il i f i I It11 l . , '.ii1i 1 pipe 1; I.:: 1 :. iI ,. lull1= 1I; i ..,, diameter (Do) 1 80 , I i• ling IjII /4s- nn •fiLfl' La -- at I . 1' I 1 .,0 I,.r►.I. I + T.ilwater < 0.5D0 l 1 I I4.• . _ I: I . ` II ` 111111l t,I bi;+lI 1�11� 1, n II , iii r�illi� �, I jj ff ,imr . �P�°�` , I. '.1 .C�I Ili t fi1 •r I... .• II , I 1 :ii:iII!d'u' }, J'II i r° 60 i I.. I 1 //inr1r/r '',1 - Cl,h ,\. 1 , , I,t+— 1 till - . .` i , rkti,i.d °I°i 1,\ - 111�111 �Ve g 1 1i ' I lii -II t -, r41 11' 11iii 1f11111, v 5 co •JAN..i `f ' /MI II u'=u1ui �p tt` 0 } IlOgrri,"' '� IPa uol n11\`1�\'6 !-1- t i• it11 I :1 „li l 1 '� 1..i��11111�11IIIII�NI�11( I., 1 ,1 , t 1,1; '�f LII ii i,ll t ± 0 a-rm1111MilliI I �I=nnll,- 11111 1 1 I Illr40 t I' { d Ad 4Ufa 21 inlituunll 1=!;eil 4 i I of I uuIul oA.,imrl I !. il 1 i • ' Iul 1 .niilil�nS1� 30 i III' - 1 f f. It i'l }!II d __t.'ei%I 4. 11Iy1��11= frnu,un;ll!�c 2, .� .� 111nn1/1IIlw';nn'd 3 .T._ t t + 1 I 'ir/° � :� mu 1} _ i1ii!1jL!jj 20 tl - '5. 1 I. JNiill/ai11 3 - � _ ' 2 ve�01211 ii } 1 CIOKI ' __ Fo ii!•l, iir. �.��10 r1i! ii id --I- -. 'I i 1 ����' �,�'a 1 Ii �� I�1/ Iilhli:;1!r.a �� - - _ . I: i _ i .uIIIL1111�1. IlSllt• 0 ,__ 1 1111116 il�+ I O 1/,�� IIII:IIIILIIIiI�!11! 1 N I I' i /�V �).� '. , ri11111i1P11!IVi 11111 2 -- -ii- I , ' ii ,1.f :t. i a �F�11;'Ilrri•S ,I Ii'inn a iii .-_-.iii - t ,1 f t _ IL ,.' ,1=p::Ln 1111„ i11111 ..... _ _ 1. i I I M I I - . 1 �.-s ' 4 Al 1 Illl:l�/Pi!IIIIIIIII IIItIIIIII t a-i MK e�:nn.u.Inuuw i11n `r o_ ,:•_ lid. reir II'iil m I nl 1 Iluuun111 RI :�� i I v1 }f ,, •� . 1= or ► e ion lip I 11 tinting miquil ac CD 111 tl' i 1 1 IiltVI,I 15 ZZ 'asil� �I "• .--VP ' ( it_ 1111111 : ! Ili I: r!iv 5 . .. .. ., is Il., _ 3 5 10 20 25.71 cfs 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Ty,<0.5 diameter). Rev.12/93 8.06.3 Appendices FES-G2 42" Diameter Q10 = 14.94 cfs La = 22' d50 = 8.4" W = 25.5' 3 0 3Do = 10.5' 1 ,- t = 1.6' Ill. ;il, : Outlet W = Do + La .III II Itll l : ill ;'1 pipe - I : I :. iI i. lull11 ili i .." diameter (Do) 1 • I 11�- ': I I:Pill! iI'I L,:• l 80 uua •.fi i;i1 La --11 ' , I . 1, I = 1 " r,.iiraf. ..+ T.ilwater < 0.5Do • I : 11 I-. - _ I: I . ` l 111 `' 1111111 t-'lkiil�1�{'rr{ 1, n 11 , .fi rir aid ,, I h I ,imr ppo60 E '.i l I i•ii I . f.. . I 1_ ' , 4 , :iisii°AI .: ,NI • 'Ai/:INZ , '1 , r ��r e 1 ,, 1� , 1 ,`L' �i !a 11 F. '''1 • 1�CFI, c-C\ 1 + i I ,-II t! I 4 �� �0 A,, Ili {{Ifll 1{ v I d/ ,i `�r rn4l a 11111111111 5QIt I:1 _ _ I r' , ►■r ' ' van nulls■111 °\\ !-1- i i� ill l it i1 „li 1 • , j t- - i ,, i A11,11111{IIIIII{IM1111 G ,-1 I1 I lil t f I, 1.1 iI j,ili i• I 1 0 !!� 5�D-r11111l 1 1 IMP + ', T 1111 i 1 1 1 Ilil 1 40 ! I ( I I I t a �i .i null==iii {I_;er 4 {. - 1. i1 I on 1 IIIIIII ,oA Ali;low II— C: l: l ► a�� ! 111111I . i;.111'1 l I I 1;1 • I. . 1 i f: 1 1 ;.. !. ,. 30 #., _ , ;;, ;,�,�1 d -a.i%I 1{Il�n� IlMirrrl)LIR .� .� I Hinman/Pr;mug .i f I ,. r j 'i ! ■1111 I n nP mI 11zn 41. ,/ice i 1 �� I.�Adi11, :III - t } I la tiN�/����� �" h T ii3111 IJII�II�v11� 20 n _ - — , i6. ,Id .1%ei ai�l!ililiil{{>•■iiiIIII 1 1 I I v11illl/nr!4nii nlU11111 __ _ ■ t - '''s��11�•■' h' 1 ■1 n Ins m 1►� 3 :rill✓ � Ii } Ill 1111111, --1-1 � Ir I��� ,�.._;� I 1 [i. l I {, .I;li 1 - _ 3A��.19.7 `� • lir� � F �' a r� n ni" I. II IlIt l._ Jr_.Ail _.u1111.i1111I IIIt' N 0 I t I+ I I 1 I r O .Irr1i�� . 1111:1i1Parnl'111 • 1 2 .) Illlf l iiiiiiironr-'• �� -- , - l ,i ,,I II lri11111511'Ill�i "Ilr � 1• 11 I I __ •�;41 a01'illrl.':-n 1r A i.o?'III RI RI 11 1__.1_ i I, I _1 . .. 0►_i 4 .=rrlii IiI1pI.IIG11111�1111111 t .i'dor �1 / 41, ir1:11115//41111111111111111 -- - 4 1.- 1-,- 1 i ,I IV - AL ..�'r,7 pur a wan i1�1111111111m Q IN ` I III I .l lI IIIIi,.I 15 n1 , - i +,.. I 1 t i � � _ lo,d ' Iili I'! III ;' w,lo r"'' t .: i ;Il! I' 3 5 10 20 50 100 200 500 1000 14.94 cfs Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices FES-H2 36" Diameter Q10 = 26.89 cfs La = 20' d50 = 7.2" W = 23' 3 0 3Do = 9' ,� ,,. !III ,I;,,I, t = 1.4' I 11H1: ' Outlet W = Do + La _ :ill if ! . i : I 90 ;,..I11111 : 1 pipe k:.' i : l lul!u= ii i `�•diameter (Do) I Il ': ling �f': 1•:: La ---.1 80 l ,, l I111 . ;011iliirir• �l�. T.ilwater < 0.5D , i ' I` ' . I `' 1111111r,I• 1xi 1, n • - jI 1 _ -I . ' ; iP'„ A ifgfir� " a1` a 1 I i a L .. I i f ► 1 I jj ,L11.1' I ',,hallo:/. , '1 , li,r° 6o i l. I I' I //:nr,v/r ,I°g'� 't c I,t+-jj j�� I tl II - i 1 eti,ifi ' -.0 1 cb- 1�� 1, .��\�J 59 l I ;_ - t , c:,.Pill'' 1 11, iliiiuil iiiiliiii i I • t . ,Ili , I., 11111 1111111.1111 I ( i I 1 I ' I..; ... I. !LI I 1 j;it f I. , 1 ' p a-Im1a=lllIi I Il=IIIIIIr 40 I-- f. ,; I I t_d ii� r, muumuu 1 II=!;.iii I.. I di I uiDA.,illrl 4 I I r. . i I u' l unml_ II I:, , i � Iu ll ni11aln:1!I„�- - `f I 111; it �r i i t�l n rIMIMln;l:130 #.'.1_. �-_ ..I_ 1 �I:I f I a ,: O;;�I ��U IIIIIi61�11111111;111;11I11 3 --T-_ ;i }- I I 2' .i/'P � lr WWI 1 11111i iAIN r' -- '- _1 I _ . L I ..1a41i1 40°V���I���" .k .11111 T L a0,11 1 1111,4._Al,•41 20 '~ �5. 1. .,'%'ii�ai0l!illliil�■1iii�l��� 14 Jtlii!I�ial�'e rnirng. :10%l IIUnt111 3 -1. 2 0 eri l 101 ii t ' I-- — �0"1, iir e'. ......,00,09,ogisigigism II ,,i nom ,_ iformor ,Ag..1 10 tmirm. -H -.ail II. I 1 ;I I -� ■011, 1, Air 111111 � �.�11.��'• IIII:IIIII:IIIiIt!11! 1 N 1 - - I l i ,1 ,/i'/ �).�""�i , ,,lriI1111i11'llrllri n111 2 -- il- 1 : . I'I �' .I q =_ D .11�%.11:i1,:1�151;1-;:11111 - T i 1 f + / ,It11111�::L n�/11.11„ n11111 III ...... _ _ I. _ ' l'[ I l - . P .0 4 Amerind 1,. RI _u-i-_.:.r, e1:1n150411uu1u I11t111118. =2? wn/I!''_ Amigrag.0.2pIraisiiiiil !Him mum a 1111111IMF n } '2 i .�5 d i i�' 1 1 n lIvi 7,151 + ( I " i,v - lo , i I !i� II, v 5 YI�Iii } .. �" . t,•. '11 r Ali. I 0 3 5 10 20 26.89 cfs 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices FES-I2 24" Diameter Q10 = 9.36 cfs La = 14' d50 = 6" W = 16' 3 0 3Do = 6' ,:1'� t = 1.2' .ill 1� 1' .`'•I III . II Outlet W = Do + La _ ! 90 ; .;111111 pipe - Il•:: i :: al ,. 11lip ili I[ `o diameter (Do) 1 I i 11,- is I is :I.1 an jI' l.:; La -at 80' , I . „ 1 11I I or,!lr,a� 1I . I�+ T.ilwater < O.5Do I . 4. . i 111 i-, •r ! p� 0, 1 ' iLi . ,.I , . - ,i.11.ri�i 1 �� E. .11. r� I1 I a .I , • •%il:iIIi%'!1 �111 l P s. 'il i1111 11 '�a , uu11 t 1 i . I Iti•i0,1i IrMI'10.t ''' umm I JfiVe ! , I -CS�'a! ill � 'Ir I II • .iEili rn�l a u rnu ��` 5Q l I ;; ;_ . ._ I, r'/ i11r . 1►an Illlul rll l �� II :i: , I it ,. ;,i I t . I� a 'i1n1I uuu11Iu1III1 ( i_1 - 11 f 1i1- i !.I 1 II j ,I i i. I I ' o • 1 III,IIIIIIII I I1lrnmr f. i , ,I , . . ' ,dii'ag1� �11 II 1 I prim 40t-d '. .i i emu 1 �1i� 1 mom 1 moll DA„Aim/. , Ir+_ _ ..,..._iii, ,,,,, ,i ijil ,I� r, / 1 1 III111, J'� 1i1111'f I . I. . .l,. , a :I1fi,1I;= ��, ,,1,I:I ��30 I ; : ;i;l •III,II ,.:r..ii%I idi I I llIIIIIIIIIIIrdIUI'iIlui i - �1''' II�1rMV U 1111111 ndnl:nlN Ian T._ +- 'ii +��;. it r�.:1;1ilrpIr:a I ' 19,:..I.r;/'iAl II�al�I��" �i I1 91 WIII dI'uu 20 . _ _ ._ ��..,f6 %,:ii, wl��.!id dI ill - 0 1, , iiilliiali'n•11iirnri • a Ali ■ t Alit miinll 3 = I 2 o_�ia'�jtlt 1r''iltr�q��Ilpillpp�� URI III11!I �i�.du :; iu al�r,�n ai imaiii— .-�iili � lejllii1id �I w171 1�11/1,111 i 10 i =.—;. —ri \rot/_i 1 Ip," o .uIIIL,III4I ,llall• 1 „ 1 1111:IIIIrlIPdell •. 1 11 ..i. I , l��i .1'! rmm�.n'nrl, �IIu 2 cn i! ■9I I'mirllrri•.Y,�1d 'Ii f I 90105rA r /'. Ir,Ilr:l ru!IIGIIIII1r111m! I �,, 2y-- s ' �Ji 4 I Ewiris II,UilIIIIIIIIIIltum Q�_ :i I: I I}G It . ,AN - 1= �rLlr it 11 I''II1 IIIIIIIIIIi ni ac i t I ;I: ' " '. • _ .II�.I0 iIIiIi IIImI11 0 . '' .�1 . ��� .rs� lii i�1lI,IIII i� 61:II:ia1 io } ;. A5 fir.. I�� I I I lun. 1 73 11l Ii' i I I I 111, 7 - 1 ai ,.I , i . �� • 1�. -+i v 5 [ rra/ } I l. 1:: 3 5 10 20 50 100 200 500 1000 9.36 cfs Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices FES-J3 15" Diameter Q10 = 2.23 cfs La = 10' d50 = 6" W = 11.25' 3 0 3Do = 3.75' 1 ,� t = 1.2' iill ;i 1, Outlet W = Do + La . , Ill. I Itll . i III 1 l 90 -- - LInm I pipe j; i :: a i ,. lull 1= i I i ..'� diameter (Do) 1 l i1�- ': I ':Ih11 iI'1 L,: 80 uun •.fi:r�1 La --at I . i1111111 r " I,.iirir �+ T�lwater < 0.5D0 . I : 1 I II. . _ t: I .• ` I lil ` iliilMr 1'1 PiriiIiirI4 1, n it , .fi riildi� j f ,imr 'iirinv:/. , ''I � u r° 60 i k I 1 //inrlvl 1 '',1 Cl,h ° i , I,t+10111 III I -Z -II I 1 *, I11, i, 11'1i If11I1 , v 5 ii •i II.i `4 ' rArA 11111111M tc' Q • _ 1 r' ' '� ulin nuol n11 \�\ '-I 1 is t4 I ii i1 „li I , j - - , 0000110011, '� i.11�,11111�11IIIII�N1�1�1 ( I-i I I } H I;I if I. 1 i 1 ji it' i I I 0 a-Iml iiiiiill 1. i1=1111r O - f. I, t td'- gl Ara, �iiii1uilu 1 Ir=4iii -i.. I of 1111111111111 Mull oA.,mvl 4 It- I 1, III; 'I i� i 'r'. 0'" !' —1=look ,, GO11'1 I i. . } I i I, I it r 111111= ntii;l.n;11 II — i I 1 1 +11I �o1� I I II Ir11111111LI1R I I �•�' - I 1 IV' 1 q b- Idi.l�ii Nill%lllilill Anil 1 - ■ Jtligi/1114� ilirli11t1 20 , 1 a'i'j/',1,(tr'' 1 . ■ n In m�;��i/ liinlul 3 ' 2 ve��0 00 ii } CI ; ' � �i IF' !•�,eiirIr .IAtil 10 emu'- lUll -` �. i�fiiii �11�, 11�7,6:;1!�'I i I!-.-H -"i 'iii I i i I � � i H 4 �,i. I, ,I r �i�,i.i11S mpd ►,I ,,.,, O - �_ it`, 'r_.t .uIIILIIII/I .Ilill•� rIjlllhitL O �11 1111:IIIIr11111 11. 1 t _ i 1' I i �� ,/�/ nu. �i , ri11111dIP11�Ii 1I1 2 i -I. a ■11�11 i�ni;'I�rri�s ;I Ii'inlu a 1 I f _ Il ,1t111111'Irk �/Ir II„ IllillU L i I� J �I ,� i OP09.0Irllli'Iirk111111111�111111 cd- t I _ u i_-.r. i1':ni151M11uulu u111 Qi , 1 „. I v =, , . 0_ l... =1' wan iir.rl} . I1 ., jii 'iiiijflj 11 cc i. I i Il Ii' I• . II IIII11= is Z2 'ate'' . ( I •• it ._ -- - to d �_ • ' Ii 1 I'''I �'' 11 III t . i v 5 I i• .. . . II i' .1 'Ii., I' 3 5 10 20 50 100 200 500 1000 2.23 cfs Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 Appendices END-K2 15" Diameter Q10 = 4.66 cfs La = 10' d50 = 6" W = 11.25' 3 0 3Do = 3.75' I T t = 1.2' ill ;l; I, : Outlet W = Do + La , 1l lil I itl• * 'it ; I pipe . II::: It. , 1 i:Iliull iI; i ..'# diameter (Do) 1 I t- ': I ':1111/1 II'I L+/1 80 111111 •.fi ifil' La -- at ' ; I . 1, i 1 ;011iliiirar �+ T.ilwater < 0.5D0 I 1 I ; _ ,, I . ` i I ` iiiiiil t,I p,+ili � 1, n II", Ai liirlil j4. • f ,imr 'Ai rinv;l. , ''I , I r° 6oi I. - I , , / ,nrlI F. '',1 Cl,h ° 1 I ' 1,t+-� • III II - . .` , i 1 b,`'.Or °I°i 11�_ liOil I �v0 g 1 i i ' ICI _II ' l 4 i 1 *U �10 II, iiiii IfI, v 5z •i 0.i `4 ' rnilla II'=■1111 •cC Q 1 irna nuol m \\\ i11 l ti „li l j - - ;00;901111r'' i.11��11111�11IIIII�NI�1i( i_1. I I I I;i; ,,,, j, !.i i r♦ ji J 1 i it 0 a-rmt i1==1.i I it= ■■O ,-- f. 1, . t t d'- • :,ii�ipi , �iriiliunu I "loll i.. 1 0l 1 min oA.,iiiin, 4 ltr �. ; 1 111i ;,i1. 1 ii r j r r -I�111I ,, 6 111'1 III! j I;f I; 1 1, i i pildlu� ntii;l.n;11 _ I ui I I ��1�® Ir11111 Al1 �•:1• - 1111iinii1i1Vidim/T 1,_ . J- . f I- 1, Ii ' �1l --� :; 1 Irira"m�in;' _ , — _}Y I �la4U..l�p����M�,�iI�l � T L - 11tit1A III.,iVIM. __ tl �. 1dL 00 A1��%ill�'ii■1I lI.i --i `- v i 1/�115�irlll illi 20 , 1 ■ tlilll� :,m n,InI11 3 1ip ' 2 �.�rri=�i li I CIlUll , - ' imirg",;iii PA r .p,til etrivit ITIIi— ,,. f1, 1 1f_ �- vr1/4i1p[ r f �I■Ii L_ "" :IIII/l��lli�lt`• '0 �I11 IIII:IIIIrd rif 11. • 1 1 - III :i' I i �' :1._ �g a ■SIi +ligg ri.: a li'tnm a I t .. III iron 1;:L�1 11 11,: I11I11 � I � r ill �;I 1 I. ,� i 4 �lrt IGIII 1i►/i IIGIIIII 1rIIIIIco . _ I' ' u i._-:r, ar:nnzir�inwuu1Iu111 Q �_ l =. N :I �_ !��• =r,11 ■1 iir of } }r . . 4 - igiti . ili 1 1 !iron Ic -I l` . . . .,I i.1 ._: I I- L . I�, _ I/� I ill Ill III i.' .i _ , V, I . .► .1 ��, :N= i i° I lilt 1 d 1 l I }` y-•I15 '1iM, /�Ir'' i� }• 1 I .} t 11h11111,1 I III t1 it 1 .. li I11,i,1�I VL di � r-: , : 1 11_ y10 ,d „ Ii . i, ;, it I i I. :H I il. . . � .. II' I ;Il. 5-' I 1. 'i 1. 0 3 5 10 20 50 100 200 500 1000 4.66 cfs Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). Rev.12/93 8.06.3 APPENDICES III , 1-1..)-- / p- rtxwn •— m ./�`\ \ 7 e•} ••`• I/ r) //f�J..--,/ , ► V Jrr J // / l ! �/ r j 1• .040, Qo / / I� / J Ime '�w /( // DPc o w4w�cas>FR I ,.,,,a. 1 r''l rr' �g N " m 4 -2 I 093175 PG434 �., �� Z � 0 {\ � ZON/NGRI / \,I �/ j 'ty���\\1 V U U Y J. , \ ev �f` iio ®A W f, r:•� f - ,,.m° N �� t\ .. \ "`s /�� �� *IJ1iii, j. ,, :'! !/fr'✓"„, -_�- „ van,,, /'' L) ) SlR- `\ \ s' `��i®�.1, ,��\/ /� 1� r i\1 \tt1il�/\ i "T /r✓'� .....- . .`���,Q'�N RHO/i'''. j ) y .(/�� ®'� ����.� I ! r )\)!1\\\ I 1 i` .' •;4�t r rr✓ �� LOCATION MAP 'i ERICArv�sgy �'- f J 2�., 'v 7j r� / ��� ��� 1` x �„ f� /J,1 j \ t /5 �e ENGINEERING 1 z C Zq, } ASSOCIATES •o F. /- /\- o`\ ! j 1/ j/ a�yR` //��Iij ® v. J�\� t9i������ / I Sri<.l( f t Sf r Je r s 3? �C /� d ! j i SOUTHEAST tttttttttttt 'E"' UEP� '/ \\( 1" '' � t,*, " / C��'tfo�� ��,11 ���I v++li l4u / �l{ J'II 31 cz4 I f t ~""�`\>\(( .,,�q c3ssi pti / T0' rA^4� I ®�o (f� �f ® t JlrSt ,1 � ' yu , i\\ \ , '• ;OFA /`A J Y L `���� �I � e �� ,�°�:, 11d�9 f 1 14/Tf"sxr� �P',,r'� ( - �\ V �'' J I 1 /. � 3_ _ °� ��,e\`,������/ "'";;/,►��i, r # J j 33 i;!'>. >i c\ ( I \ t11tt / /' / / ! ✓ 0/// yam -7 I'oy `, 7,-, \ �" -/ ® iii r- '{ i J L d j j/ ,k €7 -,, 3 I ..../, (\ (( 1,;ca: / / / 1 / /).t/• 3', �/� \`_ ram/�����''IIJr� /f, j sr t$r 7 :"� !`/! i l\�\ (\ \ aePS �Sr#. t�� $ / �� "i////� ! 4 • ') tSd l` t, �\ \� 4SEAT s /=/fir f�i �\ r��„'g`��gy //// ( / - ® ���� 7 , )���ll !k`` =� - `V �� �l > 1 .23 ✓; ttS✓ J- �2 ,N,,„', ,. //'/ ,„... o3u , e/i/ \� `.. , aa�Eruao,,,,„I,/ 1 / J, ,mlq` ; (o��\;NG5 WEN TENTYAYNf7PIDARAM s �. / • llpL N�/yye�:: / \ // I �;� rJ a\ /// ����_`� v:vo ,l`_6"`�: ('.,... fL/ /' (Deli r4�PadsTEAu// `/- / r,/7 ST(L\��� N4zNOON ECOORDIN(74 \ ,r) / /r / ) ;�ram& 'v Ivb ��m •p lakt /, fi �,-`.- �-/v e x '� i i r;�sulty fr48010AR3m' / .! �.•, } g, ®1 �a ®I� ",' l f fr= - , off , J ��' ( . -'zouN / /s e ,, •" �� � g ®jam ® Dh i t i J" r - J - // � PF 'y / .. � �'�II poi � �_� \: ti` / >'..'S / °` , \ // ,4.� i 1-. rg,��- /'•/ + ® ��\ ' l l\ I:,j \ IS�,at SCE \ _ i •,--,/w 0 ••.•\ ,Away,,• ,44$42 -..... — , 1 l 11 ♦ �� / I� \Q� — 1 lJ�r/ -ram 9yy r zm >✓�_� /��o�� �`� f sei �/, Rs' /,,\ I \ \,. I Yll\\�, . i�i, • $9Po,4. �1 �'- '`�"'��,- -t. ^1��/ ����w``/��`�®fL%i� rl s:��//� 7r ;:� -`'J \'/ — N 1 \\yv I ,�;, AVV� a,,''e" br,� �_ r n.�•_ ! _ -zr��� r» ,.��ImciN� ���// �� / / / f r 1 I �, e y44: yes > _ 1 F ' �� t // i ,- o r s t 2 a 1 1 i E ��a�A��..1 RNlPENA / J II / boy/ �r q / �./ , j�1 m,. \ � ev ITm �� ` ;t/NE "/✓ / /'//`1/v v\.+r,a--e \ `\ -./ '''\ ExrsriNc 1 WWI i LINKER �� ,v /� � /, d °; •1. . ` { I' ',\ PIN 05087 w { ti / TRANSMi i 1 /I„r.1 r Ifj�o t\ ( \ ce \ ` �, —Y i }, ��� �/ .,,., I ION ;R10 UNION COUNTY �oE , }E- of �E`�� ���oE t - midir' _ �d \ o / -,-i.._.:- eE \ o �� \v vv O'r- ,l-, �"v, /,il v� of-- a .17- �� �' Ct \1�//il ��� o of : _ of �• `P V AV � v 1 v A A V \•3.. f-lV� v��V-OvC ✓ �y _ ._4 - ' ,y/ z \ 1 +,,`. - -.\ I t / \ \ y r t' ,I8 h o `�j � / STIPULATION FOR REUSE t . • )� �� \\ V,\\� �`y=`� •�`���i_���_i•��j� _ j THIS DRAWING WAS PREPARED FO0.USE \ N. \ . \ ® = = ,IC = i=����if �0 _ ' /'' ON THE SPECIFIC SITE,NAMED HEREON, 1 , �r® ��Vl ,y.� ��_� s '� ��1.aA \\ CONTEMP::00REFD:TUHU.S SLY WRH ITS ISSUE \ } / - �� L��' ��� -- /• ® � /•� �.` _ \\\ GATE AS ERfDNANDR6 NOT``t wl `j 11 ,ram _ ---�--. - --•�' / \ j -- `\ \ \ \\37/y PROIECfESTAIATER TIME.FLLSE OF\i/ , s�P ���,� 1 1® ® . ��J/ , v1 /1 / �A` , 1 ��� !1 /, - THR IMA RTFEREN�00.HW.•IE' 01AI� IIII / t2//1( / C \'\I��'\t ON ANO :A:EL REET:R.R S THEt \`p p \ _ , / SAPI}I CRECGIIEEI6LRENI000CRON\ ( \\ O J, 'II-�� `\\��, ®�J�J� �1��� 1_ 'J (D.�Y'/ `\OI t \ /', ANOTHERNSNOT ARUTHORQED( \� ( 1. Yrl. IJ� 1 / ./ I if/\ \ 4`„ ,5 i ramVida �((� -_ r--�. SIC®J��, L /-F,/� li'J' • �.% ANOM TO7HE TAW. —1\\ r \ 1� �\ �,\\ �� ®I ✓ %✓�3aiiiiiiiiiriniertraw'I' '''7 ' 4 . ''''.' �• ( � "�'""'"AwvaTxavrPARmOsrEc /�'/ O 1••*F \.,�U� ,Ik\L / i A A RN.Of0ATtl7N WF%(NAwFAF�6 G NEW \ �-\•`, :i t�J il�ll�i '��/� / \. ---j,f! 64•20UNI N Q Q�i &PO7A}, G goo 1 ! / / z[N/NG/AXION/GRCWN7F' W p 7 "'p5C \\*11711.---153III.";:'7:01141,1111*1 \\�I' J/�, t `:- N/F N / i--I-I 6 rJ.„ , •I \UNRN' 3W1 \ ( \\ I `\ �`11 L��� j• //— 1� \. //� .r�m�I� / / .i �_�/ •- OAgASMA/INEWffRRY • /'' y z J ,\ ING;13�1 \ 4 as%1 1:� r � � �,%� _\ / `J f • >iNosasou�7 • .,,,.., r• \ ` \�` �,t ! /'P ZdbY/NG R-XIONIONGYlUN1Y98 E \ \ A D A �``®►���V�R®��\� ♦� _ "v I /Nc R-2O5N/ON000Nry , Q a ' ` 0 \NrE \ \y �' \� \—._ - /A)4 \ 7\\\\ .�'y��i �� /?+ , PA]AN7ACRUIlEA'E//EMF / O �V / ,, 1 nN awxwx I--� �o y\ T, UEGAEE 'V '� } ' �� , L_� 1 / avOfsllGLSB N CO \ \ �/ P ZOWNNA\200N/ONCOUA7V Ott \ • 5 7 \ \\` Ali _// / AEA I�i�, ��/p t /pBr'..,N6:A� v^t `y� �/ 1 N/F , \ IOB NUMBER: C220016 Z�ellllVAV� �� 4r "_; /icuansE roaEwx-- ��- _ �` �f^_ MARYmumttEr CHECKED BY: BHE t 1 \ `- d'/ P/N0508IL'0990 / \GRAPHIC SCALE �\ / ¢' aRVT%P{3ER DRAWNBY: BHE " 150 0 75 150 300 \,�� / ) SON/N(i.'R-ZOUN/GNCOUNIY \ /// DATE: 03-22-2023 :t\ OON \ SH EET TITLE: m m , -- 4 ' ram \` /� i (IN FEET) IN Rf vtWra N m. linch=150 ft. t �- .... �� } h �y ' DRAINAGE , IV CNERYP. / AREA MAP g' t PlN 050 �"� / arolina„Tip, "" \ Nor[h 8 E V/ ZON/Nf..R-1 — •••30 ;1; t�s SHEET NO.:` __1 \ / ' C4.5 RI JOY o 3 hllp://votI t.00 r;�ioi.iicl.tevhy.h� 111 r: /-L>-- \ / b^ ,I (/ I/ i /( , SITE INFO �� - Q°C if ttj F` ,t , rtxwn /� C`al / /1 ////''-J.i CONSTRUCTION START DATE, AUGUST 1,2023 - „i�r♦ .. U L L \ r�' 1 t I / /''/I�/ DISTURBED AREA. 43A4 AC ,, I CD N O O /d �i 7 1 i �� I)% .-.i �_I ( / /yu;/1/1//f �� v��`'F}J)1 ' ,- rl J ?;,,, ;r /firI ,/./.;. 4 '... ,\/ ; I', 'b(Il`(\\{\ ( C d / /// //// / / r t \ J 1 1' W N 1. ' C Q v/Kma5087035f/Y '•`•,�\ \ _ r Q W c N y� I 093115 PG434 '' / T - w ... f) 4 , ' W PC7PG4642 (/ �� ''l a J 'f'I -, �k w`o z �K' mTp35 '' sa,‘ f' ."`►... d..l /1(i I ''/ / ai . \/� mN/TUG R-I ---,aj � �/'h l S .{+1\ \1ti J 1 1�., \ 2,� , /rri/ . �.�.� "C` v • \}iF `• �.� /%//�f-,/::'," /'- ,,.m. N '/' `J) // y 'Y-� `\ „ .2 r' Y "' _\ -' �,i?,_. ra�,\IY\i\�\It\1( f7 -gyp,„.,•,-'i..,, ��a�(NuCA qO�'. / � �y \\ \ s ! s .1't)\)\ \\\ \\1 i i ;�'N t !r.. /F LOCATION MAP ?2 AMERICAN y s. /-' ,lc 4c "�9 \\\\ L.(( �' \ \ _J4 / 'T; �/ f• [( 11f i1{i1 \ \ \-tt '6 ,� � INEERI ,: \ '\ �' // �/ -�ti \1 ){ 1 c, S t' oyj/ / I)f t F1.13 ! _.� .J\_- F. zc / 4y4 I \) { /' - R (( f I \ ! i f iti \,! 5 �° ASSOCIATES •°o / o` ! /J J/ m, >1 + i s f rt 1 J�!S ( i i\„ LEGEND 1,4„SOUTHEAST mb+P /' t \�/JI'''' sr' ' �. ') 1'.,'�,11�.*i?1J / jI111j., I - T . t t•+ Iri1 i41 ) i, \~ l I '°w,388 ~�� uAucA/Y7 \ (I' / �y J f !t! J\1C (7 / I �i zaa4y;pu J l (� ! a i ` \\ l I I 9r 0',," / ��p �/'•� / \, /// �. .., 9-' <,/'//f /Y SI�/ 1 a I SBf�l� _ F['(•. F I 11{ it i!\ ' y.J�' ~ i\\ 1 n , sm6WALKs 4'OF ADP,`` / ,W, )i \f! si ./ 1)'(jL 1 1 L . _ •j it 1{ ? :n y_ / `/ '4,,, 7 + l '� I \t\\'�/ / TRIBUTARY AREA 1nJ 1 , TT \ s / /l o v / 1 / I 1 gm '/� ) t i I lei{ r / le' '' \ V '' / / \\ l �/ I /J It/ / / 40 �N/ T ( 7 ) I Ile 1 ^44• , ` ^4 ,. ` r c 1 \ -..-..- LIMITS OF DISTURBANCE / / �' /�I 1 /,' ,g,9 'JJs i 1 Il�f ae-lilll r }l 1.1 f;! > y 7'f ,, J \ \ L rr/ I '/ - 1/1 1 i 4 ' • I'yy-gam r\ ® /- r .,i. V • I 1!j t� t ` -•'t 1 I 1�^- 4 •\ 1\ DI DROP INLET H C. '' / / ,i cA f�IIJJX "3\t� _ T b� / I / !j I \ \ CB CATCH BASIN J /J r j{ / t� $ R //// //'�".'. ��.-: } .,�.:;.,,� / N`l s ./ / S(f .J+1�I"it) Sd''i a.t.`�t�' ({ \ \ \\ `\\'/ FES FLARED ENRCP ED SEOCTION EPIPE •4 SEA( s f 'J 'R`O' ��- / // ) \ t11I tF. 44 ";- .';_N\-" ry I 55RW SANITARY SEWER RIGHT OF WAY 2243 // `( /J/ / L/ " �E`q -"" 4",. j J ' If�lll ///.,/ ) f t, _',,\- \ _/!/y� \ ( / J J SDE PUBLIC STORM DRAIN EASEMENT m{T GIN E '�;` AESMAYUMEM YAW 17 P/Q•AN9379 ,- VI y '� s \ / I sr lit m/ '' ' ,\-''�`" i,'( RJ/J. /- __ 7'7r H.FSTR\o\� 4„2 „ / Ire • _ !\ 1 .0470106" PROPERTY LINE / /fAGL177FC TE4I /J I ,, / r7 -W a9 'r` // � / ~♦ �� ++ M. �n J ,(tf ..:- �l';\ e m7lum✓ / I/6 "i r11}LLT\\\ ''A o e\, " \ ., J ( • J / .t / ADJACENT PROPERTY LINE N.'47AFBd1Bdtl' .,/) . '. .r J' /') ✓' ) f S rl4a7lf�3un, � .! �T'j/ �,1 j \ g-�,�g � . r L Y-- 'C \T<�/ _ l .y i r se/ J f _ / ePctm3 '� / \ f[Y.67673' ��JJJ,,,l I /J I'// ')U' ,r / y hT / / ? .-,, I /4 0 1 \. giiitov. -.i\ I•\ ' f '1 r A,�= R-^X/U4telt / EASEMENT LINE T / / / /`f 4- // - / \- 1 �J yI/ --'� f / \.. ( V t /^ J -�'f J \\ N ss N N ss N IX GRAVITY SEWER _/ / 1 �/ 1, g'142q,� J y "' "i\, �$--/'' ✓/- 4,. N / 7�� \\\\` �,,h ' `\,ss.,, Is �.A., T// / IX.UNDERGROUND TELEPHONE LINE -0----`' I I 4-r •r<',,, t /fi A 2 / // 7---- J`-" SB2 f \ /61/, ,A.. \\ \\ -, yltl t .( / I / °` ) f g P� 4 fi- ma '> I ! 5• / f"'r �{ / .-„- -. I FLOOD , 1`11'' S \ `.+/ / / J cP SIpP•4.''c � .�_ ) \ / I ( j \ �.M �". O\? iII '} �\ y,+ O^L : \ ucE uuE DC UNDERGROUND ELECTRIC LINES --- �,• ��,,\y .�I T� \ 1+ ` 'I I 1 o[ o[ o[ IX OVERHEAD ELECTRIC \� _, .. ,;.3 0 r (\\ \r s ° \( t �`\\• A--yT \ ''` /11 :\'.� \\ .- '\\ \ -� W IX.WATER LINE /(\``V\ '^^ C/�/ J \ `, ^, -�� \ 0_...�$ l 1 \ L //• Y~ \��\ \`\\\ \\\= y_'�.+:. \ \\\ \,__ SSB PROP.MAJOR CONTOUR r _ / ( \,... .-^,. F '" ). f..S - 'ro 1\\�_`ir� \\ ti m - j"/ 11 ',l \\\ \ ",✓'1~)1\ \ \ 548 PROP.MINOR CONTOUR , .. / ( ` t° l.R (` r+ 4 \..� /l:�\\\\\ Y 'S' �,1 \\ �. '.-. \\+)\ I \ \ \ -SSO- EX.MAIOR CONTOUR I r �_ l\._-_. ) Gam . , cA`.•.\. * '' } F) } 4- \ \ \\`� $ "5\, \ I \ ----54g EX.MINOR CONTOUR KAMAkel?0D ` �\ t` d 2�,e.-•"y \ \ ,„-. i t ) �� 1 \ t\\ ,),V Y �,. 'f �Cl '7S� \\\ \ \\\1{;-. �. w vueutR/w ) ) _ - .� 2w,a'fr�s ,.,.. / _ A j � \ / 1 \ N. } - j I \v A A `v A N __ _ Pcr PG a647 /..__ r g, 2� 1 „✓/ /-+�,' S ,.a' .: •*v.._ yh��1° hx p t\� 4`)A/ J ^\-,-/_-1- i '�tii ti �44 __ / ,-. a / v., / r'./ I, -'1 r// _5"-- ,-,.'jl \ ' \\ \ `m g� �$�y 1 /r % l J I t/ \1\ \ .. .\,..,,, ae .,,� ti _ r . ( 4-' 1�� 4,* / //l �/;k, \ EROSION CONTROL MEASURES y ,PPo 2/ 4 r`r& /.. I �, \ �_�i�.IIJI r s.s� xI / za7+tFEMA�j \ l L )/ 'P9'f' / , s'v I \iii `,. + ,T/NE / // / , \� ^.. j © -'. / \\, C,a /II ; -SF SILTFENCE(SEESHEET C]IS,STD.50]1) \\ • '? '-, ' \ �. POND sts a\( \5 •� G\ �� -- / /f/I 11j/�I �2+m/ /NKEE. SILT FENCE OUTLET(SEE SHEET C7.15,STD.509.1) O -,.- "_ 'Vy M4flKN'UNKfR t1 \ \ \ tr. -- _ , \, ,, EXISTING � /. p/.yte / I I �, \. vm Oso37a7v -_.o._<_ w \ ce \ ""' fau- ao ` ° - ) % 1 1 \ + ^ 006751/V344 /l TEMP DIVERSION(SEE SHEET C7.15,ST0.506.1) - - _. s.. 39 9.- 6- \��" TRANSMI,a/YI_ 1_ ` 'T,._ a}` 1 \\ `ZON,;R-PO UN/ONCOUNTY \ j {\ ` _ c<\ et� - -,� _ RJ4k'EN -1i {``\l /�--- {. '4{ t Y. t{ 1 4 t \, • ROCK CHECK DAM(SEE SHEET C7.16,STD.513.1) -OF doe \--\ \ \ -'"C \• r ` % ~x r- "\8 \ OE moo[ o �7 �-� l- \ A. \ oe1) sr��\'� \- -.- r-.,- - .( I 4.�'€,�..-e!,° o -----'= �r/,f/ / - sl\4 '\\ \I ) �/ /// ROCK PIPE INLET PROTECTION(SEE SHEET C7.I6,STD.516.1) Q �V///''..`"'PP ��f'\ oe--'-oz� 4EA'�--o,, ••• ',\ oE\ OE , - p - _� .. y� JJ//� o J Noe `o` �[-\U ' 3- oY ", \ \,,` .\ I- \, . ¢ $ -o / - or a\n ))///% INLET PROTECTION SHEET C7.15,STD.512.1& ` T *.-�'� c o\.'^ � -�'�- u_,,,4 Sg � ct or 4- ut / �� L ,..fi _J � SHEET C7.IQ STD.519.1 FOR INLET PROTECTION) d o, c .�• V\\ \\ .\ e <�xxxxxxx x .z.:aabx,^" '�?,s,.2,�,;'x t� �" �'�-^�`�\ \\,�," ,4"�8m ct 7• J /� / � z A` \ o usr-� �/ �. � 's � STIPULATION FOR REUSE y -- '+ c THIS DRAWING WAS PREPARED FO0.USE '- g / �' ___ ___� ` l - ON THE SPECIFIC SIZE,NAMED HEREON, } __ 'ay e -*Tit" I -� 1 �F � \ r ✓'C`' 1 J I ' \ / i `p "NC \ �'` /// DATE CONTEMPORANEOUSLY HERLEON AND ITS ISSUE FT B NOT R _( \ V \ Yf -- C , I l I / I + �'®�";a r y'`:. .; \ ' '/J -`--.1 •\ SUITABLE FOR USE ON A DIFFERENT V).1 \ .T. a ' t • .i ( / / ^` (,r L���/�--- vAv 1Aj3'r CONSTRUCTION SEQUENCE PROECTSITEORArA ATERTIME.USE OF C+ I c`vv „ s, a - f l -} ( / l( _/ l_ �// / v TROdTSITEFORROCT REQUIRES E OR DID THE o- . i G I• _ -1 -� / t. \I • 1 I f//' ,� ;\\\\ j,�y/1/ / C \• i \1 1. GRADING/EROSION CONTROL PLAN APPROVAL FROM THE TOWN OF WA%HAW ENGINEERINGON ANOTIER �. \ \ - �+ «/i/ I I . 4/ I , \ \ I` I//,-^.y\ \\\.,3 '''..e ,ram- /J/r'\t '\ \ /' 2. SR UDEPARTMENT. NONISITEEPRE-CONSTRUCLION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE TOWN ARCHITECTS AND ENG ESLREPRODUCTIONTY T \ \- I h= • ) ! ( / ( I / \\\ . ' -f \ Y ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES FAILURE TO SCHEDULE SUCH OF DAIS DRAWING FOR REUSE ON < i 1 1 1 /t ` \ JI J \�rf� • '/ // /! t� CONFERENCE OWN COD %HOURS PRIORTO ANY LAND DISTURBING ACTIVITY IS AVIOIATION OF CHAPTER 370E THE \ i \? , A,t I 1 I \ ( I I ) I 1-J.( r \ J/)� /,%/ \\ e I SBS . J )4: Y' Oi t ANAOIHERPROIER I$NOTO7HE LAW. \ I1-/ / ( f \ ) 'j.�, / \ r /-,//r / `,/� \ EAND155UBIERTO FINE. MAY BE CONTRARY/ `` j `/ I ( ( { •,�J 'r.,/ "-.\ )/ Z rC ° �'J 3. INSTALL SILTFENCE,INLEF PROTECDON,SEDIMENTING ON NS,DIVERSION DITCHR,TREE PROTECTION,AND I ) I \ ' l• ( '' / \\ !! i /// OTHER MFASURR ASSXOWN ON PUWS,CIFARINGONLY ASNECESSARYTOINSTTA THESEDEVICES. •`.l N u o \ z3'/ `4 i ( /� L 1 i I 11 11I / / ( '/�/..-- \� _,7,111 '_/--.' / // (4 y Y _A / 4. CALL FOR ON-SITE INSPECTION BY INSPECTOR.WHEN APPROVED,INSPECTOR ISSUES THE GRADING PERMIT I^�• I Jf JI tf / \ ! i / / Ll ( f J J / $!t \ \ /J / / / ) 1 L M / N/F AND CLEARING AND GRUBBING MAY BEGIN -\ g F \ `l l / I/_rI y '� ) / f�r./7 d ) f/ S./ /�/ "• \ /M /Eri,DtBn/'ERfl10 /// 5. THE CONTRACTOR SHALL DNGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND 0' s04 ,4 k\ / I /t R t, \ I / / 1 % // \ \_ A&¢'asa 7x STRUCTURES. O 0 .,,.}� `\IL) j\ \ g \ '/ '�'� / "' \ \ �E173pffi'S47 BASIN NUMBER. 4 BASIN NUMBER. s WAANA 60 }� 6pFY'6 NENV'\ \ \ \ \'1 \'''), \) !F `'�� \P T I /�iJ \ / 6. FOR PHASED EROSION CONTROL PLANS,CONTRACTOR SHALL MEET WITH EROSION CONIROLINSPEROR Q �' \ (S& \\\ \, ( ,.7/„!J \ //�/////J Y"- /'--" / :'/FXIUN/GYLWN71' PHASE: 1 PHASE: 1 PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. APL9 `�\g y pG 8�i \\\ r\ \� it \j r 1( �f�r 'r /- {( /� "� m' ,I\\` {{ ' L�%/ �'\ \ �, BASIN TYPE: SKIMMER BASIN TYPE. SKIMMER 7. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. LU Q M f 1 0 0\ p,l i`\ \ \ yyA 1 \ \ \ r /.1 I'\` .' () __ \ \,DRAINAGE 3.52 AC DRAINAGE AREA 0.61 AC A�QNLNG'\ ` L " )4� I V/// // / l` -/ (�1�%/-' --\ i1RAINAE REAR 3.52 AC DISTURBEDRAINAAREA. 0.61 AC 8, COORDINATE WITH EROSIONCONTROLINSPECTOR PRIORI°REMOVAL OF EROSION CONTROL MEASURE, �, n `` \ \ \•C\,`� \ (f ) I\y/// r,r4 N.,:;,...--„-," - ' �.r) �YJ / /'� ^` \ , Q10',, 13A US QID. 2.3 CFS 9, ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH NE NC EROSION AND O Z \'-I SEDIMENT CONTROL PLANNING AND DESIGN MANUAL,US DEPT OF AGRICULTURE,TOWN OF WAXHAW co \A ,\\\ \)lA t5 i 1 e` a/Jf V_�'�`-� ,-r - �: j L\ `(.�j'! '.s` '` READ RFACE AREA: 4,353 SF READ.SURFACE AREA: 754 SF EROSION CONTROL ORDINANCE. /� O (V _ /k1`+ \.1/F IN\ j \U A. t\ I\`\ \ ✓ ,o/ /�tJ\ t/ -1lµ"y f I t`'�- /- N/F REPR .STORAGE AREVOL. 6,398 IACF PRREQD.STORAGE VOL: 3,756 OSSCF HLy � V \ ; 1 \UN�C�it's \ \\\\ii 1, S\ t 1 ,,,'k� /f f /4-A• `l _,t =_, �' ✓ANTNUYN6UYEN, RCQD.STORAGE VOL. 12,770E REOD.STORAGE VOL: 4,798 CF /• \\ %N• 3i'61` \ \ \\ \\ )\ \ l I / w' bf' �,_ OMASMAR-NEWFERRY pROV.STORAGE VOL 12,770 CF PROV.STORAGE VOL 9,798ff //) �. ``��{{ S `_ ,..(//- \ \ /BOTTOM ELEV. 619.00 BOTTOM ELEV: 592.00 V I\ 0A�•„ ;k1\ \ 4 1\\\\\ 12 I \ /I/1//�°"\\ :,ti T 1 _- ` J r . PIN'05090007 STORAGE ELEV. 616.50 STORAGE ELEV. 593.50 x 2°'SY' \\ \ \\ j( \ JT/// , .; !\,r. '�, Jr L-- ///^\`IM74.90KM CLEAN OUT DEPTH. 1.25' CLEAN OUT DEPTH: 0.75' EROSION CONTROL NOTES S,' • J mm - N" ZONING:R-20UNIONLYIUMY AMf3 TRUST TOP OF BERM ELEV. BOB.% TOP OF BERM ELEV. 595.00 `JC �' A A.11 \\\/kY(„D D\•1 'B,1\1\� 'I, I`, _Li i 1 I r /\ - P/N.' 7K \ /// 1. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM ZONING ADMINISTRATOR. • ii __._\ "�pApA, t �, ---`7 Y SKIMMER PIPE DIA. 2.0' SKIMMER PIPE DIA. 1.5" \ 036OJIN/O R4 2. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS AVIOIATION OF THE TOWN'S K' SKIMMER ORIFICE DIA 1.5" SKIMMER ORIFICE MA. 0.75" I I \`- ( f ~ /\ I /NU!-10UN/ONCOUNTY ,/ EROSION CONTROL ORDINANCE AND IS SUBJECT TOAFINE. / i \I \1YE 1�g ) L 1 ` \\\ \ \ l 1 I - \ ENTER.SPILLWAY ELEV. 616.50 ENTER.SPILLWAY ELEV: 593.50 `/ Q i': \\` N' Fy' 1L\\ `}\ {\��j\\ f1l �,-'< /•♦ �• / ENTER.SPILLWAY WIDTHS 20' ENTER.SPILLWAY WIDTHS 20' 3. GRADING MORE THAN ONEACRE WITHOUTAN APPROVED EROSION CONTROL PLAN ISAVIOIATION FO THEQ (° ! TOWN'S EROSIONCONROL ORDINANCE AND IS SUBJECT TO A FINE./ 1j \ )("1 ;\ •\ i^•/ -d-.-..�? `- \ 0. ALL PERIMETER DIKES,SWALFS,DITCHES,PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL O 0 I ` l'1iI } -\,'K\l '-�`/'e5 •p"� °�" � '' ` TO1VERTICAL(3:1)SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER„ R ` \/,,,g!' J �,y/jAS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LST LAND-DISTURBING �(.•1 �< \� kV..ter. \ \�\ \,.r'S`/'�"+r/ r"=" j'•' ..,\- -•)PA]I�CNUNm6E/N�s N / // ALL N {\^\ \) ` NIP SPA \ \ '" I / .. //A" Z_ 5 1 HN OSII BASIN NUMBER. 1// BASIN NUMBER. 2 BASIN NUMBER. 3GROUND COVER AS SOON AS 5. ALLOTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH CO \ II ,�AA�,��50E5g `� `�I\ t t y-•F / p ) J • / �Of51PGZSB \ PHASE: PHASE: 1 PHASE: 1 LAND-DISTURBING ACTIVITY. PRACTICABLE BUT IN ANY EVENT WITHIN I4 CALENDAR DAYS FROM THE CAS \ I AEAo"'1. \ ~ `It \ \u../'/~// ( 2, I ZOWN"'20 UNION 'm BASIN TYPE. /SEDIMENT BASIN TYPE: SEDIMENT BASIN TYPE: SEDIMENT 6A. 8.01 AC DRAINAGE AREA: 5.51 AC . ADDRONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BYAREPRESENTATNEOF d S \ OBN�I' 4N�A�t\'''el t \ �,,,•"J••��' mm f I N/F h / ^\ DISTURBE AREA 22A6 AC DDISTUNAGE RBED ED AREA. 8.OS AC DISTURBED AREA: 5.51 A[ THE TOWN OFEEGHAW ENGINEERING DIVISION. LOB NUMBER: C220016 N'` '� = JJ CURI/SE.TO .UO/E / DISTURBED AREA. 22A6 AC 7, SLOPES SHALL BE GRADED NO STEEPER THAN 2:I.FILL SLOPES GREATER THAN 10'HIGH REQUIRE ADEQUATE \ -'�""' � MARY/ouTu22EsoN Q10. 85.5 CFS RED %.s CFS8S QID. 21.0 CFs TEARAONG, CHECKED BY: BHE 'n C\Z' / REDD.SURFACE AREA. 13,258 SF READ.SURFACE AREA. 9,120 SF I 1 - '-'/ P/N'0508Z0'N9b--" REQU.SURFACEAREA 37,17s SF 8. AGRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT 1 \ \ \ " g- \ PROV.SURFACE ARE."./ 38,7795E PROV.SURFACE AREA: 2Q80.65F PROV.SURFACE AREA. 9,9105E PREVIOUSLY APPROVED. DRAWN BY: BHE GRAPHIC SCALE \ \� / 0917004r369 REQD.STORAGEVOL. 9,9RCF REQD.STORAGEVOL. 9,918ff ' S`� \ '- ¢ / % ON/NG'fl-20UN/NNCOUNTY / REQD.STORAGE V9L 40,42E CF 9. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT % 150 0 75 150 300 \ A7M1YeF4yG 0/ON \ \.�� ! r \ PROV.STORAG L. 92,178 CF PROV.STORAGE VOL: 55,681 CF PROV.STORAGE VOL 19,7%CF PRE-CONSRUCIION MEETING. DATE: 03-22-2023 5 % OS NNt7' - T \ TfOM EIEIk 632.50BOTTOM ELEV: 594.50 BOTTOM ELEV 593.00 N zyg 1 STORAGEEIEV. 597.50 RAGE ELEV. 595.50 SHEETTy� = = I 03 yZ74C + m /CU1777J€TO[LkoN \,\ \` GE fi35.50 CLEAN OUT DEPTH: 1.5' CLEAN OUT DEPTH. 1.25' IN R-1 Ma3rtouroi N C DEPTH, 1,5' TOP OF BERM ELEV. 598.00 VVERALL (IN FEET) __ - - TOP ERM ELEV. 638.00 1 TOP OF BERM ELEV. 600.00 1 inch=150 ft. I .....« r�OBq74f�r.7Cd' mIT SK194MER PIPE DIA. 0.0' SKIMMER PIPE DIA 4.0' SKIMMER PIPE DIA. 3Z EROSION 3 \ I N` ^ 1 ITS/NNGG.''3-1 SER TOP EREVCE DIA. 5.50 RISERSKIM ELEV.ER DIA. 597.50 RISERRTOPER OR ORIFICE DIA. 595.50 \ 1 CHfRLP. 'Z / , RISER DIA. 5'X5'PRECAST RISER DIA 5'X5'PRECAST RISER DIA: 5'X5'PRECAST CONTROL PLAN- ,\ P1N050 /t / / CULVERT DIA. 42'RCP CULVERT DIA 36"RCP CULVERT DIA: 24"RCP North E I \ 0e / R 7 �_� \ / NVLVPE LENGTH. 9 � NLVERT LENGTH. 41' CULVERT LENGTH: 60. 585.80 Carolina$ , PHASE 1 I INV DOWN. 629.63 INV DOWN. 592.00 WV DOWN: 585.50 wwMONLM��, \ �1 ENTER.SPILLWAY ELEV. 5%.50 ••*3D 131 -IJ;,, ENTER SPILLWAY ELF/: 636.s0 ENTER.SPILLWAY ELEV: 598.50 SHEET NO I \ \ /, ENTER.SPILLWAY WIDTHS 20' c 8 C7 O \ ENTER SPILLWAY WIDTHS 20' ENTER.SPILLWAY WIDTHS 20' u 81 J4 o 3 http//vo81 L.o13 nmommketevhy.htm III at A-L)-- / 1 /� // i /I ✓ SITE INFO �� Q.0 T` ,1 ,� rtxwn /� C°�1 t / /1 //�/''-r.r CONSTRUCTION START DATE. AUGUST 1,2023 - „i1' ♦ I. U L L 8 \ r7' I f / / ✓L. DISTURBED AREA. 43A4AC ,, 41, CD N O O /s „'7i , I/ �, /)/ :-.1 �I l / /u,/>Ik4 �� C '�_., / Itae//( Ivtm� ����j ✓J J ,§ 11 r��A//Ji/-�.� q 1 �V f[�VAVA i I� C o> /' / -- ! T r I r ° / 1 / , ( �? // �,/ rr ' / / /,S. /// " � Q w =c }/ATA/fWW WCdSIFR ` A RI ��, ( � PC0004357 �)_� � ,,(/ll 11i 1�f'/ °`'� [ 4 w j......... .. i 8 ai WT435 a "7" i:::: aoh. ZON/NG�R-I i 1 8 / N /' -=) '� ( ` �, v - ) \',Ift ?�:�. i„i l \ , ? 1r( \\\1 t).� • � v `� I1.t A \ 1 \ \ 1 / .,- // :/' ,/� J �l �. ' / i• / )11 1\1 j LOCATION MAP^ • •/ \ �az ' �" 1 i /!11<\ \Fi )'3i6 41. n°ENGINEERING/ � } S. /Y 1( f/I l d (a; \$ --i 5/ - �° ASSOCIATES °o / °`` 1 /// f .r %� "��®�� f; ���, .'`i/ i/srft'l(1 d J�f t <. 11( i< ( LEGEND SOUTHEAST Q? J' / t 1 J C 3881 'V. 3 gblD /' \( N/It'/" /� PLO s� ' / ���� �"/"i"° f zi'r 41 L �l{ I ' (1 ,, I t `4 ` C ..... Q ' frA^ NNNV --\ r�r ��a P W \ � !1l �1 t 11 t 11 ,/ SIDEWALKS ""'.IS of A��.�`P�, UB 7 / . 0 / /-/' ,p C,-,�� `\\/ 1 n i nJ i/ � � 2 1. NiillAra-.....-7 � 't /{'i- 1 " i7f t1.4/T I.rf /' re'° Y, i \t\\ - '/ TRIBUTARY AREA nU L �'� Y./ r 19 / / L e N /A 1 1 /, / / -� ((/// • 1IS /it } T I �•• .�� LIMITS OF DISTURBANCE /- /- ���/'j{I I//ram �1� ��� (" r } //34!'> 5Ntr7�f j l // \ vv ��/lu ntt�.�/ ' ,/ ', • 0 4' /`\ 5%_-.-:: „'. ` I \ DI DROP INLET C / / f ! ✓ // /'/ yay y Gb ,111�1/,rr 1 !d j f ? } 1 I I�� \ \ H / � 'A --- '1 7, �,�'^''� I ' !j ( l \ \ CB CATCH BASIN / 1 / 1 /' / 4..._____,„,________.„____--,,,,___.....--- ' MHO • ll f's /'`/d \ \ // / Ir /f ,, Y� ( \ `\ RCP REINFORCED CONCRETE PIPE / / r#. )/ yy . -�- F vial / 1 Hftsd ' t ( \ \�..,„ A SEALf /) / S�Cy ✓ /: /�'"•"v I 4 I f t"J 1 II 1".,L,-. \�\ -,\ \ \ \ FES FLARED END SECTION G23 o °{ J I f / "'$40 oZi r// ;,/ 5. ,'tip t ) \l\1/J t F. " \\"' ry \ SSRW SANITARY SEWER RIGHT OF WAY 22f I3 /r(/ J '/31:// y m. .oy -..$�f //,T • \ �� J //� ✓, 1 f >)\�\\\\ `\� l'.:.././ 1\ ``1 / ,•J / SIDE PUBLIC STORM DRAIN EASEMENT m{�' GIN.Ep•�W s AGSMpYUMfMYMB'l7 R/LkAN9379 ✓i `(.�/ J�/ / C r, oil �9 4 b �x((� �. ,✓ ....., / J il�Ql l �� ' / /��//N % j" 7 .`' °, ` .// / / /)>. 9r<� // 1 1 �•// 1 `"/ / (eta ROtT9fAU// `/J 6 ---- PROPERTY LINE Jl7k h.F$1 o\y, POUND-C W E1/ i v IAII /!r �i' t • �`/ a 9 F //,t. 1 1 D r .r } PIN. 7071A3� / fi ri l4}1. 'jc �0 11�{ / ADJACENT PROPERTY LINE N.'41A75d1&tl' //) .!/ I/.{�- } y�� // �'`'/ �.'=��=J T,iL o�� �i ,, 16 ^t if 6 ,./e J",��/JX/UN�N. l <\`\ EASEMENT LINE E.'14dD1[H63A7' .�, / \ l , r /I `J \ J ,`,��"„'',y,� L74E767R' .° 11T 1 // /✓fir''/ // 4 0� ( : N A° ✓ �� 'a �� \� l est\. \ }'t i`t i.J i r ✓ • 1 • ' t - 'a-- \ ss ss IX GRAVITY SEWER ! f / /7' d �. / w+ I I \ ®11® \;. lti 1s GY y',..�°95'� / ----�--- ''¢¢ccam�,, ?tiiMbiliti, +j �, 1r}1 �/�/ ) ; / IX UNDERGROUND TELEPHONE LINE �t'JY / 1 . 5P 9�'Z $,f41 } ' �J�\ .>.,AE \\\`\Il.` t H of QCI\ • \ / ESUN.5 / \// S! .� �*�� �J M �� ` / ♦O\ '�'T 1(1 :,j�\'t•y.l 4 L \\ \ OEucE OE usE OE IXUNOERGROUNO ELECLRIC LINES / `. ,�� ( v- 5 .?f; J /S (' 1 IX.OVERHEAD ELECRIC `.--._ ''" \\\` \ s -°a l �p\. ='r��� ` \/� �1111 �-r� •+ 1 1 1 i-1 \\ \ �'r- .. \ \ - W IX.WATER LINE /( ``t\ • C(,/ y • •t )\�\�p4 •��� 1 / 1`i \\1\\ \\ -.mil✓„�•'\\\\\ \\..- SSO PROP.MAJOR CONTOUR - \ p /�1 J+ 'F/A �f / / �R� ® / �, , ••J • .5 \ _ "`~ \ 548 PROP.MINOR CONTOUR I5S0- - EX MAJOR CONTOUR •t •!✓✓ L��- ,,'^T. C• GGq q_y: ,� \ ao/ ;,, �IT v ��a®I `\ ®� �\` ����f� ,�\i Ai..- \�\\\ I\ \\\ \\\ --- 546 EX.MNOR CONTOUR 7 . 1 - \\ \ may, ,,r --- -- rA,wtsEEFaAN ; v r e5 v N, / /`/-" V%: �� � �j0 4. i '!�t.1 ,4l \ V A V (1 w'vueutR/w ) - s o ' ----I)* v�. ���` �� A v- V A v A VAT, � T''' / - ,, ----2L-4?6-46--412-"'>••=......-- ..-.'-•". -\ -1^6",y / ` Y\ \t `',,,, �l\\\1\�1~' ''e �y s ��/r n.;w j44 � Oi��/� �9L���� / � /' l l; 1 / tl l A ti ti } � / , ,,/ , \ EROSION CONTROL MEASURES �I \ �•,� L. �,y r /. _-` %�i - 1 \ ;11i � � •/ zanifrMA �' J, / L✓ \/L \` PP ` I`P y �boy/ //.' .-„, , i / \"}"' { ■ `f / ` .4 �</ / ,1/Nf j/✓///I ✓ li,,, -� - \ SF SILT FENCE(SEE SHEET C715,STD.5071) 1m I. \ �\ \ f/I 1 / N/ POND �- 1 y`•1. , / 1 1 { / / /t(( 1 44.41 NC/NKf/l, SILT FENCE OUTLET(SEE SHEET C715,STD 509.1) O 9� _ // I 0( YI Ube EX/ST/NG 1 l -' r' /°Yte 1• ` (\ P/N Q5087 -.o-�<� TEMP DIVERSION SEE SHEET C7.35,5T0.506.1) w TAANSM(, ,,1 ' �.) JI�� J®� _ ,. 1 1 \\\\ aRG7OONG344 I z _ _ ' -,/ /j - s.. _ _ ''^ZONE;RZO UN/ONCOUNIY \ ( \ -b- `-..'fir=., e, -- - \\l /���\ `.: �$• 1 i 4 t L I • ROCK CHECK DAM(SEE SHEET C7.16,STD.513.1) , . ACE \-0, . E- of -�E 1 s,p \ ' 1 I //�� f`r //��� - \d \ \ f �/ 1-=E" \, ti ` \• ',1 ` \� \- .., ten=- L,t I ":.� • -- f G -.... ROCK PIPE INLET PROTECTION(SEE SHEET C7.16,STD.516.1) Q P \ O '� 01-of T 5 of Oe 'G �E-\U 3y oe,2'�oe-\oE ��\oE\\ a�✓` • ,\ 11 ° �- ///� .., 7 - - 0.- 3 p _p °r "'- . f/ .° °r /)//,/ INLET PROTECTION(SEE SHEET C7.15,STD.512.18 = "" -\-\ ,,F OK�`V:- % \,\_\^•`•` �' �� /// SHEET STD.519.5 FOR INLET PROTECTION) .�V\\ \ `\` vv A v mli�, • v v - _ gt� ��� 2 i // /� o e ry / z \ \ \A " - \. b, � .111` • p 4 1 0 89 -. _ cx. , � eC _ _ / / _ z ' "` /m '`' �� sF„ �j <v �' ` "'�" 4/� �/� STIPULATION FOR REUSE -- j//� ��/ �..1 \ \V`����� ,I fir`_®�`�_ y- '-g ®� c THIS DRAWING WAS PREPARED FORON THE SPECIFIC SITE,NAMED HER USE 7s�M --_i�i'.�,__AD/� - ��° • COTE MPAS ORANESTED, USLY AND ITS L SNOT \ \\ l-/f�.1/r��/" AIF AR� ��-� � � `i / '-at�"'�^ \ \ /,/ CONTEMPORANEOUSLY WITH ISSUE \ } `=. T �''0T�i�B�LC L-: �� L i-� \ J/ �^� _� '"• \\ PROJECT SITE OR ATA LATER TIME.USE OF \wl t �� ��� 8l� iV / %r SURABLE FOR USE ON A DIFFERENT i■ �. _ L r1.- --��" i`` . 1 3 CONSTRUCTION SEQUENCE 1 • • I "•I P. �� / ✓ /' THS DRAWING FOR REFERENCE OR EXAAT E 1 `: L°%//V( / C \• 1` 1. DEPARTMENT. OBTAIN GRING/EROSION CONTROL PLAN APPROVAL FROM THE TOWN OF WA%HAW ENGINEERING ON ANOTHER PROJECT REQUIRES THE \ • 6 / �; , / //F'_\( \ 1 / SERVICES OF PROPERLY LICENSED / 2. SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE TOWN ARCHITECTS AND ENGINEERS REPRODUCTION \A L Ys° 1 1 /"� rr' "+\ \ //, ENGINEERING DEPARTMENT TO DISCUSS EROSION CONROL MEASURES.FAILURE TO SCHEDULE SUCH OF THIS DRAWING FOR REUSE ON \\ .\ a <^ R i `i /II _ , ' �� �� J,'J �7 f ^)a t \ , CONFERENCE 48 HOURS PRIORTO ANY LAND DISTURBING ACAVAY IS A VIOLATION OF CHAPTER 17 OF THE ANOTHER PROJECT IS NOT AUTHORIZED \ S -f><ao'/.w-,�+e - 4i / I l '� 0 �+ TOWN CODE AND IS FINE. \ _ liar� 1 AND MAY BE CONTRARY TO THE JAW. r/f rl .,�t� `��jJ "� •._�� ...,,��1 ..▪ /.err/, (.,ii i, i% r /( f t �',. / +) / 3. INSTALL SILT FENCE,INLET PROTECAON,SEDIMENTBASINS,DIVERSION DITCHES,TREE PROTECTION,AND ._\ '` //( ) `,\\\ ��Oaeu�`1LTIa__�By j // ;///-,,, e / /' OTHER MEASURES ASSXOWN ON PLWS,CLEARING ONLYAS NECESSARYTO INSTALLTHESE DEVICES. U or \� T,. \ �� I -,Il4,41,j1r,/,..) �,4�, ,,� / ;/ ✓✓ \�y�Y 4. AND CLERINGIAND GRUBBINBMAY BEGIN. WHEN APP0.0VED,INSPECTORI55UE5 THE GRADING PERMIT \\ \ \ l\` J' / u /1"Vl_/[2TgNIY AND CLEARING AND GRUBBING MAY BEGIN Sa i /�/e \ \ /NVF57MENTPRRTNIXSDC /,/ 5. THE CONTRACTOR SHALL DIUGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICESAN0 �' #'` V / ✓� iAA Rri47I/ STRUCTURESO ✓ �\ \ \' �0173Affi'S47WF1(NAwfTF S6 -_- GARYD� wMw• '��\V I� � l�'4 �/� \ �/, DONNG,R-pUN 6. FOR PHASED EROSIONCONTROL PLANE,CONTRACTOR SHALL MEET WITH EROSION CONROLINSPECTOR®J ".� PRIOR TO COMMENCING WAHEACH PHASE OF EROSION CONROL MEASURES�PL9 1®J_4I \ W ,mOB+t' R \ "\ + i_ _Yyf � 1I �/ 1' 7. STABICOOR ZE INATE ITH ER SIGN ARE BROUGHCONTROT TO INSPEC ORPHED GRADE. (] M( J(; 1 ` _, `� / j (jy/ / 8. COORDINATE WITH EROSIONCONTROLINSPECTOTE PRIORTO REMOVALOF EROSION CONRDLMEASURE. �, N. 0L + \\ _ 1�� % !�YJ j� \'\ 9. ALL EROSIONCONTROLNNINGESSHALLBECONUALUSDINACCORDANCEWITHTXENCER05IONAND O O N` 1\ / ' \, SEDLMEMCONNTROLM NING ANDDESIGN MANUA UEDIN ACc AGRId1LTURE,TOWN OF OSIONA (b p 1 ` -^b 11000 \\\\ ��\ ��/ii� �I/ L\ f ✓ �� EROSION CONROLORDINANCE. /1 N L PSON L ✓ N/F / �� ✓ANTNUYNGUIEN, V - (7MASMATTNFWFERRY �G E ��� ® % 1-,-� P a. p611� '' I �\ 1FIG;15\ C < . � �� %;,.,..` ' '.�.< < YiN osa90A71 \ OR74AAGd04 � EN EROSION CONTROL NOTES x E \A 1 \\\ ,, -`�,�� �•f�\ / LNG.'R-Z0l/NIONGYlUN1Y ,'� ` '/ 1. ON-SITE BURNLPITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM ZONING ADMINISTRATOR. `� Y ® �/• \��\ y..� ', z OB6Y91N/ONC ,' 2. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE TOWNS '�. s 1.1.q \\L 1 mUpB -K D�1 \ ,5\\\ `� �; /'' /l I /NG.I/-ZOUN/ONCOUN7Y ,' EROSION CONTROL ORDINANCE AND IS SUBJECT TOAFINE. Q� x \ pN:�3 FYI ) C �. \�� f, ,_ -• 3. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN ISAVIOIATION FO THE O Q (° }�p pf \ 1 �. \ TOWNS EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. %".tu1HN6j 1 gym `, �- \ / 4. ALL PERIMETER DIKES,SWALES,DITCHES,PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL '� �� �o-/ r ,� \ „ TO 1VERTICAL 3:1 SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER /°Y/ o ` „•,� \� ♦/ \ \N/j AS SOON AS PRACTICABLE BITE IN ANY EVENT WITHIN]CALENDAR DAYS FROM THE LAST LAND-DISTURBING �< t NI 8 \\ \L 1,' SS6pEE�jSPA\ \��(,.-.'- f / ^ 1 - BET. BET. NUMBER. PRACTICABLE BUT IN ANY EVENT WITHIN I4 CALENDAR DAYS FROM THE HAS CO I IPp �/ ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH <p / 2_ BASIN NUM 1/ BASIN NUM 2 BASIN NUM 3\\`\\\\Y` GROUND COVER AS SOON AS f�0151PGZS8 .#44 INPHASE: 2 �eo _,,gyp ./ ) ZONAWR-70L/NLONOWA74 PHASE: �' PHASE: 2 LAND-DISTURBING ACINAY. \I 1 pEBtLpRN.01�""9j5 \, '� �� \ / BASIN TYPE. /SEDIMENT BASIN SEDIMENT BASIN TYPE: SEDIMENT 6. ADDRONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF d \ \ DB,N1N�p-1\\R l� �1- -/`s// IT f 1 N/F h ✓ ^ DRAINAGE AREA. 21.98 AC DIDSTUNAGE AREA. 14.15 AC DRAINAGE AREA: 5.51 ACRBED ED AREA. 1415 AC DISTURBED AREA: S.SSA[ THE TOWN OF WA%HAW ENGINEERING DIVISION. JOB NUMBER: C220016 i • / ✓/ CURI/SE TOUESOM1'% / DISTURBED AREA. 21.98 AC 7. SLOPES SHALL BE GRADED NO STEEPER THAN 21.FILL SLOPES GREATER THAN 10'HIGH REQUIRE ADEQUATE \ • '' Q30. 83.6 CFS Q10. 53.8 CFS Q10. 21.0 CFS TERRACING. CHECKED BY: BHE " MARYLOUTDCLf50N READ.SURFACE AREA. 23,4215E READ.SURFACE AREA. 9,1205E p 1 \ `- -,<..- '-'/ '"' P/N 050/2009 9 0'-" REOD.SURFACE AREA. 36,3815E 8. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT GRAPHIC SCALE I \ \ Oe17T7PN.768 PROV.SURFACE AREHI5 38,7795E PROV.SURFACEAREA 24,8055E PROV.SURFACEAREA. 9,9105E PREVIOUSLY APPROVED. DRAWN BY: BHE \ \ `•- / 4. \ / REQD.STORAGE VQL 39,564 CF REQD.STORAGE VOL. 25,470 CF REQD.STORAGE VOL. 9,91E CF 9. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT " 15D 0 /S 15D 300 " \,��" - 1 / ) TON/NG'R-ZO UN/[7NCOUNIY FyYO PROV.STORAGEVOL 55,681 CF PROD.STORAGE VOL 19,794 CF DATE: ATV O/ON \ \ N. PROV.STORAG L. 92,178 CFPRE-CONSTRUCTION MEETING. 03-22-2023 5 q 050Y$p7' ` TTOM EIEIk 632.50 BOTTOM ELEV. 594.50 BOTTOM ELEV. 593.00 N gTT��99 '8 y STORA EEIEV. 597.50 STAGE ELEV. 595.50 SHEETTy� \ , pg Yt��..774P 1 ,+;'f TLY/RI75(TOLLy(H;' \• GE fi35.50 ZpNING'R= 7W(RYLOD701 N C DEPTH, 1.5' CLEAN OUT DEPTH: 1.5' CLEAN OUT DEMI. 1.25' TOPOF ERMEIEV 598.00 VVERALL (IN FEET) __ - _ PAy,;,p, I 70P ERM ELEV. 638.00 -. TOP OF BERM ELEV. 600.20 l inch=150 ft. I\ .....r.�w� px '4"'•r., OB�73f SK194LIER PIPE DIA. 4.0' SKIMMER PIPE DIA 40' SKIMMER PIPE DIA 3.0' "/Sn \ ZONING R� ��+.1°" 5 RFTOP ELER LEVCE DIA. 635.50 RISERFTOP ELEVER CE DIA: 597.50 RISERKTOP EER LEV. DIA. 59 50 EROSION I `1 CHfRYL/PfLPLN'\ '7 ,,' , RISER DIA. 5'X5'PREWT RISER DIA 5'%5'PRECAST RISER DIA: 5'%5'PRECAST CONTROL PLAN- 1,, $' I \ PIN 0509G>048 �^.. '` \ CULVERT DIA. 42'RCP CULVERT DIA 36"RCP CULVERT DIA: 24"RCP CULVERT LENGTH: 60' North 8 PHASE 2 E \ 081957P6047 - // CULVERT LENGTH. 92' CULVERT LENGTH. 41' Carolina Z(iy/NG R-1 INV UP. 630.09 INV UP. 592.21 INV UP. 585.80 ` 7 I INV DOWN. 629.63 INV DOWN. 592.00 INV DOWN: 585.50 w�aslllM� �1 EMER.SPILLWAY ELEV. 596.50 °°*3D 131 -IJ3;,, EMER SPILLWAY ELF/: 636.50 EMER.SPILLWAY EIEV: 598.50 SHEET NO.: 1 \ \ /, EMER.SPILLWAY WIDTHS 2U \ c 8 C7.5 \ EMER SPILLWAY WIDTHS 20' EMER.SPILLWAY WIDTHS 20' G RJ :-00/Y o 3 h0p:L/v°81 L.op;nmoi.licketevhy.hoo i d/.(/" / r f .�X, t_ r Z to Lc v ,) / // / /( / SITE INFO ,„ �� Q.- I` ,C ,'� rtxwn /� Coal A. / // //f,�J� CONSTRUCTION START DATE, AUGUST 1,2023 - „i�r♦ 4. U I A st—ff •/'J / / � �U .rl ) 1• Qo f • 1'g+am/Eww WPM m ,A� F 053115PG434 -•. �., :.,:,:-;„,''„/--,-,, /_,- 1� 4 •O cc') 0`j ( ZO)T35 / • 5',\� 'Y'-•3k ) 1[{ l (', 44 ii ` m �R \ r�?�, mN/NG R1 ,vi\ _. °p" �� "h„'"`/ \ s\1 jII C)�\11 ti \� `N U A 111,/ ,411 4 44 /...54-.4,,...'14:-•,2'21",:./.../ '14.1":"'' .-; /, '' Lv may, AV,-� � �i' ® � J .�" •'^�r.� tJJ /" `�) t , v ` ` 2.,,,�//!` '�'� 105 ,;, % '' 1\\\\)[ r� r-i;'" �-,, ,,,,,6N�I.ARo°' 121 ���. �� ��''' IJ; .1.I v1v v11v iv I t / r /p LOCATION MAP ' AMERICAN ti' / h a,„ 2• / I �I t / [ z . t, AN/ /J[ j ' \ \J .} /5 .ENGINEERING Kz C \ Ay }} f r t $ 5 ASSOCIATES O( a v41121,11 ✓ : r v f < / +v, 3 LEGEND '/ o / /A 119 h*,, i\yly\ v / /s I ! S xvd ( s C-3881 T Q.pL .,/ vV( J�// s 'gw�� ,,>. f�r!<4 vl %,R, �I' ,>W z,l+iau / �l{ t°I� )��� ,(J[ /1 v `\� I\ l :��:c� Oc3ssy�: ' 'U%BEAD 7 \ N�//• c 7 1 ,/, mm ®y 3,,�gg, I r :Y Fu.y F /)! (p \�\ , / SIDEWALKS 'o'.Tf °°°°O'''o /' bp P )1ks-' / '°,w�.c• .,f' /w ` r \ )- 1 II r ,. t I �// OF A�P.1, J \ q � 114' Il �.- ) [ 1� � tt( I 1,�� >,j 1 iv\ \ , .,IIII.I„/ y �l / I l .� ) 'a2 V� � e ��/�� c' I i1r rl V\�'� /[ ®i."P ) I 102 7 f x / y �d 1\ \ TRIBUTARY AREA 115 < I 4 !_ / t t 4 f i�;�/ �'/ ''/ \� I jtt ( / $� 'Ys% + / )- \ �////jy �G3 I� il ,� ` f /{ J 1) .'. } '` 4\ (� 1 ������� LIMITS OF DISTURBANCE / '/ /,'/ /� 4 4/ •iZ /ei 2y 4 45 ]7/4� 117')L 116 � .;71/Za 1<�l�'1 Sd9' ,. •J of ( )3 L d j i y' �� j ) �\ \\ \I DI DROP INLET \\t{C rrl I / '714L �Y rasj fri ....: I I/j r f / s !j [ \ CB CATCH BASIN ' J / �� H\ / .,_ /I�r.4 �7(l i;* /�/ S{ /.$.'7 ! /y1' t \\\ \\ �-\ RCP REINFORCED CONCRETE PIPE 5- 4' / /1 / os� Ii �- -_- '� h li/i/i� / < / E{yv� ` t v v v� a SEAL I s4Cy /-// ,v I t I. 5/t 1 /[ L ��\ \ \ \ \ FES FLARED END SECTION _ 623.0 _ .{ J ( / � "°�4'0�]i- // :/ -, t ) 1\\\1 A[tY "- \\-- ry \ SSRW SANITARY SEWER RIGHT OF WAY 22tI3 /y ,, ", //,/ -s' ,-4i�'• `b,� ,,�^s / / ,, s.r-r* iiiii,a';' '1.,� ,1,,,?' -j l �, 1 A V A V /... �1A 1 �.1 / m . �o r, t / // "•� • q a, / �" � Iii I 1 \. \\_ \ ' 1 / •J SIDE PUBLIC STORM DRAIN EASEMENT / GIN- p��` /ice`,-S ..� / cy' �o ",NI`''''� / �!:, � �' �� (,�III/�� r//�i �//� �.✓-``' �,.//��ta N/ /`r f N ���� r'��ti.•F T(l\�`� sr c/ /' 1 fi,PQtraTf4U/ `/ PROPERTY LINE / e� ..// / / / 4,,,-v9 //. l :-� //.lrrl -„�- \ t\ qN 7011A3n✓ / / ri1JL1L))\ r.) / �' t o�qy ¢\, -, (- \ ( // � � / ( ADJACENT PROPERTY LINE I I/ t / / S • tr` / / ;/_:::;,. / `} '/ P7 69 t i A I I \ t J° r' R�1UN EASEMENT SE pf,.1,T / /'/_,•// �S j �.�o�, // A pt �s/.. .LHEVELLE CT r_ � JI.� �� �. � ��i�tt)/J^� /'Ir ���/1 J y v �s �s IX.GRAVITY SEWER , / f (' /'/,g 4 -y / WRDP 5r Rlw1 =_'il,`I r \ V A V ?s I Y 7/. S y --- �'--- y / *p' � � �I��' _ _ >,•.__ { / IX UNDERGROUND TELEPHONE LINE -(S��. / ) f 1,.,.,7 A .g,yW'ry' 1 4^f���4----r. :I I' C j l \4. A.'.-A•. \\ `\\ {t t l t / i ' _ — / -�����������i / /, 6 S! �c$,,� / �) , I ' ���I ,.. +) I 1\) I. }i\ •y.7 •,, , ., (�\ \ usE u0E IX UNDERGROUND ELECTRIC LINES f ,,� d+ rq I � ♦ / 1 \ \ ){ •1•J / 4 \ \ OE 0 OE IX OVERHEAD ELECTRIC � .._ • ,,.. \\ � .".�" ! 1I,�� \ \ I�j / \-. 1 �Il .1 i�. � • \ ,'r-�.. \ \ -� W IX.WATER LINE //.\ y l �, \ Ij/ e t \ /l/I ' I 1 \ -�- \ -- SSO PROP.MAJOR CONTOUR � 1 •�_ ',.' ; � 1.'...j..,sl -o / _1� �. \\\�C� ° �14� � f✓R I" .° 1 CS \\_ ,✓'/Y)1\ \ \ 548 PROP.MINOR CONTOUR ''�.^^ / f •C v ,�, f /, m 1 %/. ��`\\a FJ' /®/�99 -tic. �1 ) \\\� uc \�i \ I \ 1 \ _ _5S0— — EX.MAJOR CONTOUR \\ ' / ��r/�! I `\�, /� �' �...„,"......,,,/,. ../ \, n� /1 \ \ 1 ) \ ___-546-___ EX.MINOR CONTOUR 1 V ----- rA,wsEEFaAO ;���� ��. _ eye"• v ;N /...�r,�� s' s�-� ,� '- 91 �1I/Zj `i//?`) i,i',, :ql V AV A \� ((°{ ,_ 1 wvuONtR/w ) - r�Ta y .. .1—•,"—,-4V'' \�' �!,p A/�....' , //I !:Pcr,?c 4548 '"�f/___� � .2,'2- .' �p v f � / 1 `�,A/ ? J 1 ]�� j v I. \A\ 1 ,$�vVice• Voss ti 'N.,..`'" � 'yam �r n. w_.r 1 _-��1'..� +�.�CO\�� / / f v���I/l�j fJ /�--�\ '°� � EROSION CONTROL MEASURES t�, \ o PPo�\ �`^ 45L` � . > � a� 1:\ \ \ _�`�,'v. / ;r♦``\��// 100+tFCMA 1 J, / l L" \/L 4, \ + yj� oy / s'q'bv c i\„.I ' \l "' �\0„si i i. \ R,'. / ,' i7 ' Kill/NE !/ / // / d'3--' '''-- 'II \ —SF SILT FENCE(SEE SHEET C]IS,ST0 5071) \ ° ,."'�,�'.: m,- psi,_ .,� / 1 ) { / / /) ( 1 /NKE/l, SILT FECEA : : E LET(SHEET .1509.1) O \ \ \ ' EX/sT/NG 1- "'_ „'C �„ /. °-, ). y 1 \. WW1/ 0e N __To-_<_ w � -1 _=<. 39 0 <-Q m�-Q TRANSM(,J,_ I..1 �) /^ �i .,..k.•� ,.}(, ) t 1\\\ ,ZON•0 Z UPG344 TEMP61)m NCOUNIY / 13.1) oE`\� ,� — _ .fir,; , i;�/// . �4 — �F- of / 1, \ \ \ E» oe �a[� ���moo[ \- .., cr1 I -"- / f �® -.... \ ROCK PIPE INLET PROTECTION(SEE SHEET C7.16,STD.516.1) H OE of �, s o � �i j ae \'. .-\ 762':oe \ ` \ ✓' F �- ''< c- 3 ct - °� ///// INLET PROTECTION(SEE SHEET LET PRTECTIO1& � od- [-\ bp\ p�" c.,��� \F\,.,,r,\ „_, .,' �^- � "� or. c mmP / c .fi!�. //// SHEETC7.IQ STD.519.I FOR INLET PROTECTION) V A �.._,``-, Nv Z 5, v v n I A A v�v <, ,` o^49 - cx. � _ / / \ \\ - �zr�r , s —qs Am.- F �'�� -- °. ;�'�/// /�� 0 STIPULATION FOR REUSE \)�\.... \ \ \\`\ / =—w -, ;IL ��.4�-:. ' \`-;��i��--:- - r __ // THIS DRAWING WAS PREPARED FOR USE \ T \' 2-C '� .7. • W,.„,.. wl OU_ r``r! 5�� / ' CONTEMPORANEOUSLY E CIFIC SITE,WISH DI ITS ISSUE \ } \- �L��,:�I �� _— -L - 1�—���+L�` S 1J'-.../ r �1 1\.. '\\\ DATE AS LISTED,HEREON.AND R LS NOT ® ��« �� I��-L -r�� I/ , _ -. \%� NOTABLE FOR USE ON A DIFFERENT �\I KI • '— ;S� 18►-��� _ _ c - Al' �-\� t�,,,'/////,.-_ ��\\-\\ 1\/) CONSTRUCTION SEQUENCE PROJECT SITE OR AT A LATER TIME.USE OF h I, \m J) ./ '� �I ` W ') 4 °� J// • - \ / /'' MS DRAWING FOR REFERENCE OR IDOMPE �.,4 1 \ /. /I � I I� _ Y/,/ /� I \ 1. DEPARTMENT.G/EROSION CONOLOL PLAN APPROVAL FROM 7HETOWN OF WA%HAW ENGINEERING ON ANOTEER PROJECT REQUIRES THE \ ` ` :- `f ( II '. I° 1 II I IIIIll /!II I-30 -.yri//,{ \( C \ `/ 1 OB AI NMEM. SERVICES OF PROPERLY LICENSED ( 1 II /e9 _ ` , _ \ / 2. SET UP AN ONSITE PRE-CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE TOWN AI�IIIECIS AND ENGIIEEI6 RENIOOUCRON\ \-�` // -AO a le._ I � J //:" „.',\ C \ \ /', ENGINEERINGDEPARTMEMTODISCUSSEROSION CONIItOLMEASURES FAILURETOSCHEDULESUCH OF TXIN DRAWING FORREUSE ON \ t ,�, \ _ NId Il J` ll"/! OIJ t CONFERENCE46HOURSPRIORTOANYLANDDISTURBING ACTIVITYISAVIOIATIONOFCHAPTER170E THEANOTHER PROIER IS NOT AUTHORDED f -;,,,,,,,.,..'3.,---.,,-„,,,-- �r TOWN CODE AND IS SUBJECTTO FINE.i \ �/ /\ , ,,';:�, .. .= =a I IF L9 '.. L �C� / ANO MAY BE CONIIURY TO7HE JAW. (\ .r ` _ 1� l �/ - () , - �' 3. INSTALLSILT FENCE,INLET PROTECOON,s!EcM TGBgINS,DIVER510IRMH,FS,TRETIZECTION,AND � //f 1 \ � 1/' ''�_, _ _ _ -7 �� ('� 1 � r 1! '��////,,,,-a /', OTNER MEASURES ASSXOWNON PLWS,CIFARING ONLYASNECESSARY TOINSTALLTHESE DEVICEN. ~1 1,`\\�.,. / \ ` C I�'iiII 1`1 '$� /' f ) / "] / 4. CALL FOR ON-SITE INSPECTION BY INSPECTOR.WHEN APPROVED,INSPECTOR ISSUES THE GRADING PERMIT N Gr \ 1,� ' \ -A� �,,/,45j , ^'�• �I ��,1) �}l' I�/ j/ /���I �L�� S�.i �/ "° \ 5NpMpa`h+/F ;Mpr ` ,\ .e����V ►I 1� V %�-• A v� /ANS NEYI N \� Y� 00" �, � fII N, �•I� \\\\ppPRV0 NEBrNIA \ \ ` t:� 44 r �r �(� / / _ �/ 6IppBU \\ y�\, J Is �t 1 /� /rTJIkCC /'' PRIORTOCOMMENCIASNG AREBEACHPHASE isEROSION CONRLMOVA OF EROSION CONII1oL MEASURE \sT444' NsppGGebb \ GT'. ~i��� -rj '� �` J r'-.j- �� \ 7. STABILQE SITE ASARFASARE BROUGHTTO FINISHED GRADE. Q Ny 1 OB ,R1\ �\ \\�la `���� /j , 1V��� �� 7�£(/ / ' -. \ 8. COORDINATE WITH EROSION CONTROL INSPECTOR PRIORTO �, L� \� \ � .1t \ / /I� /� /�� �' , 9. ALL E0.0SIONCONTROLMEASURES SHALL BECONSIIIUCTEOIN ACCORDANCE WITH THE NC EROSION ANDOO! \\\ , ®1 \ +���� N� ` y� SEDIMENT[ONTROLPNNNING AND DESIGN MANOA4 OS DEPfOF AGRId1LTURE,TOWN OFWA%XAW /^� cq/ \ EROSIONCONTROLORDINANCE. � (\3' ) 1S \pNOA C \%\\10‘ \\l ,` � '�'" I�%' / ` ��._./ •�� ✓AN/NUYNGUIEN, VRN. 3p61t� � `� I�1!� ��' � // `_ // �MASMArrNEWFERRY /'' CI) � �. J I IFG: A \. /i I� _. osasoter �._.t /f PEN V v a �.-- - wv- �: i -,s �74�pca� � rz� EROSION CONTROL NOTES x < E \ 1 \ ' • 1�n \1�t,`� �� 51 AO \, �1 r r. _• C ZONiNfi.R-zOUNIavmUNIP a�ERrRusr QI 1� I\ ( \ 0 \�1O �`EGP ftI.N\, ]}\ 11 'v - /869/19YWMK NV 1. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM ZONING ADMININTRATOR. < N/F t \ Qv p51 \\\ \ 0R-Y91f/Sf4 Y 2. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE TOWNS '�. PPO.\\ q \\I j3 \ • \\�, `®�� ) \\ `1\ Z0 *-�' /' --�1 NG RI0UNON000NY ,' EROSION CONTROL ORDINANCE AND IS SUBJECT TOAFINE. Q \ N 19 / \ 3. GRAD' NG MORE THAN ONEACRE WITHOUTAN APPROVED EROSION CONTROL PLAN ISAVIOIATION FO THE p y,5�1 p \, �N\ 1-`•}°p7O11N6',Rtl ,1 c ,,• ���i�\ 17\10 \� f _ \ N. / TOWN SEROSION CONOLOLORDINANCE ANDISSUBJEQTOAFINE. O Q \ C`'Ex"W \L 0. ALL PERIMETER DIKES,NWAIES,DITCHES,PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL�e I`4�� i�`\,� 1�1`�" / ) \ TO IVERPCAL 3I SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER /1/ ° Iy ` p.� \ \\\\` 0,, ^'� 11�% ,/f 1 `�i �N/j \ \/'/ AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN7CAIUNDAR DAYS FROM THE LAST LAND-DISTURBING �N.,I �. 3 \ S) \ `\ \ �♦ 4f �;l) P.I]A/dICRUNEA'E//EMS / c, W \ \� 1 EET/9A\ -, \\/ 4( f/- / ,y/ Z,- ff> ALL OTHER DISTURBED AREASSHALL BE PRWIDEOTEMPORARY OR PERMANENT STABILIZATION WITH \ LIY 5pEA_,y. / \ �f i' l �OfsIR"i LSB \ GROUND COVER AS SOON AS PRACTICABLE BUT INANY EVENT WITHIN 14 CALENDAR DAYS FROM THETAS CO r�p87b.'° // / ) LAND-DISTURBING ACIWIIY. ��,� `��/ S, /ZRWWNNR-20ONIONCOUA7r / d \L \ABBtLp1N.'04Ep69)p\\` \\ 7 '°` 6. ADDMONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF p6' 6A-1 f \ 15 I N/F ///' \ THE TOWN OFWAXHAW ENGINEERING DIVISION. 10B NUMBER: C220016 \ N1N' \ � , �/I�m� / / \ 7. SLOPESSHALL BE GRADED NO STEEPER THAN 2:1.FILL SLOPES GREATER THAN 10'HIGH REQUIRE ADEQUATE \ \. �/F d /I manse rTOLUCSN- / t \, i MARYLOU TOLLESON ^ / TERRACING, CHECKED BY: BILE A 1 \\\ "-"/ '"' P/N'0508Z0'N90 8. AGRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT GRAPHIC SCALE I \ / ONIMPN368 / \ PREVIOUSLY APPROVED. DRAWN BY: BILE ' "` \ . ¢ % VON/NG'R-20 UNONCOUNIY \ 9. DRIVEWAY PERMIT FOR CONSTRURION ENTRANCES IN NCDOT RIGHTOF WAY MUST BE PRESENTEDAT 2- no 0 75 150 300 \Fo: 8 Vg:80/ON \ �7" - ! \ \ // PRE-CONSTRUCTION PERMITN MEETING. 03-22-2023 / '/' DATE: q asasI \ . SHEETT IIIIIIi IIIIIIi —�— , pB7d3cr= ,'.�x. rou.pav, "s\. \� V�/ERALL , I LNG;'AY .- Y[0(/77Xr[2a0N 'b, i (IN FEET) I - ' f inch=150ft. `,, N ^. °� /NPhvg/scLimma� -� EROSION 3 �� f " / „fR'PEI�N CONTROL PLAN g' I \ PlN 0509Cd78 �^, \ North OR1957PG047 _ / CarolinaeivIRMONIAll nim PHASE 3 e I1 \ ' /' n3r,tl,cur u�%II / \ \- -63�0"' SHEET NO.: 8°°� °, C7 10 3 , hop://v°811 313 nmoi.iicketevUy.hhn