Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3230302_Stormwater Report_20230627
STORM WATER MANAGEMENT REPORT FOR DAVIS VILLAGE PHIFER RD WINGATE, NORTH CAROLINA BY A PLOTT HOUND ---- p ENGINEERING V PLOTT HOUND ENGINEERING 8050 CORPORATE CENTER DR. SUITE 100E CHARLOTTE, NC 28226 � F N (704) 439-6521 \\�` .C ..RO "1 .� .o •• 7 ;% FIRM #P-1884 ;•Qs q 042077 /21/2 3 July 22, 2022 %� �'FHGINE� � Rev. 1: March 3, 2023 ////,y4iNi i LIN\\O\\\ Rev. 2: June 21, 2023 A ENGINEERINGHOUND TABLE OF CONTENTS I. NARRATIVE Introduction Storm Water Management Requirements Existing Site Conditions Proposed BMP Design Conclusions II. MAPS AND FIGURES HydroCAD Model Diagram Pre and Post Drainage Area Maps NOAA Rainfall Data Location Map Soils Map USGS Map FEMA FIRM Map III. HYDROCAD MODEL OUTPUT WET POND A HydroCAD: 1-yr 24-hr Storm Event HydroCAD: 10-yr 6-hr Storm Event HydroCAD: 50-yr 6-hr Storm Event SAND FILTER B HydroCAD: 1-yr 24-hr Storm Event HydroCAD: 10-yr 6-hr Storm Event HydroCAD: 50-yr 6-hr Storm Event SAND FILTER C HydroCAD: 1-yr 24-hr Storm Event HydroCAD: 10-yr 6-hr Storm Event HydroCAD: 50-yr 6-hr Storm Event IV. OFFSITE STORM WATER CALCULATIONS CA PLOW HOUND - ENGINEERING IV. STORM WATER HYDRAULIC CALCULATIONS Storm Sewers Design V. SEDIMENT BASIN / EROSION CONTROL CALCULATIONS BASIN Al BASIN B1 BASIN Cl SKIMMER BASIN 1 SEDIMENT TRAP T1 A OEN IN EERINGHOUND ENG I N INTRODUCTION Bulldog Investment Holdings, LLC is proposing the construction of a new residential subdivision with 168 single-family homes and 46 townhomes located off Phifer Rd in the Town of Wingate, North Carolina. The purpose of this report is to show that the proposed storm water management BMPs associated with these improvements will meet or exceed the state of North Carolina's storm water requirements as well as the requirements of NCDOT and the Town of Wingate. The NCDOT roadside ditch and culvert analysis is included in this report for two roadside culverts and the roadside ditch at the intersection of Ansonville Road (SR1002) and Phifer Road (SR1819). STORM WATER MANAGEMENT REQUIREMENTS The proposed BMPs shall meet or exceed the rules as defined in the NCDEQ Stormwater Design Manual Chapter A-1. Runoff Treatment and Volume Match and be designed to meet or exceed the Minimum Design Criteria (MDC) as outlined in Chapter C-0. The BMPs chosen for these improvements is a Wet Pond and two Sand Filters, as designed per Chapters C-3 & C-6 respectively. Storm water in this subdivision is conveyed through grassed ditches, swales, and storm inlets to drainage systems that divert runoff to the BMPs. These are the requirements the wet pond must meet per the rules of 15A NCAC 2H .1053: MDC for Wet Ponds: A PLOTTHOUND ENGINEERING 15A N('AC 0211 .1053 MDC FOR WET PONDS The purpose of this Rule is to set forth thc dcsign requirements for wet ponds that arc constructed to meet thc rcquircmcnts of this Scction. (I) MAIN POOL SURFACE AREA AND VOLUME. The main pool of thc wet pond shall be sized using cithcr: (a) the Hydraulic Retention Timc(HRT)Method:or (b) the SA+DA and Average Depth Method. (2) MAIN POOL DEPTH. The average depth of the main pool shall be three to eight feet below the permanent pool elevation. The applicant shall have the option of excluding the submerged portion of the vegetated shelf from the calculation of average depth. (3) SEDIMENT STORAGE. The forcbay and main pool shall have a minimum scdimcnt storage depth of six inches. (4) LOCATION OF INLET(S) AND OUTLET. The inlet(s) and outlet shall be located in a manner that avoids short circuiting. (5) FOREBAY. A forcbay that meets the following specifications shall be included: (a) Forcbay volume shall be I S to 20 perccnt of the volume in the main pool: (b) The forcbay entrance shall be deeper than the forcbay exit: (c) The water flowing over or through the structure that separates the forcbay from thc main pool shall flow at a noncrosivc velocity:and (d) If sediment accumulates in the forcbay in a manner that reduces its depth to less than 75 percent of its dcsign depth. then the forcbay shall be cleaned out and returned to its dcsign state. (6) VEGETATED SHELF. The main pool shall be equipped with a vegetative shelf around its perimeter. The minimum width of the vegetated shelf shall be six feet and the slope shall be no steeper than 6:1 (horizontal to vertical). (7) DRAWDOWN TIME. The dcsign volume shall draw down to the permanent pool level between two and five days. (8) PROTECTION OF THE RECEIVING STREAM. The wet pond shall discharge the runoff from the one-year. 24-hour storm in a manner that minimizes hydrologic impacts to the receiving channel. (9) FOUNTAINS. If fountains arc proposed. then documentation shall be provided that they will not cause a resuspcnsion of sediment within the pond,or cause erosion on the side slopes of the pond. (10) TRASH RACK. A trash rack or other device shall be provided to prevent large debris from entering the outlet system. (I I) VEGETATION. The following criteria apply to vegetation in and around the wet pond: (a) The dam structure, including front and back embankment slopes, of the pond shall be vegetated with non-clumping turf grass:trccs and woody shrubs shall not be allowed:and (b) The vegetated shelf shall be planted with a minimum of three diverse species of herbaceous. native vegetation at a minimum density of 50 plants per 200 square feet of shelf area. History Note: Authority G.S. 143-214.7B: /43-215.1: 143-215.3(a): EQI January 1. 20/7_ A PLOTTHOUND ENGINEERING The following are the requirements the sand filters must meet per the rules of 15A NCAC 2H .1056: MDC for Sand Filters I5A NUM 0211.1056 MDC FOR SAND FILTERS The purpose of this Rule is to set forth the design requirements sand filters that are constructed to meet the requirements of a State post-construction stonnwater program. (I) SIIWT SEPARATION. The minimum separation between the lowest point of the sand filter system and the SIIWT shall be: (a) two feet for open-bottom designs:and (b) one foot for closed bottom designs. Exceptions to the one foot SIIWT separation may be made if the applicant pro%idcs documentation that the design will neither float nor drain the water table. (2) TWO CHAMBER SYSTEM. The sand filter shall include a sediment chamber and a sand chamber. Storage volume in each chamber shall be equivalent. (3) SEDIMENT/SAND CHAMBER SIZING. The volume of water that can be stored in the sediment chamber and the sand chamber above the sand surface combined shall be 0.75 times the treatment volume. The elevation of bypass devices shall be set above the ponding depth associated with this volume. The bypass dew ice may be designed to attenuate peak flows. (4) MAXIMUM PONDING DEPTH. The maximum ponding depth from the top of the sand to the bypass dew ice shall be six feet. (5) FLOW DISTRIBUTION. Incoming stormwater shall be evenly distributed over the surface of the sand chamber. (6) SAND MEDIA SPECIFICATION. Sand media shall meet ASTM C33 or the equivalent. (7) MEDIA DEPTH. The filter bed shall base a minimum depth of 18 inches. The nununum depth of sand above the underdrain pipe shall be 12 inches. (8) MAINTENANCE OF MEDIA. The sand filter shall be maintained in a manner that results in a drawdown of at least two inches per hour at the sand surface. (9) CLEAN-OUT PIPES. At least one clean-out pipe shall be prosided at the low point of each underdrain line. Clean out pipes shall be capped. llLslorr Note: Authority G.S. 143-214.7B: 143-215.1. 143-215.3tat. Eff January 1.2017. Objective: Remove urban stormwater pollutants including TSS, BOD, fecal coliform, hydrocarbons, and metals. Design Volume: The design storm depth for high density projects [greater than 24% Built Upon Area (BUA)] shall be 1-inch of storm water runoff from the BUA of the site. Discharge Flow: Stormwater outlets shall be designed so that they do not cause erosion downslope of the discharge point during the peak flow from the 10-year storm event as shown by engineering calculations. A � � PLOTTHOUND ENGINEERING 1 EXISTING SITE CONDITIONS This project is currently being called Davis Village and the parcel associated with this project has an area of 53.35 Acres located on the North side of Phifer Rd. as well as an area of 7.94 Acres on the South side of Phifer Rd. The 61.3 acres total is currently being used for residential and agricultural purposes. There are multiple homes on the property and a fenced in cattle field. The project is bordered to the West by residential/agricultural land, to the South by the 60' Phifer Rd. Public Right of Way, to the East by several residential properties, and to the North by NCDOT Right of Way- Monroe 74 Bypass. The site was assessed and determined to have three unnamed jurisdictional tributaries and one jurisdictional pond. The existing pond is a silted-in cattle grazing pond that may need to be dredged/cleaned out post construction. The existing soils on site are mostly a Cid Channery silt loam (hyd soil group D), a Goldston-Badin complex (hyd soil group D), and Misenheimer-Cid Complex (hyd soil group D/C). There is an area of Badin Channery Silt Loam (HSG C) on the eastern side of the property, surrounded by the Cid Channery Silt Loam (HSG D) and Goldston Very Channery Silt Loam (HSG D). PROPOSED SITE CONDITIONS The proposed improvements include the development of a residential subdivision with approximately 168 single-family homes, minimum 6,000 SQFT lot, to the North side of Phifer Rd. and 46 townhomes, with a minimum 2,200 SQFT lot, to the South of Phifer Rd. Each single-family home will have an 18' wide driveway and the townhomes will have a 12' driveway along with two additional overflow parking lots, each with 16 spaces in the townhome development. There will also be 5' sidewalks on each side of the streets. The proposed roadway cross section includes 12' travel lanes, 24" curb and gutter, with 5' planting strip and 5' sidewalk on both sides of the street. There is approximately 1.3 acres reserved for an amenity area located within the single-family development, North of Phifer Road. WET POND A SUMMARY TABLE Pre- Post- Post Developed Total Post- Storm Developed Developed Bypass Wet Pond Developed Post-Developed Event Flow(cfs) flow to Wet BUA(cfs) Outflow(cfs) Flow(cfs) Pond Elevation/Top Pond(cfs) of Dam Elev. 1yr-24hr 39.59 67.08 2.78 18.77 21.55 557.92/560.5 _ 10yr-6hr 69.98 116.74 4.61 54.15 58.76 558.45/ 560.5 25yr-6hr 92.34 148.85 5.55 86.94 92.49 558.83/ 560.5 50yr-6hr 105.35 167.27 6.08 94.74 100.82 559.08/560.5 100yr-6hr 125.06 194.91 6.89 113.40 120.29 559.48/ 560.5 �A // ENGIN HOUND 4 r ENGINEERING �' SAND FILTER B SUMMARY TABLE Post Pre- Developed Bypass Total Post- Post-Developed Sand Post- Storm Developed Sand Filter BUA developed Filter Chamber elev/ Event Flow (cfs) Developed Outflow flow (cfs) (cfs) Flow (cfs) Emergency Spillway (cfs) Elev. 1yr-24hr 18.66 17.64 6.21 7.70 _ 13.91 576.75/579 _ 10yr-6hr 37.09 35.35 13.98 13.70 27.68 578.08/ 579 25yr-6hr 47.46 45.00 29.10 16.26 45.36 578.41/ 579 50yr-6hr 55.83 52.75 39.31 18.29 57.60 578.58/ 579 100yr-6hr 64.41 60.69 50.11 20.36 70.47 578.74/ 579 SAND FILTER C SUMMARY TABLE Post Pre- Developed Bypass Total Post- Post-Developed Sand Post- Storm Developed Sand Filter BUA developed Filter Chamber elev/ Event Flow (cfs) Developed Outflow flow (cfs) (cfs) Flow (cfs) Emergency Spillway (cfs) Elev. 1yr-24hr 11.49 15.00 0.27 1.84 2.11 553.26/555.0 10yr-6hr 23.01 28.59 1.67 3.27 4.94 554.08/555.0 25yr-6hr 29.30 35.31 6.14 3.88 10.02 554.22/555.0 50yr-6hr 34.36 40.66 14.01 4.37 18.38 554.40/ 555.0 100yr-6hr 39.54 46.10 23.11 4.86 27.97 554.57/ 555.0 PLOTT HOUND ENGINEERING MAPS & FIGURES HydroCAD Model Routing Diagram Drainage Area Maps NOAA Rainfall Data Location Map Soils Map USGS Map FEMA FIRM Map NCDEQ SUPPLEMENT - EZ FORM ® BMP HYDROCAD WETPONDAPRE DEV ROUTING DIAGRAMS 0 WET POND A POST 0 YPASS BUA 12P WET POND A (OS) PRE-DEVELOPMENT 14P 1 S <5S> TOTAL RUNOFF PO TO SAND FILTER B BY ASS BUA WET POND A /2F\ D 3P FOREBAY SAND FIL ER 4D TOTAL <Os> PRE-DEVELOPMENT 0 TOWNS SAND FILTER B POS TOEILTER SANDC <5S> PASS BUA /2ND D A FOREBAY SAND ILTER /41:\ TOTAL SAND FILTER C 11\1\1• \\1`' // \\`�`�/ / \ \\ \\\\ • -`• /1 I I I / % /'--�\\ \\- / l / / /�' \ �i 1 Y 1 \ \\ \`� I " 7 \\\ /1 / / I I/ \ •\ \ \ i i i/ / / ( \ \ \ \ / // / / \ \ / / FBI 1 i • \ \�• �` \ \ / - 1 1 ��--''/ I '''/'/ /' /,' ` / / I I / / l 1 / �� Y 1/ I I 1 I I I 1 1 I I 1 1 l ' / ///,/i i� I 1 1 / 1 1 / , / / / I 1 1 -- / f / CL / / I I �\ - ,-,-„ _-'_. / \ ---- ii',i",i"," / ` �- - - , ; J \\ \ \ / l I ''',\ \........... \ \ `� / / 1, l , l l �' _1,10 \ _ _ ____ // -////// 1 /— / \ \ \ 1) \ \ \\ ", 1 ____ /,...__....\ ,- v I 1 i ) \I i ) P ; '-4, alt,'"' \ \\A , _, , , , „ „ „ , ._ „ „ „ „ ______N i / / f / , / //,'"// / I 1 / .../ _---- I I //, , /, , ;.'/1/// ( I \ \ /� \ J 1 // /�/ / ° I I ;� I �/ / / . 1 I I 1 \ / / /// // 1 / / / / / / , / / / II I \ \\ ( � \ I 1 I /'`/ \\ \ I I I\ \\ \yi////// I I1 / I I'I'I'/'/ /// ( 1\` \\ \\ � 7/ _ 1 �\ l \1 I \ \ \ \` \ -- %\�\ / ' ) I ( // /,//7// / / / / / \I I I I _- \, \. `, \•• / / ;/\ ; ; \,\ 'y.,,��•� `.> . -IP I I I I ( ! / //��\ , /// I \\\\\\\ I i 1 `ANALYSIS LOCATION A / / ) �, 1... / \ \ I i i I I((\( ( � ) / I , , \ \ I I 1 1 1 -\ DRAINAGE AREA: 30 AC / / , j/ 11. I \ • /' i l I \' I ` H � ^\� \ \/ \CN: 80 (GOOD PASTURE/GRASSLAND) J Xisl\-4/r/i / / �' \ ` ` \ �\\� `/ ��// / \ \\ ` \ ` a ,/ / / / HSG D // ► II / / ./ ç,)) ` \\ /// \ \ . _1 ( /// I ToC: 29.5 MIN / / \ \\'\ \ ��� // /� \ Q I / 1 i / l / 10 YR FLOW,65.85 CFS ```' • / I / / / / I �// ` 1 I I 1 1 ( 111111/4 \ i �\ .........^ /,;/,/''/i'/,' ^'' / \ ( I 1 . �y I // /;0;igfr / / •/'��, \ ��/i/ I D I Ct ,iiiii _..... V A l ► I I ///;,,, ; I I;;I I 1 1 / i \\ �1 /� /— —��/%%�=� -- I l 1 LLI 0 w _y —J 1 1 1 //// / / IIII r'. _� ►_ L 1 I k / �\ ll I 1 fI� I I 1 I �// // 1 �,:, I i� — .4 )ri -r- J I ( //i/i \ = ��%- _ +- �.��\l I /;�, v z Q •\\ 1 1 ,�//1 i/ ' � rr�A�!N�, ,1 i �- �—� / I 1 / / / / pi I //-- _J/ / ��-�\ II 1I d/ / I / / L / / —// / / // I I I I( J Q w \\ `_,- / off �/ l� IlkX / J d :/// / -_ // / �, , \ \\\ \ > \ /,, I I l ( l c f ` X \ ) / /// ! (i 1 , -_ �-� //�'/ / ���"�► \� 111 cn H o `\__ ,j// / p/ I \ I ��x ' ��+--� /�—�/ - ` 11 / / /�/I � ��/ i�•l -�� ,/7 , / / , ` \ \I I ,110 — w c7 / -- ........-________ ---- --....,)\//1_,_, .,--- — -',///,/' / /7 ////7z C I )4110 \ ‘/ 7 -'/ / ./ I /OM/ / , / ("1 \` i: //� % ''= -_ ==—=--== f((ll - V w/1 \ ( ill��%����: \ \\\ ANALYSIS LOCATION B; _ 1 ��A \ I , ,,-- /./. • Ay q LI (' Ct / �' /� —J �\ �\ii .. /����• � \\`\\ DRAINAGE AREA: 10.4 AC , /,.-, • \\,/ '...,,,Z.,...�oillio' t /` 1 / / w //71 /7_---_____:,,:„.„-)\) 1 �` __ '--, 1 11 I CN: 84 (FAIR PASTURE/GRASSLAND) , ,� ,/ \\ \ �� �"'� } / / / CL /• //' — — — — , ;//, HSG: D,/ / /, //,�/ /,- �.\ \ _- \ � / (/ I \ /� - / , �/� /,, / // /j/ ,,' _-� \\\ / \ \ \ \ice �/ �/ , / - ToC: 17.7 MIN. / / / \ \ \ \ /////// 10 YR FLOW: 55.83 CFS / t \ 1 1 \ \C'1:‘,e ...,...• / / / 7 ) / /�ej ) / , ,/,„., /„, /// // // - — --��\�__-_` . / --• / l \ \ \ `� \ \ --- ' 1 1 1 I �' I / ,'�' i7.7 I \,° / / / / - // / / / / /// l /ll (1, /l l / / //▪ /'� \�--� \ 1 1 I I 1 1 // -\ - -//'/'�___------------1 / l I \ \\ ` /// 05ill I / / / � �ji / , / / ll1/iiii1 , 1 ,, I , r / . ,� � _� \� , , I / I / /, — � 1 ` IIIII1/ /// /�� I // / l l/ 'l I 1 1 1 1 11 11 �11 III I ( ll \\ �\ / /'' /�-���\-\`-` \\ -/' //'�♦ ,,��/ -- _-�'/% ���` - __� --' /'' / ( ( // ?� / / 1 \ \ 1 I 1 l 1 \ 1 1 / / \ \\ \\ \ \ \ „/„."/ ///i,,, i // \ /�1( I / // 0 / 1 I1 , \ \ /( / \\ \ \ \ " ' ' /'�. �� - /' '' \` It I p • 1 \ ) / / / l / \ \\11 \\\\\ � \ \ \ \II III / \ \ \\ \ \\ / , , ,/// „ / � _• _ _ , / / _`\\ �\ / / / I _ // !! 7 ///'/� '-� / �jl I/�/ \\\:\ \\.\\\\ \\ III 1 \ \\ •l \ \ \ \, 1 //i,�ii'�%/�/' ` �/ /'/� \'\�� _�' �il /�/ /))\\\ �` /��// i / //,/i ?= - /'''-' / -`\�\\�\\\\1�\\\\II\\\ •\\ �`_,1 / / 1 ' \ \ //'Vi '"'�'' /^- __ __-� / /' - --_ \ \ I //� ( ` ///� „s. /, , ANALYSIS LOCATION C \\\`\\•\� /// / 1�_ /,'i // /j i _ /��/ /, \\ 1\ \\ \ \, \ ��_ `�� //iii �// DRAINAGE AREA: 4.75 AC \ �\ \\� ./ / ,��;; �'// , ,' ,/ / , I \I /� -�� 1\ \\\ i'r ' .'�'/',/i% / \ \`\\\.� %'-�, ,'�.;'/l/;/ `�\ / /`- l /,' ,' / , ) /' 1 -�� 0 / // I , //,/, // CN: 84 (FAIR PASTURE/GRASSLAND) \\\ , _ „ / l \ ( l_ , / �-� . /� / ,),/ /''/',ii' i, / \\\\ \\\\\ ` -\ \ / / //%%i/ rl _ \\ \ \\`\\ \`1--/�/ / /' / I / �- / ,// / / HSG: D \\ \ \ ) / /// , / J / \ \ '' / / / _ / / / //// //� ToC: 10 MIN. - \ ////// / - \ I I \_ _-_ \ -\\ , / ///„/ //////i��i 10 YR FLOW 32.64 CFS ) 1 -I I 1 1 I / I l/r/, 1 \ `._,''�' \ \ \ `� /' /' / / •, \. PRE DA \ i .� '%%//ii�/�//,��/// ///' 1 \ \�",„i ij/��__ �_-�, / I II 1 I 1 1 I I 1 l \ /�,/ -,\ \ \ �\` ` ,♦ / / / . , w I 'r A - //, , . ----------- --....°. ‘04,, r--- =--------- ''''' ' ,\ litit• id• i II ...., --.. 14 1 \ 4,,,,,g'- li 4 •.•.-,---, __''` ' / /kd ''' _-__.-- 1 r \* \--,,,k ie.%i.,.!•944,14,10,„ ii i :::•:.±:- 44.,_, \ • .„ _.,,,._.___. _.„, 11, • ,,, ..... , N ' I'.... / "'41, ---- ----- ,.,•z.-:- ''':.17.,L I • .4.• ...... ,.41, 16 ' '''''''' %.1,,-%.----ci;AILlatski4 s- is.;1411,' ; •-•,' 0111.,„ I 47 4"...1.-..........44040. r- ,0•ArtiOr= ./.6* of., ---1, 0; :,,,4,:,:t.,„;,...:.-"top.,414 / 46 ,„,•, .., ,.. :-......_ / „ ,, ...f. / ::...„,,, ,, ,,,...„, ,....v.„ ,...., .s ......../ 5\\,„ I! 4 r/tv/o/ ..;:w".•! =ils.- „,,,, „AI._ i 16 • qt4i9 ...t..---'"' f ' / \ /4if//if/ ` - :lw - "` . ...w, r_ //ftNt-..-.- ,,,tv,„„.., 1 ,, r 16, , ::-.4.1_Allio/it 41,(0/-ill/tee'II f:-.11 itPM171,",tt••=-P wkwi I:— ---III IF ...•ti,,J lifili:** 41*.4ts.4Sb:.4° '' \, ......".. WET POND 'A' (SCM 1) / 6 41,1;$11ail'Ifso... - a i n r i r i IP-.37 1 it,g --/ 4 fate* 1-afh:47.:41,, ,v-- '4 1 - j: icr-1111141114 FC-100 li - d 1 TOTAL DA: 30 AC .._ , , _ 11,11111, _ j 1i1"'"---... .... TOTAL BUA: 14.73 AC __-....,.., maw I '44 ri ,,g ir . / „____ ___""mi______,........- J II el: / , , _______EA a i ..;,__ _ I ---------- ,•"Of BUA ON LOTS: 10.53 AC (3500 SF/LOT) i BUA OUTSIDE LOTS: 4.2 AC 111' --14 ' Vel' 111116;11161111131111 :1° Eil.,'II fli,i_ilt:10:1 il:_ if_ _121411.1'.39 45 )1 iilL:Lii:_2'1\ l'I /r'?1,0 ,,,,ii flimpilegrk : CN: 88 (HSG D) 49% IMPERVIOUS EXIST 1111 1 6 • tir4, 4,_,,1. a_ , , ,,,,4,,,. .\ \ '1:i;!!1211--6-87 11;11,1. 82_11:i11:4,1 Ili:: I,iiil 111 li:36 .,. . 1•1111.17.77jilui POND_ 1\1 114 lee.----'' l'' .-- ' -111.r- ;7 °,,; 71 MI — 104 i i wir i ill WI ‘j' ilw ,- i Yr- EMI El II marl/ 1 Fr < SCM1 BYPASS BUA: 0.65 AC (SHADED) ,,,,,, k ,,,e,...„&, \ .--- ..'''...•.*. 'Pil -- Minim_- I ; 1. ,i 1 o5 i 1 ii - - lir gig( it..•• ,,,Lrlam ,,.,, ,,,,,j•\'14 I (' t 116 tir,ik/CA ' , do ---.7- z Iti ,„,, ._ ._____27...ratia------__ _ eto.;.-$,Y41.A,-1 b fi_65 III I 84 !JAI!r0,I19 \ Lu - -* ct -masa, c''# \ \,,,e•'''..'' ------='%-i- - \ 'ra 64 I MIL85 ll Iii *VII ,,n7 It III jr -, 717 t1,1113IMITCe- k < L1.1 w \ ,,; L__ - 4,-4' /. 114/111% A4‘'\'''''':./10,"" I' — --.- ' - - \ 34\4m1IF - , "lit::------ -----1-1 f ''-'' WA I:. ' --. ....,- lir-.VI 111 (Da / 4 ,..._xic. fr.--,,--, ,--.1 ir--- r--7.: _ , 40\ - -,4•• : c71 - • - ,- ,1 1 ilv 8 14 A i 2 < 00 , , , iiwp"., i -----P;), ill. 87 • -110 '''.- ...„! 1\\ , 0 OP \1 63,----_=2,- • - Z pi/X\ '4\7', 29 130 31 3.i -- I /oor / 44` "4/ 4 .7t < / 1 0 *1/1 t:/''4 i ...amP.-__ - --___- --,,,,,ell,•F!"-11**----:-.47,,-;Kii--1.-frejelgArnz'll 4:: ::, ,.....1117-4."7--1,.. :11414:401# 2 ‘ , 170 1114‘311..\ti'llil-3° ' \' I _I CC V-) //..: _ ____ Q ,,..- ,./,.,.:,,,/ 41A11"-- _I ---— IF pill11....._ 1,00,000001"—,,,- ,- ,-,- -ritql,",..1"-,`Are•Ardril It art -._,:ultilah.4.--,,,,,:,......, , 1 ,,,,„,.,,t,ar,„___,-. , z > H 7/ /--='•'''14.; 4 \ ,,,Ts=4- 2,,y,4 4 4 .........ii ..74 .41... ,.. r.....,„ ,_____ de/,///, /KA...',a. .tf„'4!9'.. 40/(At 1:\` \ li• Ainr----..... ...............%__..._tooipip„., li ...01A 62 Al _ /,% • ` „„„mt Jill)AlirNIII 128 LLJ I-U > Q9 — ------ _- i .... /,////7/ e , ;A„,,,,,,, -,-..:,, :sz--•...,___,,_.,—,...-.-,?_-_--.... ,-.7....,,,,,;,,,ix.i.,tot __ ..„...._. ,,..._ - 4 ".. 0 . ____ - -- - ------ . ,..441,T:irr-..agam 1 dik\ t'•, ,.- Att. I ki 111°7;i i f in -...•„„ J 3 s-- •Il --- H 2 "a,•. 111111. - ii s.., 18 11,... ___-- __- ---%, --, i s __-- 14,'N SAND FILTER 'B' (SCM 2) o_ AC., - ---- TOTAL BUA: 3.35 AC SAND FILTER 'C' (SCM 3) ---- BUA ON LOTS: 0.96 AC (3500 SF/LOT) TOTAL DA: 5.0 AC BUA OUTSIDE LOTS: 2.38 AC Aik‘g TOTALBUA: 2.40 AC (INCLUDES 0.70 AC FOR FUTURE 4Al‘ IJII BUA ON LOTS: 1.50 AC (1720 SF/TH LOT) AMENITY AREA) .4 11111reir.141111111.rk --------- BUA OUTSIDE LOTS: 0.90 AC CN: 84 (HSG D) /to ii 45')/0 IMPERVIOUS %411r ) 11,1-1- 48% IMPERVIOUS M1 BYPASS BUA: 0.43 AC (SHADED) CN BYPASS BUA: 1.80 AC (SHADED) 1 ___,--- ------ _..-- . s c CN: 98 : 98 ‘...---,-----=--------\\01 , POST DA 5/11/22, 11:26 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 so.4-N. Location name:Wingate,North Carolina,USA* I . N none Latitude:34.9939°, Longitude: -80.4257° i �a i7*cif Elevation:572.82 ft** i �I ET+rEE 0> *source:ESRI Mapsk"M'wre 4� **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 - 5-min 5.16 6.10 7.07 7.78 8.59 9.14 9.66 10.1 10.6 I 11.0 (4.75-5.60) (5.60-6.65) (6.48-7.70) (7.13-8.45) (7.84-9.31) (8.30-9.91) (8.72-10.5) (9.10-11.0) (9.47-11.6) (9.73-12.0) 10-min 4.12 4.88 5.66 6.22 6.85 7.28 7.67 8.02 8.41 8.67 i (3.79-4.48) (4.48-5.31) (5.19-6.17) (5.69-6.76) (6.24-7.42) (6.61-7.90) (6.93-8.32) (7.21-8.70) (7.49-9.15) i (7.66-9.45) i 15-min 3.43 4.09 4.78 5.25 5.78 6.15 6.46 I 6.74 7.06 I 7.26 (3.16-3.73) (3.75-4.45) (4.38-5.20) (4.80-5.70) (5.27-6.27) (5.58-6.66) (5.84-7.01) (6.06-7.32) (6.28-7.68) (6.41-7.91) 30-min 2.35 1 2.82 3.39 3.80 4.28 4.63 4.95 5.25 5.62 5.88 (2.17-2.56) (2.59-3.07) (3.11-3.70) (3.48-4.13) (3.91-4.64) (4.20-5.02) (4.47-5.37) (4.72-5.70) (5.00-6.11) (5.19-6.40) 60-min 1.47 1.77 2.17 2.48 2.85 3.14 3.41 3.68 4.03 4.29 (1.35-1.59) I (1.63-1.93) (1.99-2.37) I (2.27-2.69) I (2.60-3.09) (2.85-3.40) I (3.08-3.70) I (3.31-4.00) (3.59-4.38) I (3.79-4.68) 2-hr 0.846 1.02 1.27 1.46 1.70 1.88 2.06 1 2.24 1 2.48 I 2.66 (0.776-0.925) (0.938-1.12) (1.16-1.39) (1.33-1.59) (1.54-1.85) (1.70-2.05) (1.85-2.24) (2.00-2.44) (2.19-2.70) (2.33-2.91) 3-hr 0.599 0.724 0.903 1.04 1.23 1.38 1.52 1.68 1.89 2.05 (0.547-0.658) (0.662-0.797) (0.824-0.993) (0.948-1.14) (1.11-1.35) (1.24-1.50) (1.36-1.66) (1.49-1.83) (1.65-2.06) (1.78-2.24) 6-hr 0.359 0.434 0.542 1 0.627 0.741 0.833 0.927 1.02 1.16 1.26 (0.329-0.395) (0.397-0.476) (0.495-0.595)1(0.571-0.687)1(0.671-0.810)1(0.749-0.908) (0.827-1.01) (0.905-1.11) I (1.01-1.26) (1.09-1.38) 12-hr 0.211 0.255 0.320 0.371 0.443 0.501 0.561 0.624 0.712 1 0.784 (0.193-0.231) (0.234-0.281) (0.292-0.351) (0.338-0.407) (0.401-0.484) (0.450-0.547) (0.499-0.611) (0.548-0.679) (0.616-0.775)1(0.669-0.854) 24-hr 0.125 0.151 0.190 0.221 0.265 0.300 0.337 0.376 0.430 0.474 (0.116-0.136) (0.140-0.164) (0.175-0.207) (0.203-0.240) (0.242-0.287) (0.273-0.326) (0.305-0.366) (0.339-0.409) (0.386-0.468) (0.423-0.518) 2-day 0.074 0.089 0.111 0.129 0.153 I 0.173 0.194 0.216 0.246 0.271 (0.068-0.080) (0.082-0.097) (0.103-0.120) (0.118-0.139)(0.141-0.166) (0.158-0.188)1(0.176-0.210)1(0.195-0.235) (0.221-0.269) (0.242-0.297) 3-day 0.052 0.063 0.078 0.090 0.107 0.120 0.135 0.150 0.171 0.188 (0.048-0.056) (0.058-0.068) (0.072-0.084) (0.083-0.097) (0.098-0.116) (0.110-0.130) (0.123-0.146) (0.136-0.162) (0.154-0.186) (0.168-0.205) 4-day 0.041 0.050 0.061 0.071 0.084 0.094 0.105 0.117 0.133 0.146 (0.038-0.045) (0.046-0.053) (0.057-0.066) (0.065-0.076) (0.077-0.090) (0.086-0.102) (0.096-0.114) (0.106-0.126) (0.120-0.144) (0.132-0.159) 7-day 0.027 0.033 0.040 0.045 0.053 0.060 0.066 0.073 0.083 0.091 (0.025-0.029) (0.030-0.035) (0.037-0.043) (0.042-0.049) (0.050-0.057) (0.055-0.064) (0.061-0.071) (0.067-0.079) (0.076-0.090) (0.083-0.098) 10-day 0.022 0.026 0.031 0.036 0.041 0.046 0.051 0.055 0.062 0.067 (0.021-0.023) (0.024-0.028) (0.029-0.033) (0.033-0.038) (0.039-0.044) (0.043-0.049) (0.047-0.054) (0.051-0.059) (0.057-0.066) (0.062-0.072) 20-day 0.015 0.017 0.021 0.023 0.026 0.029 0.032 0.035 0.038 0.041 (0.014-0.016) (0.016-0.018) (0.019-0.022) (0.022-0.024) (0.025-0.028) (0.027-0.031) (0.030-0.034) (0.032-0.037) (0.036-0.041) (0.038-0.044)1 30-day 0.012 0.014 0.017 0.018 0.021 0.023 0.024 0.026 0.029 0.030 (0.011-0.013) (0.013-0.015) (0.016-0.017) (0.017-0.019) (0.020-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.028) (0.027-0.030) (0.028-0.032) 45-day 0.010 0.012 0.014 0.015 0.017 0.018 0.019 0.021 0.022 0.023 (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.017) (0.017-0.019) (0.018-0.020) (0.019-0.022) (0.021-0.023) (0.022-0.025) 60-day 0.009 0.011 0.012 0.013 0.014 0.016 0.017 0.018 0.019 0.020 (0.009-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.017-0.018) (0.018-0.020) (0.019-0.021) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9939&Ion=-80.4257&data=intensity&units=english&series=pds#top 1/4 5/11/22, 11:26 AM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 34.9939°, Longitude: -80.4257° 100.000 Average recurrence inter%al L 10.000 - fyearsl _c 1 _- — 5 c — 10 c ` — 25 0-100 �� ` — 50 a — 10 0 — 200 a` 0.010 500 — 1000 0.001 - c c c c c 6- 6- i I >, >,>. >, >, >, >, >,>, 'F .- • '- •- L L . L t r0 r0 /0 N r0 2 l0 r0 r0 IA O UI rn lD r-1 N N AI� O N fo I Ct ID Duration 100.000 I 10.000 - - - _ —— Duration 1.000 - - — 5-min — 2-day c — 10-min — 3-day 15-min — 4-day 0.100 — 30-min — 7-day • +� — 60-min — 10-day a •w — 2-hr — 20-day a 0.010 - - — 3-hr — 30-day — 6-hr — 45-day — 12-hr — 60-day 0.001 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed May 11 15:25:41 2022 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9939&Ion=-80.4257&data=intensity&units=english&series=pds#top 2/4 5/11/22, 11:26 AM Precipitation Frequency Data Server Marshvillej,_ Wingate _•_ = 0= Mon roe St 3km 2mi Lai a scale terrain City. 0 ,y Winston-Salem • Durham Greensboro • Raleig it Mitchell • •asheville NORTH CAROLINA •Chap Otte Fayetteville• •Greenville I SOUTH CAROLINA + Imir 100km hi 60mi Large scale map Vl}instonealem Greensboro o D rham Raleigl • Ash II- North Carolina arlotte Aar ' of ettevillr Gre ' le J 0 -+ mbia 100km \ ith 60mi lina / Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9939&Ion=-80.4257&data=intensity&units=english&series=pds#top 3/4 5/11/22, 11:26 AM Precipitation Frequency Data Server Winston-Salem Greensboro Durham Raleigh • Asheville • h Charlotte Fayettevill Greenville umbia GI 100km iuth 60mi_- olina Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lot=34.9939&Ion=-80.4257&data=intensity&units=english&series=pds#top 4/4 D Glencroft Dr ce I 0 I a Reid Phifer Farms 9 Wingate Estates y°'o//%gaJ Mobile Home ParkIhi, © a` • Mis�� . e o�hi//pr 4 17 • Phifer Cir 1 7571 EPP .1',Q ® Phifer Rd Contact Us-IgniteSEO ® Phifer Brothers s �2 tv 9 Paint Contact 41 WD Phifer Temporarily closed Q Painting Contractor if' 4 -1 4,0A Yop jr4d> Zap Goodman Rd ® N,gJ 0 e„'`S� $I� no A \ qy 10 Gp' 1111/ g AO ii + s — O Layers 41/GoodrnanRd Google p 6 Custom Soil Resource Report Soil Map N N N 551400 5515W 551600 5517W 551800 551900 552000 552100 552200 552300 552400 552500 552600 5527W 552800 552900 553000 553100 34°59'57•'N g r4.• - .,2. i i-8 34°59'57'N i l GsB 8 - J -MhA ' - '- -_-- CrriB • _ _ 3S - y., 5� l _ - c BaB A BdB2 •MhA CmB • - 8dillIllIllPr / ti • 3 '' a ./ll BaB afrei ''4 BdB2 i • CmB ' -i.,..� •• �_ BaB i- M ' -f_ GsB" i. "Pi,,>•� t _ 4,Phifer Cir s. e r GsB GoC� + R BdB2 rj i _40 BaB ^. BaB `•p. iyojk I 2 BaB T • X. . t a. ti g 8 GsB A , •4 te�00 GGap�aW �o� ea0od ate t Goo. 0.c�a0ao • 1 ' 34°59'19"N I I 34°59'19"N 551400 5515W 551600 551700 551855 551553 552000 552100 552200 552300 552400 552500 552600 552700 552800 552900 553000 553100 3 3 N Map Scale:1:8,200 if printed on A landscape(11"x 8.5")sheet. - N Meters 8 N 0 100 200 400 600 Feet 0 350 700 1400 2100 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 14 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soilsit Very Stony Spot Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot ,..,. Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstandingof the detail of mapping and accuracyof soil p Soil Map Unit Points pp 9 .• Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Blowout Water Features scale. Streams and Canals kg Borrow Pit Transportation Please rely on the bar scale on each map sheet for map * clay Spot 1.44 Rails measurements. 0 Closed Depression o,/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service .r US Routes Web Soil Survey URL: Gravelly Spot Major Roads Coordinate System: Web Mercator(EPSG:3857) ® Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator • Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 46 Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more It Mine or Quarry accurate calculations of distance or area are required. 4 Miscellaneous Water This product is generated from the USDA-NRCS certified data as O Perennial Water of the version date(s)listed below. v Rock Outcrop Soil Survey Area: Union County, North Carolina + Saline Spot Survey Area Data: Version 22,Jan 21,2022 Sandy Spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. • Sinkhole Date(s)aerial images were photographed: Oct 28,2018—Oct 31 Slide or Slip 30,2018 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Badin channery silt loam,2 to 8 28.8 13.7% percent slopes BaC Badin channery silt loam,8 to 2.3 1.1% 15 percent slopes BdB2 Badin channery silty clay loam, 24.2 11.5% 2 to 8 percent slopes, moderately eroded CmB Cid channery silt loam, 1 to 5 88.1 41.8% percent slopes GoC Goldston very channery silt 5.9 2.8% loam,4 to 15 percent slopes GsB Goldston-Badin complex,2 to 8 37.0 17.5% percent slopes MhA Misenheimer-Cid complex,0 to 23.8 11.3% 3 percent slopes W Water 0.8 0.4% Totals for Area of Interest 210.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas 11 Custom Soil Resource Report are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Union County, North Carolina BaB—Badin channery silt loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 2t80y Elevation: 300 to 1,100 feet Mean annual precipitation: 43 to 49 inches Mean annual air temperature: 59 to 63 degrees F Frost-free period: 215 to 245 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin Setting Landform: Interfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from metasedimentary rock and/or metavolcanics Typical profile A -0 to 6 inches: channery silt loam Bt- 6 to 35 inches: silty clay Cr-35 to 43 inches: bedrock R-43 to 53 inches: bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 24 to 40 inches to paralithic bedrock; 40 to 59 inches to lithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 6.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Hydric soil rating: No 13 Custom Soil Resource Report Minor Components Goldston Percent of map unit: 5 percent Landform: Interfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Tatum Percent of map unit: 5 percent Landform: Interfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across-slope shape: Convex Hydric soil rating: No BaC—Badin channery silt loam, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3w0g Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap- 0 to 6 inches: channery silt loam Bt- 6 to 35 inches: silty clay Cr-35 to 43 inches: weathered bedrock R-43 to 80 inches: unweathered bedrock 14 Custom Soil Resource Report Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 6.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Hydric soil rating: No BdB2—Badin channery silty clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mx85 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap- 0 to 6 inches: silty clay loam Bt- 6 to 20 inches: silty clay BC-20 to 28 inches: channery silty clay loam Cr-28 to 42 inches: weathered bedrock R-42 to 80 inches: unweathered bedrock 15 Custom Soil Resource Report Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Hydric soil rating: No CmB—Cid channery silt loam, 1 to 5 percent slopes Map Unit Setting National map unit symbol: 3w0q Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Cid and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cid Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Linear Parent material: Residuum weathered from metavolcanics and/or residuum weathered from argillite Typical profile Ap- 0 to 9 inches: channery silt loam Bt- 9 to 22 inches: silty clay loam BC-22 to 27 inches: channery silty clay Cr-27 to 32 inches: weathered bedrock R-32 to 80 inches: unweathered bedrock 16 Custom Soil Resource Report Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat):Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table:About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: D Hydric soil rating: No GoC—Goldston very channery silt loam, 4 to 15 percent slopes Map Unit Setting National map unit symbol: 3w0z Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Goldston and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Goldston Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile A -0 to 1 inches: very channery silt loam E- 1 to 7 inches: very channery silt loam Bw- 7 to 16 inches: very channery silt loam Cr- 16 to 36 inches: weathered bedrock R-36 to 80 inches: unweathered bedrock Properties and qualities Slope:4 to 15 percent 17 Custom Soil Resource Report Depth to restrictive feature: 10 to 20 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Very low(about 1.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: D Hydric soil rating: No GsB—Goldston-Badin complex, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3w11 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Goldston and similar soils:45 percent Badin and similar soils:40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Goldston Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile A -0 to 5 inches: very channery silt loam Bw-5 to 16 inches: very channery silt loam Cr- 16 to 27 inches: weathered bedrock R-27 to 80 inches: unweathered bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 10 to 20 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock 18 Custom Soil Resource Report Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Very low(about 1.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: D Hydric soil rating: No Description of Badin Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile A -0 to 7 inches: channery silt loam Bt- 7 to 28 inches: silty clay Cr-28 to 41 inches: weathered bedrock R-41 to 80 inches: unweathered bedrock Properties and qualities Slope:4 to 8 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 4.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Hydric soil rating: No 19 Custom Soil Resource Report MhA—Misenheimer-Cid complex, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 3w17 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Misenheimer and similar soils: 60 percent Cid and similar soils: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Misenheimer Setting Landform: Interfluves Landform position (two-dimensional): Summit Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or residuum weathered from argillite Typical profile A -0 to 2 inches: channery silt loam E-2 to 7 inches: channery silt loam Bw- 7 to 14 inches: channery silt loam Cr- 14 to 25 inches: weathered bedrock R-25 to 80 inches: unweathered bedrock Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 10 to 20 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Drainage class: Moderately well drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat):Very low to high (0.00 to 1.98 in/hr) Depth to water table:About 12 to 18 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Very low(about 2.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: C/D Hydric soil rating: No 20 Custom Soil Resource Report Description of Cid Setting Landform: Interfluves Landform position (two-dimensional): Summit Down-slope shape: Convex Across-slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or residuum weathered from argillite Typical profile Ap- 0 to 9 inches: channery silt loam Bt- 9 to 22 inches: silty clay loam BC-22 to 27 inches: channery silty clay Cr-27 to 32 inches: weathered bedrock R-32 to 80 inches: unweathered bedrock Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat):Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table:About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: D Hydric soil rating: No W—Water Map Unit Composition Water: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w Hydric soil rating: No 21 `_ _ USGS MAP 7-, , ,, ( , , r 1 ..:), ,...„, ..„ , _ - - . , ,, , / 1 11 _ , _ ... .„, ! _____ - / • \..../...\ rtg , --- ,.2 , , , , . ...,, ---- • _�� . _ _ el / OV 8 -.-" ' ' ) 41 / 7 d •-'°-k ' i. . , --7 1 ) e' l V f c , _,----A. ...._ - ---I-7......_ _ _ . \ ,...... r ,,,, , !.., , . . (-:::, .._ i „A-- / ,`� r * - , •"--"\,\,,---1.,j i/ ' -....-•-"--/- TIP-7 / • • IIiin-j___ � �', � ! SITE i j11 x . ," 41ill ;,I. • ----6):';' 1 ii5d• 1 '04 - rk 0 /7 i --• 4 c------,:s- 7 ii (-- ___ \ is7 ( : . , _ - _ `._" _ di ;IV \ OD \ - : 0 C:t ..1 ... . PH/1% Al r. ( c:::' r..„..„•. --...7 - ! . . lc), \\ , I • 590 ;5? (e ,7 , 0 4 ,..---- ---Airpo---- a °;:l. IP:na .".dil"......M. • '' • / a fi P ithlWIP C - --- - offAr-- -\i-ii eiTc----S. -,:q\kir*, 650 IFIliii#Wircii ••••••••••7 1 '' . • 1%dV ‘. • ii 0 • ............p.MMI•Milii.. VP \ 1 ,\N . It • °°.) ,\ t I . . . 1404 (.. . n \ 4P.,___ L. ..,,,- ,-7(.--_.F.-y/ , ..,, _ ,_.. ,_____ , ,, ll .. ,. . ,_.,_ , - ,, .. __,_ 4 +1 ‘.• ` ` � • � w ram. \ Legend Open Water 54, •••.•••— Intermittent Tributary •—•—•— Perennial Tributary Marginal Area o , _,...„......, bi Ephemeral Drainage Pattern ` ,,,,,i 0-r: .:._,:: ,o 4 `II f ' Tributary 1 ; 84 - '��1(-,'0111l0 ' I -./ PP' ' <-- • - ' :6 . ' '4°- -." '''' :: '%'1;,'ia-Sloil P ,-- 46,:r°,>>--- / 7-----1 c.... ? " 4 , (19N) ft /" ':•'' '''i/g f\ ,, -', i =_Ii:=_„,:z..,_____________ ..-,_ -...,,,_ . -----A,‘„_______ ___=____ __________....:--------,_ (, tli , "4:i, : t....:12.,....rnk ,-...._ i _ ,_ ,, , ,,, .„,_ /.. 0 �� _ \\jam 0 -� ' -ram a, , \ _, ,‘ ,r l7: Tributary 2-A C \ - g o ftk ill' ,..... .- 1 j/e., �0 r Tributary 2 �300 ft� N _ O *Wetland Sketch provided for illustrative purposes for preliminary planning use only. Not intended ,1')'t :+° oo' to be relied upon for exact location,dimensions,or orientation. All findings and assessments made ' t-vr �- 'fir' bywetland consultants regarding limits ofjurisdiction or permittingrequirements are subject to ��. �� g g � q 1 verification by the US Army Corps of Engineers and other appropriate state and local authorities. il Project Name: Davis Village Owner/ Developer: Bulldog Investment Holdings LLC WETLANDS City/County: Wingate/Union & WATERS, INC. TaxPIN(S): 02242026 Coordinates: Scale: Date: Figure 1:Approximate Delineation of Surface Waters and Wetlands Lat: 34.993863 Long: -80.425098 graphic 09 21 21 National Flood Hazard Layer FI RMette } FEMA Legend 80°25'56"W 34°59'48"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation(BFE) . _* - Zone A,V,A99 ' « SPECIAL FLOOD * ; With BFE or Depth ZoneAE,AO,AH,VE,AR • �. HAZARD AREAS Regulatory Floodway 41Plifilfri—i ' ,, t. + i - = -- • a 0.2%Annual Chance Flood Hazard,Areas of 1%annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X • f "1 Future Conditions 1%Annual iplidir Chance Flood Hazard zonex 0 i r . a� ti►_- aka. Area with Reduced Flood Risk due to • ' F. OTHER AREAS OF Levee.See Notes.zone x ♦AP. FLOOD HAZARD Area with Flood Risk due to Leveezooe 111. ' NO SCREEN Area of Minimal Flood Hazard zonex • • ir: lir fll 1114 _ rI Effective LOMR5 r - , • OTHER AREAS Area of Undetermined Flood Hazard zone D • GENERAL -—-- Channel,Culvert,or Storm Sewer r STRUCTURES I I I I I I I Levee,Dike,or Floodwall . * O 20.2 Cross Sections with 1%Annual Chance y 1L Water Surface Elevation I_ ION( p ti AREA OF MINIMAL FLOOD HAZARD' r, 8— — — Coastal Transect `OI ' O Zt. • X ^^^^-sn.^^^-. Base Flood Elevation Line(BFE) t Limit of Study f Jurisdiction Boundary • - Coastal Transect Baseline • - ir OTHER - — Profile Baseline te 371U54]SUI�I FEATURES Hydrographic Feature + 1 etf. 1U/i(J2OU8 4110 a. lbr r Digital Data Available N MN4 No Digital Data Available l MAP PANELS Unmapped `trt' ` The pin displayed on the map is an approximate t+ point selected by the user and does not represent "� t I an authoritative property location. Lr 0 This map complies with FEMA's standards for the use of F16digital flood maps if it is not void as described below. I The basemap shown complies with FEMA's basemap �� accuracy standards O The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA.This map was exported on 8/15/2022 at 4:10 PM and does not reflect changes or amendments subsequent to this date and time.The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, 80°25'19"W 34°59'18"N FIRM panel number,and FIRM effective date.Map images for Feet 1:6 000 unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap:USGS National Map:Orthoimagery:Data refreshed October,2020 _ - - R �. _, " � ,,r -� Find address or place Q. '4 �., v• , ,t '4%i 'Zirdliki/A [PArN E L ' '' ' If, �Ir 11111,J . . r3�71 '5465' i' - , • <�. ' aat_.„. .. .,.'•;; P• N -L ` . ......1„....�, , eff. j ii .is __ 8 •- 1 .�_¢* ,Plvi oe- . Y 71054'750i 1 • ...-ir vty P-- A.'" - 1-..all - 41* -. ... : : :- i .:, Ili :,411111111P AtAgo": Ad. :-:in.,...., • IA ur_ , -left ,i i .1 ., r 1104114 ` Ilto . 1:141 1IP 1( 'ti _ '.. . , r. ram, . . ' , I i r" i# .. i USGS The National Map: Orthoimac�erLand U �A // PLOTT HOUND - r ENGINEERING �' WET POND A HYDROCAD OUTPUT 1-Yr 24-Hr Design Volume Storm Event WET POND 'A'DESIGN SHEET Revised 6/15/2023 Pond Volume Linked to Worksheet: Wet Pond Volume 85%Total Suspended Soilds 25%Total Nitrogen 40%total Phosphate Mountain&Piedmont Regions Table 10-1 SURFACE AREA REQ'D Design TSS%Removal Rate SA/DA RATIO CHART(for 85%TSS removal) Drainage Area= ac 85 % %imp cover avg.permanent pool depth(ft) 3 4 5 6 7 >=8 %Impervious= % 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 Perm.Pool Depth= 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1.24 1.09 0.91 0.78 0.71 SA/DA= 1.31 50 1.79 1.51 ®1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 Surface Area Req'd= 0.390 ac 16,988 sf 70 2.51 2.09 1.80 1.56 1.34 1.17 Area Provided= 0.789 ac 34,349 sf 80 2.92 2.41 2.07 1.86 1.62 1.40 at Elev= 555.50 90 3.25 2.64 2.31 2.04 1.84 1.59 VOL prov'd perm pool= 2.92 ac-ft (includes Fore-bay) Avg Depth= 3.70 ft Actual Ratio= 1.57 ELEV AREA STORAGE Actual Area Req'd= 0.470 ac (SF) (CF) TEMP.DRAWDOWN - DETERMINE 1"STORM VOLUME 556.74 40,297 44,380 556.75 40,332 44,783 USE SIMPLE METHOD Rv=0.05+0.9(I) 556.76 40,367 45,187 Rv=6.491 IN/IN 556.77 40,402 45,590 P= 1.0 IN 556.78 40,437 45,995 VOLUME=DESIGN RAINFALL(Rv)DA 556.79 40,472 46,399 VOLUME=' 1.228 AC-FT 53,470 CF 556.80 40,507 46,804 VOLprov= 1.262 AC-FT at elevation 557.00 556.81 40,542 47,209 556.82 40,577 47,615 556.83 40,612 48,021 FORE-BAY SIZE 556.84 40,647 48,427 PRE-BAY VOL=20%OF PERM POOL VOLUME 556.85 40,682 48,834 VOLUME OF MAIN POND: 2.365 ac-ft 556.86 40,717 49,241 MIN. MAX 556.87 40,752 49,648 PRE-BAY VOLregd= 0.473 ac-ft 0.591 556.88 40,787 50,056 PRE-BAY VOLprov.= 0.555 ac-ft 556.89 40,822 50,464 Actual%Used= 23.5 % 556.90 40,857 50,872 ORIFICE SIZING ORIFICE CALCULATIONS 556.91 40,892 51,281 orifice formula Q=cA(2gh)^.5 w/c=.6 556.92 40,927 51,690 2DAYDRAWDOWN Q2= 111511.cfs 556.93 40,962 52,100 DIA(in) 556.94 40,997 52,509 5 DAY DRAWDOWN= Q5= , 0.13 cfs Inv= 556.95 41,032 52,920 (cfs) 556.96 41,067 53,330 _ WQ FROM ORIFICE CALC'S:USE 4.0 IN DIA ORIFICE Elev Q 556.97 41,102 53,741 STORAGE Top 1"Stor= 557.00 556.98 41,137 54,152 Approx Draw Down Time= 3.7 days Perm.Pool= 555.50 VOL. ELEV: 89 hours He d= 0.50 556.99 41,172 54,564 556.97. 557.00 41,207 54,976 - Avg Q=- VOLUME 0.17 cfs 557.01 41,243 55,388 = Driving Head=H/3 557.02 41,279 55,800 53,470 CF See Figure 3-3 NCDENR BMP Manual 557.03 41,315 56,213 557.04 41,351 56,627 557.05 41,387 57,040 557.06 41,423 57,454 557.07 41,459 57,869 557.08 41,495 58,284 557.09 41,531 58,699 557.10 41,567 59,114 https://plotthoundeng.sharepoint.com/sites/PloltHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/B.Storm Water/Revised per comments 6.15.2023NVet Pond Page 1 of 1 Wet Pond Volume Linked to Worksheet: Wet Pond NCDENR Elev Perm.Pool= 555.50 Vol Perm Pool= 2.365 ac-ft 103019.4 Surface Area Perm.Pool 0.789 ac 1"Vol Storage Req'd= 1.228 ac-ft Elev Total Storage Req'd= 3.593 ac-ft 556.97 1"Vol Storage Prov'd= 1.262 ac-ft Total Storage Prov'd= 3.627 557.00 Prebay Vol.Prov'd= 0.555 ac-ft PreBay Main Pond Total Inc. Total Contour Area Avg.Area Volume Volume Area Avg.Area Inc.Volume Total Volume Cum.Volume Elev (ac) (ac) (ac-ft) (ac-ft) (ac) (ac) (ac-ft) (ac-ft) (ac-ft) ELEV FOREBAY(sf) AREA(acft) WET POOL(sf) AREA(acft) TOTAL AREA 550 0.028 0.000 0.000 0.000 0.030 0.000 0.000 0.000 0.000 550 1230 0.028 1301 0.03 0.058 551 0.053 0.040 0.040 0.040 0.374 0.200 0.200 0.200 0.240 551 2305 0.053 16294 0.37 0.427 552 0.079 0.070 0.070 0.110 0.418 0.400 0.400 0.600 0.710 552 3451 0.079 18215 0.42 0.497 553 0.107 0.090 0.090 0.200 0.464 0.440 0.440 1.040 1.240 553 4667 0.107 20211 0.46 0.571 554 0.137 0.120 0.120 0.320 0.512 0.490 0.490 1.530 1.850 554 5952 0.137 22282 0.51 0.648 555 0.168 0.150 0.150 0.470 0.560 0.540 0.540 2.070 2.540 555 7306 0.168 24396 0.56 0.728 555.5 0.178 0.170 0.085 0.555 0.610 0.590 0.295 2.365 2.920 PERM POOL 555.5 7774 0.178 26575 0.61 0.789 556 0.000 0.080 0.080 0.550 0.866 0.710 0.710 2.780 3.330 556 37708 0.87 0.866 557 0.000 0.000 0.000 0.550 0.946 0.910 0.910 3.690 4.240 557 41207 0.95 0.946 558 0.000 0.000 0.000 0.550 1.029 0.990 0.990 4.680 5.230 558 44802 1.03 1.029 559 0.000 0.000 0.000 0.550 1.112 1.070 1.070 5.750 6.300 559 48459 1.11 1.112 560 0.000 0.000 0.000 0.550 1.197 1.150 1.150 6.900 7.450 560 52124 1.20 1.197 560.5 1.234 1.220 0.366 7.266 7.266 560.3 53746 1.23 1.234 STAGE/ STORAGE 560 559 558 557 556 d 555 $ 554 553 552 551 550 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Volume (ac-ft) 2S WET POND A PRE DEV 3S WET POND A POST 13S YPASS BUA 12P WET POND A 14P TOTAL RUNOFF KSubca) Reach 'On. MP Routing Diagram for DAVIS VILLAGE WET POND A REV 6.8.2023 Prepared by Plott Hound Engineering PLLC, Printed 6/21/2023 HydroCAD®10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 3.00 2 2 10-Year Type II 6-hr Default 6.00 1 3.50 2 3 25-Year Type II 6-hr Default 6.00 1 4.20 2 4 50-Year Type II 6-hr Default 6.00 1 4.60 2 5 100-Year Type II 6-hr Default 6.00 1 5.20 2 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 0.650 98 BYPASS BUA (13S) 30.000 84 Pasture/grassland/range, Fair, HSG D (2S) 30.000 88 RESIDENTIAL: 49% BUA (3S) 60.650 86 TOTAL AREA DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 0.650 0.650 BYPASS BUA 13S 0.000 0.000 0.000 30.000 0.000 30.000 Pasture/grassland/range, Fair 2S 0.000 0.000 0.000 0.000 30.000 30.000 RESIDENTIAL: 49% BUA 3S 0.000 0.000 0.000 30.000 30.650 60.650 TOTAL AREA DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 5 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment2S: WET POND A PRE DEV Runoff Area=30.000 ac 0.00% Impervious Runoff Depth>1.38" Flow Length=2,918' Tc=29.5 min CN=84 Runoff=39.59 cfs 3.461 af Subcatchment3S: WET POND A POST Runoff Area=30.000 ac 0.00% Impervious Runoff Depth>1.68" Tc=16.3 min CN=88 Runoff=67.08 cfs 4.207 af Subcatchmentl3S: BYPASS BUA Runoff Area=0.650 ac 100.00% Impervious Runoff Depth>2.62" Tc=5.0 min CN=98 Runoff=2.78 cfs 0.142 af Pond 12P: WET POND A Peak Elev=557.92' Storage=94,391 cf Inflow=67.08 cfs 4.207 af Primary=18.77 cfs 2.670 af Secondary=0.00 cfs 0.000 af Outflow=18.77 cfs 2.670 af Pond 14P: TOTAL RUNOFF Inflow=19.02 cfs 2.812 af Primary=19.02 cfs 2.812 af Total Runoff Area = 60.650 ac Runoff Volume = 7.810 af Average Runoff Depth = 1.55" 98.93% Pervious = 60.000 ac 1.07% Impervious = 0.650 ac DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 2S: WET POND A PRE DEV Runoff = 39.59 cfs @ 12.24 hrs, Volume= 3.461 af, Depth> 1.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 30.000 84 Pasture/grassland/range, Fair, HSG D 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.7 239 0.0580 0.23 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.58" 8.7 1,095 0.0170 2.10 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 1,584 0.0138 8.61 232.48 Channel Flow, CHANNEL FLOW Area= 27.0 sf Perim= 15.0' r= 1.80' n= 0.030 Earth, grassed & winding 29.5 2,918 Total Subcatchment 2S: WET POND A PRE DEV Hydrograph - - - 4 - r - I- t 7 - I 7 - r I- 44 1- - 7 T - 1 7 1 7 1- ■Runoff 42 I I I I I I 139-59 cfs I 1 1 I 1 1 I 40 Type1I-221�h rI I I I I 38_ — N' L�Fla 32 4- Rp11V1 A1e - I- I - 4 - I- - 30 ,r -1- 4 - fib/- I- -I - - 1- - / - - I- -1 - t - 7 -1- - 28 Ru n-0fFV-IIfl me 3.461-a'f- T - - I- -I - 7 - -I- w 26 3 ,- (a�I f���ppl0 4,.3 0_ - I 8124� I224-/ — I204/ — Clovi - ength 2A18'- 1- / - 18 Iw- 4-- LC -T- -I - 4 - L - I_ - 4 - 4 -I- - 16= T1c=29.5 mint - 4 - - - 1- / - 4 - -I- 14 N0.4t - 1- -1 - _F - - I- - -I - t - H- -I- 12_ T H- - - - - - - - I 1 I I- -1 - 7 - -I- I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment 2S: WET POND A PRE DEV Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 0.94 12.01 0.25 0.01 0.00 0.00 13.00 2.32 0.98 7.34 0.50 0.02 0.00 0.00 13.25 2.36 1.01 5.36 0.75 0.02 0.00 0.00 13.50 2.40 1.04 4.29 1.00 0.03 0.00 0.00 13.75 2.43 1.06 3.68 1.25 0.04 0.00 0.00 14.00 2.46 1.09 3.24 1.50 0.05 0.00 0.00 14.25 2.49 1.11 2.89 1.75 0.06 0.00 0.00 14.50 2.51 1.13 2.63 2.00 0.07 0.00 0.00 14.75 2.54 1.15 2.47 2.25 0.08 0.00 0.00 15.00 2.56 1.16 2.35 2.50 0.08 0.00 0.00 15.25 2.58 1.18 2.23 2.75 0.09 0.00 0.00 15.50 2.60 1.20 2.11 3.00 0.10 0.00 0.00 15.75 2.62 1.21 1.99 3.25 0.11 0.00 0.00 16.00 2.64 1.23 1.87 3.50 0.12 0.00 0.00 16.25 2.66 1.24 1.75 3.75 0.13 0.00 0.00 16.50 2.67 1.25 1.66 4.00 0.14 0.00 0.00 16.75 2.69 1.27 1.61 4.25 0.15 0.00 0.00 17.00 2.71 1.28 1.56 4.50 0.17 0.00 0.00 17.25 2.72 1.29 1.52 4.75 0.18 0.00 0.00 17.50 2.74 1.30 1.48 5.00 0.19 0.00 0.00 17.75 2.75 1.31 1.43 5.25 0.20 0.00 0.00 18.00 2.76 1.32 1.39 5.50 0.21 0.00 0.00 18.25 2.78 1.33 1.35 5.75 0.23 0.00 0.00 18.50 2.79 1.34 1.30 6.00 0.24 0.00 0.00 18.75 2.80 1.35 1.26 6.25 0.25 0.00 0.00 19.00 2.81 1.36 1.22 6.50 0.27 0.00 0.00 19.25 2.82 1.37 1.17 6.75 0.28 0.00 0.00 19.50 2.84 1.38 1.13 7.00 0.30 0.00 0.00 19.75 2.85 1.39 1.08 7.25 0.31 0.00 0.00 20.00 2.86 1.40 1.04 7.50 0.33 0.00 0.00 7.75 0.34 0.00 0.00 8.00 0.36 0.00 0.00 8.25 0.38 0.00 0.00 8.50 0.40 0.00 0.00 8.75 0.42 0.00 0.02 9.00 0.44 0.00 0.06 9.25 0.47 0.00 0.12 9.50 0.49 0.01 0.19 9.75 0.51 0.01 0.25 10.00 0.54 0.01 0.33 10.25 0.58 0.02 0.45 10.50 0.61 0.02 0.60 10.75 0.65 0.03 0.79 11.00 0.71 0.05 1.07 11.25 0.77 0.07 1.44 11.50 0.85 0.09 2.06 11.75 1.16 0.23 3.72 12.00 1.99 0.74 17.47 12.25 2.12 0.83 39.56 12.50 2.20 0.89 23.09 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 3S: WET POND A POST Runoff = 67.08 cfs @ 12.08 hrs, Volume= 4.207 af, Depth> 1.68" Routed to Pond 12P : WET POND A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description * 30.000 88 RESIDENTIAL: 49% BUA 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, STORM SYSTEM ANALYSIS Subcatchment 3S: WET POND A POST Hydrograph 75" 1 1 1 4 4— 1— — — 1 I — 4 — —I— — !Runoff 70 1 1 I 1 1 I I 1 167 08 cfs I 1 1 I 1 1 I 65 Type II i 24-hri I 60 1 Ypar+Rallinfall-3. Q�— —1- 55:" Ru nioff-Area39.AOO-a-c ' L —I— — 50� 1 1 I I I I I!�/�1 1 I 45� n RuOff o1UrneF4.2Qraf / I 40 a 35" r T'=16.3 nti n-11 30 EIV�8$r 1 7 257- - k —1— H — — 1— —1 — — 4 — H —1- 20� I 1 1 1 1 15� — — I 1 10� — — 1 5 / 1 1 1 ��/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 3S: WET POND A POST Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 1.18 7.34 0.25 0.01 0.00 0.00 13.00 2.32 1.23 5.67 0.50 0.02 0.00 0.00 13.25 2.36 1.26 4.74 0.75 0.02 0.00 0.00 13.50 2.40 1.29 4.15 1.00 0.03 0.00 0.00 13.75 2.43 1.32 3.64 1.25 0.04 0.00 0.00 14.00 2.46 1.35 3.24 1.50 0.05 0.00 0.00 14.25 2.49 1.37 2.91 1.75 0.06 0.00 0.00 14.50 2.51 1.39 2.74 2.00 0.07 0.00 0.00 14.75 2.54 1.41 2.61 2.25 0.08 0.00 0.00 15.00 2.56 1.43 2.48 2.50 0.08 0.00 0.00 15.25 2.58 1.45 2.34 2.75 0.09 0.00 0.00 15.50 2.60 1.47 2.21 3.00 0.10 0.00 0.00 15.75 2.62 1.49 2.08 3.25 0.11 0.00 0.00 16.00 2.64 1.50 1.94 3.50 0.12 0.00 0.00 16.25 2.66 1.52 1.83 3.75 0.13 0.00 0.00 16.50 2.67 1.53 1.76 4.00 0.14 0.00 0.00 16.75 2.69 1.55 1.72 4.25 0.15 0.00 0.00 17.00 2.71 1.56 1.67 4.50 0.17 0.00 0.00 17.25 2.72 1.57 1.62 4.75 0.18 0.00 0.00 17.50 2.74 1.58 1.57 5.00 0.19 0.00 0.00 17.75 2.75 1.60 1.53 5.25 0.20 0.00 0.00 18.00 2.76 1.61 1.48 5.50 0.21 0.00 0.00 18.25 2.78 1.62 1.43 5.75 0.23 0.00 0.00 18.50 2.79 1.63 1.38 6.00 0.24 0.00 0.00 18.75 2.80 1.64 1.33 6.25 0.25 0.00 0.00 19.00 2.81 1.65 1.28 6.50 0.27 0.00 0.00 19.25 2.82 1.66 1.24 6.75 0.28 0.00 0.00 19.50 2.84 1.67 1.19 7.00 0.30 0.00 0.03 19.75 2.85 1.68 1.14 7.25 0.31 0.00 0.06 20.00 2.86 1.69 1.09 7.50 0.33 0.00 0.10 7.75 0.34 0.00 0.14 8.00 0.36 0.01 0.19 8.25 0.38 0.01 0.24 8.50 0.40 0.01 0.31 8.75 0.42 0.01 0.39 9.00 0.44 0.02 0.49 9.25 0.47 0.02 0.59 9.50 0.49 0.03 0.67 9.75 0.51 0.04 0.76 10.00 0.54 0.04 0.91 10.25 0.58 0.05 1.11 10.50 0.61 0.07 1.38 10.75 0.65 0.08 1.72 11.00 0.71 0.10 2.20 11.25 0.77 0.13 2.87 11.50 0.85 0.17 4.05 11.75 1.16 0.35 10.68 12.00 1.99 0.96 54.01 12.25 2.12 1.06 35.21 12.50 2.20 1.13 12.88 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 13S: BYPASS BUA Runoff = 2.78 cfs @ 11.95 hrs, Volume= 0.142 af, Depth> 2.62" Routed to Pond 14P : TOTAL RUNOFF Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description * 0.650 98 BYPASS BUA 0.650 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: BYPASS BUA Hydrograph A 1 1 I 1 1 I 3 _ I I I I I I I I I ❑Runoff` 1 12.78 cfs 1 I Type II124-hr I 1-1 Year 1,Rainfall-3.00", - Runoff Area=9.65Q a 2 Runoff VolumeF0.1142 af Runoff,, DEpth>2.6 " ' - Tc=5.01 m iln I I I I I I I I I I ■/�I VN=9$H- - - 1- 11 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 13S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 2.04 0.15 0.25 0.01 0.00 0.00 13.00 2.32 2.09 0.13 0.50 0.02 0.00 0.00 13.25 2.36 2.13 0.11 0.75 0.02 0.00 0.00 13.50 2.40 2.17 0.10 1.00 0.03 0.00 0.00 13.75 2.43 2.20 0.09 1.25 0.04 0.00 0.00 14.00 2.46 2.23 0.08 1.50 0.05 0.00 0.00 14.25 2.49 2.26 0.07 1.75 0.06 0.00 0.00 14.50 2.51 2.28 0.07 2.00 0.07 0.00 0.00 14.75 2.54 2.31 0.06 2.25 0.08 0.00 0.01 15.00 2.56 2.33 0.06 2.50 0.08 0.01 0.01 15.25 2.58 2.35 0.06 2.75 0.09 0.01 0.01 15.50 2.60 2.37 0.05 3.00 0.10 0.01 0.01 15.75 2.62 2.39 0.05 3.25 0.11 0.02 0.01 16.00 2.64 2.41 0.05 3.50 0.12 0.02 0.01 16.25 2.66 2.43 0.04 3.75 0.13 0.03 0.01 16.50 2.67 2.44 0.04 4.00 0.14 0.03 0.02 16.75 2.69 2.46 0.04 4.25 0.15 0.04 0.02 17.00 2.71 2.47 0.04 4.50 0.17 0.05 0.02 17.25 2.72 2.49 0.04 4.75 0.18 0.05 0.02 17.50 2.74 2.50 0.04 5.00 0.19 0.06 0.02 17.75 2.75 2.52 0.04 5.25 0.20 0.07 0.02 18.00 2.76 2.53 0.04 5.50 0.21 0.08 0.02 18.25 2.78 2.55 0.03 5.75 0.23 0.09 0.02 18.50 2.79 2.56 0.03 6.00 0.24 0.10 0.03 18.75 2.80 2.57 0.03 6.25 0.25 0.11 0.03 19.00 2.81 2.58 0.03 6.50 0.27 0.12 0.03 19.25 2.82 2.59 0.03 6.75 0.28 0.13 0.03 19.50 2.84 2.60 0.03 7.00 0.30 0.14 0.03 19.75 2.85 2.61 0.03 7.25 0.31 0.15 0.03 20.00 2.86 2.62 0.03 7.50 0.33 0.17 0.03 7.75 0.34 0.18 0.04 8.00 0.36 0.19 0.04 8.25 0.38 0.21 0.04 8.50 0.40 0.23 0.04 8.75 0.42 0.24 0.05 9.00 0.44 0.27 0.05 9.25 0.47 0.29 0.06 9.50 0.49 0.31 0.06 9.75 0.51 0.33 0.06 10.00 0.54 0.36 0.07 10.25 0.58 0.39 0.08 10.50 0.61 0.42 0.09 10.75 0.65 0.46 0.11 11.00 0.71 0.51 0.13 11.25 0.77 0.57 0.17 11.50 0.85 0.65 0.21 11.75 1.16 0.95 1.01 12.00 1.99 1.76 2.32 12.25 2.12 1.89 0.32 12.50 2.20 1.98 0.20 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Pond 12P: WET POND A Inflow Area = 30.000 ac, 0.00% Impervious, Inflow Depth > 1.68" for 1-Year event Inflow = 67.08 cfs @ 12.08 hrs, Volume= 4.207 af Outflow = 18.77 cfs @ 12.39 hrs, Volume= 2.670 af, Atten= 72%, Lag= 18.3 min Primary = 18.77 cfs @ 12.39 hrs, Volume= 2.670 af Routed to Pond 14P : TOTAL RUNOFF Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 14P : TOTAL RUNOFF Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 557.92'@ 12.39 hrs Surf.Area= 44,513 sf Storage= 94,391 cf Plug-Flow detention time= 154.9 min calculated for 2.670 af(63% of inflow) Center-of-Mass det. time=84.3 min ( 868.2 - 783.9 ) Volume Invert Avail.Storage Storage Description #1 555.50' 221,432 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 24,364 0 0 556.00 37,708 15,518 15,518 557.00 41,207 39,458 54,976 558.00 44,802 43,005 97,980 559.00 48,459 46,631 144,611 560.00 52,124 50,292 194,902 560.50 53,994 26,530 221,432 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round Culvert L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00'/ 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Vert. 4" WO Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 559.00' 20.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 557.00' 24.0" W x 6.0" H Vert. WEIR C= 0.600 Limited to weir flow at low heads DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 13 Primary OutFlow Max=18.71 cfs @ 12.39 hrs HW=557.92' TW=0.00' (Dynamic Tailwater) Lam=Culvert (Passes 18.71 cfs of 86.23 cfs potential flow) —2=4" WQ Orifice (Orifice Controls 0.63 cfs @ 7.23 fps) —3=Top of OS (Weir Controls 14.17 cfs @ 2.12 fps) —5=WEIR (Orifice Controls 3.91 cfs @ 3.91 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=555.50' TW=0.00' (Dynamic Tailwater) L4=Emergency Spillway ( Controls 0.00 cfs) Pond 12P: WET POND A Hydrograph r r r r T T rt rt r - H t 1 t 1 t 1 t 1 t 1 t 1 t 1 fi 1 1 1 - ■Inflow s�.os cfs •Outflow 4 - 1- -1 -1 - - � -I- + - - - - - - � - � - 75_/I- // hn_ _IArL _ _ .g00_a__ 1 _1 _1_ H _ I_ H _ I_ _1 _ L _ •Seondary 70i-/ , ' , /1- Peak v Ie =5-57.9T 1 1 1 1 I I I I I I I 65 / ' 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I 60y ' ' , '1 Stbrage -94,39-1 cf 1 1 1 1 I I 1 ' /1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 55 / _ / i r - - L -1 - r -1 - r -1- T -1- T -1 1 1 - 1- 7 - 1 - 50� , / - H 1- 1 t 1 t I t t 1 -HH I H I- I-/ - - - 1- -1 - r -I - r -I- H -1- t 1 -1- 4 - I- 4 - 1- - - I - .2. 40i: , ' i /- _I - i- -I - L _I - 1- _I- L _1_ H -1 1 1 '_ _1 - I_ - a354 i 1 _I _ L _1 _ L _I L _I_ L _I_ 1 _1 _ _1 - L - " 30� , '1 1 1 1 1 I I I 1 1 1 1a177 cfs 1 1 25 -' i '1 1 1 1 1 I I I 1 1 I i s 77 c;s[ 1 1 201 / '1 1 1 1 1 1 1 1 1 1 1 154 , ' i '1 /Z. 107 ' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 14 Hydrograph for Pond 12P: WET POND A Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 0.50 0.00 0 555.50 0.00 0.00 0.00 1.00 0.00 0 555.50 0.00 0.00 0.00 1.50 0.00 0 555.50 0.00 0.00 0.00 2.00 0.00 0 555.50 0.00 0.00 0.00 2.50 0.00 0 555.50 0.00 0.00 0.00 3.00 0.00 0 555.50 0.00 0.00 0.00 3.50 0.00 0 555.50 0.00 0.00 0.00 4.00 0.00 0 555.50 0.00 0.00 0.00 4.50 0.00 0 555.50 0.00 0.00 0.00 5.00 0.00 0 555.50 0.00 0.00 0.00 5.50 0.00 0 555.50 0.00 0.00 0.00 6.00 0.00 0 555.50 0.00 0.00 0.00 6.50 0.00 0 555.50 0.00 0.00 0.00 7.00 0.03 11 555.50 0.00 0.00 0.00 7.50 0.10 125 555.51 0.00 0.00 0.00 8.00 0.19 385 555.52 0.00 0.00 0.00 8.50 0.31 816 555.53 0.00 0.00 0.00 9.00 0.49 1,517 555.56 0.01 0.01 0.00 9.50 0.67 2,550 555.60 0.02 0.02 0.00 10.00 0.91 3,874 555.65 0.05 0.05 0.00 10.50 1.38 5,777 555.71 0.09 0.09 0.00 11.00 2.20 8,697 555.81 0.16 0.16 0.00 11.50 4.05 13,694 555.95 0.22 0.22 0.00 12.00 54.01 43,360 556.71 0.43 0.43 0.00 12.50 12.88 93,266 557.89 17.42 17.42 0.00 13.00 5.67 85,038 557.71 8.77 8.77 0.00 13.50 4.15 81,191 557.62 5.61 5.61 0.00 14.00 3.24 79,075 557.57 4.21 4.21 0.00 14.50 2.74 77,584 557.54 3.41 3.41 0.00 15.00 2.48 76,555 557.51 2.99 2.99 0.00 15.50 2.21 75,618 557.49 2.77 2.77 0.00 16.00 1.94 74,521 557.46 2.60 2.60 0.00 16.50 1.76 73,318 557.44 2.41 2.41 0.00 17.00 1.67 72,216 557.41 2.25 2.25 0.00 17.50 1.57 71,222 557.39 2.10 2.10 0.00 18.00 1.48 70,306 557.37 1.97 1.97 0.00 18.50 1.38 69,441 557.35 1.85 1.85 0.00 19.00 1.28 68,612 557.33 1.74 1.74 0.00 19.50 1.19 67,804 557.31 1.63 1.63 0.00 20.00 1.09 67,008 557.29 1.53 1.53 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 15 Stage-Discharge for Pond 12P: WET POND A Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.05 26.28 26.28 0.00 555.55 0.01 0.01 0.00 558.10 29.39 29.39 0.00 555.60 0.02 0.02 0.00 558.15 32.63 32.63 0.00 555.65 0.05 0.05 0.00 558.20 35.99 35.99 0.00 555.70 0.08 0.08 0.00 558.25 39.46 39.46 0.00 555.75 0.12 0.12 0.00 558.30 43.04 43.04 0.00 555.80 0.15 0.15 0.00 558.35 46.73 46.73 0.00 555.85 0.18 0.18 0.00 558.40 50.52 50.52 0.00 555.90 0.20 0.20 0.00 558.45 54.41 54.41 0.00 555.95 0.22 0.22 0.00 558.50 58.40 58.40 0.00 556.00 0.24 0.24 0.00 558.55 62.49 62.49 0.00 556.05 0.26 0.26 0.00 558.60 66.67 66.67 0.00 556.10 0.28 0.28 0.00 558.65 70.94 70.94 0.00 556.15 0.29 0.29 0.00 558.70 75.30 75.30 0.00 556.20 0.31 0.31 0.00 558.75 79.75 79.75 0.00 556.25 0.32 0.32 0.00 558.80 84.28 84.28 0.00 556.30 0.33 0.33 0.00 558.85 88.90 88.90 0.00 556.35 0.35 0.35 0.00 558.90 92.59 92.59 0.00 556.40 0.36 0.36 0.00 558.95 92.90 92.90 0.00 556.45 0.37 0.37 0.00 559.00 93.21 93.21 0.00 556.50 0.38 0.38 0.00 559.05 94.08 93.52 0.56 556.55 0.39 0.39 0.00 559.10 95.40 93.83 1.57 556.60 0.41 0.41 0.00 559.15 97.03 94.14 2.89 556.65 0.42 0.42 0.00 559.20 98.90 94.44 4.45 556.70 0.43 0.43 0.00 559.25 101.02 94.75 6.27 556.75 0.44 0.44 0.00 559.30 103.35 95.05 8.30 556.80 0.45 0.45 0.00 559.35 105.89 95.36 10.53 556.85 0.46 0.46 0.00 559.40 108.61 95.66 12.95 556.90 0.47 0.47 0.00 559.45 111.63 95.96 15.67 556.95 0.48 0.48 0.00 559.50 114.86 96.27 18.60 557.00 0.49 0.49 0.00 559.55 118.31 96.57 21.74 557.05 0.57 0.57 0.00 559.60 121.96 96.87 25.10 557.10 0.71 0.71 0.00 559.65 125.44 97.16 28.27 557.15 0.88 0.88 0.00 559.70 129.03 97.46 31.57 557.20 1.09 1.09 0.00 559.75 132.73 97.76 34.98 557.25 1.33 1.33 0.00 559.80 136.55 98.05 38.50 557.30 1.59 1.59 0.00 559.85 140.47 98.35 42.12 557.35 1.87 1.87 0.00 559.90 144.49 98.64 45.85 557.40 2.18 2.18 0.00 559.95 148.61 98.94 49.68 557.45 2.50 2.50 0.00 560.00 152.83 99.23 53.60 557.50 2.84 2.84 0.00 560.05 157.24 99.52 57.72 557.55 3.71 3.71 0.00 560.10 161.76 99.81 61.95 557.60 5.02 5.02 0.00 560.15 166.39 100.10 66.29 557.65 6.62 6.62 0.00 560.20 171.11 100.39 70.72 557.70 8.46 8.46 0.00 560.25 175.73 100.68 75.05 557.75 10.51 10.51 0.00 560.30 180.41 100.96 79.45 557.80 12.75 12.75 0.00 560.35 185.17 101.25 83.92 557.85 15.16 15.16 0.00 560.40 189.99 101.54 88.46 557.90 17.72 17.72 0.00 560.45 194.80 101.82 92.98 557.95 20.44 20.44 0.00 560.50 199.66 102.11 97.55 558.00 23.29 23.29 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 16 Stage-Area-Storage for Pond 12P: WET POND A Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 24,364 0 558.05 44,985 100,225 555.55 25,698 1,252 558.10 45,168 102,478 555.60 27,033 2,570 558.15 45,351 104,741 555.65 28,367 3,955 558.20 45,533 107,014 555.70 29,702 5,407 558.25 45,716 109,295 555.75 31,036 6,925 558.30 45,899 111,585 555.80 32,370 8,510 558.35 46,082 113,885 555.85 33,705 10,162 558.40 46,265 116,193 555.90 35,039 11,881 558.45 46,448 118,511 555.95 36,374 13,666 558.50 46,631 120,838 556.00 37,708 15,518 558.55 46,813 123,174 556.05 37,883 17,408 558.60 46,996 125,519 556.10 38,058 19,306 558.65 47,179 127,874 556.15 38,233 21,214 558.70 47,362 130,237 556.20 38,408 23,130 558.75 47,545 132,610 556.25 38,583 25,054 558.80 47,728 134,992 556.30 38,758 26,988 558.85 47,910 137,383 556.35 38,933 28,930 558.90 48,093 139,783 556.40 39,108 30,881 558.95 48,276 142,192 556.45 39,283 32,841 559.00 48,459 144,611 556.50 39,458 34,809 559.05 48,642 147,038 556.55 39,632 36,787 559.10 48,826 149,475 556.60 39,807 38,773 559.15 49,009 151,921 556.65 39,982 40,767 559.20 49,192 154,376 556.70 40,157 42,771 559.25 49,375 156,840 556.75 40,332 44,783 559.30 49,558 159,313 556.80 40,507 46,804 559.35 49,742 161,796 556.85 40,682 48,834 559.40 49,925 164,287 556.90 40,857 50,872 559.45 50,108 166,788 556.95 41,032 52,920 559.50 50,292 169,298 557.00 41,207 54,976 559.55 50,475 171,817 557.05 41,387 57,040 559.60 50,658 174,346 557.10 41,567 59,114 559.65 50,841 176,883 557.15 41,746 61,197 559.70 51,025 179,430 557.20 41,926 63,289 559.75 51,208 181,986 557.25 42,106 65,390 559.80 51,391 184,550 557.30 42,285 67,499 559.85 51,574 187,125 557.35 42,465 69,618 559.90 51,757 189,708 557.40 42,645 71,746 559.95 51,941 192,300 557.45 42,825 73,883 560.00 52,124 194,902 557.50 43,005 76,028 560.05 52,311 197,513 557.55 43,184 78,183 560.10 52,498 200,133 557.60 43,364 80,347 560.15 52,685 202,763 557.65 43,544 82,519 560.20 52,872 205,402 557.70 43,724 84,701 ' 560.25 53,059 208,050 557.75 43,903 86,892 560.30 53,246 210,707 557.80 44,083 89,091 560.35 53,433 213,374 557.85 44,263 91,300 560.40 53,620 216,051 557.90 44,442 93,518 560.45 53,807 218,736 557.95 44,622 95,744 560.50 53,994 221,432 558.00 44,802 97,980 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 17 Summary for Pond 14P: TOTAL RUNOFF Inflow Area = 30.650 ac, 2.12% Impervious, Inflow Depth > 1.10" for 1-Year event Inflow = 19.02 cfs @ 12.39 hrs, Volume= 2.812 af Primary = 19.02 cfs @ 12.39 hrs, Volume= 2.812 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 14P: TOTAL RUNOFF Hydrograph /� —I— 4 — I— —I — 4 — I— —I — + — I— —I — + — I— —I — + — I— —I — + — I— —I — - A — —I fi I fi I I t I I T I —I — t I I T I H - ■Inflow 21 -z / ,soz I - ■Primary ITI I7 � IT — I I � . ITIITIT - 19 hlffow-Area=30:6�fl�1c -1 18� I/� 17 , 16 " , —I— H — I— —I — H — H —I — H — H —I — -I — H — I— —I — H — I— —I — - 15 -/ , ,— —I— 4 — I— —I — 4 — I— —I — + — + —I — 1 — + — I— —I — + — I— — - 14� , � -1— fi - - -1 — fi - 1- -1 — t - 1- -1 / H 1 - t - 1- -I - t - 1- -1 - - 13t/ , — —I— T — 1— —I — T — T —I — T — T —1 — 1 — T — 1— —I — T — I— T — 11� , I I 1 1 I I I 1 1 1 01 1 1 I I I 1 c 10 , , I I 1 1 I I I 1 1 1 10, 1 1 I I I 1 Li94/ i /— II 1 1 III 1 1 1 � 1 1 1 II 1 8 -/ / 7� , /— —I— 4 — I— —1 — 4 — I— —I — + — I— —1 — / + — I— —I — + — I— + — �6 / — I H 1 — H — I I t t 1 — ��� + 5 1 T 7 1 T � �II 3 , 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 18 Hydrograph for Pond 14P: TOTAL RUNOFF Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 12.41 12.41 0.25 0.00 0.00 13.00 8.89 8.89 0.50 0.00 0.00 13.25 6.92 6.92 0.75 0.00 0.00 13.50 5.71 5.71 1.00 0.00 0.00 13.75 4.89 4.89 1.25 0.00 0.00 14.00 4.28 4.28 1.50 0.00 0.00 14.25 3.82 3.82 1.75 0.00 0.00 14.50 3.48 3.48 2.00 0.00 0.00 14.75 3.23 3.23 2.25 0.01 0.01 15.00 3.05 3.05 2.50 0.01 0.01 15.25 2.91 2.91 2.75 0.01 0.01 15.50 2.83 2.83 3.00 0.01 0.01 15.75 2.74 2.74 3.25 0.01 0.01 16.00 2.64 2.64 3.50 0.01 0.01 16.25 2.55 2.55 3.75 0.01 0.01 16.50 2.46 2.46 4.00 0.02 0.02 16.75 2.37 2.37 4.25 0.02 0.02 17.00 2.29 2.29 4.50 0.02 0.02 17.25 2.21 2.21 4.75 0.02 0.02 17.50 2.14 2.14 5.00 0.02 0.02 17.75 2.07 2.07 5.25 0.02 0.02 18.00 2.01 2.01 5.50 0.02 0.02 18.25 1.94 1.94 5.75 0.02 0.02 18.50 1.88 1.88 6.00 0.03 0.03 18.75 1.83 1.83 6.25 0.03 0.03 19.00 1.77 1.77 6.50 0.03 0.03 19.25 1.71 1.71 6.75 0.03 0.03 19.50 1.66 1.66 7.00 0.03 0.03 19.75 1.61 1.61 7.25 0.03 0.03 20.00 1.56 1.56 7.50 0.03 0.03 7.75 0.04 0.04 8.00 0.04 0.04 8.25 0.04 0.04 8.50 0.05 0.05 8.75 0.05 0.05 9.00 0.06 0.06 9.25 0.07 0.07 9.50 0.08 0.08 9.75 0.10 0.10 10.00 0.12 0.12 10.25 0.15 0.15 10.50 0.18 0.18 10.75 0.23 0.23 11.00 0.29 0.29 11.25 0.35 0.35 11.50 0.44 0.44 11.75 1.28 1.28 12.00 2.75 2.75 12.25 14.38 14.38 12.50 17.63 17.63 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 19 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment2S: WET POND A PRE DEV Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=1.94" Flow Length=2,918' Tc=29.5 min CN=84 Runoff=69.98 cfs 4.841 af Subcatchment3S: WET POND A POST Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=2.27" Tc=16.3 min CN=88 Runoff=116.74 cfs 5.672 af Subcatchmentl3S: BYPASS BUA Runoff Area=0.650 ac 100.00% Impervious Runoff Depth=3.27" Tc=5.0 min CN=98 Runoff=4.61 cfs 0.177 af Pond 12P: WET POND A Peak Elev=558.45' Storage=118,359 cf Inflow=116.74 cfs 5.672 af Primary=54.15 cfs 4.714 af Secondary=0.00 cfs 0.000 af Outflow=54.15 cfs 4.714 af Pond 14P: TOTAL RUNOFF Inflow=54.65 cfs 4.891 af Primary=54.65 cfs 4.891 af Total Runoff Area = 60.650 ac Runoff Volume = 10.690 af Average Runoff Depth = 2.12" 98.93% Pervious = 60.000 ac 1.07% Impervious = 0.650 ac DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 2S: WET POND A PRE DEV Runoff = 69.98 cfs @ 3.25 hrs, Volume= 4.841 af, Depth= 1.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.50" Area (ac) CN Description 30.000 84 Pasture/grassland/range, Fair, HSG D 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.7 239 0.0580 0.23 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.58" 8.7 1,095 0.0170 2.10 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 1,584 0.0138 8.61 232.48 Channel Flow, CHANNEL FLOW Area= 27.0 sf Perim= 15.0' r= 1.80' n= 0.030 Earth, grassed & winding 29.5 2,918 Total Subcatchment 2S: WET POND A PRE DEV Hydrograph I I I 1 I 75 -/ I I I I I I I ■Runoff -1- 69.98 ors — — r - 1- -I - 7 - -I- - 70 -/ H I% - -I - - T - 1- -1 - A - 1- - I- -I - -Type'1-1 - 65� I I I I I I I I I I I I I I I I 60 1 1 I I 1 I I 1 1 I 1 1 I 1r 55� _I ( I I I I 10-Year Rlairifalll=3.50" 50i-/ H 0 I- H - + - 1-Run-off Afeag30 DO-O-aC - y 45 -/ IIp_ 40� 1 1 / I 1 I I ou 'I fo " Ih m- 4.844,1 `I`f 35 =1 I 11 I I 1 1 RUnbff 1Delpth=11.941" 30- 4- -1 -p 10 -F - - 1- H + - 1- 1 -Flow Length2,9f8 - I - L _ 1_ J L - I- - A - L _ 20= 1 1 • I 1 1 I 1 1 14'1 15, 1 I I 1 I I 1 CN=84 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 21 Hydrograph for Subcatchment 2S: WET POND A PRE DEV Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.50 1.94 0.00 0.25 0.04 0.00 0.00 13.00 3.50 1.94 0.00 0.50 0.08 0.00 0.00 13.25 3.50 1.94 0.00 0.75 0.12 0.00 0.00 13.50 3.50 1.94 0.00 1.00 0.17 0.00 0.00 13.75 3.50 1.94 0.00 1.25 0.22 0.00 0.00 14.00 3.50 1.94 0.00 1.50 0.28 0.00 0.00 14.25 3.50 1.94 0.00 1.75 0.35 0.00 0.00 14.50 3.50 1.94 0.00 2.00 0.44 0.00 0.00 14.75 3.50 1.94 0.00 2.25 0.54 0.01 0.23 15.00 3.50 1.94 0.00 2.50 0.67 0.04 1.12 15.25 3.50 1.94 0.00 2.75 1.19 0.24 3.82 15.50 3.50 1.94 0.00 3.00 2.56 1.16 27.74 15.75 3.50 1.94 0.00 3.25 2.77 1.33 69.98 16.00 3.50 1.94 0.00 3.50 2.91 1.44 41.60 16.25 3.50 1.94 0.00 3.75 3.01 1.53 21.76 16.50 3.50 1.94 0.00 4.00 3.10 1.60 13.34 16.75 3.50 1.94 0.00 4.25 3.17 1.66 9.74 17.00 3.50 1.94 0.00 4.50 3.23 1.71 7.81 17.25 3.50 1.94 0.00 4.75 3.29 1.75 6.69 17.50 3.50 1.94 0.00 5.00 3.33 1.80 5.88 17.75 3.50 1.94 0.00 5.25 3.38 1.83 5.23 18.00 3.50 1.94 0.00 5.50 3.42 1.87 4.77 18.25 3.50 1.94 0.00 5.75 3.46 1.90 4.48 18.50 3.50 1.94 0.00 6.00 3.50 1.94 4.25 18.75 3.50 1.94 0.00 6.25 3.50 1.94 3.48 19.00 3.50 1.94 0.00 6.50 3.50 1.94 1.36 19.25 3.50 1.94 0.00 6.75 3.50 1.94 0.39 19.50 3.50 1.94 0.00 7.00 3.50 1.94 0.11 19.75 3.50 1.94 0.00 7.25 3.50 1.94 0.03 20.00 3.50 1.94 0.00 7.50 3.50 1.94 0.00 7.75 3.50 1.94 0.00 8.00 3.50 1.94 0.00 8.25 3.50 1.94 0.00 8.50 3.50 1.94 0.00 8.75 3.50 1.94 0.00 9.00 3.50 1.94 0.00 9.25 3.50 1.94 0.00 9.50 3.50 1.94 0.00 9.75 3.50 1.94 0.00 10.00 3.50 1.94 0.00 10.25 3.50 1.94 0.00 10.50 3.50 1.94 0.00 10.75 3.50 1.94 0.00 11.00 3.50 1.94 0.00 11.25 3.50 1.94 0.00 11.50 3.50 1.94 0.00 11.75 3.50 1.94 0.00 12.00 3.50 1.94 0.00 12.25 3.50 1.94 0.00 12.50 3.50 1.94 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 3S: WET POND A POST Runoff = 116.74 cfs @ 3.09 hrs, Volume= 5.672 af, Depth= 2.27" Routed to Pond 12P : WET POND A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.50" Area (ac) CN Description * 30.000 88 RESIDENTIAL: 49% BUA 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, STORM SYSTEM ANALYSIS Subcatchment 3S: WET POND A POST Hydrograph -1- rt - r - 1- - T I T - - -I - 130 El Runoff 125- - 120-' - -I- 1116.74 cfs 1- I- 4 - 4 - I- -I - 4 - 4 -I- 4 - 4 - I- -I - 4 - I- -1 115_' - 1 T 1- T T 1 1 T T 1 T T Typert l F 110_' -I I I 1 1 1 1 1 1 1 I 1 1 105= v-uori 95_/ /- - T - - -I - T - 1 113 mar rifall 3'.50"- 90_' 85_' -I_ _ I_ J _ L - I- _I _ 1 - L _I_ H _ L _ I- _I _ 1 - I_ _I 80 ' —I- + J - 1 H + 1 -1 - + + -1-Runoff Area-30A000- ac- • 75=' � - - • 70; T - 1- � - T T T � 1- -1 T - - 7 - - - uP0f# b9 IHm 2 00. O 60',' - -I- 4 I + I 4 I -[ Ruribff-'Datith=2.27.'_ • 55_ — -I T - I 4T T 1 I T T I T1 T I -I T I 50 - - - 45 ' -1A L 1 L L I JTc16.31mIn 401 -I- 4 H - + - I- -I - - -I- - - I- -I - + - 1-11 351/ - T 0— I— T I T T I T I T Imo' ' 251/ — I I I L I_ J 1 I - - 20=' 4- -I + - H T I t 1- I t I - + I -I - - 15 T -1- I I T I I T I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 23 Hydrograph for Subcatchment 3S: WET POND A POST Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.50 2.27 0.00 0.25 0.04 0.00 0.00 13.00 3.50 2.27 0.00 0.50 0.08 0.00 0.00 13.25 3.50 2.27 0.00 0.75 0.12 0.00 0.00 13.50 3.50 2.27 0.00 1.00 0.17 0.00 0.00 13.75 3.50 2.27 0.00 1.25 0.22 0.00 0.00 14.00 3.50 2.27 0.00 1.50 0.28 0.00 0.00 14.25 3.50 2.27 0.00 1.75 0.35 0.00 0.21 14.50 3.50 2.27 0.00 2.00 0.44 0.02 1.04 14.75 3.50 2.27 0.00 2.25 0.54 0.04 2.30 15.00 3.50 2.27 0.00 2.50 0.67 0.09 4.41 15.25 3.50 2.27 0.00 2.75 1.19 0.37 15.06 15.50 3.50 2.27 0.00 3.00 2.56 1.43 92.36 15.75 3.50 2.27 0.00 3.25 2.77 1.62 61.88 16.00 3.50 2.27 0.00 3.50 2.91 1.74 22.70 16.25 3.50 2.27 0.00 3.75 3.01 1.83 12.93 16.50 3.50 2.27 0.00 4.00 3.10 1.90 9.97 16.75 3.50 2.27 0.00 4.25 3.17 1.97 8.33 17.00 3.50 2.27 0.00 4.50 3.23 2.02 7.28 17.25 3.50 2.27 0.00 4.75 3.29 2.07 6.40 17.50 3.50 2.27 0.00 5.00 3.33 2.12 5.69 17.75 3.50 2.27 0.00 5.25 3.38 2.16 5.10 18.00 3.50 2.27 0.00 5.50 3.42 2.20 4.80 18.25 3.50 2.27 0.00 5.75 3.46 2.23 4.56 18.50 3.50 2.27 0.00 6.00 3.50 2.27 4.33 18.75 3.50 2.27 0.00 6.25 3.50 2.27 1.80 19.00 3.50 2.27 0.00 6.50 3.50 2.27 0.18 19.25 3.50 2.27 0.00 6.75 3.50 2.27 0.01 19.50 3.50 2.27 0.00 7.00 3.50 2.27 0.00 19.75 3.50 2.27 0.00 7.25 3.50 2.27 0.00 20.00 3.50 2.27 0.00 7.50 3.50 2.27 0.00 7.75 3.50 2.27 0.00 8.00 3.50 2.27 0.00 8.25 3.50 2.27 0.00 8.50 3.50 2.27 0.00 8.75 3.50 2.27 0.00 9.00 3.50 2.27 0.00 9.25 3.50 2.27 0.00 9.50 3.50 2.27 0.00 9.75 3.50 2.27 0.00 10.00 3.50 2.27 0.00 10.25 3.50 2.27 0.00 10.50 3.50 2.27 0.00 10.75 3.50 2.27 0.00 11.00 3.50 2.27 0.00 11.25 3.50 2.27 0.00 11.50 3.50 2.27 0.00 11.75 3.50 2.27 0.00 12.00 3.50 2.27 0.00 12.25 3.50 2.27 0.00 12.50 3.50 2.27 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 13S: BYPASS BUA Runoff = 4.61 cfs @ 2.95 hrs, Volume= 0.177 af, Depth= 3.27" Routed to Pond 14P : TOTAL RUNOFF Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.50" Area (ac) CN Description * 0.650 98 BYPASS BUA 0.650 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: BYPASS BUA Hydrograph / 5I ❑Runoff 1 I4.61ccfsl 1 1 1 1 1 1 . .HrIi I I i I I_ _L _ H _1 _ _[ _ H _ H i 1 I I_ _L _ H _1 1 I_ _ HType II 4- I I I I 1 I I I 1 16-hr ' ' ' ' 10-Yearr Rainfal'I=31.50" Runoff Area=01t650 ae - in 3 I I 1 1 Ounoff VVolnme=0.1'7 of 2 _ ' I I I Run�2ff'Dep1h=3.27" _ 1 1 I I I I 1 Tc=5.01 m i n = I ' 1 II cN=98 1� 11 11 I 1 1 1 1 1 _ � A 1 1 1 1' '� /�j �1 �1 1 1 �1 1 1 11 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 25 Hydrograph for Subcatchment 13S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.50 3.27 0.00 0.25 0.04 0.00 0.00 13.00 3.50 3.27 0.00 0.50 0.08 0.01 0.02 13.25 3.50 3.27 0.00 0.75 0.12 0.02 0.05 13.50 3.50 3.27 0.00 1.00 0.17 0.05 0.07 13.75 3.50 3.27 0.00 1.25 0.22 0.08 0.10 14.00 3.50 3.27 0.00 1.50 0.28 0.13 0.13 14.25 3.50 3.27 0.00 1.75 0.35 0.19 0.16 14.50 3.50 3.27 0.00 2.00 0.44 0.26 0.20 14.75 3.50 3.27 0.00 2.25 0.54 0.35 0.26 15.00 3.50 3.27 0.00 2.50 0.67 0.48 0.34 15.25 3.50 3.27 0.00 2.75 1.19 0.97 1.66 15.50 3.50 3.27 0.00 3.00 2.56 2.33 3.85 15.75 3.50 3.27 0.00 3.25 2.77 2.54 0.52 16.00 3.50 3.27 0.00 3.50 2.91 2.68 0.34 16.25 3.50 3.27 0.00 3.75 3.01 2.78 0.25 16.50 3.50 3.27 0.00 4.00 3.10 2.86 0.21 16.75 3.50 3.27 0.00 4.25 3.17 2.94 0.18 17.00 3.50 3.27 0.00 4.50 3.23 3.00 0.16 17.25 3.50 3.27 0.00 4.75 3.29 3.05 0.14 17.50 3.50 3.27 0.00 5.00 3.33 3.10 0.12 17.75 3.50 3.27 0.00 5.25 3.38 3.15 0.12 18.00 3.50 3.27 0.00 5.50 3.42 3.19 0.11 18.25 3.50 3.27 0.00 5.75 3.46 3.23 0.10 18.50 3.50 3.27 0.00 6.00 3.50 3.27 0.10 18.75 3.50 3.27 0.00 6.25 3.50 3.27 0.00 19.00 3.50 3.27 0.00 6.50 3.50 3.27 0.00 19.25 3.50 3.27 0.00 6.75 3.50 3.27 0.00 19.50 3.50 3.27 0.00 7.00 3.50 3.27 0.00 19.75 3.50 3.27 0.00 7.25 3.50 3.27 0.00 20.00 3.50 3.27 0.00 7.50 3.50 3.27 0.00 7.75 3.50 3.27 0.00 8.00 3.50 3.27 0.00 8.25 3.50 3.27 0.00 8.50 3.50 3.27 0.00 8.75 3.50 3.27 0.00 9.00 3.50 3.27 0.00 9.25 3.50 3.27 0.00 9.50 3.50 3.27 0.00 9.75 3.50 3.27 0.00 10.00 3.50 3.27 0.00 10.25 3.50 3.27 0.00 10.50 3.50 3.27 0.00 10.75 3.50 3.27 0.00 11.00 3.50 3.27 0.00 11.25 3.50 3.27 0.00 11.50 3.50 3.27 0.00 11.75 3.50 3.27 0.00 12.00 3.50 3.27 0.00 12.25 3.50 3.27 0.00 12.50 3.50 3.27 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 26 Summary for Pond 12P: WET POND A Inflow Area = 30.000 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-Year event Inflow = 116.74 cfs @ 3.09 hrs, Volume= 5.672 af Outflow = 54.15 cfs @ 3.28 hrs, Volume= 4.714 af, Atten= 54%, Lag= 11.5 min Primary = 54.15 cfs @ 3.28 hrs, Volume= 4.714 af Routed to Pond 14P : TOTAL RUNOFF Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 14P : TOTAL RUNOFF Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 558.45'@ 3.28 hrs Surf.Area= 46,436 sf Storage= 118,359 cf Plug-Flow detention time= 121.5 min calculated for 4.703 af(83% of inflow) Center-of-Mass det. time= 104.2 min ( 314.6 - 210.4 ) Volume Invert Avail.Storage Storage Description #1 555.50' 221,432 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 24,364 0 0 556.00 37,708 15,518 15,518 557.00 41,207 39,458 54,976 558.00 44,802 43,005 97,980 559.00 48,459 46,631 144,611 560.00 52,124 50,292 194,902 560.50 53,994 26,530 221,432 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round Culvert L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00'/ 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Vert. 4" WO Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 559.00' 20.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 557.00' 24.0" W x 6.0" H Vert. WEIR C= 0.600 Limited to weir flow at low heads DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 27 Primary OutFlow Max=53.76 cfs @ 3.28 hrs HW=558.44' TW=0.00' (Dynamic Tailwater) Lam=Culvert (Passes 53.76 cfs of 89.67 cfs potential flow) —2=4" WQ Orifice (Orifice Controls 0.70 cfs @ 8.02 fps) —3=Top of OS (Weir Controls 47.81 cfs @ 3.17 fps) —5=WEIR (Orifice Controls 5.25 cfs @ 5.25 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=555.50' TW=0.00' (Dynamic Tailwater) 4-4=Emergency Spillway ( Controls 0.00 cfs) Pond 12P: WET POND A Hydrograph - r 1 - r -1 - r -1 - r -1 - r -1 - r -1 - r -1 - r - Z _ _ L L _ L -1 - L _I - L -I - L _I - L _I - L _I - L _ ■Inflow 1 11s.7a cfs I p�I ' �-(}� ■Outflow inf�-oWATea- O1O* aC ■Primary130 L❑Secondary 120 / / - - 7 - 7 -I - 7�learcEIeli�35�451 _ - 1 - i- -I - I- -1 - I- -1 - 1- -I - 1- -I - 110i/ I I Storalaei1188359 of 1001/ / / 1 1 1 1 1 1 1 1 / / _ _ 90i/ / / 1 1 1 1 1 1 ' ' 80� / / / /1_ _ - }- H1 - - -1 - - -1 - i- - N = / / _ _ 1 1 1 15 70L/ / / 54.15 cfs / / _ 54.15 cfs 0 60L/ / / V I I I I 50� / / _ -I - r -1 — r - - r -1 — r - / / L _ _ -1 - L -1 - L - - L -1 - L _ 401 / 1 1 1 1 1 1 1 1 1 1 _ / / 30i / / I I I/ 20z ������������� ��� ���������������������������������������������� / 10 ',/ 00 (Y . ������r . >/���� / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 28 Hydrograph for Pond 12P: WET POND A Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 0.50 0.00 0 555.50 0.00 0.00 0.00 1.00 0.00 0 555.50 0.00 0.00 0.00 1.50 0.00 0 555.50 0.00 0.00 0.00 2.00 1.04 584 555.52 0.00 0.00 0.00 2.50 4.41 4,958 555.68 0.07 0.07 0.00 3.00 92.36 51,549 556.92 0.47 0.47 0.00 3.50 22.70 108,218 558.23 37.81 37.81 0.00 4.00 9.97 91,010 557.84 14.83 14.83 0.00 4.50 7.28 85,507 557.72 9.20 9.20 0.00 5.00 5.69 82,834 557.66 6.87 6.87 0.00 5.50 4.80 81,073 557.62 5.53 5.53 0.00 6.00 4.33 80,037 557.59 4.81 4.81 0.00 6.50 0.18 76,506 557.51 2.97 2.97 0.00 7.00 0.00 71,987 557.41 2.21 2.21 0.00 7.50 0.00 68,474 557.32 1.72 1.72 0.00 8.00 0.00 65,711 557.26 1.37 1.37 0.00 8.50 0.00 63,486 557.20 1.12 1.12 0.00 9.00 0.00 61,655 557.16 0.93 0.93 0.00 9.50 0.00 60,116 557.12 0.79 0.79 0.00 10.00 0.00 58,798 557.09 0.68 0.68 0.00 10.50 0.00 57,645 557.06 0.60 0.60 0.00 11.00 0.00 56,617 557.04 0.54 0.54 0.00 11.50 0.00 55,678 557.02 0.50 0.50 0.00 12.00 0.00 54,795 557.00 0.48 0.48 0.00 12.50 0.00 53,926 556.97 0.48 0.48 0.00 13.00 0.00 53,065 556.95 0.48 0.48 0.00 13.50 0.00 52,211 556.93 0.47 0.47 0.00 14.00 0.00 51,363 556.91 0.47 0.47 0.00 14.50 0.00 50,522 556.89 0.47 0.47 0.00 15.00 0.00 49,689 556.87 0.46 0.46 0.00 15.50 0.00 48,862 556.85 0.46 0.46 0.00 16.00 0.00 48,043 556.83 0.45 0.45 0.00 16.50 0.00 47,231 556.81 0.45 0.45 0.00 17.00 0.00 46,425 556.79 0.45 0.45 0.00 17.50 0.00 45,627 556.77 0.44 0.44 0.00 18.00 0.00 44,836 556.75 0.44 0.44 0.00 18.50 0.00 44,051 556.73 0.43 0.43 0.00 19.00 0.00 43,274 556.71 0.43 0.43 0.00 19.50 0.00 42,504 556.69 0.43 0.43 0.00 20.00 0.00 41,742 556.67 0.42 0.42 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 29 Stage-Discharge for Pond 12P: WET POND A Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.05 26.28 26.28 0.00 555.55 0.01 0.01 0.00 558.10 29.39 29.39 0.00 555.60 0.02 0.02 0.00 558.15 32.63 32.63 0.00 555.65 0.05 0.05 0.00 558.20 35.99 35.99 0.00 555.70 0.08 0.08 0.00 558.25 39.46 39.46 0.00 555.75 0.12 0.12 0.00 558.30 43.04 43.04 0.00 555.80 0.15 0.15 0.00 558.35 46.73 46.73 0.00 555.85 0.18 0.18 0.00 558.40 50.52 50.52 0.00 555.90 0.20 0.20 0.00 558.45 54.41 54.41 0.00 555.95 0.22 0.22 0.00 558.50 58.40 58.40 0.00 556.00 0.24 0.24 0.00 558.55 62.49 62.49 0.00 556.05 0.26 0.26 0.00 558.60 66.67 66.67 0.00 556.10 0.28 0.28 0.00 558.65 70.94 70.94 0.00 556.15 0.29 0.29 0.00 558.70 75.30 75.30 0.00 556.20 0.31 0.31 0.00 558.75 79.75 79.75 0.00 556.25 0.32 0.32 0.00 558.80 84.28 84.28 0.00 556.30 0.33 0.33 0.00 558.85 88.90 88.90 0.00 556.35 0.35 0.35 0.00 558.90 92.59 92.59 0.00 556.40 0.36 0.36 0.00 558.95 92.90 92.90 0.00 556.45 0.37 0.37 0.00 559.00 93.21 93.21 0.00 556.50 0.38 0.38 0.00 559.05 94.08 93.52 0.56 556.55 0.39 0.39 0.00 559.10 95.40 93.83 1.57 556.60 0.41 0.41 0.00 559.15 97.03 94.14 2.89 556.65 0.42 0.42 0.00 559.20 98.90 94.44 4.45 556.70 0.43 0.43 0.00 559.25 101.02 94.75 6.27 556.75 0.44 0.44 0.00 559.30 103.35 95.05 8.30 556.80 0.45 0.45 0.00 559.35 105.89 95.36 10.53 556.85 0.46 0.46 0.00 559.40 108.61 95.66 12.95 556.90 0.47 0.47 0.00 559.45 111.63 95.96 15.67 556.95 0.48 0.48 0.00 559.50 114.86 96.27 18.60 557.00 0.49 0.49 0.00 559.55 118.31 96.57 21.74 557.05 0.57 0.57 0.00 559.60 121.96 96.87 25.10 557.10 0.71 0.71 0.00 559.65 125.44 97.16 28.27 557.15 0.88 0.88 0.00 559.70 129.03 97.46 31.57 557.20 1.09 1.09 0.00 559.75 132.73 97.76 34.98 557.25 1.33 1.33 0.00 559.80 136.55 98.05 38.50 557.30 1.59 1.59 0.00 559.85 140.47 98.35 42.12 557.35 1.87 1.87 0.00 559.90 144.49 98.64 45.85 557.40 2.18 2.18 0.00 559.95 148.61 98.94 49.68 557.45 2.50 2.50 0.00 560.00 152.83 99.23 53.60 557.50 2.84 2.84 0.00 560.05 157.24 99.52 57.72 557.55 3.71 3.71 0.00 560.10 161.76 99.81 61.95 557.60 5.02 5.02 0.00 560.15 166.39 100.10 66.29 557.65 6.62 6.62 0.00 560.20 171.11 100.39 70.72 557.70 8.46 8.46 0.00 560.25 175.73 100.68 75.05 557.75 10.51 10.51 0.00 560.30 180.41 100.96 79.45 557.80 12.75 12.75 0.00 560.35 185.17 101.25 83.92 557.85 15.16 15.16 0.00 560.40 189.99 101.54 88.46 557.90 17.72 17.72 0.00 560.45 194.80 101.82 92.98 557.95 20.44 20.44 0.00 560.50 199.66 102.11 97.55 558.00 23.29 23.29 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 30 Stage-Area-Storage for Pond 12P: WET POND A Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 24,364 0 558.05 44,985 100,225 555.55 25,698 1,252 558.10 45,168 102,478 555.60 27,033 2,570 558.15 45,351 104,741 555.65 28,367 3,955 558.20 45,533 107,014 555.70 29,702 5,407 558.25 45,716 109,295 555.75 31,036 6,925 558.30 45,899 111,585 555.80 32,370 8,510 558.35 46,082 113,885 555.85 33,705 10,162 558.40 46,265 116,193 555.90 35,039 11,881 558.45 46,448 118,511 555.95 36,374 13,666 558.50 46,631 120,838 556.00 37,708 15,518 558.55 46,813 123,174 556.05 37,883 17,408 558.60 46,996 125,519 556.10 38,058 19,306 558.65 47,179 127,874 556.15 38,233 21,214 558.70 47,362 130,237 556.20 38,408 23,130 558.75 47,545 132,610 556.25 38,583 25,054 558.80 47,728 134,992 556.30 38,758 26,988 558.85 47,910 137,383 556.35 38,933 28,930 558.90 48,093 139,783 556.40 39,108 30,881 558.95 48,276 142,192 556.45 39,283 32,841 559.00 48,459 144,611 556.50 39,458 34,809 559.05 48,642 147,038 556.55 39,632 36,787 559.10 48,826 149,475 556.60 39,807 38,773 559.15 49,009 151,921 556.65 39,982 40,767 559.20 49,192 154,376 556.70 40,157 42,771 559.25 49,375 156,840 556.75 40,332 44,783 559.30 49,558 159,313 556.80 40,507 46,804 559.35 49,742 161,796 556.85 40,682 48,834 559.40 49,925 164,287 556.90 40,857 50,872 559.45 50,108 166,788 556.95 41,032 52,920 559.50 50,292 169,298 557.00 41,207 54,976 559.55 50,475 171,817 557.05 41,387 57,040 559.60 50,658 174,346 557.10 41,567 59,114 559.65 50,841 176,883 557.15 41,746 61,197 559.70 51,025 179,430 557.20 41,926 63,289 559.75 51,208 181,986 557.25 42,106 65,390 559.80 51,391 184,550 557.30 42,285 67,499 559.85 51,574 187,125 557.35 42,465 69,618 559.90 51,757 189,708 557.40 42,645 71,746 559.95 51,941 192,300 557.45 42,825 73,883 560.00 52,124 194,902 557.50 43,005 76,028 560.05 52,311 197,513 557.55 43,184 78,183 560.10 52,498 200,133 557.60 43,364 80,347 560.15 52,685 202,763 557.65 43,544 82,519 560.20 52,872 205,402 557.70 43,724 84,701 ' 560.25 53,059 208,050 557.75 43,903 86,892 560.30 53,246 210,707 557.80 44,083 89,091 560.35 53,433 213,374 557.85 44,263 91,300 560.40 53,620 216,051 557.90 44,442 93,518 560.45 53,807 218,736 557.95 44,622 95,744 560.50 53,994 221,432 558.00 44,802 97,980 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 31 Summary for Pond 14P: TOTAL RUNOFF Inflow Area = 30.650 ac, 2.12% Impervious, Inflow Depth > 1.92" for 10-Year event Inflow = 54.65 cfs @ 3.28 hrs, Volume= 4.891 af Primary = 54.65 cfs @ 3.28 hrs, Volume= 4.891 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 14P: TOTAL RUNOFF Hydrograph /- -I - T - I- - - -I -I I I ■Inflow 60-v -1- 54.65 cfs I MI /h`w,I a p'I Iq�A /M� 0 Primary 55„ / ,_ -I �54.55 cfs -1 - _L - I- -I T - - inflow Are-=30.650-ac- - / I 1 1 1 1 1 1 1 1 1 501v /- I I I 1 1 I I 1 I I / 45 -' /- 1 1 - I- -I - 1 - - -1 - 1 - - - - 1 - 1- _ - / I I I I I I I I I I I I 40iv /- 7 1 1 T 1 T 1 T 1 - / I I I 1 1 I 1 1 o 35_ 0 I I 1 1 1 1 3 30 -/ I T T T IT T T T T T T 251v /- : / 1 I I I 1 1 1 1 20 -' fi rt I I T 1 T 1- - 15 -/ I 1 1 1 1 1 10-v z I � T 1- T - / ��Ij 5]1. ,,, z 4e, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 10-Year Rainfall=3.50" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 32 Hydrograph for Pond 14P: TOTAL RUNOFF Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.48 0.48 0.25 0.00 0.00 13.00 0.48 0.48 0.50 0.02 0.02 13.25 0.47 0.47 0.75 0.05 0.05 13.50 0.47 0.47 1.00 0.07 0.07 13.75 0.47 0.47 1.25 0.10 0.10 14.00 0.47 0.47 1.50 0.13 0.13 I 14.25 0.47 0.47 1.75 0.16 0.16 14.50 0.47 0.47 2.00 0.20 0.20 14.75 0.46 0.46 2.25 0.28 0.28 15.00 0.46 0.46 2.50 0.41 0.41 15.25 0.46 0.46 2.75 1.86 1.86 15.50 0.46 0.46 3.00 4.32 4.32 15.75 0.46 0.46 3.25 54.12 54.12 16.00 0.45 0.45 3.50 38.15 38.15 16.25 0.45 0.45 3.75 22.54 22.54 16.50 0.45 0.45 4.00 15.04 15.04 16.75 0.45 0.45 4.25 11.42 11.42 17.00 0.45 0.45 4.50 9.36 9.36 17.25 0.44 0.44 4.75 8.00 8.00 17.50 0.44 0.44 5.00 7.00 7.00 17.75 0.44 0.44 5.25 6.21 6.21 18.00 0.44 0.44 5.50 5.64 5.64 18.25 0.44 0.44 5.75 5.23 5.23 18.50 0.43 0.43 6.00 4.91 4.91 18.75 0.43 0.43 6.25 4.19 4.19 19.00 0.43 0.43 6.50 2.97 2.97 19.25 0.43 0.43 6.75 2.54 2.54 19.50 0.43 0.43 7.00 2.21 2.21 , 19.75 0.42 0.42 7.25 1.94 1.94 20.00 0.42 0.42 7.50 1.72 1.72 7.75 1.53 1.53 8.00 1.37 1.37 8.25 1.23 1.23 8.50 1.12 1.12 8.75 1.02 1.02 9.00 0.93 0.93 9.25 0.85 0.85 9.50 0.79 0.79 9.75 0.73 0.73 10.00 0.68 0.68 10.25 0.64 0.64 10.50 0.60 0.60 10.75 0.57 0.57 11.00 0.54 0.54 11.25 0.52 0.52 11.50 0.50 0.50 11.75 0.49 0.49 12.00 0.48 0.48 12.25 0.48 0.48 12.50 0.48 0.48 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 33 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment2S: WET POND A PRE DEV Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=2.55" Flow Length=2,918' Tc=29.5 min CN=84 Runoff=92.34 cfs 6.370 af Subcatchment3S: WET POND A POST Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=2.92" Tc=16.3 min CN=88 Runoff=148.85 cfs 7.288 af Subcatchmentl3S: BYPASS BUA Runoff Area=0.650 ac 100.00% Impervious Runoff Depth=3.96" Tc=5.0 min CN=98 Runoff=5.55 cfs 0.215 af Pond 12P: WET POND A Peak Elev=558.83' Storage=136,376 cf Inflow=148.85 cfs 7.288 af Primary=86.94 cfs 6.327 af Secondary=0.00 cfs 0.000 af Outflow=86.94 cfs 6.327 af Pond 14P: TOTAL RUNOFF Inflow=87.59 cfs 6.542 af Primary=87.59 cfs 6.542 af Total Runoff Area = 60.650 ac Runoff Volume = 13.873 af Average Runoff Depth = 2.74" 98.93% Pervious = 60.000 ac 1.07% Impervious = 0.650 ac DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 2S: WET POND A PRE DEV Runoff = 92.34 cfs @ 3.24 hrs, Volume= 6.370 af, Depth= 2.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.20" Area (ac) CN Description 30.000 84 Pasture/grassland/range, Fair, HSG D 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.7 239 0.0580 0.23 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.58" 8.7 1,095 0.0170 2.10 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 1,584 0.0138 8.61 232.48 Channel Flow, CHANNEL FLOW Area= 27.0 sf Perim= 15.0' r= 1.80' n= 0.030 Earth, grassed & winding 29.5 2,918 Total Subcatchment 2S: WET POND A PRE DEV Hydrograph I I I I I I I I I 100=_' , I_ I I I I I I I I I I I I I I I I I ❑Runoff 95= I 92 34 cfs L I I 1 L I L I J L L I 1 I — L — I— —I — 1 — L —I— J — L — I— —I — L — 1LTylp_e111 — -1 — I— —I — 4 — —I— — —I 1- — I— —1�'.r 80 - I -1 I I 4 I C I I 75 + 1 1 4 125 eai'Rainfall=4.20"- 70= - H — + — I— —I — 4 — —I— — — I— I —I — - 65 , H L I fi "I-Runoff Ar-ea-30MOG ac- .7., 60 — 55; - T - 1- -1 - - upoff Vplume= 3 00 �f 3 50 - • RUnOffDe th=2.55 - o - T - 1 -1 T -I- m LL 45_ � I I I I I I I I I I I I � I I I 40'� — 7 I I I I Flow Length 2 7 9f8' 35_ — 30i-/ 1— 1 1 1 1 1 1 1 1 ITGL2 .5I mtn 153 I 1 I I I I -CI 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 35 Hydrograph for Subcatchment 2S: WET POND A PRE DEV Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.20 2.55 0.00 0.25 0.05 0.00 0.00 13.00 4.20 2.55 0.00 0.50 0.10 0.00 0.00 13.25 4.20 2.55 0.00 0.75 0.15 0.00 0.00 13.50 4.20 2.55 0.00 1.00 0.20 0.00 0.00 13.75 4.20 2.55 0.00 1.25 0.27 0.00 0.00 14.00 4.20 2.55 0.00 1.50 0.34 0.00 0.00 14.25 4.20 2.55 0.00 1.75 0.42 0.00 0.00 14.50 4.20 2.55 0.00 2.00 0.52 0.01 0.17 14.75 4.20 2.55 0.00 2.25 0.65 0.03 0.92 15.00 4.20 2.55 0.00 2.50 0.81 0.08 2.42 15.25 4.20 2.55 0.00 2.75 1.43 0.37 6.37 15.50 4.20 2.55 0.00 3.00 3.07 1.57 38.85 15.75 4.20 2.55 0.00 3.25 3.32 1.79 92.31 16.00 4.20 2.55 0.00 3.50 3.50 1.93 53.92 16.25 4.20 2.55 0.00 3.75 3.62 2.04 27.86 16.50 4.20 2.55 0.00 4.00 3.72 2.12 16.92 16.75 4.20 2.55 0.00 4.25 3.80 2.20 12.28 17.00 4.20 2.55 0.00 4.50 3.88 2.26 9.81 17.25 4.20 2.55 0.00 4.75 3.94 2.32 8.38 17.50 4.20 2.55 0.00 5.00 4.00 2.37 7.37 17.75 4.20 2.55 0.00 5.25 4.05 2.42 6.54 18.00 4.20 2.55 0.00 5.50 4.11 2.46 5.95 18.25 4.20 2.55 0.00 5.75 4.15 2.51 5.59 18.50 4.20 2.55 0.00 6.00 4.20 2.55 5.30 18.75 4.20 2.55 0.00 6.25 4.20 2.55 4.33 19.00 4.20 2.55 0.00 6.50 4.20 2.55 1.70 19.25 4.20 2.55 0.00 6.75 4.20 2.55 0.48 19.50 4.20 2.55 0.00 7.00 4.20 2.55 0.13 19.75 4.20 2.55 0.00 7.25 4.20 2.55 0.03 20.00 4.20 2.55 0.00 7.50 4.20 2.55 0.01 7.75 4.20 2.55 0.00 8.00 4.20 2.55 0.00 8.25 4.20 2.55 0.00 8.50 4.20 2.55 0.00 8.75 4.20 2.55 0.00 9.00 4.20 2.55 0.00 9.25 4.20 2.55 0.00 9.50 4.20 2.55 0.00 9.75 4.20 2.55 0.00 10.00 4.20 2.55 0.00 10.25 4.20 2.55 0.00 10.50 4.20 2.55 0.00 10.75 4.20 2.55 0.00 11.00 4.20 2.55 0.00 11.25 4.20 2.55 0.00 11.50 4.20 2.55 0.00 11.75 4.20 2.55 0.00 12.00 4.20 2.55 0.00 12.25 4.20 2.55 0.00 12.50 4.20 2.55 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 3S: WET POND A POST Runoff = 148.85 cfs @ 3.08 hrs, Volume= 7.288 af, Depth= 2.92" Routed to Pond 12P : WET POND A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.20" Area (ac) CN Description * 30.000 88 RESIDENTIAL: 49% BUA 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, STORM SYSTEM ANALYSIS Subcatchment 3S: WET POND A POST Hydrog rap h 1 1 1 1 1 1 160e/ I I I I I I I 1 1 ❑Runoff 148.85 cfs I I I T 1504-/ H t I- -1 - rt -1- -i - t- I -1 fi 1 yI I I- 140� - - H - + - 1- -I - + - + -I- + - + - 1- -I - + - I- -1 - 1 - 130( I J + II1LI + Iy �A1,,� L + 16hr 1201 -1- I I I I I I I I 25 Yeal-RairifaII=4.20" 1101 I 1 1 1 I I 1 1 1 1 1 1 1 1 1 1001 -I- 1 unof`f Araa�-30L000- ac y 1u iof; >f/plump 408 v 901 _c 80 -1 + - I- + + - I -I - + + -I- + RUl?of1 De'ptlt=2-92"- u 701 -I- _ _ _ II I - I1 - I 601 -1 1 1 I I 1 I I 1 1 ITc1 6.31 mile 40� -I I ' 111 40 30� 1— -1 — -r - 1- - 1- -1 - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 37 Hydrograph for Subcatchment 3S: WET POND A POST Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.20 2.92 0.00 0.25 0.05 0.00 0.00 13.00 4.20 2.92 0.00 0.50 0.10 0.00 0.00 13.25 4.20 2.92 0.00 0.75 0.15 0.00 0.00 13.50 4.20 2.92 0.00 1.00 0.20 0.00 0.00 13.75 4.20 2.92 0.00 1.25 0.27 0.00 0.00 14.00 4.20 2.92 0.00 1.50 0.34 0.00 0.11 14.25 4.20 2.92 0.00 1.75 0.42 0.02 0.90 14.50 4.20 2.92 0.00 2.00 0.52 0.04 2.14 14.75 4.20 2.92 0.00 2.25 0.65 0.08 3.88 15.00 4.20 2.92 0.00 2.50 0.81 0.15 6.74 15.25 4.20 2.92 0.00 2.75 1.43 0.53 21.22 15.50 4.20 2.92 0.00 3.00 3.07 1.88 119.60 15.75 4.20 2.92 0.00 3.25 3.32 2.11 77.98 16.00 4.20 2.92 0.00 3.50 3.50 2.26 28.27 16.25 4.20 2.92 0.00 3.75 3.62 2.37 16.02 16.50 4.20 2.92 0.00 4.00 3.72 2.47 12.33 16.75 4.20 2.92 0.00 4.25 3.80 2.54 10.28 17.00 4.20 2.92 0.00 4.50 3.88 2.61 8.98 17.25 4.20 2.92 0.00 4.75 3.94 2.68 7.89 17.50 4.20 2.92 0.00 5.00 4.00 2.73 7.01 17.75 4.20 2.92 0.00 5.25 4.05 2.78 6.28 18.00 4.20 2.92 0.00 5.50 4.11 2.83 5.91 18.25 4.20 2.92 0.00 5.75 4.15 2.87 5.61 18.50 4.20 2.92 0.00 6.00 4.20 2.92 5.32 18.75 4.20 2.92 0.00 6.25 4.20 2.92 2.21 19.00 4.20 2.92 0.00 6.50 4.20 2.92 0.23 19.25 4.20 2.92 0.00 6.75 4.20 2.92 0.02 19.50 4.20 2.92 0.00 7.00 4.20 2.92 0.00 19.75 4.20 2.92 0.00 7.25 4.20 2.92 0.00 20.00 4.20 2.92 0.00 7.50 4.20 2.92 0.00 7.75 4.20 2.92 0.00 8.00 4.20 2.92 0.00 8.25 4.20 2.92 0.00 8.50 4.20 2.92 0.00 8.75 4.20 2.92 0.00 9.00 4.20 2.92 0.00 9.25 4.20 2.92 0.00 9.50 4.20 2.92 0.00 9.75 4.20 2.92 0.00 10.00 4.20 2.92 0.00 10.25 4.20 2.92 0.00 10.50 4.20 2.92 0.00 10.75 4.20 2.92 0.00 11.00 4.20 2.92 0.00 11.25 4.20 2.92 0.00 11.50 4.20 2.92 0.00 11.75 4.20 2.92 0.00 12.00 4.20 2.92 0.00 12.25 4.20 2.92 0.00 12.50 4.20 2.92 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 13S: BYPASS BUA Runoff = 5.55 cfs @ 2.95 hrs, Volume= 0.215 af, Depth= 3.96" Routed to Pond 14P : TOTAL RUNOFF Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.20" Area (ac) CN Description * 0.650 98 BYPASS BUA 0.650 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: BYPASS BUA Hydrograph I 1 1 I I 1 1 1 1 1 1 I 1 1 I - 6� I I I I I I I I I I I I I I I I I I I ■Runoff 1 15.55 cfs I 1 I 1 1 I 1 1 I I 1 1 I 1 1 I I 1 1 I I 1 1 I I Trpe�1 I I _ 5 I _/ 1 1 I I 1 1 I 1 16-h r - 1 ,/ I I I I I I I I I I I ' IIII 11 25Yeat R'airlfal'I=4.20" - 4: 1- 1 1 1 1 I I I I I I I I I - 1 1 I I I I11 1 Runoff Area=01.650C ac y , I 1 I�u liia f-/o I I.rn 1 (� J. 2 J 1 f 0 3 I I I I I 1 1 1 1 Runoff'De'pth=3.96" u 1 1 1 1 1 1 1 1 1 1 11,, 11 1 I - t - 1 -1 - - - t - 1- -1 - t - I- -1 - C- 5.0I in - 2 / I I I CNI=9�8 I I I I I I I 1�1 v / - - + - I- I -4 - - I -1 - + - -I - -4 - -I -1 - - 1 1_ A 1 1 1 1 1 1 1 1 1 1 i . 0 - . .,/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 39 Hydrograph for Subcatchment 13S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.20 3.96 0.00 0.25 0.05 0.00 0.00 13.00 4.20 3.96 0.00 0.50 0.10 0.01 0.04 13.25 4.20 3.96 0.00 0.75 0.15 0.04 0.07 13.50 4.20 3.96 0.00 1.00 0.20 0.07 0.10 13.75 4.20 3.96 0.00 1.25 0.27 0.12 0.13 14.00 4.20 3.96 0.00 1.50 0.34 0.18 0.16 14.25 4.20 3.96 0.00 1.75 0.42 0.25 0.20 14.50 4.20 3.96 0.00 2.00 0.52 0.34 0.24 14.75 4.20 3.96 0.00 2.25 0.65 0.45 0.32 15.00 4.20 3.96 0.00 2.50 0.81 0.61 0.42 15.25 4.20 3.96 0.00 2.75 1.43 1.21 2.01 15.50 4.20 3.96 0.00 3.00 3.07 2.84 4.63 15.75 4.20 3.96 0.00 3.25 3.32 3.09 0.63 16.00 4.20 3.96 0.00 3.50 3.50 3.26 0.41 16.25 4.20 3.96 0.00 3.75 3.62 3.38 0.30 16.50 4.20 3.96 0.00 4.00 3.72 3.48 0.25 16.75 4.20 3.96 0.00 4.25 3.80 3.57 0.22 17.00 4.20 3.96 0.00 4.50 3.88 3.64 0.19 17.25 4.20 3.96 0.00 4.75 3.94 3.71 0.17 17.50 4.20 3.96 0.00 5.00 4.00 3.77 0.15 17.75 4.20 3.96 0.00 5.25 4.05 3.82 0.14 18.00 4.20 3.96 0.00 5.50 4.11 3.87 0.13 18.25 4.20 3.96 0.00 5.75 4.15 3.92 0.13 18.50 4.20 3.96 0.00 6.00 4.20 3.96 0.12 18.75 4.20 3.96 0.00 6.25 4.20 3.96 0.00 19.00 4.20 3.96 0.00 6.50 4.20 3.96 0.00 19.25 4.20 3.96 0.00 6.75 4.20 3.96 0.00 19.50 4.20 3.96 0.00 7.00 4.20 3.96 0.00 19.75 4.20 3.96 0.00 7.25 4.20 3.96 0.00 20.00 4.20 3.96 0.00 7.50 4.20 3.96 0.00 7.75 4.20 3.96 0.00 8.00 4.20 3.96 0.00 8.25 4.20 3.96 0.00 8.50 4.20 3.96 0.00 8.75 4.20 3.96 0.00 9.00 4.20 3.96 0.00 9.25 4.20 3.96 0.00 9.50 4.20 3.96 0.00 9.75 4.20 3.96 0.00 10.00 4.20 3.96 0.00 10.25 4.20 3.96 0.00 10.50 4.20 3.96 0.00 10.75 4.20 3.96 0.00 11.00 4.20 3.96 0.00 11.25 4.20 3.96 0.00 11.50 4.20 3.96 0.00 11.75 4.20 3.96 0.00 12.00 4.20 3.96 0.00 12.25 4.20 3.96 0.00 12.50 4.20 3.96 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 40 Summary for Pond 12P: WET POND A Inflow Area = 30.000 ac, 0.00% Impervious, Inflow Depth = 2.92" for 25-Year event Inflow = 148.85 cfs @ 3.08 hrs, Volume= 7.288 af Outflow = 86.94 cfs @ 3.24 hrs, Volume= 6.327 af, Atten= 42%, Lag= 9.2 min Primary = 86.94 cfs @ 3.24 hrs, Volume= 6.327 af Routed to Pond 14P : TOTAL RUNOFF Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 14P : TOTAL RUNOFF Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 558.83'@ 3.24 hrs Surf.Area= 47,834 sf Storage= 136,376 cf Plug-Flow detention time=98.4 min calculated for 6.327 af(87% of inflow) Center-of-Mass det. time=82.1 min ( 290.7 - 208.5 ) Volume Invert Avail.Storage Storage Description #1 555.50' 221,432 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 24,364 0 0 556.00 37,708 15,518 15,518 557.00 41,207 39,458 54,976 558.00 44,802 43,005 97,980 559.00 48,459 46,631 144,611 560.00 52,124 50,292 194,902 560.50 53,994 26,530 221,432 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round Culvert L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00'/ 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Vert. 4" WO Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 559.00' 20.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 557.00' 24.0" W x 6.0" H Vert. WEIR C= 0.600 Limited to weir flow at low heads DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 41 Primary OutFlow Max=86.28 cfs @ 3.24 hrs HW=558.82' TW=0.00' (Dynamic Tailwater) Lam=Culvert (Passes 86.28 cfs of 92.09 cfs potential flow) —2=4" WQ Orifice (Orifice Controls 0.75 cfs © 8.55 fps) —3=Top of OS (Weir Controls 79.50 cfs © 3.76 fps) —5=WEIR (Orifice Controls 6.03 cfs @ 6.03 fps) Secondary OutFlow Max=0.00 cfs © 0.00 hrs HW=555.50' TW=0.00' (Dynamic Tailwater) 4-4=Emergency Spillway ( Controls 0.00 cfs) Pond 12P: WET POND A Hydrograph /: I I I I I ra8secfs I- I I I I I I I I I I h ❑Inflow ❑Outflow ■Primary- - � kOWAr �_ Y�� ac � in Secondary a ry 160 / 1 1 1 1 PJeal� EIE = 58.8:3_ 150� 1 1 1 1 1 1 1 11 1 140� / / / 1 1 1 1 I gtorage136 371V cf 130� / / 1 1 1 1 1 I I I I I ' 1204-/ / • / / I I I I 110� / / 86-94 ag 1 1 1 I 1 1 1 i _ 100- i 186-94 cfs 90; / • " / 1 1 1 1 c 80� i / / ii, LI 70; • /60i! / • / / - 7 -I - 7 -I - r -I - 1- -I - 7 -I - 7 -I - 7 - 50 / • / / I- 1- - 40� / / - r 20� // / ///% �������������������������������� 207' / 7 / r,s0:0/.. ---r - „, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 42 Hydrograph for Pond 12P: WET POND A Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 0.50 0.00 0 555.50 0.00 0.00 0.00 1.00 0.00 0 555.50 0.00 0.00 0.00 1.50 0.11 21 555.50 0.00 0.00 0.00 2.00 2.14 1,767 555.57 0.01 0.01 0.00 2.50 6.74 8,992 555.81 0.16 0.16 0.00 3.00 119.60 71,720 557.40 2.17 2.17 0.00 3.50 28.27 115,866 558.39 49.98 49.98 0.00 4.00 12.33 93,752 557.91 18.00 18.00 0.00 4.50 8.98 87,492 557.76 11.11 11.11 0.00 5.00 7.01 84,534 557.70 8.32 8.32 0.00 5.50 5.91 82,601 557.65 6.69 6.69 0.00 6.00 5.32 81,496 557.63 5.84 5.84 0.00 6.50 0.23 77,428 557.53 3.34 3.34 0.00 7.00 0.00 72,657 557.42 2.31 2.31 0.00 7.50 0.00 68,994 557.34 1.79 1.79 0.00 8.00 0.00 66,124 557.27 1.42 1.42 0.00 8.50 0.00 63,822 557.21 1.15 1.15 0.00 9.00 0.00 61,934 557.17 0.96 0.96 0.00 9.50 0.00 60,353 557.13 0.81 0.81 0.00 10.00 0.00 59,002 557.10 0.70 0.70 0.00 10.50 0.00 57,825 557.07 0.61 0.61 0.00 11.00 0.00 56,779 557.04 0.55 0.55 0.00 11.50 0.00 55,828 557.02 0.51 0.51 0.00 12.00 0.00 54,939 557.00 0.49 0.49 0.00 12.50 0.00 54,069 556.98 0.48 0.48 0.00 13.00 0.00 53,206 556.96 0.48 0.48 0.00 13.50 0.00 52,351 556.94 0.47 0.47 0.00 14.00 0.00 51,502 556.92 0.47 0.47 0.00 14.50 0.00 50,660 556.89 0.47 0.47 0.00 15.00 0.00 49,826 556.87 0.46 0.46 0.00 15.50 0.00 48,998 556.85 0.46 0.46 0.00 16.00 0.00 48,177 556.83 0.45 0.45 0.00 16.50 0.00 47,364 556.81 0.45 0.45 0.00 17.00 0.00 46,557 556.79 0.45 0.45 0.00 17.50 0.00 45,758 556.77 0.44 0.44 0.00 18.00 0.00 44,965 556.75 0.44 0.44 0.00 18.50 0.00 44,180 556.74 0.43 0.43 0.00 19.00 0.00 43,402 556.72 0.43 0.43 0.00 19.50 0.00 42,631 556.70 0.43 0.43 0.00 20.00 0.00 41,867 556.68 0.42 0.42 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 43 Stage-Discharge for Pond 12P: WET POND A Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.05 26.28 26.28 0.00 555.55 0.01 0.01 0.00 558.10 29.39 29.39 0.00 555.60 0.02 0.02 0.00 558.15 32.63 32.63 0.00 555.65 0.05 0.05 0.00 558.20 35.99 35.99 0.00 555.70 0.08 0.08 0.00 558.25 39.46 39.46 0.00 555.75 0.12 0.12 0.00 558.30 43.04 43.04 0.00 555.80 0.15 0.15 0.00 558.35 46.73 46.73 0.00 555.85 0.18 0.18 0.00 558.40 50.52 50.52 0.00 555.90 0.20 0.20 0.00 558.45 54.41 54.41 0.00 555.95 0.22 0.22 0.00 558.50 58.40 58.40 0.00 556.00 0.24 0.24 0.00 558.55 62.49 62.49 0.00 556.05 0.26 0.26 0.00 558.60 66.67 66.67 0.00 556.10 0.28 0.28 0.00 558.65 70.94 70.94 0.00 556.15 0.29 0.29 0.00 558.70 75.30 75.30 0.00 556.20 0.31 0.31 0.00 558.75 79.75 79.75 0.00 556.25 0.32 0.32 0.00 558.80 84.28 84.28 0.00 556.30 0.33 0.33 0.00 558.85 88.90 88.90 0.00 556.35 0.35 0.35 0.00 558.90 92.59 92.59 0.00 556.40 0.36 0.36 0.00 558.95 92.90 92.90 0.00 556.45 0.37 0.37 0.00 559.00 93.21 93.21 0.00 556.50 0.38 0.38 0.00 559.05 94.08 93.52 0.56 556.55 0.39 0.39 0.00 559.10 95.40 93.83 1.57 556.60 0.41 0.41 0.00 559.15 97.03 94.14 2.89 556.65 0.42 0.42 0.00 559.20 98.90 94.44 4.45 556.70 0.43 0.43 0.00 559.25 101.02 94.75 6.27 556.75 0.44 0.44 0.00 559.30 103.35 95.05 8.30 556.80 0.45 0.45 0.00 559.35 105.89 95.36 10.53 556.85 0.46 0.46 0.00 559.40 108.61 95.66 12.95 556.90 0.47 0.47 0.00 559.45 111.63 95.96 15.67 556.95 0.48 0.48 0.00 559.50 114.86 96.27 18.60 557.00 0.49 0.49 0.00 559.55 118.31 96.57 21.74 557.05 0.57 0.57 0.00 559.60 121.96 96.87 25.10 557.10 0.71 0.71 0.00 559.65 125.44 97.16 28.27 557.15 0.88 0.88 0.00 559.70 129.03 97.46 31.57 557.20 1.09 1.09 0.00 559.75 132.73 97.76 34.98 557.25 1.33 1.33 0.00 559.80 136.55 98.05 38.50 557.30 1.59 1.59 0.00 559.85 140.47 98.35 42.12 557.35 1.87 1.87 0.00 559.90 144.49 98.64 45.85 557.40 2.18 2.18 0.00 559.95 148.61 98.94 49.68 557.45 2.50 2.50 0.00 560.00 152.83 99.23 53.60 557.50 2.84 2.84 0.00 560.05 157.24 99.52 57.72 557.55 3.71 3.71 0.00 560.10 161.76 99.81 61.95 557.60 5.02 5.02 0.00 560.15 166.39 100.10 66.29 557.65 6.62 6.62 0.00 560.20 171.11 100.39 70.72 557.70 8.46 8.46 0.00 560.25 175.73 100.68 75.05 557.75 10.51 10.51 0.00 560.30 180.41 100.96 79.45 557.80 12.75 12.75 0.00 560.35 185.17 101.25 83.92 557.85 15.16 15.16 0.00 560.40 189.99 101.54 88.46 557.90 17.72 17.72 0.00 560.45 194.80 101.82 92.98 557.95 20.44 20.44 0.00 560.50 199.66 102.11 97.55 558.00 23.29 23.29 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 44 Stage-Area-Storage for Pond 12P: WET POND A Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 24,364 0 558.05 44,985 100,225 555.55 25,698 1,252 558.10 45,168 102,478 555.60 27,033 2,570 558.15 45,351 104,741 555.65 28,367 3,955 558.20 45,533 107,014 555.70 29,702 5,407 558.25 45,716 109,295 555.75 31,036 6,925 558.30 45,899 111,585 555.80 32,370 8,510 558.35 46,082 113,885 555.85 33,705 10,162 558.40 46,265 116,193 555.90 35,039 11,881 558.45 46,448 118,511 555.95 36,374 13,666 558.50 46,631 120,838 556.00 37,708 15,518 558.55 46,813 123,174 556.05 37,883 17,408 558.60 46,996 125,519 556.10 38,058 19,306 558.65 47,179 127,874 556.15 38,233 21,214 558.70 47,362 130,237 556.20 38,408 23,130 558.75 47,545 132,610 556.25 38,583 25,054 558.80 47,728 134,992 556.30 38,758 26,988 558.85 47,910 137,383 556.35 38,933 28,930 558.90 48,093 139,783 556.40 39,108 30,881 558.95 48,276 142,192 556.45 39,283 32,841 559.00 48,459 144,611 556.50 39,458 34,809 559.05 48,642 147,038 556.55 39,632 36,787 559.10 48,826 149,475 556.60 39,807 38,773 559.15 49,009 151,921 556.65 39,982 40,767 559.20 49,192 154,376 556.70 40,157 42,771 559.25 49,375 156,840 556.75 40,332 44,783 559.30 49,558 159,313 556.80 40,507 46,804 559.35 49,742 161,796 556.85 40,682 48,834 559.40 49,925 164,287 556.90 40,857 50,872 559.45 50,108 166,788 556.95 41,032 52,920 559.50 50,292 169,298 557.00 41,207 54,976 559.55 50,475 171,817 557.05 41,387 57,040 559.60 50,658 174,346 557.10 41,567 59,114 559.65 50,841 176,883 557.15 41,746 61,197 559.70 51,025 179,430 557.20 41,926 63,289 559.75 51,208 181,986 557.25 42,106 65,390 559.80 51,391 184,550 557.30 42,285 67,499 559.85 51,574 187,125 557.35 42,465 69,618 559.90 51,757 189,708 557.40 42,645 71,746 559.95 51,941 192,300 557.45 42,825 73,883 560.00 52,124 194,902 557.50 43,005 76,028 560.05 52,311 197,513 557.55 43,184 78,183 560.10 52,498 200,133 557.60 43,364 80,347 560.15 52,685 202,763 557.65 43,544 82,519 560.20 52,872 205,402 557.70 43,724 84,701 ' 560.25 53,059 208,050 557.75 43,903 86,892 560.30 53,246 210,707 557.80 44,083 89,091 560.35 53,433 213,374 557.85 44,263 91,300 560.40 53,620 216,051 557.90 44,442 93,518 560.45 53,807 218,736 557.95 44,622 95,744 560.50 53,994 221,432 558.00 44,802 97,980 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 45 Summary for Pond 14P: TOTAL RUNOFF Inflow Area = 30.650 ac, 2.12% Impervious, Inflow Depth > 2.56" for 25-Year event Inflow = 87.59 cfs @ 3.24 hrs, Volume= 6.542 af Primary = 87.59 cfs @ 3.24 hrs, Volume= 6.542 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 14P: TOTAL RUNOFF Hydrograph I I I I I I I I I / I I I I I I I I I I I I I I ■Inflow 95� / I 187.59cfs I — 1 — I— —1 — M1 —/11_ _1 —e 1Q_ 11_ _1 _ ^M1 —�I— _I 0 Primary 90= / ,787.59 cfs T H 1 -Info Area=30.650-ac- - 85 / _ T H 1 T 1 1 T 804z / /I_ eg 1 44 - I- 1 - 44 - I- -I - -k — - -1 - -+ - 1- — 704z / A_ 1 — 4 — I— —I — + - 1- -1 — + — I- -1 — + - 1- -I — + — I- 65=' / _ 1 -r H I H H 1 + I 1 + I I + I - - 60 V / — H 1- 1 H 1- 1 T 1 1 H 1 1 H 1 —1 - o55= / � // 1 — rt - 1— -1 — -r - 1— -1 - 1 — I— —I — -r - 1— -1 - -r - 1— -1 - 50 V / 3 45- / rt T T T T T LL /� 7 T T T / 35=' / -- -- 40-H30-V /20_/ / /- 1 1154z / �� 1 1— —1 1— 1 — 1 — 1 5 /' ' Z������� 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 25-Year Rainfall=4.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 46 Hydrograph for Pond 14P: TOTAL RUNOFF Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.48 0.48 0.25 0.00 0.00 13.00 0.48 0.48 0.50 0.04 0.04 13.25 0.48 0.48 0.75 0.07 0.07 13.50 0.47 0.47 1.00 0.10 0.10 13.75 0.47 0.47 1.25 0.13 0.13 14.00 0.47 0.47 1.50 0.16 0.16 14.25 0.47 0.47 1.75 0.20 0.20 14.50 0.47 0.47 2.00 0.25 0.25 14.75 0.46 0.46 2.25 0.38 0.38 15.00 0.46 0.46 2.50 0.58 0.58 15.25 0.46 0.46 2.75 2.28 2.28 15.50 0.46 0.46 3.00 6.80 6.80 15.75 0.46 0.46 3.25 87.34 87.34 16.00 0.45 0.45 3.50 50.38 50.38 16.25 0.45 0.45 3.75 27.95 27.95 16.50 0.45 0.45 4.00 18.25 18.25 16.75 0.45 0.45 4.25 13.79 13.79 17.00 0.45 0.45 4.50 11.30 11.30 17.25 0.44 0.44 4.75 9.67 9.67 17.50 0.44 0.44 5.00 8.47 8.47 17.75 0.44 0.44 5.25 7.51 7.51 18.00 0.44 0.44 5.50 6.82 6.82 18.25 0.44 0.44 5.75 6.33 6.33 18.50 0.43 0.43 6.00 5.95 5.95 18.75 0.43 0.43 6.25 5.02 5.02 19.00 0.43 0.43 6.50 3.34 3.34 19.25 0.43 0.43 6.75 2.66 2.66 19.50 0.43 0.43 7.00 2.31 2.31 , 19.75 0.42 0.42 7.25 2.03 2.03 20.00 0.42 0.42 7.50 1.79 1.79 7.75 1.59 1.59 8.00 1.42 1.42 8.25 1.28 1.28 8.50 1.15 1.15 8.75 1.05 1.05 9.00 0.96 0.96 9.25 0.88 0.88 9.50 0.81 0.81 9.75 0.75 0.75 10.00 0.70 0.70 10.25 0.65 0.65 10.50 0.61 0.61 , 10.75 0.58 0.58 11.00 0.55 0.55 11.25 0.53 0.53 11.50 0.51 0.51 11.75 0.49 0.49 12.00 0.49 0.49 12.25 0.48 0.48 12.50 0.48 0.48 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 47 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment2S: WET POND A PRE DEV Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=2.91" Flow Length=2,918' Tc=29.5 min CN=84 Runoff=105.35 cfs 7.267 af Subcatchment3S: WET POND A POST Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=3.29" Tc=16.3 min CN=88 Runoff=167.27 cfs 8.226 af Subcatchmentl3S: BYPASS BUA Runoff Area=0.650 ac 100.00% Impervious Runoff Depth=4.36" Tc=5.0 min CN=98 Runoff=6.08 cfs 0.236 af Pond 12P: WET POND A Peak Elev=559.08' Storage=148,373 cf Inflow=167.27 cfs 8.226 af Primary=93.69 cfs 7.258 af Secondary=1.05 cfs 0.007 af Outflow=94.74 cfs 7.264 af Pond 14P: TOTAL RUNOFF Inflow=95.44 cfs 7.501 af Primary=95.44 cfs 7.501 af Total Runoff Area = 60.650 ac Runoff Volume = 15.729 af Average Runoff Depth = 3.11" 98.93% Pervious = 60.000 ac 1.07% Impervious = 0.650 ac DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 2S: WET POND A PRE DEV Runoff = 105.35 cfs @ 3.24 hrs, Volume= 7.267 af, Depth= 2.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.60" Area (ac) CN Description 30.000 84 Pasture/grassland/range, Fair, HSG D 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.7 239 0.0580 0.23 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.58" 8.7 1,095 0.0170 2.10 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 1,584 0.0138 8.61 232.48 Channel Flow, CHANNEL FLOW Area= 27.0 sf Perim= 15.0' r= 1.80' n= 0.030 Earth, grassed & winding 29.5 2,918 Total Subcatchment 2S: WET POND A PRE DEV Hydrograph _I_ L - 1_ 1 _. _ - L - I_ _I 115= -1- - I - I- . - I- -I - 4 - -I- - - - - I- -1 ❑Runoff 110- ,- -I- -1105.35cfs I t t 105 " 1 1 I I I I I 1 1 1 1 1 1 liylpell_ 100_ - 95=' _ - 1 I I I I I I I I I I I_ _1�-f1 l' 90=' I - 1 1 1 4 1 H 1 85 ' . + 1 1 5O eai-RainfalI=4.60"- 80_' — -1- T -r 1 I -r i- I 1 1 1 rt 75-/ — -1 -1 1 1 1 1 1 1 I Runoff Area=a0MOO ac- 70_ w 65= -1- 1 I 1 1 1 1 1 v/Irrs q c,, 60 1 - 0 I I 4 R�.lnoff Y YI121117-11 1' {/ C f 0 55;' 1 / - t 1 t -I- RUinb#fIDetnth=2.91u' LL 50-/ 7 - T - I- -1 - T - -I- - T - I -I - - 7�}-1 45LIEE 4� 1 1 1 1 1 Flow-Length:rl91-8` 35-' - 1 I 1 4 1 I � 1Ci min_ 25_ - -1- rt 1 1 - t - I- -1 - - - 1- -1- rt - fi - I- -1 - -r - 1CN 84 15 - - 7 j 7 - T 1 I- -I - T - T -I- T - T -I- -1 - T - T 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 49 Hydrograph for Subcatchment 2S: WET POND A PRE DEV Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.60 2.91 0.00 0.25 0.05 0.00 0.00 13.00 4.60 2.91 0.00 0.50 0.10 0.00 0.00 13.25 4.60 2.91 0.00 0.75 0.16 0.00 0.00 13.50 4.60 2.91 0.00 1.00 0.22 0.00 0.00 13.75 4.60 2.91 0.00 1.25 0.29 0.00 0.00 14.00 4.60 2.91 0.00 1.50 0.37 0.00 0.00 14.25 4.60 2.91 0.00 1.75 0.46 0.00 0.02 14.50 4.60 2.91 0.00 2.00 0.57 0.02 0.41 14.75 4.60 2.91 0.00 2.25 0.71 0.05 1.46 15.00 4.60 2.91 0.00 2.50 0.89 0.11 3.29 15.25 4.60 2.91 0.00 2.75 1.56 0.45 7.97 15.50 4.60 2.91 0.00 3.00 3.36 1.82 45.46 15.75 4.60 2.91 0.00 3.25 3.64 2.06 105.28 16.00 4.60 2.91 0.00 3.50 3.83 2.22 61.02 16.25 4.60 2.91 0.00 3.75 3.96 2.34 31.36 16.50 4.60 2.91 0.00 4.00 4.07 2.43 18.97 16.75 4.60 2.91 0.00 4.25 4.16 2.52 13.73 17.00 4.60 2.91 0.00 4.50 4.25 2.59 10.94 17.25 4.60 2.91 0.00 4.75 4.32 2.65 9.34 17.50 4.60 2.91 0.00 5.00 4.38 2.71 8.21 17.75 4.60 2.91 0.00 5.25 4.44 2.76 7.28 18.00 4.60 2.91 0.00 5.50 4.50 2.81 6.63 18.25 4.60 2.91 0.00 5.75 4.55 2.86 6.22 18.50 4.60 2.91 0.00 6.00 4.60 2.91 5.90 18.75 4.60 2.91 0.00 6.25 4.60 2.91 4.82 19.00 4.60 2.91 0.00 6.50 4.60 2.91 1.89 19.25 4.60 2.91 0.00 6.75 4.60 2.91 0.53 19.50 4.60 2.91 0.00 7.00 4.60 2.91 0.15 19.75 4.60 2.91 0.00 7.25 4.60 2.91 0.04 20.00 4.60 2.91 0.00 7.50 4.60 2.91 0.01 7.75 4.60 2.91 0.00 8.00 4.60 2.91 0.00 8.25 4.60 2.91 0.00 8.50 4.60 2.91 0.00 8.75 4.60 2.91 0.00 9.00 4.60 2.91 0.00 9.25 4.60 2.91 0.00 9.50 4.60 2.91 0.00 9.75 4.60 2.91 0.00 10.00 4.60 2.91 0.00 10.25 4.60 2.91 0.00 10.50 4.60 2.91 0.00 10.75 4.60 2.91 0.00 11.00 4.60 2.91 0.00 11.25 4.60 2.91 0.00 11.50 4.60 2.91 0.00 11.75 4.60 2.91 0.00 12.00 4.60 2.91 0.00 12.25 4.60 2.91 0.00 12.50 4.60 2.91 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment 3S: WET POND A POST Runoff = 167.27 cfs @ 3.08 hrs, Volume= 8.226 af, Depth= 3.29" Routed to Pond 12P : WET POND A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.60" Area (ac) CN Description * 30.000 88 RESIDENTIAL: 49% BUA 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, STORM SYSTEM ANALYSIS Subcatchment 3S: WET POND A POST Hydrograph I 1 1 I I 1 I 1 1 1 1 180" 1 1 I I 1 I I I I I I 1 1 1 ❑Runoff 1701 " I I i67J27 cfs I I I I I I I I 1 1 1 1 1 160� L _ _ ® 1 I I I 1 1 1 1 1 Type I I r 150� H _ - 1 ✓ 1 1 1 I I 1 1 I I 1 Ic-r1 r 140 -/ 1301 I I I 150-Y'eat Rainfall=4.60" 1 T I - I -IT I I T I T h T T I 1 1201 I T TI T I 1 T T 1-Ru noff Area -3-O OO1a ac- y 1101 - -1- - , ,- -I - - - I- -I - - - - - - 7 - I- -I - rt - 1001 r _ 1 rt - 1- � - T - I- -I - T I- r- Flo a/plum�= 6at 901 r / 01 - -r I I T 1- 1 -t RUnb 'Defipfli=3.29" LL 8 1 V - '- H + I I T 1- I ± t I H 1-c- 16-.31 min- 601 ,_ _I- + / H - + - 1- -I - + - + -I- H - + - I- -I - + - 1-rire=itar 501 - 1 + - - -I + I I + + 1 -i + 1 - + - i 404' ,- I + , - - + 11 + + 1 -[ + 1 - + + 1 - - 304-/ j_ I 1 - T 1- -1 - T 1- -1- -1 H I - - 1 H 1 - - 204-/ _1_ 1 '' 1 _ 1 1 _ 1_ - L - I I _ I- _I // 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 51 Hydrograph for Subcatchment 3S: WET POND A POST Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.60 3.29 0.00 0.25 0.05 0.00 0.00 13.00 4.60 3.29 0.00 0.50 0.10 0.00 0.00 13.25 4.60 3.29 0.00 0.75 0.16 0.00 0.00 13.50 4.60 3.29 0.00 1.00 0.22 0.00 0.00 13.75 4.60 3.29 0.00 1.25 0.29 0.00 0.00 14.00 4.60 3.29 0.00 1.50 0.37 0.01 0.35 14.25 4.60 3.29 0.00 1.75 0.46 0.02 1.38 14.50 4.60 3.29 0.00 2.00 0.57 0.05 2.85 14.75 4.60 3.29 0.00 2.25 0.71 0.11 4.87 15.00 4.60 3.29 0.00 2.50 0.89 0.19 8.16 15.25 4.60 3.29 0.00 2.75 1.56 0.63 24.88 15.50 4.60 3.29 0.00 3.00 3.36 2.14 135.30 15.75 4.60 3.29 0.00 3.25 3.64 2.40 87.18 16.00 4.60 3.29 0.00 3.50 3.83 2.57 31.45 16.25 4.60 3.29 0.00 3.75 3.96 2.69 17.77 16.50 4.60 3.29 0.00 4.00 4.07 2.79 13.66 16.75 4.60 3.29 0.00 4.25 4.16 2.88 11.39 17.00 4.60 3.29 0.00 4.50 4.25 2.96 9.95 17.25 4.60 3.29 0.00 4.75 4.32 3.03 8.73 17.50 4.60 3.29 0.00 5.00 4.38 3.09 7.76 17.75 4.60 3.29 0.00 5.25 4.44 3.14 6.95 18.00 4.60 3.29 0.00 5.50 4.50 3.19 6.53 18.25 4.60 3.29 0.00 5.75 4.55 3.24 6.21 18.50 4.60 3.29 0.00 6.00 4.60 3.29 5.89 18.75 4.60 3.29 0.00 6.25 4.60 3.29 2.44 19.00 4.60 3.29 0.00 6.50 4.60 3.29 0.25 19.25 4.60 3.29 0.00 6.75 4.60 3.29 0.02 19.50 4.60 3.29 0.00 7.00 4.60 3.29 0.00 19.75 4.60 3.29 0.00 7.25 4.60 3.29 0.00 20.00 4.60 3.29 0.00 7.50 4.60 3.29 0.00 7.75 4.60 3.29 0.00 8.00 4.60 3.29 0.00 8.25 4.60 3.29 0.00 8.50 4.60 3.29 0.00 8.75 4.60 3.29 0.00 9.00 4.60 3.29 0.00 9.25 4.60 3.29 0.00 9.50 4.60 3.29 0.00 9.75 4.60 3.29 0.00 10.00 4.60 3.29 0.00 10.25 4.60 3.29 0.00 10.50 4.60 3.29 0.00 10.75 4.60 3.29 0.00 11.00 4.60 3.29 0.00 11.25 4.60 3.29 0.00 11.50 4.60 3.29 0.00 11.75 4.60 3.29 0.00 12.00 4.60 3.29 0.00 12.25 4.60 3.29 0.00 12.50 4.60 3.29 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment 13S: BYPASS BUA Runoff = 6.08 cfs @ 2.95 hrs, Volume= 0.236 af, Depth= 4.36" Routed to Pond 14P : TOTAL RUNOFF Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.60" Area (ac) CN Description * 0.650 98 BYPASS BUA 0.650 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: BYPASS BUA Hydrograph I ❑Runoff` ,1- -1- 16.08 cfs I — — 6� 1 / 1 Type Il - 1 ,✓ - 'T - 116-hr _ 5- 1 50-Year Rainfa11I=4.60" I 1 1 I 1 1 1 1 - 'F - - 1- T - 1 - - - - 1- -Runoff-Area=0t6-50 ac - -e 4- 1 1 1 1 I 11Ouliio f Vol 1 me=0 2 6 of `� 3- _ i Run bff 11De�pth=4.36" I I I I I I I I I I Tc=5.01 min 2--/ 1 1 1 1 1 1 1 1 1 1 1 1 c 1 =08 1 1 1 1 1 1 1 1 1 1 1 1 '16 / 1 1 1 1 1 1 1 1-' 1 1 1 1 1 1 1 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 53 Hydrograph for Subcatchment 13S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.60 4.36 0.00 0.25 0.05 0.00 0.00 13.00 4.60 4.36 0.00 0.50 0.10 0.02 0.05 13.25 4.60 4.36 0.00 0.75 0.16 0.04 0.08 13.50 4.60 4.36 0.00 1.00 0.22 0.08 0.11 13.75 4.60 4.36 0.00 1.25 0.29 0.14 0.15 14.00 4.60 4.36 0.00 1.50 0.37 0.20 0.18 14.25 4.60 4.36 0.00 1.75 0.46 0.29 0.22 14.50 4.60 4.36 0.00 2.00 0.57 0.38 0.27 14.75 4.60 4.36 0.00 2.25 0.71 0.51 0.36 15.00 4.60 4.36 0.00 2.50 0.89 0.68 0.46 15.25 4.60 4.36 0.00 2.75 1.56 1.34 2.21 15.50 4.60 4.36 0.00 3.00 3.36 3.13 5.07 15.75 4.60 4.36 0.00 3.25 3.64 3.41 0.69 16.00 4.60 4.36 0.00 3.50 3.83 3.59 0.45 16.25 4.60 4.36 0.00 3.75 3.96 3.72 0.33 16.50 4.60 4.36 0.00 4.00 4.07 3.83 0.28 16.75 4.60 4.36 0.00 4.25 4.16 3.93 0.24 17.00 4.60 4.36 0.00 4.50 4.25 4.01 0.21 17.25 4.60 4.36 0.00 4.75 4.32 4.08 0.19 17.50 4.60 4.36 0.00 5.00 4.38 4.15 0.16 17.75 4.60 4.36 0.00 5.25 4.44 4.20 0.15 18.00 4.60 4.36 0.00 5.50 4.50 4.26 0.14 18.25 4.60 4.36 0.00 5.75 4.55 4.31 0.14 18.50 4.60 4.36 0.00 6.00 4.60 4.36 0.13 18.75 4.60 4.36 0.00 6.25 4.60 4.36 0.00 19.00 4.60 4.36 0.00 6.50 4.60 4.36 0.00 19.25 4.60 4.36 0.00 6.75 4.60 4.36 0.00 19.50 4.60 4.36 0.00 7.00 4.60 4.36 0.00 19.75 4.60 4.36 0.00 7.25 4.60 4.36 0.00 20.00 4.60 4.36 0.00 7.50 4.60 4.36 0.00 7.75 4.60 4.36 0.00 8.00 4.60 4.36 0.00 8.25 4.60 4.36 0.00 8.50 4.60 4.36 0.00 8.75 4.60 4.36 0.00 9.00 4.60 4.36 0.00 9.25 4.60 4.36 0.00 9.50 4.60 4.36 0.00 9.75 4.60 4.36 0.00 10.00 4.60 4.36 0.00 10.25 4.60 4.36 0.00 10.50 4.60 4.36 0.00 10.75 4.60 4.36 0.00 11.00 4.60 4.36 0.00 11.25 4.60 4.36 0.00 11.50 4.60 4.36 0.00 11.75 4.60 4.36 0.00 12.00 4.60 4.36 0.00 12.25 4.60 4.36 0.00 12.50 4.60 4.36 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 54 Summary for Pond 12P: WET POND A Inflow Area = 30.000 ac, 0.00% Impervious, Inflow Depth = 3.29" for 50-Year event Inflow = 167.27 cfs @ 3.08 hrs, Volume= 8.226 af Outflow = 94.74 cfs @ 3.24 hrs, Volume= 7.264 af, Atten= 43%, Lag= 9.5 min Primary = 93.69 cfs @ 3.24 hrs, Volume= 7.258 af Routed to Pond 14P : TOTAL RUNOFF Secondary= 1.05 cfs @ 3.24 hrs, Volume= 0.007 af Routed to Pond 14P : TOTAL RUNOFF Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 559.08'@ 3.24 hrs Surf.Area= 48,743 sf Storage= 148,373 cf Plug-Flow detention time=88.8 min calculated for 7.264 af(88% of inflow) Center-of-Mass det. time= 73.9 min ( 281.6 - 207.7 ) Volume Invert Avail.Storage Storage Description #1 555.50' 221,432 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 24,364 0 0 556.00 37,708 15,518 15,518 557.00 41,207 39,458 54,976 558.00 44,802 43,005 97,980 559.00 48,459 46,631 144,611 560.00 52,124 50,292 194,902 560.50 53,994 26,530 221,432 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round Culvert L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00'/ 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Vert. 4" WO Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 559.00' 20.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 557.00' 24.0" W x 6.0" H Vert. WEIR C= 0.600 Limited to weir flow at low heads DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 55 Primary OutFlow Max=93.64 cfs @ 3.24 hrs HW=559.07' TW=0.00' (Dynamic Tailwater) Lam=Culvert (Inlet Controls 93.64 cfs © 13.25 fps) —2=4" WQ Orifice (Passes < 0.78 cfs potential flow) —3=Top of OS (Passes < 96.53 cfs potential flow) —5=WEIR (Passes < 6.49 cfs potential flow) Secondary OutFlow Max=0.95 cfs © 3.24 hrs HW=559.07' TW=0.00' (Dynamic Tailwater) 4-4=Emergency Spillway (Weir Controls 0.95 cfs @ 0.66 fps) Pond 12P: WET POND A Hydrograph 1 1 1 1 1 1 1 I I I I I I I I I I / 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 I I I ❑Inflow / 1167.27 cfs I ❑Outflow �.. Primary / / /L _I _ ,_ I_ _I _ I_ _I _ L —I — L inl DlM^Lea= — alC ❑Secondary 180 / / / '/— —I I- - I- 1 1 I- I I- - I—Peak Elev=55908'- 170 / / / /1— - 1 — 1 1 I— 1 I— —1I— - I— 1 I— 1 H -1 - 1— -1 - 1601 / � / / / r r Storage�1,��47,3 150- / 130=' / / / / I I I I I I I I 120 / / / / 94.74 cfs 1 1 1 1 I I I I 1 1 1 1 1 i 11 0 / / � / 93.69Os 1 1 1 1 I I I I 1 1 1 1 1 0 1007 1 / / / / L 1 1 1 1 I I I I 1 1 1 1 1 o• 90 / / / i L -1 - -I - L -I - L -I - I_ -I - I_ -I - L - LL 80- z , /r _ 1 _1 _ J_ _1 _ i_ _1 _ i_ -1 — l_ -1 — l_ -1 — J_ - 701 / / I— -1I- 1I- 1I— - 1 -1I- 1 — 601 / / / 501 / / H 1 = I- 1 I- 1 I- H I— 1 I— 1 H — 401 / � —1 - 1— -1 — � — I— —1 — I— —1 — '7 301 / ///'z. � �Z��j 201 / �������� Z 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 56 Hydrograph for Pond 12P: WET POND A Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 0.50 0.00 0 555.50 0.00 0.00 0.00 1.00 0.00 0 555.50 0.00 0.00 0.00 1.50 0.35 95 555.50 0.00 0.00 0.00 2.00 2.85 2,704 555.60 0.03 0.03 0.00 2.50 8.16 11,693 555.89 0.20 0.20 0.00 3.00 135.30 83,426 557.67 7.36 7.36 0.00 3.50 31.45 121,010 558.50 58.70 58.70 0.00 4.00 13.66 95,271 557.94 19.85 19.85 0.00 4.50 9.95 88,559 557.79 12.19 12.19 0.00 5.00 7.76 85,440 557.72 9.13 9.13 0.00 5.50 6.53 83,410 557.67 7.35 7.35 0.00 6.00 5.89 82,263 557.64 6.42 6.42 0.00 6.50 0.25 77,885 557.54 3.56 3.56 0.00 7.00 0.00 72,971 557.43 2.36 2.36 0.00 7.50 0.00 69,236 557.34 1.82 1.82 0.00 8.00 0.00 66,316 557.27 1.44 1.44 0.00 8.50 0.00 63,978 557.22 1.17 1.17 0.00 9.00 0.00 62,063 557.17 0.97 0.97 0.00 9.50 0.00 60,462 557.13 0.82 0.82 0.00 10.00 0.00 59,096 557.10 0.70 0.70 0.00 10.50 0.00 57,908 557.07 0.62 0.62 0.00 11.00 0.00 56,854 557.05 0.56 0.56 0.00 11.50 0.00 55,897 557.02 0.51 0.51 0.00 12.00 0.00 55,004 557.00 0.49 0.49 0.00 12.50 0.00 54,134 556.98 0.48 0.48 0.00 13.00 0.00 53,270 556.96 0.48 0.48 0.00 13.50 0.00 52,414 556.94 0.47 0.47 0.00 14.00 0.00 51,565 556.92 0.47 0.47 0.00 14.50 0.00 50,723 556.90 0.47 0.47 0.00 15.00 0.00 49,888 556.88 0.46 0.46 0.00 15.50 0.00 49,060 556.86 0.46 0.46 0.00 16.00 0.00 48,238 556.84 0.45 0.45 0.00 16.50 0.00 47,424 556.82 0.45 0.45 0.00 17.00 0.00 46,617 556.80 0.45 0.45 0.00 17.50 0.00 45,817 556.78 0.44 0.44 0.00 18.00 0.00 45,024 556.76 0.44 0.44 0.00 18.50 0.00 44,238 556.74 0.43 0.43 0.00 19.00 0.00 43,460 556.72 0.43 0.43 0.00 19.50 0.00 42,688 556.70 0.43 0.43 0.00 20.00 0.00 41,924 556.68 0.42 0.42 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 57 Stage-Discharge for Pond 12P: WET POND A Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.05 26.28 26.28 0.00 555.55 0.01 0.01 0.00 558.10 29.39 29.39 0.00 555.60 0.02 0.02 0.00 558.15 32.63 32.63 0.00 555.65 0.05 0.05 0.00 558.20 35.99 35.99 0.00 555.70 0.08 0.08 0.00 558.25 39.46 39.46 0.00 555.75 0.12 0.12 0.00 558.30 43.04 43.04 0.00 555.80 0.15 0.15 0.00 558.35 46.73 46.73 0.00 555.85 0.18 0.18 0.00 558.40 50.52 50.52 0.00 555.90 0.20 0.20 0.00 558.45 54.41 54.41 0.00 555.95 0.22 0.22 0.00 558.50 58.40 58.40 0.00 556.00 0.24 0.24 0.00 558.55 62.49 62.49 0.00 556.05 0.26 0.26 0.00 558.60 66.67 66.67 0.00 556.10 0.28 0.28 0.00 558.65 70.94 70.94 0.00 556.15 0.29 0.29 0.00 558.70 75.30 75.30 0.00 556.20 0.31 0.31 0.00 558.75 79.75 79.75 0.00 556.25 0.32 0.32 0.00 558.80 84.28 84.28 0.00 556.30 0.33 0.33 0.00 558.85 88.90 88.90 0.00 556.35 0.35 0.35 0.00 558.90 92.59 92.59 0.00 556.40 0.36 0.36 0.00 558.95 92.90 92.90 0.00 556.45 0.37 0.37 0.00 559.00 93.21 93.21 0.00 556.50 0.38 0.38 0.00 559.05 94.08 93.52 0.56 556.55 0.39 0.39 0.00 559.10 95.40 93.83 1.57 556.60 0.41 0.41 0.00 559.15 97.03 94.14 2.89 556.65 0.42 0.42 0.00 559.20 98.90 94.44 4.45 556.70 0.43 0.43 0.00 559.25 101.02 94.75 6.27 556.75 0.44 0.44 0.00 559.30 103.35 95.05 8.30 556.80 0.45 0.45 0.00 559.35 105.89 95.36 10.53 556.85 0.46 0.46 0.00 559.40 108.61 95.66 12.95 556.90 0.47 0.47 0.00 559.45 111.63 95.96 15.67 556.95 0.48 0.48 0.00 559.50 114.86 96.27 18.60 557.00 0.49 0.49 0.00 559.55 118.31 96.57 21.74 557.05 0.57 0.57 0.00 559.60 121.96 96.87 25.10 557.10 0.71 0.71 0.00 559.65 125.44 97.16 28.27 557.15 0.88 0.88 0.00 559.70 129.03 97.46 31.57 557.20 1.09 1.09 0.00 559.75 132.73 97.76 34.98 557.25 1.33 1.33 0.00 559.80 136.55 98.05 38.50 557.30 1.59 1.59 0.00 559.85 140.47 98.35 42.12 557.35 1.87 1.87 0.00 559.90 144.49 98.64 45.85 557.40 2.18 2.18 0.00 559.95 148.61 98.94 49.68 557.45 2.50 2.50 0.00 560.00 152.83 99.23 53.60 557.50 2.84 2.84 0.00 560.05 157.24 99.52 57.72 557.55 3.71 3.71 0.00 560.10 161.76 99.81 61.95 557.60 5.02 5.02 0.00 560.15 166.39 100.10 66.29 557.65 6.62 6.62 0.00 560.20 171.11 100.39 70.72 557.70 8.46 8.46 0.00 560.25 175.73 100.68 75.05 557.75 10.51 10.51 0.00 560.30 180.41 100.96 79.45 557.80 12.75 12.75 0.00 560.35 185.17 101.25 83.92 557.85 15.16 15.16 0.00 560.40 189.99 101.54 88.46 557.90 17.72 17.72 0.00 560.45 194.80 101.82 92.98 557.95 20.44 20.44 0.00 560.50 199.66 102.11 97.55 558.00 23.29 23.29 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 58 Stage-Area-Storage for Pond 12P: WET POND A Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 24,364 0 558.05 44,985 100,225 555.55 25,698 1,252 558.10 45,168 102,478 555.60 27,033 2,570 558.15 45,351 104,741 555.65 28,367 3,955 558.20 45,533 107,014 555.70 29,702 5,407 558.25 45,716 109,295 555.75 31,036 6,925 558.30 45,899 111,585 555.80 32,370 8,510 558.35 46,082 113,885 555.85 33,705 10,162 558.40 46,265 116,193 555.90 35,039 11,881 558.45 46,448 118,511 555.95 36,374 13,666 558.50 46,631 120,838 556.00 37,708 15,518 558.55 46,813 123,174 556.05 37,883 17,408 558.60 46,996 125,519 556.10 38,058 19,306 558.65 47,179 127,874 556.15 38,233 21,214 558.70 47,362 130,237 556.20 38,408 23,130 558.75 47,545 132,610 556.25 38,583 25,054 558.80 47,728 134,992 556.30 38,758 26,988 558.85 47,910 137,383 556.35 38,933 28,930 558.90 48,093 139,783 556.40 39,108 30,881 558.95 48,276 142,192 556.45 39,283 32,841 559.00 48,459 144,611 556.50 39,458 34,809 559.05 48,642 147,038 556.55 39,632 36,787 559.10 48,826 149,475 556.60 39,807 38,773 559.15 49,009 151,921 556.65 39,982 40,767 559.20 49,192 154,376 556.70 40,157 42,771 559.25 49,375 156,840 556.75 40,332 44,783 559.30 49,558 159,313 556.80 40,507 46,804 559.35 49,742 161,796 556.85 40,682 48,834 559.40 49,925 164,287 556.90 40,857 50,872 559.45 50,108 166,788 556.95 41,032 52,920 559.50 50,292 169,298 557.00 41,207 54,976 559.55 50,475 171,817 557.05 41,387 57,040 559.60 50,658 174,346 557.10 41,567 59,114 559.65 50,841 176,883 557.15 41,746 61,197 559.70 51,025 179,430 557.20 41,926 63,289 559.75 51,208 181,986 557.25 42,106 65,390 559.80 51,391 184,550 557.30 42,285 67,499 559.85 51,574 187,125 557.35 42,465 69,618 559.90 51,757 189,708 557.40 42,645 71,746 559.95 51,941 192,300 557.45 42,825 73,883 560.00 52,124 194,902 557.50 43,005 76,028 560.05 52,311 197,513 557.55 43,184 78,183 560.10 52,498 200,133 557.60 43,364 80,347 560.15 52,685 202,763 557.65 43,544 82,519 560.20 52,872 205,402 557.70 43,724 84,701 ' 560.25 53,059 208,050 557.75 43,903 86,892 560.30 53,246 210,707 557.80 44,083 89,091 560.35 53,433 213,374 557.85 44,263 91,300 560.40 53,620 216,051 557.90 44,442 93,518 560.45 53,807 218,736 557.95 44,622 95,744 560.50 53,994 221,432 558.00 44,802 97,980 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 59 Summary for Pond 14P: TOTAL RUNOFF Inflow Area = 30.650 ac, 2.12% Impervious, Inflow Depth > 2.94" for 50-Year event Inflow = 95.44 cfs @ 3.24 hrs, Volume= 7.501 af Primary = 95.44 cfs @ 3.24 hrs, Volume= 7.501 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 14P: TOTAL RUNOFF Hydrograph — — + - i 1 1 1 ■Inflow ` 105=' i r I ss as cfs I �p - ■Primary 1 100 —11 i ssaacfs Inflow re$_3(�.65,-- 95=' i — — V�I�I 90: ) 1 _I _ 1— 1 1 1 1 1 1 1 1 - I I I I 80_' i _1 _ / L — 1_ L — L _I_ _L _ L _1 — _L _ L —I _ 1 _ I— _I _ L — 75� i � —I — I 4 - 1- 4 - 4 —I- 4 - 7 -1 - 4 - 7 —I - 4 — I- -I - 4 — _ — — 655" i ,T 1 /.0-1 -r 1- 1 r 1- rt r 1 rt 1 1 T I I T U 60_% ice —I 55- i — — O 50" i � // 1111111111111111 Li454 / ) 1 // 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 40� i ,L 1 / 1 7 1 —1 L 1 4 L 1 4 L 1 7 1 1 7 351i )— 1 4 - 1 —1 - 4 —I- 4 — I— —I - 4 — I I — T — I— 1 - 4 303' ifi 1 25-' i T717717 T717717 r 1 T T 1 T I I T 15-" i � 1 � 1 I I I 1 1 1 I I I 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 50-Year Rainfall=4.60" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 60 Hydrograph for Pond 14P: TOTAL RUNOFF Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.48 0.48 0.25 0.00 0.00 13.00 0.48 0.48 0.50 0.05 0.05 13.25 0.48 0.48 0.75 0.08 0.08 13.50 0.47 0.47 1.00 0.11 0.11 13.75 0.47 0.47 1.25 0.15 0.15 14.00 0.47 0.47 1.50 0.18 0.18 14.25 0.47 0.47 1.75 0.22 0.22 14.50 0.47 0.47 2.00 0.30 0.30 14.75 0.46 0.46 2.25 0.45 0.45 15.00 0.46 0.46 2.50 0.66 0.66 15.25 0.46 0.46 2.75 2.52 2.52 15.50 0.46 0.46 3.00 12.43 12.43 15.75 0.46 0.46 3.25 95.40 95.40 16.00 0.45 0.45 3.50 59.14 59.14 16.25 0.45 0.45 3.75 31.30 31.30 16.50 0.45 0.45 4.00 20.12 20.12 16.75 0.45 0.45 4.25 15.14 15.14 17.00 0.45 0.45 4.50 12.40 12.40 17.25 0.44 0.44 4.75 10.62 10.62 17.50 0.44 0.44 5.00 9.30 9.30 17.75 0.44 0.44 5.25 8.25 8.25 18.00 0.44 0.44 5.50 7.49 7.49 18.25 0.44 0.44 5.75 6.96 6.96 18.50 0.43 0.43 6.00 6.55 6.55 18.75 0.43 0.43 6.25 5.49 5.49 19.00 0.43 0.43 6.50 3.56 3.56 19.25 0.43 0.43 6.75 2.71 2.71 I 19.50 0.43 0.43 7.00 2.36 2.36 19.75 0.42 0.42 7.25 2.07 2.07 20.00 0.42 0.42 7.50 1.82 1.82 7.75 1.62 1.62 8.00 1.44 1.44 8.25 1.30 1.30 8.50 1.17 1.17 8.75 1.06 1.06 9.00 0.97 0.97 9.25 0.89 0.89 9.50 0.82 0.82 9.75 0.76 0.76 10.00 0.70 0.70 10.25 0.66 0.66 10.50 0.62 0.62 10.75 0.59 0.59 11.00 0.56 0.56 11.25 0.53 0.53 11.50 0.51 0.51 11.75 0.50 0.50 12.00 0.49 0.49 12.25 0.48 0.48 12.50 0.48 0.48 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 61 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment2S: WET POND A PRE DEV Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=3.45" Flow Length=2,918' Tc=29.5 min CN=84 Runoff=125.06 cfs 8.635 af Subcatchment3S: WET POND A POST Runoff Area=30.000 ac 0.00% Impervious Runoff Depth=3.86" Tc=16.3 min CN=88 Runoff=194.91 cfs 9.648 af Subcatchmentl3S: BYPASS BUA Runoff Area=0.650 ac 100.00% Impervious Runoff Depth=4.96" Tc=5.0 min CN=98 Runoff=6.89 cfs 0.269 af Pond 12P: WET POND A Peak Elev=559.48' Storage=168,205 cf Inflow=194.91 cfs 9.648 af Primary=96.13 cfs 8.428 af Secondary=17.27 cfs 0.257 af Outflow=113.40 cfs 8.685 af Pond 14P: TOTAL RUNOFF Inflow=114.20 cfs 8.954 af Primary=114.20 cfs 8.954 af Total Runoff Area = 60.650 ac Runoff Volume = 18.552 af Average Runoff Depth = 3.67" 98.93% Pervious = 60.000 ac 1.07% Impervious = 0.650 ac DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 62 Summary for Subcatchment 2S: WET POND A PRE DEV Runoff = 125.06 cfs @ 3.24 hrs, Volume= 8.635 af, Depth= 3.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.20" Area (ac) CN Description 30.000 84 Pasture/grassland/range, Fair, HSG D 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.7 239 0.0580 0.23 Sheet Flow, SHEET FLOW Grass: Dense n= 0.240 P2= 3.58" 8.7 1,095 0.0170 2.10 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 1,584 0.0138 8.61 232.48 Channel Flow, CHANNEL FLOW Area= 27.0 sf Perim= 15.0' r= 1.80' n= 0.030 Earth, grassed & winding 29.5 2,918 Total Subcatchment 2S: WET POND A PRE DEV Hydrograph I I I I I 140-/- _ -I- HL 1_ - - - - I - - - - H - I - L I I ❑Runoff 130- I 1125-06 cfs I I I I I I 120 ► I I I Type* l r 110 6-hr 100=' 0 n 100-Yeas- Rainfall=5.20"1 - Runoff Area=3 k00�0 ac go -ui of1 Vplume- 5 af- 70- I / 60 - t - -0 -1 - - -1- -1RunbffDepfh=3.45" L L 1 LIA 50 I �� 1 1 1 1 1 Flow Length=2,1918' 1 I 1 1 40 'Tc-2 51 min -I- 4 + - I- - - - 1- -I - + - 30 I I I _ I I I CN=84_ 20 I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 63 Hydrograph for Subcatchment 2S: WET POND A PRE DEV Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.20 3.45 0.00 0.25 0.06 0.00 0.00 13.00 5.20 3.45 0.00 0.50 0.12 0.00 0.00 13.25 5.20 3.45 0.00 0.75 0.18 0.00 0.00 13.50 5.20 3.45 0.00 1.00 0.25 0.00 0.00 13.75 5.20 3.45 0.00 1.25 0.33 0.00 0.00 14.00 5.20 3.45 0.00 1.50 0.42 0.00 0.00 14.25 5.20 3.45 0.00 1.75 0.52 0.01 0.16 14.50 5.20 3.45 0.00 2.00 0.65 0.03 0.95 14.75 5.20 3.45 0.00 2.25 0.80 0.08 2.38 15.00 5.20 3.45 0.00 2.50 1.00 0.15 4.70 15.25 5.20 3.45 0.00 2.75 1.77 0.58 10.51 15.50 5.20 3.45 0.00 3.00 3.80 2.19 55.63 15.75 5.20 3.45 0.00 3.25 4.12 2.47 124.92 16.00 5.20 3.45 0.00 3.50 4.33 2.66 71.73 16.25 5.20 3.45 0.00 3.75 4.48 2.79 36.62 16.50 5.20 3.45 0.00 4.00 4.60 2.91 22.04 16.75 5.20 3.45 0.00 4.25 4.71 3.00 15.90 17.00 5.20 3.45 0.00 4.50 4.80 3.09 12.64 17.25 5.20 3.45 0.00 4.75 4.88 3.16 10.79 17.50 5.20 3.45 0.00 5.00 4.95 3.23 9.47 17.75 5.20 3.45 0.00 5.25 5.02 3.29 8.40 18.00 5.20 3.45 0.00 5.50 5.08 3.35 7.64 18.25 5.20 3.45 0.00 5.75 5.14 3.40 7.17 18.50 5.20 3.45 0.00 6.00 5.20 3.45 6.79 18.75 5.20 3.45 0.00 6.25 5.20 3.45 5.55 19.00 5.20 3.45 0.00 6.50 5.20 3.45 2.17 19.25 5.20 3.45 0.00 6.75 5.20 3.45 0.62 19.50 5.20 3.45 0.00 7.00 5.20 3.45 0.17 19.75 5.20 3.45 0.00 7.25 5.20 3.45 0.04 20.00 5.20 3.45 0.00 7.50 5.20 3.45 0.01 7.75 5.20 3.45 0.00 8.00 5.20 3.45 0.00 8.25 5.20 3.45 0.00 8.50 5.20 3.45 0.00 8.75 5.20 3.45 0.00 9.00 5.20 3.45 0.00 9.25 5.20 3.45 0.00 9.50 5.20 3.45 0.00 9.75 5.20 3.45 0.00 10.00 5.20 3.45 0.00 10.25 5.20 3.45 0.00 10.50 5.20 3.45 0.00 10.75 5.20 3.45 0.00 11.00 5.20 3.45 0.00 11.25 5.20 3.45 0.00 11.50 5.20 3.45 0.00 11.75 5.20 3.45 0.00 12.00 5.20 3.45 0.00 12.25 5.20 3.45 0.00 12.50 5.20 3.45 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 3S: WET POND A POST Runoff = 194.91 cfs @ 3.08 hrs, Volume= 9.648 af, Depth= 3.86" Routed to Pond 12P : WET POND A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.20" Area (ac) CN Description * 30.000 88 RESIDENTIAL: 49% BUA 30.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.3 Direct Entry, STORM SYSTEM ANALYSIS Subcatchment 3S: WET POND A POST Hydrograph I 1 1 I I 1 1 i 1 1 1 1 210 I I ❑Runoff 200 I I 194 ®91crsI I- _I - 1 - 1- -I - 1 - L -I- _ L _ I- _ L L -I - _ 190 -I- - - - I- -I - 4 - -I_ - - 1- -1 - - i--1 T ype I I 180i' - / i- H - H - I- -I - 4 - H -I- H - H - 1- -I - + - H -1c- L - 170;' ,- - - - fi - I- -1 - -r - -I- - t - II-p-11 - t - I- -IVY 1 160-' —I— - * I 1 — rt — - IrO9- ear RainnfaII==5.26'r 1501 I 1 I I I I I I I I I I Ilk I I I I 1401 -1 1 I 1 1 I I 1 1Runoff AreaWM1X10O ac- 1301 1201 L1110ff Y' I1 m 1pp8 1 f 3 1101 -I 1 / I I 1 1 I I 1 `T Y � _ s 1001 ,- -1- � - I- H - H - - -I - 4 - H -I- -1RiinbffIDeptlt3.86.. 901 -I- 4 - I- H - + - 1- -I - 4 - H -I- H - H - 1- -I - + -A I- -I - 4 - 801 — -1- 4 / - I- H - -- - I- -I t H FT c l 6-.31 mun- 701 - -I- rt I— - -r - - -1 - -r — r -1— - -r - - -1 — * - - -I - 601 T rCN 8 T T TI T T T T T 504/ , 401 30: -I- - - I - I- -I 204./ 1 1 L I I I_ 1 I I_ ! 1 _ 10 // . 41r, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 65 Hydrograph for Subcatchment 3S: WET POND A POST Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.20 3.86 0.00 0.25 0.06 0.00 0.00 13.00 5.20 3.86 0.00 0.50 0.12 0.00 0.00 13.25 5.20 3.86 0.00 0.75 0.18 0.00 0.00 13.50 5.20 3.86 0.00 1.00 0.25 0.00 0.00 13.75 5.20 3.86 0.00 1.25 0.33 0.00 0.06 14.00 5.20 3.86 0.00 1.50 0.42 0.01 0.85 14.25 5.20 3.86 0.00 1.75 0.52 0.04 2.20 14.50 5.20 3.86 0.00 2.00 0.65 0.08 4.00 14.75 5.20 3.86 0.00 2.25 0.80 0.15 6.44 15.00 5.20 3.86 0.00 2.50 1.00 0.25 10.39 15.25 5.20 3.86 0.00 2.75 1.77 0.78 30.51 15.50 5.20 3.86 0.00 3.00 3.80 2.54 158.94 15.75 5.20 3.86 0.00 3.25 4.12 2.84 100.95 16.00 5.20 3.86 0.00 3.50 4.33 3.03 36.20 16.25 5.20 3.86 0.00 3.75 4.48 3.17 20.39 16.50 5.20 3.86 0.00 4.00 4.60 3.29 15.66 16.75 5.20 3.86 0.00 4.25 4.71 3.39 13.05 17.00 5.20 3.86 0.00 4.50 4.80 3.48 11.39 17.25 5.20 3.86 0.00 4.75 4.88 3.56 10.00 17.50 5.20 3.86 0.00 5.00 4.95 3.62 8.88 17.75 5.20 3.86 0.00 5.25 5.02 3.69 7.95 18.00 5.20 3.86 0.00 5.50 5.08 3.75 7.47 18.25 5.20 3.86 0.00 5.75 5.14 3.81 7.10 18.50 5.20 3.86 0.00 6.00 5.20 3.86 6.73 18.75 5.20 3.86 0.00 6.25 5.20 3.86 2.79 19.00 5.20 3.86 0.00 6.50 5.20 3.86 0.29 19.25 5.20 3.86 0.00 6.75 5.20 3.86 0.02 19.50 5.20 3.86 0.00 7.00 5.20 3.86 0.00 19.75 5.20 3.86 0.00 7.25 5.20 3.86 0.00 20.00 5.20 3.86 0.00 7.50 5.20 3.86 0.00 7.75 5.20 3.86 0.00 8.00 5.20 3.86 0.00 8.25 5.20 3.86 0.00 8.50 5.20 3.86 0.00 8.75 5.20 3.86 0.00 9.00 5.20 3.86 0.00 9.25 5.20 3.86 0.00 9.50 5.20 3.86 0.00 9.75 5.20 3.86 0.00 10.00 5.20 3.86 0.00 10.25 5.20 3.86 0.00 10.50 5.20 3.86 0.00 10.75 5.20 3.86 0.00 11.00 5.20 3.86 0.00 11.25 5.20 3.86 0.00 11.50 5.20 3.86 0.00 11.75 5.20 3.86 0.00 12.00 5.20 3.86 0.00 12.25 5.20 3.86 0.00 12.50 5.20 3.86 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 66 Summary for Subcatchment 13S: BYPASS BUA Runoff = 6.89 cfs @ 2.95 hrs, Volume= 0.269 af, Depth= 4.96" Routed to Pond 14P : TOTAL RUNOFF Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.20" Area (ac) CN Description * 0.650 98 BYPASS BUA 0.650 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: BYPASS BUA Hydrograph 1 1 1 1 1 1 I I I 1 1 1 I 1 1 I 1 1 I ❑Runoff` 7/ I s.89 ccfs f 1 I I 1 1 I I I I I I I I 1 1 1 1 I I I 11 1 1 1 1 1 1 1 1 1Type1 I I I - - 1 -1 - _i - - 1- -I - + - - -1 - _[ - -'6-hlr 6� 1 1 I I I I I I 1 11� II 1 1 1 1 11OO-Yf ar Raiflfail=.20" _ 5_/ 1 1 1 1 1 I I I I I I I I 1 1 I 1 1 I 1 1 Runoff Area=01.650 ac y Ounof`f Vor' in— (�� 1 f - 4 pp I�� `'"n o 1 I I 1 1 1 1 1 1 RIintiff Depths=4.�7S" u 3L/ 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 I I I I I I TICi=5.01 miln I 1 - - 1 -1 - _i - - 1- -1 - 1 - - -1 - _i ¢ - 2 / 1 1 1 1 1 I I I I I I I 1 ""' �v '/ 1 I 1 I 1 I 1 1 1- I I ���II� 1 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 67 Hydrograph for Subcatchment 13S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.20 4.96 0.00 0.25 0.06 0.00 0.00 13.00 5.20 4.96 0.00 0.50 0.12 0.02 0.06 13.25 5.20 4.96 0.00 0.75 0.18 0.06 0.10 13.50 5.20 4.96 0.00 1.00 0.25 0.11 0.14 13.75 5.20 4.96 0.00 1.25 0.33 0.17 0.17 14.00 5.20 4.96 0.00 1.50 0.42 0.25 0.21 14.25 5.20 4.96 0.00 1.75 0.52 0.34 0.26 14.50 5.20 4.96 0.00 2.00 0.65 0.45 0.31 14.75 5.20 4.96 0.00 2.25 0.80 0.60 0.41 15.00 5.20 4.96 0.00 2.50 1.00 0.79 0.52 15.25 5.20 4.96 0.00 2.75 1.77 1.54 2.51 15.50 5.20 4.96 0.00 3.00 3.80 3.56 5.74 15.75 5.20 4.96 0.00 3.25 4.12 3.88 0.78 16.00 5.20 4.96 0.00 3.50 4.33 4.09 0.50 16.25 5.20 4.96 0.00 3.75 4.48 4.24 0.38 16.50 5.20 4.96 0.00 4.00 4.60 4.36 0.31 16.75 5.20 4.96 0.00 4.25 4.71 4.47 0.27 17.00 5.20 4.96 0.00 4.50 4.80 4.56 0.24 17.25 5.20 4.96 0.00 4.75 4.88 4.64 0.21 17.50 5.20 4.96 0.00 5.00 4.95 4.72 0.19 17.75 5.20 4.96 0.00 5.25 5.02 4.78 0.17 18.00 5.20 4.96 0.00 5.50 5.08 4.85 0.16 18.25 5.20 4.96 0.00 5.75 5.14 4.91 0.16 18.50 5.20 4.96 0.00 6.00 5.20 4.96 0.15 18.75 5.20 4.96 0.00 6.25 5.20 4.96 0.00 19.00 5.20 4.96 0.00 6.50 5.20 4.96 0.00 19.25 5.20 4.96 0.00 6.75 5.20 4.96 0.00 19.50 5.20 4.96 0.00 7.00 5.20 4.96 0.00 19.75 5.20 4.96 0.00 7.25 5.20 4.96 0.00 20.00 5.20 4.96 0.00 7.50 5.20 4.96 0.00 7.75 5.20 4.96 0.00 8.00 5.20 4.96 0.00 8.25 5.20 4.96 0.00 8.50 5.20 4.96 0.00 8.75 5.20 4.96 0.00 9.00 5.20 4.96 0.00 9.25 5.20 4.96 0.00 9.50 5.20 4.96 0.00 9.75 5.20 4.96 0.00 10.00 5.20 4.96 0.00 10.25 5.20 4.96 0.00 10.50 5.20 4.96 0.00 10.75 5.20 4.96 0.00 11.00 5.20 4.96 0.00 11.25 5.20 4.96 0.00 11.50 5.20 4.96 0.00 11.75 5.20 4.96 0.00 12.00 5.20 4.96 0.00 12.25 5.20 4.96 0.00 12.50 5.20 4.96 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 68 Summary for Pond 12P: WET POND A Inflow Area = 30.000 ac, 0.00% Impervious, Inflow Depth = 3.86" for 100-Year event Inflow = 194.91 cfs @ 3.08 hrs, Volume= 9.648 af Outflow = 113.40 cfs @ 3.23 hrs, Volume= 8.685 af, Atten= 42%, Lag= 9.1 min Primary = 96.13 cfs @ 3.23 hrs, Volume= 8.428 af Routed to Pond 14P : TOTAL RUNOFF Secondary= 17.27 cfs @ 3.23 hrs, Volume= 0.257 af Routed to Pond 14P : TOTAL RUNOFF Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 559.48'@ 3.23 hrs Surf.Area= 50,212 sf Storage= 168,205 cf Plug-Flow detention time=76.3 min calculated for 8.663 af(90% of inflow) Center-of-Mass det. time=65.1 min ( 271.6 - 206.6 ) Volume Invert Avail.Storage Storage Description #1 555.50' 221,432 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 555.50 24,364 0 0 556.00 37,708 15,518 15,518 557.00 41,207 39,458 54,976 558.00 44,802 43,005 97,980 559.00 48,459 46,631 144,611 560.00 52,124 50,292 194,902 560.50 53,994 26,530 221,432 Device Routing Invert Outlet Devices #1 Primary 550.00' 36.0" Round Culvert L= 115.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 550.00'/ 548.00' S= 0.0174 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Device 1 555.50' 4.0" Vert. 4" WO Orifice C= 0.600 Limited to weir flow at low heads #3 Device 1 557.50' 48.0" x 48.0" Horiz. Top of OS C= 0.600 Limited to weir flow at low heads #4 Secondary 559.00' 20.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #5 Device 1 557.00' 24.0" W x 6.0" H Vert. WEIR C= 0.600 Limited to weir flow at low heads DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 69 Primary OutFlow Max=96.07 cfs @ 3.23 hrs HW=559.47' TW=0.00' (Dynamic Tailwater) Lam=Culvert (Inlet Controls 96.07 cfs © 13.59 fps) —2=4" WQ Orifice (Passes < 0.82 cfs potential flow) —3=Top of OS (Passes < 108.07 cfs potential flow) —5=WEIR (Passes < 7.17 cfs potential flow) Secondary OutFlow Max=16.70 cfs @ 3.23 hrs HW=559.47' TW=0.00' (Dynamic Tailwater) 4-4=Emergency Spillway (Weir Controls 16.70 cfs © 1.78 fps) Pond 12P: WET POND A Hydrograph 1 I 1 1 1 1 1 -� _ L J — — — � —I — i/ / 194.91 fs I I I L1 — L —I — L —I — L —I — ' � h ' �� � w / .�— f - AG ❑Infl ow ❑Outflow w CI Secondary ary 210= , I I I I I I I 1 P- ak EIe=559-48' 200 i i , 190 ' z , , - - - 1 - 1 -I - H -I - I- -I - I- -1 - 1 -I - 1 -I - 1- -I - 1- -I - 180=' / , / / - - - r _1 _ r i- -1 - r -1 - Storage -168 205-cf- 170-' i , , , , 1 1 1 1 1 1 1 1 1 1 1 1 ' 160 ' i i , H 1 H 1 L 1 I_ _I 1 1 1 1 1_ _ 150- / / „ 140_' / , / ,1- - 113.40 cfs - f- -1 - I- -1 - 1- -1 - 1- -1 - i- - "G 110+/ / , / / — [96.13 fs 1 1 - 0 1001 , , ,1— — A 1 1 — I 1 — 1— 1 — 1— - I— 1 I— 1 1— I - 90=1 , z / /1-- 00 - 1 -1 - '7 - - I- -1 - I- -1 - I- -1 - I- -1 - 1- - 80./ / / / - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 701 i , , - 601 i i , / � I_1_ _I _ 501 / , / - - -1 - I— -1 - I— 1 - H -1 - H -1 - H 1 - 1- 1 - 404/ / / / "141 4������ 201 102 �� 0' �Z 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 70 Hydrograph for Pond 12P: WET POND A Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 555.50 0.00 0.00 0.00 0.50 0.00 0 555.50 0.00 0.00 0.00 1.00 0.00 0 555.50 0.00 0.00 0.00 1.50 0.85 357 555.51 0.00 0.00 0.00 2.00 4.00 4,424 555.67 0.06 0.06 0.00 2.50 10.39 16,222 556.02 0.25 0.25 0.00 3.00 158.94 100,332 558.05 26.42 26.42 0.00 3.50 36.20 132,624 558.75 79.77 79.77 0.00 4.00 15.66 97,661 557.99 22.88 22.88 0.00 4.50 11.39 90,106 557.82 13.84 13.84 0.00 5.00 8.88 86,733 557.75 10.36 10.36 0.00 5.50 7.47 84,556 557.70 8.34 8.34 0.00 6.00 6.73 83,345 557.67 7.29 7.29 0.00 6.50 0.29 78,507 557.56 3.88 3.88 0.00 7.00 0.00 73,375 557.44 2.42 2.42 0.00 7.50 0.00 69,548 557.35 1.86 1.86 0.00 8.00 0.00 66,563 557.28 1.47 1.47 0.00 8.50 0.00 64,178 557.22 1.19 1.19 0.00 9.00 0.00 62,228 557.17 0.98 0.98 0.00 9.50 0.00 60,601 557.14 0.83 0.83 0.00 10.00 0.00 59,216 557.10 0.71 0.71 0.00 10.50 0.00 58,014 557.07 0.63 0.63 0.00 11.00 0.00 56,948 557.05 0.56 0.56 0.00 11.50 0.00 55,983 557.02 0.51 0.51 0.00 12.00 0.00 55,086 557.00 0.49 0.49 0.00 12.50 0.00 54,215 556.98 0.48 0.48 0.00 13.00 0.00 53,351 556.96 0.48 0.48 0.00 13.50 0.00 52,495 556.94 0.47 0.47 0.00 14.00 0.00 51,645 556.92 0.47 0.47 0.00 14.50 0.00 50,802 556.90 0.47 0.47 0.00 15.00 0.00 49,966 556.88 0.46 0.46 0.00 15.50 0.00 49,137 556.86 0.46 0.46 0.00 16.00 0.00 48,315 556.84 0.45 0.45 0.00 16.50 0.00 47,500 556.82 0.45 0.45 0.00 17.00 0.00 46,693 556.80 0.45 0.45 0.00 17.50 0.00 45,892 556.78 0.44 0.44 0.00 18.00 0.00 45,098 556.76 0.44 0.44 0.00 18.50 0.00 44,312 556.74 0.43 0.43 0.00 19.00 0.00 43,533 556.72 0.43 0.43 0.00 19.50 0.00 42,760 556.70 0.43 0.43 0.00 20.00 0.00 41,995 556.68 0.42 0.42 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 71 Stage-Discharge for Pond 12P: WET POND A Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 555.50 0.00 0.00 0.00 558.05 26.28 26.28 0.00 555.55 0.01 0.01 0.00 558.10 29.39 29.39 0.00 555.60 0.02 0.02 0.00 558.15 32.63 32.63 0.00 555.65 0.05 0.05 0.00 558.20 35.99 35.99 0.00 555.70 0.08 0.08 0.00 558.25 39.46 39.46 0.00 555.75 0.12 0.12 0.00 558.30 43.04 43.04 0.00 555.80 0.15 0.15 0.00 558.35 46.73 46.73 0.00 555.85 0.18 0.18 0.00 558.40 50.52 50.52 0.00 555.90 0.20 0.20 0.00 558.45 54.41 54.41 0.00 555.95 0.22 0.22 0.00 558.50 58.40 58.40 0.00 556.00 0.24 0.24 0.00 558.55 62.49 62.49 0.00 556.05 0.26 0.26 0.00 558.60 66.67 66.67 0.00 556.10 0.28 0.28 0.00 558.65 70.94 70.94 0.00 556.15 0.29 0.29 0.00 558.70 75.30 75.30 0.00 556.20 0.31 0.31 0.00 558.75 79.75 79.75 0.00 556.25 0.32 0.32 0.00 558.80 84.28 84.28 0.00 556.30 0.33 0.33 0.00 558.85 88.90 88.90 0.00 556.35 0.35 0.35 0.00 558.90 92.59 92.59 0.00 556.40 0.36 0.36 0.00 558.95 92.90 92.90 0.00 556.45 0.37 0.37 0.00 559.00 93.21 93.21 0.00 556.50 0.38 0.38 0.00 559.05 94.08 93.52 0.56 556.55 0.39 0.39 0.00 559.10 95.40 93.83 1.57 556.60 0.41 0.41 0.00 559.15 97.03 94.14 2.89 556.65 0.42 0.42 0.00 559.20 98.90 94.44 4.45 556.70 0.43 0.43 0.00 559.25 101.02 94.75 6.27 556.75 0.44 0.44 0.00 559.30 103.35 95.05 8.30 556.80 0.45 0.45 0.00 559.35 105.89 95.36 10.53 556.85 0.46 0.46 0.00 559.40 108.61 95.66 12.95 556.90 0.47 0.47 0.00 559.45 111.63 95.96 15.67 556.95 0.48 0.48 0.00 559.50 114.86 96.27 18.60 557.00 0.49 0.49 0.00 559.55 118.31 96.57 21.74 557.05 0.57 0.57 0.00 559.60 121.96 96.87 25.10 557.10 0.71 0.71 0.00 559.65 125.44 97.16 28.27 557.15 0.88 0.88 0.00 559.70 129.03 97.46 31.57 557.20 1.09 1.09 0.00 559.75 132.73 97.76 34.98 557.25 1.33 1.33 0.00 559.80 136.55 98.05 38.50 557.30 1.59 1.59 0.00 559.85 140.47 98.35 42.12 557.35 1.87 1.87 0.00 559.90 144.49 98.64 45.85 557.40 2.18 2.18 0.00 559.95 148.61 98.94 49.68 557.45 2.50 2.50 0.00 560.00 152.83 99.23 53.60 557.50 2.84 2.84 0.00 560.05 157.24 99.52 57.72 557.55 3.71 3.71 0.00 560.10 161.76 99.81 61.95 557.60 5.02 5.02 0.00 560.15 166.39 100.10 66.29 557.65 6.62 6.62 0.00 560.20 171.11 100.39 70.72 557.70 8.46 8.46 0.00 560.25 175.73 100.68 75.05 557.75 10.51 10.51 0.00 560.30 180.41 100.96 79.45 557.80 12.75 12.75 0.00 560.35 185.17 101.25 83.92 557.85 15.16 15.16 0.00 560.40 189.99 101.54 88.46 557.90 17.72 17.72 0.00 560.45 194.80 101.82 92.98 557.95 20.44 20.44 0.00 560.50 199.66 102.11 97.55 558.00 23.29 23.29 0.00 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 72 Stage-Area-Storage for Pond 12P: WET POND A Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 555.50 24,364 0 558.05 44,985 100,225 555.55 25,698 1,252 558.10 45,168 102,478 555.60 27,033 2,570 558.15 45,351 104,741 555.65 28,367 3,955 558.20 45,533 107,014 555.70 29,702 5,407 558.25 45,716 109,295 555.75 31,036 6,925 558.30 45,899 111,585 555.80 32,370 8,510 558.35 46,082 113,885 555.85 33,705 10,162 558.40 46,265 116,193 555.90 35,039 11,881 558.45 46,448 118,511 555.95 36,374 13,666 558.50 46,631 120,838 556.00 37,708 15,518 558.55 46,813 123,174 556.05 37,883 17,408 558.60 46,996 125,519 556.10 38,058 19,306 558.65 47,179 127,874 556.15 38,233 21,214 558.70 47,362 130,237 556.20 38,408 23,130 558.75 47,545 132,610 556.25 38,583 25,054 558.80 47,728 134,992 556.30 38,758 26,988 558.85 47,910 137,383 556.35 38,933 28,930 558.90 48,093 139,783 556.40 39,108 30,881 558.95 48,276 142,192 556.45 39,283 32,841 559.00 48,459 144,611 556.50 39,458 34,809 559.05 48,642 147,038 556.55 39,632 36,787 559.10 48,826 149,475 556.60 39,807 38,773 559.15 49,009 151,921 556.65 39,982 40,767 559.20 49,192 154,376 556.70 40,157 42,771 559.25 49,375 156,840 556.75 40,332 44,783 559.30 49,558 159,313 556.80 40,507 46,804 559.35 49,742 161,796 556.85 40,682 48,834 559.40 49,925 164,287 556.90 40,857 50,872 559.45 50,108 166,788 556.95 41,032 52,920 559.50 50,292 169,298 557.00 41,207 54,976 559.55 50,475 171,817 557.05 41,387 57,040 559.60 50,658 174,346 557.10 41,567 59,114 559.65 50,841 176,883 557.15 41,746 61,197 559.70 51,025 179,430 557.20 41,926 63,289 559.75 51,208 181,986 557.25 42,106 65,390 559.80 51,391 184,550 557.30 42,285 67,499 559.85 51,574 187,125 557.35 42,465 69,618 559.90 51,757 189,708 557.40 42,645 71,746 559.95 51,941 192,300 557.45 42,825 73,883 560.00 52,124 194,902 557.50 43,005 76,028 560.05 52,311 197,513 557.55 43,184 78,183 560.10 52,498 200,133 557.60 43,364 80,347 560.15 52,685 202,763 557.65 43,544 82,519 560.20 52,872 205,402 557.70 43,724 84,701 ' 560.25 53,059 208,050 557.75 43,903 86,892 560.30 53,246 210,707 557.80 44,083 89,091 560.35 53,433 213,374 557.85 44,263 91,300 560.40 53,620 216,051 557.90 44,442 93,518 560.45 53,807 218,736 557.95 44,622 95,744 560.50 53,994 221,432 558.00 44,802 97,980 DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 73 Summary for Pond 14P: TOTAL RUNOFF Inflow Area = 30.650 ac, 2.12% Impervious, Inflow Depth > 3.51" for 100-Year event Inflow = 114.20 cfs @ 3.23 hrs, Volume= 8.954 af Primary = 114.20 cfs @ 3.23 hrs, Volume= 8.954 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 14P: TOTAL RUNOFF Hydrograph I I 1 1 I I I I I I I I fi 1 t 1 1 t 1 —I 1 fi 1 1 t 1 1 t ■Inflow - / 1 1 I I I I I 1 1 1 I I I 1 1 ❑Primary 120� 111420cfs - w/Inflo Area-30-.6_5_0_a1c_ 110� I I// 1 - T T rt — T 1007 ) 0 I I I 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 90� 1 1 I I I I I I I I - i 1 1 1 I I I I I I I I N - 0 70� / 1 0 60� — —1 — — — 1— —1 — 1 u = // 1 1 1 I 1 50= - / 40 -/ ' 1 - —1 - 1 30� 1 1 1 o: ./ / .r . /*. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE WET POND A REV 6.8.2023 Type 11 6-hr 100-Year Rainfall=5.20" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 74 Hydrograph for Pond 14P: TOTAL RUNOFF Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.48 0.48 0.25 0.00 0.00 13.00 0.48 0.48 0.50 0.06 0.06 13.25 0.48 0.48 0.75 0.10 0.10 13.50 0.47 0.47 1.00 0.14 0.14 13.75 0.47 0.47 1.25 0.17 0.17 14.00 0.47 0.47 1.50 0.21 0.21 I 14.25 0.47 0.47 1.75 0.27 0.27 14.50 0.47 0.47 2.00 0.37 0.37 14.75 0.46 0.46 2.25 0.57 0.57 15.00 0.46 0.46 2.50 0.77 0.77 15.25 0.46 0.46 2.75 2.87 2.87 15.50 0.46 0.46 3.00 32.16 32.16 15.75 0.46 0.46 3.25 113.91 113.91 16.00 0.45 0.45 3.50 80.28 80.28 16.25 0.45 0.45 3.75 37.56 37.56 16.50 0.45 0.45 4.00 23.19 23.19 16.75 0.45 0.45 4.25 17.24 17.24 17.00 0.45 0.45 4.50 14.07 14.07 17.25 0.44 0.44 4.75 12.04 12.04 17.50 0.44 0.44 5.00 10.54 10.54 17.75 0.44 0.44 5.25 9.36 9.36 18.00 0.44 0.44 5.50 8.50 8.50 18.25 0.44 0.44 5.75 7.91 7.91 18.50 0.43 0.43 6.00 7.44 7.44 18.75 0.43 0.43 6.25 6.20 6.20 19.00 0.43 0.43 6.50 3.88 3.88 19.25 0.43 0.43 6.75 2.79 2.79 19.50 0.43 0.43 7.00 2.42 2.42 19.75 0.43 0.43 7.25 2.12 2.12 20.00 0.42 0.42 7.50 1.86 1.86 7.75 1.65 1.65 8.00 1.47 1.47 8.25 1.32 1.32 8.50 1.19 1.19 8.75 1.08 1.08 9.00 0.98 0.98 9.25 0.90 0.90 9.50 0.83 0.83 9.75 0.77 0.77 10.00 0.71 0.71 10.25 0.67 0.67 10.50 0.63 0.63 10.75 0.59 0.59 11.00 0.56 0.56 11.25 0.54 0.54 11.50 0.51 0.51 11.75 0.50 0.50 12.00 0.49 0.49 12.25 0.48 0.48 12.50 0.48 0.48 �A // PLOTT HOUND - r ENGINEERING �' SAND FILTER B HYDROCAD OUTPUT 1-Yr 24-Hr Design Volume Storm Event Phifer Road WINGATE, NORTH CAROLINA SAND FILTER B DESIGN COMPUTE WATER QUALITY VOLUME Drainage Area = 7.50 ac A diversion or bypass structure, must divert all but the design % Impervious = 48.00 °Ao flow for the filter Curve Number= 84.00 USE SIMPLE METHOD Rv=0.05+0.009(I) 0.482 IN/IN Modified P to account for the rainfall loss in the 1" Storm P= 1.0 IN (to be used in lieu of the 1" depth in the SCS rainfall distribution) S = 1.905 Q=( P-I,)"2/( P-Ia+S) solvedforP = [(4QxS+QA2 )nl/2+Q+2xla]/2 PModified = N/A WQV= 13,123 ft3 WQV Adj= 9,843 ft' Maximum Head on the Sand Filter must DETERMINE FILTER BED&SEDIMENTATION BASIN SURFACE AREA not exceed 6 ft(Design Storm only) h MaxFilter= WQV Adj(ft3) As(ft2)+Af(ft) Assume Hmax until min (AS+AF) ' ` =q Greater of AS and Af X 2 Choose a combination of Af&hMaxFllter to meet total the space available. Sedimentation Chamber \v\ \ and Sand Filter should be about the same size. Assume h MaxFilter h MaxFilter= 3.00 ft Min. (As+AF)= 1,497 ftz Min.Area for Sedimentation Chamber Min.Area for Sand Filter As= 0.066 x WQV Af— WQV x 1.5 ft 3.5 ft/day x 1.66 days x(Avg Head + 1.5 ft) As= 650 ft` Af= 847 ftz Elev Bottom Area Used = 6,453 ft2 (ELEV 575) Bottom Area Used = 1,334 ft2 575 Top Area Used = 9,280 ft2 Top Area Used = 2,958 ft2 578 23,600 ft3 6,438 ft3 VERIFY VOLUMES VOltotal = (As+Af x hMaxFilter Compare to WQVAdi Voltotal = 30,038 ft' Page 1 of 2 SIZE UNDERDRAIN SYSTEM Determine capacity of Under Drain System Af=WQvxdf/[(kxHf+Df)xTf] Where: Af= 988 ft2 surface area of filter bed df= 1.5 ft filter bed depth k= 4 ft/day coefficient of permeability media (2" per hr) hf= 1.50 ft average height of water above filter bed, (Hmax/2) Tf= 1.66 Days (40 Hours, 1.66 Days)) 3.0 Ft Max. Depth of Storage Volume Af Provided= 1,096 ft` surface area provided Q at Full Depth = 0.152 cfs Darcy's Law: Q= k x Af x((H +df)/df)) Q at Avg Depth = 0.101 cfs Darcy's Law: Q= k x Af x((H/2 +df)/df)) Time to Drain= 36.09 hrs Safety Factor of 10 1.010 cfs Bottom of sand to have min surface area Compute Perforation Capacity as well. May go to 1:1 slope Pipes Length 4 Holes/Row #of Perforations= 2 10 10 = 400 Holes 50%of Perforations= 200 Holes 3/8" Dia. Hole Capacity of One Hole= CA(2gh)^0.5 Holes spaced 6"o/c. 0.007 cfs/Hole Min of 2 pipes Max 10'o/c Total Capacity= 1.479 cfs Capacity of Filter Media= 1.010 cfs Perforation Capacity= > Media Capacity OK <Os> PRE - DEVELOPMENT 1S 5S PO TO SAND FILTER B BY'ASS BUA /2ND > AD FOREBAY SAND FIL ER 4P TOTAL (Subca Reach 'On. lit Routing Diagram for DAVIS VILLAGE SAND FILTER B 6.11.23 Prepared by Plott Hound Engineering PLLC, Printed 6/21/2023 HydroCAD®10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 3.00 2 2 10-Year Type II 6-hr Default 6.00 1 3.75 2 3 25-Year Type II 6-hr Default 6.00 1 4.44 2 4 50-Year Type II 6-hr Default 6.00 1 4.99 2 5 100-Year Type II 6-hr Default 6.00 1 5.55 2 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 7.500 84 45% IMPERVIOUS, HSG D (1S) 1.800 98 BYPASS BUA (5S) 10.400 84 Pasture/grassland/range, Fair, HSG D (OS) 19.700 85 TOTAL AREA DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 7.500 0.000 7.500 45% IMPERVIOUS 1 S 0.000 0.000 0.000 0.000 1.800 1.800 BYPASS BUA 5S 0.000 0.000 0.000 10.400 0.000 10.400 Pasture/grassland/range, Fair OS 0.000 0.000 0.000 17.900 1.800 19.700 TOTAL AREA DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 5 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=10.400 ac 0.00% Impervious Runoff Depth>1.39" Flow Length=950' Tc=17.7 min CN=84 Runoff=18.66 cfs 1.205 af SubcatchmentlS: POST TO SAND FILTER B Runoff Area=7.500 ac 0.00% Impervious Runoff Depth>1.39" Tc=9.4 min CN=84 Runoff=17.64 cfs 0.872 af Subcatchment5S: BYPASS BUA Runoff Area=1.800 ac 100.00% Impervious Runoff Depth>2.62" Tc=5.0 min CN=98 Runoff=7.70 cfs 0.393 af Pond 2P: FOREBAY Peak Elev=576.75' Storage=12,840 cf Inflow=17.64 cfs 0.872 af Primary=6.20 cfs 0.837 af Secondary=0.01 cfs 0.002 af Tertiary=0.00 cfs 0.000 af Outflow=6.21 cfs 0.839 af Pond 3P: SAND FILTER Peak Elev=575.02' Storage=28 cf Inflow=0.01 cfs 0.002 af Outflow=0.00 cfs 0.002 af Pond 4P: TOTAL Inflow=11.98 cfs 1.232 af Primary=11.98 cfs 1.232 af Total Runoff Area = 19.700 ac Runoff Volume = 2.470 af Average Runoff Depth = 1.50" 90.86% Pervious = 17.900 ac 9.14% Impervious = 1.800 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 18.66 cfs @ 12.10 hrs, Volume= 1.205 af, Depth> 1.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 10.400 84 Pasture/grassland/range, Fair, HSG D 10.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Grass: Dense n= 0.240 P2= 3.58" 5.1 800 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 17.7 950 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph I I I I I 1 I 1 1 I I I I I I 20 1 1 I 1 1 I I I I I I I I I I ■Runoff 194-/ 1 1 I 1 1 1 1 I I 118.66 cfs l I I I I I I 18 Te11F24 Ir I 1 1 I I 1 I 1 I 1 1 17 1 I i 1 1 I I I I 16� � firTParl�alinfa11=3.00'1 1 1 1L 1 - 15f Run-off- ea- 1e.4� J - 1 - 1- 1- -I - _L - I_ -I- - 14� — -1- - - H - I- -I - 4 - I- - I- -I - H - I- H - I- -I - 4 - I- -I- - 13 - Runoff-V-OlJfl j.+205-af + - I- - - 1- - 1 -I - 4 H -I- - w 12i r�io�{�t-riot lrpl��} n 1 - t 1-I - - - 1- 1 1 fi 1 1 - 11� _ NM 1- "1" •.47- - I- - -[ - 1- - I- -1 - -r - 1- -1- - io 9� F11ov� Lbr�ath -95V.1- 1 - - 1 7 1 I 7 I- I _ 1 1 1 1 1 1 1 8t2TIc= II7.7min-1 I I 1 1 1 1 1 6� — QA 1 1 1 1 5� � I�FI / 1 1 1 1 4/ _ 1 1 1 1 1 / 1 1 1 1 3 ./ 1 1 1 1 1 24-/ _ 1 1 1 1 1 le . �� 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 0.94 2.40 0.25 0.01 0.00 0.00 13.00 2.32 0.98 1.79 0.50 0.02 0.00 0.00 13.25 2.36 1.01 1.50 0.75 0.02 0.00 0.00 13.50 2.40 1.04 1.31 1.00 0.03 0.00 0.00 13.75 2.43 1.06 1.15 1.25 0.04 0.00 0.00 14.00 2.46 1.09 1.03 1.50 0.05 0.00 0.00 14.25 2.49 1.11 0.92 1.75 0.06 0.00 0.00 14.50 2.51 1.13 0.86 2.00 0.07 0.00 0.00 14.75 2.54 1.15 0.82 2.25 0.08 0.00 0.00 15.00 2.56 1.16 0.78 2.50 0.08 0.00 0.00 15.25 2.58 1.18 0.74 2.75 0.09 0.00 0.00 15.50 2.60 1.20 0.70 3.00 0.10 0.00 0.00 15.75 2.62 1.21 0.66 3.25 0.11 0.00 0.00 16.00 2.64 1.23 0.62 3.50 0.12 0.00 0.00 16.25 2.66 1.24 0.58 3.75 0.13 0.00 0.00 16.50 2.67 1.25 0.56 4.00 0.14 0.00 0.00 16.75 2.69 1.27 0.54 4.25 0.15 0.00 0.00 17.00 2.71 1.28 0.53 4.50 0.17 0.00 0.00 17.25 2.72 1.29 0.52 4.75 0.18 0.00 0.00 17.50 2.74 1.30 0.50 5.00 0.19 0.00 0.00 17.75 2.75 1.31 0.49 5.25 0.20 0.00 0.00 18.00 2.76 1.32 0.47 5.50 0.21 0.00 0.00 18.25 2.78 1.33 0.46 5.75 0.23 0.00 0.00 18.50 2.79 1.34 0.44 6.00 0.24 0.00 0.00 18.75 2.80 1.35 0.43 6.25 0.25 0.00 0.00 19.00 2.81 1.36 0.41 6.50 0.27 0.00 0.00 19.25 2.82 1.37 0.39 6.75 0.28 0.00 0.00 19.50 2.84 1.38 0.38 7.00 0.30 0.00 0.00 19.75 2.85 1.39 0.36 7.25 0.31 0.00 0.00 20.00 2.86 1.40 0.35 7.50 0.33 0.00 0.00 7.75 0.34 0.00 0.00 8.00 0.36 0.00 0.00 8.25 0.38 0.00 0.00 8.50 0.40 0.00 0.00 8.75 0.42 0.00 0.01 9.00 0.44 0.00 0.03 9.25 0.47 0.00 0.06 9.50 0.49 0.01 0.08 9.75 0.51 0.01 0.11 10.00 0.54 0.01 0.14 10.25 0.58 0.02 0.19 10.50 0.61 0.02 0.25 10.75 0.65 0.03 0.33 11.00 0.71 0.05 0.45 11.25 0.77 0.07 0.62 11.50 0.85 0.09 0.91 11.75 1.16 0.23 2.40 12.00 1.99 0.74 13.71 12.25 2.12 0.83 11.59 12.50 2.20 0.89 4.28 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 1S: POST TO SAND FILTER B Runoff = 17.64 cfs @ 12.01 hrs, Volume= 0.872 af, Depth> 1.39" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description * 7.500 84 45% IMPERVIOUS, HSG D 7.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER B Hydrograph 1 1 1 1 1 I — 19;/ ,_ I I I I I I I I I I I I _ ■Runoff 14/ II I — nsa cfs 171/ 2Ty_pe1IT2 Mil 1 1 I 1 I I 115t ,_ t r?(Par 1 RQ1rnf I 1 1.1 3. 0'I- I I I � TC I I I I I I I I 14 /— Run es .fir' o©-a� -I _ 1 — 1 1 1 1 13 -/ 1 1 �1 1 I 1 1 1 I I I I I I 12 r Runol 11 V oIumeFO.872a1 I I I1 1 1I y 11 / _{ pI } �� 1 1 1 1 1 10� ,,u�l"w"I �`T�`,'" '� I I I I I I I I LL9� _ TC A 1r I In 1 I I 1 I I 1 1 1 1 — 8 / 1 L L _ 1_ _I _ 1 _ L _1_ _ I _ L 1 I L L I _ 7 , CN 8_11•L I 1 L 1 — — — L I L L I 6 / _ I I 1 I I 1 1 1 I I I 54-/ _I_ _I — L — 1_ _I _ 1 — L _I_ 1_ _I _ 1 _ L _I_ _ 4/ _ 1 L L I I 1 L I — — — L — 1 I L L I — 3 -/ ,_ I L L I— 1 — 1 L I_ — L 1— —I L L I — 24 , I L L I 1 L I L — I L L J 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 1S: POST TO SAND FILTER B Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 0.94 1.39 0.25 0.01 0.00 0.00 13.00 2.32 0.98 1.17 0.50 0.02 0.00 0.00 13.25 2.36 1.01 1.00 0.75 0.02 0.00 0.00 13.50 2.40 1.04 0.88 1.00 0.03 0.00 0.00 13.75 2.43 1.06 0.78 1.25 0.04 0.00 0.00 14.00 2.46 1.09 0.70 1.50 0.05 0.00 0.00 14.25 2.49 1.11 0.64 1.75 0.06 0.00 0.00 14.50 2.51 1.13 0.61 2.00 0.07 0.00 0.00 14.75 2.54 1.15 0.58 2.25 0.08 0.00 0.00 15.00 2.56 1.16 0.55 2.50 0.08 0.00 0.00 15.25 2.58 1.18 0.52 2.75 0.09 0.00 0.00 15.50 2.60 1.20 0.49 3.00 0.10 0.00 0.00 15.75 2.62 1.21 0.46 3.25 0.11 0.00 0.00 16.00 2.64 1.23 0.43 3.50 0.12 0.00 0.00 16.25 2.66 1.24 0.41 3.75 0.13 0.00 0.00 16.50 2.67 1.25 0.40 4.00 0.14 0.00 0.00 16.75 2.69 1.27 0.39 4.25 0.15 0.00 0.00 17.00 2.71 1.28 0.38 4.50 0.17 0.00 0.00 17.25 2.72 1.29 0.37 4.75 0.18 0.00 0.00 17.50 2.74 1.30 0.36 5.00 0.19 0.00 0.00 17.75 2.75 1.31 0.34 5.25 0.20 0.00 0.00 18.00 2.76 1.32 0.33 5.50 0.21 0.00 0.00 18.25 2.78 1.33 0.32 5.75 0.23 0.00 0.00 18.50 2.79 1.34 0.31 6.00 0.24 0.00 0.00 18.75 2.80 1.35 0.30 6.25 0.25 0.00 0.00 19.00 2.81 1.36 0.29 6.50 0.27 0.00 0.00 19.25 2.82 1.37 0.28 6.75 0.28 0.00 0.00 19.50 2.84 1.38 0.27 7.00 0.30 0.00 0.00 19.75 2.85 1.39 0.26 7.25 0.31 0.00 0.00 20.00 2.86 1.40 0.25 7.50 0.33 0.00 0.00 7.75 0.34 0.00 0.00 8.00 0.36 0.00 0.00 8.25 0.38 0.00 0.00 8.50 0.40 0.00 0.00 8.75 0.42 0.00 0.02 9.00 0.44 0.00 0.03 9.25 0.47 0.00 0.05 9.50 0.49 0.01 0.07 9.75 0.51 0.01 0.09 10.00 0.54 0.01 0.12 10.25 0.58 0.02 0.16 10.50 0.61 0.02 0.21 10.75 0.65 0.03 0.28 11.00 0.71 0.05 0.38 11.25 0.77 0.07 0.53 11.50 0.85 0.09 0.79 11.75 1.16 0.23 3.56 12.00 1.99 0.74 17.56 12.25 2.12 0.83 3.68 12.50 2.20 0.89 2.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 5S: BYPASS BUA Runoff = 7.70 cfs @ 11.95 hrs, Volume= 0.393 af, Depth> 2.62" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description * 1.800 98 BYPASS BUA 1.800 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: BYPASS BUA Hydrograph 1 1 1 1 1 : ,_ —I— _ I — _H — I— - I I_ _ l — _H —I— - ❑Runoff` 81/ 1 I I I I I 1 77°cfs I 1 1 - 1 Type II1241-h r 1 1 1 1 III 1 1 1 1 1 1 17Year 1IRainfalIT3.PU 1 1 11 I 61/ zr Runbl l'Ar�ea1.500 ad ' 1 1 1 I 1 I I - 1 1I 1 1 I I 1 1 1 1 1 1 1 RunofftVoIum3e=0.393-a# rt - 1- - - rt - ff -1- y 5� I un1 —I — 11 TDO ' „ 1 0 4� 1 Tc 5.01 miln I I 1 1 1 1 1 1 1 �+ I�pI I I I I I 1 1 1 1 1 3� _ C N 981 1 1 1 1 1 1 1 1 1 1 1 I I 1 1 I I 1 1 1 - 1 1 1 1 1 1 1 1 1 II/ 1 1 1 1— 1 t 1 1 1 t 1 1 t 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 2.04 0.42 0.25 0.01 0.00 0.00 13.00 2.32 2.09 0.35 0.50 0.02 0.00 0.00 13.25 2.36 2.13 0.30 0.75 0.02 0.00 0.00 13.50 2.40 2.17 0.27 1.00 0.03 0.00 0.00 13.75 2.43 2.20 0.24 1.25 0.04 0.00 0.00 14.00 2.46 2.23 0.21 1.50 0.05 0.00 0.00 14.25 2.49 2.26 0.19 1.75 0.06 0.00 0.01 14.50 2.51 2.28 0.18 2.00 0.07 0.00 0.01 14.75 2.54 2.31 0.17 2.25 0.08 0.00 0.02 15.00 2.56 2.33 0.17 2.50 0.08 0.01 0.02 15.25 2.58 2.35 0.16 2.75 0.09 0.01 0.02 15.50 2.60 2.37 0.15 3.00 0.10 0.01 0.03 15.75 2.62 2.39 0.14 3.25 0.11 0.02 0.03 16.00 2.64 2.41 0.13 3.50 0.12 0.02 0.04 16.25 2.66 2.43 0.12 3.75 0.13 0.03 0.04 16.50 2.67 2.44 0.12 4.00 0.14 0.03 0.04 16.75 2.69 2.46 0.12 4.25 0.15 0.04 0.05 17.00 2.71 2.47 0.11 4.50 0.17 0.05 0.05 17.25 2.72 2.49 0.11 4.75 0.18 0.05 0.05 17.50 2.74 2.50 0.11 5.00 0.19 0.06 0.06 17.75 2.75 2.52 0.10 5.25 0.20 0.07 0.06 18.00 2.76 2.53 0.10 5.50 0.21 0.08 0.06 18.25 2.78 2.55 0.10 5.75 0.23 0.09 0.07 18.50 2.79 2.56 0.09 6.00 0.24 0.10 0.07 18.75 2.80 2.57 0.09 6.25 0.25 0.11 0.08 19.00 2.81 2.58 0.09 6.50 0.27 0.12 0.08 19.25 2.82 2.59 0.08 6.75 0.28 0.13 0.08 19.50 2.84 2.60 0.08 7.00 0.30 0.14 0.09 19.75 2.85 2.61 0.07 7.25 0.31 0.15 0.09 20.00 2.86 2.62 0.07 7.50 0.33 0.17 0.09 7.75 0.34 0.18 0.10 8.00 0.36 0.19 0.10 8.25 0.38 0.21 0.11 8.50 0.40 0.23 0.12 8.75 0.42 0.24 0.14 9.00 0.44 0.27 0.15 9.25 0.47 0.29 0.16 9.50 0.49 0.31 0.16 9.75 0.51 0.33 0.17 10.00 0.54 0.36 0.19 10.25 0.58 0.39 0.22 10.50 0.61 0.42 0.25 10.75 0.65 0.46 0.30 11.00 0.71 0.51 0.35 11.25 0.77 0.57 0.46 11.50 0.85 0.65 0.59 11.75 1.16 0.95 2.80 12.00 1.99 1.76 6.43 12.25 2.12 1.89 0.87 12.50 2.20 1.98 0.57 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Pond 2P: FOREBAY Inflow Area = 7.500 ac, 0.00% Impervious, Inflow Depth > 1.39" for 1-Year event Inflow = 17.64 cfs @ 12.01 hrs, Volume= 0.872 af Outflow = 6.21 cfs @ 12.17 hrs, Volume= 0.839 af, Atten= 65%, Lag= 9.7 min Primary = 6.20 cfs @ 12.17 hrs, Volume= 0.837 af Routed to Pond 4P : TOTAL Secondary= 0.01 cfs @ 12.17 hrs, Volume= 0.002 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 576.75'@ 12.17 hrs Surf.Area= 8,213 sf Storage= 12,840 cf Plug-Flow detention time=42.3 min calculated for 0.839 af(96% of inflow) Center-of-Mass det. time=28.0 min ( 817.9 - 789.9 ) Volume Invert Avail.Storage Storage Description _ #1 575.00' 66,167 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 6,453 0 0 576.00 7,437 6,945 6,945 577.00 8,467 7,952 14,897 578.00 9,280 8,874 23,771 579.00 13,874 11,577 35,348 580.00 15,391 14,633 49,980 581.00 16,983 16,187 66,167 Device Routing Invert Outlet Devices #1 Primary 575.00' 36.0" Round 36" Culvert L= 87.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 575.00'/ 574.00' S= 0.0115 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Primary 577.50' 36.0" W x 6.0" H Vert. 6X36 IN ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 578.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 575.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Primary 575.00' 12.0" Round 12" PIPE TO SF X 2.00 L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 575.00'/ 574.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #6 Tertiary 579.00' 10.0' long + 3.0 '/' SideZ x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 13 Primary OutFlow Max=6.18 cfs @ 12.17 hrs HW=576.74' TW=0.00' (Dynamic Tailwater) —1=36" Culvert (Passes 0.00 cfs of 19.18 cfs potential flow) L3=TOP OF OUTLET STRUCTURE( Controls 0.00 cfs) —2=6X36 IN ORIFICE ( Controls 0.00 cfs) —5=12" PIPE TO SF (Barrel Controls 6.18 cfs @ 3.93 fps) Secondary OutFlow Max=0.01 cfs @ 12.17 hrs HW=576.74' TW=575.01' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.01 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=575.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph II 1 1 II 1 1 1 I I I 1 1 1 I I z ._ _ 1 _L I _L I _L I _L 1 _H L I L I L I L ■Inflow I � fj 17.64 n �p�?�_� "�(� + • i /19 ,/ / / - V Outflow•Primary p 1�$��� -I- T — T —I— —I — fi —I — — Secondary■ Tertiary 18 z z i ItAI I I 1 1 1 1 1 I I III I III 16=/ i / 15 / / zz � - - 1- T - 1- T - I- T - I- T -1- T T -I- T -1 - T -I - T- - 1315" / / % T 124/ i / / / / L _I _ 1_ L _ 1_ L _ 1_ 1 _ 1_ L _1_ L L _I_ L _I _ L _I _ L _ 11. / / / / / - - 1- 4 - 1- 4 — I- 4 — I— + —I— + + —I- 4 —I - 4 —I - 1— - 2. 10 i / — —I _ 1_ _ 1_ —[ _ I_ rt _ I_ 1 6.21 cfs fi —I— fi —1 — fi —I — 1— — 3 / /o 1 LL 9 / � i I 1 1 1 I I 1 I 6.20 cfs I I 1 1 1 I I Ski / / / I 1 1 1 1 1 1 1 1 � III III 6� // / / L _1 _ 1_ L _ 1_ L _ ' ' _ 1_ 1 '/l _1_ L _I _ L _1 _ L _ 3- �� ����������� ' ��������� 10.00 0 i � �/ �t� cfs . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 14 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 0.00 0.50 0.00 0 575.00 0.00 0.00 0.00 0.00 1.00 0.00 0 575.00 0.00 0.00 0.00 0.00 1.50 0.00 0 575.00 0.00 0.00 0.00 0.00 2.00 0.00 0 575.00 0.00 0.00 0.00 0.00 2.50 0.00 0 575.00 0.00 0.00 0.00 0.00 3.00 0.00 0 575.00 0.00 0.00 0.00 0.00 3.50 0.00 0 575.00 0.00 0.00 0.00 0.00 4.00 0.00 0 575.00 0.00 0.00 0.00 0.00 4.50 0.00 0 575.00 0.00 0.00 0.00 0.00 5.00 0.00 0 575.00 0.00 0.00 0.00 0.00 5.50 0.00 0 575.00 0.00 0.00 0.00 0.00 6.00 0.00 0 575.00 0.00 0.00 0.00 0.00 6.50 0.00 0 575.00 0.00 0.00 0.00 0.00 7.00 0.00 0 575.00 0.00 0.00 0.00 0.00 7.50 0.00 0 575.00 0.00 0.00 0.00 0.00 8.00 0.00 0 575.00 0.00 0.00 0.00 0.00 8.50 0.00 1 575.00 0.00 0.00 0.00 0.00 9.00 0.03 31 575.00 0.00 0.00 0.00 0.00 9.50 0.07 120 575.02 0.00 0.00 0.00 0.00 10.00 0.12 272 575.04 0.01 0.01 0.00 0.00 10.50 0.21 522 575.08 0.03 0.03 0.00 0.00 11.00 0.38 911 575.14 0.11 0.11 0.00 0.00 11.50 0.79 1,549 575.24 0.32 0.32 0.00 0.00 12.00 17.56 8,736 576.24 5.17 5.16 0.01 0.00 12.50 2.00 9,702 576.36 5.15 5.14 0.01 0.00 13.00 1.17 4,984 575.73 2.64 2.64 0.00 0.00 13.50 0.88 3,386 575.51 1.39 1.39 0.00 0.00 14.00 0.70 2,739 575.41 0.95 0.95 0.00 0.00 14.50 0.61 2,392 575.36 0.74 0.74 0.00 0.00 15.00 0.55 2,203 575.33 0.64 0.63 0.00 0.00 15.50 0.49 2,065 575.31 0.56 0.56 0.00 0.00 16.00 0.43 1,940 575.29 0.50 0.50 0.00 0.00 16.50 0.40 1,832 575.28 0.45 0.44 0.00 0.00 17.00 0.38 1,759 575.27 0.41 0.41 0.00 0.00 17.50 0.36 1,701 575.26 0.39 0.38 0.00 0.00 18.00 0.33 1,648 575.25 0.36 0.36 0.00 0.00 18.50 0.31 1,596 575.24 0.34 0.34 0.00 0.00 19.00 0.29 1,545 575.24 0.32 0.32 0.00 0.00 19.50 0.27 1,491 575.23 0.30 0.30 0.00 0.00 20.00 0.25 1,437 575.22 0.28 0.28 0.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 15 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 0.00 575.20 0.23 0.23 0.00 0.00 575.40 0.90 0.90 0.00 0.00 575.60 1.89 1.89 0.00 0.00 575.80 3.04 3.04 0.00 0.00 576.00 4.19 4.18 0.01 0.00 576.20 5.07 5.06 0.01 0.00 576.40 5.26 5.25 0.01 0.00 576.60 5.82 5.81 0.01 0.00 576.80 6.32 6.31 0.01 0.00 577.00 6.79 6.78 0.01 0.00 577.20 7.23 7.22 0.01 0.00 577.40 7.64 7.63 0.01 0.00 577.60 8.34 8.33 0.01 0.00 577.80 9.99 9.98 0.01 0.00 578.00 12.18 12.16 0.02 0.00 578.20 18.57 18.56 0.02 0.00 578.40 28.47 28.45 0.02 0.00 578.60 40.72 40.70 0.02 0.00 578.80 54.90 54.88 0.02 0.00 579.00 70.76 70.74 0.02 0.00 579.20 77.80 75.26 0.02 2.51 579.40 85.67 78.16 0.02 7.49 579.60 95.33 80.95 0.02 14.36 579.80 106.19 83.64 0.03 22.52 580.00 118.89 86.25 0.03 32.61 580.20 133.50 88.77 0.03 44.70 580.40 149.68 91.22 0.03 58.43 580.60 167.30 93.61 0.03 73.67 580.80 186.91 95.93 0.03 90.95 581.00 208.33 98.20 0.03 110.09 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 16 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 6,453 0 580.10 15,550 51,527 575.10 6,551 650 580.20 15,709 53,090 575.20 6,650 1,310 580.30 15,869 54,669 575.30 6,748 1,980 580.40 16,028 56,264 575.40 6,847 2,660 580.50 16,187 57,875 575.50 6,945 3,350 580.60 16,346 59,501 575.60 7,043 4,049 580.70 16,505 61,144 575.70 7,142 4,758 580.80 16,665 62,802 575.80 7,240 5,477 580.90 16,824 64,477 575.90 7,339 6,206 581.00 16,983 66,167 576.00 7,437 6,945 576.10 7,540 7,694 576.20 7,643 8,453 576.30 7,746 9,222 576.40 7,849 10,002 576.50 7,952 10,792 576.60 8,055 11,593 576.70 8,158 12,403 576.80 8,261 13,224 576.90 8,364 14,055 577.00 8,467 14,897 577.10 8,548 15,748 577.20 8,630 16,607 577.30 8,711 17,474 577.40 8,792 18,349 577.50 8,874 19,232 577.60 8,955 20,124 577.70 9,036 21,023 577.80 9,117 21,931 577.90 9,199 22,847 578.00 9,280 23,771 578.10 9,739 24,721 578.20 10,199 25,718 578.30 10,658 26,761 578.40 11,118 27,850 578.50 11,577 28,985 578.60 12,036 30,165 578.70 12,496 31,392 578.80 12,955 32,665 578.90 13,415 33,983 579.00 13,874 35,348 579.10 14,026 36,742 579.20 14,177 38,153 579.30 14,329 39,578 579.40 14,481 41,018 579.50 14,633 42,474 579.60 14,784 43,945 579.70 14,936 45,431 579.80 15,088 46,932 579.90 15,239 48,448 580.00 15,391 49,980 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 17 Summary for Pond 3P: SAND FILTER Inflow = 0.01 cfs @ 12.17 hrs, Volume= 0.002 af Outflow = 0.00 cfs @ 13.69 hrs, Volume= 0.002 af, Atten= 69%, Lag= 91.1 min Primary = 0.00 cfs @ 13.69 hrs, Volume= 0.002 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 575.02'@ 13.69 hrs Surf.Area= 1,344 sf Storage= 28 cf Plug-Flow detention time= 143.8 min calculated for 0.002 af(79% of inflow) Center-of-Mass det. time=81.3 min ( 941.9 - 860.6 ) Volume Invert Avail.Storage Storage Description #1 575.00' 45,537 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 575.00 1,334 0 0 576.00 1,812 1,573 1,573 577.00 2,353 2,083 3,656 578.00 2,958 2,656 6,311 579.00 13,864 8,411 14,722 580.00 15,391 14,628 29,350 581.00 16,983 16,187 45,537 Device Routing Invert Outlet Devices #1 Primary 575.00' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 13.69 hrs HW=575.02' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Custom Controls 0.00 cfs) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 18 Pond 3P: SAND FILTER Hydrograph I- — I. 1 -I— — I— —I - - —I — T —1— —1 — 1— r — 1— —1 — 1 :- —1— —r — 1— —1 ■Inflow 0.01 i /7 —1 — T {—1— 7 — - —1 T — I— —I — T I o.oi cfs — p —I T 7 — )— —I — ❑Primary 00.00009'' / ' -Peak El$j/� :02� =, /r I I I I I I 1 1 1 1 I I I 1 1 0.008- 0.008-' / —I StO =2$ c_f— 1 1 1 I I I I 1 0.007 ' / 1 1 1 1 1 1 1 1 1 1 1 / 1 1 LLL : 0.007i' / I I I I I I I0.006-' / _ _I — 1 —I— J — L —I — 1 — I— —I — L -1 0.006 / ) I T I _I L I T I I 1- -I / — —I— - — I- I - w 0.0051i ,_ -1 — + —I— H — i— -I — + - 1— -1 — _H -1 — t —I— —I — — -1 — LL o.0041ifi I t I -I 1— I t I I t 1 - t I —11 I - 0.0041 - fi I t I— —I 1— —I -r 1 1 fi 1 �i - fi 1 1 1— 1 - 0.0031 i I T T T IT TI T F TI T T I I T 1 o.00 crs rA� —1 T T I - 0.002 / 0.00247 / I 1 1 1 1 1 1 1 1 1 1 i 1 �/������%- 0.0011 i � 1 0.0011i I 1 1II 11, 1 1 1 1 0.000- / ���.. �� Sf ///5fr�STr ,5fr '5fr�5f !/ 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 19 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 575.00 0.00 0.50 0.00 0 575.00 0.00 1.00 0.00 0 575.00 0.00 1.50 0.00 0 575.00 0.00 2.00 0.00 0 575.00 0.00 2.50 0.00 0 575.00 0.00 3.00 0.00 0 575.00 0.00 3.50 0.00 0 575.00 0.00 4.00 0.00 0 575.00 0.00 4.50 0.00 0 575.00 0.00 5.00 0.00 0 575.00 0.00 5.50 0.00 0 575.00 0.00 6.00 0.00 0 575.00 0.00 6.50 0.00 0 575.00 0.00 7.00 0.00 0 575.00 0.00 7.50 0.00 0 575.00 0.00 8.00 0.00 0 575.00 0.00 8.50 0.00 0 575.00 0.00 9.00 0.00 0 575.00 0.00 9.50 0.00 0 575.00 0.00 10.00 0.00 0 575.00 0.00 10.50 0.00 1 575.00 0.00 11.00 0.00 2 575.00 0.00 11.50 0.00 3 575.00 0.00 12.00 0.01 8 575.01 0.00 12.50 0.01 20 575.02 0.00 13.00 0.00 27 575.02 0.00 13.50 0.00 28 575.02 0.00 14.00 0.00 28 575.02 0.00 14.50 0.00 27 575.02 0.00 15.00 0.00 26 575.02 0.00 15.50 0.00 25 575.02 0.00 16.00 0.00 24 575.02 0.00 16.50 0.00 23 575.02 0.00 17.00 0.00 22 575.02 0.00 17.50 0.00 21 575.02 0.00 18.00 0.00 20 575.02 0.00 18.50 0.00 19 575.01 0.00 19.00 0.00 19 575.01 0.00 19.50 0.00 18 575.01 0.00 20.00 0.00 17 575.01 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 20 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 575.00 0.00 577.55 0.33 580.10 0.54 575.05 0.01 577.60 0.34 580.15 0.54 575.10 0.01 577.65 0.34 580.20 0.55 575.15 0.02 577.70 0.34 580.25 0.55 575.20 0.03 577.75 0.35 580.30 0.56 575.25 0.03 577.80 0.35 580.35 0.56 575.30 0.04 577.85 0.36 I 580.40 0.56 575.35 0.05 577.90 0.36 580.45 0.57 575.40 0.05 577.95 0.36 580.50 0.57 575.45 0.06 578.00 0.37 580.55 0.58 575.50 0.07 , 578.05 0.37 580.60 0.58 575.55 0.07 578.10 0.38 580.65 0.59 575.60 0.08 578.15 0.38 580.70 0.59 575.65 0.09 578.20 0.38 580.75 0.59 575.70 0.09 578.25 0.39 580.80 0.60 575.75 0.10 578.30 0.39 580.85 0.60 575.80 0.10 578.35 0.40 580.90 0.61 575.85 0.11 578.40 0.40 580.95 0.61 575.90 0.12 578.45 0.40 581.00 0.61 575.95 0.12 578.50 0.41 576.00 0.13 578.55 0.41 576.05 0.14 578.60 0.42 576.10 0.14 578.65 0.42 576.15 0.15 ' 578.70 0.43 576.20 0.16 578.75 0.43 576.25 0.16 578.80 0.43 576.30 0.17 ' 578.85 0.44 576.35 0.18 578.90 0.44 576.40 0.18 578.95 0.45 576.45 0.19 579.00 0.45 576.50 0.20 579.05 0.45 576.55 0.20 579.10 0.46 576.60 0.21 579.15 0.46 576.65 0.22 579.20 0.47 576.70 0.22 579.25 0.47 576.75 0.23 579.30 0.47 576.80 0.24 579.35 0.48 576.85 0.24 579.40 0.48 576.90 0.25 I 579.45 0.49 576.95 0.26 579.50 0.49 577.00 0.26 579.55 0.50 577.05 0.27 579.60 0.50 577.10 0.27 579.65 0.50 577.15 0.28 579.70 0.51 577.20 0.29 579.75 0.51 577.25 0.29 579.80 0.52 577.30 0.30 579.85 0.52 577.35 0.31 579.90 0.52 577.40 0.31 579.95 0.53 577.45 0.32 580.00 0.53 577.50 0.33 580.05 0.54 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 21 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 1,334 0 580.10 15,550 30,897 575.10 1,382 136 580.20 15,709 32,460 575.20 1,430 276 580.30 15,869 34,038 575.30 1,477 422 580.40 16,028 35,633 575.40 1,525 572 580.50 16,187 37,244 575.50 1,573 727 580.60 16,346 38,871 575.60 1,621 886 580.70 16,505 40,513 575.70 1,669 1,051 580.80 16,665 42,172 575.80 1,716 1,220 580.90 16,824 43,846 575.90 1,764 1,394 581.00 16,983 45,537 576.00 1,812 1,573 576.10 1,866 1,757 576.20 1,920 1,946 576.30 1,974 2,141 576.40 2,028 2,341 576.50 2,083 2,547 576.60 2,137 2,758 576.70 2,191 2,974 576.80 2,245 3,196 576.90 2,299 3,423 577.00 2,353 3,656 577.10 2,414 3,894 577.20 2,474 4,138 577.30 2,534 4,389 577.40 2,595 4,645 577.50 2,656 4,908 577.60 2,716 5,176 577.70 2,777 5,451 577.80 2,837 5,731 577.90 2,897 6,018 578.00 2,958 6,311 578.10 4,049 6,661 578.20 5,139 7,121 578.30 6,230 7,689 578.40 7,320 8,367 578.50 8,411 9,153 578.60 9,502 10,049 578.70 10,592 11,054 578.80 11,683 12,167 578.90 12,773 13,390 579.00 13,864 14,722 579.10 14,017 16,116 579.20 14,169 17,525 579.30 14,322 18,950 579.40 14,475 20,390 579.50 14,628 21,845 579.60 14,780 23,315 579.70 14,933 24,801 579.80 15,086 26,302 579.90 15,238 27,818 580.00 15,391 29,350 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 22 Summary for Pond 4P: TOTAL Inflow Area = 9.300 ac, 19.35% Impervious, Inflow Depth > 1.59" for 1-Year event Inflow = 11.98 cfs @ 11.97 hrs, Volume= 1.232 af Primary = 11.98 cfs @ 11.97 hrs, Volume= 1.232 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph / 1 I I 1 I I I I 1 I ❑ Inflow 13 I I I I 111.98 cfs r 1 1 1 D Primary 1 12 Inflow Area=9.300 ac 1lii98cfsi 1 1 1 1 1 1 1 10� / A- -I- fi - I- -1 - fi - I- -I - g I I I I I I / I I v 7� / ,f` —I— 4 — I— —I — 4 — I— —I — 4 — I— —I — �� -I — 4 — I— — — — I— —I — - 3 = / I I I I I I I I I I LL B� fi 1 1 1 1 1 1Oit � 1 1 1 1 1 51/ fi —I— 1 I— —I — rt - 1- -1 rt - 1 - 1 rt I— — — rt — I— — - = / I 1 I I 1 I ` _ I_ _I _ 1 _ I_ _I 4 _ I 1 I I I I I I I / �� I I I I I 3 1 1 1 1 1 1 I 1 2 4 — I— —I — 4 — I— —I �� '��� - 1- -I - - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 23 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 4.51 4.51 0.25 0.00 0.00 13.00 2.99 2.99 0.50 0.00 0.00 13.25 2.14 2.14 0.75 0.00 0.00 13.50 1.66 1.66 1.00 0.00 0.00 13.75 1.36 1.36 1.25 0.00 0.00 14.00 1.16 1.16 1.50 0.00 0.00 14.25 1.02 1.02 1.75 0.01 0.01 14.50 0.93 0.93 2.00 0.01 0.01 14.75 0.86 0.86 2.25 0.02 0.02 15.00 0.80 0.80 2.50 0.02 0.02 15.25 0.75 0.75 2.75 0.02 0.02 15.50 0.71 0.71 3.00 0.03 0.03 15.75 0.67 0.67 3.25 0.03 0.03 16.00 0.63 0.63 3.50 0.04 0.04 16.25 0.59 0.59 3.75 0.04 0.04 16.50 0.57 0.57 4.00 0.04 0.04 16.75 0.54 0.54 4.25 0.05 0.05 17.00 0.52 0.52 4.50 0.05 0.05 17.25 0.51 0.51 4.75 0.05 0.05 17.50 0.49 0.49 5.00 0.06 0.06 17.75 0.48 0.48 5.25 0.06 0.06 18.00 0.46 0.46 5.50 0.06 0.06 18.25 0.45 0.45 5.75 0.07 0.07 18.50 0.43 0.43 6.00 0.07 0.07 18.75 0.42 0.42 6.25 0.08 0.08 19.00 0.40 0.40 6.50 0.08 0.08 19.25 0.39 0.39 6.75 0.08 0.08 19.50 0.38 0.38 7.00 0.09 0.09 19.75 0.36 0.36 7.25 0.09 0.09 20.00 0.35 0.35 7.50 0.09 0.09 7.75 0.10 0.10 8.00 0.10 0.10 8.25 0.11 0.11 8.50 0.12 0.12 8.75 0.14 0.14 9.00 0.15 0.15 9.25 0.16 0.16 9.50 0.16 0.16 9.75 0.18 0.18 10.00 0.20 0.20 10.25 0.24 0.24 10.50 0.29 0.29 10.75 0.36 0.36 11.00 0.46 0.46 11.25 0.64 0.64 11.50 0.91 0.91 11.75 3.64 3.64 12.00 11.59 11.59 12.25 6.94 6.94 12.50 5.71 5.71 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 24 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=10.400 ac 0.00% Impervious Runoff Depth=2.15" Flow Length=950' Tc=17.7 min CN=84 Runoff=37.09 cfs 1.865 af SubcatchmentlS: POST TO SAND FILTER B Runoff Area=7.500 ac 0.00% Impervious Runoff Depth=2.15" Tc=9.4 min CN=84 Runoff=35.35 cfs 1.345 af Subcatchment5S: BYPASS BUA Runoff Area=1.800 ac 100.00% Impervious Runoff Depth=3.52" Tc=5.0 min CN=98 Runoff=13.70 cfs 0.527 af Pond 2P: FOREBAY Peak Elev=578.08' Storage=24,511 cf Inflow=35.35 cfs 1.345 af Primary=13.97 cfs 1.339 af Secondary=0.02 cfs 0.002 af Tertiary=0.00 cfs 0.000 af Outflow=13.98 cfs 1.342 af Pond 3P: SAND FILTER Peak EIev=575.04' Storage=48 cf Inflow=0.02 cfs 0.002 af Outflow=0.00 cfs 0.002 af Pond 4P: TOTAL Inflow=19.48 cfs 1.869 af Primary=19.48 cfs 1.869 af Total Runoff Area = 19.700 ac Runoff Volume = 3.738 af Average Runoff Depth = 2.28" 90.86% Pervious = 17.900 ac 9.14% Impervious = 1.800 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 37.09 cfs @ 3.11 hrs, Volume= 1.865 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.75" Area (ac) CN Description 10.400 84 Pasture/grassland/range, Fair, HSG D 10.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Grass: Dense n= 0.240 P2= 3.58" 5.1 800 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 17.7 950 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph 1 1 I 1 1 I I I I I I I I I I I I I 40 -1- I 1 I I I I I I I I I I I I I I - •Runoff 38;:,/ , -1- 1 37.o9 cfs 1 1 I I 1 I I 1 1 I 1 1 I 1 1 I - 364-/ , 1 1 1 1 I I 1 I I 1 1 I 1 1 I ITypeiu - 344 -I- _I - -I - _1 - 1_ -I- _I - H - I- -I - _1 - H - I- -I - 4 - v " 32 -I- _I - - I- -I - _1 - 1_ -I- _I - H - I- -I - _1 - H - l- -I - 4 - 1 I— - 304-/ — I -11- 1 4 1- 1 -I H 10-Y .eat RaitifaH=a " - 284-/ - - _1 1 - -1 - -1 - 1- -1- -I - H - I- -1 - -1 - H - I- -I - H - i- -I- - 26 � -1- H - I- -1 - 4 - 1— -I— H — + - 1—Ruf ffArea 1-O40,O-ac - y 24 I _[ - -1 - rt I- 1 - -r 1 ft.1 - oio 1 r 11110 Delpth 2-.T5" 16 14 I I I I I 1 ' ow Itength-95O' 1 104 ,_ I I I I 1 I 1 1 "I - 8 ,- ,_ _I 1 I I I I 1 I 1 1 I 1G 4 0/ 1 _ I I 1 I I I I I I I 4 , , .,- 1 I 1 1 I 1 1 I X. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 26 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.75 2.15 0.00 0.25 0.04 0.00 0.00 13.00 3.75 2.15 0.00 0.50 0.08 0.00 0.00 13.25 3.75 2.15 0.00 0.75 0.13 0.00 0.00 13.50 3.75 2.15 0.00 1.00 0.18 0.00 0.00 13.75 3.75 2.15 0.00 1.25 0.24 0.00 0.00 14.00 3.75 2.15 0.00 1.50 0.30 0.00 0.00 14.25 3.75 2.15 0.00 1.75 0.38 0.00 0.00 14.50 3.75 2.15 0.00 2.00 0.47 0.00 0.04 14.75 3.75 2.15 0.00 2.25 0.58 0.02 0.34 15.00 3.75 2.15 0.00 2.50 0.72 0.05 0.93 15.25 3.75 2.15 0.00 2.75 1.27 0.28 3.63 15.50 3.75 2.15 0.00 3.00 2.74 1.30 26.64 15.75 3.75 2.15 0.00 3.25 2.97 1.49 23.15 16.00 3.75 2.15 0.00 3.50 3.12 1.62 8.55 16.25 3.75 2.15 0.00 3.75 3.23 1.71 4.78 16.50 3.75 2.15 0.00 4.00 3.32 1.78 3.57 16.75 3.75 2.15 0.00 4.25 3.39 1.85 2.97 17.00 3.75 2.15 0.00 4.50 3.46 1.90 2.59 17.25 3.75 2.15 0.00 4.75 3.52 1.95 2.28 17.50 3.75 2.15 0.00 5.00 3.57 2.00 2.03 17.75 3.75 2.15 0.00 5.25 3.62 2.04 1.82 18.00 3.75 2.15 0.00 5.50 3.67 2.08 1.70 18.25 3.75 2.15 0.00 5.75 3.71 2.12 1.62 18.50 3.75 2.15 0.00 6.00 3.75 2.15 1.54 18.75 3.75 2.15 0.00 6.25 3.75 2.15 0.75 19.00 3.75 2.15 0.00 6.50 3.75 2.15 0.09 19.25 3.75 2.15 0.00 6.75 3.75 2.15 0.01 19.50 3.75 2.15 0.00 7.00 3.75 2.15 0.00 19.75 3.75 2.15 0.00 7.25 3.75 2.15 0.00 20.00 3.75 2.15 0.00 7.50 3.75 2.15 0.00 7.75 3.75 2.15 0.00 8.00 3.75 2.15 0.00 8.25 3.75 2.15 0.00 8.50 3.75 2.15 0.00 8.75 3.75 2.15 0.00 9.00 3.75 2.15 0.00 9.25 3.75 2.15 0.00 9.50 3.75 2.15 0.00 9.75 3.75 2.15 0.00 10.00 3.75 2.15 0.00 10.25 3.75 2.15 0.00 10.50 3.75 2.15 0.00 10.75 3.75 2.15 0.00 11.00 3.75 2.15 0.00 11.25 3.75 2.15 0.00 11.50 3.75 2.15 0.00 11.75 3.75 2.15 0.00 12.00 3.75 2.15 0.00 12.25 3.75 2.15 0.00 12.50 3.75 2.15 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 1S: POST TO SAND FILTER B Runoff = 35.35 cfs @ 3.01 hrs, Volume= 1.345 af, Depth= 2.15" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.75" Area (ac) CN Description * 7.500 84 45% IMPERVIOUS, HSG D 7.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER B Hydrograph / 38' 1 I 1 I I 1 I I I I I I I I I I ■Runoff 36� _ _ 35 35. cfs I I I 1 I I 1 I 1 1 I 1 1 I 34 1 eIn 32� _ _1_ I I I I I I I 4I ,, _ 30� 1 1 I I I I I 1 I ,1I �-1111 28 ,_ _1_ 1 1 1 I 1 1 1G--Yeat R'airifall= 7-5" — 26 1 1 1 1 I 1 1 I I I I I I I I 24 I_ _I / I 1 I 1 I Wunof1 Area=71.5OO ac - 224-/ I I I11-o `1_E-1--__ 1 =T.3- r _c 18 1 I I 1 I 1 1 1 - R nigi Delptli-2 -5r — u 16� _I_ _1 _ I_ _I _ A _ L _1_ J _ L _ I_ _1 _ A _ L _ 1_ _I _ L _ L 1_ _ 14 _ _ A I 1 1 I 1 I I TIc_=.41 min _ 12 -/ ,_ II 1 I 1 I I 1 10 ,_ -I- I - 1- -I - 1 - L -I_ J - L - 1- _I - J - L - 1_ _I - I _ 6 r _I 1 _ L _ I _ L _ I_ _I _ J _ L _ I I _ I _ L 1_ _ 4 ,- -I- - ' J - L I - 1 I I A L I 1 - L - - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 28 Hydrograph for Subcatchment 1S: POST TO SAND FILTER B Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.75 2.15 0.00 0.25 0.04 0.00 0.00 13.00 3.75 2.15 0.00 0.50 0.08 0.00 0.00 13.25 3.75 2.15 0.00 0.75 0.13 0.00 0.00 13.50 3.75 2.15 0.00 1.00 0.18 0.00 0.00 13.75 3.75 2.15 0.00 1.25 0.24 0.00 0.00 14.00 3.75 2.15 0.00 1.50 0.30 0.00 0.00 14.25 3.75 2.15 0.00 1.75 0.38 0.00 0.00 14.50 3.75 2.15 0.00 2.00 0.47 0.00 0.10 14.75 3.75 2.15 0.00 2.25 0.58 0.02 0.41 15.00 3.75 2.15 0.00 2.50 0.72 0.05 0.95 15.25 3.75 2.15 0.00 2.75 1.27 0.28 5.99 15.50 3.75 2.15 0.00 3.00 2.74 1.30 35.15 15.75 3.75 2.15 0.00 3.25 2.97 1.49 7.38 16.00 3.75 2.15 0.00 3.50 3.12 1.62 3.98 16.25 3.75 2.15 0.00 3.75 3.23 1.71 2.76 16.50 3.75 2.15 0.00 4.00 3.32 1.78 2.32 16.75 3.75 2.15 0.00 4.25 3.39 1.85 1.98 17.00 3.75 2.15 0.00 4.50 3.46 1.90 1.75 17.25 3.75 2.15 0.00 4.75 3.52 1.95 1.54 17.50 3.75 2.15 0.00 5.00 3.57 2.00 1.38 17.75 3.75 2.15 0.00 5.25 3.62 2.04 1.26 18.00 3.75 2.15 0.00 5.50 3.67 2.08 1.20 18.25 3.75 2.15 0.00 5.75 3.71 2.12 1.14 18.50 3.75 2.15 0.00 6.00 3.75 2.15 1.08 18.75 3.75 2.15 0.00 6.25 3.75 2.15 0.09 19.00 3.75 2.15 0.00 6.50 3.75 2.15 0.00 19.25 3.75 2.15 0.00 6.75 3.75 2.15 0.00 19.50 3.75 2.15 0.00 7.00 3.75 2.15 0.00 19.75 3.75 2.15 0.00 7.25 3.75 2.15 0.00 20.00 3.75 2.15 0.00 7.50 3.75 2.15 0.00 7.75 3.75 2.15 0.00 8.00 3.75 2.15 0.00 8.25 3.75 2.15 0.00 8.50 3.75 2.15 0.00 8.75 3.75 2.15 0.00 9.00 3.75 2.15 0.00 9.25 3.75 2.15 0.00 9.50 3.75 2.15 0.00 9.75 3.75 2.15 0.00 10.00 3.75 2.15 0.00 10.25 3.75 2.15 0.00 10.50 3.75 2.15 0.00 10.75 3.75 2.15 0.00 11.00 3.75 2.15 0.00 11.25 3.75 2.15 0.00 11.50 3.75 2.15 0.00 11.75 3.75 2.15 0.00 12.00 3.75 2.15 0.00 12.25 3.75 2.15 0.00 12.50 3.75 2.15 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 5S: BYPASS BUA Runoff = 13.70 cfs @ 2.95 hrs, Volume= 0.527 af, Depth= 3.52" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.75" Area (ac) CN Description 1.800 98 BYPASS BUA 1.800 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: BYPASS BUA Hydrograph I L I — — L — I— H H I - 15� I I I I I I i I I I 1 1 I 1 1 I ■Runoff 14� T 1 113.70 cfs I I I 1 I I 1 1 I 1 1 I 1 1 I 13� 1 1 �Ih 12� 1 1 L I J L I I _ L I I �_L L6-1 r 11 I O �'ai�fall 7�" 10� I I I I I T — I T -Runoff Area=1- 8-OO-ac - y - —1— — —I — — —1— — — — 8� utlo111 Ylol�m�= .5 1 c 7 I _mini "H 6� I I I I I I T nI I 1 I 1 I 1 1 1 1 1 1� rrnin 1 I 1 I I I I I I I I I I 1 1 I 1 1 I 1 1 1 1- —1— + - - I- - + - - - - — — 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 30 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.75 3.52 0.00 0.25 0.04 0.00 0.00 13.00 3.75 3.52 0.00 0.50 0.08 0.01 0.08 13.25 3.75 3.52 0.00 0.75 0.13 0.03 0.16 13.50 3.75 3.52 0.00 1.00 0.18 0.06 0.23 13.75 3.75 3.52 0.00 1.25 0.24 0.10 0.30 14.00 3.75 3.52 0.00 1.50 0.30 0.15 0.38 14.25 3.75 3.52 0.00 1.75 0.38 0.21 0.48 14.50 3.75 3.52 0.00 2.00 0.47 0.29 0.59 14.75 3.75 3.52 0.00 2.25 0.58 0.39 0.78 15.00 3.75 3.52 0.00 2.50 0.72 0.52 1.02 15.25 3.75 3.52 0.00 2.75 1.27 1.06 4.95 15.50 3.75 3.52 0.00 3.00 2.74 2.51 11.42 15.75 3.75 3.52 0.00 3.25 2.97 2.74 1.55 16.00 3.75 3.52 0.00 3.50 3.12 2.89 1.00 16.25 3.75 3.52 0.00 3.75 3.23 3.00 0.75 16.50 3.75 3.52 0.00 4.00 3.32 3.08 0.62 16.75 3.75 3.52 0.00 4.25 3.39 3.16 0.54 17.00 3.75 3.52 0.00 4.50 3.46 3.23 0.47 17.25 3.75 3.52 0.00 4.75 3.52 3.29 0.42 17.50 3.75 3.52 0.00 5.00 3.57 3.34 0.37 17.75 3.75 3.52 0.00 5.25 3.62 3.39 0.34 18.00 3.75 3.52 0.00 5.50 3.67 3.43 0.33 18.25 3.75 3.52 0.00 5.75 3.71 3.47 0.31 18.50 3.75 3.52 0.00 6.00 3.75 3.52 0.29 18.75 3.75 3.52 0.00 6.25 3.75 3.52 0.00 19.00 3.75 3.52 0.00 6.50 3.75 3.52 0.00 19.25 3.75 3.52 0.00 6.75 3.75 3.52 0.00 19.50 3.75 3.52 0.00 7.00 3.75 3.52 0.00 19.75 3.75 3.52 0.00 7.25 3.75 3.52 0.00 20.00 3.75 3.52 0.00 7.50 3.75 3.52 0.00 7.75 3.75 3.52 0.00 8.00 3.75 3.52 0.00 8.25 3.75 3.52 0.00 8.50 3.75 3.52 0.00 8.75 3.75 3.52 0.00 9.00 3.75 3.52 0.00 9.25 3.75 3.52 0.00 9.50 3.75 3.52 0.00 9.75 3.75 3.52 0.00 10.00 3.75 3.52 0.00 10.25 3.75 3.52 0.00 10.50 3.75 3.52 0.00 10.75 3.75 3.52 0.00 11.00 3.75 3.52 0.00 11.25 3.75 3.52 0.00 11.50 3.75 3.52 0.00 11.75 3.75 3.52 0.00 12.00 3.75 3.52 0.00 12.25 3.75 3.52 0.00 12.50 3.75 3.52 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type II 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 31 Summary for Pond 2P: FOREBAY Inflow Area = 7.500 ac, 0.00% Impervious, Inflow Depth = 2.15" for 10-Year event Inflow = 35.35 cfs @ 3.01 hrs, Volume= 1.345 af Outflow = 13.98 cfs @ 3.16 hrs, Volume= 1.342 af, Atten= 60%, Lag= 9.0 min Primary = 13.97 cfs @ 3.16 hrs, Volume= 1.339 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.16 hrs, Volume= 0.002 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 578.08'@ 3.16 hrs Surf.Area= 9,639 sf Storage= 24,511 cf Plug-Flow detention time=37.9 min calculated for 1.342 af(100% of inflow) Center-of-Mass det. time= 37.4 min ( 244.1 - 206.8 ) Volume Invert Avail.Storage Storage Description #1 575.00' 66,167 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 6,453 0 0 576.00 7,437 6,945 6,945 577.00 8,467 7,952 14,897 578.00 9,280 8,874 23,771 579.00 13,874 11,577 35,348 580.00 15,391 14,633 49,980 581.00 16,983 16,187 66,167 Device Routing Invert Outlet Devices #1 Primary 575.00' 36.0" Round 36" Culvert L= 87.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 575.00'/ 574.00' S= 0.0115 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Primary 577.50' 36.0" W x 6.0" H Vert. 6X36 IN ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 578.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 575.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Primary 575.00' 12.0" Round 12" PIPE TO SF X 2.00 L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 575.00'/ 574.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #6 Tertiary 579.00' 10.0' long + 3.0 '/' SideZ x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 32 Primary OutFlow Max=13.70 cfs @ 3.16 hrs HW=578.07' TW=0.00' (Dynamic Tailwater) —1=36" Culvert (Passes 0.89 cfs of 42.60 cfs potential flow) L3=TOP OF OUTLET STRUCTURE(Weir Controls 0.89 cfs @ 0.84 fps) —2=6X36 IN ORIFICE (Orifice Controls 3.94 cfs @ 2.63 fps) —5=12" PIPE TO SF (Barrel Controls 8.87 cfs @ 5.65 fps) Secondary OutFlow Max=0.02 cfs © 3.16 hrs HW=578.06' TW=575.01' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=575.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph 1 1 1 1 1 I 1 1 1 1 I I I 1 1 1 I I L J I L I L I 1 I L I L I L I L I L I L ■Inflow j H 135.35 cfs I •+ �p�_ L�(�� �+ •Primary w rt rt �IQ T'"` `r" "f�f' •Seconary 38 / / / z 1 1 1 1 I - ' ' ' 1 1 1 peak'Erev=_57$1.O@. ■Tertiary 36 r � I I I I I I I I I I A I I I II I �J�II 34 i z z • / — - 1 1 —[ — I —[ 1 —L 1 OI'�g� �37�11 32i'/ / / , // / — H — 1 — 1— H — I— H — I— + —1— + —1— + —1— H —1 — H —1 — I— — 3O / / • / rT - 1 — I— T — I— T — I— T —I— T —I— T —I— T —I — T —I — T - 264/ / i26 / / / I I I I I I I I I I I I I I I I I I 244/ / / / / / L J — 1 — I— L — I— 1 — I— L —I_ L _I— L _I— L —I — L —I — L — t224/ ii , // / I— A13.98cfs — 1— —I — I— 4 — I— 4 —1— 4 —I— -L —I— —1 — —I — I— - 18/ / / / / I13F'i 97cfs ' — 1- —I — I— rt — I— rt -1— rt —I— fi —I— fi -1 — fi —I — I— — LL 161 / i , I I I I I I I I I I I I I I _ I I I I I I I I I I I I I 6� , / 44, / �///0.02 cfs ////////// I 0.00 ifs �/ �������������������/ - / /// 0 r 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 33 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 0.00 0.50 0.00 0 575.00 0.00 0.00 0.00 0.00 1.00 0.00 0 575.00 0.00 0.00 0.00 0.00 1.50 0.00 0 575.00 0.00 0.00 0.00 0.00 2.00 0.10 24 575.00 0.00 0.00 0.00 0.00 2.50 0.95 804 575.12 0.09 0.08 0.00 0.00 3.00 35.15 15,631 577.09 6.98 6.97 0.01 0.00 3.50 3.98 19,557 577.54 7.98 7.97 0.01 0.00 4.00 2.32 12,157 576.67 6.00 5.99 0.01 0.00 4.50 1.75 6,601 575.95 3.93 3.93 0.01 0.00 5.00 1.38 4,285 575.63 2.08 2.07 0.00 0.00 5.50 1.20 3,478 575.52 1.46 1.46 0.00 0.00 6.00 1.08 3,141 575.47 1.22 1.22 0.00 0.00 6.50 0.00 2,054 575.31 0.56 0.55 0.00 0.00 7.00 0.00 1,375 575.21 0.25 0.25 0.00 0.00 7.50 0.00 1,033 575.16 0.14 0.14 0.00 0.00 8.00 0.00 828 575.13 0.09 0.09 0.00 0.00 8.50 0.00 693 575.11 0.06 0.06 0.00 0.00 9.00 0.00 596 575.09 0.05 0.05 0.00 0.00 9.50 0.00 524 575.08 0.04 0.03 0.00 0.00 10.00 0.00 468 575.07 0.03 0.03 0.00 0.00 10.50 0.00 424 575.07 0.02 0.02 0.00 0.00 11.00 0.00 387 575.06 0.02 0.02 0.00 0.00 11.50 0.00 357 575.06 0.02 0.02 0.00 0.00 12.00 0.00 331 575.05 0.01 0.01 0.00 0.00 12.50 0.00 308 575.05 0.01 0.01 0.00 0.00 13.00 0.00 289 575.04 0.01 0.01 0.00 0.00 13.50 0.00 272 575.04 0.01 0.01 0.00 0.00 14.00 0.00 257 575.04 0.01 0.01 0.00 0.00 14.50 0.00 244 575.04 0.01 0.01 0.00 0.00 15.00 0.00 232 575.04 0.01 0.01 0.00 0.00 15.50 0.00 221 575.03 0.01 0.01 0.00 0.00 16.00 0.00 211 575.03 0.01 0.00 0.00 0.00 16.50 0.00 203 575.03 0.00 0.00 0.00 0.00 17.00 0.00 194 575.03 0.00 0.00 0.00 0.00 17.50 0.00 187 575.03 0.00 0.00 0.00 0.00 18.00 0.00 180 575.03 0.00 0.00 0.00 0.00 18.50 0.00 174 575.03 0.00 0.00 0.00 0.00 19.00 0.00 168 575.03 0.00 0.00 0.00 0.00 19.50 0.00 162 575.03 0.00 0.00 0.00 0.00 20.00 0.00 157 575.02 0.00 0.00 0.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 34 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 0.00 575.20 0.23 0.23 0.00 0.00 575.40 0.90 0.90 0.00 0.00 575.60 1.89 1.89 0.00 0.00 575.80 3.04 3.04 0.00 0.00 576.00 4.19 4.18 0.01 0.00 576.20 5.07 5.06 0.01 0.00 576.40 5.26 5.25 0.01 0.00 576.60 5.82 5.81 0.01 0.00 576.80 6.32 6.31 0.01 0.00 577.00 6.79 6.78 0.01 0.00 577.20 7.23 7.22 0.01 0.00 577.40 7.64 7.63 0.01 0.00 577.60 8.34 8.33 0.01 0.00 577.80 9.99 9.98 0.01 0.00 578.00 12.18 12.16 0.02 0.00 578.20 18.57 18.56 0.02 0.00 578.40 28.47 28.45 0.02 0.00 578.60 40.72 40.70 0.02 0.00 578.80 54.90 54.88 0.02 0.00 579.00 70.76 70.74 0.02 0.00 579.20 77.80 75.26 0.02 2.51 579.40 85.67 78.16 0.02 7.49 579.60 95.33 80.95 0.02 14.36 579.80 106.19 83.64 0.03 22.52 580.00 118.89 86.25 0.03 32.61 580.20 133.50 88.77 0.03 44.70 580.40 149.68 91.22 0.03 58.43 580.60 167.30 93.61 0.03 73.67 580.80 186.91 95.93 0.03 90.95 581.00 208.33 98.20 0.03 110.09 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 35 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 6,453 0 580.10 15,550 51,527 575.10 6,551 650 580.20 15,709 53,090 575.20 6,650 1,310 580.30 15,869 54,669 575.30 6,748 1,980 580.40 16,028 56,264 575.40 6,847 2,660 580.50 16,187 57,875 575.50 6,945 3,350 580.60 16,346 59,501 575.60 7,043 4,049 580.70 16,505 61,144 575.70 7,142 4,758 580.80 16,665 62,802 575.80 7,240 5,477 580.90 16,824 64,477 575.90 7,339 6,206 581.00 16,983 66,167 576.00 7,437 6,945 576.10 7,540 7,694 576.20 7,643 8,453 576.30 7,746 9,222 576.40 7,849 10,002 576.50 7,952 10,792 576.60 8,055 11,593 576.70 8,158 12,403 576.80 8,261 13,224 576.90 8,364 14,055 577.00 8,467 14,897 577.10 8,548 15,748 577.20 8,630 16,607 577.30 8,711 17,474 577.40 8,792 18,349 577.50 8,874 19,232 577.60 8,955 20,124 577.70 9,036 21,023 577.80 9,117 21,931 577.90 9,199 22,847 578.00 9,280 23,771 578.10 9,739 24,721 578.20 10,199 25,718 578.30 10,658 26,761 578.40 11,118 27,850 578.50 11,577 28,985 578.60 12,036 30,165 578.70 12,496 31,392 578.80 12,955 32,665 578.90 13,415 33,983 579.00 13,874 35,348 579.10 14,026 36,742 579.20 14,177 38,153 579.30 14,329 39,578 579.40 14,481 41,018 579.50 14,633 42,474 579.60 14,784 43,945 579.70 14,936 45,431 579.80 15,088 46,932 579.90 15,239 48,448 580.00 15,391 49,980 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 36 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.16 hrs, Volume= 0.002 af Outflow = 0.00 cfs @ 4.71 hrs, Volume= 0.002 af, Atten= 72%, Lag= 92.6 min Primary = 0.00 cfs @ 4.71 hrs, Volume= 0.002 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 575.04'@ 4.71 hrs Surf.Area= 1,351 sf Storage= 48 cf Plug-Flow detention time= 168.1 min calculated for 0.002 af(98% of inflow) Center-of-Mass det. time= 151.5 min ( 462.4 - 310.8 ) Volume Invert Avail.Storage Storage Description #1 575.00' 45,537 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 575.00 1,334 0 0 576.00 1,812 1,573 1,573 577.00 2,353 2,083 3,656 578.00 2,958 2,656 6,311 579.00 13,864 8,411 14,722 580.00 15,391 14,628 29,350 581.00 16,983 16,187 45,537 Device Routing Invert Outlet Devices #1 Primary 575.00' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 4.71 hrs HW=575.04' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Custom Controls 0.00 cfs) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 37 Pond 3P: SAND FILTER Hydrograph _1 _ 1 _ I_ _I 1 1 L _I _ _ / _1 _ 1 _ I_ _I 1_ _I_ _1_ L _ L _I _ _ ■Inflow 0.018� / I o.o2cfs 1 1 1 1 I L 1 1 41LCI L 1 L L I ■Primary 0.017 / I, —1 — 1 — I— —I — L PeakLE1Iev=575 04' 0.016= / )_ Ili� L I ± IL LI L LI J L LI L IL L L LI _ 0.015i-/ / 1 1 1 1 1 1 1 1 I or a=48-elf 0.014+' / )_ -1 _ 1 '_ _1 - 1 _ I_ _I _ L _1_ 1 _ L _I _ L _1_ L _ L _1 _ _ 0.013 / 1 1 1 1 I I I 1 1 1 1 0.012'' / 1 1 1 ' III I I 1 1 1 1 I I 0.011� / )_ —1 — 1 _ _1 — 1 _ 1— —I — L _I— 1 _ L _I — L _1_ L _ L _1 — N 0.014,-/ / • 0.009= / 1 u.• 0.008+' , _I — 1 1 1 I I I I I I I I 0.0071 / I 1 I 1 I I I 1 1 1 1 I 0.0061 / 1 1 I 1 1III 1 1 1 1 1 I o.00 ofs . 1 1 1 1 1 I 0.0051 � —I — ,ii 0.0041 / ' i .."',.j I II 0.002 / _ _ � j /% _ I 1 1 1 1 0.0021 / I I i 0.0011 %%.11 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 38 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 575.00 0.00 0.50 0.00 0 575.00 0.00 1.00 0.00 0 575.00 0.00 1.50 0.00 0 575.00 0.00 2.00 0.00 0 575.00 0.00 2.50 0.00 0 575.00 0.00 3.00 0.01 7 575.00 0.00 3.50 0.01 30 575.02 0.00 4.00 0.01 43 575.03 0.00 4.50 0.01 48 575.04 0.00 5.00 0.00 47 575.04 0.00 5.50 0.00 45 575.03 0.00 6.00 0.00 43 575.03 0.00 6.50 0.00 40 575.03 0.00 7.00 0.00 36 575.03 0.00 7.50 0.00 32 575.02 0.00 8.00 0.00 28 575.02 0.00 8.50 0.00 25 575.02 0.00 9.00 0.00 22 575.02 0.00 9.50 0.00 19 575.01 0.00 10.00 0.00 17 575.01 0.00 10.50 0.00 15 575.01 0.00 11.00 0.00 13 575.01 0.00 11.50 0.00 11 575.01 0.00 12.00 0.00 10 575.01 0.00 12.50 0.00 9 575.01 0.00 13.00 0.00 8 575.01 0.00 13.50 0.00 7 575.01 0.00 14.00 0.00 6 575.00 0.00 14.50 0.00 6 575.00 0.00 15.00 0.00 5 575.00 0.00 15.50 0.00 5 575.00 0.00 16.00 0.00 4 575.00 0.00 16.50 0.00 4 575.00 0.00 17.00 0.00 4 575.00 0.00 17.50 0.00 3 575.00 0.00 18.00 0.00 3 575.00 0.00 18.50 0.00 3 575.00 0.00 19.00 0.00 3 575.00 0.00 19.50 0.00 2 575.00 0.00 20.00 0.00 2 575.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 39 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 575.00 0.00 577.55 0.33 580.10 0.54 575.05 0.01 577.60 0.34 580.15 0.54 575.10 0.01 577.65 0.34 580.20 0.55 575.15 0.02 577.70 0.34 580.25 0.55 575.20 0.03 577.75 0.35 580.30 0.56 575.25 0.03 577.80 0.35 580.35 0.56 575.30 0.04 577.85 0.36 I 580.40 0.56 575.35 0.05 577.90 0.36 580.45 0.57 575.40 0.05 577.95 0.36 580.50 0.57 575.45 0.06 578.00 0.37 580.55 0.58 575.50 0.07 , 578.05 0.37 580.60 0.58 575.55 0.07 578.10 0.38 580.65 0.59 575.60 0.08 578.15 0.38 580.70 0.59 575.65 0.09 578.20 0.38 580.75 0.59 575.70 0.09 578.25 0.39 580.80 0.60 575.75 0.10 578.30 0.39 580.85 0.60 575.80 0.10 578.35 0.40 580.90 0.61 575.85 0.11 578.40 0.40 580.95 0.61 575.90 0.12 578.45 0.40 581.00 0.61 575.95 0.12 578.50 0.41 576.00 0.13 578.55 0.41 576.05 0.14 578.60 0.42 576.10 0.14 578.65 0.42 576.15 0.15 ' 578.70 0.43 576.20 0.16 578.75 0.43 576.25 0.16 578.80 0.43 576.30 0.17 ' 578.85 0.44 576.35 0.18 578.90 0.44 576.40 0.18 578.95 0.45 576.45 0.19 579.00 0.45 576.50 0.20 579.05 0.45 576.55 0.20 579.10 0.46 576.60 0.21 579.15 0.46 576.65 0.22 579.20 0.47 576.70 0.22 579.25 0.47 576.75 0.23 579.30 0.47 576.80 0.24 579.35 0.48 576.85 0.24 579.40 0.48 576.90 0.25 I 579.45 0.49 576.95 0.26 579.50 0.49 577.00 0.26 579.55 0.50 577.05 0.27 579.60 0.50 577.10 0.27 579.65 0.50 577.15 0.28 579.70 0.51 577.20 0.29 579.75 0.51 577.25 0.29 579.80 0.52 577.30 0.30 579.85 0.52 577.35 0.31 579.90 0.52 577.40 0.31 579.95 0.53 577.45 0.32 580.00 0.53 577.50 0.33 580.05 0.54 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 40 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 1,334 0 580.10 15,550 30,897 575.10 1,382 136 580.20 15,709 32,460 575.20 1,430 276 580.30 15,869 34,038 575.30 1,477 422 580.40 16,028 35,633 575.40 1,525 572 580.50 16,187 37,244 575.50 1,573 727 580.60 16,346 38,871 575.60 1,621 886 580.70 16,505 40,513 575.70 1,669 1,051 580.80 16,665 42,172 575.80 1,716 1,220 580.90 16,824 43,846 575.90 1,764 1,394 581.00 16,983 45,537 576.00 1,812 1,573 576.10 1,866 1,757 576.20 1,920 1,946 576.30 1,974 2,141 576.40 2,028 2,341 576.50 2,083 2,547 576.60 2,137 2,758 576.70 2,191 2,974 576.80 2,245 3,196 576.90 2,299 3,423 577.00 2,353 3,656 577.10 2,414 3,894 577.20 2,474 4,138 577.30 2,534 4,389 577.40 2,595 4,645 577.50 2,656 4,908 577.60 2,716 5,176 577.70 2,777 5,451 577.80 2,837 5,731 577.90 2,897 6,018 578.00 2,958 6,311 578.10 4,049 6,661 578.20 5,139 7,121 578.30 6,230 7,689 578.40 7,320 8,367 578.50 8,411 9,153 578.60 9,502 10,049 578.70 10,592 11,054 578.80 11,683 12,167 578.90 12,773 13,390 579.00 13,864 14,722 579.10 14,017 16,116 579.20 14,169 17,525 579.30 14,322 18,950 579.40 14,475 20,390 579.50 14,628 21,845 579.60 14,780 23,315 579.70 14,933 24,801 579.80 15,086 26,302 579.90 15,238 27,818 580.00 15,391 29,350 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 41 Summary for Pond 4P: TOTAL Inflow Area = 9.300 ac, 19.35% Impervious, Inflow Depth > 2.41" for 10-Year event Inflow = 19.48 cfs @ 2.96 hrs, Volume= 1.869 af Primary = 19.48 cfs @ 2.96 hrs, Volume= 1.869 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph /) // 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ■Inflow 1 21 ' i ,I -1 119.48cfs I I _L H 1 _L - I- 1 - _L - 1 -1 - _H 1- -1 - _L - 1- -1 -■Primary 20 -1I,9.48 / -F 1 1 - - 1- -1 -Inflow-Area=9-.300-ac - 19 i ,r -1- ri"- rt 1 1 rt - 1 - I - I -1 - I I- -1 - I - I- -I - 18; ' I I I I I I I I I I I I I I I 164v i A I I I I I I I I I I I I I I I - 15 i App/ I l 1 1 1 1 1 1 1 1 1 1 1 1 1 144-/ i -I - 4 - I- -I - - I- -I - 4 - I- -I - - I- -I 134vi ,- /I - + - 1- -1 - + - 1- -1 - + - 1- -1 - + - 1- -1 lz o 12 / r /� - -r - I- -I - I - I- -I - 1 - I- -I - 1 - I- -I 0 107' / 2 I I I I I I I I I I I I 84-/ i /- / - 1 - - -1 - 1 - 1- -1 - 1 - 1- -1 - I I _I 7i' i ,- �, ,- -1 - 4 - 4 -1 - 4 - I- -1 - 4 - I- -1 - 4 - I- -1 6-' / A- -1 H 1 + H 1 + 1 1 + 1 1 + 1- + - 3_ ' � i 1 I I I I I I I I I I I I 2_ , /// �� � 1 1 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 42 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.01 0.01 0.25 0.00 0.00 13.00 0.01 0.01 0.50 0.08 0.08 13.25 0.01 0.01 0.75 0.16 0.16 13.50 0.01 0.01 1.00 0.23 0.23 13.75 0.01 0.01 1.25 0.30 0.30 14.00 0.01 0.01 1.50 0.38 0.38 14.25 0.01 0.01 1.75 0.48 0.48 14.50 0.01 0.01 2.00 0.59 0.59 14.75 0.01 0.01 2.25 0.79 0.79 15.00 0.01 0.01 2.50 1.11 1.11 15.25 0.01 0.01 2.75 5.87 5.87 15.50 0.01 0.01 3.00 18.40 18.40 15.75 0.01 0.01 3.25 13.33 13.33 16.00 0.01 0.01 3.50 8.98 8.98 16.25 0.01 0.01 3.75 7.75 7.75 16.50 0.00 0.00 4.00 6.62 6.62 16.75 0.00 0.00 4.25 5.77 5.77 17.00 0.00 0.00 4.50 4.40 4.40 17.25 0.00 0.00 4.75 3.17 3.17 17.50 0.00 0.00 5.00 2.45 2.45 17.75 0.00 0.00 5.25 2.03 2.03 18.00 0.00 0.00 5.50 1.79 1.79 18.25 0.00 0.00 5.75 1.63 1.63 18.50 0.00 0.00 6.00 1.51 1.51 18.75 0.00 0.00 6.25 0.92 0.92 19.00 0.00 0.00 6.50 0.56 0.56 19.25 0.00 0.00 6.75 0.37 0.37 19.50 0.00 0.00 7.00 0.26 0.26 19.75 0.00 0.00 7.25 0.19 0.19 20.00 0.00 0.00 7.50 0.14 0.14 7.75 0.11 0.11 8.00 0.09 0.09 8.25 0.08 0.08 8.50 0.06 0.06 8.75 0.05 0.05 9.00 0.05 0.05 9.25 0.04 0.04 9.50 0.04 0.04 9.75 0.03 0.03 10.00 0.03 0.03 10.25 0.03 0.03 10.50 0.02 0.02 10.75 0.02 0.02 11.00 0.02 0.02 11.25 0.02 0.02 11.50 0.02 0.02 11.75 0.02 0.02 12.00 0.01 0.01 12.25 0.01 0.01 12.50 0.01 0.01 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a sin 11998 ©2020 HydroCAD Software Solutions LLC Page 43 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=10.400 ac 0.00% Impervious Runoff Depth=2.76" Flow Length=950' Tc=17.7 min CN=84 Runoff=47.46 cfs 2.394 af Subcatchment1 S: POST TO SAND FILTER B Runoff Area=7.500 ac 0.00% Impervious Runoff Depth=2.76" Tc=9.4 min CN=84 Runoff=45.00 cfs 1.727 af Subcatchment5S: BYPASS BUA Runoff Area=1.800 ac 100.00% Impervious Runoff Depth=4.20" Tc=5.0 min CN=98 Runoff=16.26 cfs 0.631 af Pond 2P: FOREBAY Peak Elev=578.41' Storage=27,987 cf Inflow=45.00 cfs 1.727 af Primary=29.08 cfs 1.720 af Secondary=0.02 cfs 0.003 af Tertiary=0.00 cfs 0.000 af Outflow=29.10 cfs 1.723 af Pond 3P: SAND FILTER Peak Elev=575.04' Storage=54 cf Inflow=0.02 cfs 0.003 af Outflow=0.01 cfs 0.003 af Pond 4P: TOTAL Inflow=32.24 cfs 2.354 af Primary=32.24 cfs 2.354 af Total Runoff Area = 19.700 ac Runoff Volume = 4.752 af Average Runoff Depth = 2.89" 90.86% Pervious = 17.900 ac 9.14% Impervious = 1.800 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 47.46 cfs @ 3.10 hrs, Volume= 2.394 af, Depth= 2.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.44" Area (ac) CN Description 10.400 84 Pasture/grassland/range, Fair, HSG D 10.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Grass: Dense n= 0.240 P2= 3.58" 5.1 800 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 17.7 950 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph I 1 1 I I I I I I I I I I 4— 1— 1 1 — fi 1 1 1 rt 1 — ■Runoff 501-/ 47.46 cfs TypeIH 45-- 1 1 1 1 1 1 40:-/ 1 1 1 1 1 1 1 1 I11 _1 . . 1 1 1 25-YeaI R'airifall=4-44" - 352/ 1 1 1 1 1 1 I I IA.,I I I I I 1 _1 _ _ L 1 L 1 Runoff Area=10].400_aC - w 301 1 OUilaf f Vom�= .3 - 25_ 1 1 1 1 1 1 RUnbff'Delpth=2.76" LL = r 1 1 rt 1 H t 1 rt 1 1 rt- r 1 - 201-/ 1 1 1 1 1 1 1 1 1 Flow(Length=950' :: H 1 1 1 CN=64 _ I 1 54/ �� 1 1 I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 45 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.44 2.76 0.00 0.25 0.05 0.00 0.00 13.00 4.44 2.76 0.00 0.50 0.10 0.00 0.00 13.25 4.44 2.76 0.00 0.75 0.15 0.00 0.00 13.50 4.44 2.76 0.00 1.00 0.21 0.00 0.00 13.75 4.44 2.76 0.00 1.25 0.28 0.00 0.00 14.00 4.44 2.76 0.00 1.50 0.36 0.00 0.00 14.25 4.44 2.76 0.00 1.75 0.45 0.00 0.02 14.50 4.44 2.76 0.00 2.00 0.55 0.01 0.26 14.75 4.44 2.76 0.00 2.25 0.69 0.04 0.75 15.00 4.44 2.76 0.00 2.50 0.85 0.09 1.58 15.25 4.44 2.76 0.00 2.75 1.51 0.42 5.32 15.50 4.44 2.76 0.00 3.00 3.24 1.72 34.86 15.75 4.44 2.76 0.00 3.25 3.51 1.95 29.25 16.00 4.44 2.76 0.00 3.50 3.70 2.10 10.66 16.25 4.44 2.76 0.00 3.75 3.82 2.21 5.91 16.50 4.44 2.76 0.00 4.00 3.93 2.31 4.39 16.75 4.44 2.76 0.00 4.25 4.02 2.39 3.65 17.00 4.44 2.76 0.00 4.50 4.10 2.46 3.18 17.25 4.44 2.76 0.00 4.75 4.17 2.52 2.80 17.50 4.44 2.76 0.00 5.00 4.23 2.57 2.49 17.75 4.44 2.76 0.00 5.25 4.29 2.62 2.23 18.00 4.44 2.76 0.00 5.50 4.34 2.67 2.09 18.25 4.44 2.76 0.00 5.75 4.39 2.72 1.98 18.50 4.44 2.76 0.00 6.00 4.44 2.76 1.88 18.75 4.44 2.76 0.00 6.25 4.44 2.76 0.92 19.00 4.44 2.76 0.00 6.50 4.44 2.76 0.12 19.25 4.44 2.76 0.00 6.75 4.44 2.76 0.01 19.50 4.44 2.76 0.00 7.00 4.44 2.76 0.00 19.75 4.44 2.76 0.00 7.25 4.44 2.76 0.00 20.00 4.44 2.76 0.00 7.50 4.44 2.76 0.00 7.75 4.44 2.76 0.00 8.00 4.44 2.76 0.00 8.25 4.44 2.76 0.00 8.50 4.44 2.76 0.00 8.75 4.44 2.76 0.00 9.00 4.44 2.76 0.00 9.25 4.44 2.76 0.00 9.50 4.44 2.76 0.00 9.75 4.44 2.76 0.00 10.00 4.44 2.76 0.00 10.25 4.44 2.76 0.00 10.50 4.44 2.76 0.00 10.75 4.44 2.76 0.00 11.00 4.44 2.76 0.00 11.25 4.44 2.76 0.00 11.50 4.44 2.76 0.00 11.75 4.44 2.76 0.00 12.00 4.44 2.76 0.00 12.25 4.44 2.76 0.00 12.50 4.44 2.76 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 1S: POST TO SAND FILTER B Runoff = 45.00 cfs @ 3.01 hrs, Volume= 1.727 af, Depth= 2.76" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.44" Area (ac) CN Description 7.500 84 45% IMPERVIOUS, HSG D 7.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER B Hydrograph - - - fi - 1- _I - 7 - 1— - I— — I I i I I — fi — r —I- - 50; I I I I I I I I I I I I I I I I I ■Runoff 484/ - 464-/ 1 145.00 cfs I I 1 A AlA _ T I A L I I 4 H AlA — 44 - - - - - I- -1 - 4 - 1- -I- H - + - I- -1 - 4 - H - I- -I - -Type IH - 424/ - I T 1 T I T I 7 404/ - — 384 1_ -I _ 1 _ L _1_ J _ L _ I_ -1 _ H _ L _ 1_ _I - 1 _ Y"Ill - 364/ - -I- -1I 4 I- H + 255-Yeat- R'airifaH=4-44L - 34� -1 1 - I_ _I _ T _ _I_ _ T _ T _1 _ T _ T _ 1_ _I _ T� _ _I_ — 32" 1 1 1 1 1 1 1 -Furioff Area=I `5 -ac �30 —' 1— - `"' 26/ — —1— H 1 1 H i— —I— H T `"f"' f YOIt "h' 'Z o 0 24= — I I I I I I I I I I I ZU.,�y� I T �Q LL 22 41VL/� � /�7n 20 - - - H - 1- -1 - 1 - L -I- J - L I - H - L - I- - 1 -�1L -I- - 184/ - 1- A 4 I + I 4 + T-1+I :t l-min — 16 - -1- T - I- -1 - T - T -I- T - T - 1- -1 - T - T - 1- -1 - T - T - - 144/ — 124/ , —I— ►► 1 1 1 1 1 1 1 1 1 1 1 1 1 — 10� 1- // - 1 - 4 - I- -I- H - T - -I - 4 - H- - I- 1 - 4 - H -1- - 8 — — /' 1 —1 — rt — —1— — T — 1— —1 — rt — fi — 1— —I — rt — —1- 6 — 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 47 Hydrograph for Subcatchment 1S: POST TO SAND FILTER B Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.44 2.76 0.00 0.25 0.05 0.00 0.00 13.00 4.44 2.76 0.00 0.50 0.10 0.00 0.00 13.25 4.44 2.76 0.00 0.75 0.15 0.00 0.00 13.50 4.44 2.76 0.00 1.00 0.21 0.00 0.00 13.75 4.44 2.76 0.00 1.25 0.28 0.00 0.00 14.00 4.44 2.76 0.00 1.50 0.36 0.00 0.00 14.25 4.44 2.76 0.00 1.75 0.45 0.00 0.05 14.50 4.44 2.76 0.00 2.00 0.55 0.01 0.34 14.75 4.44 2.76 0.00 2.25 0.69 0.04 0.79 15.00 4.44 2.76 0.00 2.50 0.85 0.09 1.52 15.25 4.44 2.76 0.00 2.75 1.51 0.42 8.45 15.50 4.44 2.76 0.00 3.00 3.24 1.72 44.82 15.75 4.44 2.76 0.00 3.25 3.51 1.95 9.19 16.00 4.44 2.76 0.00 3.50 3.70 2.10 4.92 16.25 4.44 2.76 0.00 3.75 3.82 2.21 3.41 16.50 4.44 2.76 0.00 4.00 3.93 2.31 2.85 16.75 4.44 2.76 0.00 4.25 4.02 2.39 2.43 17.00 4.44 2.76 0.00 4.50 4.10 2.46 2.14 17.25 4.44 2.76 0.00 4.75 4.17 2.52 1.89 17.50 4.44 2.76 0.00 5.00 4.23 2.57 1.69 17.75 4.44 2.76 0.00 5.25 4.29 2.62 1.54 18.00 4.44 2.76 0.00 5.50 4.34 2.67 1.47 18.25 4.44 2.76 0.00 5.75 4.39 2.72 1.39 18.50 4.44 2.76 0.00 6.00 4.44 2.76 1.32 18.75 4.44 2.76 0.00 6.25 4.44 2.76 0.11 19.00 4.44 2.76 0.00 6.50 4.44 2.76 0.00 19.25 4.44 2.76 0.00 6.75 4.44 2.76 0.00 19.50 4.44 2.76 0.00 7.00 4.44 2.76 0.00 19.75 4.44 2.76 0.00 7.25 4.44 2.76 0.00 20.00 4.44 2.76 0.00 7.50 4.44 2.76 0.00 7.75 4.44 2.76 0.00 8.00 4.44 2.76 0.00 8.25 4.44 2.76 0.00 8.50 4.44 2.76 0.00 8.75 4.44 2.76 0.00 9.00 4.44 2.76 0.00 9.25 4.44 2.76 0.00 9.50 4.44 2.76 0.00 9.75 4.44 2.76 0.00 10.00 4.44 2.76 0.00 10.25 4.44 2.76 0.00 10.50 4.44 2.76 0.00 10.75 4.44 2.76 0.00 11.00 4.44 2.76 0.00 11.25 4.44 2.76 0.00 11.50 4.44 2.76 0.00 11.75 4.44 2.76 0.00 12.00 4.44 2.76 0.00 12.25 4.44 2.76 0.00 12.50 4.44 2.76 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 5S: BYPASS BUA Runoff = 16.26 cfs @ 2.95 hrs, Volume= 0.631 af, Depth= 4.20" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.44" Area (ac) CN Description * 1.800 98 BYPASS BUA 1.800 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: BYPASS BUA Hydrog rap h 187-/ , 1 4 1- I i- i - 4 - # - I -I - 4 - I- -I- - ■Runoff 174-/ I16.26 cfs I i - 4 — I— -I— —I — — I— —I — —I - 4 — I— —I - 4 — I- -I- — 16� ,_ -1 / -1 - 4 - 1_ -1- _I - _L - 1- -1 - _1 - 1_ - 1- -I - --Type 1 ll - 15� -I - _I - L -I- _ I - I - I- -I - I - L - I- -I - 1 - L„ iIT. _ 14/ _I I I I I 1 1 I 1 1 I 1 w1(i 111 13� I I I I 25-Yeat Rlak�hfaIi=4 44!' - 12 -/ - - _I I I I I 1 I I I I _I 11� I I I I runoff Area=1 8OD ac o 10y 1 1 1 ��I�� �1 1 3 9� "'T""I' �I""T"'1'= •Va7f 1 1 1 1 1 1 Runoff 1Delpth=4.20 1 8 " I / I I I I I I I I I I I I I IC nI I 7,- I 7 - I- I 7 1- I -I T 1 1 7 T - - 1- 1 c-=5.V 1-rniin - 6� - - I- -I - rt - 1- -1- - 1 - -r - 1- -1 - rt - 1- - 1- -1 - rt^ Q 5t, - - - -I I- -1 - -F - 1- -I- -I - t - I- -1 - -1 - 1— — I— —I — fi Q - 34 -1- - ' 1 1 4 - i- - I I I I I- - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 49 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.44 4.20 0.00 0.25 0.05 0.00 0.00 13.00 4.44 4.20 0.00 0.50 0.10 0.01 0.12 13.25 4.44 4.20 0.00 0.75 0.15 0.04 0.21 13.50 4.44 4.20 0.00 1.00 0.21 0.08 0.30 13.75 4.44 4.20 0.00 1.25 0.28 0.13 0.39 14.00 4.44 4.20 0.00 1.50 0.36 0.19 0.48 14.25 4.44 4.20 0.00 1.75 0.45 0.27 0.59 14.50 4.44 4.20 0.00 2.00 0.55 0.37 0.72 14.75 4.44 4.20 0.00 2.25 0.69 0.49 0.95 15.00 4.44 4.20 0.00 2.50 0.85 0.65 1.23 15.25 4.44 4.20 0.00 2.75 1.51 1.29 5.91 15.50 4.44 4.20 0.00 3.00 3.24 3.01 13.55 15.75 4.44 4.20 0.00 3.25 3.51 3.28 1.84 16.00 4.44 4.20 0.00 3.50 3.70 3.46 1.19 16.25 4.44 4.20 0.00 3.75 3.82 3.59 0.89 16.50 4.44 4.20 0.00 4.00 3.93 3.69 0.74 16.75 4.44 4.20 0.00 4.25 4.02 3.78 0.64 17.00 4.44 4.20 0.00 4.50 4.10 3.86 0.56 17.25 4.44 4.20 0.00 4.75 4.17 3.93 0.50 17.50 4.44 4.20 0.00 5.00 4.23 3.99 0.44 17.75 4.44 4.20 0.00 5.25 4.29 4.05 0.41 18.00 4.44 4.20 0.00 5.50 4.34 4.10 0.39 18.25 4.44 4.20 0.00 5.75 4.39 4.16 0.37 18.50 4.44 4.20 0.00 6.00 4.44 4.20 0.35 18.75 4.44 4.20 0.00 6.25 4.44 4.20 0.00 19.00 4.44 4.20 0.00 6.50 4.44 4.20 0.00 19.25 4.44 4.20 0.00 6.75 4.44 4.20 0.00 19.50 4.44 4.20 0.00 7.00 4.44 4.20 0.00 19.75 4.44 4.20 0.00 7.25 4.44 4.20 0.00 20.00 4.44 4.20 0.00 7.50 4.44 4.20 0.00 7.75 4.44 4.20 0.00 8.00 4.44 4.20 0.00 8.25 4.44 4.20 0.00 8.50 4.44 4.20 0.00 8.75 4.44 4.20 0.00 9.00 4.44 4.20 0.00 9.25 4.44 4.20 0.00 9.50 4.44 4.20 0.00 9.75 4.44 4.20 0.00 10.00 4.44 4.20 0.00 10.25 4.44 4.20 0.00 10.50 4.44 4.20 0.00 10.75 4.44 4.20 0.00 11.00 4.44 4.20 0.00 11.25 4.44 4.20 0.00 11.50 4.44 4.20 0.00 11.75 4.44 4.20 0.00 12.00 4.44 4.20 0.00 12.25 4.44 4.20 0.00 12.50 4.44 4.20 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type II 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Pond 2P: FOREBAY Inflow Area = 7.500 ac, 0.00% Impervious, Inflow Depth = 2.76" for 25-Year event Inflow = 45.00 cfs @ 3.01 hrs, Volume= 1.727 af Outflow = 29.10 cfs @ 3.11 hrs, Volume= 1.723 af, Atten= 35%, Lag= 6.1 min Primary = 29.08 cfs @ 3.11 hrs, Volume= 1.720 of Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.11 hrs, Volume= 0.003 of Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 578.41'@ 3.11 hrs Surf.Area= 11,174 sf Storage= 27,987 cf Plug-Flow detention time=32.3 min calculated for 1.719 af(100% of inflow) Center-of-Mass det. time= 33.2 min ( 238.1 - 205.0 ) Volume Invert Avail.Storage Storage Description #1 575.00' 66,167 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 6,453 0 0 576.00 7,437 6,945 6,945 577.00 8,467 7,952 14,897 578.00 9,280 8,874 23,771 579.00 13,874 11,577 35,348 580.00 15,391 14,633 49,980 581.00 16,983 16,187 66,167 Device Routing Invert Outlet Devices #1 Primary 575.00' 36.0" Round 36" Culvert L= 87.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 575.00'/ 574.00' S= 0.0115 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Primary 577.50' 36.0" W x 6.0" H Vert. 6X36 IN ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 578.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 575.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Primary 575.00' 12.0" Round 12" PIPE TO SF X 2.00 L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 575.00'/ 574.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #6 Tertiary 579.00' 10.0' long + 3.0 '/' SideZ x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 51 Primary OutFlow Max=28.02 cfs @ 3.11 hrs HW=578.39' TW=0.00' (Dynamic Tailwater) —1=36" Culvert (Passes 12.85 cfs of 46.82 cfs potential flow) 4-3=TOP OF OUTLET STRUCTURE(Weir Controls 12.85 cfs © 2.05 fps) —2=6X36 IN ORIFICE (Orifice Controls 5.75 cfs @ 3.83 fps) —5=12" PIPE TO SF (Barrel Controls 9.42 cfs @ 5.99 fps) Secondary OutFlow Max=0.02 cfs © 3.11 hrs HW=578.39' TW=575.01' (Dynamic Tailwater) 4-4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=575.00' TW=0.00' (Dynamic Tailwater) 4-6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph —I I rt I 1 I -r 1 t I t I fi 1 fi I 1— / I I I I I I I I I I I I I I I I I I ■Inflow — 1 45.00 cfs I III•Outflow i 1 1 I 1 •primary / 1 Ifllov �re�a=1 0 a P •Secondary 50 IPeakEI1ev1=51781.41' U Tertiary / / / 45 / 1 1 1 1 1 1 Storsage a7,9&7_cf— , —40 / / , I 1 1 1 , , I I I , 1 1 I I I 1 i 129.10 cfs 35 / 29.08 cfs 1 II 1 1 1 1 1 1 1 11 30 i 1 1 1 1 I I I 1 1 1 1 1 t z z / _ r _ 1_ _L _ 1_ _, _ I_ _L _1_ _H _i_ _L _i_ _1 _ _ _ _ _ 25 / 1 1 1 1 1 1 1 i lie 1— 7 — 1— - 1 1 1 1 O 20 / itel / 5 ��o.oz cfs 0I 0.00 cfs ���� /l�/// 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 52 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 0.00 0.50 0.00 0 575.00 0.00 0.00 0.00 0.00 1.00 0.00 0 575.00 0.00 0.00 0.00 0.00 1.50 0.00 0 575.00 0.00 0.00 0.00 0.00 2.00 0.34 173 575.03 0.00 0.00 0.00 0.00 2.50 1.52 1,518 575.23 0.31 0.31 0.00 0.00 3.00 44.82 20,945 577.69 9.02 9.00 0.01 0.00 3.50 4.92 20,722 577.67 8.82 8.80 0.01 0.00 4.00 2.85 13,775 576.87 6.48 6.47 0.01 0.00 4.50 2.14 8,100 576.15 4.91 4.90 0.01 0.00 5.00 1.69 4,974 575.73 2.63 2.63 0.00 0.00 5.50 1.47 3,922 575.58 1.79 1.79 0.00 0.00 6.00 1.32 3,514 575.52 1.49 1.48 0.00 0.00 6.50 0.00 2,223 575.34 0.65 0.64 0.00 0.00 7.00 0.00 1,450 575.22 0.28 0.28 0.00 0.00 7.50 0.00 1,074 575.16 0.15 0.15 0.00 0.00 8.00 0.00 855 575.13 0.10 0.10 0.00 0.00 8.50 0.00 711 575.11 0.07 0.07 0.00 0.00 9.00 0.00 610 575.09 0.05 0.05 0.00 0.00 9.50 0.00 534 575.08 0.04 0.04 0.00 0.00 10.00 0.00 476 575.07 0.03 0.03 0.00 0.00 10.50 0.00 430 575.07 0.02 0.02 0.00 0.00 11.00 0.00 392 575.06 0.02 0.02 0.00 0.00 11.50 0.00 361 575.06 0.02 0.02 0.00 0.00 12.00 0.00 334 575.05 0.01 0.01 0.00 0.00 12.50 0.00 312 575.05 0.01 0.01 0.00 0.00 13.00 0.00 292 575.05 0.01 0.01 0.00 0.00 13.50 0.00 275 575.04 0.01 0.01 0.00 0.00 14.00 0.00 259 575.04 0.01 0.01 0.00 0.00 14.50 0.00 246 575.04 0.01 0.01 0.00 0.00 15.00 0.00 234 575.04 0.01 0.01 0.00 0.00 15.50 0.00 223 575.03 0.01 0.01 0.00 0.00 16.00 0.00 213 575.03 0.01 0.01 0.00 0.00 16.50 0.00 204 575.03 0.00 0.00 0.00 0.00 17.00 0.00 196 575.03 0.00 0.00 0.00 0.00 17.50 0.00 188 575.03 0.00 0.00 0.00 0.00 18.00 0.00 181 575.03 0.00 0.00 0.00 0.00 18.50 0.00 175 575.03 0.00 0.00 0.00 0.00 19.00 0.00 168 575.03 0.00 0.00 0.00 0.00 19.50 0.00 163 575.03 0.00 0.00 0.00 0.00 20.00 0.00 158 575.02 0.00 0.00 0.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 53 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 0.00 575.20 0.23 0.23 0.00 0.00 575.40 0.90 0.90 0.00 0.00 575.60 1.89 1.89 0.00 0.00 575.80 3.04 3.04 0.00 0.00 576.00 4.19 4.18 0.01 0.00 576.20 5.07 5.06 0.01 0.00 576.40 5.26 5.25 0.01 0.00 576.60 5.82 5.81 0.01 0.00 576.80 6.32 6.31 0.01 0.00 577.00 6.79 6.78 0.01 0.00 577.20 7.23 7.22 0.01 0.00 577.40 7.64 7.63 0.01 0.00 577.60 8.34 8.33 0.01 0.00 577.80 9.99 9.98 0.01 0.00 578.00 12.18 12.16 0.02 0.00 578.20 18.57 18.56 0.02 0.00 578.40 28.47 28.45 0.02 0.00 578.60 40.72 40.70 0.02 0.00 578.80 54.90 54.88 0.02 0.00 579.00 70.76 70.74 0.02 0.00 579.20 77.80 75.26 0.02 2.51 579.40 85.67 78.16 0.02 7.49 579.60 95.33 80.95 0.02 14.36 579.80 106.19 83.64 0.03 22.52 580.00 118.89 86.25 0.03 32.61 580.20 133.50 88.77 0.03 44.70 580.40 149.68 91.22 0.03 58.43 580.60 167.30 93.61 0.03 73.67 580.80 186.91 95.93 0.03 90.95 581.00 208.33 98.20 0.03 110.09 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 54 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 6,453 0 580.10 15,550 51,527 575.10 6,551 650 580.20 15,709 53,090 575.20 6,650 1,310 580.30 15,869 54,669 575.30 6,748 1,980 580.40 16,028 56,264 575.40 6,847 2,660 580.50 16,187 57,875 575.50 6,945 3,350 580.60 16,346 59,501 575.60 7,043 4,049 580.70 16,505 61,144 575.70 7,142 4,758 580.80 16,665 62,802 575.80 7,240 5,477 580.90 16,824 64,477 575.90 7,339 6,206 581.00 16,983 66,167 576.00 7,437 6,945 576.10 7,540 7,694 576.20 7,643 8,453 576.30 7,746 9,222 576.40 7,849 10,002 576.50 7,952 10,792 576.60 8,055 11,593 576.70 8,158 12,403 576.80 8,261 13,224 576.90 8,364 14,055 577.00 8,467 14,897 577.10 8,548 15,748 577.20 8,630 16,607 577.30 8,711 17,474 577.40 8,792 18,349 577.50 8,874 19,232 577.60 8,955 20,124 577.70 9,036 21,023 577.80 9,117 21,931 577.90 9,199 22,847 578.00 9,280 23,771 578.10 9,739 24,721 578.20 10,199 25,718 578.30 10,658 26,761 578.40 11,118 27,850 578.50 11,577 28,985 578.60 12,036 30,165 578.70 12,496 31,392 578.80 12,955 32,665 578.90 13,415 33,983 579.00 13,874 35,348 579.10 14,026 36,742 579.20 14,177 38,153 579.30 14,329 39,578 579.40 14,481 41,018 579.50 14,633 42,474 579.60 14,784 43,945 579.70 14,936 45,431 579.80 15,088 46,932 579.90 15,239 48,448 580.00 15,391 49,980 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 55 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.11 hrs, Volume= 0.003 of Outflow = 0.01 cfs @ 4.76 hrs, Volume= 0.003 af, Atten= 71%, Lag= 99.0 min Primary = 0.01 cfs @ 4.76 hrs, Volume= 0.003 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 575.04'@ 4.76 hrs Surf.Area= 1,353 sf Storage= 54 cf Plug-Flow detention time= 168.2 min calculated for 0.003 af(98% of inflow) Center-of-Mass det. time= 153.1 min ( 456.5 - 303.4 ) Volume Invert Avail.Storage Storage Description #1 575.00' 45,537 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 575.00 1,334 0 0 576.00 1,812 1,573 1,573 577.00 2,353 2,083 3,656 578.00 2,958 2,656 6,311 579.00 13,864 8,411 14,722 580.00 15,391 14,628 29,350 581.00 16,983 16,187 45,537 Device Routing Invert Outlet Devices #1 Primary 575.00' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.01 cfs @ 4.76 hrs HW=575.04' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Custom Controls 0.01 cfs) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 56 Pond 3P: SAND FILTER Hydrograph 1 I I I I 1 I 1 I I I I I I I I I I I I I I I I I I ■Inflow 0.02_/ / I Jo.02 cfs _l L I T I I L I 1 I- I L./ I �bb� L _II - ❑Primary 0.019 / ,- -I - b OF '- -I - - - 1- -1 - - �n_IIev=5 '�/■O"!, 0.018 / /t 1 + , I t I 1 t 1 -F - H I t I- -1 I- 1 - 0.017 / fi _t OP -I - T I 1 t Storaae C� 0.016- / _ - T - 1- -1 - T -1- 7 - I- -I - 747#I- T -1 - 0.015 ' / � -1 I 1 1 1 1 1 I I I I I I I 0.014=/ / /- - - w 0.012 / 1 1 1 1 1 1 1 1 I I I 1 1 1 1 c00.011' / � -I - 1 I_ � - 1 - I- -I - L -I- 1 - L -I - L -1- L - L -I u 0.009 / ,- -1 - + I- / - + - I- -I - b -I- 4 - I- -I - H -I- b - I- -I 0.00847z _1 - + I - + H t t- 1- -1 - t -I- - H -I - t -I- - -1 1 0.007 / fi -1 - t /4 t - I- -1 - t -1- fi - r -I - t -1- -I - 1- -1 - 0.0061 / 0.01 cfs /T 1 T ,ii'''. T I 1 T 1 7 I- 1 T I T T 1 0.0051 / 1 1 1 I I I I I I I I I 1 1 1 1 I I I 0.00247 , �i�i�I/�/�ii���i �' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 57 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 575.00 0.00 0.50 0.00 0 575.00 0.00 1.00 0.00 0 575.00 0.00 1.50 0.00 0 575.00 0.00 2.00 0.00 0 575.00 0.00 2.50 0.00 1 575.00 0.00 3.00 0.01 9 575.01 0.00 3.50 0.01 35 575.03 0.00 4.00 0.01 48 575.04 0.00 4.50 0.01 53 575.04 0.01 5.00 0.00 54 575.04 0.01 5.50 0.00 51 575.04 0.01 6.00 0.00 49 575.04 0.00 6.50 0.00 45 575.03 0.00 7.00 0.00 41 575.03 0.00 7.50 0.00 36 575.03 0.00 8.00 0.00 32 575.02 0.00 8.50 0.00 28 575.02 0.00 9.00 0.00 24 575.02 0.00 9.50 0.00 21 575.02 0.00 10.00 0.00 19 575.01 0.00 10.50 0.00 16 575.01 0.00 11.00 0.00 14 575.01 0.00 11.50 0.00 12 575.01 0.00 12.00 0.00 11 575.01 0.00 12.50 0.00 10 575.01 0.00 13.00 0.00 9 575.01 0.00 13.50 0.00 8 575.01 0.00 14.00 0.00 7 575.01 0.00 14.50 0.00 6 575.00 0.00 15.00 0.00 5 575.00 0.00 15.50 0.00 5 575.00 0.00 16.00 0.00 4 575.00 0.00 16.50 0.00 4 575.00 0.00 17.00 0.00 4 575.00 0.00 17.50 0.00 3 575.00 0.00 18.00 0.00 3 575.00 0.00 18.50 0.00 3 575.00 0.00 19.00 0.00 3 575.00 0.00 19.50 0.00 3 575.00 0.00 20.00 0.00 2 575.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 58 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 575.00 0.00 577.55 0.33 580.10 0.54 575.05 0.01 577.60 0.34 580.15 0.54 575.10 0.01 577.65 0.34 580.20 0.55 575.15 0.02 577.70 0.34 580.25 0.55 575.20 0.03 577.75 0.35 580.30 0.56 575.25 0.03 577.80 0.35 580.35 0.56 575.30 0.04 577.85 0.36 I 580.40 0.56 575.35 0.05 577.90 0.36 580.45 0.57 575.40 0.05 577.95 0.36 580.50 0.57 575.45 0.06 578.00 0.37 580.55 0.58 575.50 0.07 , 578.05 0.37 580.60 0.58 575.55 0.07 578.10 0.38 580.65 0.59 575.60 0.08 578.15 0.38 580.70 0.59 575.65 0.09 578.20 0.38 580.75 0.59 575.70 0.09 578.25 0.39 580.80 0.60 575.75 0.10 578.30 0.39 580.85 0.60 575.80 0.10 578.35 0.40 580.90 0.61 575.85 0.11 578.40 0.40 580.95 0.61 575.90 0.12 578.45 0.40 581.00 0.61 575.95 0.12 578.50 0.41 576.00 0.13 578.55 0.41 576.05 0.14 578.60 0.42 576.10 0.14 578.65 0.42 576.15 0.15 ' 578.70 0.43 576.20 0.16 578.75 0.43 576.25 0.16 578.80 0.43 576.30 0.17 ' 578.85 0.44 576.35 0.18 578.90 0.44 576.40 0.18 578.95 0.45 576.45 0.19 579.00 0.45 576.50 0.20 579.05 0.45 576.55 0.20 579.10 0.46 576.60 0.21 579.15 0.46 576.65 0.22 579.20 0.47 576.70 0.22 579.25 0.47 576.75 0.23 579.30 0.47 576.80 0.24 579.35 0.48 576.85 0.24 579.40 0.48 576.90 0.25 I 579.45 0.49 576.95 0.26 579.50 0.49 577.00 0.26 579.55 0.50 577.05 0.27 579.60 0.50 577.10 0.27 579.65 0.50 577.15 0.28 579.70 0.51 577.20 0.29 579.75 0.51 577.25 0.29 579.80 0.52 577.30 0.30 579.85 0.52 577.35 0.31 579.90 0.52 577.40 0.31 579.95 0.53 577.45 0.32 580.00 0.53 577.50 0.33 580.05 0.54 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 59 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 1,334 0 580.10 15,550 30,897 575.10 1,382 136 580.20 15,709 32,460 575.20 1,430 276 580.30 15,869 34,038 575.30 1,477 422 580.40 16,028 35,633 575.40 1,525 572 580.50 16,187 37,244 575.50 1,573 727 580.60 16,346 38,871 575.60 1,621 886 580.70 16,505 40,513 575.70 1,669 1,051 580.80 16,665 42,172 575.80 1,716 1,220 580.90 16,824 43,846 575.90 1,764 1,394 581.00 16,983 45,537 576.00 1,812 1,573 576.10 1,866 1,757 576.20 1,920 1,946 576.30 1,974 2,141 576.40 2,028 2,341 576.50 2,083 2,547 576.60 2,137 2,758 576.70 2,191 2,974 576.80 2,245 3,196 576.90 2,299 3,423 577.00 2,353 3,656 577.10 2,414 3,894 577.20 2,474 4,138 577.30 2,534 4,389 577.40 2,595 4,645 577.50 2,656 4,908 577.60 2,716 5,176 577.70 2,777 5,451 577.80 2,837 5,731 577.90 2,897 6,018 578.00 2,958 6,311 578.10 4,049 6,661 578.20 5,139 7,121 578.30 6,230 7,689 578.40 7,320 8,367 578.50 8,411 9,153 578.60 9,502 10,049 578.70 10,592 11,054 578.80 11,683 12,167 578.90 12,773 13,390 579.00 13,864 14,722 579.10 14,017 16,116 579.20 14,169 17,525 579.30 14,322 18,950 579.40 14,475 20,390 579.50 14,628 21,845 579.60 14,780 23,315 579.70 14,933 24,801 579.80 15,086 26,302 579.90 15,238 27,818 580.00 15,391 29,350 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 60 Summary for Pond 4P: TOTAL Inflow Area = 9.300 ac, 19.35% Impervious, Inflow Depth = 3.04" for 25-Year event Inflow = 32.24 cfs @ 3.10 hrs, Volume= 2.354 af Primary = 32.24 cfs @ 3.10 hrs, Volume= 2.354 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph 367/( —I- 4 - 1— 1 1 r I H I - - -1 — T 1— -1 T 1 H —I— rt I- 1 -r L 1 -r 1 1 - I — I —I — I I— —I I I I - ■Inflow _ 0 Prima 1 —I— I32.24cfs I —1 — -r - 1- -I - t _ I- _ I-- -1 - t - -1 - t - -I - t - -1Primary 34 -/ InflowrArea=9-30-0-ac / 132.24 cfs — — rt — — — t — — — — 327 / ' —I— 1 t I— I t — 1 — t — I —1 — t I— —I — t — I— —1 7-30 1— —I— - 1 —1I —I I — I + I— —I — + I— —I + I— —I 7 28 i` —I— - I —L I I + + I + I I + I I + I —I 26� / � - ' - - — — — — — —I - 4 — I - - 4 — II - 4 — II - 4 — I - - 4 — I— —I 247 / + 1 —I - 4 — I- -I - 4 — — —I - 4 — I- -I - 4 — I- -I - 4 — I- 22iv + —I - 4 — I- -I - 4 — — I — I — I —I — H — I —I — H — I I 20� / — —1 — - H —I 4 H I I I I H I —I H I —I - 14 -z / � 1 L _IH L _II I_ I 1 I _I L I L _ 12= / � 1 I I I I I I I I I I I I I I _ 10 / I I I I I I I I _ P I I I I I I I I I I I I I 6= i $fr4I_ _ 1 I I I I I 4 / ' -r /Z -"3-#/3--r#j--#/3,-# 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 61 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.01 0.01 0.25 0.00 0.00 13.00 0.01 0.01 0.50 0.12 0.12 13.25 0.01 0.01 0.75 0.21 0.21 13.50 0.01 0.01 1.00 0.30 0.30 13.75 0.01 0.01 1.25 0.39 0.39 14.00 0.01 0.01 1.50 0.48 0.48 14.25 0.01 0.01 1.75 0.59 0.59 14.50 0.01 0.01 2.00 0.72 0.72 14.75 0.01 0.01 2.25 1.00 1.00 15.00 0.01 0.01 2.50 1.53 1.53 15.25 0.01 0.01 2.75 7.77 7.77 15.50 0.01 0.01 3.00 22.55 22.55 15.75 0.01 0.01 3.25 16.62 16.62 16.00 0.01 0.01 3.50 10.00 10.00 16.25 0.01 0.01 3.75 8.26 8.26 16.50 0.01 0.01 4.00 7.22 7.22 16.75 0.00 0.00 4.25 6.16 6.16 17.00 0.00 0.00 4.50 5.47 5.47 17.25 0.00 0.00 4.75 4.05 4.05 17.50 0.00 0.00 5.00 3.07 3.07 17.75 0.00 0.00 5.25 2.50 2.50 18.00 0.00 0.00 5.50 2.18 2.18 18.25 0.00 0.00 5.75 1.98 1.98 18.50 0.00 0.00 6.00 1.83 1.83 I 18.75 0.00 0.00 6.25 1.10 1.10 19.00 0.00 0.00 6.50 0.65 0.65 19.25 0.00 0.00 6.75 0.41 0.41 I 19.50 0.00 0.00 7.00 0.28 0.28 19.75 0.00 0.00 7.25 0.21 0.21 20.00 0.00 0.00 7.50 0.16 0.16 7.75 0.12 0.12 8.00 0.10 0.10 8.25 0.08 0.08 8.50 0.07 0.07 8.75 0.06 0.06 9.00 0.05 0.05 9.25 0.04 0.04 9.50 0.04 0.04 9.75 0.03 0.03 10.00 0.03 0.03 10.25 0.03 0.03 10.50 0.02 0.02 10.75 0.02 0.02 11.00 0.02 0.02 11.25 0.02 0.02 11.50 0.02 0.02 11.75 0.02 0.02 12.00 0.01 0.01 12.25 0.01 0.01 12.50 0.01 0.01 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 62 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=10.400 ac 0.00% Impervious Runoff Depth=3.26" Flow Length=950' Tc=17.7 min CN=84 Runoff=55.83 cfs 2.826 af SubcatchmentlS: POST TO SAND FILTER B Runoff Area=7.500 ac 0.00% Impervious Runoff Depth=3.26" Tc=9.4 min CN=84 Runoff=52.75 cfs 2.038 af Subcatchment5S: BYPASS BUA Runoff Area=1.800 ac 100.00% Impervious Runoff Depth=4.75" Tc=5.0 min CN=98 Runoff=18.29 cfs 0.713 af Pond 2P: FOREBAY Peak Elev=578.58' Storage=29,914 cf Inflow=52.75 cfs 2.038 af Primary=39.29 cfs 2.032 af Secondary=0.02 cfs 0.003 af Tertiary=0.00 cfs 0.000 af Outflow=39.31 cfs 2.035 af Pond 3P: SAND FILTER Peak Elev=575.04' Storage=58 cf Inflow=0.02 cfs 0.003 af Outflow=0.01 cfs 0.003 af Pond 4P: TOTAL Inflow=45.48 cfs 2.748 af Primary=45.48 cfs 2.748 af Total Runoff Area = 19.700 ac Runoff Volume = 5.578 af Average Runoff Depth = 3.40" 90.86% Pervious = 17.900 ac 9.14% Impervious = 1.800 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 55.83 cfs @ 3.10 hrs, Volume= 2.826 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.99" Area (ac) CN Description 10.400 84 Pasture/grassland/range, Fair, HSG D 10.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Grass: Dense n= 0.240 P2= 3.58" 5.1 800 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 17.7 950 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph 1 1 I I I I I I I I I 60 -/ — I I I I I I I I I ■Runoff ,1_ [55.83cfs I — — — —1 — —[ — — 1— —I — 4 — 1 —I— - 55 1 I 1 1 1 1 1 1 T_ype I II _ 50� 1 _1 1 11 _ L I _I L 1 L I A L I I 6-h r 45� 1 1 1 1 I 1 1 1 I 50-Year R'airifal'I=4.99" 40� 1 1 1 1 1 1 1 I I Runoff A e-a 40i.40O sac - 35- fi —11— - - - 11- -11 rt - I- - II- -II - 1- -Ouf.-" f Violljme- .8*6 of — 3 30� nb#Dept -3.26" - LL 25� T 1 1 1 1 1 1 1 1 1 4- 1 + / -F + I- + - + 1 1 +FIOW ILengfh-950' - 20� I I I I I �e,�1 f-t-m-in 15� 1 1 1 1 1 1 1 1 1 1 1 1 4- -I- - - L - 1- -I + I- I + 1- I I +CI4=84 - 10 0:-1Z. .-.- .-,,-71-n- ‘n-1•14.(' #// . 2, / . . / p 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 64 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.99 3.26 0.00 0.25 0.06 0.00 0.00 13.00 4.99 3.26 0.00 0.50 0.11 0.00 0.00 13.25 4.99 3.26 0.00 0.75 0.17 0.00 0.00 13.50 4.99 3.26 0.00 1.00 0.24 0.00 0.00 13.75 4.99 3.26 0.00 1.25 0.32 0.00 0.00 14.00 4.99 3.26 0.00 1.50 0.40 0.00 0.00 14.25 4.99 3.26 0.00 1.75 0.50 0.01 0.11 14.50 4.99 3.26 0.00 2.00 0.62 0.03 0.51 14.75 4.99 3.26 0.00 2.25 0.77 0.07 1.13 15.00 4.99 3.26 0.00 2.50 0.96 0.14 2.15 15.25 4.99 3.26 0.00 2.75 1.70 0.54 6.77 15.50 4.99 3.26 0.00 3.00 3.64 2.06 41.56 15.75 4.99 3.26 0.00 3.25 3.95 2.33 34.15 16.00 4.99 3.26 0.00 3.50 4.15 2.51 12.34 16.25 4.99 3.26 0.00 3.75 4.30 2.63 6.81 16.50 4.99 3.26 0.00 4.00 4.41 2.74 5.05 16.75 4.99 3.26 0.00 4.25 4.52 2.83 4.20 17.00 4.99 3.26 0.00 4.50 4.61 2.91 3.65 17.25 4.99 3.26 0.00 4.75 4.68 2.98 3.21 17.50 4.99 3.26 0.00 5.00 4.75 3.05 2.85 17.75 4.99 3.26 0.00 5.25 4.82 3.10 2.55 18.00 4.99 3.26 0.00 5.50 4.88 3.16 2.39 18.25 4.99 3.26 0.00 5.75 4.94 3.21 2.27 18.50 4.99 3.26 0.00 6.00 4.99 3.26 2.16 18.75 4.99 3.26 0.00 6.25 4.99 3.26 1.05 19.00 4.99 3.26 0.00 6.50 4.99 3.26 0.13 19.25 4.99 3.26 0.00 6.75 4.99 3.26 0.01 19.50 4.99 3.26 0.00 7.00 4.99 3.26 0.00 19.75 4.99 3.26 0.00 7.25 4.99 3.26 0.00 20.00 4.99 3.26 0.00 7.50 4.99 3.26 0.00 7.75 4.99 3.26 0.00 8.00 4.99 3.26 0.00 8.25 4.99 3.26 0.00 8.50 4.99 3.26 0.00 8.75 4.99 3.26 0.00 9.00 4.99 3.26 0.00 9.25 4.99 3.26 0.00 9.50 4.99 3.26 0.00 9.75 4.99 3.26 0.00 10.00 4.99 3.26 0.00 10.25 4.99 3.26 0.00 10.50 4.99 3.26 0.00 10.75 4.99 3.26 0.00 11.00 4.99 3.26 0.00 11.25 4.99 3.26 0.00 11.50 4.99 3.26 0.00 11.75 4.99 3.26 0.00 12.00 4.99 3.26 0.00 12.25 4.99 3.26 0.00 12.50 4.99 3.26 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 1S: POST TO SAND FILTER B Runoff = 52.75 cfs @ 3.01 hrs, Volume= 2.038 af, Depth= 3.26" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.99" Area (ac) CN Description 7.500 84 45% IMPERVIOUS, HSG D 7.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER B Hydrograph 1 1 1 1 1 -1- - - - - - I- -1 4 I - ■Runoff 55� z 7s cfs 1 I I I I I I I I elh 50� 1 1 1 1 1 1 1 1 1 �I 45� 1 1 1 1 1 1 1 1 1 1 1 -611T 4- -1- + - - - - - I- 6O Yeah- Ra i rifa II=499" - 40� 1 1 1 1 1 1 1 1 1 I �1 1 35 _I_ I I I I Runoff ]Area=/ L5Ofl ac - w 1 1111 YIVe= .�a QI 30� I I I I I -I- - H - I- H - + - I- -I 1Rtrnon- Depth=3.26" 'L 251/ 1 1 1 1 1 1 1 1 1 1 1 1 1 20 1 1 1 1 1 1 1 1 1 T1 p 4Imin -I- _ 1 - I- -I - - L - I- _I - L 15� 1 1 1 1 1 1 1 1 1� - 1 - A fi t 1 - rt 1 1 rt r 1 - I I I I 0 1 2 3 4.. ..0. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 66 Hydrograph for Subcatchment 1S: POST TO SAND FILTER B Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.99 3.26 0.00 0.25 0.06 0.00 0.00 13.00 4.99 3.26 0.00 0.50 0.11 0.00 0.00 13.25 4.99 3.26 0.00 0.75 0.17 0.00 0.00 13.50 4.99 3.26 0.00 1.00 0.24 0.00 0.00 13.75 4.99 3.26 0.00 1.25 0.32 0.00 0.00 14.00 4.99 3.26 0.00 1.50 0.40 0.00 0.00 14.25 4.99 3.26 0.00 1.75 0.50 0.01 0.19 14.50 4.99 3.26 0.00 2.00 0.62 0.03 0.56 14.75 4.99 3.26 0.00 2.25 0.77 0.07 1.12 15.00 4.99 3.26 0.00 2.50 0.96 0.14 2.01 15.25 4.99 3.26 0.00 2.75 1.70 0.54 10.53 15.50 4.99 3.26 0.00 3.00 3.64 2.06 52.59 15.75 4.99 3.26 0.00 3.25 3.95 2.33 10.63 16.00 4.99 3.26 0.00 3.50 4.15 2.51 5.67 16.25 4.99 3.26 0.00 3.75 4.30 2.63 3.92 16.50 4.99 3.26 0.00 4.00 4.41 2.74 3.28 16.75 4.99 3.26 0.00 4.25 4.52 2.83 2.79 17.00 4.99 3.26 0.00 4.50 4.61 2.91 2.46 17.25 4.99 3.26 0.00 4.75 4.68 2.98 2.17 17.50 4.99 3.26 0.00 5.00 4.75 3.05 1.93 17.75 4.99 3.26 0.00 5.25 4.82 3.10 1.76 18.00 4.99 3.26 0.00 5.50 4.88 3.16 1.68 18.25 4.99 3.26 0.00 5.75 4.94 3.21 1.60 18.50 4.99 3.26 0.00 6.00 4.99 3.26 1.51 18.75 4.99 3.26 0.00 6.25 4.99 3.26 0.12 19.00 4.99 3.26 0.00 6.50 4.99 3.26 0.00 19.25 4.99 3.26 0.00 6.75 4.99 3.26 0.00 19.50 4.99 3.26 0.00 7.00 4.99 3.26 0.00 19.75 4.99 3.26 0.00 7.25 4.99 3.26 0.00 20.00 4.99 3.26 0.00 7.50 4.99 3.26 0.00 7.75 4.99 3.26 0.00 8.00 4.99 3.26 0.00 8.25 4.99 3.26 0.00 8.50 4.99 3.26 0.00 8.75 4.99 3.26 0.00 9.00 4.99 3.26 0.00 9.25 4.99 3.26 0.00 9.50 4.99 3.26 0.00 9.75 4.99 3.26 0.00 10.00 4.99 3.26 0.00 10.25 4.99 3.26 0.00 10.50 4.99 3.26 0.00 10.75 4.99 3.26 0.00 11.00 4.99 3.26 0.00 11.25 4.99 3.26 0.00 11.50 4.99 3.26 0.00 11.75 4.99 3.26 0.00 12.00 4.99 3.26 0.00 12.25 4.99 3.26 0.00 12.50 4.99 3.26 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 1I 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 67 Summary for Subcatchment 5S: BYPASS BUA Runoff = 18.29 cfs @ 2.95 hrs, Volume= 0.713 af, Depth= 4.75" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.99" Area (ac) CN Description * 1.800 98 BYPASS BUA 1.800 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: BYPASS BUA Hydrograph 20 -/ ,- _1- 1 _ I- -1 - 4 - 1- I 1 _ 1_ - I_ _I - _L - 1 -I_ - ■Runoff 19� -1 Ifa.29cfsI • 1- -1 - 4 - 1- -1- - 4 - 4 - 1- -I - 4 - 4 -I- - 18� _ -1- - -i - - 1- -1 - 1- 1- - T I 4 T I -I -TypeIH - 17� ,- -I 1 - - - 4 - 1- -1- -I - + - 1- -1 - - - H - 1- -1 - 4 - I- --1-1- - 16� - -1- - - - -F - 1- -1- -I - t - 1- -1 - -1 - '7 - 1- -I - t - ��I1-1 14/ ,_ 1 H 1 1 -F r 1 H t 50--Yat Rlalritall=C99" - 14/ _ - - _ I- -1 - rt — r —1— - — fi — I— —1 — rt — r — 1— —1 — rt r —1— - 134'/ — 1 -1 - 1- 171- 1 T1 -Rt11110ffArea=t8OO-ac - y 12� - -I T T 1 T T Ouiloir lIetkini =0.7134f 010- — 1 1 1 1 I Li 94 - - R�n�ff D��Zth=4.7�_' 8 / - -I 1 1 1 I I I I I I I I 7i 1 1 I 1 1 I 1 I 1 1 TIc=5 11�1111 5 I I I 1 I I I I I N- v 44-/ _I_ _I 1 1 1 I 1 I I 1 1 1 1 3� _ 1 1 I 1 I I I I I I I I I 2' ,_ 1 - L - - I- I - 1 - L - I - 1 - L - - . ..,. ..!!��,...,��� . 0/117( i , ,���� .�������i . ,��� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 68 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.99 4.75 0.00 0.25 0.06 0.00 0.01 13.00 4.99 4.75 0.00 0.50 0.11 0.02 0.15 13.25 4.99 4.75 0.00 0.75 0.17 0.05 0.26 13.50 4.99 4.75 0.00 1.00 0.24 0.10 0.35 13.75 4.99 4.75 0.00 1.25 0.32 0.16 0.45 14.00 4.99 4.75 0.00 1.50 0.40 0.23 0.55 14.25 4.99 4.75 0.00 1.75 0.50 0.32 0.68 14.50 4.99 4.75 0.00 2.00 0.62 0.43 0.82 14.75 4.99 4.75 0.00 2.25 0.77 0.57 1.08 15.00 4.99 4.75 0.00 2.50 0.96 0.75 1.39 15.25 4.99 4.75 0.00 2.75 1.70 1.47 6.66 15.50 4.99 4.75 0.00 3.00 3.64 3.41 15.24 15.75 4.99 4.75 0.00 3.25 3.95 3.71 2.07 16.00 4.99 4.75 0.00 3.50 4.15 3.92 1.34 16.25 4.99 4.75 0.00 3.75 4.30 4.06 1.00 16.50 4.99 4.75 0.00 4.00 4.41 4.18 0.83 16.75 4.99 4.75 0.00 4.25 4.52 4.28 0.72 17.00 4.99 4.75 0.00 4.50 4.61 4.37 0.63 17.25 4.99 4.75 0.00 4.75 4.68 4.45 0.56 17.50 4.99 4.75 0.00 5.00 4.75 4.52 0.49 17.75 4.99 4.75 0.00 5.25 4.82 4.58 0.46 18.00 4.99 4.75 0.00 5.50 4.88 4.64 0.44 18.25 4.99 4.75 0.00 5.75 4.94 4.70 0.41 18.50 4.99 4.75 0.00 6.00 4.99 4.75 0.39 18.75 4.99 4.75 0.00 6.25 4.99 4.75 0.00 19.00 4.99 4.75 0.00 6.50 4.99 4.75 0.00 19.25 4.99 4.75 0.00 6.75 4.99 4.75 0.00 19.50 4.99 4.75 0.00 7.00 4.99 4.75 0.00 19.75 4.99 4.75 0.00 7.25 4.99 4.75 0.00 20.00 4.99 4.75 0.00 7.50 4.99 4.75 0.00 7.75 4.99 4.75 0.00 8.00 4.99 4.75 0.00 8.25 4.99 4.75 0.00 8.50 4.99 4.75 0.00 8.75 4.99 4.75 0.00 9.00 4.99 4.75 0.00 9.25 4.99 4.75 0.00 9.50 4.99 4.75 0.00 9.75 4.99 4.75 0.00 10.00 4.99 4.75 0.00 10.25 4.99 4.75 0.00 10.50 4.99 4.75 0.00 10.75 4.99 4.75 0.00 11.00 4.99 4.75 0.00 11.25 4.99 4.75 0.00 11.50 4.99 4.75 0.00 11.75 4.99 4.75 0.00 12.00 4.99 4.75 0.00 12.25 4.99 4.75 0.00 12.50 4.99 4.75 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type II 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 69 Summary for Pond 2P: FOREBAY Inflow Area = 7.500 ac, 0.00% Impervious, Inflow Depth = 3.26" for 50-Year event Inflow = 52.75 cfs @ 3.01 hrs, Volume= 2.038 af Outflow = 39.31 cfs @ 3.09 hrs, Volume= 2.035 af, Atten= 25%, Lag= 4.8 min Primary = 39.29 cfs @ 3.09 hrs, Volume= 2.032 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.09 hrs, Volume= 0.003 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 578.58'@ 3.09 hrs Surf.Area= 11,940 sf Storage= 29,914 cf Plug-Flow detention time=31.1 min calculated for 2.035 of(100% of inflow) Center-of-Mass det. time= 30.6 min ( 234.3 - 203.7 ) Volume Invert Avail.Storage Storage Description #1 575.00' 66,167 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 6,453 0 0 576.00 7,437 6,945 6,945 577.00 8,467 7,952 14,897 578.00 9,280 8,874 23,771 579.00 13,874 11,577 35,348 580.00 15,391 14,633 49,980 581.00 16,983 16,187 66,167 Device Routing Invert Outlet Devices #1 Primary 575.00' 36.0" Round 36" Culvert L= 87.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 575.00'/ 574.00' S= 0.0115 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Primary 577.50' 36.0" W x 6.0" H Vert. 6X36 IN ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 578.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 575.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Primary 575.00' 12.0" Round 12" PIPE TO SF X 2.00 L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 575.00'/ 574.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #6 Tertiary 579.00' 10.0' long + 3.0 '/' SideZ x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 70 Primary OutFlow Max=38.32 cfs @ 3.09 hrs HW=578.56' TW=0.00' (Dynamic Tailwater) —1=36" Culvert (Passes 22.14 cfs of 48.89 cfs potential flow) L3=TOP OF OUTLET STRUCTURE(Weir Controls 22.14 cfs © 2.46 fps) —2=6X36 IN ORIFICE (Orifice Controls 6.49 cfs @ 4.33 fps) —5=12" PIPE TO SF (Barrel Controls 9.69 cfs @ 6.17 fps) Secondary OutFlow Max=0.02 cfs © 3.09 hrs HW=578.56' TW=575.01' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=575.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph I I I I I i I I I I I I I I I I I I — —1 — I— —1 — I— rt — I— t —I— t —I— t —I— t —I — t —I — 1— — ■Inflow / 152.75 cfs 1 •Outflow / _ I _ I 1 I irafil _ •Primary / / 1 I 1 1 1 1 1 16 1e ■Secondary / / / / / L 1 I I I I 1 peak Bev1=51781.58. ■Tertiary 55� / / — H — 1 4 - 1— + —I— + -1— + -1— + -1 — + —I - 1 50� / / / / / 1E9.3f cfs 1 1 1 1 Storage=29,914 of - / / / 39.29 cfs I , I I I I I I I I I I 45� / / / / — -I T 7 1 T I T I T I T I T I I 40 -/ / / _I 1 — 4 — 1— -L —I— —1— -k —1— —I — —I — I— — / / 35Lz / / / / / , , 1 1 1 , , 1 1 1 30 / / / - fi - 1— rt —I— rt -1— fi -1— fi —I — fi —I - 1 c = / / / a 25 / / / _ _ — 1 L 1 L 1— 1 —I_ L _I _ L _I _ L — / / , 1 1 1 , , 1 1 1 20 / / / — _ = / / / 1 1 1 1 1 5� / 0 02 cfs , I 0.00 cfs / / 0 r 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 71 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 0.00 0.50 0.00 0 575.00 0.00 0.00 0.00 0.00 1.00 0.00 0 575.00 0.00 0.00 0.00 0.00 1.50 0.00 0 575.00 0.00 0.00 0.00 0.00 2.00 0.56 389 575.06 0.02 0.02 0.00 0.00 2.50 2.01 2,138 575.32 0.60 0.60 0.00 0.00 3.00 52.59 24,934 578.12 15.52 15.50 0.02 0.00 3.50 5.67 21,376 577.74 9.42 9.41 0.01 0.00 4.00 3.28 14,852 576.99 6.78 6.77 0.01 0.00 4.50 2.46 9,290 576.31 5.22 5.21 0.01 0.00 5.00 1.93 5,580 575.81 3.13 3.12 0.00 0.00 5.50 1.68 4,278 575.63 2.07 2.07 0.00 0.00 6.00 1.51 3,801 575.56 1.70 1.70 0.00 0.00 6.50 0.00 2,346 575.35 0.72 0.71 0.00 0.00 7.00 0.00 1,504 575.23 0.30 0.30 0.00 0.00 7.50 0.00 1,103 575.17 0.16 0.16 0.00 0.00 8.00 0.00 873 575.13 0.10 0.10 0.00 0.00 8.50 0.00 723 575.11 0.07 0.07 0.00 0.00 9.00 0.00 618 575.10 0.05 0.05 0.00 0.00 9.50 0.00 541 575.08 0.04 0.04 0.00 0.00 10.00 0.00 482 575.07 0.03 0.03 0.00 0.00 10.50 0.00 434 575.07 0.02 0.02 0.00 0.00 11.00 0.00 396 575.06 0.02 0.02 0.00 0.00 11.50 0.00 364 575.06 0.02 0.02 0.00 0.00 12.00 0.00 337 575.05 0.01 0.01 0.00 0.00 12.50 0.00 314 575.05 0.01 0.01 0.00 0.00 13.00 0.00 294 575.05 0.01 0.01 0.00 0.00 13.50 0.00 276 575.04 0.01 0.01 0.00 0.00 14.00 0.00 261 575.04 0.01 0.01 0.00 0.00 14.50 0.00 247 575.04 0.01 0.01 0.00 0.00 15.00 0.00 235 575.04 0.01 0.01 0.00 0.00 15.50 0.00 224 575.03 0.01 0.01 0.00 0.00 16.00 0.00 214 575.03 0.01 0.01 0.00 0.00 16.50 0.00 205 575.03 0.00 0.00 0.00 0.00 17.00 0.00 196 575.03 0.00 0.00 0.00 0.00 17.50 0.00 189 575.03 0.00 0.00 0.00 0.00 18.00 0.00 182 575.03 0.00 0.00 0.00 0.00 18.50 0.00 175 575.03 0.00 0.00 0.00 0.00 19.00 0.00 169 575.03 0.00 0.00 0.00 0.00 19.50 0.00 163 575.03 0.00 0.00 0.00 0.00 20.00 0.00 158 575.02 0.00 0.00 0.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 72 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 0.00 575.20 0.23 0.23 0.00 0.00 575.40 0.90 0.90 0.00 0.00 575.60 1.89 1.89 0.00 0.00 575.80 3.04 3.04 0.00 0.00 576.00 4.19 4.18 0.01 0.00 576.20 5.07 5.06 0.01 0.00 576.40 5.26 5.25 0.01 0.00 576.60 5.82 5.81 0.01 0.00 576.80 6.32 6.31 0.01 0.00 577.00 6.79 6.78 0.01 0.00 577.20 7.23 7.22 0.01 0.00 577.40 7.64 7.63 0.01 0.00 577.60 8.34 8.33 0.01 0.00 577.80 9.99 9.98 0.01 0.00 578.00 12.18 12.16 0.02 0.00 578.20 18.57 18.56 0.02 0.00 578.40 28.47 28.45 0.02 0.00 578.60 40.72 40.70 0.02 0.00 578.80 54.90 54.88 0.02 0.00 579.00 70.76 70.74 0.02 0.00 579.20 77.80 75.26 0.02 2.51 579.40 85.67 78.16 0.02 7.49 579.60 95.33 80.95 0.02 14.36 579.80 106.19 83.64 0.03 22.52 580.00 118.89 86.25 0.03 32.61 580.20 133.50 88.77 0.03 44.70 580.40 149.68 91.22 0.03 58.43 580.60 167.30 93.61 0.03 73.67 580.80 186.91 95.93 0.03 90.95 581.00 208.33 98.20 0.03 110.09 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 73 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 6,453 0 580.10 15,550 51,527 575.10 6,551 650 580.20 15,709 53,090 575.20 6,650 1,310 580.30 15,869 54,669 575.30 6,748 1,980 580.40 16,028 56,264 575.40 6,847 2,660 580.50 16,187 57,875 575.50 6,945 3,350 580.60 16,346 59,501 575.60 7,043 4,049 580.70 16,505 61,144 575.70 7,142 4,758 580.80 16,665 62,802 575.80 7,240 5,477 580.90 16,824 64,477 575.90 7,339 6,206 581.00 16,983 66,167 576.00 7,437 6,945 576.10 7,540 7,694 576.20 7,643 8,453 576.30 7,746 9,222 576.40 7,849 10,002 576.50 7,952 10,792 576.60 8,055 11,593 576.70 8,158 12,403 576.80 8,261 13,224 576.90 8,364 14,055 577.00 8,467 14,897 577.10 8,548 15,748 577.20 8,630 16,607 577.30 8,711 17,474 577.40 8,792 18,349 577.50 8,874 19,232 577.60 8,955 20,124 577.70 9,036 21,023 577.80 9,117 21,931 577.90 9,199 22,847 578.00 9,280 23,771 578.10 9,739 24,721 578.20 10,199 25,718 578.30 10,658 26,761 578.40 11,118 27,850 578.50 11,577 28,985 578.60 12,036 30,165 578.70 12,496 31,392 578.80 12,955 32,665 578.90 13,415 33,983 579.00 13,874 35,348 579.10 14,026 36,742 579.20 14,177 38,153 579.30 14,329 39,578 579.40 14,481 41,018 579.50 14,633 42,474 579.60 14,784 43,945 579.70 14,936 45,431 579.80 15,088 46,932 579.90 15,239 48,448 580.00 15,391 49,980 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 74 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.09 hrs, Volume= 0.003 af Outflow = 0.01 cfs @ 4.82 hrs, Volume= 0.003 af, Atten= 71%, Lag= 103.8 min Primary = 0.01 cfs @ 4.82 hrs, Volume= 0.003 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 575.04'@ 4.82 hrs Surf.Area= 1,355 sf Storage= 58 cf Plug-Flow detention time= 168.5 min calculated for 0.003 af(98% of inflow) Center-of-Mass det. time= 154.0 min ( 453.0 - 299.0 ) Volume Invert Avail.Storage Storage Description #1 575.00' 45,537 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 575.00 1,334 0 0 576.00 1,812 1,573 1,573 577.00 2,353 2,083 3,656 578.00 2,958 2,656 6,311 579.00 13,864 8,411 14,722 580.00 15,391 14,628 29,350 581.00 16,983 16,187 45,537 Device Routing Invert Outlet Devices #1 Primary 575.00' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.01 cfs @ 4.82 hrs HW=575.04' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Custom Controls 0.01 cfs) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 75 Pond 3P: SAND FILTER Hydrograph I I I I I I 1 I I /I I I I I I I I I I I I I I I I I I I I ■Inflow 0.021 i ,- -I - I0.02ofs - — L —I — H — I— —I — L —I— — H —I — L —I— H — 1— —I — - Primary 0.02 / ,+ -I - + L -I - + - 1- -1 - + Peak IIevC1575.04'- 0.019 i ,r -1 - rt - -I - -r - 1- -1 - r -1- rt - 1- -1 - r -1- - 1- -I - 0.018_ i ' -I 1 , I 1 1 1 1 1 I S#Oraae_= cf- 0.017= i - - `� 0.016= i 0.014_/ ik -I - 1 I- I 1 1 1 L 1 4 I- I L I -1 1- 1 - 0.013-' i ,+ -I - + 4 - 1- -I - + - 1 1 - L -1- H - H I - L -I- + - + 1 - - 40 0.012-' i ,1 1 rt 1 r 1 -r 1 1 L 1 rt r 1 L 1 rt r 1 - 0 00.01 ' i LL =/ 1 0.009- i � 0.0081i � I1 1- ' I L11 L111_ ILILL1 - 0.0071 i )- -I - 1 /jam I -k 1 1 L 1 4 I- 1 L 1 -1 1- 1 - fs r 0.0061 001 c + -1 - + ��jj/ + - 1- -I - H -I- H - H -I - H -I- H - H -I - 0.005, / - %/ 1 1 I I - rt - r -1 - r -i- - 1 -1 - 0.003k / � - *, � 1 1 0.003; i ��i 0.0021 I ����I/I ����� ����������������������������� 0.001 i i i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 76 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 575.00 0.00 0.50 0.00 0 575.00 0.00 1.00 0.00 0 575.00 0.00 1.50 0.00 0 575.00 0.00 2.00 0.00 0 575.00 0.00 2.50 0.00 2 575.00 0.00 3.00 0.02 12 575.01 0.00 3.50 0.01 38 575.03 0.00 4.00 0.01 52 575.04 0.01 4.50 0.01 57 575.04 0.01 5.00 0.00 58 575.04 0.01 5.50 0.00 56 575.04 0.01 6.00 0.00 53 575.04 0.01 6.50 0.00 49 575.04 0.00 7.00 0.00 44 575.03 0.00 7.50 0.00 39 575.03 0.00 8.00 0.00 34 575.03 0.00 8.50 0.00 30 575.02 0.00 9.00 0.00 26 575.02 0.00 9.50 0.00 23 575.02 0.00 10.00 0.00 20 575.01 0.00 10.50 0.00 17 575.01 0.00 11.00 0.00 15 575.01 0.00 11.50 0.00 13 575.01 0.00 12.00 0.00 12 575.01 0.00 12.50 0.00 10 575.01 0.00 13.00 0.00 9 575.01 0.00 13.50 0.00 8 575.01 0.00 14.00 0.00 7 575.01 0.00 14.50 0.00 6 575.00 0.00 15.00 0.00 6 575.00 0.00 15.50 0.00 5 575.00 0.00 16.00 0.00 5 575.00 0.00 16.50 0.00 4 575.00 0.00 17.00 0.00 4 575.00 0.00 17.50 0.00 4 575.00 0.00 18.00 0.00 3 575.00 0.00 18.50 0.00 3 575.00 0.00 19.00 0.00 3 575.00 0.00 19.50 0.00 3 575.00 0.00 20.00 0.00 2 575.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 77 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 575.00 0.00 577.55 0.33 580.10 0.54 575.05 0.01 577.60 0.34 580.15 0.54 575.10 0.01 577.65 0.34 580.20 0.55 575.15 0.02 577.70 0.34 580.25 0.55 575.20 0.03 577.75 0.35 580.30 0.56 575.25 0.03 577.80 0.35 580.35 0.56 575.30 0.04 577.85 0.36 I 580.40 0.56 575.35 0.05 577.90 0.36 580.45 0.57 575.40 0.05 577.95 0.36 580.50 0.57 575.45 0.06 578.00 0.37 580.55 0.58 575.50 0.07 , 578.05 0.37 580.60 0.58 575.55 0.07 578.10 0.38 580.65 0.59 575.60 0.08 578.15 0.38 580.70 0.59 575.65 0.09 578.20 0.38 580.75 0.59 575.70 0.09 578.25 0.39 580.80 0.60 575.75 0.10 578.30 0.39 580.85 0.60 575.80 0.10 578.35 0.40 580.90 0.61 575.85 0.11 578.40 0.40 580.95 0.61 575.90 0.12 578.45 0.40 581.00 0.61 575.95 0.12 578.50 0.41 576.00 0.13 578.55 0.41 576.05 0.14 578.60 0.42 576.10 0.14 578.65 0.42 576.15 0.15 ' 578.70 0.43 576.20 0.16 578.75 0.43 576.25 0.16 578.80 0.43 576.30 0.17 ' 578.85 0.44 576.35 0.18 578.90 0.44 576.40 0.18 578.95 0.45 576.45 0.19 579.00 0.45 576.50 0.20 579.05 0.45 576.55 0.20 579.10 0.46 576.60 0.21 579.15 0.46 576.65 0.22 579.20 0.47 576.70 0.22 579.25 0.47 576.75 0.23 579.30 0.47 576.80 0.24 579.35 0.48 576.85 0.24 579.40 0.48 576.90 0.25 I 579.45 0.49 576.95 0.26 579.50 0.49 577.00 0.26 579.55 0.50 577.05 0.27 579.60 0.50 577.10 0.27 579.65 0.50 577.15 0.28 579.70 0.51 577.20 0.29 579.75 0.51 577.25 0.29 579.80 0.52 577.30 0.30 579.85 0.52 577.35 0.31 579.90 0.52 577.40 0.31 579.95 0.53 577.45 0.32 580.00 0.53 577.50 0.33 580.05 0.54 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 78 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 1,334 0 580.10 15,550 30,897 575.10 1,382 136 580.20 15,709 32,460 575.20 1,430 276 580.30 15,869 34,038 575.30 1,477 422 580.40 16,028 35,633 575.40 1,525 572 580.50 16,187 37,244 575.50 1,573 727 580.60 16,346 38,871 575.60 1,621 886 580.70 16,505 40,513 575.70 1,669 1,051 580.80 16,665 42,172 575.80 1,716 1,220 580.90 16,824 43,846 575.90 1,764 1,394 581.00 16,983 45,537 576.00 1,812 1,573 576.10 1,866 1,757 576.20 1,920 1,946 576.30 1,974 2,141 576.40 2,028 2,341 576.50 2,083 2,547 576.60 2,137 2,758 576.70 2,191 2,974 576.80 2,245 3,196 576.90 2,299 3,423 577.00 2,353 3,656 577.10 2,414 3,894 577.20 2,474 4,138 577.30 2,534 4,389 577.40 2,595 4,645 577.50 2,656 4,908 577.60 2,716 5,176 577.70 2,777 5,451 577.80 2,837 5,731 577.90 2,897 6,018 578.00 2,958 6,311 578.10 4,049 6,661 578.20 5,139 7,121 578.30 6,230 7,689 578.40 7,320 8,367 578.50 8,411 9,153 578.60 9,502 10,049 578.70 10,592 11,054 578.80 11,683 12,167 578.90 12,773 13,390 579.00 13,864 14,722 579.10 14,017 16,116 579.20 14,169 17,525 579.30 14,322 18,950 579.40 14,475 20,390 579.50 14,628 21,845 579.60 14,780 23,315 579.70 14,933 24,801 579.80 15,086 26,302 579.90 15,238 27,818 580.00 15,391 29,350 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 79 Summary for Pond 4P: TOTAL Inflow Area = 9.300 ac, 19.35% Impervious, Inflow Depth = 3.55" for 50-Year event Inflow = 45.48 cfs @ 3.07 hrs, Volume= 2.748 af Primary = 45.48 cfs @ 3.07 hrs, Volume= 2.748 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph -I- 4 - I- -I - 4 - I- -I - 4 - I- -I - . - -I - 4 - I- -I - 4 - I- -I - - / z- -1- rt 1- 1 rt L 1 -r 1 1 T - I I 1 I- I I I -I - ■Inflow 507/ / - -I a5.aacfs El Primary 46� i 1(45.48 cfs/ 1 - - L -I + - + 1 -Inflow►-Area-9-.300-ac - 44 / / 7 - T -I - T - T -I - T I T I T I 42=' / /- I 1 1 L I L L 1 1 I 1 L 1 I L I L 40� � �- 38I" / -I- p -1 - -F - - -I - - - -1 - + - I- -1 - + - 1- -I - + - I- -1 - 36./ 34 / /- - 32=' / /- -I- -I - - I- -I - - - -I - - I- -I - - I- -I - - I- - - - 30 / 1- I- ' I rt I- I t r 1 t I I t I I t I t - z 28, z 'L I 1 I I I I I I I I I I I I I I 26 ' 0 24� i ,- -I- I -I - 4 - I- -I - 4 - I- -1 - -L - I- -I - - I- -I - -L - I- -1 - - LL 22= / /- -I- -I - 7 - I- -I - T - I- -I - T - I- -I - T - I- -I - T - I- T - - 20✓ -I 1 I IIII IIII IIII I L I- _I 18- / � 16 / A 1 - - 1- -1 - + - 1- -1 - + - 1- -1 - + - 1- -1 - + - 1- -1 12 / � � 1 - - - - - 1- -1 - - - -1 - - 1- - - 10 e''A - I -� g_ t I I fi I I fi I- -I fi I _ 4 / �fr�SSr�S (/Sr�t�Sr��r�rt /Sr� 0- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 80 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.01 0.01 0.25 0.01 0.01 13.00 0.01 0.01 0.50 0.15 0.15 13.25 0.01 0.01 0.75 0.26 0.26 13.50 0.01 0.01 1.00 0.35 0.35 13.75 0.01 0.01 1.25 0.45 0.45 14.00 0.01 0.01 1.50 0.55 0.55 14.25 0.01 0.01 1.75 0.68 0.68 14.50 0.01 0.01 2.00 0.84 0.84 14.75 0.01 0.01 2.25 1.22 1.22 15.00 0.01 0.01 2.50 1.99 1.99 15.25 0.01 0.01 2.75 9.38 9.38 15.50 0.01 0.01 3.00 30.74 30.74 15.75 0.01 0.01 3.25 18.95 18.95 16.00 0.01 0.01 3.50 10.75 10.75 16.25 0.01 0.01 3.75 8.58 8.58 16.50 0.01 0.01 4.00 7.61 7.61 I 16.75 0.00 0.00 4.25 6.61 6.61 17.00 0.00 0.00 4.50 5.84 5.84 17.25 0.00 0.00 4.75 4.79 4.79 17.50 0.00 0.00 5.00 3.62 3.62 17.75 0.00 0.00 5.25 2.91 2.91 18.00 0.00 0.00 5.50 2.51 2.51 18.25 0.00 0.00 5.75 2.26 2.26 18.50 0.00 0.00 6.00 2.09 2.09 18.75 0.00 0.00 6.25 1.25 1.25 19.00 0.00 0.00 6.50 0.72 0.72 19.25 0.00 0.00 6.75 0.45 0.45 19.50 0.00 0.00 7.00 0.31 0.31 19.75 0.00 0.00 7.25 0.22 0.22 20.00 0.00 0.00 7.50 0.17 0.17 7.75 0.13 0.13 8.00 0.10 0.10 8.25 0.08 0.08 8.50 0.07 0.07 8.75 0.06 0.06 9.00 0.05 0.05 9.25 0.04 0.04 9.50 0.04 0.04 9.75 0.03 0.03 10.00 0.03 0.03 10.25 0.03 0.03 10.50 0.02 0.02 10.75 0.02 0.02 11.00 0.02 0.02 11.25 0.02 0.02 11.50 0.02 0.02 11.75 0.02 0.02 12.00 0.01 0.01 12.25 0.01 0.01 12.50 0.01 0.01 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 81 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=10.400 ac 0.00% Impervious Runoff Depth=3.78" Flow Length=950' Tc=17.7 min CN=84 Runoff=64.41 cfs 3.274 af SubcatchmentlS: POST TO SAND FILTER B Runoff Area=7.500 ac 0.00% Impervious Runoff Depth=3.78" Tc=9.4 min CN=84 Runoff=60.69 cfs 2.361 af Subcatchment5S: BYPASS BUA Runoff Area=1.800 ac 100.00% Impervious Runoff Depth=5.31" Tc=5.0 min CN=98 Runoff=20.36 cfs 0.797 af Pond 2P: FOREBAY Peak Elev=578.74' Storage=31,877 cf Inflow=60.69 cfs 2.361 af Primary=50.09 cfs 2.354 af Secondary=0.02 cfs 0.003 af Tertiary=0.00 cfs 0.000 af Outflow=50.11 cfs 2.357 af Pond 3P: SAND FILTER Peak Elev=575.05' Storage=62 cf Inflow=0.02 cfs 0.003 af Outflow=0.01 cfs 0.003 af Pond 4P: TOTAL Inflow=57.42 cfs 3.154 af Primary=57.42 cfs 3.154 af Total Runoff Area = 19.700 ac Runoff Volume = 6.431 af Average Runoff Depth = 3.92" 90.86% Pervious = 17.900 ac 9.14% Impervious = 1.800 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 82 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 64.41 cfs @ 3.10 hrs, Volume= 3.274 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.55" Area (ac) CN Description 10.400 84 Pasture/grassland/range, Fair, HSG D 10.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Grass: Dense n= 0.240 P2= 3.58" 5.1 800 0.0300 2.60 Shallow Concentrated Flow, Grassed Waterway Kv= 15.0 fps 17.7 950 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph _I_ _I I I I I I I I I I I I I _ 70i-/ 1 1 1 I I I I I I I I I I I I I I ■Runoff 164.41 cfs I 1 I I 1 I I 1 1 I 1 1 I 1 1 I 65� 4- 1 1 �l 1 f - H - 1- H - + - 1- -1 - -i - 1- - 1- -1 - -Type I 1-1 - 60 -/ 1 1 I 1 I I 1 1 I 1 1 I 1 �I 55� 1 1 1 1 1 1 1 1 1 1 1 1 1 *r 50 1- 7 / - r - 1- -I - T - 1100-Year Rlairif-all=5:55" - 4- -1- -1 - I I I 4 - 4 1 - 4 - I- -I- - 45 -/ Runoff 1Area=101.400 ac a 40� 1 1 1 - -1 1 1 Ruoffvolpme=4.2f4* - a 35� 1 - I-1 4 _ _ _ 1 _RUnbff lDepth=&7-8" - 30� 1 I I 1 I I 1 1 I 1 1 1 1 25� -1- / - 1 1 1 1 1 1 1 I F1oW(Length:9501 - 20-/ 1 4 _ 1 1 1 1_ 1 Tc=17.71Hm i n _ 15'' 1 1A 1 1 1 1 1 1 CN=84 10iv 1 1 1 1 1 , 1 1 5v / p �-.#7 1 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 83 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.55 3.78 0.00 0.25 0.06 0.00 0.00 13.00 5.55 3.78 0.00 0.50 0.13 0.00 0.00 13.25 5.55 3.78 0.00 0.75 0.19 0.00 0.00 13.50 5.55 3.78 0.00 1.00 0.27 0.00 0.00 13.75 5.55 3.78 0.00 1.25 0.35 0.00 0.00 14.00 5.55 3.78 0.00 1.50 0.45 0.00 0.01 14.25 5.55 3.78 0.00 1.75 0.56 0.02 0.28 14.50 5.55 3.78 0.00 2.00 0.69 0.04 0.80 14.75 5.55 3.78 0.00 2.25 0.86 0.09 1.55 15.00 5.55 3.78 0.00 2.50 1.07 0.18 2.77 15.25 5.55 3.78 0.00 2.75 1.89 0.66 8.30 15.50 5.55 3.78 0.00 3.00 4.05 2.42 48.47 15.75 5.55 3.78 0.00 3.25 4.39 2.72 39.14 16.00 5.55 3.78 0.00 3.50 4.62 2.92 14.05 16.25 5.55 3.78 0.00 3.75 4.78 3.07 7.72 16.50 5.55 3.78 0.00 4.00 4.91 3.19 5.72 16.75 5.55 3.78 0.00 4.25 5.02 3.29 4.75 17.00 5.55 3.78 0.00 4.50 5.12 3.38 4.13 17.25 5.55 3.78 0.00 4.75 5.21 3.46 3.63 17.50 5.55 3.78 0.00 5.00 5.29 3.53 3.22 17.75 5.55 3.78 0.00 5.25 5.36 3.60 2.88 18.00 5.55 3.78 0.00 5.50 5.43 3.66 2.70 18.25 5.55 3.78 0.00 5.75 5.49 3.72 2.57 18.50 5.55 3.78 0.00 6.00 5.55 3.78 2.43 18.75 5.55 3.78 0.00 6.25 5.55 3.78 1.18 19.00 5.55 3.78 0.00 6.50 5.55 3.78 0.15 19.25 5.55 3.78 0.00 6.75 5.55 3.78 0.02 19.50 5.55 3.78 0.00 7.00 5.55 3.78 0.00 19.75 5.55 3.78 0.00 7.25 5.55 3.78 0.00 20.00 5.55 3.78 0.00 7.50 5.55 3.78 0.00 7.75 5.55 3.78 0.00 8.00 5.55 3.78 0.00 8.25 5.55 3.78 0.00 8.50 5.55 3.78 0.00 8.75 5.55 3.78 0.00 9.00 5.55 3.78 0.00 9.25 5.55 3.78 0.00 9.50 5.55 3.78 0.00 9.75 5.55 3.78 0.00 10.00 5.55 3.78 0.00 10.25 5.55 3.78 0.00 10.50 5.55 3.78 0.00 10.75 5.55 3.78 0.00 11.00 5.55 3.78 0.00 11.25 5.55 3.78 0.00 11.50 5.55 3.78 0.00 11.75 5.55 3.78 0.00 12.00 5.55 3.78 0.00 12.25 5.55 3.78 0.00 12.50 5.55 3.78 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 84 Summary for Subcatchment 1S: POST TO SAND FILTER B Runoff = 60.69 cfs @ 3.01 hrs, Volume= 2.361 af, Depth= 3.78" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.55" Area (ac) CN Description * 7.500 84 45% IMPERVIOUS, HSG D 7.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER B Hydrograph I I I 651 1 1 ■Runoff —I— o.69 cfs 60� I I +Type 111 55 1 7 I I 1 I I 1 1 I 1 1 I 1 i�I 5077 1 1 11 00-Yeat Rainfall=5,5-5" - 45 -' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - 7 7 - 1 - 177 — T - 17 -iunoffAre-a=7- 500-ac — 40 35� 1 1 1 0Li6O f1(ol-Il�mg= .301 4f — 30� — —1 1 1 1 1 RUnbff 1De�pt�h=3.78" —I— - —I - 4 — I— — I— —I — -k — — -1 - 4 - 1— - I- -I - 4 — I— -I- - 25:_-/ 1 1 1 1 11 1 Tic=9..41 mien 20 —1— I I— —1 — -(�'+h%" --�j4 — 15� - - A/ I _ 10� 1 / 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 85 Hydrograph for Subcatchment 1S: POST TO SAND FILTER B Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.55 3.78 0.00 0.25 0.06 0.00 0.00 13.00 5.55 3.78 0.00 0.50 0.13 0.00 0.00 13.25 5.55 3.78 0.00 0.75 0.19 0.00 0.00 13.50 5.55 3.78 0.00 1.00 0.27 0.00 0.00 13.75 5.55 3.78 0.00 1.25 0.35 0.00 0.00 14.00 5.55 3.78 0.00 1.50 0.45 0.00 0.05 14.25 5.55 3.78 0.00 1.75 0.56 0.02 0.36 14.50 5.55 3.78 0.00 2.00 0.69 0.04 0.81 14.75 5.55 3.78 0.00 2.25 0.86 0.09 1.48 15.00 5.55 3.78 0.00 2.50 1.07 0.18 2.54 15.25 5.55 3.78 0.00 2.75 1.89 0.66 12.71 15.50 5.55 3.78 0.00 3.00 4.05 2.42 60.54 15.75 5.55 3.78 0.00 3.25 4.39 2.72 12.10 16.00 5.55 3.78 0.00 3.50 4.62 2.92 6.43 16.25 5.55 3.78 0.00 3.75 4.78 3.07 4.44 16.50 5.55 3.78 0.00 4.00 4.91 3.19 3.71 16.75 5.55 3.78 0.00 4.25 5.02 3.29 3.16 17.00 5.55 3.78 0.00 4.50 5.12 3.38 2.78 17.25 5.55 3.78 0.00 4.75 5.21 3.46 2.45 17.50 5.55 3.78 0.00 5.00 5.29 3.53 2.18 17.75 5.55 3.78 0.00 5.25 5.36 3.60 1.99 18.00 5.55 3.78 0.00 5.50 5.43 3.66 1.89 18.25 5.55 3.78 0.00 5.75 5.49 3.72 1.80 18.50 5.55 3.78 0.00 6.00 5.55 3.78 1.71 18.75 5.55 3.78 0.00 6.25 5.55 3.78 0.14 19.00 5.55 3.78 0.00 6.50 5.55 3.78 0.00 19.25 5.55 3.78 0.00 6.75 5.55 3.78 0.00 19.50 5.55 3.78 0.00 7.00 5.55 3.78 0.00 19.75 5.55 3.78 0.00 7.25 5.55 3.78 0.00 20.00 5.55 3.78 0.00 7.50 5.55 3.78 0.00 7.75 5.55 3.78 0.00 8.00 5.55 3.78 0.00 8.25 5.55 3.78 0.00 8.50 5.55 3.78 0.00 8.75 5.55 3.78 0.00 9.00 5.55 3.78 0.00 9.25 5.55 3.78 0.00 9.50 5.55 3.78 0.00 9.75 5.55 3.78 0.00 10.00 5.55 3.78 0.00 10.25 5.55 3.78 0.00 10.50 5.55 3.78 0.00 10.75 5.55 3.78 0.00 11.00 5.55 3.78 0.00 11.25 5.55 3.78 0.00 11.50 5.55 3.78 0.00 11.75 5.55 3.78 0.00 12.00 5.55 3.78 0.00 12.25 5.55 3.78 0.00 12.50 5.55 3.78 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 86 Summary for Subcatchment 5S: BYPASS BUA Runoff = 20.36 cfs @ 2.95 hrs, Volume= 0.797 af, Depth= 5.31" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.55" Area (ac) CN Description 1.800 98 BYPASS BUA 1.800 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: BYPASS BUA Hydrograph 1 1 I 1 I I - I 1 1 1 I 1 1 I - 221/ - I I I I I I I I I I I I I I I I I I ■Runoff 211/ - 1- 120.3%fs I 1— H H 4 T I— I — 4 — H 1 H H I - 20 - -1- -1 - 4 - H -1- H - + - I- -I - H - H - I- -I - H e I N - 19 -I- - 1 - rt - H -1- 1 - T - 1- -1 - 1 - H - 1- -I - rt - H -1- - 18� - - - 17� - - y� ppI �w'II, �` I� 16 - - _ I I 1 I I 1QO--Yea RaifFQH=5c55.. - 15 -I- -1 - 1 L I I H L I H L I - 144/ -I- I -1 - 4 - H -1- - - H - 1H _Runoff Area t800-ac - u, 13 -I- 7`�71 � 12� - - -r - -I- - - - "111 f V�"'Fr'`?'� - LL minbf# Delpth 5 3-1" - 94,/ 1 1 - 1 I I I I I I I I I I I II I 84/ - - J - 1 1 1 _I L I- 1 A L Tc 5M rnhin - 7 - I- H - - 1- I - 4 - H -1 H - + - 1 - 4 - H - 1 -I - 4 - 61/ - - - 1 1 - H - H -1- I - t - I- -1 - 1 - H — I— —I — fi 5� - I I - 7 - -1771 - T - I- -I - 7 - 7 - I- -I - 7 - 7 -I- - 41 - - - - - - - I I I I 24/ _1_ . 1 I _ 1 1 1 1 1 _ 1 14/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 87 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.55 5.31 0.00 0.25 0.06 0.00 0.02 13.00 5.55 5.31 0.00 0.50 0.13 0.02 0.19 13.25 5.55 5.31 0.00 0.75 0.19 0.06 0.31 13.50 5.55 5.31 0.00 1.00 0.27 0.12 0.41 13.75 5.55 5.31 0.00 1.25 0.35 0.19 0.52 14.00 5.55 5.31 0.00 1.50 0.45 0.27 0.63 14.25 5.55 5.31 0.00 1.75 0.56 0.37 0.77 14.50 5.55 5.31 0.00 2.00 0.69 0.50 0.92 14.75 5.55 5.31 0.00 2.25 0.86 0.65 1.21 15.00 5.55 5.31 0.00 2.50 1.07 0.86 1.56 15.25 5.55 5.31 0.00 2.75 1.89 1.66 7.43 15.50 5.55 5.31 0.00 3.00 4.05 3.82 16.97 15.75 5.55 5.31 0.00 3.25 4.39 4.16 2.30 16.00 5.55 5.31 0.00 3.50 4.62 4.38 1.49 16.25 5.55 5.31 0.00 3.75 4.78 4.54 1.11 16.50 5.55 5.31 0.00 4.00 4.91 4.67 0.93 16.75 5.55 5.31 0.00 4.25 5.02 4.79 0.80 17.00 5.55 5.31 0.00 4.50 5.12 4.88 0.70 17.25 5.55 5.31 0.00 4.75 5.21 4.97 0.62 17.50 5.55 5.31 0.00 5.00 5.29 5.05 0.55 17.75 5.55 5.31 0.00 5.25 5.36 5.12 0.51 18.00 5.55 5.31 0.00 5.50 5.43 5.19 0.48 18.25 5.55 5.31 0.00 5.75 5.49 5.25 0.46 18.50 5.55 5.31 0.00 6.00 5.55 5.31 0.43 18.75 5.55 5.31 0.00 6.25 5.55 5.31 0.00 19.00 5.55 5.31 0.00 6.50 5.55 5.31 0.00 19.25 5.55 5.31 0.00 6.75 5.55 5.31 0.00 19.50 5.55 5.31 0.00 7.00 5.55 5.31 0.00 19.75 5.55 5.31 0.00 7.25 5.55 5.31 0.00 20.00 5.55 5.31 0.00 7.50 5.55 5.31 0.00 7.75 5.55 5.31 0.00 8.00 5.55 5.31 0.00 8.25 5.55 5.31 0.00 8.50 5.55 5.31 0.00 8.75 5.55 5.31 0.00 9.00 5.55 5.31 0.00 9.25 5.55 5.31 0.00 9.50 5.55 5.31 0.00 9.75 5.55 5.31 0.00 10.00 5.55 5.31 0.00 10.25 5.55 5.31 0.00 10.50 5.55 5.31 0.00 10.75 5.55 5.31 0.00 11.00 5.55 5.31 0.00 11.25 5.55 5.31 0.00 11.50 5.55 5.31 0.00 11.75 5.55 5.31 0.00 12.00 5.55 5.31 0.00 12.25 5.55 5.31 0.00 12.50 5.55 5.31 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type II 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 88 Summary for Pond 2P: FOREBAY Inflow Area = 7.500 ac, 0.00% Impervious, Inflow Depth = 3.78" for 100-Year event Inflow = 60.69 cfs @ 3.01 hrs, Volume= 2.361 af Outflow = 50.11 cfs @ 3.07 hrs, Volume= 2.357 af, Atten= 17%, Lag= 3.9 min Primary = 50.09 cfs @ 3.07 hrs, Volume= 2.354 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.07 hrs, Volume= 0.003 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 578.74'@ 3.07 hrs Surf.Area= 12,673 sf Storage= 31,877 cf Plug-Flow detention time=29.0 min calculated for 2.357 af(100% of inflow) Center-of-Mass det. time=28.5 min ( 231.2 - 202.7 ) Volume Invert Avail.Storage Storage Description #1 575.00' 66,167 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 575.00 6,453 0 0 576.00 7,437 6,945 6,945 577.00 8,467 7,952 14,897 578.00 9,280 8,874 23,771 579.00 13,874 11,577 35,348 580.00 15,391 14,633 49,980 581.00 16,983 16,187 66,167 Device Routing Invert Outlet Devices #1 Primary 575.00' 36.0" Round 36" Culvert L= 87.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 575.00'/ 574.00' S= 0.0115 '/' Cc= 0.900 n= 0.012, Flow Area= 7.07 sf #2 Primary 577.50' 36.0" W x 6.0" H Vert. 6X36 IN ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 578.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 575.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Primary 575.00' 12.0" Round 12" PIPE TO SF X 2.00 L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 575.00'/ 574.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.79 sf #6 Tertiary 579.00' 10.0' long + 3.0 '/' SideZ x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 89 Primary OutFlow Max=47.71 cfs @ 3.07 hrs HW=578.70' TW=0.00' (Dynamic Tailwater) —1=36" Culvert (Passes 30.77 cfs of 50.50 cfs potential flow) L3=TOP OF OUTLET STRUCTURE(Weir Controls 30.77 cfs @ 2.74 fps) —2=6X36 IN ORIFICE (Orifice Controls 7.03 cfs @ 4.68 fps) —5=12" PIPE TO SF (Barrel Controls 9.91 cfs @ 6.31 fps) Secondary OutFlow Max=0.02 cfs © 3.07 hrs HW=578.70' TW=575.01' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=575.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph I I I I I 1 1 1 1 I I I 1 1 1 I I i 1 1 1 I I I I I I I I I I I I I ■Inflow i L - 160 69 cfs) •Outflow , / / 1 I 1 1 I AI vpl� $00 II ■Primary z / ` —I — I- 1� - I- — I— -r —I— 1ur ' T'v`I"' -aP — ■Secondary ■Tertiary 65_ / / / / - + - I— - 1— + - - — I— + I + -Peak'EI�eV=-51781.74 50.11 cfs 1 I I 1 _ I— 1 _I_ 1 _I_ 1 —I— L I — L I _ L - 6° ,/ ' , , 150;09cfs I 1 1 1 1 Storage=31,877 of 55- z , / L -1 1 I I I I I I I I I I 50� / z/ i 454-' z / , / i 1 + I rt 1 + 1 + I + I + 1 -r — — - 40y / , r % — 1— + — 1— 4 — 1— + —I— + —1— + —1— + —1 I LLI1I + 1 + I1IL1L - 3- - / / / 1 1 I I I 1 1 1 I I I 1 I LI 30� / , i — / I I I I I I I I I I I I 1 25 -/ / / I I I I I I I I I I I I 1 1(47 z //- 002 cfs ZZ /> 10.00 cfs 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 90 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 575.00 0.00 0.00 0.00 0.00 0.50 0.00 0 575.00 0.00 0.00 0.00 0.00 1.00 0.00 0 575.00 0.00 0.00 0.00 0.00 1.50 0.05 8 575.00 0.00 0.00 0.00 0.00 2.00 0.81 681 575.10 0.06 0.06 0.00 0.00 2.50 2.54 2,777 575.42 0.98 0.98 0.00 0.00 3.00 60.54 28,185 578.43 30.17 30.15 0.02 0.00 3.50 6.43 21,963 577.80 10.03 10.01 0.01 0.00 4.00 3.71 15,851 577.11 7.04 7.03 0.01 0.00 4.50 2.78 10,370 576.45 5.39 5.39 0.01 0.00 5.00 2.18 6,297 575.91 3.70 3.69 0.01 0.00 5.50 1.89 4,659 575.69 2.38 2.37 0.00 0.00 6.00 1.71 4,090 575.61 1.92 1.92 0.00 0.00 6.50 0.00 2,466 575.37 0.79 0.78 0.00 0.00 7.00 0.00 1,554 575.24 0.32 0.32 0.00 0.00 7.50 0.00 1,130 575.17 0.17 0.17 0.00 0.00 8.00 0.00 889 575.14 0.10 0.10 0.00 0.00 8.50 0.00 734 575.11 0.07 0.07 0.00 0.00 9.00 0.00 626 575.10 0.05 0.05 0.00 0.00 9.50 0.00 547 575.08 0.04 0.04 0.00 0.00 10.00 0.00 486 575.07 0.03 0.03 0.00 0.00 10.50 0.00 438 575.07 0.02 0.02 0.00 0.00 11.00 0.00 399 575.06 0.02 0.02 0.00 0.00 11.50 0.00 366 575.06 0.02 0.02 0.00 0.00 12.00 0.00 339 575.05 0.01 0.01 0.00 0.00 12.50 0.00 316 575.05 0.01 0.01 0.00 0.00 13.00 0.00 295 575.05 0.01 0.01 0.00 0.00 13.50 0.00 278 575.04 0.01 0.01 0.00 0.00 14.00 0.00 262 575.04 0.01 0.01 0.00 0.00 14.50 0.00 248 575.04 0.01 0.01 0.00 0.00 15.00 0.00 236 575.04 0.01 0.01 0.00 0.00 15.50 0.00 225 575.03 0.01 0.01 0.00 0.00 16.00 0.00 215 575.03 0.01 0.01 0.00 0.00 16.50 0.00 205 575.03 0.00 0.00 0.00 0.00 17.00 0.00 197 575.03 0.00 0.00 0.00 0.00 17.50 0.00 189 575.03 0.00 0.00 0.00 0.00 18.00 0.00 182 575.03 0.00 0.00 0.00 0.00 18.50 0.00 176 575.03 0.00 0.00 0.00 0.00 19.00 0.00 170 575.03 0.00 0.00 0.00 0.00 19.50 0.00 164 575.03 0.00 0.00 0.00 0.00 20.00 0.00 159 575.02 0.00 0.00 0.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 91 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 575.00 0.00 0.00 0.00 0.00 575.20 0.23 0.23 0.00 0.00 575.40 0.90 0.90 0.00 0.00 575.60 1.89 1.89 0.00 0.00 575.80 3.04 3.04 0.00 0.00 576.00 4.19 4.18 0.01 0.00 576.20 5.07 5.06 0.01 0.00 576.40 5.26 5.25 0.01 0.00 576.60 5.82 5.81 0.01 0.00 576.80 6.32 6.31 0.01 0.00 577.00 6.79 6.78 0.01 0.00 577.20 7.23 7.22 0.01 0.00 577.40 7.64 7.63 0.01 0.00 577.60 8.34 8.33 0.01 0.00 577.80 9.99 9.98 0.01 0.00 578.00 12.18 12.16 0.02 0.00 578.20 18.57 18.56 0.02 0.00 578.40 28.47 28.45 0.02 0.00 578.60 40.72 40.70 0.02 0.00 578.80 54.90 54.88 0.02 0.00 579.00 70.76 70.74 0.02 0.00 579.20 77.80 75.26 0.02 2.51 579.40 85.67 78.16 0.02 7.49 579.60 95.33 80.95 0.02 14.36 579.80 106.19 83.64 0.03 22.52 580.00 118.89 86.25 0.03 32.61 580.20 133.50 88.77 0.03 44.70 580.40 149.68 91.22 0.03 58.43 580.60 167.30 93.61 0.03 73.67 580.80 186.91 95.93 0.03 90.95 581.00 208.33 98.20 0.03 110.09 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 92 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 6,453 0 580.10 15,550 51,527 575.10 6,551 650 580.20 15,709 53,090 575.20 6,650 1,310 580.30 15,869 54,669 575.30 6,748 1,980 580.40 16,028 56,264 575.40 6,847 2,660 580.50 16,187 57,875 575.50 6,945 3,350 580.60 16,346 59,501 575.60 7,043 4,049 580.70 16,505 61,144 575.70 7,142 4,758 580.80 16,665 62,802 575.80 7,240 5,477 580.90 16,824 64,477 575.90 7,339 6,206 581.00 16,983 66,167 576.00 7,437 6,945 576.10 7,540 7,694 576.20 7,643 8,453 576.30 7,746 9,222 576.40 7,849 10,002 576.50 7,952 10,792 576.60 8,055 11,593 576.70 8,158 12,403 576.80 8,261 13,224 576.90 8,364 14,055 577.00 8,467 14,897 577.10 8,548 15,748 577.20 8,630 16,607 577.30 8,711 17,474 577.40 8,792 18,349 577.50 8,874 19,232 577.60 8,955 20,124 577.70 9,036 21,023 577.80 9,117 21,931 577.90 9,199 22,847 578.00 9,280 23,771 578.10 9,739 24,721 578.20 10,199 25,718 578.30 10,658 26,761 578.40 11,118 27,850 578.50 11,577 28,985 578.60 12,036 30,165 578.70 12,496 31,392 578.80 12,955 32,665 578.90 13,415 33,983 579.00 13,874 35,348 579.10 14,026 36,742 579.20 14,177 38,153 579.30 14,329 39,578 579.40 14,481 41,018 579.50 14,633 42,474 579.60 14,784 43,945 579.70 14,936 45,431 579.80 15,088 46,932 579.90 15,239 48,448 580.00 15,391 49,980 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 93 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.07 hrs, Volume= 0.003 af Outflow = 0.01 cfs @ 4.88 hrs, Volume= 0.003 af, Atten= 70%, Lag= 108.2 min Primary = 0.01 cfs @ 4.88 hrs, Volume= 0.003 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 575.05'@ 4.88 hrs Surf.Area= 1,356 sf Storage= 62 cf Plug-Flow detention time= 168.5 min calculated for 0.003 af(98% of inflow) Center-of-Mass det. time= 154.8 min ( 450.1 - 295.3 ) Volume Invert Avail.Storage Storage Description #1 575.00' 45,537 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 575.00 1,334 0 0 576.00 1,812 1,573 1,573 577.00 2,353 2,083 3,656 578.00 2,958 2,656 6,311 579.00 13,864 8,411 14,722 580.00 15,391 14,628 29,350 581.00 16,983 16,187 45,537 Device Routing Invert Outlet Devices #1 Primary 575.00' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.01 cfs @ 4.88 hrs HW=575.05' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Custom Controls 0.01 cfs) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 94 Pond 3P: SAND FILTER Hydrograph 1 I I I I 1 1 I I I I I _I I II I I I I I I I I I I I I I I I ■Inflow 0.022- , ,- - 10.02 crsl -1 — 1- —I — + — I— —I — H —I— 4 — 1 —I — �H/—I— H — 1 —I — - ❑Primary 0.021_' / ,1 1 - T 0 -1 H 1 T 1 1 h peak II e Y=1575.05' - 0.02 ' / ,- —I — T j —I F I T I I T I H P I T I T T 0.019-' , — - ;, r � 1 1 1 1 1 1 1 1 1 toraCao— I ef- _ 0.018� " `J 0.0174' i 1 1 1 1 1 1 L 1 1 I— 1 L 1 1 L 1 - 0.016- , + 1 + J —1 — + - 1 1 — + 1— H — H 1 — T -1— + — + 1 — - 0.015-' i —I — T 00 I- -I - T - I- -I - T -I- 7 - I- -1 - T -I- 7 - 7 -I - - 0.014'' i )— — — v a 0.013= / °- 0.012; i � 1 1 1 1 1 1 L 1 1 L I L I L L I - 33 0.011-' ik -1 - + 1- % - + - 1- -1 - H -1- 4 - I- -I - H -I- H - 1 -1 - u. 0.01 i —I I- — t — I— —I — t -1— rt — I— —I — t —I— rt - 1— —I - 0.009 , 1— I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.0081 i _ 0.0071 / 1 1 ci m cfs 1 1 1 1 1 1 0.0061 , ,L —I — ��J/////// -H - 1- -1 - -H -1- - H -1 - -L -1 i - 1- -1 - - 0.0051 / fi I ..4. I - - H -I- i I- -I H -I- -1 1 I - 0.0041 i 1 ,i% � ��� I 1 i � T 7 flill 0.003 0.0021 , 1 I A i._��i�j� _ .i��� Rio Ardor . i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 95 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 575.00 0.00 0.50 0.00 0 575.00 0.00 1.00 0.00 0 575.00 0.00 1.50 0.00 0 575.00 0.00 2.00 0.00 0 575.00 0.00 2.50 0.00 3 575.00 0.00 3.00 0.02 14 575.01 0.00 3.50 0.01 41 575.03 0.00 4.00 0.01 55 575.04 0.01 4.50 0.01 61 575.05 0.01 5.00 0.01 62 575.05 0.01 5.50 0.00 60 575.04 0.01 6.00 0.00 57 575.04 0.01 6.50 0.00 52 575.04 0.01 7.00 0.00 47 575.03 0.00 7.50 0.00 41 575.03 0.00 8.00 0.00 36 575.03 0.00 8.50 0.00 32 575.02 0.00 9.00 0.00 28 575.02 0.00 9.50 0.00 24 575.02 0.00 10.00 0.00 21 575.02 0.00 10.50 0.00 18 575.01 0.00 11.00 0.00 16 575.01 0.00 11.50 0.00 14 575.01 0.00 12.00 0.00 12 575.01 0.00 12.50 0.00 11 575.01 0.00 13.00 0.00 9 575.01 0.00 13.50 0.00 8 575.01 0.00 14.00 0.00 7 575.01 0.00 14.50 0.00 7 575.00 0.00 15.00 0.00 6 575.00 0.00 15.50 0.00 5 575.00 0.00 16.00 0.00 5 575.00 0.00 16.50 0.00 4 575.00 0.00 17.00 0.00 4 575.00 0.00 17.50 0.00 4 575.00 0.00 18.00 0.00 3 575.00 0.00 18.50 0.00 3 575.00 0.00 19.00 0.00 3 575.00 0.00 19.50 0.00 3 575.00 0.00 20.00 0.00 2 575.00 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 96 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) 575.00 0.00 577.55 0.33 580.10 0.54 575.05 0.01 577.60 0.34 580.15 0.54 575.10 0.01 577.65 0.34 580.20 0.55 575.15 0.02 577.70 0.34 580.25 0.55 575.20 0.03 577.75 0.35 580.30 0.56 575.25 0.03 577.80 0.35 580.35 0.56 575.30 0.04 577.85 0.36 I 580.40 0.56 575.35 0.05 577.90 0.36 580.45 0.57 575.40 0.05 577.95 0.36 580.50 0.57 575.45 0.06 578.00 0.37 580.55 0.58 575.50 0.07 , 578.05 0.37 580.60 0.58 575.55 0.07 578.10 0.38 580.65 0.59 575.60 0.08 578.15 0.38 580.70 0.59 575.65 0.09 578.20 0.38 580.75 0.59 575.70 0.09 578.25 0.39 580.80 0.60 575.75 0.10 578.30 0.39 580.85 0.60 575.80 0.10 578.35 0.40 580.90 0.61 575.85 0.11 578.40 0.40 580.95 0.61 575.90 0.12 578.45 0.40 581.00 0.61 575.95 0.12 578.50 0.41 576.00 0.13 578.55 0.41 576.05 0.14 578.60 0.42 576.10 0.14 578.65 0.42 576.15 0.15 ' 578.70 0.43 576.20 0.16 578.75 0.43 576.25 0.16 578.80 0.43 576.30 0.17 ' 578.85 0.44 576.35 0.18 578.90 0.44 576.40 0.18 578.95 0.45 576.45 0.19 579.00 0.45 576.50 0.20 579.05 0.45 576.55 0.20 579.10 0.46 576.60 0.21 579.15 0.46 576.65 0.22 579.20 0.47 576.70 0.22 579.25 0.47 576.75 0.23 579.30 0.47 576.80 0.24 579.35 0.48 576.85 0.24 579.40 0.48 576.90 0.25 I 579.45 0.49 576.95 0.26 579.50 0.49 577.00 0.26 579.55 0.50 577.05 0.27 579.60 0.50 577.10 0.27 579.65 0.50 577.15 0.28 579.70 0.51 577.20 0.29 579.75 0.51 577.25 0.29 579.80 0.52 577.30 0.30 579.85 0.52 577.35 0.31 579.90 0.52 577.40 0.31 579.95 0.53 577.45 0.32 580.00 0.53 577.50 0.33 580.05 0.54 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 97 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 575.00 1,334 0 580.10 15,550 30,897 575.10 1,382 136 580.20 15,709 32,460 575.20 1,430 276 580.30 15,869 34,038 575.30 1,477 422 580.40 16,028 35,633 575.40 1,525 572 580.50 16,187 37,244 575.50 1,573 727 580.60 16,346 38,871 575.60 1,621 886 580.70 16,505 40,513 575.70 1,669 1,051 580.80 16,665 42,172 575.80 1,716 1,220 580.90 16,824 43,846 575.90 1,764 1,394 581.00 16,983 45,537 576.00 1,812 1,573 576.10 1,866 1,757 576.20 1,920 1,946 576.30 1,974 2,141 576.40 2,028 2,341 576.50 2,083 2,547 576.60 2,137 2,758 576.70 2,191 2,974 576.80 2,245 3,196 576.90 2,299 3,423 577.00 2,353 3,656 577.10 2,414 3,894 577.20 2,474 4,138 577.30 2,534 4,389 577.40 2,595 4,645 577.50 2,656 4,908 577.60 2,716 5,176 577.70 2,777 5,451 577.80 2,837 5,731 577.90 2,897 6,018 578.00 2,958 6,311 578.10 4,049 6,661 578.20 5,139 7,121 578.30 6,230 7,689 578.40 7,320 8,367 578.50 8,411 9,153 578.60 9,502 10,049 578.70 10,592 11,054 578.80 11,683 12,167 578.90 12,773 13,390 579.00 13,864 14,722 579.10 14,017 16,116 579.20 14,169 17,525 579.30 14,322 18,950 579.40 14,475 20,390 579.50 14,628 21,845 579.60 14,780 23,315 579.70 14,933 24,801 579.80 15,086 26,302 579.90 15,238 27,818 580.00 15,391 29,350 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 98 Summary for Pond 4P: TOTAL Inflow Area = 9.300 ac, 19.35% Impervious, Inflow Depth = 4.07" for 100-Year event Inflow = 57.42 cfs @ 3.06 hrs, Volume= 3.154 af Primary = 57.42 cfs @ 3.06 hrs, Volume= 3.154 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph I I I I 1 I I I I I I I —I— 4 I— —I — rt — 1— —1 + — — + — 1 —1 — + I— —1 — + — 1— —1 •Inflow : / 1 157.42 cfs 1 I I I I I 1 11 1 I I I 1 ❑Primary 1 60� r —iI5742cs1: / I I Inflow Area=9.30Oac 55 -' fi — — —I — fi - 1- -1 t - - - t - 1 -1 - t 1- -1 - t - 1- -1 50 -/ : i 1 I I I I I 1 1 45./ fi -1 - rt - 1- -1 - -r - - -1 - t — — — — -r - 1- - 40iv /— 1 1 1 1 I 1 1 I I 0 — 35� 1 1 1 1 1 1 3 30� I01 —I — — — —1 — — — —1 — — 1— 25� 1 1 20= // 1 - 4 — I— —I - 1 — I 1 - 1 — I— -1 — I - 1— — - 1 — I— —I — - = //% 1 1 1 1 1 1 1 1 1 15_ � �� 1 1 1 I I I 1 1 10- A 01 �� —1 — 1 1 1 1 — + — 1— — — - 5= / ' Z0: /',.,( �/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER B 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 99 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.01 0.01 0.25 0.02 0.02 13.00 0.01 0.01 0.50 0.19 0.19 13.25 0.01 0.01 0.75 0.31 0.31 13.50 0.01 0.01 1.00 0.41 0.41 13.75 0.01 0.01 1.25 0.52 0.52 14.00 0.01 0.01 1.50 0.63 0.63 14.25 0.01 0.01 1.75 0.77 0.77 14.50 0.01 0.01 2.00 0.98 0.98 14.75 0.01 0.01 2.25 1.52 1.52 15.00 0.01 0.01 2.50 2.53 2.53 15.25 0.01 0.01 2.75 11.02 11.02 15.50 0.01 0.01 3.00 47.11 47.11 15.75 0.01 0.01 3.25 21.22 21.22 16.00 0.01 0.01 3.50 11.51 11.51 16.25 0.01 0.01 3.75 8.86 8.86 16.50 0.01 0.01 4.00 7.96 7.96 16.75 0.00 0.00 4.25 7.03 7.03 17.00 0.00 0.00 4.50 6.09 6.09 17.25 0.00 0.00 4.75 5.51 5.51 17.50 0.00 0.00 5.00 4.25 4.25 17.75 0.00 0.00 5.25 3.36 3.36 18.00 0.00 0.00 5.50 2.86 2.86 18.25 0.00 0.00 5.75 2.56 2.56 18.50 0.00 0.00 6.00 2.36 2.36 18.75 0.00 0.00 6.25 1.40 1.40 19.00 0.00 0.00 6.50 0.79 0.79 19.25 0.00 0.00 6.75 0.49 0.49 19.50 0.00 0.00 7.00 0.33 0.33 , 19.75 0.00 0.00 7.25 0.23 0.23 20.00 0.00 0.00 7.50 0.17 0.17 7.75 0.13 0.13 8.00 0.11 0.11 8.25 0.09 0.09 8.50 0.07 0.07 8.75 0.06 0.06 9.00 0.05 0.05 9.25 0.05 0.05 9.50 0.04 0.04 9.75 0.04 0.04 10.00 0.03 0.03 10.25 0.03 0.03 10.50 0.03 0.03 10.75 0.02 0.02 11.00 0.02 0.02 11.25 0.02 0.02 11.50 0.02 0.02 11.75 0.02 0.02 12.00 0.01 0.01 12.25 0.01 0.01 12.50 0.01 0.01 C POTTND" ENGINEERING' SAND FILTER C HYDROCAD OUTPUT 1-Yr 24-Hr Design Volume Storm Event Phifer Road WINGATE, NORTH CAROLINA SAND FILTER C DESIGN COMPUTE WATER QUALITY VOLUME Drainage Area = 5.00 ac A diversion or bypass structure must divert all but the design % Impervious = 48.00 °Ao flow for the filter Curve Number= 88.60 USE SIMPLE METHOD Rv=0.05+0.009(I) 0.482 IN/IN Modified P to account for the rainfall loss in the 1"\ Storm P= 1.0 IN (to be used in lieu of the 1" depth in the SCS rainfall distribution) S = 1.287 Q=( P-la)"2/( P-Ia+S) solvedforP = [ (4QxS+QA2 )n1/2+Q+2x la]/2 PModified = N/A WQV= 8,749 ft3 WQV Ad]= 6,562 ft' Maximum Head on the Sand Filter must DETERMINE FILTER BED&SEDIMENTATION BASIN SURFACE AREA not exceed 6 ft(Design Storm only) h MaxFilter= WQV Adj(ft3) As(ft2)+Af(ft) Assume Hmax until min (AS+AF) =q Greater of AS and Af X 2 Choose a combination of Af&hMaxFilter to meet total the space available. Sedimentation Chamber \v\ and Sand Filter should be about the same size. Assume h MaxFilter h MaxFilter= 3.00 ft Min. (As+AF)= 1,186 ft` Min.Area for Sedimentation Chamber Min.Area for Sand Filter As= 0.066 x WQV Af— WQV x 1.5 ft 3.5 ft/day x 1.66 days x(Avg Head + 1.5 ft) As= 433 ft` Af= 753 ft` Elev Bottom Area Used = 3,727 ft2 (ELEV 550) Bottom Area Used = 912 ft2 550 Top Area Used = 7,937 ft2 Top Area Used = 2,221 ft2 553 17,496 ft3 4,700 ft3 VERIFY VOLUMES VOltotal = (As+Af)x hMaxFilter Compare to WQVAdi Voltotal = 22,196 ft' Page 1 of 2 SIZE UNDERDRAIN SYSTEM Determine capacity of Under Drain System Af=WQvxdf/[(kxHf+Df)xTf] Where: Af= 659 ft2 surface area of filter bed df= 1.5 ft filter bed depth k= 4 ft/day coefficient of permeability media (2" per hr) hf= 1.50 ft average height of water above filter bed, (Hmax/2) Tf= 1.66 Days (40 Hours, 1.66 Days)) 3.0 Ft Max. Depth of Storage Volume Af Provided= 1,096 ft` surface area provided Q at Full Depth = 0.152 cfs Darcy's Law: Q= k x Af x((H +df)/df)) Q at Avg Depth = 0.101 c Darcy's Law: Q= k x Af x((H/2 +df)/df)) Time to Drain= 24.06 hrs Safety Factor of 10 1.010 cfs Bottom of sand to have min surface area Compute Perforation Capacity as well. May go to 1:1 slope Pipes Length 4 Holes/Row #of Perforations= 2 25 4 = 400 Holes 50%of Perforations= 200 Holes 3/8" Dia. Hole Capacity of One Hole= CA(2gh)^0.5 Holes spaced 6"o/c. 0.007 cfs/Hole Min of 2 pipes Max 10'o/c Total Capacity= 1.479 cfs Capacity of Filter Media= 1.010 cfs Perforation Capacity= > Media Capac OK Page 2 of 2 <Os> PRE - DEVELOPMENT TOWNS 1S POS TO SAND 5S IILTER C : PASS BUA /21\ > AND FOREBAY SAND ILTER / 4P TOTAL SubCat Reach 'On. lit Routing Diagram for DAVIS VILLAGE SAND FILTER C 6.11.23 Prepared by Plott Hound Engineering PLLC, Printed 6/21/2023 HydroCAD®10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 3.00 2 2 10-Year Type II 6-hr Default 6.00 1 3.75 2 3 25-Year Type II 6-hr Default 6.00 1 4.44 2 4 50-Year Type II 6-hr Default 6.00 1 4.99 2 5 100-Year Type II 6-hr Default 6.00 1 5.55 2 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 5.000 89 48% IMPERVIOUS, HSG D (1S) 0.430 98 BYPASS BUA (5S) 5.000 84 Pasture/grassland/range, Fair, HSG D (OS) 10.430 87 TOTAL AREA DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 5.000 0.000 5.000 48% IMPERVIOUS 1 S 0.000 0.000 0.000 0.000 0.430 0.430 BYPASS BUA 5S 0.000 0.000 0.000 5.000 0.000 5.000 Pasture/grassland/range, Fair OS 0.000 0.000 0.000 10.000 0.430 10.430 TOTAL AREA DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 5 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=5.000 ac 0.00% Impervious Runoff Depth>1.39" Tc=10.0 min CN=84 Runoff=11.49 cfs 0.581 af SubcatchmentlS: POST TO SAND FILTER C Runoff Area=5.000 ac 0.00% Impervious Runoff Depth>1.77" Tc=8.5 min CN=89 Runoff=15.00 cfs 0.736 af Subcatchment5S: BYPASS BUA Runoff Area=0.430 ac 100.00% Impervious Runoff Depth>2.62" Tc=5.0 min CN=98 Runoff=1.84 cfs 0.094 af Pond 2P: FOREBAY Peak Elev=553.26' Storage=26,448 cf Inflow=15.00 cfs 0.736 af Primary=0.25 cfs 0.125 af Secondary=0.02 cfs 0.012 af Tertiary=0.00 cfs 0.000 af Outflow=0.27 cfs 0.137 af Pond 3P: SAND FILTER Peak Elev=550.00' Storage=0 cf Inflow=0.02 cfs 0.012 af Outflow=0.02 cfs 0.012 af Pond 4P: TOTAL Inflow=1.85 cfs 0.231 af Primary=1.85 cfs 0.231 af Total Runoff Area = 10.430 ac Runoff Volume = 1.411 af Average Runoff Depth = 1.62" 95.88% Pervious = 10.000 ac 4.12% Impervious = 0.430 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment OS: PRE - DEVELOPMENT TOWNS Runoff = 11.49 cfs @ 12.02 hrs, Volume= 0.581 af, Depth> 1.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 5.000 84 Pasture/grassland/range, Fair, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment OS: PRE - DEVELOPMENT TOWNS Hydrograph I 1 1 I 1 I I 1 1 I 1 1 I 1 1 I 1 4 k 1 1 1— 1 4 -k 1 1 - — # — 1 I — 4 — # —I— — ■Runoff 12 -/ 1 1 � 1 I I 1 I I I11.49cfs 1 I I I I I 11 T Type y II 244lr II I I - I — f` � — - 4 - 4 -I- - 10� 1 Year alin�,a1I 3. 0'1 I 91- Runoff Ar'ea5.000 ad I - - Runoff VolumeF0.581 af / I Dump .3 „- - � 6� Tc=10 0 n�h_i n I I 1 . Ca18-44_ - 11- -11 - - 1 -11- - - 4� 1 1 1 1 1 ' 3� � 1 1 1 1 1 ,- I I 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 7 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT TOWNS Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 0.94 0.93 0.25 0.01 0.00 0.00 13.00 2.32 0.98 0.78 0.50 0.02 0.00 0.00 13.25 2.36 1.01 0.67 0.75 0.02 0.00 0.00 13.50 2.40 1.04 0.59 1.00 0.03 0.00 0.00 13.75 2.43 1.06 0.52 1.25 0.04 0.00 0.00 14.00 2.46 1.09 0.47 1.50 0.05 0.00 0.00 14.25 2.49 1.11 0.43 1.75 0.06 0.00 0.00 14.50 2.51 1.13 0.41 2.00 0.07 0.00 0.00 14.75 2.54 1.15 0.39 2.25 0.08 0.00 0.00 15.00 2.56 1.16 0.37 2.50 0.08 0.00 0.00 15.25 2.58 1.18 0.35 2.75 0.09 0.00 0.00 15.50 2.60 1.20 0.33 3.00 0.10 0.00 0.00 15.75 2.62 1.21 0.31 3.25 0.11 0.00 0.00 16.00 2.64 1.23 0.29 3.50 0.12 0.00 0.00 16.25 2.66 1.24 0.27 3.75 0.13 0.00 0.00 16.50 2.67 1.25 0.27 4.00 0.14 0.00 0.00 16.75 2.69 1.27 0.26 4.25 0.15 0.00 0.00 17.00 2.71 1.28 0.25 4.50 0.17 0.00 0.00 17.25 2.72 1.29 0.24 4.75 0.18 0.00 0.00 17.50 2.74 1.30 0.24 5.00 0.19 0.00 0.00 17.75 2.75 1.31 0.23 5.25 0.20 0.00 0.00 18.00 2.76 1.32 0.22 5.50 0.21 0.00 0.00 18.25 2.78 1.33 0.22 5.75 0.23 0.00 0.00 18.50 2.79 1.34 0.21 6.00 0.24 0.00 0.00 18.75 2.80 1.35 0.20 6.25 0.25 0.00 0.00 19.00 2.81 1.36 0.19 6.50 0.27 0.00 0.00 19.25 2.82 1.37 0.19 6.75 0.28 0.00 0.00 19.50 2.84 1.38 0.18 7.00 0.30 0.00 0.00 19.75 2.85 1.39 0.17 7.25 0.31 0.00 0.00 20.00 2.86 1.40 0.16 7.50 0.33 0.00 0.00 7.75 0.34 0.00 0.00 8.00 0.36 0.00 0.00 8.25 0.38 0.00 0.00 8.50 0.40 0.00 0.00 8.75 0.42 0.00 0.01 9.00 0.44 0.00 0.02 9.25 0.47 0.00 0.03 9.50 0.49 0.01 0.04 9.75 0.51 0.01 0.06 10.00 0.54 0.01 0.08 10.25 0.58 0.02 0.10 10.50 0.61 0.02 0.14 10.75 0.65 0.03 0.18 11.00 0.71 0.05 0.25 11.25 0.77 0.07 0.35 11.50 0.85 0.09 0.52 11.75 1.16 0.23 2.24 12.00 1.99 0.74 11.34 12.25 2.12 0.83 2.63 12.50 2.20 0.89 1.36 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 1S: POST TO SAND FILTER C Runoff = 15.00 cfs @ 12.00 hrs, Volume= 0.736 af, Depth> 1.77" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 5.000 89 48% IMPERVIOUS, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.5 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER C Hydrog raph 1 1 1 1 1 1 16i-/ I I I I I I ■Runoff - - -r - I- -I - - t -1 15.00 cfs r - - - - -I - - r -1- T 15� - type-I11-24r - - - ♦- -I- r - - - - I- -1 - - H -1- - 13� rYgarain ,a�l= aI- 66 1- 1 - 1 - L -I- - 12 4- Run ea- .0OQ ad_ I I 114- I�� I I I I I 10� Rurriooff V oolI+ me l/nu o. J6af ,u ngyp""tD t •� n H fi 1 / - - - H 1 82- :LI _ - L - 1- -1 - 1 _ L _1- 1 _I - 1 _ L -1- - 6 ' CN891 I I I I 54-/ I I 1 I I 1 1 I I I I 1 yI I 1 I I 1 3 I I fi -1- 1 1 1I/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 9 Hydrograph for Subcatchment 1S: POST TO SAND FILTER C Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 1.25 1.05 0.25 0.01 0.00 0.00 13.00 2.32 1.30 0.88 0.50 0.02 0.00 0.00 13.25 2.36 1.33 0.75 0.75 0.02 0.00 0.00 13.50 2.40 1.37 0.66 1.00 0.03 0.00 0.00 13.75 2.43 1.39 0.59 1.25 0.04 0.00 0.00 14.00 2.46 1.42 0.52 1.50 0.05 0.00 0.00 14.25 2.49 1.44 0.48 1.75 0.06 0.00 0.00 14.50 2.51 1.47 0.46 2.00 0.07 0.00 0.00 14.75 2.54 1.49 0.43 2.25 0.08 0.00 0.00 15.00 2.56 1.51 0.41 2.50 0.08 0.00 0.00 15.25 2.58 1.53 0.39 2.75 0.09 0.00 0.00 15.50 2.60 1.55 0.37 3.00 0.10 0.00 0.00 15.75 2.62 1.56 0.34 3.25 0.11 0.00 0.00 16.00 2.64 1.58 0.32 3.50 0.12 0.00 0.00 16.25 2.66 1.59 0.30 3.75 0.13 0.00 0.00 16.50 2.67 1.61 0.30 4.00 0.14 0.00 0.00 16.75 2.69 1.62 0.29 4.25 0.15 0.00 0.00 17.00 2.71 1.64 0.28 4.50 0.17 0.00 0.00 17.25 2.72 1.65 0.27 4.75 0.18 0.00 0.00 17.50 2.74 1.66 0.26 5.00 0.19 0.00 0.00 17.75 2.75 1.67 0.26 5.25 0.20 0.00 0.00 18.00 2.76 1.69 0.25 5.50 0.21 0.00 0.00 18.25 2.78 1.70 0.24 5.75 0.23 0.00 0.00 18.50 2.79 1.71 0.23 6.00 0.24 0.00 0.00 18.75 2.80 1.72 0.22 6.25 0.25 0.00 0.00 19.00 2.81 1.73 0.21 6.50 0.27 0.00 0.01 19.25 2.82 1.74 0.21 6.75 0.28 0.00 0.01 19.50 2.84 1.75 0.20 7.00 0.30 0.00 0.02 19.75 2.85 1.76 0.19 7.25 0.31 0.00 0.03 20.00 2.86 1.77 0.18 7.50 0.33 0.00 0.03 7.75 0.34 0.01 0.04 8.00 0.36 0.01 0.05 8.25 0.38 0.01 0.06 8.50 0.40 0.02 0.07 8.75 0.42 0.02 0.09 9.00 0.44 0.03 0.11 9.25 0.47 0.03 0.13 9.50 0.49 0.04 0.14 9.75 0.51 0.05 0.16 10.00 0.54 0.06 0.19 10.25 0.58 0.07 0.23 10.50 0.61 0.08 0.29 10.75 0.65 0.10 0.36 11.00 0.71 0.12 0.45 11.25 0.77 0.15 0.61 11.50 0.85 0.20 0.85 11.75 1.16 0.39 3.72 12.00 1.99 1.02 15.00 12.25 2.12 1.13 2.61 12.50 2.20 1.20 1.50 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 5S: BYPASS BUA Runoff = 1.84 cfs @ 11.95 hrs, Volume= 0.094 af, Depth> 2.62" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description * 0.430 98 BYPASS BUA 0.430 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 5S: BYPASS BUA Hydrograph 2 - I I I ❑Runoff` I I I 11.84 cfs I Type II1241-hr I 1-1 Year(,Rainfall-3.00'1 Runoff Area=0.430 ad I I I I I I I I I Runoff VolumeF0.1094 af I Tuppth>2.6 " .2 1 T'c=5.0 I m iln GN=981 1 I I I I I I I I I I I I I I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 11 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 2.27 2.04 0.10 0.25 0.01 0.00 0.00 13.00 2.32 2.09 0.08 0.50 0.02 0.00 0.00 13.25 2.36 2.13 0.07 0.75 0.02 0.00 0.00 13.50 2.40 2.17 0.06 1.00 0.03 0.00 0.00 13.75 2.43 2.20 0.06 1.25 0.04 0.00 0.00 14.00 2.46 2.23 0.05 1.50 0.05 0.00 0.00 14.25 2.49 2.26 0.05 1.75 0.06 0.00 0.00 14.50 2.51 2.28 0.04 2.00 0.07 0.00 0.00 14.75 2.54 2.31 0.04 2.25 0.08 0.00 0.00 15.00 2.56 2.33 0.04 2.50 0.08 0.01 0.00 15.25 2.58 2.35 0.04 2.75 0.09 0.01 0.01 15.50 2.60 2.37 0.03 3.00 0.10 0.01 0.01 15.75 2.62 2.39 0.03 3.25 0.11 0.02 0.01 16.00 2.64 2.41 0.03 3.50 0.12 0.02 0.01 16.25 2.66 2.43 0.03 3.75 0.13 0.03 0.01 16.50 2.67 2.44 0.03 4.00 0.14 0.03 0.01 16.75 2.69 2.46 0.03 4.25 0.15 0.04 0.01 17.00 2.71 2.47 0.03 4.50 0.17 0.05 0.01 17.25 2.72 2.49 0.03 4.75 0.18 0.05 0.01 17.50 2.74 2.50 0.03 5.00 0.19 0.06 0.01 17.75 2.75 2.52 0.02 5.25 0.20 0.07 0.01 18.00 2.76 2.53 0.02 5.50 0.21 0.08 0.02 18.25 2.78 2.55 0.02 5.75 0.23 0.09 0.02 18.50 2.79 2.56 0.02 6.00 0.24 0.10 0.02 18.75 2.80 2.57 0.02 6.25 0.25 0.11 0.02 19.00 2.81 2.58 0.02 6.50 0.27 0.12 0.02 19.25 2.82 2.59 0.02 6.75 0.28 0.13 0.02 19.50 2.84 2.60 0.02 7.00 0.30 0.14 0.02 19.75 2.85 2.61 0.02 7.25 0.31 0.15 0.02 20.00 2.86 2.62 0.02 7.50 0.33 0.17 0.02 7.75 0.34 0.18 0.02 8.00 0.36 0.19 0.02 8.25 0.38 0.21 0.03 8.50 0.40 0.23 0.03 8.75 0.42 0.24 0.03 9.00 0.44 0.27 0.04 9.25 0.47 0.29 0.04 9.50 0.49 0.31 0.04 9.75 0.51 0.33 0.04 10.00 0.54 0.36 0.05 10.25 0.58 0.39 0.05 10.50 0.61 0.42 0.06 10.75 0.65 0.46 0.07 11.00 0.71 0.51 0.08 11.25 0.77 0.57 0.11 11.50 0.85 0.65 0.14 11.75 1.16 0.95 0.67 12.00 1.99 1.76 1.54 12.25 2.12 1.89 0.21 12.50 2.20 1.98 0.14 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Pond 2P: FOREBAY Inflow Area = 5.000 ac, 0.00% Impervious, Inflow Depth > 1.77" for 1-Year event Inflow = 15.00 cfs @ 12.00 hrs, Volume= 0.736 af Outflow = 0.27 cfs @ 17.40 hrs, Volume= 0.137 af, Atten= 98%, Lag= 324.0 min Primary = 0.25 cfs @ 17.40 hrs, Volume= 0.125 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 17.40 hrs, Volume= 0.012 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 553.26'@ 17.40 hrs Surf.Area= 10,985 sf Storage= 26,448 cf Plug-Flow detention time=348.7 min calculated for 0.137 of(19% of inflow) Center-of-Mass det. time=233.7 min ( 1,008.2 - 774.5 ) Volume Invert Avail.Storage Storage Description #1 550.00' 69,077 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 5,499 0 0 551.00 7,059 6,279 6,279 552.00 8,674 7,867 14,146 553.00 10,345 9,510 23,655 554.00 12,788 11,567 35,222 555.00 16,358 14,573 49,795 556.00 22,207 19,283 69,077 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round 24" RCP Outfall L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 549.50'/ 549.00' S= 0.0059 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 553.00' 24.0" W x 12.0" H Vert. 10 YR. ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 554.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 550.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 2 550.00' 6.0" Round 6" Underdrain to Sand L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 550.00'/ 549.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.20 sf #6 Tertiary 555.00' 20.0' long + 3.0 '/' SideZ x 28.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 13 Primary OutFlow Max=0.25 cfs @ 17.40 hrs HW=553.26' TW=0.00' (Dynamic Tailwater) 4-1=24" RCP Outfall (Passes 0.25 cfs of 24.46 cfs potential flow) 2=10 YR. ORIFICE (Passes 0.25 cfs of 0.86 cfs potential flow) 4-5=6" Underdrain to Sand (Outlet Controls 0.25 cfs @ 1.27 fps) 3=TOP OF OUTLET STRUCTURE( Controls 0.00 cfs) Secondary OutFlow Max=0.02 cfs @ 17.40 hrs HW=553.26' TW=550.00' (Dynamic Tailwater) 4-4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph 1 1 1 1 1 1 1 1 1 1 1 1 1 I I ■Inflow I is.00crs r ■Outflow ss IA pp I�_ ( (}(� •1 TI" '"1 '"I""I� •Secondary / / _ Peak-Elev5 3 126' 1 1 1 1 1 1 •Tertiary 16� / / / / / 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15. / / // / / _ Stora_ge*26-,44QQf- 1 1 I I I I I 14 - / 13- / / / / 12 -/ / / / / / L J _ I_ L _ I_ L — 1_ 1 _ 1— L _I_ L _1_ 11 / / / / / L L L L L L 1 1 1 L I L 1 1 L I L 1 L 10 -/ / / / / / L I 11 1 1 L L L 8 / / / / / / I— 4 — I— 4 — I— 4 — I— 4 — I— 4 —I— -k —I— —I — —I — I— — Li II —I — I 4 — I— - — I— 4 — I— 4 —I ` -k 1 I 1 I—— I— —[ — I— 4 — I— 4 —I— r -k —I— —I — —1 — I— - 54 // / / / I- - I 4 I 4 1 -[ 1 4 —I— i 1 —I I— z. 2 / / 0 02 cfs or 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 14 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 0.00 0.50 0.00 0 550.00 0.00 0.00 0.00 0.00 1.00 0.00 0 550.00 0.00 0.00 0.00 0.00 1.50 0.00 0 550.00 0.00 0.00 0.00 0.00 2.00 0.00 0 550.00 0.00 0.00 0.00 0.00 2.50 0.00 0 550.00 0.00 0.00 0.00 0.00 3.00 0.00 0 550.00 0.00 0.00 0.00 0.00 3.50 0.00 0 550.00 0.00 0.00 0.00 0.00 4.00 0.00 0 550.00 0.00 0.00 0.00 0.00 4.50 0.00 0 550.00 0.00 0.00 0.00 0.00 5.00 0.00 0 550.00 0.00 0.00 0.00 0.00 5.50 0.00 0 550.00 0.00 0.00 0.00 0.00 6.00 0.00 0 550.00 0.00 0.00 0.00 0.00 6.50 0.01 3 550.00 0.00 0.00 0.00 0.00 7.00 0.02 25 550.00 0.00 0.00 0.00 0.00 7.50 0.03 73 550.01 0.00 0.00 0.00 0.00 8.00 0.05 147 550.03 0.00 0.00 0.00 0.00 8.50 0.07 255 550.05 0.00 0.00 0.00 0.00 9.00 0.11 421 550.08 0.00 0.00 0.00 0.00 9.50 0.14 649 550.12 0.00 0.00 0.00 0.00 10.00 0.19 939 550.17 0.00 0.00 0.00 0.00 10.50 0.29 1,362 550.24 0.00 0.00 0.00 0.00 11.00 0.45 2,012 550.35 0.00 0.00 0.00 0.00 11.50 0.85 3,135 550.53 0.00 0.00 0.00 0.00 12.00 15.00 12,604 551.82 0.01 0.00 0.01 0.00 12.50 1.50 21,094 552.75 0.01 0.00 0.01 0.00 13.00 0.88 23,031 552.94 0.02 0.00 0.02 0.00 13.50 0.66 24,321 553.06 0.12 0.10 0.02 0.00 14.00 0.52 25,076 553.14 0.20 0.18 0.02 0.00 14.50 0.46 25,562 553.18 0.22 0.21 0.02 0.00 15.00 0.41 25,920 553.21 0.24 0.22 0.02 0.00 15.50 0.37 26,171 553.24 0.25 0.24 0.02 0.00 16.00 0.32 26,323 553.25 0.26 0.24 0.02 0.00 16.50 0.30 26,399 553.26 0.26 0.25 0.02 0.00 17.00 0.28 26,439 553.26 0.27 0.25 0.02 0.00 17.50 0.26 26,447 553.26 0.27 0.25 0.02 0.00 18.00 0.25 26,427 553.26 0.27 0.25 0.02 0.00 18.50 0.23 26,380 553.26 0.26 0.25 0.02 0.00 19.00 0.21 26,309 553.25 0.26 0.24 0.02 0.00 19.50 0.20 26,214 553.24 0.26 0.24 0.02 0.00 20.00 0.18 26,098 553.23 0.25 0.23 0.02 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 15 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 0.00 550.20 0.00 0.00 0.00 0.00 550.40 0.00 0.00 0.00 0.00 550.60 0.00 0.00 0.00 0.00 550.80 0.00 0.00 0.00 0.00 551.00 0.01 0.00 0.01 0.00 551.20 0.01 0.00 0.01 0.00 551.40 0.01 0.00 0.01 0.00 551.60 0.01 0.00 0.01 0.00 551.80 0.01 0.00 0.01 0.00 552.00 0.01 0.00 0.01 0.00 552.20 0.01 0.00 0.01 0.00 552.40 0.01 0.00 0.01 0.00 552.60 0.01 0.00 0.01 0.00 552.80 0.01 0.00 0.01 0.00 553.00 0.02 0.00 0.02 0.00 553.20 0.23 0.22 0.02 0.00 553.40 0.33 0.31 0.02 0.00 553.60 0.40 0.38 0.02 0.00 553.80 0.46 0.44 0.02 0.00 554.00 0.51 0.49 0.02 0.00 554.20 5.24 5.21 0.02 0.00 554.40 13.84 13.81 0.02 0.00 554.60 24.96 24.93 0.02 0.00 554.80 31.39 31.37 0.03 0.00 555.00 32.11 32.09 0.03 0.00 555.20 37.73 32.79 0.03 4.91 555.40 47.83 33.48 0.03 14.32 555.60 61.09 34.16 0.03 26.90 555.80 76.26 34.82 0.03 41.41 556.00 94.42 35.48 0.03 58.91 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 16 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 5,499 0 555.10 16,943 51,460 550.10 5,655 558 555.20 17,528 53,183 550.20 5,811 1,131 555.30 18,113 54,965 550.30 5,967 1,720 555.40 18,698 56,806 550.40 6,123 2,324 555.50 19,283 58,705 550.50 6,279 2,945 555.60 19,867 60,662 550.60 6,435 3,580 555.70 20,452 62,678 550.70 6,591 4,232 555.80 21,037 64,753 550.80 6,747 4,898 555.90 21,622 66,886 550.90 6,903 5,581 556.00 22,207 69,077 551.00 7,059 6,279 551.10 7,221 6,993 551.20 7,382 7,723 551.30 7,543 8,469 551.40 7,705 9,232 551.50 7,867 10,010 551.60 8,028 10,805 551.70 8,190 11,616 551.80 8,351 12,443 551.90 8,512 13,286 552.00 8,674 14,146 552.10 8,841 15,021 552.20 9,008 15,914 552.30 9,175 16,823 552.40 9,342 17,749 552.50 9,510 18,691 552.60 9,677 19,651 552.70 9,844 20,627 552.80 10,011 21,619 552.90 10,178 22,629 553.00 10,345 23,655 553.10 10,589 24,702 553.20 10,834 25,773 553.30 11,078 26,868 553.40 11,322 27,988 553.50 11,567 29,133 553.60 11,811 30,302 553.70 12,055 31,495 553.80 12,299 32,713 553.90 12,544 33,955 554.00 12,788 35,222 554.10 13,145 36,518 554.20 13,502 37,851 554.30 13,859 39,219 554.40 14,216 40,622 554.50 14,573 42,062 554.60 14,930 43,537 , 554.70 15,287 45,048 554.80 15,644 46,594 554.90 16,001 48,177 555.00 16,358 49,795 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 17 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 17.40 hrs, Volume= 0.012 af Outflow = 0.02 cfs @ 17.40 hrs, Volume= 0.012 af, Atten= 0%, Lag= 0.0 min Primary = 0.02 cfs @ 17.40 hrs, Volume= 0.012 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 550.00'@ 0.00 hrs Surf.Area= 913 sf Storage= 0 cf Plug-Flow detention time=(not calculated: outflow precedes inflow) Center-of-Mass det. time=0.0 min ( 953.9 - 953.9 ) Volume Invert Avail.Storage Storage Description #1 550.00' 15,158 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 550.00 913 0 0 551.00 1,309 1,111 1,111 552.00 1,776 1,543 2,654 553.00 2,221 1,999 4,652 554.00 5,933 4,077 8,729 555.00 6,925 6,429 15,158 Device Routing Invert Outlet Devices #1 Primary 549.50' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 17.40 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Passes 0.00 cfs of 0.07 cfs potential flow) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 18 Pond 3P: SAND FILTER Hydrograph i I I I I I I I I I I I I I I I 1 1 1 I I ■Inflow D Primary j 0.019 " / 1 I I I I I 1 1 1 1 1 1 0.02c 0.018=' , ' d -Elev=55O.O0' - -1- -L ��iii�ii �; �/ ,- 0.017_' / I I 1 1 _I 1_ 1 1 1 _I H I /� _l 1_ I - storag--�cf 0.015-' i —I — —I— — ,_ —I — _ 1_ —1 — —1 - —I— — _1 _ . 0.014_' —I —I H —I— —1 1 1 - 0.013 fi -I - + -I— H — i— —1 — + — 1— —1 — t — — H —1 — t —I— —1 — 1 —1 - 0.012-' i fi 1 + _I_ _1 i_ 1 t 1 1 — 1 1 t I —1 1 1 - y 0.011 H fi 1 T 1— —1 r 1 -r 1 1 fi 1 1 fi 1 1 r 1 - 0.01=' —1 — T -1- 1 — r -1 — r — I— —I - 7 — r -1 — r -1— r — r —I - 0 0.009- LL 0.008=' / —I — T —I— —I 1— —IT 1 1 T — I— I T I T T 1 - 0.0071 i /7 I I I I I I I 1 1 1 I I I I 1 0.0061 i 1 I 1 1 1 1 1 I I I I 1 0.0051 / I 1 1 1 1 1 I I I I 1 0.0041 iI I 1 1 1 I I I I I 1 0.0031i1— 1 1 1 1 1 1 I I I I 1 - 0.0011 / Z-Zr 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 19 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 550.00 0.00 0.50 0.00 0 550.00 0.00 1.00 0.00 0 550.00 0.00 1.50 0.00 0 550.00 0.00 2.00 0.00 0 550.00 0.00 2.50 0.00 0 550.00 0.00 3.00 0.00 0 550.00 0.00 3.50 0.00 0 550.00 0.00 4.00 0.00 0 550.00 0.00 4.50 0.00 0 550.00 0.00 5.00 0.00 0 550.00 0.00 5.50 0.00 0 550.00 0.00 6.00 0.00 0 550.00 0.00 6.50 0.00 0 550.00 0.00 7.00 0.00 0 550.00 0.00 7.50 0.00 0 550.00 0.00 8.00 0.00 0 550.00 0.00 8.50 0.00 0 550.00 0.00 9.00 0.00 0 550.00 0.00 9.50 0.00 0 550.00 0.00 10.00 0.00 0 550.00 0.00 10.50 0.00 0 550.00 0.00 11.00 0.00 0 550.00 0.00 11.50 0.00 0 550.00 0.00 12.00 0.01 0 550.00 0.01 12.50 0.01 0 550.00 0.01 13.00 0.02 0 550.00 0.02 13.50 0.02 0 550.00 0.02 14.00 0.02 0 550.00 0.02 14.50 0.02 0 550.00 0.02 15.00 0.02 0 550.00 0.02 15.50 0.02 0 550.00 0.02 16.00 0.02 0 550.00 0.02 16.50 0.02 0 550.00 0.02 17.00 0.02 0 550.00 0.02 17.50 0.02 0 550.00 0.02 18.00 0.02 0 550.00 0.02 18.50 0.02 0 550.00 0.02 19.00 0.02 0 550.00 0.02 19.50 0.02 0 550.00 0.02 20.00 0.02 0 550.00 0.02 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 20 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 550.00 0.00 552.55 0.37 550.05 0.07 552.60 0.38 550.10 0.08 552.65 0.38 550.15 0.09 552.70 0.38 550.20 0.09 552.75 0.39 550.25 0.10 552.80 0.39 550.30 0.10 552.85 0.40 550.35 0.11 552.90 0.40 550.40 0.12 552.95 0.40 550.45 0.12 553.00 0.41 550.50 0.13 553.05 0.41 550.55 0.14 553.10 0.42 550.60 0.14 553.15 0.42 550.65 0.15 553.20 0.43 550.70 0.16 553.25 0.43 550.75 0.16 553.30 0.43 550.80 0.17 553.35 0.44 550.85 0.18 553.40 0.44 550.90 0.18 553.45 0.45 550.95 0.19 553.50 0.45 551.00 0.20 553.55 0.45 551.05 0.20 553.60 0.46 551.10 0.21 553.65 0.46 551.15 0.22 553.70 0.47 551.20 0.22 553.75 0.47 551.25 0.23 553.80 0.47 551.30 0.24 553.85 0.48 551.35 0.24 553.90 0.48 551.40 0.25 553.95 0.49 551.45 0.26 554.00 0.49 551.50 0.26 554.05 0.50 551.55 0.27 554.10 0.50 551.60 0.27 554.15 0.50 551.65 0.28 554.20 0.51 551.70 0.29 554.25 0.51 551.75 0.29 554.30 0.52 551.80 0.30 554.35 0.52 551.85 0.31 554.40 0.52 551.90 0.31 554.45 0.53 551.95 0.32 554.50 0.53 552.00 0.33 554.55 0.54 552.05 0.33 554.60 0.54 552.10 0.34 554.65 0.54 552.15 0.34 554.70 0.55 552.20 0.34 554.75 0.55 552.25 0.35 554.80 0.56 552.30 0.35 554.85 0.56 552.35 0.36 554.90 0.56 552.40 0.36 554.95 0.57 552.45 0.36 555.00 0.57 552.50 0.37 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 21 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 913 0 552.55 2,021 3,698 550.05 933 46 552.60 2,043 3,799 550.10 953 93 552.65 2,065 3,902 550.15 972 141 , 552.70 2,088 4,006 550.20 992 191 552.75 2,110 4,111 550.25 1,012 241 552.80 2,132 4,217 550.30 1,032 292 552.85 2,154 4,324 550.35 1,052 344 552.90 2,176 4,432 550.40 1,071 397 552.95 2,199 4,542 550.45 1,091 451 553.00 2,221 4,652 550.50 1,111 506 553.05 2,407 4,768 550.55 1,131 562 553.10 2,592 4,893 550.60 1,151 619 553.15 2,778 5,027 550.65 1,170 677 553.20 2,963 5,170 550.70 1,190 736 553.25 3,149 5,323 550.75 1,210 796 553.30 3,335 5,485 550.80 1,230 857 553.35 3,520 5,657 550.85 1,250 919 553.40 3,706 5,837 550.90 1,269 982 553.45 3,891 6,027 550.95 1,289 1,046 553.50 4,077 6,227 551.00 1,309 1,111 553.55 4,263 6,435 551.05 1,332 1,177 553.60 4,448 6,653 551.10 1,356 1,244 553.65 4,634 6,880 551.15 1,379 1,313 553.70 4,819 7,116 551.20 1,402 1,382 553.75 5,005 7,362 551.25 1,426 1,453 553.80 5,191 7,617 551.30 1,449 1,525 553.85 5,376 7,881 551.35 1,472 1,598 553.90 5,562 8,154 551.40 1,496 1,672 553.95 5,747 8,437 551.45 1,519 1,747 554.00 5,933 8,729 551.50 1,543 1,824 554.05 5,983 9,027 551.55 1,566 1,902 554.10 6,032 9,327 551.60 1,589 1,980 554.15 6,082 9,630 551.65 1,613 2,061 554.20 6,131 9,935 551.70 1,636 2,142 554.25 6,181 10,243 551.75 1,659 2,224 554.30 6,231 10,554 551.80 1,683 2,308 554.35 6,280 10,866 551.85 1,706 2,392 554.40 6,330 11,182 551.90 1,729 2,478 554.45 6,379 11,499 551.95 1,753 2,565 554.50 6,429 11,820 552.00 1,776 2,654 554.55 6,479 12,142 552.05 1,798 2,743 554.60 6,528 12,467 552.10 1,821 2,833 554.65 6,578 12,795 552.15 1,843 2,925 554.70 6,627 13,125 552.20 1,865 3,018 554.75 6,677 13,458 552.25 1,887 3,111 554.80 6,727 13,793 552.30 1,909 3,206 554.85 6,776 14,130 552.35 1,932 3,302 554.90 6,826 14,470 552.40 1,954 3,399 554.95 6,875 14,813 552.45 1,976 3,498 555.00 6,925 15,158 552.50 1,999 3,597 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 22 Summary for Pond 4P: TOTAL Inflow Area = 5.430 ac, 7.92% Impervious, Inflow Depth > 0.51" for 1-Year event Inflow = 1.85 cfs @ 11.95 hrs, Volume= 0.231 af Primary = 1.85 cfs @ 11.95 hrs, Volume= 0.231 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph II II II 11 11 11 II ❑ Inflow 2—/ I I I I f-85ofs D Primary Inflow Area=5.430 ac '185 cfs N / o T. o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 1124-hr 1-Year Rainfall=3.00" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 23 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.12 0.12 0.25 0.00 0.00 13.00 0.10 0.10 0.50 0.00 0.00 13.25 0.09 0.09 0.75 0.00 0.00 13.50 0.18 0.18 1.00 0.00 0.00 13.75 0.23 0.23 1.25 0.00 0.00 14.00 0.25 0.25 1.50 0.00 0.00 14.25 0.26 0.26 1.75 0.00 0.00 14.50 0.27 0.27 2.00 0.00 0.00 14.75 0.28 0.28 2.25 0.00 0.00 15.00 0.28 0.28 2.50 0.00 0.00 15.25 0.29 0.29 2.75 0.01 0.01 15.50 0.29 0.29 3.00 0.01 0.01 15.75 0.29 0.29 3.25 0.01 0.01 16.00 0.29 0.29 3.50 0.01 0.01 16.25 0.29 0.29 3.75 0.01 0.01 16.50 0.29 0.29 4.00 0.01 0.01 16.75 0.29 0.29 4.25 0.01 0.01 17.00 0.29 0.29 4.50 0.01 0.01 17.25 0.29 0.29 4.75 0.01 0.01 17.50 0.29 0.29 5.00 0.01 0.01 17.75 0.29 0.29 5.25 0.01 0.01 18.00 0.29 0.29 5.50 0.02 0.02 18.25 0.29 0.29 5.75 0.02 0.02 18.50 0.29 0.29 6.00 0.02 0.02 18.75 0.28 0.28 6.25 0.02 0.02 19.00 0.28 0.28 6.50 0.02 0.02 19.25 0.28 0.28 6.75 0.02 0.02 19.50 0.27 0.27 7.00 0.02 0.02 19.75 0.27 0.27 7.25 0.02 0.02 20.00 0.27 0.27 7.50 0.02 0.02 7.75 0.02 0.02 8.00 0.02 0.02 8.25 0.03 0.03 8.50 0.03 0.03 ' 8.75 0.03 0.03 9.00 0.04 0.04 9.25 0.04 0.04 9.50 0.04 0.04 9.75 0.04 0.04 10.00 0.05 0.05 10.25 0.05 0.05 10.50 0.06 0.06 10.75 0.07 0.07 11.00 0.09 0.09 11.25 0.11 0.11 11.50 0.14 0.14 11.75 0.67 0.67 12.00 1.54 1.54 12.25 0.22 0.22 12.50 0.15 0.15 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 24 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=2.15" Tc=10.0 min CN=84 Runoff=23.01 cfs 0.897 af SubcatchmentlS: POST TO SAND FILTER C Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=2.59" Tc=8.5 min CN=89 Runoff=28.59 cfs 1.079 af Subcatchment5S: BYPASS BUA Runoff Area=0.430 ac 100.00% Impervious Runoff Depth=3.52" Tc=5.0 min CN=98 Runoff=3.27 cfs 0.126 af Pond 2P: FOREBAY Peak Elev=554.08' Storage=36,228 cf Inflow=28.59 cfs 1.079 af Primary=1.64 cfs 0.509 af Secondary=0.02 cfs 0.026 af Tertiary=0.00 cfs 0.000 af Outflow=1.67 cfs 0.536 af Pond 3P: SAND FILTER Peak EIev=550.00' Storage=0 cf Inflow=0.02 cfs 0.026 af Outflow=0.02 cfs 0.026 af Pond 4P: TOTAL Inflow=3.28 cfs 0.662 af Primary=3.28 cfs 0.662 af Total Runoff Area = 10.430 ac Runoff Volume = 2.102 af Average Runoff Depth = 2.42" 95.88% Pervious = 10.000 ac 4.12% Impervious = 0.430 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment OS: PRE - DEVELOPMENT TOWNS Runoff = 23.01 cfs @ 3.02 hrs, Volume= 0.897 af, Depth= 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.75" Area (ac) CN Description 5.000 84 Pasture/grassland/range, Fair, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment OS: PRE - DEVELOPMENT TOWNS Hydrograph I 1 1 1 _ _ I_ I I I I I I I I - 25 — 1 - — H — 1— 1 — 4 — 1— — I— —1 — H — —I — 4 — H — I —I — 4 — I— —1— — ■Runoff 244-' ,— —I— 123.or ors I — I— —1 — rt - r -1- - - -r - r -1 - rt - fi — I— —I — rt - r -I- — 23 — 22� � — — �y�Q l d 21" — —I— - — I— —1 — 4 — I— —I— - — H — I— —1 — 4 — 1— — I— —I — 4 — I-' — 20 —I— —I — I- -I — rt - r -1- - - fi - r -1 - rt - r - 1- -I - rt - ru4 — 19 I I1 I 1 1-O--Yeat PC'airlfaN�3,75" — 16 r 1— —1 I 1 rt I- 1 -I H Runoff Area=5-t0110-ac — 154' — — w _II I— —I1 — 4 — 1— —II— - — -k —OIT-OTT V�Vi4m�—I 1 4444 7 f — 14� r 3 13; _0 12 1— I —1 I 1 -rr 1 -1t 1 1 -Runbff'Derit =2cizu u. 11; I 1 104-/ r 94/ —1— - — I— —I — 4 — 1— —I— —1 — — I— —1 — 4 — 1— — 1-Cr1=1-.U1- iq - 8 r I H I 1 rt r I H t 1 1 H H I 1 H 74-' —1 I rOl I 5 —1- 1 / — I- - - 4 - 1— -1- -I - -L - - -I - 4 — — I- -I - 4 — I- -1- - 4 — —I— - — I 1 H r I— H t 1 I 1 H I— 1 fi I 1 — 2� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 26 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT TOWNS Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.75 2.15 0.00 0.25 0.04 0.00 0.00 13.00 3.75 2.15 0.00 0.50 0.08 0.00 0.00 13.25 3.75 2.15 0.00 0.75 0.13 0.00 0.00 13.50 3.75 2.15 0.00 1.00 0.18 0.00 0.00 13.75 3.75 2.15 0.00 1.25 0.24 0.00 0.00 14.00 3.75 2.15 0.00 1.50 0.30 0.00 0.00 14.25 3.75 2.15 0.00 1.75 0.38 0.00 0.00 14.50 3.75 2.15 0.00 2.00 0.47 0.00 0.06 14.75 3.75 2.15 0.00 2.25 0.58 0.02 0.27 15.00 3.75 2.15 0.00 2.50 0.72 0.05 0.62 15.25 3.75 2.15 0.00 2.75 1.27 0.28 3.74 15.50 3.75 2.15 0.00 3.00 2.74 1.30 22.67 15.75 3.75 2.15 0.00 3.25 2.97 1.49 5.26 16.00 3.75 2.15 0.00 3.50 3.12 1.62 2.71 16.25 3.75 2.15 0.00 3.75 3.23 1.71 1.86 16.50 3.75 2.15 0.00 4.00 3.32 1.78 1.55 16.75 3.75 2.15 0.00 4.25 3.39 1.85 1.33 17.00 3.75 2.15 0.00 4.50 3.46 1.90 1.17 17.25 3.75 2.15 0.00 4.75 3.52 1.95 1.03 17.50 3.75 2.15 0.00 5.00 3.57 2.00 0.92 17.75 3.75 2.15 0.00 5.25 3.62 2.04 0.84 18.00 3.75 2.15 0.00 5.50 3.67 2.08 0.80 18.25 3.75 2.15 0.00 5.75 3.71 2.12 0.76 18.50 3.75 2.15 0.00 6.00 3.75 2.15 0.72 18.75 3.75 2.15 0.00 6.25 3.75 2.15 0.07 19.00 3.75 2.15 0.00 6.50 3.75 2.15 0.00 19.25 3.75 2.15 0.00 6.75 3.75 2.15 0.00 19.50 3.75 2.15 0.00 7.00 3.75 2.15 0.00 19.75 3.75 2.15 0.00 7.25 3.75 2.15 0.00 20.00 3.75 2.15 0.00 7.50 3.75 2.15 0.00 7.75 3.75 2.15 0.00 8.00 3.75 2.15 0.00 8.25 3.75 2.15 0.00 8.50 3.75 2.15 0.00 8.75 3.75 2.15 0.00 9.00 3.75 2.15 0.00 9.25 3.75 2.15 0.00 9.50 3.75 2.15 0.00 9.75 3.75 2.15 0.00 10.00 3.75 2.15 0.00 10.25 3.75 2.15 0.00 10.50 3.75 2.15 0.00 10.75 3.75 2.15 0.00 11.00 3.75 2.15 0.00 11.25 3.75 2.15 0.00 11.50 3.75 2.15 0.00 11.75 3.75 2.15 0.00 12.00 3.75 2.15 0.00 12.25 3.75 2.15 0.00 12.50 3.75 2.15 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 1S: POST TO SAND FILTER C Runoff = 28.59 cfs @ 3.00 hrs, Volume= 1.079 af, Depth= 2.59" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.75" Area (ac) CN Description * 5.000 89 48% IMPERVIOUS, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.5 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER C Hydrograph 1 1 1 1 I 32_ 4- 1 1- -I - -F - 1- -I- - I I I I -I - 4 - H -I- - ■Runoff 30 _ 12a.59 cfs I 1- A 1_ I _I L I A L I I 1 L I — 28 1_ 1 1 I I 1 I I 1 1 I 1 1 I I Type 1I I - 26� I 1 1 1 1 1 1 1 1 1 1 1 1 1 1,I.,, 24y 1 1 1 1 1 1 1 1 1 1 1 rn1 -1I� 1 1 1 1 -r I 1 -1H IOYeat R'aitifahl 3T5n - 22 _ —1— -1 1— —I — 4 — 1— —I— —I — + — I— —I — 4 — H — I— —I — H- — I— —I— - 20i/ I _ 1 I J L I _ L 1 _Runoff Area5.QaO ac - y 184 1 1 1 1 1 I T 16 -' I I I I I 1( rl A �_ �=I e r1 - 3 7" 1 1 I I I I I 1 I 1ltUnbff'Delpthh=2 59" LL 14 I- —I 1 1 rt 1- I H L 1 1 1 i I I rt C1 1 - 12� -1- -1 - I- -I - � - 1- -1- -1 - � - I- -1 - H - 1- - 1-Tc-8.-J Alin - 10 -' 1 1 1 1 1 1 1 1 1 1 1 1.+,ryl,—� 8'' -I- 1 1 1 1 1 1 1 1 1 1C '— � 1 10 4� /''' if 1— — - I 1— 1 — 4 1— — 1 - 4 - H - - 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 28 Hydrograph for Subcatchment 1S: POST TO SAND FILTER C Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.75 2.59 0.00 0.25 0.04 0.00 0.00 13.00 3.75 2.59 0.00 0.50 0.08 0.00 0.00 13.25 3.75 2.59 0.00 0.75 0.13 0.00 0.00 13.50 3.75 2.59 0.00 1.00 0.18 0.00 0.00 13.75 3.75 2.59 0.00 1.25 0.24 0.00 0.00 14.00 3.75 2.59 0.00 1.50 0.30 0.00 0.05 14.25 3.75 2.59 0.00 1.75 0.38 0.01 0.20 14.50 3.75 2.59 0.00 2.00 0.47 0.03 0.41 14.75 3.75 2.59 0.00 2.25 0.58 0.07 0.73 15.00 3.75 2.59 0.00 2.50 0.72 0.13 1.23 15.25 3.75 2.59 0.00 2.75 1.27 0.47 6.42 15.50 3.75 2.59 0.00 3.00 2.74 1.67 28.58 15.75 3.75 2.59 0.00 3.25 2.97 1.87 4.97 16.00 3.75 2.59 0.00 3.50 3.12 2.01 2.84 16.25 3.75 2.59 0.00 3.75 3.23 2.11 1.98 16.50 3.75 2.59 0.00 4.00 3.32 2.19 1.66 16.75 3.75 2.59 0.00 4.25 3.39 2.26 1.42 17.00 3.75 2.59 0.00 4.50 3.46 2.32 1.25 17.25 3.75 2.59 0.00 4.75 3.52 2.38 1.10 17.50 3.75 2.59 0.00 5.00 3.57 2.42 0.98 17.75 3.75 2.59 0.00 5.25 3.62 2.47 0.90 18.00 3.75 2.59 0.00 5.50 3.67 2.51 0.86 18.25 3.75 2.59 0.00 5.75 3.71 2.55 0.81 18.50 3.75 2.59 0.00 6.00 3.75 2.59 0.77 18.75 3.75 2.59 0.00 6.25 3.75 2.59 0.04 19.00 3.75 2.59 0.00 6.50 3.75 2.59 0.00 19.25 3.75 2.59 0.00 6.75 3.75 2.59 0.00 19.50 3.75 2.59 0.00 7.00 3.75 2.59 0.00 19.75 3.75 2.59 0.00 7.25 3.75 2.59 0.00 20.00 3.75 2.59 0.00 7.50 3.75 2.59 0.00 7.75 3.75 2.59 0.00 8.00 3.75 2.59 0.00 8.25 3.75 2.59 0.00 8.50 3.75 2.59 0.00 8.75 3.75 2.59 0.00 9.00 3.75 2.59 0.00 9.25 3.75 2.59 0.00 9.50 3.75 2.59 0.00 9.75 3.75 2.59 0.00 10.00 3.75 2.59 0.00 10.25 3.75 2.59 0.00 10.50 3.75 2.59 0.00 10.75 3.75 2.59 0.00 11.00 3.75 2.59 0.00 11.25 3.75 2.59 0.00 11.50 3.75 2.59 0.00 11.75 3.75 2.59 0.00 12.00 3.75 2.59 0.00 12.25 3.75 2.59 0.00 12.50 3.75 2.59 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 5S: BYPASS BUA Runoff = 3.27 cfs @ 2.95 hrs, Volume= 0.126 af, Depth= 3.52" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 10-Year Rainfall=3.75" Area (ac) CN Description * 0.430 98 BYPASS BUA 0.430 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 5S: BYPASS BUA Hydrograph I I - I I I ❑Runoff` - 1327 cfs II I 'Ty'peL 3 1 11111 la " I 1 1 I 16-hr 10-Year irlfal'I=31.75" _ Run R'aoff Area=0A30 ac 2� 1I IRunoff Vlolijme=0.1$ af Rim on- Depth=3.52" Tc=5.01 min 1 1 4 - 1 r 1 fi t 1 -hcNos 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 30 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 3.75 3.52 0.00 0.25 0.04 0.00 0.00 13.00 3.75 3.52 0.00 0.50 0.08 0.01 0.02 13.25 3.75 3.52 0.00 0.75 0.13 0.03 0.04 13.50 3.75 3.52 0.00 1.00 0.18 0.06 0.05 13.75 3.75 3.52 0.00 1.25 0.24 0.10 0.07 14.00 3.75 3.52 0.00 1.50 0.30 0.15 0.09 14.25 3.75 3.52 0.00 1.75 0.38 0.21 0.11 14.50 3.75 3.52 0.00 2.00 0.47 0.29 0.14 14.75 3.75 3.52 0.00 2.25 0.58 0.39 0.19 15.00 3.75 3.52 0.00 2.50 0.72 0.52 0.24 15.25 3.75 3.52 0.00 2.75 1.27 1.06 1.18 15.50 3.75 3.52 0.00 3.00 2.74 2.51 2.73 15.75 3.75 3.52 0.00 3.25 2.97 2.74 0.37 16.00 3.75 3.52 0.00 3.50 3.12 2.89 0.24 16.25 3.75 3.52 0.00 3.75 3.23 3.00 0.18 16.50 3.75 3.52 0.00 4.00 3.32 3.08 0.15 16.75 3.75 3.52 0.00 4.25 3.39 3.16 0.13 17.00 3.75 3.52 0.00 4.50 3.46 3.23 0.11 17.25 3.75 3.52 0.00 4.75 3.52 3.29 0.10 17.50 3.75 3.52 0.00 5.00 3.57 3.34 0.09 17.75 3.75 3.52 0.00 5.25 3.62 3.39 0.08 18.00 3.75 3.52 0.00 5.50 3.67 3.43 0.08 18.25 3.75 3.52 0.00 5.75 3.71 3.47 0.07 18.50 3.75 3.52 0.00 6.00 3.75 3.52 0.07 18.75 3.75 3.52 0.00 6.25 3.75 3.52 0.00 19.00 3.75 3.52 0.00 6.50 3.75 3.52 0.00 19.25 3.75 3.52 0.00 6.75 3.75 3.52 0.00 19.50 3.75 3.52 0.00 7.00 3.75 3.52 0.00 19.75 3.75 3.52 0.00 7.25 3.75 3.52 0.00 20.00 3.75 3.52 0.00 7.50 3.75 3.52 0.00 7.75 3.75 3.52 0.00 8.00 3.75 3.52 0.00 8.25 3.75 3.52 0.00 8.50 3.75 3.52 0.00 8.75 3.75 3.52 0.00 9.00 3.75 3.52 0.00 9.25 3.75 3.52 0.00 9.50 3.75 3.52 0.00 9.75 3.75 3.52 0.00 10.00 3.75 3.52 0.00 10.25 3.75 3.52 0.00 10.50 3.75 3.52 0.00 10.75 3.75 3.52 0.00 11.00 3.75 3.52 0.00 11.25 3.75 3.52 0.00 11.50 3.75 3.52 0.00 11.75 3.75 3.52 0.00 12.00 3.75 3.52 0.00 12.25 3.75 3.52 0.00 12.50 3.75 3.52 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type II 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 31 Summary for Pond 2P: FOREBAY Inflow Area = 5.000 ac, 0.00% Impervious, Inflow Depth = 2.59" for 10-Year event Inflow = 28.59 cfs @ 3.00 hrs, Volume= 1.079 af Outflow = 1.67 cfs @ 4.00 hrs, Volume= 0.536 af, Atten= 94%, Lag= 60.3 min Primary = 1.64 cfs @ 4.00 hrs, Volume= 0.509 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 4.00 hrs, Volume= 0.026 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 554.08'@ 4.00 hrs Surf.Area= 13,066 sf Storage= 36,228 cf Plug-Flow detention time=279.0 min calculated for 0.534 af(50% of inflow) Center-of-Mass det. time=250.2 min ( 451.7 - 201.5 ) Volume Invert Avail.Storage Storage Description #1 550.00' 69,077 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 5,499 0 0 551.00 7,059 6,279 6,279 552.00 8,674 7,867 14,146 553.00 10,345 9,510 23,655 554.00 12,788 11,567 35,222 555.00 16,358 14,573 49,795 556.00 22,207 19,283 69,077 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round 24" RCP Outfall L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 549.50'/ 549.00' S= 0.0059 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 553.00' 24.0" W x 12.0" H Vert. 10 YR. ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 554.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 550.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 2 550.00' 6.0" Round 6" Underdrain to Sand L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 550.00'/ 549.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.20 sf #6 Tertiary 555.00' 20.0' long + 3.0 '/' SideZ x 28.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 32 Primary OutFlow Max=1.64 cfs © 4.00 hrs HW=554.08' TW=0.00' (Dynamic Tailwater) L1=24" RCP Outfall (Passes 1.64 cfs of 28.53 cfs potential flow) 2=10 YR. ORIFICE (Passes 0.51 cfs of 7.04 cfs potential flow) L5=6" Underdrain to Sand (Outlet Controls 0.51 cfs © 2.57 fps) 3=TOP OF OUTLET STRUCTURE(Weir Controls 1.14 cfs @ 0.91 fps) Secondary OutFlow Max=0.02 cfs © 4.00 hrs HW=554.08' TW=550.00' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph II I Il I T I T I T I 1 / - -I I T I T I T I T I T I T I T I T I >- ■Inflow 28.59 cfs 1 •outflow ` 1 T I J IT I iTn I T QQI r�pp7a�_I r+ •Prima - - 1- -I - I- -r - 1- - -I- I if low AreIa= f}��@p - ■Secondary 32, / • / / - -1 - - I- T I - I T T �eaki EreV=554I.Vv •Tertiary 30i / / / - -I - , - ,- -I - 1- rt - 1- t - - t -1- t -1- t - - t -1 - r - 287 / / / - - - - ,- -t - 1- rt - 1- t -,- -- -Stor-age=36,228-cf- 264/ / z• / / - H H I rt I t t I t I t t I I- 24 / / / ,, // - H , I- H - I- -[ - I- t -I- t -I- t -I- t I t I I- 22 / / / / .- - - - ,- -I - I- rt - I- t -I- t -1- t -1- t - - t -1 - r - 20� / / / - -I H I -[ I t t I t I t t I I- 18 / ; j , ; - H I t I -F I t t I t I t I t I I- 316 / / I- H - I / - I- H - I- -F - I- t -I- ± -I- t -I- t -I - t -I - I- — LL14� / / I- A - 1- -F - 1- -+ - 1- + -1- + -1- + -1- -H -1 - -H -1 - i 12i/ / / • I- H I i - I- t - I- -t - I- + ,- t -I- t -I- t -I - t -I - I - 105/ z / � � - I p I - I- -+ - I- + -I- + -I- + -I- i I + -I - I- - 8� / / / 1 67 cfsrir / 27 s 0.00 cfs �� 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 33 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 0.00 0.50 0.00 0 550.00 0.00 0.00 0.00 0.00 1.00 0.00 0 550.00 0.00 0.00 0.00 0.00 1.50 0.05 10 550.00 0.00 0.00 0.00 0.00 2.00 0.41 387 550.07 0.00 0.00 0.00 0.00 2.50 1.23 1,756 550.31 0.00 0.00 0.00 0.00 3.00 28.58 19,036 552.54 0.01 0.00 0.01 0.00 3.50 2.84 34,585 553.95 0.50 0.47 0.02 0.00 4.00 1.66 36,228 554.08 1.67 1.64 0.02 0.00 4.50 1.25 36,045 554.06 1.37 1.35 0.02 0.00 5.00 0.98 35,848 554.05 1.08 1.06 0.02 0.00 5.50 0.86 35,710 554.04 0.91 0.88 0.02 0.00 6.00 0.77 35,630 554.03 0.81 0.79 0.02 0.00 6.50 0.00 34,886 553.97 0.50 0.48 0.02 0.00 7.00 0.00 33,998 553.90 0.48 0.46 0.02 0.00 7.50 0.00 33,143 553.83 0.47 0.44 0.02 0.00 8.00 0.00 32,321 553.77 0.45 0.43 0.02 0.00 8.50 0.00 31,533 553.70 0.43 0.41 0.02 0.00 9.00 0.00 30,779 553.64 0.41 0.39 0.02 0.00 9.50 0.00 30,059 553.58 0.39 0.37 0.02 0.00 10.00 0.00 29,375 553.52 0.37 0.35 0.02 0.00 10.50 0.00 28,726 553.46 0.35 0.33 0.02 0.00 11.00 0.00 28,113 553.41 0.33 0.31 0.02 0.00 11.50 0.00 27,536 553.36 0.31 0.29 0.02 0.00 12.00 0.00 26,996 553.31 0.29 0.27 0.02 0.00 12.50 0.00 26,494 553.27 0.27 0.25 0.02 0.00 13.00 0.00 26,029 553.22 0.25 0.23 0.02 0.00 13.50 0.00 25,603 553.18 0.23 0.21 0.02 0.00 14.00 0.00 25,215 553.15 0.20 0.19 0.02 0.00 14.50 0.00 24,867 553.12 0.18 0.17 0.02 0.00 15.00 0.00 24,559 553.09 0.16 0.14 0.02 0.00 15.50 0.00 24,305 553.06 0.12 0.10 0.02 0.00 16.00 0.00 24,132 553.05 0.08 0.06 0.02 0.00 16.50 0.00 24,011 553.03 0.06 0.04 0.02 0.00 17.00 0.00 23,922 553.03 0.04 0.03 0.02 0.00 17.50 0.00 23,854 553.02 0.03 0.02 0.02 0.00 18.00 0.00 23,801 553.01 0.03 0.01 0.02 0.00 18.50 0.00 23,757 553.01 0.02 0.01 0.02 0.00 19.00 0.00 23,719 553.01 0.02 0.00 0.02 0.00 19.50 0.00 23,687 553.00 0.02 0.00 0.02 0.00 20.00 0.00 23,657 553.00 0.02 0.00 0.02 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 34 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 0.00 550.20 0.00 0.00 0.00 0.00 550.40 0.00 0.00 0.00 0.00 550.60 0.00 0.00 0.00 0.00 550.80 0.00 0.00 0.00 0.00 551.00 0.01 0.00 0.01 0.00 551.20 0.01 0.00 0.01 0.00 551.40 0.01 0.00 0.01 0.00 551.60 0.01 0.00 0.01 0.00 551.80 0.01 0.00 0.01 0.00 552.00 0.01 0.00 0.01 0.00 552.20 0.01 0.00 0.01 0.00 552.40 0.01 0.00 0.01 0.00 552.60 0.01 0.00 0.01 0.00 552.80 0.01 0.00 0.01 0.00 553.00 0.02 0.00 0.02 0.00 553.20 0.23 0.22 0.02 0.00 553.40 0.33 0.31 0.02 0.00 553.60 0.40 0.38 0.02 0.00 553.80 0.46 0.44 0.02 0.00 554.00 0.51 0.49 0.02 0.00 554.20 5.24 5.21 0.02 0.00 554.40 13.84 13.81 0.02 0.00 554.60 24.96 24.93 0.02 0.00 554.80 31.39 31.37 0.03 0.00 555.00 32.11 32.09 0.03 0.00 555.20 37.73 32.79 0.03 4.91 555.40 47.83 33.48 0.03 14.32 555.60 61.09 34.16 0.03 26.90 555.80 76.26 34.82 0.03 41.41 556.00 94.42 35.48 0.03 58.91 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 35 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 5,499 0 555.10 16,943 51,460 550.10 5,655 558 555.20 17,528 53,183 550.20 5,811 1,131 555.30 18,113 54,965 550.30 5,967 1,720 555.40 18,698 56,806 550.40 6,123 2,324 555.50 19,283 58,705 550.50 6,279 2,945 555.60 19,867 60,662 550.60 6,435 3,580 555.70 20,452 62,678 550.70 6,591 4,232 555.80 21,037 64,753 550.80 6,747 4,898 555.90 21,622 66,886 550.90 6,903 5,581 556.00 22,207 69,077 551.00 7,059 6,279 551.10 7,221 6,993 551.20 7,382 7,723 551.30 7,543 8,469 551.40 7,705 9,232 551.50 7,867 10,010 551.60 8,028 10,805 551.70 8,190 11,616 551.80 8,351 12,443 551.90 8,512 13,286 552.00 8,674 14,146 552.10 8,841 15,021 552.20 9,008 15,914 552.30 9,175 16,823 552.40 9,342 17,749 552.50 9,510 18,691 552.60 9,677 19,651 552.70 9,844 20,627 552.80 10,011 21,619 552.90 10,178 22,629 553.00 10,345 23,655 553.10 10,589 24,702 553.20 10,834 25,773 553.30 11,078 26,868 553.40 11,322 27,988 553.50 11,567 29,133 553.60 11,811 30,302 553.70 12,055 31,495 553.80 12,299 32,713 553.90 12,544 33,955 554.00 12,788 35,222 554.10 13,145 36,518 554.20 13,502 37,851 554.30 13,859 39,219 554.40 14,216 40,622 554.50 14,573 42,062 554.60 14,930 43,537 , 554.70 15,287 45,048 554.80 15,644 46,594 554.90 16,001 48,177 555.00 16,358 49,795 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 36 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 4.00 hrs, Volume= 0.026 af Outflow = 0.02 cfs @ 4.00 hrs, Volume= 0.026 af, Atten= 0%, Lag= 0.0 min Primary = 0.02 cfs @ 4.00 hrs, Volume= 0.026 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 550.00'@ 0.00 hrs Surf.Area= 913 sf Storage= 0 cf Plug-Flow detention time=(not calculated: outflow precedes inflow) Center-of-Mass det. time=0.0 min ( 651.4 - 651.4 ) Volume Invert Avail.Storage Storage Description #1 550.00' 15,158 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 550.00 913 0 0 551.00 1,309 1,111 1,111 552.00 1,776 1,543 2,654 553.00 2,221 1,999 4,652 554.00 5,933 4,077 8,729 555.00 6,925 6,429 15,158 Device Routing Invert Outlet Devices #1 Primary 549.50' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 4.00 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Passes 0.00 cfs of 0.07 cfs potential flow) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 37 Pond 3P: SAND FILTER Hydrograph i I 1 1 1 1 1 I i I 1 1 1 z _I _ 1 _I_ 1 _ L _I 1 _ I_ _I _ L TIT 1 _ L _I _ L _I_ H _ L _I _ _ ■Inflow o.oz cfs ■Primary 0.024 z -1 - + — 1— -1 — t --111--F -- H -I -- -I-�-F -- 1- A1 - 1 0.023 1 1 o.oz ct�/ '' I - ealc it ei al MI5 V�L■0 V,- - 0.022 - - - II/jam//II�j/ I I L I _1 1_ I 0.0210. 2 � I/jl�j��I�/I�j/�/ -tO�'a 0-C'- - 0.02 / I, / / 0.019 T /��� �/�/� �f 0.017 / L -1 - i L ///I/// _ 0.017 0.016 z - -I - i- -I - t - 1- -1 - t -1- H 0.015 / 1 1 I I I I I I I I I I a 0.014 z - 0 0.013 i - J - I_ _I - 1 - I- -I - _H -I- _L - I_ _I - L _1_ _I - 1_ -I - I c 0.012 / 1 I- I t t I -1 I- I t I t t I - LI 00.01 z Ai II 111111111 'I 0.009 1- _1 - H -I - _H - I- _I - _H _1_ - H -1 - _L -I- - 1_ -I - 0.008 z I- 1 - t -1 - t - I- -I - t -1- rt - t -I - H -1- 1 - t -I - 0.007 / 1 I 1 1 I I I I I I 1 I I 0.006 i - 0.005 i - I _I H I H 1 1 L 1 H I- I H 1 H L 1 - 0.004 / /' -1- 1 - t -1 - t - - - - t -1- fi - t -1 - fi -1- 1 - t -I - 0.003 / 1 0.0020.001 - /j i 0 ,, /.-(....(....,,,(.,,,(... ...,(,,,(.,,,(.„,(.,,,(.,,,(.,,,(.,,,(.,,,(...(...(„ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 38 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 550.00 0.00 0.50 0.00 0 550.00 0.00 1.00 0.00 0 550.00 0.00 1.50 0.00 0 550.00 0.00 2.00 0.00 0 550.00 0.00 2.50 0.00 0 550.00 0.00 3.00 0.01 0 550.00 0.01 3.50 0.02 0 550.00 0.02 4.00 0.02 0 550.00 0.02 4.50 0.02 0 550.00 0.02 5.00 0.02 0 550.00 0.02 5.50 0.02 0 550.00 0.02 6.00 0.02 0 550.00 0.02 6.50 0.02 0 550.00 0.02 7.00 0.02 0 550.00 0.02 7.50 0.02 0 550.00 0.02 8.00 0.02 0 550.00 0.02 8.50 0.02 0 550.00 0.02 9.00 0.02 0 550.00 0.02 9.50 0.02 0 550.00 0.02 10.00 0.02 0 550.00 0.02 10.50 0.02 0 550.00 0.02 11.00 0.02 0 550.00 0.02 11.50 0.02 0 550.00 0.02 12.00 0.02 0 550.00 0.02 12.50 0.02 0 550.00 0.02 13.00 0.02 0 550.00 0.02 13.50 0.02 0 550.00 0.02 14.00 0.02 0 550.00 0.02 14.50 0.02 0 550.00 0.02 15.00 0.02 0 550.00 0.02 15.50 0.02 0 550.00 0.02 16.00 0.02 0 550.00 0.02 16.50 0.02 0 550.00 0.02 17.00 0.02 0 550.00 0.02 17.50 0.02 0 550.00 0.02 18.00 0.02 0 550.00 0.02 18.50 0.02 0 550.00 0.02 19.00 0.02 0 550.00 0.02 19.50 0.02 0 550.00 0.02 20.00 0.02 0 550.00 0.02 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 39 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 550.00 0.00 552.55 0.37 550.05 0.07 552.60 0.38 550.10 0.08 552.65 0.38 550.15 0.09 552.70 0.38 550.20 0.09 552.75 0.39 550.25 0.10 552.80 0.39 550.30 0.10 552.85 0.40 550.35 0.11 552.90 0.40 550.40 0.12 552.95 0.40 550.45 0.12 553.00 0.41 550.50 0.13 553.05 0.41 550.55 0.14 553.10 0.42 550.60 0.14 553.15 0.42 550.65 0.15 553.20 0.43 550.70 0.16 553.25 0.43 550.75 0.16 553.30 0.43 550.80 0.17 553.35 0.44 550.85 0.18 553.40 0.44 550.90 0.18 553.45 0.45 550.95 0.19 553.50 0.45 551.00 0.20 553.55 0.45 551.05 0.20 553.60 0.46 551.10 0.21 553.65 0.46 551.15 0.22 553.70 0.47 551.20 0.22 553.75 0.47 551.25 0.23 553.80 0.47 551.30 0.24 553.85 0.48 551.35 0.24 553.90 0.48 551.40 0.25 553.95 0.49 551.45 0.26 554.00 0.49 551.50 0.26 554.05 0.50 551.55 0.27 554.10 0.50 551.60 0.27 554.15 0.50 551.65 0.28 554.20 0.51 551.70 0.29 554.25 0.51 551.75 0.29 554.30 0.52 551.80 0.30 554.35 0.52 551.85 0.31 554.40 0.52 551.90 0.31 554.45 0.53 551.95 0.32 554.50 0.53 552.00 0.33 554.55 0.54 552.05 0.33 554.60 0.54 552.10 0.34 554.65 0.54 552.15 0.34 554.70 0.55 552.20 0.34 554.75 0.55 552.25 0.35 554.80 0.56 552.30 0.35 554.85 0.56 552.35 0.36 554.90 0.56 552.40 0.36 554.95 0.57 552.45 0.36 555.00 0.57 552.50 0.37 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 40 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 913 0 552.55 2,021 3,698 550.05 933 46 552.60 2,043 3,799 550.10 953 93 552.65 2,065 3,902 550.15 972 141 , 552.70 2,088 4,006 550.20 992 191 552.75 2,110 4,111 550.25 1,012 241 552.80 2,132 4,217 550.30 1,032 292 552.85 2,154 4,324 550.35 1,052 344 552.90 2,176 4,432 550.40 1,071 397 552.95 2,199 4,542 550.45 1,091 451 553.00 2,221 4,652 550.50 1,111 506 553.05 2,407 4,768 550.55 1,131 562 553.10 2,592 4,893 550.60 1,151 619 553.15 2,778 5,027 550.65 1,170 677 553.20 2,963 5,170 550.70 1,190 736 553.25 3,149 5,323 550.75 1,210 796 553.30 3,335 5,485 550.80 1,230 857 553.35 3,520 5,657 550.85 1,250 919 553.40 3,706 5,837 550.90 1,269 982 553.45 3,891 6,027 550.95 1,289 1,046 553.50 4,077 6,227 551.00 1,309 1,111 553.55 4,263 6,435 551.05 1,332 1,177 553.60 4,448 6,653 551.10 1,356 1,244 553.65 4,634 6,880 551.15 1,379 1,313 553.70 4,819 7,116 551.20 1,402 1,382 553.75 5,005 7,362 551.25 1,426 1,453 553.80 5,191 7,617 551.30 1,449 1,525 553.85 5,376 7,881 551.35 1,472 1,598 553.90 5,562 8,154 551.40 1,496 1,672 553.95 5,747 8,437 551.45 1,519 1,747 554.00 5,933 8,729 551.50 1,543 1,824 554.05 5,983 9,027 551.55 1,566 1,902 554.10 6,032 9,327 551.60 1,589 1,980 554.15 6,082 9,630 551.65 1,613 2,061 554.20 6,131 9,935 551.70 1,636 2,142 554.25 6,181 10,243 551.75 1,659 2,224 554.30 6,231 10,554 551.80 1,683 2,308 554.35 6,280 10,866 551.85 1,706 2,392 554.40 6,330 11,182 551.90 1,729 2,478 554.45 6,379 11,499 551.95 1,753 2,565 554.50 6,429 11,820 552.00 1,776 2,654 554.55 6,479 12,142 552.05 1,798 2,743 554.60 6,528 12,467 552.10 1,821 2,833 554.65 6,578 12,795 552.15 1,843 2,925 554.70 6,627 13,125 552.20 1,865 3,018 554.75 6,677 13,458 552.25 1,887 3,111 554.80 6,727 13,793 552.30 1,909 3,206 554.85 6,776 14,130 552.35 1,932 3,302 554.90 6,826 14,470 552.40 1,954 3,399 554.95 6,875 14,813 552.45 1,976 3,498 555.00 6,925 15,158 552.50 1,999 3,597 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 41 Summary for Pond 4P: TOTAL Inflow Area = 5.430 ac, 7.92% Impervious, Inflow Depth > 1.46" for 10-Year event Inflow = 3.28 cfs @ 2.95 hrs, Volume= 0.662 af Primary = 3.28 cfs @ 2.95 hrs, Volume= 0.662 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph I I I I / I I I 1 I I I 1 ❑ Inflow ` 1 13.28.cfs 1 1 1 1 1 D Primary 1 — r 1 ,3.28 cfs . I 1 _H 1 Inflow Area=5.43ac, - / 1 1 1 1 1 1 1 3—/ 1 I 1 I I I I 1 I 1 1 I I I I - I 1 1 I I I I 1 1 1 - 11 1 L 1 1 _1 — L1 ii i I o 2 o /// - / .'�LI - * , 1 1—/ 0 000V I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 10-Year Rainfall=3.75" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 42 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.26 0.26 0.25 0.00 0.00 13.00 0.25 0.25 0.50 0.02 0.02 13.25 0.24 0.24 0.75 0.04 0.04 13.50 0.23 0.23 1.00 0.05 0.05 13.75 0.22 0.22 1.25 0.07 0.07 14.00 0.20 0.20 1.50 0.09 0.09 14.25 0.19 0.19 1.75 0.11 0.11 14.50 0.18 0.18 2.00 0.14 0.14 14.75 0.17 0.17 2.25 0.19 0.19 15.00 0.16 0.16 2.50 0.25 0.25 15.25 0.14 0.14 2.75 1.19 1.19 15.50 0.12 0.12 3.00 2.74 2.74 15.75 0.10 0.10 3.25 0.80 0.80 16.00 0.08 0.08 3.50 0.74 0.74 16.25 0.07 0.07 3.75 1.45 1.45 16.50 0.06 0.06 4.00 1.81 1.81 ' 16.75 0.05 0.05 4.25 1.67 1.67 17.00 0.04 0.04 4.50 1.48 1.48 17.25 0.04 0.04 4.75 1.31 1.31 17.50 0.03 0.03 5.00 1.17 1.17 17.75 0.03 0.03 5.25 1.06 1.06 18.00 0.03 0.03 5.50 0.98 0.98 18.25 0.02 0.02 5.75 0.93 0.93 18.50 0.02 0.02 6.00 0.88 0.88 18.75 0.02 0.02 6.25 0.56 0.56 19.00 0.02 0.02 6.50 0.50 0.50 19.25 0.02 0.02 6.75 0.49 0.49 19.50 0.02 0.02 7.00 0.48 0.48 19.75 0.02 0.02 7.25 0.48 0.48 20.00 0.02 0.02 7.50 0.47 0.47 7.75 0.46 0.46 8.00 0.45 0.45 8.25 0.44 0.44 8.50 0.43 0.43 8.75 0.42 0.42 9.00 0.41 0.41 9.25 0.40 0.40 9.50 0.39 0.39 9.75 0.38 0.38 10.00 0.37 0.37 10.25 0.36 0.36 10.50 0.35 0.35 10.75 0.34 0.34 11.00 0.33 0.33 11.25 0.32 0.32 11.50 0.31 0.31 11.75 0.30 0.30 12.00 0.29 0.29 12.25 0.28 0.28 12.50 0.27 0.27 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 43 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=2.76" Tc=10.0 min CN=84 Runoff=29.30 cfs 1.151 af SubcatchmentlS: POST TO SAND FILTER C Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=3.24" Tc=8.5 min CN=89 Runoff=35.31 cfs 1.349 af Subcatchment5S: BYPASS BUA Runoff Area=0.430 ac 100.00% Impervious Runoff Depth=4.20" Tc=5.0 min CN=98 Runoff=3.88 cfs 0.151 af Pond 2P: FOREBAY Peak Elev=554.22' Storage=38,187 cf Inflow=35.31 cfs 1.349 af Primary=6.12 cfs 0.779 af Secondary=0.02 cfs 0.027 af Tertiary=0.00 cfs 0.000 af Outflow=6.14 cfs 0.806 af Pond 3P: SAND FILTER Peak Elev=550.00' Storage=0 cf Inflow=0.02 cfs 0.027 af Outflow=0.02 cfs 0.027 af Pond 4P: TOTAL Inflow=6.57 cfs 0.957 af Primary=6.57 cfs 0.957 af Total Runoff Area = 10.430 ac Runoff Volume = 2.651 af Average Runoff Depth = 3.05" 95.88% Pervious = 10.000 ac 4.12% Impervious = 0.430 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment OS: PRE - DEVELOPMENT TOWNS Runoff = 29.30 cfs @ 3.02 hrs, Volume= 1.151 af, Depth= 2.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.44" Area (ac) CN Description 5.000 84 Pasture/grassland/range, Fair, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment OS: PRE - DEVELOPMENT TOWNS Hydrograph 32i-' 1 1 I 1 1 I I I I I I I I I I I I _ ■Runoff 304 1 129.30 cfs I 1 1 I I 1 I I 1 1 I 1 1 I 1 1 I 28y 1 I I I I I 1 1 I 1 1 I 1 Type 1 H - T - -I - T - T -I- T - T - I- -I - T - T - I- -I - T - T -".N 26� 4- -1- H - - 1 1 - -F - 1- -1- H - + - -I - H- - + - 1 1 - H - �J IIl - 244: - 1- 1 - j - 1- -1- -I - + - 1- 25YearR'airifaHl=“4" 22 1 I I I I I I I I I I I I I I 20 -1- I I I I I 1 Runoff Area=5.000 ac '$z - 1I- I I I I Ou,o R1,..ki i =o-.1- 1 f 016- 4- -I- I -I - -F - 1- -I- -I - -h - I- -I -Rim 0ffIDepth=r76" - 13 14 / -I- - 4 - 1- -I- -I - -k - I- -I - 4 - - I- -I - 4n- I -I- - 12 I _1 . - A 1_ I I I I I H IJ T C1=1_0.OLrni1n _ 101/ I I I I I I I I I I I I I I I�_+ I _ 8� T 1 1 1 1 I 1 1 1 1 1 I%s 6/ /� I I I I I I I I I I I I I - - 1- - - 1- -1 - 7 - T - I -I - T - I- '- - 4- 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 45 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT TOWNS Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.44 2.76 0.00 0.25 0.05 0.00 0.00 13.00 4.44 2.76 0.00 0.50 0.10 0.00 0.00 13.25 4.44 2.76 0.00 0.75 0.15 0.00 0.00 13.50 4.44 2.76 0.00 1.00 0.21 0.00 0.00 13.75 4.44 2.76 0.00 1.25 0.28 0.00 0.00 14.00 4.44 2.76 0.00 1.50 0.36 0.00 0.00 14.25 4.44 2.76 0.00 1.75 0.45 0.00 0.03 14.50 4.44 2.76 0.00 2.00 0.55 0.01 0.22 14.75 4.44 2.76 0.00 2.25 0.69 0.04 0.51 15.00 4.44 2.76 0.00 2.50 0.85 0.09 0.99 15.25 4.44 2.76 0.00 2.75 1.51 0.42 5.30 15.50 4.44 2.76 0.00 3.00 3.24 1.72 28.96 15.75 4.44 2.76 0.00 3.25 3.51 1.95 6.56 16.00 4.44 2.76 0.00 3.50 3.70 2.10 3.35 16.25 4.44 2.76 0.00 3.75 3.82 2.21 2.29 16.50 4.44 2.76 0.00 4.00 3.93 2.31 1.91 16.75 4.44 2.76 0.00 4.25 4.02 2.39 1.63 17.00 4.44 2.76 0.00 4.50 4.10 2.46 1.44 17.25 4.44 2.76 0.00 4.75 4.17 2.52 1.27 17.50 4.44 2.76 0.00 5.00 4.23 2.57 1.13 17.75 4.44 2.76 0.00 5.25 4.29 2.62 1.03 18.00 4.44 2.76 0.00 5.50 4.34 2.67 0.98 18.25 4.44 2.76 0.00 5.75 4.39 2.72 0.93 18.50 4.44 2.76 0.00 6.00 4.44 2.76 0.88 18.75 4.44 2.76 0.00 6.25 4.44 2.76 0.09 19.00 4.44 2.76 0.00 6.50 4.44 2.76 0.00 19.25 4.44 2.76 0.00 6.75 4.44 2.76 0.00 19.50 4.44 2.76 0.00 7.00 4.44 2.76 0.00 19.75 4.44 2.76 0.00 7.25 4.44 2.76 0.00 20.00 4.44 2.76 0.00 7.50 4.44 2.76 0.00 7.75 4.44 2.76 0.00 8.00 4.44 2.76 0.00 8.25 4.44 2.76 0.00 8.50 4.44 2.76 0.00 8.75 4.44 2.76 0.00 9.00 4.44 2.76 0.00 9.25 4.44 2.76 0.00 9.50 4.44 2.76 0.00 9.75 4.44 2.76 0.00 10.00 4.44 2.76 0.00 10.25 4.44 2.76 0.00 10.50 4.44 2.76 0.00 10.75 4.44 2.76 0.00 11.00 4.44 2.76 0.00 11.25 4.44 2.76 0.00 11.50 4.44 2.76 0.00 11.75 4.44 2.76 0.00 12.00 4.44 2.76 0.00 12.25 4.44 2.76 0.00 12.50 4.44 2.76 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 1S: POST TO SAND FILTER C Runoff = 35.31 cfs @ 3.00 hrs, Volume= 1.349 af, Depth= 3.24" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.44" Area (ac) CN Description * 5.000 89 48% IMPERVIOUS, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.5 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER C Hydrograph I I I I I _ I I I I I I 38y 1 I 1 I 1 I I I I I I I I I ■Runoff 364/ 1 _I_ 135.31 cfs I I I I 1 I 1 1 I 1 1 I 34/ _ 1 1 1 1 1 1 1 1 1 1 1 1T e111 324-/ _ _ _ I 1 I I I I 1 I 4I�,, 30 / _ 1 1 1 1 1 1 1 1 1 "Iir 284 _I_ _I 1 1 1 1 25--Yeat R1e i fl fa u=44!' _ 26 / 1 1 1 1 I I I I 7t I I �1 I f1 A 24� _I I I I 1 1 Wunorea-5OIa�_ac _ y 22€'/ _ 1 1 �y1 1 1 1I � 3 20� _I / 1 1 ti ""I' a 1""T"'l' 349 `I" _0 18� 1 1 1 1 1 -RU1_nOff Ipepth-3 24 u 16 -/ ,_ _I_ _ I / _ 1 _ L _I_ J _ L _ I_ _I _ A _ L _ I_ _I _ 1 _ L 1_ _ 14 ,_ _ 1 I 1 1 I 1 1 1 1 1 1 TIC_8,5IMiIn _ 12 -/ _ I_ _ / 1 1 I I I I I I I I 10� ,_ —1_ _ I _I _ 1 _ L _I_ _I — L _ I_ _I _ A _ L _ 1_ _I _ 1- - _ 8� � 1 _1 _ H I L L I _ L _ I 1 A L I I L L 1 _ 64-/ r I 1 1 _ L _ I _ L _ I_ _I _ J _ L _ 1 I _ I _ L 1_ _ 4 / , 4 J L 1 - I 1 1 A I I L L — _ 2=/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 47 Hydrograph for Subcatchment 1S: POST TO SAND FILTER C Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.44 3.24 0.00 0.25 0.05 0.00 0.00 13.00 4.44 3.24 0.00 0.50 0.10 0.00 0.00 13.25 4.44 3.24 0.00 0.75 0.15 0.00 0.00 13.50 4.44 3.24 0.00 1.00 0.21 0.00 0.00 13.75 4.44 3.24 0.00 1.25 0.28 0.00 0.01 14.00 4.44 3.24 0.00 1.50 0.36 0.01 0.16 14.25 4.44 3.24 0.00 1.75 0.45 0.03 0.37 14.50 4.44 3.24 0.00 2.00 0.55 0.06 0.65 14.75 4.44 3.24 0.00 2.25 0.69 0.11 1.07 15.00 4.44 3.24 0.00 2.50 0.85 0.20 1.71 15.25 4.44 3.24 0.00 2.75 1.51 0.64 8.44 15.50 4.44 3.24 0.00 3.00 3.24 2.12 35.29 15.75 4.44 3.24 0.00 3.25 3.51 2.37 6.05 16.00 4.44 3.24 0.00 3.50 3.70 2.54 3.44 16.25 4.44 3.24 0.00 3.75 3.82 2.66 2.40 16.50 4.44 3.24 0.00 4.00 3.93 2.76 2.01 16.75 4.44 3.24 0.00 4.25 4.02 2.84 1.72 17.00 4.44 3.24 0.00 4.50 4.10 2.91 1.51 17.25 4.44 3.24 0.00 4.75 4.17 2.98 1.33 17.50 4.44 3.24 0.00 5.00 4.23 3.04 1.18 17.75 4.44 3.24 0.00 5.25 4.29 3.09 1.08 18.00 4.44 3.24 0.00 5.50 4.34 3.14 1.03 18.25 4.44 3.24 0.00 5.75 4.39 3.19 0.98 18.50 4.44 3.24 0.00 6.00 4.44 3.24 0.93 18.75 4.44 3.24 0.00 6.25 4.44 3.24 0.05 19.00 4.44 3.24 0.00 6.50 4.44 3.24 0.00 19.25 4.44 3.24 0.00 6.75 4.44 3.24 0.00 19.50 4.44 3.24 0.00 7.00 4.44 3.24 0.00 19.75 4.44 3.24 0.00 7.25 4.44 3.24 0.00 20.00 4.44 3.24 0.00 7.50 4.44 3.24 0.00 7.75 4.44 3.24 0.00 8.00 4.44 3.24 0.00 8.25 4.44 3.24 0.00 8.50 4.44 3.24 0.00 8.75 4.44 3.24 0.00 9.00 4.44 3.24 0.00 9.25 4.44 3.24 0.00 9.50 4.44 3.24 0.00 9.75 4.44 3.24 0.00 10.00 4.44 3.24 0.00 10.25 4.44 3.24 0.00 10.50 4.44 3.24 0.00 10.75 4.44 3.24 0.00 11.00 4.44 3.24 0.00 11.25 4.44 3.24 0.00 11.50 4.44 3.24 0.00 11.75 4.44 3.24 0.00 12.00 4.44 3.24 0.00 12.25 4.44 3.24 0.00 12.50 4.44 3.24 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 5S: BYPASS BUA Runoff = 3.88 cfs @ 2.95 hrs, Volume= 0.151 af, Depth= 4.20" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 25-Year Rainfall=4.44" Area (ac) CN Description * 0.430 98 BYPASS BUA 0.430 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ 5.0 Direct Entry, DIRECT Subcatchment 5S: BYPASS BUA Hydrog raph I I I I I I I I I I I I I I I I I 1 I I I I I I I - ❑Runoff` 41 1 13.88 cfs 1 1 1 1 1 1 I I I I I I I I I I - 1 1 i I 1 1 1 1 1 1 1 1 1 1 1 1 Type I 1 1 1 1 1 1 1 1 1 1 - 1 1 1 1 1 1 1 1 16-Iir 1 —' - 7 - r - '-25-Yeai R'ainfait=4-44"- - 3 1 1 1I I I I I I I I I I I I I I I I I Runoff Area=0.430 ac y = 11 11 tunoff Viol m 1$1 a 1 f u 2' 1 1 1 1 1 1 1 1 1 1 Runoff'Delpth=4.20" 1 1 1 1 1 1 1 1 1 1 Tc=5.01 m i nQ 1 1 I I _ 1 A 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 49 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.44 4.20 0.00 0.25 0.05 0.00 0.00 13.00 4.44 4.20 0.00 0.50 0.10 0.01 0.03 13.25 4.44 4.20 0.00 0.75 0.15 0.04 0.05 13.50 4.44 4.20 0.00 1.00 0.21 0.08 0.07 13.75 4.44 4.20 0.00 1.25 0.28 0.13 0.09 14.00 4.44 4.20 0.00 1.50 0.36 0.19 0.11 14.25 4.44 4.20 0.00 1.75 0.45 0.27 0.14 14.50 4.44 4.20 0.00 2.00 0.55 0.37 0.17 14.75 4.44 4.20 0.00 2.25 0.69 0.49 0.23 15.00 4.44 4.20 0.00 2.50 0.85 0.65 0.29 15.25 4.44 4.20 0.00 2.75 1.51 1.29 1.41 15.50 4.44 4.20 0.00 3.00 3.24 3.01 3.24 15.75 4.44 4.20 0.00 3.25 3.51 3.28 0.44 16.00 4.44 4.20 0.00 3.50 3.70 3.46 0.28 16.25 4.44 4.20 0.00 3.75 3.82 3.59 0.21 16.50 4.44 4.20 0.00 4.00 3.93 3.69 0.18 16.75 4.44 4.20 0.00 4.25 4.02 3.78 0.15 17.00 4.44 4.20 0.00 4.50 4.10 3.86 0.13 17.25 4.44 4.20 0.00 4.75 4.17 3.93 0.12 17.50 4.44 4.20 0.00 5.00 4.23 3.99 0.10 17.75 4.44 4.20 0.00 5.25 4.29 4.05 0.10 18.00 4.44 4.20 0.00 5.50 4.34 4.10 0.09 18.25 4.44 4.20 0.00 5.75 4.39 4.16 0.09 18.50 4.44 4.20 0.00 6.00 4.44 4.20 0.08 18.75 4.44 4.20 0.00 6.25 4.44 4.20 0.00 19.00 4.44 4.20 0.00 6.50 4.44 4.20 0.00 19.25 4.44 4.20 0.00 6.75 4.44 4.20 0.00 19.50 4.44 4.20 0.00 7.00 4.44 4.20 0.00 19.75 4.44 4.20 0.00 7.25 4.44 4.20 0.00 20.00 4.44 4.20 0.00 7.50 4.44 4.20 0.00 7.75 4.44 4.20 0.00 8.00 4.44 4.20 0.00 8.25 4.44 4.20 0.00 8.50 4.44 4.20 0.00 8.75 4.44 4.20 0.00 9.00 4.44 4.20 0.00 9.25 4.44 4.20 0.00 9.50 4.44 4.20 0.00 9.75 4.44 4.20 0.00 10.00 4.44 4.20 0.00 10.25 4.44 4.20 0.00 10.50 4.44 4.20 0.00 10.75 4.44 4.20 0.00 11.00 4.44 4.20 0.00 11.25 4.44 4.20 0.00 11.50 4.44 4.20 0.00 11.75 4.44 4.20 0.00 12.00 4.44 4.20 0.00 12.25 4.44 4.20 0.00 12.50 4.44 4.20 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type II 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 50 Summary for Pond 2P: FOREBAY Inflow Area = 5.000 ac, 0.00% Impervious, Inflow Depth = 3.24" for 25-Year event Inflow = 35.31 cfs @ 3.00 hrs, Volume= 1.349 af Outflow = 6.14 cfs @ 3.26 hrs, Volume= 0.806 af, Atten= 83%, Lag= 15.8 min Primary = 6.12 cfs @ 3.26 hrs, Volume= 0.779 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.26 hrs, Volume= 0.027 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 554.22'@ 3.26 hrs Surf.Area= 13,591 sf Storage= 38,187 cf Plug-Flow detention time=203.3 min calculated for 0.806 af(60% of inflow) Center-of-Mass det. time= 175.4 min ( 375.2 - 199.9 ) Volume Invert Avail.Storage Storage Description #1 550.00' 69,077 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 5,499 0 0 551.00 7,059 6,279 6,279 552.00 8,674 7,867 14,146 553.00 10,345 9,510 23,655 554.00 12,788 11,567 35,222 555.00 16,358 14,573 49,795 556.00 22,207 19,283 69,077 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round 24" RCP Outfall L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 549.50'/ 549.00' S= 0.0059 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 553.00' 24.0" W x 12.0" H Vert. 10 YR. ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 554.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 550.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 2 550.00' 6.0" Round 6" Underdrain to Sand L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 550.00'/ 549.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.20 sf #6 Tertiary 555.00' 20.0' long + 3.0 '/' SideZ x 28.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 51 Primary OutFlow Max=6.06 cfs © 3.26 hrs HW=554.22' TW=0.00' (Dynamic Tailwater) L1=24" RCP Outfall (Passes 6.06 cfs of 29.19 cfs potential flow) 2=10 YR. ORIFICE (Passes 0.54 cfs of 8.01 cfs potential flow) L5=6" Underdrain to Sand (Outlet Controls 0.54 cfs © 2.74 fps) 3=TOP OF OUTLET STRUCTURE(Weir Controls 5.52 cfs @ 1.55 fps) Secondary OutFlow Max=0.02 cfs © 3.26 hrs HW=554.22' TW=550.00' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph I I I I I I I I I I I I I I I I I I / J I_ LIL11IL1LILIL1LIL ■Inflow / / / ® L aaI��pp���_I - Prima• ry / / / / - - 1- 1 - 1- rt - 1- -r -1- �Iorf ' T'"`"� �1" - •Secondary 66 rr `,'p l - Tertiary 38 / / / rR EIr��F .�� 36 / / / / / 1 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 1 1 34 / / / -11 1 -I 1 -[ 1 4 1 -H Storage 38,1 Frei 32 / / / / / - - 1 - 1- t - I- -t - I- t -I- t -I- t -I- t -I - t -I - I- - 30 / / / / / T - 1 - 1- T - I- T - 1- T -1- T -I- T -I- T -1 - T -I - T - 28 / / / / / I 1 I I I I I I I I _ 24 / / / / / J - 1 - 1- L - I- 1 - I- L -1- L -I_ I _I- L -1 - L -I - L - fi22 / / / / / - - 1 - 1- -I - 1- 4 - I- 4 -1- 4 -1- -L -1- -1 - -1 - I- - 320 / / / / / -I - I I- t - I- -f - I- t -I- t -I- t -I- t -I - t -I - I- - 0 18 / Iøiiiiiiii " 16 / / / / / 14 / / / 6.14 cfs — — 12 / / / / / I6.12c1s 1 — 1— _I - 1- L -1_ L -1- L -1- J 10 / / / / y „. 4,A 0.00fs I cfs �� ///'v / 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 52 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 0.00 0.50 0.00 0 550.00 0.00 0.00 0.00 0.00 1.00 0.00 0 550.00 0.00 0.00 0.00 0.00 1.50 0.16 73 550.01 0.00 0.00 0.00 0.00 2.00 0.65 765 550.14 0.00 0.00 0.00 0.00 2.50 1.71 2,756 550.47 0.00 0.00 0.00 0.00 3.00 35.29 24,721 553.10 0.17 0.16 0.02 0.00 3.50 3.44 37,467 554.17 4.27 4.24 0.02 0.00 4.00 2.01 36,558 554.10 2.26 2.24 0.02 0.00 4.50 1.51 36,220 554.08 1.65 1.63 0.02 0.00 5.00 1.18 35,997 554.06 1.30 1.27 0.02 0.00 5.50 1.03 35,849 554.05 1.08 1.06 0.02 0.00 6.00 0.93 35,765 554.04 0.97 0.95 0.02 0.00 6.50 0.00 34,966 553.98 0.50 0.48 0.02 0.00 7.00 0.00 34,076 553.91 0.49 0.46 0.02 0.00 7.50 0.00 33,218 553.84 0.47 0.45 0.02 0.00 8.00 0.00 32,393 553.77 0.45 0.43 0.02 0.00 8.50 0.00 31,602 553.71 0.43 0.41 0.02 0.00 9.00 0.00 30,845 553.65 0.41 0.39 0.02 0.00 9.50 0.00 30,122 553.58 0.39 0.37 0.02 0.00 10.00 0.00 29,434 553.53 0.37 0.35 0.02 0.00 10.50 0.00 28,782 553.47 0.35 0.33 0.02 0.00 11.00 0.00 28,166 553.42 0.33 0.31 0.02 0.00 11.50 0.00 27,586 553.36 0.31 0.29 0.02 0.00 12.00 0.00 27,043 553.32 0.29 0.27 0.02 0.00 12.50 0.00 26,537 553.27 0.27 0.25 0.02 0.00 13.00 0.00 26,069 553.23 0.25 0.23 0.02 0.00 13.50 0.00 25,639 553.19 0.23 0.21 0.02 0.00 14.00 0.00 25,248 553.15 0.21 0.19 0.02 0.00 14.50 0.00 24,897 553.12 0.18 0.17 0.02 0.00 15.00 0.00 24,585 553.09 0.16 0.15 0.02 0.00 15.50 0.00 24,324 553.06 0.12 0.10 0.02 0.00 16.00 0.00 24,144 553.05 0.08 0.07 0.02 0.00 16.50 0.00 24,020 553.04 0.06 0.04 0.02 0.00 17.00 0.00 23,929 553.03 0.04 0.03 0.02 0.00 17.50 0.00 23,860 553.02 0.03 0.02 0.02 0.00 18.00 0.00 23,805 553.01 0.03 0.01 0.02 0.00 18.50 0.00 23,760 553.01 0.02 0.01 0.02 0.00 19.00 0.00 23,723 553.01 0.02 0.00 0.02 0.00 19.50 0.00 23,690 553.00 0.02 0.00 0.02 0.00 20.00 0.00 23,660 553.00 0.02 0.00 0.02 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 53 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 0.00 550.20 0.00 0.00 0.00 0.00 550.40 0.00 0.00 0.00 0.00 550.60 0.00 0.00 0.00 0.00 550.80 0.00 0.00 0.00 0.00 551.00 0.01 0.00 0.01 0.00 551.20 0.01 0.00 0.01 0.00 551.40 0.01 0.00 0.01 0.00 551.60 0.01 0.00 0.01 0.00 551.80 0.01 0.00 0.01 0.00 552.00 0.01 0.00 0.01 0.00 552.20 0.01 0.00 0.01 0.00 552.40 0.01 0.00 0.01 0.00 552.60 0.01 0.00 0.01 0.00 552.80 0.01 0.00 0.01 0.00 553.00 0.02 0.00 0.02 0.00 553.20 0.23 0.22 0.02 0.00 553.40 0.33 0.31 0.02 0.00 553.60 0.40 0.38 0.02 0.00 553.80 0.46 0.44 0.02 0.00 554.00 0.51 0.49 0.02 0.00 554.20 5.24 5.21 0.02 0.00 554.40 13.84 13.81 0.02 0.00 554.60 24.96 24.93 0.02 0.00 554.80 31.39 31.37 0.03 0.00 555.00 32.11 32.09 0.03 0.00 555.20 37.73 32.79 0.03 4.91 555.40 47.83 33.48 0.03 14.32 555.60 61.09 34.16 0.03 26.90 555.80 76.26 34.82 0.03 41.41 556.00 94.42 35.48 0.03 58.91 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 54 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 5,499 0 555.10 16,943 51,460 550.10 5,655 558 555.20 17,528 53,183 550.20 5,811 1,131 555.30 18,113 54,965 550.30 5,967 1,720 555.40 18,698 56,806 550.40 6,123 2,324 555.50 19,283 58,705 550.50 6,279 2,945 555.60 19,867 60,662 550.60 6,435 3,580 555.70 20,452 62,678 550.70 6,591 4,232 555.80 21,037 64,753 550.80 6,747 4,898 555.90 21,622 66,886 550.90 6,903 5,581 556.00 22,207 69,077 551.00 7,059 6,279 551.10 7,221 6,993 551.20 7,382 7,723 551.30 7,543 8,469 551.40 7,705 9,232 551.50 7,867 10,010 551.60 8,028 10,805 551.70 8,190 11,616 551.80 8,351 12,443 551.90 8,512 13,286 552.00 8,674 14,146 552.10 8,841 15,021 552.20 9,008 15,914 552.30 9,175 16,823 552.40 9,342 17,749 552.50 9,510 18,691 552.60 9,677 19,651 552.70 9,844 20,627 552.80 10,011 21,619 552.90 10,178 22,629 553.00 10,345 23,655 553.10 10,589 24,702 553.20 10,834 25,773 553.30 11,078 26,868 553.40 11,322 27,988 553.50 11,567 29,133 553.60 11,811 30,302 553.70 12,055 31,495 553.80 12,299 32,713 553.90 12,544 33,955 554.00 12,788 35,222 554.10 13,145 36,518 554.20 13,502 37,851 554.30 13,859 39,219 554.40 14,216 40,622 554.50 14,573 42,062 554.60 14,930 43,537 , 554.70 15,287 45,048 554.80 15,644 46,594 554.90 16,001 48,177 555.00 16,358 49,795 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 55 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.26 hrs, Volume= 0.027 af Outflow = 0.02 cfs @ 3.26 hrs, Volume= 0.027 af, Atten= 0%, Lag= 0.0 min Primary = 0.02 cfs @ 3.26 hrs, Volume= 0.027 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 550.00'@ 0.00 hrs Surf.Area= 913 sf Storage= 0 cf Plug-Flow detention time=0.0 min calculated for 0.027 af(100% of inflow) Center-of-Mass det. time=0.0 min ( 647.3 - 647.3 ) Volume Invert Avail.Storage Storage Description #1 550.00' 15,158 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 550.00 913 0 0 551.00 1,309 1,111 1,111 552.00 1,776 1,543 2,654 553.00 2,221 1,999 4,652 554.00 5,933 4,077 8,729 555.00 6,925 6,429 15,158 Device Routing Invert Outlet Devices #1 Primary 549.50' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 3.26 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Passes 0.00 cfs of 0.07 cfs potential flow) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 56 Pond 3P: SAND FILTER Hydrograph 1 1 1 1 1 1 - t I 1 t 1 -F H 1 t 1 -[ ± I - ■Inflow 1 I 10.02cfs , 1 1 1 1 1 I I 1 I I 1 1 1 Primary 0.024_ �O.O2 s �%��� 1 Feak1�11ev=1556.00r %0.022� =i1 1- rt - � -/1 - / 0.02 i- StorQY-e�-0-c - ' 1= 1 0.018 /T I T i � I /0.016- )- - - - L —1 — 1 - 1- -1 - L //////////////// - i lI I I I I I N _ 0.014� - i c 0.012i/ /1- - 1 _1LI _L _H1 1 _11_ 1 - LL - / I I I 1 1 1 1 1 ' 1 0.01 1 1 1 I I 1 1 1 1 0.008 / k j 1- -I - I- -I - -k - I- -I - -I- 4 - I- -I - -I- -[ - I- -I - - / I I '1 I I I 1 1 1 I I I I I 1 0.006� I I I - i 0.004 /I- -1 I H 1- I + t I -F H 1 t 1 -[ 1- - 1 I I I I I 1 I I I I I I I 1 0.0021 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 57 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 550.00 0.00 0.50 0.00 0 550.00 0.00 1.00 0.00 0 550.00 0.00 1.50 0.00 0 550.00 0.00 2.00 0.00 0 550.00 0.00 2.50 0.00 0 550.00 0.00 3.00 0.02 0 550.00 0.02 3.50 0.02 0 550.00 0.02 4.00 0.02 0 550.00 0.02 4.50 0.02 0 550.00 0.02 5.00 0.02 0 550.00 0.02 5.50 0.02 0 550.00 0.02 6.00 0.02 0 550.00 0.02 6.50 0.02 0 550.00 0.02 7.00 0.02 0 550.00 0.02 7.50 0.02 0 550.00 0.02 8.00 0.02 0 550.00 0.02 8.50 0.02 0 550.00 0.02 9.00 0.02 0 550.00 0.02 9.50 0.02 0 550.00 0.02 10.00 0.02 0 550.00 0.02 10.50 0.02 0 550.00 0.02 11.00 0.02 0 550.00 0.02 11.50 0.02 0 550.00 0.02 12.00 0.02 0 550.00 0.02 12.50 0.02 0 550.00 0.02 13.00 0.02 0 550.00 0.02 13.50 0.02 0 550.00 0.02 14.00 0.02 0 550.00 0.02 14.50 0.02 0 550.00 0.02 15.00 0.02 0 550.00 0.02 15.50 0.02 0 550.00 0.02 16.00 0.02 0 550.00 0.02 16.50 0.02 0 550.00 0.02 17.00 0.02 0 550.00 0.02 17.50 0.02 0 550.00 0.02 18.00 0.02 0 550.00 0.02 18.50 0.02 0 550.00 0.02 19.00 0.02 0 550.00 0.02 19.50 0.02 0 550.00 0.02 20.00 0.02 0 550.00 0.02 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 58 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 550.00 0.00 552.55 0.37 550.05 0.07 552.60 0.38 550.10 0.08 552.65 0.38 550.15 0.09 552.70 0.38 550.20 0.09 552.75 0.39 550.25 0.10 552.80 0.39 550.30 0.10 552.85 0.40 550.35 0.11 552.90 0.40 550.40 0.12 552.95 0.40 550.45 0.12 553.00 0.41 550.50 0.13 553.05 0.41 550.55 0.14 553.10 0.42 550.60 0.14 553.15 0.42 550.65 0.15 553.20 0.43 550.70 0.16 553.25 0.43 550.75 0.16 553.30 0.43 550.80 0.17 553.35 0.44 550.85 0.18 553.40 0.44 550.90 0.18 553.45 0.45 550.95 0.19 553.50 0.45 551.00 0.20 553.55 0.45 551.05 0.20 553.60 0.46 551.10 0.21 553.65 0.46 551.15 0.22 553.70 0.47 551.20 0.22 553.75 0.47 551.25 0.23 553.80 0.47 551.30 0.24 553.85 0.48 551.35 0.24 553.90 0.48 551.40 0.25 553.95 0.49 551.45 0.26 554.00 0.49 551.50 0.26 554.05 0.50 551.55 0.27 554.10 0.50 551.60 0.27 554.15 0.50 551.65 0.28 554.20 0.51 551.70 0.29 554.25 0.51 551.75 0.29 554.30 0.52 551.80 0.30 554.35 0.52 551.85 0.31 554.40 0.52 551.90 0.31 554.45 0.53 551.95 0.32 554.50 0.53 552.00 0.33 554.55 0.54 552.05 0.33 554.60 0.54 552.10 0.34 554.65 0.54 552.15 0.34 554.70 0.55 552.20 0.34 554.75 0.55 552.25 0.35 554.80 0.56 552.30 0.35 554.85 0.56 552.35 0.36 554.90 0.56 552.40 0.36 554.95 0.57 552.45 0.36 555.00 0.57 552.50 0.37 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 59 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 913 0 552.55 2,021 3,698 550.05 933 46 552.60 2,043 3,799 550.10 953 93 552.65 2,065 3,902 550.15 972 141 , 552.70 2,088 4,006 550.20 992 191 552.75 2,110 4,111 550.25 1,012 241 552.80 2,132 4,217 550.30 1,032 292 552.85 2,154 4,324 550.35 1,052 344 552.90 2,176 4,432 550.40 1,071 397 552.95 2,199 4,542 550.45 1,091 451 553.00 2,221 4,652 550.50 1,111 506 553.05 2,407 4,768 550.55 1,131 562 553.10 2,592 4,893 550.60 1,151 619 553.15 2,778 5,027 550.65 1,170 677 553.20 2,963 5,170 550.70 1,190 736 553.25 3,149 5,323 550.75 1,210 796 553.30 3,335 5,485 550.80 1,230 857 553.35 3,520 5,657 550.85 1,250 919 553.40 3,706 5,837 550.90 1,269 982 553.45 3,891 6,027 550.95 1,289 1,046 553.50 4,077 6,227 551.00 1,309 1,111 553.55 4,263 6,435 551.05 1,332 1,177 553.60 4,448 6,653 551.10 1,356 1,244 553.65 4,634 6,880 551.15 1,379 1,313 553.70 4,819 7,116 551.20 1,402 1,382 553.75 5,005 7,362 551.25 1,426 1,453 553.80 5,191 7,617 551.30 1,449 1,525 553.85 5,376 7,881 551.35 1,472 1,598 553.90 5,562 8,154 551.40 1,496 1,672 553.95 5,747 8,437 551.45 1,519 1,747 554.00 5,933 8,729 551.50 1,543 1,824 554.05 5,983 9,027 551.55 1,566 1,902 554.10 6,032 9,327 551.60 1,589 1,980 554.15 6,082 9,630 551.65 1,613 2,061 554.20 6,131 9,935 551.70 1,636 2,142 554.25 6,181 10,243 551.75 1,659 2,224 554.30 6,231 10,554 551.80 1,683 2,308 554.35 6,280 10,866 551.85 1,706 2,392 554.40 6,330 11,182 551.90 1,729 2,478 554.45 6,379 11,499 551.95 1,753 2,565 554.50 6,429 11,820 552.00 1,776 2,654 554.55 6,479 12,142 552.05 1,798 2,743 554.60 6,528 12,467 552.10 1,821 2,833 554.65 6,578 12,795 552.15 1,843 2,925 554.70 6,627 13,125 552.20 1,865 3,018 554.75 6,677 13,458 552.25 1,887 3,111 554.80 6,727 13,793 552.30 1,909 3,206 554.85 6,776 14,130 552.35 1,932 3,302 554.90 6,826 14,470 552.40 1,954 3,399 554.95 6,875 14,813 552.45 1,976 3,498 555.00 6,925 15,158 552.50 1,999 3,597 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 60 Summary for Pond 4P: TOTAL Inflow Area = 5.430 ac, 7.92% Impervious, Inflow Depth > 2.11" for 25-Year event Inflow = 6.57 cfs @ 3.26 hrs, Volume= 0.957 af Primary = 6.57 cfs @ 3.26 hrs, Volume= 0.957 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph I I I I� I I I I I I I I i ❑ Inflow 1 7:/ I L°57 cfs I 1 1 1 1 ❑Primary z I657cfs i — Inflow Area=--.43-0 // / I — T — I— — — T — I— — - 1 I— T — T —I— TI - 1 —I— T - 5 I I 1 I I 1 T I I L I _1 L I J LI _L I I I I I 0 4 �� 1 1 I I I 1 1 o -I- /� 1 1 T — 1— T — T 1- - 3 1 1 1 1 1 1 1 1 1 1 2 0- /- "r"di /////// 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 25-Year Rainfall=4.44" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 61 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.26 0.26 0.25 0.00 0.00 13.00 0.25 0.25 0.50 0.03 0.03 13.25 0.24 0.24 0.75 0.05 0.05 13.50 0.23 0.23 1.00 0.07 0.07 13.75 0.22 0.22 1.25 0.09 0.09 14.00 0.21 0.21 1.50 0.11 0.11 I 14.25 0.20 0.20 1.75 0.14 0.14 14.50 0.18 0.18 2.00 0.17 0.17 14.75 0.17 0.17 2.25 0.23 0.23 ' 15.00 0.16 0.16 2.50 0.30 0.30 15.25 0.15 0.15 2.75 1.42 1.42 15.50 0.12 0.12 3.00 3.41 3.41 ' 15.75 0.10 0.10 3.25 6.57 6.57 16.00 0.08 0.08 3.50 4.55 4.55 16.25 0.07 0.07 3.75 3.07 3.07 16.50 0.06 0.06 4.00 2.44 2.44 16.75 0.05 0.05 4.25 2.05 2.05 17.00 0.04 0.04 4.50 1.78 1.78 17.25 0.04 0.04 4.75 1.57 1.57 17.50 0.03 0.03 5.00 1.40 1.40 17.75 0.03 0.03 5.25 1.26 1.26 18.00 0.03 0.03 5.50 1.18 1.18 18.25 0.02 0.02 5.75 1.11 1.11 18.50 0.02 0.02 6.00 1.06 1.06 18.75 0.02 0.02 6.25 0.62 0.62 19.00 0.02 0.02 6.50 0.50 0.50 19.25 0.02 0.02 6.75 0.49 0.49 19.50 0.02 0.02 7.00 0.49 0.49 19.75 0.02 0.02 7.25 0.48 0.48 20.00 0.02 0.02 7.50 0.47 0.47 7.75 0.46 0.46 8.00 0.45 0.45 8.25 0.44 0.44 8.50 0.43 0.43 8.75 0.42 0.42 9.00 0.41 0.41 9.25 0.40 0.40 9.50 0.39 0.39 9.75 0.38 0.38 10.00 0.37 0.37 10.25 0.36 0.36 10.50 0.35 0.35 10.75 0.34 0.34 11.00 0.33 0.33 11.25 0.32 0.32 11.50 0.31 0.31 11.75 0.30 0.30 12.00 0.29 0.29 12.25 0.28 0.28 12.50 0.27 0.27 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 62 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=3.26" Tc=10.0 min CN=84 Runoff=34.36 cfs 1.359 of SubcatchmentlS: POST TO SAND FILTER C Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=3.76" Tc=8.5 min CN=89 Runoff=40.66 cfs 1.568 af Subcatchment5S: BYPASS BUA Runoff Area=0.430 ac 100.00% Impervious Runoff Depth=4.75" Tc=5.0 min CN=98 Runoff=4.37 cfs 0.170 af Pond 2P: FOREBAY Peak Elev=554.40' Storage=40,673 cf Inflow=40.66 cfs 1.568 af Primary=13.98 cfs 0.998 af Secondary=0.02 cfs 0.027 af Tertiary=0.00 cfs 0.000 af Outflow=14.01 cfs 1.024 af Pond 3P: SAND FILTER Peak EIev=550.00' Storage=0 cf Inflow=0.02 cfs 0.027 af Outflow=0.02 cfs 0.027 af Pond 4P: TOTAL Inflow=14.62 cfs 1.195 af Primary=14.62 cfs 1.195 af Total Runoff Area = 10.430 ac Runoff Volume = 3.097 af Average Runoff Depth = 3.56" 95.88% Pervious = 10.000 ac 4.12% Impervious = 0.430 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 63 Summary for Subcatchment OS: PRE - DEVELOPMENT TOWNS Runoff = 34.36 cfs @ 3.01 hrs, Volume= 1.359 af, Depth= 3.26" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.99" Area (ac) CN Description 5.000 84 Pasture/grassland/range, Fair, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment OS: PRE - DEVELOPMENT TOWNS Hydrograph H - t - I- -V - 1- I - -1 - 1- - I- -I - H - H -I- - 38� � - - H - -h - I- -I - H - ♦- - I I -I - H - 4 - I- -I - 4 - 4 -I- - ■Runoff 36i-/ _ - 34.36 cfs I - I— —1 — 4 — I— —1— —I — + — I— —1 — 4 — H — 1— —I — 4 — 1 —I— - 344/ ,- -1- H I - -I - 4 - 1- -I- H - + - I- -I - H - 4 - I- -I - -+TypeIH - 32+/ _1_ H I - -I - 4 - 1- -1- H - + - 4 -I - H - 4 - 1- -I - 4 - H -I- - 30 I _ - - I- -I - 4 - 1- -I- -I - H - -I - 4 H - I I 4 �-hr - 28 .- -1- - - 1- -1 4 I 1- - H 50 Yea! R'airifaH=4-99" - 264-/ -I- - 1 1 - -I - 4 - 1- -I- H - - I- -I - 4 - 4 -- I- -I - � , _1H p 4 - H -I- - 24 1 - 1- -I - 4 - 1- -1- -I - - I- �unO1�Fuu Area`&000- c - 20 „ -II- _ 1- -11 . 4 . 1- -II- _ _ _ _ _ o#f V�o- - -7 .3. .7-a - 0 18� ,_ -1 -I - I -I - 4 - I- -1 -I - H - -I Runtaf Depth.&�n LT. 16: ,_ I H - 1 I - 4 - 1- -I -I - H - -I - 4 - H - I- -I - 4 -nI -I- - 144-z , -I- -I - I- -I - -V - 1- -I- -I - -L - I- -I - - - 1- - ITc 1L.-VI--rnhin - 12 ,_ I -I , - I- I 4 i_ I 4 H - -I - 4 - H - I- -I - 10� ,_ I - r 1 4 i_ 1 4 H 1 4 H 1 I 4� 4 - 8i-/ _I- - I- -I - 4 - 1- -I- -I - -L - 1- -I - H - H- - I- -I - H- - I- -I- - 6; I _ 1 1 11_ - I - I- I _LLI- -I _LI - 4� I I . 1_ _ 1 1 - 1 4,.." ' �/ //l�//�i /��//�/ �/fir //���/�� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 64 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT TOWNS Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.99 3.26 0.00 0.25 0.06 0.00 0.00 13.00 4.99 3.26 0.00 0.50 0.11 0.00 0.00 13.25 4.99 3.26 0.00 0.75 0.17 0.00 0.00 13.50 4.99 3.26 0.00 1.00 0.24 0.00 0.00 13.75 4.99 3.26 0.00 1.25 0.32 0.00 0.00 14.00 4.99 3.26 0.00 1.50 0.40 0.00 0.00 14.25 4.99 3.26 0.00 1.75 0.50 0.01 0.12 14.50 4.99 3.26 0.00 2.00 0.62 0.03 0.36 14.75 4.99 3.26 0.00 2.25 0.77 0.07 0.73 15.00 4.99 3.26 0.00 2.50 0.96 0.14 1.32 15.25 4.99 3.26 0.00 2.75 1.70 0.54 6.61 15.50 4.99 3.26 0.00 3.00 3.64 2.06 34.02 15.75 4.99 3.26 0.00 3.25 3.95 2.33 7.60 16.00 4.99 3.26 0.00 3.50 4.15 2.51 3.86 16.25 4.99 3.26 0.00 3.75 4.30 2.63 2.64 16.50 4.99 3.26 0.00 4.00 4.41 2.74 2.20 16.75 4.99 3.26 0.00 4.25 4.52 2.83 1.87 17.00 4.99 3.26 0.00 4.50 4.61 2.91 1.65 17.25 4.99 3.26 0.00 4.75 4.68 2.98 1.45 17.50 4.99 3.26 0.00 5.00 4.75 3.05 1.29 17.75 4.99 3.26 0.00 5.25 4.82 3.10 1.18 18.00 4.99 3.26 0.00 5.50 4.88 3.16 1.12 18.25 4.99 3.26 0.00 5.75 4.94 3.21 1.07 18.50 4.99 3.26 0.00 6.00 4.99 3.26 1.01 18.75 4.99 3.26 0.00 6.25 4.99 3.26 0.10 19.00 4.99 3.26 0.00 6.50 4.99 3.26 0.00 19.25 4.99 3.26 0.00 6.75 4.99 3.26 0.00 19.50 4.99 3.26 0.00 7.00 4.99 3.26 0.00 19.75 4.99 3.26 0.00 7.25 4.99 3.26 0.00 20.00 4.99 3.26 0.00 7.50 4.99 3.26 0.00 7.75 4.99 3.26 0.00 8.00 4.99 3.26 0.00 8.25 4.99 3.26 0.00 8.50 4.99 3.26 0.00 8.75 4.99 3.26 0.00 9.00 4.99 3.26 0.00 9.25 4.99 3.26 0.00 9.50 4.99 3.26 0.00 9.75 4.99 3.26 0.00 10.00 4.99 3.26 0.00 10.25 4.99 3.26 0.00 10.50 4.99 3.26 0.00 10.75 4.99 3.26 0.00 11.00 4.99 3.26 0.00 11.25 4.99 3.26 0.00 11.50 4.99 3.26 0.00 11.75 4.99 3.26 0.00 12.00 4.99 3.26 0.00 12.25 4.99 3.26 0.00 12.50 4.99 3.26 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 1S: POST TO SAND FILTER C Runoff = 40.66 cfs @ 3.00 hrs, Volume= 1.568 af, Depth= 3.76" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.99" Area (ac) CN Description * 5.000 89 48% IMPERVIOUS, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.5 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER C Hydrograph 1 1 1 I I 1 1 1 1 1 I 444-/ , I I I I I I I I 1 I 1 1 I 1 1 I ■Runoff 42 ,— -1— I40.66 cfs I —I - 4 — i— -I- -I — T — I- -1 - 4 - 4 — I- -I - 4 — I- -I- - 40 ,— —1— - — - - I- -1- - - H - 1- -1 - H - '7 — I— —I — tType 1 II — 384/ — —1— I — 7 - 1— -I- 7 — T — I- -I - 7 — T — I- -I — T — T —I- — 364/4 , — — — ��I� 34 ,_ _I_ AA_9 32� ,_ _I_ 1 e_ 1 I I 1 I I 1 50-Y RIairifai=4 9 .. _ 30 — 1 I I L L I L L 1 p1 ��L L 1_ _I L L — I 28 , runoff Area`&000-ac - y 26 — I— I 1 4 1- 1 -I fi __1=_fir ` ^�_1-=1 .5 — u24 - 1— II4 � I � T �,��1QT�T YT"1��1P 3 22' p .,�y� ^ LL 20� — — — _Runt off — 184-/ — 1— 1 1 I I I I I I I I I I I I I _I 16 — I— L I I A L 1 J L 1— 1 A L 1 TC=SI1_f_hin 144-/ — 1- - — I 1 - 4 - 1— -1 4 — H — 1 - 4 — H - 1 —I — +� ai - 12� — —1— - 1 l� — I— —1 — H — 1— —I— - — H — I— —I — H — H — I— —I — fi 10� � — - II �/ — -I — T — T —I— T — T - - -1 — T — T — I- -I — T — T -1- - 8� — —1 — 6� - -1_ 1 — 1 1 1 1 1 1 1 1 1 1 — 1 — 1 1- - 4� _ �� 1 1 I _ 1 1 1 1 1 1 _ 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 66 Hydrograph for Subcatchment 1S: POST TO SAND FILTER C Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.99 3.76 0.00 0.25 0.06 0.00 0.00 13.00 4.99 3.76 0.00 0.50 0.11 0.00 0.00 13.25 4.99 3.76 0.00 0.75 0.17 0.00 0.00 13.50 4.99 3.76 0.00 1.00 0.24 0.00 0.00 13.75 4.99 3.76 0.00 1.25 0.32 0.00 0.07 14.00 4.99 3.76 0.00 1.50 0.40 0.02 0.27 14.25 4.99 3.76 0.00 1.75 0.50 0.04 0.53 14.50 4.99 3.76 0.00 2.00 0.62 0.09 0.86 14.75 4.99 3.76 0.00 2.25 0.77 0.16 1.36 15.00 4.99 3.76 0.00 2.50 0.96 0.26 2.11 15.25 4.99 3.76 0.00 2.75 1.70 0.78 10.08 15.50 4.99 3.76 0.00 3.00 3.64 2.49 40.62 15.75 4.99 3.76 0.00 3.25 3.95 2.78 6.90 16.00 4.99 3.76 0.00 3.50 4.15 2.97 3.91 16.25 4.99 3.76 0.00 3.75 4.30 3.10 2.73 16.50 4.99 3.76 0.00 4.00 4.41 3.21 2.29 16.75 4.99 3.76 0.00 4.25 4.52 3.31 1.95 17.00 4.99 3.76 0.00 4.50 4.61 3.40 1.72 17.25 4.99 3.76 0.00 4.75 4.68 3.47 1.51 17.50 4.99 3.76 0.00 5.00 4.75 3.54 1.34 17.75 4.99 3.76 0.00 5.25 4.82 3.60 1.23 18.00 4.99 3.76 0.00 5.50 4.88 3.66 1.17 18.25 4.99 3.76 0.00 5.75 4.94 3.71 1.11 18.50 4.99 3.76 0.00 6.00 4.99 3.76 1.05 18.75 4.99 3.76 0.00 6.25 4.99 3.76 0.06 19.00 4.99 3.76 0.00 6.50 4.99 3.76 0.00 19.25 4.99 3.76 0.00 6.75 4.99 3.76 0.00 19.50 4.99 3.76 0.00 7.00 4.99 3.76 0.00 19.75 4.99 3.76 0.00 7.25 4.99 3.76 0.00 20.00 4.99 3.76 0.00 7.50 4.99 3.76 0.00 7.75 4.99 3.76 0.00 8.00 4.99 3.76 0.00 8.25 4.99 3.76 0.00 8.50 4.99 3.76 0.00 8.75 4.99 3.76 0.00 9.00 4.99 3.76 0.00 9.25 4.99 3.76 0.00 9.50 4.99 3.76 0.00 9.75 4.99 3.76 0.00 10.00 4.99 3.76 0.00 10.25 4.99 3.76 0.00 10.50 4.99 3.76 0.00 10.75 4.99 3.76 0.00 11.00 4.99 3.76 0.00 11.25 4.99 3.76 0.00 11.50 4.99 3.76 0.00 11.75 4.99 3.76 0.00 12.00 4.99 3.76 0.00 12.25 4.99 3.76 0.00 12.50 4.99 3.76 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 67 Summary for Subcatchment 5S: BYPASS BUA Runoff = 4.37 cfs @ 2.95 hrs, Volume= 0.170 af, Depth= 4.75" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 50-Year Rainfall=4.99" Area (ac) CN Description * 0.430 98 BYPASS BUA 0.430 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 5S: BYPASS BUA Hydrograph I I I I - I I I I I I I ❑Runoff` 1 4.37 cfs I I 1 rI 1 1 I I 1 1 I I Type'u _ 41 1 I I I I I I 1 I I I I I I 1 16-hr ' I ' ' 50-Year R'airlfal'I=4.99" J _ 1 _ L _1 _ LE _ L _ I_ _I _ 1 _ I_ _1 _ LL1 _ 3. 1 11 1 I 1 1 Runoff Area=01.430 ac y - 1 1 1 1 i tunoff Viol m 0 1 0 a f 21 / 1 1 - ff nb 119 1 p# =4.7�.. - 1 H I I I I 1 Tc=5.01 mien . � L I 1 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 68 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 4.99 4.75 0.00 0.25 0.06 0.00 0.00 13.00 4.99 4.75 0.00 0.50 0.11 0.02 0.04 13.25 4.99 4.75 0.00 0.75 0.17 0.05 0.06 13.50 4.99 4.75 0.00 1.00 0.24 0.10 0.08 13.75 4.99 4.75 0.00 1.25 0.32 0.16 0.11 14.00 4.99 4.75 0.00 1.50 0.40 0.23 0.13 14.25 4.99 4.75 0.00 1.75 0.50 0.32 0.16 14.50 4.99 4.75 0.00 2.00 0.62 0.43 0.20 14.75 4.99 4.75 0.00 2.25 0.77 0.57 0.26 15.00 4.99 4.75 0.00 2.50 0.96 0.75 0.33 15.25 4.99 4.75 0.00 2.75 1.70 1.47 1.59 15.50 4.99 4.75 0.00 3.00 3.64 3.41 3.64 15.75 4.99 4.75 0.00 3.25 3.95 3.71 0.49 16.00 4.99 4.75 0.00 3.50 4.15 3.92 0.32 16.25 4.99 4.75 0.00 3.75 4.30 4.06 0.24 16.50 4.99 4.75 0.00 4.00 4.41 4.18 0.20 16.75 4.99 4.75 0.00 4.25 4.52 4.28 0.17 17.00 4.99 4.75 0.00 4.50 4.61 4.37 0.15 17.25 4.99 4.75 0.00 4.75 4.68 4.45 0.13 17.50 4.99 4.75 0.00 5.00 4.75 4.52 0.12 17.75 4.99 4.75 0.00 5.25 4.82 4.58 0.11 18.00 4.99 4.75 0.00 5.50 4.88 4.64 0.10 18.25 4.99 4.75 0.00 5.75 4.94 4.70 0.10 18.50 4.99 4.75 0.00 6.00 4.99 4.75 0.09 18.75 4.99 4.75 0.00 6.25 4.99 4.75 0.00 19.00 4.99 4.75 0.00 6.50 4.99 4.75 0.00 19.25 4.99 4.75 0.00 6.75 4.99 4.75 0.00 19.50 4.99 4.75 0.00 7.00 4.99 4.75 0.00 19.75 4.99 4.75 0.00 7.25 4.99 4.75 0.00 20.00 4.99 4.75 0.00 7.50 4.99 4.75 0.00 7.75 4.99 4.75 0.00 8.00 4.99 4.75 0.00 8.25 4.99 4.75 0.00 8.50 4.99 4.75 0.00 8.75 4.99 4.75 0.00 9.00 4.99 4.75 0.00 9.25 4.99 4.75 0.00 9.50 4.99 4.75 0.00 9.75 4.99 4.75 0.00 10.00 4.99 4.75 0.00 10.25 4.99 4.75 0.00 10.50 4.99 4.75 0.00 10.75 4.99 4.75 0.00 11.00 4.99 4.75 0.00 11.25 4.99 4.75 0.00 11.50 4.99 4.75 0.00 11.75 4.99 4.75 0.00 12.00 4.99 4.75 0.00 12.25 4.99 4.75 0.00 12.50 4.99 4.75 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type II 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 69 Summary for Pond 2P: FOREBAY Inflow Area = 5.000 ac, 0.00% Impervious, Inflow Depth = 3.76" for 50-Year event Inflow = 40.66 cfs @ 3.00 hrs, Volume= 1.568 af Outflow = 14.01 cfs @ 3.16 hrs, Volume= 1.024 af, Atten= 66%, Lag= 9.7 min Primary = 13.98 cfs @ 3.16 hrs, Volume= 0.998 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.16 hrs, Volume= 0.027 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 554.40'@ 3.16 hrs Surf.Area= 14,229 sf Storage= 40,673 cf Plug-Flow detention time= 168.2 min calculated for 1.024 af(65% of inflow) Center-of-Mass det. time= 141.7 min ( 340.5 - 198.8 ) Volume Invert Avail.Storage Storage Description #1 550.00' 69,077 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 5,499 0 0 551.00 7,059 6,279 6,279 552.00 8,674 7,867 14,146 553.00 10,345 9,510 23,655 554.00 12,788 11,567 35,222 555.00 16,358 14,573 49,795 556.00 22,207 19,283 69,077 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round 24" RCP Outfall L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 549.50'/ 549.00' S= 0.0059 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 553.00' 24.0" W x 12.0" H Vert. 10 YR. ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 554.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 550.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 2 550.00' 6.0" Round 6" Underdrain to Sand L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 550.00'/ 549.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.20 sf #6 Tertiary 555.00' 20.0' long + 3.0 '/' SideZ x 28.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 70 Primary OutFlow Max=13.69 cfs @ 3.16 hrs HW=554.40' TW=0.00' (Dynamic Tailwater) L1=24" RCP Outfall (Passes 13.69 cfs of 29.86 cfs potential flow) 2=10 YR. ORIFICE (Passes 0.58 cfs of 9.00 cfs potential flow) L5=6" Underdrain to Sand (Outlet Controls 0.58 cfs © 2.93 fps) 3=TOP OF OUTLET STRUCTURE(Weir Controls 13.12 cfs @ 2.06 fps) Secondary OutFlow Max=0.02 cfs © 3.16 hrs HW=554.40' TW=550.00' (Dynamic Tailwater) L4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) L6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph - 1 —1 1 —1 I t 1 t I t I L 1 L I 1— i / 1 1 1 1 I I I I I I I I I I I I ■Inflow 40.66 cfs_1T — 1— 7 — 1— T —I— T —I— T —I— T - - - ■Outflow 1 1 1 1 1 I I I1fllov� /area=�.�0� arc •SeconPrimadary 45� , ' / r •1 1 1 1 1 1 peak)ElleV1=5154�.40' Tertiary - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - - i 40 -/ , ' / 1 1 1 1 1 1 1 1 Storage=40,673 of _ , 35� , ._ _i - - I- _ I_ 7 - 1- _L -1- _I_ T -1- -1 - -1 - I - / I 1 1 I I 1 1 1 I I I 1 1 1 I : i / 301/ / / — -I — — I— t — 1— rt — I— t —1— t —1— t —1— t —1 — t —1 — r — - ' / , 1 1 , 1 1 1 1 1 , 1 1 1 1 1 L ' 25� ' / 1 1 1 , 1 1 1 1 1 , 1 1 1 1 1 _ / / I LL4.0.1 cfs 1 I I I 1 1 1 I I I 1 1 1 I O 1/ / r 113.98 cfs LL 20_ / / 1 1 , I I I I I , I I I I I / �/r I_ L 1 1 I L I L I 1 I_ L —I L _1 _ L 15- , ' / ��tir‘l� 1 I I I 1 1 1 1 / / / 1o� %//%k�% % I 0.00 cfs ii/ f;'';,, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 71 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 0.00 0.50 0.00 0 550.00 0.00 0.00 0.00 0.00 1.00 0.00 0 550.00 0.00 0.00 0.00 0.00 1.50 0.27 166 550.03 0.00 0.00 0.00 0.00 2.00 0.86 1,139 550.20 0.00 0.00 0.00 0.00 2.50 2.11 3,659 550.61 0.00 0.00 0.00 0.00 3.00 40.62 29,390 553.52 0.37 0.35 0.02 0.00 3.50 3.91 37,774 554.19 5.04 5.02 0.02 0.00 4.00 2.29 36,707 554.11 2.56 2.54 0.02 0.00 4.50 1.72 36,345 554.09 1.87 1.84 0.02 0.00 5.00 1.34 36,106 554.07 1.46 1.44 0.02 0.00 5.50 1.17 35,950 554.06 1.23 1.20 0.02 0.00 6.00 1.05 35,862 554.05 1.10 1.08 0.02 0.00 6.50 0.00 35,016 553.98 0.50 0.48 0.02 0.00 7.00 0.00 34,123 553.91 0.49 0.47 0.02 0.00 7.50 0.00 33,263 553.84 0.47 0.45 0.02 0.00 8.00 0.00 32,437 553.78 0.45 0.43 0.02 0.00 8.50 0.00 31,644 553.71 0.43 0.41 0.02 0.00 9.00 0.00 30,885 553.65 0.41 0.39 0.02 0.00 9.50 0.00 30,160 553.59 0.39 0.37 0.02 0.00 10.00 0.00 29,471 553.53 0.37 0.35 0.02 0.00 10.50 0.00 28,817 553.47 0.35 0.33 0.02 0.00 11.00 0.00 28,198 553.42 0.33 0.31 0.02 0.00 11.50 0.00 27,616 553.37 0.31 0.29 0.02 0.00 12.00 0.00 27,071 553.32 0.29 0.27 0.02 0.00 12.50 0.00 26,563 553.27 0.27 0.25 0.02 0.00 13.00 0.00 26,093 553.23 0.25 0.23 0.02 0.00 13.50 0.00 25,661 553.19 0.23 0.21 0.02 0.00 14.00 0.00 25,268 553.15 0.21 0.19 0.02 0.00 14.50 0.00 24,915 553.12 0.19 0.17 0.02 0.00 15.00 0.00 24,601 553.09 0.16 0.15 0.02 0.00 15.50 0.00 24,336 553.07 0.12 0.11 0.02 0.00 16.00 0.00 24,153 553.05 0.08 0.07 0.02 0.00 16.50 0.00 24,026 553.04 0.06 0.04 0.02 0.00 17.00 0.00 23,933 553.03 0.04 0.03 0.02 0.00 17.50 0.00 23,863 553.02 0.03 0.02 0.02 0.00 18.00 0.00 23,808 553.01 0.03 0.01 0.02 0.00 18.50 0.00 23,762 553.01 0.02 0.01 0.02 0.00 19.00 0.00 23,724 553.01 0.02 0.00 0.02 0.00 19.50 0.00 23,691 553.00 0.02 0.00 0.02 0.00 20.00 0.00 23,661 553.00 0.02 0.00 0.02 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 72 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 0.00 550.20 0.00 0.00 0.00 0.00 550.40 0.00 0.00 0.00 0.00 550.60 0.00 0.00 0.00 0.00 550.80 0.00 0.00 0.00 0.00 551.00 0.01 0.00 0.01 0.00 551.20 0.01 0.00 0.01 0.00 551.40 0.01 0.00 0.01 0.00 551.60 0.01 0.00 0.01 0.00 551.80 0.01 0.00 0.01 0.00 552.00 0.01 0.00 0.01 0.00 552.20 0.01 0.00 0.01 0.00 552.40 0.01 0.00 0.01 0.00 552.60 0.01 0.00 0.01 0.00 552.80 0.01 0.00 0.01 0.00 553.00 0.02 0.00 0.02 0.00 553.20 0.23 0.22 0.02 0.00 553.40 0.33 0.31 0.02 0.00 553.60 0.40 0.38 0.02 0.00 553.80 0.46 0.44 0.02 0.00 554.00 0.51 0.49 0.02 0.00 554.20 5.24 5.21 0.02 0.00 554.40 13.84 13.81 0.02 0.00 554.60 24.96 24.93 0.02 0.00 554.80 31.39 31.37 0.03 0.00 555.00 32.11 32.09 0.03 0.00 555.20 37.73 32.79 0.03 4.91 555.40 47.83 33.48 0.03 14.32 555.60 61.09 34.16 0.03 26.90 555.80 76.26 34.82 0.03 41.41 556.00 94.42 35.48 0.03 58.91 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 73 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 5,499 0 555.10 16,943 51,460 550.10 5,655 558 555.20 17,528 53,183 550.20 5,811 1,131 555.30 18,113 54,965 550.30 5,967 1,720 555.40 18,698 56,806 550.40 6,123 2,324 555.50 19,283 58,705 550.50 6,279 2,945 555.60 19,867 60,662 550.60 6,435 3,580 555.70 20,452 62,678 550.70 6,591 4,232 555.80 21,037 64,753 550.80 6,747 4,898 555.90 21,622 66,886 550.90 6,903 5,581 556.00 22,207 69,077 551.00 7,059 6,279 551.10 7,221 6,993 551.20 7,382 7,723 551.30 7,543 8,469 551.40 7,705 9,232 551.50 7,867 10,010 551.60 8,028 10,805 551.70 8,190 11,616 551.80 8,351 12,443 551.90 8,512 13,286 552.00 8,674 14,146 552.10 8,841 15,021 552.20 9,008 15,914 552.30 9,175 16,823 552.40 9,342 17,749 552.50 9,510 18,691 552.60 9,677 19,651 552.70 9,844 20,627 552.80 10,011 21,619 552.90 10,178 22,629 553.00 10,345 23,655 553.10 10,589 24,702 553.20 10,834 25,773 553.30 11,078 26,868 553.40 11,322 27,988 553.50 11,567 29,133 553.60 11,811 30,302 553.70 12,055 31,495 553.80 12,299 32,713 553.90 12,544 33,955 554.00 12,788 35,222 554.10 13,145 36,518 554.20 13,502 37,851 554.30 13,859 39,219 554.40 14,216 40,622 554.50 14,573 42,062 554.60 14,930 43,537 , 554.70 15,287 45,048 554.80 15,644 46,594 554.90 16,001 48,177 555.00 16,358 49,795 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 74 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.16 hrs, Volume= 0.027 af Outflow = 0.02 cfs @ 3.16 hrs, Volume= 0.027 af, Atten= 0%, Lag= 0.0 min Primary = 0.02 cfs @ 3.16 hrs, Volume= 0.027 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 550.00'@ 0.00 hrs Surf.Area= 913 sf Storage= 0 cf Plug-Flow detention time=(not calculated: outflow precedes inflow) Center-of-Mass det. time=0.0 min ( 644.9 - 644.9 ) Volume Invert Avail.Storage Storage Description #1 550.00' 15,158 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 550.00 913 0 0 551.00 1,309 1,111 1,111 552.00 1,776 1,543 2,654 553.00 2,221 1,999 4,652 554.00 5,933 4,077 8,729 555.00 6,925 6,429 15,158 Device Routing Invert Outlet Devices #1 Primary 549.50' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 3.16 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Passes 0.00 cfs of 0.07 cfs potential flow) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 75 Pond 3P: SAND FILTER Hydrograph 7;1— _ I I I I I I I I I ■Inflow 0.026 0.02 cfs ❑Primary 0022 e C ln550. % 1 1 . ''' '''''' I 1 c 0 018 / - - / 1 I I I I I 0.016� /- - 1 I N 0.014� -h 1 - -I - t - I- -I - t -I- - -I- -h - I- -1 3 - / 1 1 I I 1 1 I 1 1 17- 0.012� I 0.011:-./ - -1 — T T T T T T T — T 1 - / - z I 1 I I I I I 0.006i-z - 1 1 1 1 1 1 1- 0.004 / k / 1 + - t I -F H -I t I -1 1- I - 0.0021 T 1 1 1 1 1 1 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 76 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 550.00 0.00 0.50 0.00 0 550.00 0.00 1.00 0.00 0 550.00 0.00 1.50 0.00 0 550.00 0.00 2.00 0.00 0 550.00 0.00 2.50 0.00 0 550.00 0.00 3.00 0.02 0 550.00 0.02 3.50 0.02 0 550.00 0.02 4.00 0.02 0 550.00 0.02 4.50 0.02 0 550.00 0.02 5.00 0.02 0 550.00 0.02 5.50 0.02 0 550.00 0.02 6.00 0.02 0 550.00 0.02 6.50 0.02 0 550.00 0.02 7.00 0.02 0 550.00 0.02 7.50 0.02 0 550.00 0.02 8.00 0.02 0 550.00 0.02 8.50 0.02 0 550.00 0.02 9.00 0.02 0 550.00 0.02 9.50 0.02 0 550.00 0.02 10.00 0.02 0 550.00 0.02 10.50 0.02 0 550.00 0.02 11.00 0.02 0 550.00 0.02 11.50 0.02 0 550.00 0.02 12.00 0.02 0 550.00 0.02 12.50 0.02 0 550.00 0.02 13.00 0.02 0 550.00 0.02 13.50 0.02 0 550.00 0.02 14.00 0.02 0 550.00 0.02 14.50 0.02 0 550.00 0.02 15.00 0.02 0 550.00 0.02 15.50 0.02 0 550.00 0.02 16.00 0.02 0 550.00 0.02 16.50 0.02 0 550.00 0.02 17.00 0.02 0 550.00 0.02 17.50 0.02 0 550.00 0.02 18.00 0.02 0 550.00 0.02 18.50 0.02 0 550.00 0.02 19.00 0.02 0 550.00 0.02 19.50 0.02 0 550.00 0.02 20.00 0.02 0 550.00 0.02 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 77 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 550.00 0.00 552.55 0.37 550.05 0.07 552.60 0.38 550.10 0.08 552.65 0.38 550.15 0.09 552.70 0.38 550.20 0.09 552.75 0.39 550.25 0.10 552.80 0.39 550.30 0.10 552.85 0.40 550.35 0.11 552.90 0.40 550.40 0.12 552.95 0.40 550.45 0.12 553.00 0.41 550.50 0.13 553.05 0.41 550.55 0.14 553.10 0.42 550.60 0.14 553.15 0.42 550.65 0.15 553.20 0.43 550.70 0.16 553.25 0.43 550.75 0.16 553.30 0.43 550.80 0.17 553.35 0.44 550.85 0.18 553.40 0.44 550.90 0.18 553.45 0.45 550.95 0.19 553.50 0.45 551.00 0.20 553.55 0.45 551.05 0.20 553.60 0.46 551.10 0.21 553.65 0.46 551.15 0.22 553.70 0.47 551.20 0.22 553.75 0.47 551.25 0.23 553.80 0.47 551.30 0.24 553.85 0.48 551.35 0.24 553.90 0.48 551.40 0.25 553.95 0.49 551.45 0.26 554.00 0.49 551.50 0.26 554.05 0.50 551.55 0.27 554.10 0.50 551.60 0.27 554.15 0.50 551.65 0.28 554.20 0.51 551.70 0.29 554.25 0.51 551.75 0.29 554.30 0.52 551.80 0.30 554.35 0.52 551.85 0.31 554.40 0.52 551.90 0.31 554.45 0.53 551.95 0.32 554.50 0.53 552.00 0.33 554.55 0.54 552.05 0.33 554.60 0.54 552.10 0.34 554.65 0.54 552.15 0.34 554.70 0.55 552.20 0.34 554.75 0.55 552.25 0.35 554.80 0.56 552.30 0.35 554.85 0.56 552.35 0.36 554.90 0.56 552.40 0.36 554.95 0.57 552.45 0.36 555.00 0.57 552.50 0.37 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 78 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 913 0 552.55 2,021 3,698 550.05 933 46 552.60 2,043 3,799 550.10 953 93 552.65 2,065 3,902 550.15 972 141 , 552.70 2,088 4,006 550.20 992 191 552.75 2,110 4,111 550.25 1,012 241 552.80 2,132 4,217 550.30 1,032 292 552.85 2,154 4,324 550.35 1,052 344 552.90 2,176 4,432 550.40 1,071 397 552.95 2,199 4,542 550.45 1,091 451 553.00 2,221 4,652 550.50 1,111 506 553.05 2,407 4,768 550.55 1,131 562 553.10 2,592 4,893 550.60 1,151 619 553.15 2,778 5,027 550.65 1,170 677 553.20 2,963 5,170 550.70 1,190 736 553.25 3,149 5,323 550.75 1,210 796 553.30 3,335 5,485 550.80 1,230 857 553.35 3,520 5,657 550.85 1,250 919 553.40 3,706 5,837 550.90 1,269 982 553.45 3,891 6,027 550.95 1,289 1,046 553.50 4,077 6,227 551.00 1,309 1,111 553.55 4,263 6,435 551.05 1,332 1,177 553.60 4,448 6,653 551.10 1,356 1,244 553.65 4,634 6,880 551.15 1,379 1,313 553.70 4,819 7,116 551.20 1,402 1,382 553.75 5,005 7,362 551.25 1,426 1,453 553.80 5,191 7,617 551.30 1,449 1,525 553.85 5,376 7,881 551.35 1,472 1,598 553.90 5,562 8,154 551.40 1,496 1,672 553.95 5,747 8,437 551.45 1,519 1,747 554.00 5,933 8,729 551.50 1,543 1,824 554.05 5,983 9,027 551.55 1,566 1,902 554.10 6,032 9,327 551.60 1,589 1,980 554.15 6,082 9,630 551.65 1,613 2,061 554.20 6,131 9,935 551.70 1,636 2,142 554.25 6,181 10,243 551.75 1,659 2,224 554.30 6,231 10,554 551.80 1,683 2,308 554.35 6,280 10,866 551.85 1,706 2,392 554.40 6,330 11,182 551.90 1,729 2,478 554.45 6,379 11,499 551.95 1,753 2,565 554.50 6,429 11,820 552.00 1,776 2,654 554.55 6,479 12,142 552.05 1,798 2,743 554.60 6,528 12,467 552.10 1,821 2,833 554.65 6,578 12,795 552.15 1,843 2,925 554.70 6,627 13,125 552.20 1,865 3,018 554.75 6,677 13,458 552.25 1,887 3,111 554.80 6,727 13,793 552.30 1,909 3,206 554.85 6,776 14,130 552.35 1,932 3,302 554.90 6,826 14,470 552.40 1,954 3,399 554.95 6,875 14,813 552.45 1,976 3,498 555.00 6,925 15,158 552.50 1,999 3,597 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 79 Summary for Pond 4P: TOTAL Inflow Area = 5.430 ac, 7.92% Impervious, Inflow Depth > 2.64" for 50-Year event Inflow = 14.62 cfs @ 3.16 hrs, Volume= 1.195 af Primary = 14.62 cfs @ 3.16 hrs, Volume= 1.195 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph 1 1 1 1 1 I I I I I I I 1 ■Inflow 16 v , /— I L14.62 cfs /�I El Primary 15 , - 2—1114.6 fs 1 I Inflow Area=5.4aO ac 13v 4 1 I I I 1 1 I I I 1 1 1 I 12v r —1 — I 1 + 1 1 rt 1 I + 1 1 rt 1 —I - 11� A— I I— —1 — + - - -I — + - 1- -I — + — I- -1 — + - 1— —I- 4 — — —I - 4 — I- -I - 4 — I- -I - 4 — I— -1 - 13, 10I I I I I I I �8� ,7� '� I 16-Y 5 -/ rt4y %` — + H1 + — I I + 1I + I1 + 1I - ��/� 4 — I— —I — 4 — 1— —I - 4 - I— —I — 4 — I— —I — 4 — I— —I 4 III/�I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 50-Year Rainfall=4.99" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 80 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.26 0.26 0.25 0.00 0.00 13.00 0.25 0.25 0.50 0.04 0.04 13.25 0.24 0.24 0.75 0.06 0.06 13.50 0.23 0.23 1.00 0.08 0.08 13.75 0.22 0.22 1.25 0.11 0.11 14.00 0.21 0.21 1.50 0.13 0.13 I 14.25 0.20 0.20 1.75 0.16 0.16 14.50 0.19 0.19 2.00 0.20 0.20 14.75 0.17 0.17 2.25 0.26 0.26 15.00 0.16 0.16 2.50 0.34 0.34 15.25 0.15 0.15 2.75 1.60 1.60 15.50 0.12 0.12 3.00 4.01 4.01 15.75 0.10 0.10 3.25 10.85 10.85 16.00 0.08 0.08 3.50 5.36 5.36 16.25 0.07 0.07 3.75 3.48 3.48 16.50 0.06 0.06 4.00 2.76 2.76 16.75 0.05 0.05 4.25 2.31 2.31 17.00 0.04 0.04 4.50 2.02 2.02 17.25 0.04 0.04 4.75 1.78 1.78 17.50 0.03 0.03 5.00 1.58 1.58 I 17.75 0.03 0.03 5.25 1.42 1.42 18.00 0.03 0.03 5.50 1.33 1.33 18.25 0.02 0.02 5.75 1.26 1.26 18.50 0.02 0.02 6.00 1.19 1.19 18.75 0.02 0.02 6.25 0.68 0.68 19.00 0.02 0.02 6.50 0.50 0.50 19.25 0.02 0.02 6.75 0.50 0.50 19.50 0.02 0.02 7.00 0.49 0.49 19.75 0.02 0.02 7.25 0.48 0.48 20.00 0.02 0.02 7.50 0.47 0.47 7.75 0.46 0.46 8.00 0.45 0.45 8.25 0.44 0.44 8.50 0.43 0.43 8.75 0.42 0.42 9.00 0.41 0.41 9.25 0.40 0.40 9.50 0.39 0.39 9.75 0.38 0.38 10.00 0.37 0.37 10.25 0.36 0.36 10.50 0.35 0.35 10.75 0.34 0.34 11.00 0.33 0.33 11.25 0.32 0.32 11.50 0.31 0.31 11.75 0.30 0.30 12.00 0.29 0.29 12.25 0.28 0.28 12.50 0.27 0.27 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 81 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method SubcatchmentOS: PRE- DEVELOPMENT Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=3.78" Tc=10.0 min CN=84 Runoff=39.54 cfs 1.574 of SubcatchmentlS: POST TO SAND FILTER C Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=4.30" Tc=8.5 min CN=89 Runoff=46.10 cfs 1.792 af Subcatchment5S: BYPASS BUA Runoff Area=0.430 ac 100.00% Impervious Runoff Depth=5.31" Tc=5.0 min CN=98 Runoff=4.86 cfs 0.190 af Pond 2P: FOREBAY Peak Elev=554.57' Storage=43,102 cf Inflow=46.10 cfs 1.792 af Primary=23.09 cfs 1.222 af Secondary=0.02 cfs 0.027 af Tertiary=0.00 cfs 0.000 af Outflow=23.11 cfs 1.249 af Pond 3P: SAND FILTER Peak Elev=550.00' Storage=0 cf Inflow=0.02 cfs 0.027 af Outflow=0.02 cfs 0.027 af Pond 4P: TOTAL Inflow=23.95 cfs 1.439 af Primary=23.95 cfs 1.439 af Total Runoff Area = 10.430 ac Runoff Volume = 3.556 af Average Runoff Depth = 4.09" 95.88% Pervious = 10.000 ac 4.12% Impervious = 0.430 ac DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 82 Summary for Subcatchment OS: PRE - DEVELOPMENT TOWNS Runoff = 39.54 cfs @ 3.01 hrs, Volume= 1.574 af, Depth= 3.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.55" Area (ac) CN Description 5.000 84 Pasture/grassland/range, Fair, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment OS: PRE - DEVELOPMENT TOWNS Hydrograph 7 — r r — r - rt - fi - I- -I - rt - r -1- — 44 — — 7 1 1 7 1 1— r r 42� — _ — — r — — 7 — 7 —I _ ■Runoff 40� — — 13ss fs 38 _1_ 1 1 1 1 1 1 1 1 1 1 1 I1ypeln _ 364/ , —I— - — 1 — L —I— _I — L — I— —I — I — I — I— —1 — 1 —� -�,6,_1— — 34 - -I- I - -I - 7 - 1_ -I- H - I - I- -I - I - I - I- -1 - I - IV1111r _ 32 —I— + - — + — —I- + — + - 100--Yeat RaihfaH=1&55L - 304/ - — — - — rt - r -1- - fi - 1- -1 - rt - - 1- -1 - rt - r -1- - 28 - 1- 171717T1 -R'ulmofifArea=511a0-ac - 26 221/ 1 1 1 1 1 1 I I __I_ _ `i1-1--__ I _ .0 Ir 3 14. 22� ��Qp�� vyQ��^�P �7 ff 164 1- - - 1 1 - 7 - I -1- - - + - -1 - - - + - I14:1=7-- -min — 14 — 1 I 1 - 7 - 1— -I- 7 fi 1 1 H - 4 — I 1 H — w 12 7 1 1 7 1 1 7 1 7 1 1 7 10 � 8� —1— 1 9 I I I I I I I 1 1 I I 1 1 I I I I I 44 1 1ef 1 1 1 1 1 1 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 83 Hydrograph for Subcatchment OS: PRE - DEVELOPMENT TOWNS Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.55 3.78 0.00 0.25 0.06 0.00 0.00 13.00 5.55 3.78 0.00 0.50 0.13 0.00 0.00 13.25 5.55 3.78 0.00 0.75 0.19 0.00 0.00 13.50 5.55 3.78 0.00 1.00 0.27 0.00 0.00 13.75 5.55 3.78 0.00 1.25 0.35 0.00 0.00 14.00 5.55 3.78 0.00 1.50 0.45 0.00 0.03 14.25 5.55 3.78 0.00 1.75 0.56 0.02 0.23 14.50 5.55 3.78 0.00 2.00 0.69 0.04 0.53 14.75 5.55 3.78 0.00 2.25 0.86 0.09 0.97 15.00 5.55 3.78 0.00 2.50 1.07 0.18 1.67 15.25 5.55 3.78 0.00 2.75 1.89 0.66 7.99 15.50 5.55 3.78 0.00 3.00 4.05 2.42 39.20 15.75 5.55 3.78 0.00 3.25 4.39 2.72 8.65 16.00 5.55 3.78 0.00 3.50 4.62 2.92 4.37 16.25 5.55 3.78 0.00 3.75 4.78 3.07 2.98 16.50 5.55 3.78 0.00 4.00 4.91 3.19 2.49 16.75 5.55 3.78 0.00 4.25 5.02 3.29 2.12 17.00 5.55 3.78 0.00 4.50 5.12 3.38 1.86 17.25 5.55 3.78 0.00 4.75 5.21 3.46 1.64 17.50 5.55 3.78 0.00 5.00 5.29 3.53 1.46 17.75 5.55 3.78 0.00 5.25 5.36 3.60 1.33 18.00 5.55 3.78 0.00 5.50 5.43 3.66 1.27 18.25 5.55 3.78 0.00 5.75 5.49 3.72 1.20 18.50 5.55 3.78 0.00 6.00 5.55 3.78 1.14 18.75 5.55 3.78 0.00 6.25 5.55 3.78 0.12 19.00 5.55 3.78 0.00 6.50 5.55 3.78 0.00 19.25 5.55 3.78 0.00 6.75 5.55 3.78 0.00 19.50 5.55 3.78 0.00 7.00 5.55 3.78 0.00 19.75 5.55 3.78 0.00 7.25 5.55 3.78 0.00 20.00 5.55 3.78 0.00 7.50 5.55 3.78 0.00 7.75 5.55 3.78 0.00 8.00 5.55 3.78 0.00 8.25 5.55 3.78 0.00 8.50 5.55 3.78 0.00 8.75 5.55 3.78 0.00 9.00 5.55 3.78 0.00 9.25 5.55 3.78 0.00 9.50 5.55 3.78 0.00 9.75 5.55 3.78 0.00 10.00 5.55 3.78 0.00 10.25 5.55 3.78 0.00 10.50 5.55 3.78 0.00 10.75 5.55 3.78 0.00 11.00 5.55 3.78 0.00 11.25 5.55 3.78 0.00 11.50 5.55 3.78 0.00 11.75 5.55 3.78 0.00 12.00 5.55 3.78 0.00 12.25 5.55 3.78 0.00 12.50 5.55 3.78 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 84 Summary for Subcatchment 1S: POST TO SAND FILTER C Runoff = 46.10 cfs @ 3.00 hrs, Volume= 1.792 af, Depth= 4.30" Routed to Pond 2P : FOREBAY Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.55" Area (ac) CN Description 5.000 89 48% IMPERVIOUS, HSG D 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.5 Direct Entry, STORM SEWERS CALC Subcatchment 1S: POST TO SAND FILTER C Hydrograph I i I I 1 1 1 1 1 1 I — 501/ I 4 4 4 4 1 _ 4 4 4 I 4 4 I - ■Runoff 484-/ -1- 146.1ocrs 1 - I- -1 - rt - r -1- 4 - 7 - 1- -I - rt - fi - I- -1 - rt - r -1- — 46 44� — Type ry el11 424-/ - -I— 4 — 1 1 4 4 I— 4 4 1 4 4 I I 4 I - 404-/ -1- -1 - 1- -1 - rt - r -1- - fi - 1- -1 - rt - -p -1 - -r - 38 I- 1 I I I I 11 00--Y@at RlairifaN=5,5-5"32 -1- -1 - 1- -1 - rt - 1- -I- - fi - I- -RUnoffArea=5tOOO-ae - 30 o 28= 26; 24 -I- - fi - 1- -1- - fi - I- -I offIDel th 4i3r — LL 22 -/ - - 20 - 4 - - -1 - 4 - 1- -1- -1 - - I- -I - 4 - -4 - I-LIC=OZl--lhiq - a 14 1 I I 1 1 1 1 1 1 1 �12 I- 10 -I I - I- -I - - 1- -I- - - I- -I - - - I- -I - - -I- 4 81/, - -1- r- 1 1r1Hfi - 1 r1 1fir1 - -hill! (��iiiiiiiiiiiiiiiiiiiiiiiii� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 85 Hydrograph for Subcatchment 1S: POST TO SAND FILTER C Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.55 4.30 0.00 0.25 0.06 0.00 0.00 13.00 5.55 4.30 0.00 0.50 0.13 0.00 0.00 13.25 5.55 4.30 0.00 0.75 0.19 0.00 0.00 13.50 5.55 4.30 0.00 1.00 0.27 0.00 0.00 13.75 5.55 4.30 0.00 1.25 0.35 0.01 0.15 14.00 5.55 4.30 0.00 1.50 0.45 0.03 0.39 14.25 5.55 4.30 0.00 1.75 0.56 0.06 0.70 14.50 5.55 4.30 0.00 2.00 0.69 0.12 1.08 14.75 5.55 4.30 0.00 2.25 0.86 0.20 1.67 15.00 5.55 4.30 0.00 2.50 1.07 0.33 2.53 15.25 5.55 4.30 0.00 2.75 1.89 0.93 11.77 15.50 5.55 4.30 0.00 3.00 4.05 2.87 46.03 15.75 5.55 4.30 0.00 3.25 4.39 3.19 7.77 16.00 5.55 4.30 0.00 3.50 4.62 3.41 4.40 16.25 5.55 4.30 0.00 3.75 4.78 3.56 3.07 16.50 5.55 4.30 0.00 4.00 4.91 3.69 2.57 16.75 5.55 4.30 0.00 4.25 5.02 3.79 2.19 17.00 5.55 4.30 0.00 4.50 5.12 3.89 1.92 17.25 5.55 4.30 0.00 4.75 5.21 3.97 1.70 17.50 5.55 4.30 0.00 5.00 5.29 4.05 1.51 17.75 5.55 4.30 0.00 5.25 5.36 4.12 1.38 18.00 5.55 4.30 0.00 5.50 5.43 4.18 1.31 18.25 5.55 4.30 0.00 5.75 5.49 4.24 1.25 18.50 5.55 4.30 0.00 6.00 5.55 4.30 1.18 18.75 5.55 4.30 0.00 6.25 5.55 4.30 0.06 19.00 5.55 4.30 0.00 6.50 5.55 4.30 0.00 19.25 5.55 4.30 0.00 6.75 5.55 4.30 0.00 19.50 5.55 4.30 0.00 7.00 5.55 4.30 0.00 19.75 5.55 4.30 0.00 7.25 5.55 4.30 0.00 20.00 5.55 4.30 0.00 7.50 5.55 4.30 0.00 7.75 5.55 4.30 0.00 8.00 5.55 4.30 0.00 8.25 5.55 4.30 0.00 8.50 5.55 4.30 0.00 8.75 5.55 4.30 0.00 9.00 5.55 4.30 0.00 9.25 5.55 4.30 0.00 9.50 5.55 4.30 0.00 9.75 5.55 4.30 0.00 10.00 5.55 4.30 0.00 10.25 5.55 4.30 0.00 10.50 5.55 4.30 0.00 10.75 5.55 4.30 0.00 11.00 5.55 4.30 0.00 11.25 5.55 4.30 0.00 11.50 5.55 4.30 0.00 11.75 5.55 4.30 0.00 12.00 5.55 4.30 0.00 12.25 5.55 4.30 0.00 12.50 5.55 4.30 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 86 Summary for Subcatchment 5S: BYPASS BUA Runoff = 4.86 cfs @ 2.95 hrs, Volume= 0.190 af, Depth= 5.31" Routed to Pond 4P : TOTAL Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 6-hr 100-Year Rainfall=5.55" Area (ac) CN Description * 0.430 98 BYPASS BUA 0.430 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, DIRECT Subcatchment 5S: BYPASS BUA Hydrog raph I 1 1 1 I I I I - 1 I 1 1 I i I I 1 I 1 I I I I _ ❑Runoff` 5-/ I I4.86CSI 1 I I 1 I 1 1 I I 1 I 1 1 I 1 1 . 1 1 1 1 I 1 1 1 1 1 1 1TfpeIII 1 1 1 1 1 fi / - 1 -1 - + - 1- -1 - -[ - -16-hr _ 4-"/ ' 1 ' 1 100-Yeas- Rairlfal'I=5.55" 1 1 1 1 1 I I 1 1 I 1 1 I I 1 I 11 Runoff Area=0A30 ac _ ' 3 1 I I`unoff V'ol 1 m l 1 0 a 1 f ' 1 ' 1 ' ' I Runoff'De'pth=5.31" 2-/ 1 1 I I 1 Tc=5.011 miinn - 1 1 1 1 I I C'I'=98 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 87 Hydrograph for Subcatchment 5S: BYPASS BUA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 12.75 5.55 5.31 0.00 0.25 0.06 0.00 0.01 13.00 5.55 5.31 0.00 0.50 0.13 0.02 0.05 13.25 5.55 5.31 0.00 0.75 0.19 0.06 0.07 13.50 5.55 5.31 0.00 1.00 0.27 0.12 0.10 13.75 5.55 5.31 0.00 1.25 0.35 0.19 0.12 14.00 5.55 5.31 0.00 1.50 0.45 0.27 0.15 14.25 5.55 5.31 0.00 1.75 0.56 0.37 0.18 14.50 5.55 5.31 0.00 2.00 0.69 0.50 0.22 14.75 5.55 5.31 0.00 2.25 0.86 0.65 0.29 15.00 5.55 5.31 0.00 2.50 1.07 0.86 0.37 15.25 5.55 5.31 0.00 2.75 1.89 1.66 1.78 15.50 5.55 5.31 0.00 3.00 4.05 3.82 4.05 15.75 5.55 5.31 0.00 3.25 4.39 4.16 0.55 16.00 5.55 5.31 0.00 3.50 4.62 4.38 0.36 16.25 5.55 5.31 0.00 3.75 4.78 4.54 0.27 16.50 5.55 5.31 0.00 4.00 4.91 4.67 0.22 16.75 5.55 5.31 0.00 4.25 5.02 4.79 0.19 17.00 5.55 5.31 0.00 4.50 5.12 4.88 0.17 17.25 5.55 5.31 0.00 4.75 5.21 4.97 0.15 17.50 5.55 5.31 0.00 5.00 5.29 5.05 0.13 17.75 5.55 5.31 0.00 5.25 5.36 5.12 0.12 18.00 5.55 5.31 0.00 5.50 5.43 5.19 0.12 18.25 5.55 5.31 0.00 5.75 5.49 5.25 0.11 18.50 5.55 5.31 0.00 6.00 5.55 5.31 0.10 18.75 5.55 5.31 0.00 6.25 5.55 5.31 0.00 19.00 5.55 5.31 0.00 6.50 5.55 5.31 0.00 19.25 5.55 5.31 0.00 6.75 5.55 5.31 0.00 19.50 5.55 5.31 0.00 7.00 5.55 5.31 0.00 19.75 5.55 5.31 0.00 7.25 5.55 5.31 0.00 20.00 5.55 5.31 0.00 7.50 5.55 5.31 0.00 7.75 5.55 5.31 0.00 8.00 5.55 5.31 0.00 8.25 5.55 5.31 0.00 8.50 5.55 5.31 0.00 8.75 5.55 5.31 0.00 9.00 5.55 5.31 0.00 9.25 5.55 5.31 0.00 9.50 5.55 5.31 0.00 9.75 5.55 5.31 0.00 10.00 5.55 5.31 0.00 10.25 5.55 5.31 0.00 10.50 5.55 5.31 0.00 10.75 5.55 5.31 0.00 11.00 5.55 5.31 0.00 11.25 5.55 5.31 0.00 11.50 5.55 5.31 0.00 11.75 5.55 5.31 0.00 12.00 5.55 5.31 0.00 12.25 5.55 5.31 0.00 12.50 5.55 5.31 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type II 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 88 Summary for Pond 2P: FOREBAY Inflow Area = 5.000 ac, 0.00% Impervious, Inflow Depth = 4.30" for 100-Year event Inflow = 46.10 cfs @ 3.00 hrs, Volume= 1.792 af Outflow = 23.11 cfs @ 3.12 hrs, Volume= 1.249 af, Atten= 50%, Lag= 7.3 min Primary = 23.09 cfs @ 3.12 hrs, Volume= 1.222 af Routed to Pond 4P : TOTAL Secondary= 0.02 cfs @ 3.12 hrs, Volume= 0.027 af Routed to Pond 3P : SAND FILTER Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 554.57'@ 3.12 hrs Surf.Area= 14,826 sf Storage= 43,102 cf Plug-Flow detention time= 142.2 min calculated for 1.246 af(70% of inflow) Center-of-Mass det. time= 119.1 min ( 317.0 - 197.9 ) Volume Invert Avail.Storage Storage Description #1 550.00' 69,077 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 550.00 5,499 0 0 551.00 7,059 6,279 6,279 552.00 8,674 7,867 14,146 553.00 10,345 9,510 23,655 554.00 12,788 11,567 35,222 555.00 16,358 14,573 49,795 556.00 22,207 19,283 69,077 Device Routing Invert Outlet Devices #1 Primary 549.50' 24.0" Round 24" RCP Outfall L= 85.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 549.50'/ 549.00' S= 0.0059 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 553.00' 24.0" W x 12.0" H Vert. 10 YR. ORIFICE C= 0.600 Limited to weir flow at low heads #3 Device 1 554.00' 48.0" x 48.0" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 550.00' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 2 550.00' 6.0" Round 6" Underdrain to Sand L= 30.0' CMP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 550.00'/ 549.50' S= 0.0167 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 0.20 sf #6 Tertiary 555.00' 20.0' long + 3.0 '/' SideZ x 28.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 89 Primary OutFlow Max=21.88 cfs @ 3.12 hrs HW=554.55' TW=0.00' (Dynamic Tailwater) 4-1=24" RCP Outfall (Passes 21.88 cfs of 30.44 cfs potential flow) 2=10 YR. ORIFICE (Passes 0.61 cfs of 9.77 cfs potential flow) 4-5=6" Underdrain to Sand (Outlet Controls 0.61 cfs © 3.09 fps) 3=TOP OF OUTLET STRUCTURE(Weir Controls 21.28 cfs @ 2.42 fps) Secondary OutFlow Max=0.02 cfs © 3.12 hrs HW=554.55' TW=550.00' (Dynamic Tailwater) 4-4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) Tertiary OutFlow Max=0.00 cfs © 0.00 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-6=EMERGENCY SPILLWAY( Controls 0.00 cfs) Pond 2P: FOREBAY Hydrograph - 1- 1 - 1- 1 - 1- _L _ i- 1 _1- I -I- 1 -I- I -1 - I -I - L - / I I I I I I I I I I I I I I ■Inflow // 46.10 •cfs ••Outflow , , ' 1 I I rif Ilow Psrea=5. 0 ap •SeconPrimadary /50� / ' ' 1 1 I 1 1 1 Peak1 E11ev1=5541.57' Tertiary / , ' - H - 1 + - 1- + -I- + -1- + -1- 1 1 + -I - I- - 45 / / 1 1 1 1 1 1 1 Storage=43,102 of 40� / - - - ' - 1 - 1- -1 - 4 I 4 1 -k I T I J- I I- 35" , ' 1 1 1 I I I I 1 1 I 1 1 I I / / _ 23.1.cfs ?, 30� —I23.osors I- T -1- T -1- T -1- T 1 L - _ 1 1 1 1 1 1 1 L 1 L3 25� / ' / 1 1 1 1 1 1 I I 1 1 1 1 1 0 LL : , , - - I1 - rt1rtIrt -.- 1 .- fi -1 fi1r 20-✓ 1 1 / 15:-/ ' 1 I I I 1 1 1 1 1 : ' / f' 10� 0.00 cfs / 0.02 cf� /�/�j/ 0 G//��G��G�C! 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 90 Hydrograph for Pond 2P: FOREBAY Time Inflow Storage Elevation Outflow Primary Secondary Tertiary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) (cfs) 0.00 0.00 0 550.00 0.00 0.00 0.00 0.00 0.50 0.00 0 550.00 0.00 0.00 0.00 0.00 1.00 0.00 0 550.00 0.00 0.00 0.00 0.00 1.50 0.39 298 550.05 0.00 0.00 0.00 0.00 2.00 1.08 1,578 550.28 0.00 0.00 0.00 0.00 2.50 2.53 4,659 550.76 0.00 0.00 0.00 0.00 3.00 46.03 34,207 553.92 0.49 0.47 0.02 0.00 3.50 4.40 38,011 554.21 5.66 5.64 0.02 0.00 4.00 2.57 36,851 554.13 2.86 2.84 0.02 0.00 4.50 1.92 36,464 554.10 2.09 2.06 0.02 0.00 5.00 1.51 36,210 554.08 1.63 1.61 0.02 0.00 5.50 1.31 36,046 554.06 1.37 1.35 0.02 0.00 6.00 1.18 35,953 554.06 1.23 1.21 0.02 0.00 6.50 0.00 35,058 553.99 0.51 0.48 0.02 0.00 7.00 0.00 34,164 553.92 0.49 0.47 0.02 0.00 7.50 0.00 33,302 553.85 0.47 0.45 0.02 0.00 8.00 0.00 32,474 553.78 0.45 0.43 0.02 0.00 8.50 0.00 31,680 553.72 0.43 0.41 0.02 0.00 9.00 0.00 30,919 553.65 0.41 0.39 0.02 0.00 9.50 0.00 30,193 553.59 0.39 0.37 0.02 0.00 10.00 0.00 29,502 553.53 0.37 0.36 0.02 0.00 10.50 0.00 28,846 553.48 0.35 0.34 0.02 0.00 11.00 0.00 28,226 553.42 0.33 0.32 0.02 0.00 11.50 0.00 27,642 553.37 0.31 0.30 0.02 0.00 12.00 0.00 27,095 553.32 0.29 0.28 0.02 0.00 12.50 0.00 26,586 553.27 0.27 0.26 0.02 0.00 13.00 0.00 26,114 553.23 0.25 0.23 0.02 0.00 13.50 0.00 25,680 553.19 0.23 0.21 0.02 0.00 14.00 0.00 25,286 553.15 0.21 0.19 0.02 0.00 14.50 0.00 24,930 553.12 0.19 0.17 0.02 0.00 15.00 0.00 24,615 553.09 0.16 0.15 0.02 0.00 15.50 0.00 24,346 553.07 0.13 0.11 0.02 0.00 16.00 0.00 24,160 553.05 0.08 0.07 0.02 0.00 16.50 0.00 24,031 553.04 0.06 0.04 0.02 0.00 17.00 0.00 23,937 553.03 0.04 0.03 0.02 0.00 17.50 0.00 23,866 553.02 0.03 0.02 0.02 0.00 18.00 0.00 23,810 553.01 0.03 0.01 0.02 0.00 18.50 0.00 23,764 553.01 0.02 0.01 0.02 0.00 19.00 0.00 23,726 553.01 0.02 0.00 0.02 0.00 19.50 0.00 23,693 553.00 0.02 0.00 0.02 0.00 20.00 0.00 23,663 553.00 0.02 0.00 0.02 0.00 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 91 Stage-Discharge for Pond 2P: FOREBAY Elevation Discharge Primary Secondary Tertiary (feet) (cfs) (cfs) (cfs) (cfs) 550.00 0.00 0.00 0.00 0.00 550.20 0.00 0.00 0.00 0.00 550.40 0.00 0.00 0.00 0.00 550.60 0.00 0.00 0.00 0.00 550.80 0.00 0.00 0.00 0.00 551.00 0.01 0.00 0.01 0.00 551.20 0.01 0.00 0.01 0.00 551.40 0.01 0.00 0.01 0.00 551.60 0.01 0.00 0.01 0.00 551.80 0.01 0.00 0.01 0.00 552.00 0.01 0.00 0.01 0.00 552.20 0.01 0.00 0.01 0.00 552.40 0.01 0.00 0.01 0.00 552.60 0.01 0.00 0.01 0.00 552.80 0.01 0.00 0.01 0.00 553.00 0.02 0.00 0.02 0.00 553.20 0.23 0.22 0.02 0.00 553.40 0.33 0.31 0.02 0.00 553.60 0.40 0.38 0.02 0.00 553.80 0.46 0.44 0.02 0.00 554.00 0.51 0.49 0.02 0.00 554.20 5.24 5.21 0.02 0.00 554.40 13.84 13.81 0.02 0.00 554.60 24.96 24.93 0.02 0.00 554.80 31.39 31.37 0.03 0.00 555.00 32.11 32.09 0.03 0.00 555.20 37.73 32.79 0.03 4.91 555.40 47.83 33.48 0.03 14.32 555.60 61.09 34.16 0.03 26.90 555.80 76.26 34.82 0.03 41.41 556.00 94.42 35.48 0.03 58.91 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 92 Stage-Area-Storage for Pond 2P: FOREBAY Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 5,499 0 555.10 16,943 51,460 550.10 5,655 558 555.20 17,528 53,183 550.20 5,811 1,131 555.30 18,113 54,965 550.30 5,967 1,720 555.40 18,698 56,806 550.40 6,123 2,324 555.50 19,283 58,705 550.50 6,279 2,945 555.60 19,867 60,662 550.60 6,435 3,580 555.70 20,452 62,678 550.70 6,591 4,232 555.80 21,037 64,753 550.80 6,747 4,898 555.90 21,622 66,886 550.90 6,903 5,581 556.00 22,207 69,077 551.00 7,059 6,279 551.10 7,221 6,993 551.20 7,382 7,723 551.30 7,543 8,469 551.40 7,705 9,232 551.50 7,867 10,010 551.60 8,028 10,805 551.70 8,190 11,616 551.80 8,351 12,443 551.90 8,512 13,286 552.00 8,674 14,146 552.10 8,841 15,021 552.20 9,008 15,914 552.30 9,175 16,823 552.40 9,342 17,749 552.50 9,510 18,691 552.60 9,677 19,651 552.70 9,844 20,627 552.80 10,011 21,619 552.90 10,178 22,629 553.00 10,345 23,655 553.10 10,589 24,702 553.20 10,834 25,773 553.30 11,078 26,868 553.40 11,322 27,988 553.50 11,567 29,133 553.60 11,811 30,302 553.70 12,055 31,495 553.80 12,299 32,713 553.90 12,544 33,955 554.00 12,788 35,222 554.10 13,145 36,518 554.20 13,502 37,851 554.30 13,859 39,219 554.40 14,216 40,622 554.50 14,573 42,062 554.60 14,930 43,537 , 554.70 15,287 45,048 554.80 15,644 46,594 554.90 16,001 48,177 555.00 16,358 49,795 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 93 Summary for Pond 3P: SAND FILTER Inflow = 0.02 cfs @ 3.12 hrs, Volume= 0.027 af Outflow = 0.02 cfs @ 3.12 hrs, Volume= 0.027 af, Atten= 0%, Lag= 0.0 min Primary = 0.02 cfs @ 3.12 hrs, Volume= 0.027 af Routed to Pond 4P : TOTAL Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 550.00'@ 0.00 hrs Surf.Area= 913 sf Storage= 0 cf Plug-Flow detention time=(not calculated: outflow precedes inflow) Center-of-Mass det. time=0.0 min ( 642.7 - 642.7 ) Volume Invert Avail.Storage Storage Description #1 550.00' 15,158 cf SAND FILTER STORAGE (Prismatic)isted below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 550.00 913 0 0 551.00 1,309 1,111 1,111 552.00 1,776 1,543 2,654 553.00 2,221 1,999 4,652 554.00 5,933 4,077 8,729 555.00 6,925 6,429 15,158 Device Routing Invert Outlet Devices #1 Primary 549.50' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.00 cfs @ 3.12 hrs HW=550.00' TW=0.00' (Dynamic Tailwater) 4-1=FILTER MEDIA (Passes 0.00 cfs of 0.07 cfs potential flow) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 94 Pond 3P: SAND FILTER Hydrograph 1 1 1 1 1 1 I I I I I I I I ■Inflow 0.026� A- -I - I o.oz cfs fi - 1- -1 - t -1- - r -I - fi -I- -I - t -1 - - ❑Primary / I o.ozl I ' 1 1 L f eak1 11ev=1J5►0.00, - 0.024: �I�// ��I' 1 1 1 1 1 1 1 /1�y 0.022� �i' i` toraMeC�C'f 0.02 ��� �i�' -I - - -i i i -I - I- -I - - /�ii /���i� �i��i�o��o�� 0.018 �o dr 0.016� /I I- - , - I 1 in 0.014� I_ ._ _I - 1 - I- -1 L _I_ _ -I- L - L -I 33 : / 1 I I I 1 1 I 1 o Li 0.012 / I HH - HHHH I I 0.01i/ fi -_ _ _ I 0.008� I I I d I I I I I I I 0.006 / / 1 1 I I I I I I I 1 - / 0.004i/ k - /' 1 -1 I- 1 + 1 4 I- I 1 -I I- - ' 1 1 1 I I I I I I I I I I I 1 0.0021 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 95 Hydrograph for Pond 3P: SAND FILTER Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 550.00 0.00 0.50 0.00 0 550.00 0.00 1.00 0.00 0 550.00 0.00 1.50 0.00 0 550.00 0.00 2.00 0.00 0 550.00 0.00 2.50 0.00 0 550.00 0.00 3.00 0.02 0 550.00 0.02 3.50 0.02 0 550.00 0.02 4.00 0.02 0 550.00 0.02 4.50 0.02 0 550.00 0.02 5.00 0.02 0 550.00 0.02 5.50 0.02 0 550.00 0.02 6.00 0.02 0 550.00 0.02 6.50 0.02 0 550.00 0.02 7.00 0.02 0 550.00 0.02 7.50 0.02 0 550.00 0.02 8.00 0.02 0 550.00 0.02 8.50 0.02 0 550.00 0.02 9.00 0.02 0 550.00 0.02 9.50 0.02 0 550.00 0.02 10.00 0.02 0 550.00 0.02 10.50 0.02 0 550.00 0.02 11.00 0.02 0 550.00 0.02 11.50 0.02 0 550.00 0.02 12.00 0.02 0 550.00 0.02 12.50 0.02 0 550.00 0.02 13.00 0.02 0 550.00 0.02 13.50 0.02 0 550.00 0.02 14.00 0.02 0 550.00 0.02 14.50 0.02 0 550.00 0.02 15.00 0.02 0 550.00 0.02 15.50 0.02 0 550.00 0.02 16.00 0.02 0 550.00 0.02 16.50 0.02 0 550.00 0.02 17.00 0.02 0 550.00 0.02 17.50 0.02 0 550.00 0.02 18.00 0.02 0 550.00 0.02 18.50 0.02 0 550.00 0.02 19.00 0.02 0 550.00 0.02 19.50 0.02 0 550.00 0.02 20.00 0.02 0 550.00 0.02 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 96 Stage-Discharge for Pond 3P: SAND FILTER Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 550.00 0.00 552.55 0.37 550.05 0.07 552.60 0.38 550.10 0.08 552.65 0.38 550.15 0.09 552.70 0.38 550.20 0.09 552.75 0.39 550.25 0.10 552.80 0.39 550.30 0.10 552.85 0.40 550.35 0.11 552.90 0.40 550.40 0.12 552.95 0.40 550.45 0.12 553.00 0.41 550.50 0.13 553.05 0.41 550.55 0.14 553.10 0.42 550.60 0.14 553.15 0.42 550.65 0.15 553.20 0.43 550.70 0.16 553.25 0.43 550.75 0.16 553.30 0.43 550.80 0.17 553.35 0.44 550.85 0.18 553.40 0.44 550.90 0.18 553.45 0.45 550.95 0.19 553.50 0.45 551.00 0.20 553.55 0.45 551.05 0.20 553.60 0.46 551.10 0.21 553.65 0.46 551.15 0.22 553.70 0.47 551.20 0.22 553.75 0.47 551.25 0.23 553.80 0.47 551.30 0.24 553.85 0.48 551.35 0.24 553.90 0.48 551.40 0.25 553.95 0.49 551.45 0.26 554.00 0.49 551.50 0.26 554.05 0.50 551.55 0.27 554.10 0.50 551.60 0.27 554.15 0.50 551.65 0.28 554.20 0.51 551.70 0.29 554.25 0.51 551.75 0.29 554.30 0.52 551.80 0.30 554.35 0.52 551.85 0.31 554.40 0.52 551.90 0.31 554.45 0.53 551.95 0.32 554.50 0.53 552.00 0.33 554.55 0.54 552.05 0.33 554.60 0.54 552.10 0.34 554.65 0.54 552.15 0.34 554.70 0.55 552.20 0.34 554.75 0.55 552.25 0.35 554.80 0.56 552.30 0.35 554.85 0.56 552.35 0.36 554.90 0.56 552.40 0.36 554.95 0.57 552.45 0.36 555.00 0.57 552.50 0.37 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 97 Stage-Area-Storage for Pond 3P: SAND FILTER Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 550.00 913 0 552.55 2,021 3,698 550.05 933 46 552.60 2,043 3,799 550.10 953 93 552.65 2,065 3,902 550.15 972 141 , 552.70 2,088 4,006 550.20 992 191 552.75 2,110 4,111 550.25 1,012 241 552.80 2,132 4,217 550.30 1,032 292 552.85 2,154 4,324 550.35 1,052 344 552.90 2,176 4,432 550.40 1,071 397 552.95 2,199 4,542 550.45 1,091 451 553.00 2,221 4,652 550.50 1,111 506 553.05 2,407 4,768 550.55 1,131 562 553.10 2,592 4,893 550.60 1,151 619 553.15 2,778 5,027 550.65 1,170 677 553.20 2,963 5,170 550.70 1,190 736 553.25 3,149 5,323 550.75 1,210 796 553.30 3,335 5,485 550.80 1,230 857 553.35 3,520 5,657 550.85 1,250 919 553.40 3,706 5,837 550.90 1,269 982 553.45 3,891 6,027 550.95 1,289 1,046 553.50 4,077 6,227 551.00 1,309 1,111 553.55 4,263 6,435 551.05 1,332 1,177 553.60 4,448 6,653 551.10 1,356 1,244 553.65 4,634 6,880 551.15 1,379 1,313 553.70 4,819 7,116 551.20 1,402 1,382 553.75 5,005 7,362 551.25 1,426 1,453 553.80 5,191 7,617 551.30 1,449 1,525 553.85 5,376 7,881 551.35 1,472 1,598 553.90 5,562 8,154 551.40 1,496 1,672 553.95 5,747 8,437 551.45 1,519 1,747 554.00 5,933 8,729 551.50 1,543 1,824 554.05 5,983 9,027 551.55 1,566 1,902 554.10 6,032 9,327 551.60 1,589 1,980 554.15 6,082 9,630 551.65 1,613 2,061 554.20 6,131 9,935 551.70 1,636 2,142 554.25 6,181 10,243 551.75 1,659 2,224 554.30 6,231 10,554 551.80 1,683 2,308 554.35 6,280 10,866 551.85 1,706 2,392 554.40 6,330 11,182 551.90 1,729 2,478 554.45 6,379 11,499 551.95 1,753 2,565 554.50 6,429 11,820 552.00 1,776 2,654 554.55 6,479 12,142 552.05 1,798 2,743 554.60 6,528 12,467 552.10 1,821 2,833 554.65 6,578 12,795 552.15 1,843 2,925 554.70 6,627 13,125 552.20 1,865 3,018 554.75 6,677 13,458 552.25 1,887 3,111 554.80 6,727 13,793 552.30 1,909 3,206 554.85 6,776 14,130 552.35 1,932 3,302 554.90 6,826 14,470 552.40 1,954 3,399 554.95 6,875 14,813 552.45 1,976 3,498 555.00 6,925 15,158 552.50 1,999 3,597 DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 98 Summary for Pond 4P: TOTAL Inflow Area = 5.430 ac, 7.92% Impervious, Inflow Depth > 3.18" for 100-Year event Inflow = 23.95 cfs @ 3.12 hrs, Volume= 1.439 af Primary = 23.95 cfs @ 3.12 hrs, Volume= 1.439 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph I I I I I I 1 1 i I I 1 1 I I I I I 1 1 I I I ■Inflow 26� � I 123.95 cfs I 1 I I I I I I I I - 0 Primary 241 ' 123.9�fs�' 1 4 - I- -I - - 1- i ETTTT�.4T-O-alcI I 1I -I — 1 101/ d 1 -r 1 rt 1 1 rt 1 - - g� 1 1 - i � I 1 1 1 I I 1 I J - 1 1 1 1 I I I 6-? . 1 1 1 I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DAVIS VILLAGE DAVIS VILLAGE SAND FILTER C 6.11.23 Type 11 6-hr 100-Year Rainfall=5.55" Prepared by Plott Hound Engineering PLLC Printed 6/21/2023 HydroCAD® 10.10-6a s/n 11998 ©2020 HydroCAD Software Solutions LLC Page 99 Hydrograph for Pond 4P: TOTAL Time Inflow Elevation Primary Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 12.75 0.26 0.26 0.25 0.01 0.01 13.00 0.25 0.25 0.50 0.05 0.05 13.25 0.24 0.24 0.75 0.07 0.07 13.50 0.23 0.23 1.00 0.10 0.10 13.75 0.22 0.22 1.25 0.12 0.12 14.00 0.21 0.21 1.50 0.15 0.15 14.25 0.20 0.20 1.75 0.18 0.18 14.50 0.19 0.19 2.00 0.22 0.22 14.75 0.18 0.18 2.25 0.29 0.29 15.00 0.16 0.16 2.50 0.38 0.38 15.25 0.15 0.15 2.75 1.78 1.78 15.50 0.13 0.13 3.00 4.54 4.54 15.75 0.10 0.10 3.25 13.33 13.33 16.00 0.08 0.08 3.50 6.02 6.02 16.25 0.07 0.07 3.75 3.88 3.88 16.50 0.06 0.06 4.00 3.08 3.08 16.75 0.05 0.05 4.25 2.58 2.58 17.00 0.04 0.04 4.50 2.25 2.25 17.25 0.04 0.04 4.75 1.98 1.98 17.50 0.03 0.03 5.00 1.76 1.76 17.75 0.03 0.03 5.25 1.59 1.59 18.00 0.03 0.03 5.50 1.48 1.48 18.25 0.03 0.03 5.75 1.41 1.41 18.50 0.02 0.02 6.00 1.33 1.33 18.75 0.02 0.02 6.25 0.73 0.73 19.00 0.02 0.02 6.50 0.51 0.51 19.25 0.02 0.02 6.75 0.50 0.50 19.50 0.02 0.02 7.00 0.49 0.49 19.75 0.02 0.02 7.25 0.48 0.48 20.00 0.02 0.02 7.50 0.47 0.47 7.75 0.46 0.46 8.00 0.45 0.45 8.25 0.44 0.44 8.50 0.43 0.43 8.75 0.42 0.42 9.00 0.41 0.41 9.25 0.40 0.40 9.50 0.39 0.39 9.75 0.38 0.38 10.00 0.37 0.37 10.25 0.36 0.36 10.50 0.35 0.35 10.75 0.34 0.34 11.00 0.33 0.33 11.25 0.32 0.32 11.50 0.31 0.31 11.75 0.30 0.30 12.00 0.29 0.29 12.25 0.28 0.28 12.50 0.27 0.27 CipENGIN HOUNDEERING ENGIN STORM WATER HYDRAULIC CALCULATIONS Storm Sewers Design NCDOT— Hydro Ca lcs Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan 31 30 32 29 34 33 28 27 39r 26 5 60 40 • 58 59 4 2 41 42 24 61 57 43 23...0011IIIIIIIIIII 70 20 21 22 / 32 69 7, 19 100 aIF12 73 68 50 51 10 11 1: Outfall 16 12 44 • 17 18 45 48 Outfall 66 56 46 47 53 55 - 54 65 71 81 80 79 78 77 76 75 8 Outfall Project File: PROP STORM SEWERS-DAVIS VILL REVISED 3.2023.stm Number of lines:83 Date:3/14/2023 Storm Sewers v2023.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 68.374 0.18 2.62 0.80 0.14 2.06 5.0 9.4 6.5 13.33 26.32 5.41 30 0.35 575.01 575.25 576.24 576.53 579.30 582.56 B1-OUTFALL 2 1 24.000 0.27 2.44 0.80 0.22 1.91 5.0 9.3 6.5 12.44 17.33 5.96 24 0.50 575.75 575.87 577.00 577.14 582.56 582.56 B2-B1 3 2 325.814 0.10 1.76 0.80 0.08 1.37 5.0 7.6 7.0 9.53 21.63 4.95 24 0.78 575.87 578.41 577.14 579.51 582.56 588.49 B3-B2 4 3 107.447 0.35 1.66 0.80 0.28 1.29 5.0 7.2 7.0 9.10 14.39 7.39 18 1.60 578.91 580.63 579.78 581.80 588.49 587.62 B4-B3 5 4 154.371 0.03 0.56 0.80 0.02 0.45 5.0 5.9 7.5 3.34 18.54 5.55 18 2.66 581.32 585.42 581.80 586.12 587.62 589.67 B5-B4 6 5 24.000 0.03 0.53 0.80 0.02 0.42 5.0 5.7 7.5 3.19 8.04 4.20 18 0.50 585.52 585.64 586.18 586.32 589.67 589.67 B6-B5 7 6 38.539 0.14 0.50 0.80 0.11 0.40 5.0 5.3 7.7 3.06 19.57 4.45 18 2.96 585.74 586.88 586.32 587.55 589.67 590.96 B7-B6 8 7 24.947 0.36 0.36 0.80 0.29 0.29 5.0 5.0 7.8 2.24 7.89 3.68 18 0.48 586.98 587.10 587.55 587.66 590.96 590.87 B8-B7 9 4 22.000 0.75 0.75 0.75 0.56 0.56 5.0 5.0 7.8 4.37 8.05 3.91 18 0.50 580.73 580.84 581.80 581.64 587.62 587.62 B9-B4 10 2 46.454 0.16 0.41 0.80 0.13 0.33 5.0 5.5 7.6 2.50 8.18 3.93 18 0.52 578.27 578.51 578.84 579.11 582.56 582.35 B10-B2 11 10 24.000 0.25 0.25 0.80 0.20 0.20 5.0 5.0 7.8 1.56 8.04 3.17 18 0.50 578.61 578.73 579.11 579.20 582.35 582.36 B11-610 12 End 120.033 0.00 17.10 0.00 0.00 8.55 0.0 5.4 7.6 65.27 88.48 10.07 36 1.50 576.71 578.51 579.30 581.10 0.00 590.41 BP1-BPOF 13 12 62.689 0.00 17.10 0.00 0.00 8.55 0.0 5.3 7.7 65.61 88.94 10.10 36 1.52 578.50 579.45 581.10 582.04 590.41 589.40 BP2-BP1 14 13 125.000 0.00 17.10 0.00 0.00 8.55 0.0 5.1 7.8 66.29 88.37 10.19 36 1.50 579.45 581.32 582.04 583.92 589.40 588.10 BP3-BP2 15 14 35.392 17.10 17.10 0.50 8.55 8.55 5.0 5.0 7.8 66.49 88.41 10.20 36 1.50 581.32 581.85 583.92 584.46 588.10 585.77 BP4-BP3 16 End 61.410 0.38 24.58 0.50 0.19 15.44 5.0 16.3 5.2 80.29 101.3 8.85 48 0.42 550.00 550.26 552.71 552.97 555.92 561.80 Al-OUTFALL 17 16 138.004 0.44 23.15 0.80 0.35 14.73 5.0 15.9 5.2 77.25 88.99 9.98 42 0.67 552.98 553.90 555.50 556.65 561.80 564.64 A2-Al 18 17 157.469 0.00 22.36 0.80 0.00 14.09 5.0 15.6 5.3 74.71 84.21 9.63 42 0.60 554.15 555.09 556.72 557.79 564.64 567.36 A3-A2 19 18 353.806 0.19 16.55 0.80 0.15 10.35 5.0 14.5 5.5 56.58 108.7 8.35 42 0.99 555.50 559.02 557.79 561.37 567.36 569.07 A22-A3(1) 20 19 32.059 0.18 16.36 0.80 0.14 10.20 5.0 14.4 5.5 55.91 105.4 8.88 42 0.94 559.33 559.63 561.37 561.97 569.07 568.94 A22-A3 21 20 159.611 0.12 14.92 0.80 0.10 9.42 5.0 14.1 5.5 52.25 77.15 10.26 36 1.14 560.70 562.52 562.51 564.87 568.94 570.45 A23-A22 22 21 167.102 0.15 12.87 0.80 0.12 8.36 5.0 13.6 5.6 46.98 74.15 8.11 36 1.05 562.51 564.27 564.87 566.50 570.45 572.40 A24-A23 Project File: PROP STORM SEWERS-DAVIS VILL REVISED 3.2023.stm Number of lines:83 Run Date: 3/14/2023 NOTES:Intensity=73.28/(Inlet time+12.00)A 0.79; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2023 00 Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 23 22 219.083 0.02 12.72 0.80 0.02 8.24 5.0 13.1 5.7 47.11 72.40 8.56 36 1.00 564.37 566.57 566.50 568.80 572.40 574.76 A25-A24 24 23 49.274 0.02 12.54 0.80 0.02 8.10 5.0 13.0 5.7 46.47 67.50 8.47 36 0.87 566.67 567.10 568.80 569.32 574.76 574.67 A27-A26 25 24 69.029 1.11 12.52 0.80 0.89 8.08 5.0 12.8 5.8 46.63 63.90 8.52 36 0.78 567.20 567.74 569.32 569.96 574.67 574.21 A28-A27 26 25 288.564 0.27 7.62 0.80 0.22 5.02 5.0 12.0 5.9 29.67 36.71 7.94 30 0.68 568.25 570.22 569.96 572.08 574.21 578.61 A29-A28 27 26 106.866 0.28 7.35 0.80 0.22 4.80 5.0 11.7 6.0 28.67 31.29 7.23 30 0.50 570.32 570.85 572.20 572.73 578.61 579.95 A59-A29 28 27 63.376 0.07 7.07 0.80 0.06 4.58 5.0 11.5 6.0 27.50 31.57 6.01 30 0.50 570.85 571.17 573.14 573.29 579.95 580.55 A30-A59 29 28 86.889 0.10 7.00 0.80 0.08 4.52 5.0 11.3 6.1 27.38 31.26 5.58 30 0.49 571.17 571.60 573.82 574.10 580.55 581.38 A49-A30 30 29 152.929 0.49 1.32 0.50 0.25 0.66 5.0 10.3 6.3 4.14 11.30 3.04 18 0.99 572.60 574.11 574.82 575.01 581.38 577.87 A50-A49 31 30 198.783 0.39 0.83 0.50 0.20 0.42 5.0 8.9 6.6 2.74 8.79 3.40 15 1.58 574.36 577.50 575.34 578.16 577.87 581.85 A51-A50 32 31 161.572 0.00 0.44 0.00 0.00 0.22 0.0 6.9 7.1 1.57 10.60 3.19 15 2.30 577.60 581.31 578.16 581.81 581.85 585.08 A52-A51 33 32 161.567 0.44 0.44 0.50 0.22 0.22 5.0 5.0 7.8 1.71 10.25 4.34 15 2.15 581.41 584.88 581.81 585.40 585.08 588.31 A53-A52 34 29 58.914 0.14 5.58 0.80 0.11 3.78 5.0 8.8 6.6 25.08 31.71 5.11 30 0.51 571.60 571.90 574.82 575.01 581.38 581.94 A31-A49 35 34 92.442 0.27 5.44 0.80 0.22 3.67 5.0 8.5 6.7 24.62 31.34 5.02 30 0.50 571.90 572.36 575.46 575.75 581.94 582.24 A32-A31 36 35 24.000 0.52 1.22 0.80 0.42 0.98 5.0 5.6 7.6 7.40 8.04 5.17 18 0.50 578.07 578.19 579.20 579.32 582.24 582.24 A46-A32 37 36 41.161 0.29 0.70 0.80 0.23 0.56 5.0 5.3 7.7 4.30 21.43 3.48 18 3.55 578.29 579.75 579.84 580.54 582.24 583.64 A47-A46 38 37 24.528 0.41 0.41 0.80 0.33 0.33 5.0 5.0 7.8 2.55 7.96 3.48 18 0.49 579.84 579.96 580.54 580.56 583.64 583.53 A48-A47 39 35 105.369 0.27 3.95 0.80 0.22 2.48 5.0 8.0 6.8 16.96 34.35 3.45 30 0.60 572.36 572.99 576.22 576.37 582.24 583.35 A33-A32 40 39 270.307 0.61 3.68 0.80 0.49 2.26 5.0 7.1 7.1 16.03 19.09 5.10 24 0.61 573.49 575.13 576.46 577.62 583.35 581.06 A34-A33 41 40 24.000 0.79 3.07 0.80 0.63 1.77 5.0 7.0 7.1 12.62 18.72 4.02 24 0.58 575.13 575.27 578.23 578.29 581.06 581.06 A35-A34 42 41 138.658 1.52 2.28 0.50 0.76 1.14 5.0 6.2 7.4 8.42 18.26 2.68 24 0.56 575.37 576.14 578.42 578.58 581.06 580.35 A36-A35 43 42 115.972 0.76 0.76 0.50 0.38 0.38 5.0 5.0 7.8 2.96 16.70 2.84 18 2.16 576.64 579.14 578.75 579.79 580.35 582.84 A37-A36 44 18 24.000 0.57 5.81 0.80 0.46 3.75 5.0 13.8 5.6 20.93 31.42 5.45 30 0.50 555.44 555.56 557.79 557.11 567.36 567.36 A4-A3 Project File: PROP STORM SEWERS-DAVIS VILL REVISED 3.2023.stm Number of lines:83 Run Date: 3/14/2023 NOTES:Intensity=73.28/(Inlet time+12.00)A 0.79; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2023 00 Storm Sewer Tabulation Page 3 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 45 44 43.720 0.29 5.24 0.80 0.23 3.29 5.0 13.6 5.6 18.48 81.19 6.24 30 3.34 555.66 557.12 557.11 558.58 567.36 566.76 A5-A4 46 45 75.411 0.25 4.85 0.80 0.20 2.98 5.0 13.4 5.7 16.84 17.39 6.31 24 0.50 557.62 558.00 559.21 559.58 566.76 568.48 A6-A5 47 46 200.576 0.06 3.36 0.80 0.05 2.16 5.0 12.6 5.8 12.50 24.71 4.96 24 1.02 558.10 560.14 560.48 561.41 568.48 573.99 A7-A6 48 47 370.906 0.71 3.30 0.80 0.57 2.11 5.0 11.3 6.1 12.78 17.35 6.02 24 0.50 560.14 562.00 561.42 563.28 573.99 571.33 A8-A7 49 48 229.982 0.13 0.45 0.80 0.10 0.36 5.0 8.8 6.6 2.39 23.53 3.15 18 4.28 562.50 572.34 563.28 572.92 571.33 576.79 A9-A8 50 49 100.609 0.13 0.29 0.80 0.10 0.23 5.0 5.7 7.5 1.75 21.43 3.48 18 3.55 572.44 576.01 572.92 576.51 576.79 579.95 A10-A9 51 50 24.000 0.16 0.16 0.80 0.13 0.13 5.0 5.0 7.8 1.00 8.04 2.79 18 0.50 576.11 576.23 576.51 576.60 579.95 579.95 Al1-A10 52 49 24.000 0.03 0.03 0.80 0.02 0.02 5.0 5.0 7.8 0.19 8.04 1.88 18 0.50 573.10 573.22 573.26 573.38 576.79 576.79 A16-A9 53 48 138.000 0.63 1.77 0.50 0.32 0.89 5.0 9.0 6.6 5.82 8.04 4.96 18 0.50 562.50 563.19 563.45 564.13 571.33 567.03 A17-A8 54 53 105.829 0.00 0.77 0.50 0.00 0.39 5.0 8.2 6.8 2.61 13.05 3.10 15 3.48 563.44 567.12 565.00 567.77 567.03 571.00 A18-A17 55 54 158.743 0.40 0.77 0.50 0.20 0.39 5.0 7.1 7.1 2.73 13.71 4.20 15 3.84 567.12 573.22 567.77 573.88 571.00 576.95 A19-A18 56 55 148.376 0.37 0.37 0.50 0.19 0.19 5.0 5.0 7.8 1.44 13.75 2.77 15 3.86 573.22 578.95 573.88 579.42 576.95 582.35 A20-A19 57 23 24.000 0.16 0.16 0.80 0.13 0.13 5.0 5.0 7.8 1.00 8.04 3.00 18 0.50 570.64 570.76 571.00 571.13 574.76 574.76 A26-A25 58 25 24.000 0.94 3.79 0.80 0.75 2.18 5.0 7.6 7.0 15.15 17.33 6.22 24 0.50 568.75 568.87 570.20 570.32 574.21 574.21 A42-A28 59 58 138.000 1.43 2.85 0.50 0.72 1.43 5.0 6.9 7.2 10.20 17.33 4.50 24 0.50 568.87 569.56 570.62 570.70 574.21 573.31 A43-A42 60 59 161.191 0.75 0.75 0.50 0.38 0.38 5.0 5.0 7.8 2.92 15.34 4.01 18 1.82 570.06 572.99 570.70 573.64 573.31 576.69 A44-A43 61 59 166.037 0.67 0.67 0.50 0.34 0.34 5.0 5.0 7.8 2.61 11.20 3.73 18 0.97 570.06 571.67 570.70 572.28 573.31 576.05 A45-A43 62 48 24.000 0.37 0.37 0.80 0.30 0.30 5.0 5.0 7.8 2.30 8.04 3.82 18 0.50 567.49 567.61 568.04 568.18 571.33 571.33 A15-A8 63 21 24.000 1.93 1.93 0.50 0.97 0.97 5.0 5.0 7.8 7.50 8.04 5.18 18 0.50 566.33 566.45 567.48 567.60 570.45 570.45 A38-A23 64 20 24.000 1.26 1.26 0.50 0.63 0.63 5.0 5.0 7.8 4.90 8.04 4.76 18 0.50 565.11 565.23 565.96 566.08 568.94 568.94 Pipe-(195) 65 53 158.743 0.37 0.37 0.50 0.19 0.19 5.0 5.0 7.8 1.44 10.43 2.27 15 2.22 563.44 566.97 565.00 567.44 567.03 570.20 A21-A17 66 45 24.012 0.10 0.10 0.80 0.08 0.08 5.0 5.0 7.8 0.62 8.04 2.63 18 0.50 562.64 562.76 562.92 563.05 566.76 566.74 A13-A5 Project File: PROP STORM SEWERS-DAVIS VILL REVISED 3.2023.stm Number of lines:83 Run Date: 3/14/2023 NOTES:Intensity=73.28/(Inlet time+12.00)A 0.79; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2023 00 Storm Sewer Tabulation Page4 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 67 17 24.112 0.35 0.35 0.80 0.28 0.28 5.0 5.0 7.8 2.18 8.03 3.75 18 0.50 560.97 561.09 561.50 561.65 564.64 564.65 Al2-A2 68 16 171.072 0.36 1.05 0.50 0.18 0.53 5.0 7.8 6.9 3.62 4.87 4.35 15 0.49 557.54 558.37 558.34 559.17 561.80 565.20 A54-Al 69 68 156.000 0.12 0.69 0.50 0.06 0.35 5.0 6.5 7.3 2.51 4.95 3.42 15 0.50 558.47 559.25 559.32 559.88 565.20 568.32 A55-A54 70 69 164.619 0.57 0.57 0.50 0.29 0.29 5.0 5.0 7.8 2.22 5.17 3.95 15 0.55 559.35 560.25 559.92 560.84 568.32 566.63 A56-A55 71 46 142.833 1.24 1.24 0.50 0.62 0.62 5.0 5.0 7.8 4.82 8.08 2.73 18 0.50 558.50 559.22 560.48 560.72 568.48 562.93 A14-A6 72 End 52.510 0.12 1.95 0.50 0.06 1.52 5.0 5.5 7.6 11.60 16.91 5.77 24 0.48 574.98 575.23 576.20 576.45 578.73 587.27 B15-B14 73 72 138.000 0.85 1.83 0.80 0.68 1.46 5.0 5.1 7.7 11.32 13.93 7.91 18 1.50 578.59 580.66 579.62 581.94 587.27 588.23 B16-B15 74 73 24.000 0.98 0.98 0.80 0.78 0.78 5.0 5.0 7.8 6.10 13.93 4.61 18 1.50 580.76 581.12 581.94 582.07 588.23 588.23 B17-B16 75 End 39.558 0.00 2.26 0.00 0.00 1.52 0.0 8.5 6.7 10.18 14.57 5.22 24 0.35 549.78 549.92 550.92 551.17 553.70 557.81 C1-OUTFALL 76 75 129.255 0.07 2.26 0.80 0.06 1.52 5.0 7.9 6.9 10.44 17.38 4.84 24 0.50 549.91 550.56 551.41 551.72 557.81 554.74 C2-C1 77 76 97.724 0.44 2.08 0.80 0.35 1.38 5.0 7.4 7.0 9.64 17.35 5.26 24 0.50 550.56 551.05 551.72 552.16 554.74 555.78 C3-C2 78 77 49.550 0.59 1.55 0.80 0.47 0.95 5.0 7.2 7.1 6.73 8.08 5.12 18 0.50 551.52 551.77 552.57 552.81 555.78 556.17 C4-C3 79 78 68.407 0.09 0.96 0.50 0.05 0.48 5.0 6.6 7.2 3.47 8.02 3.23 18 0.50 551.87 552.21 553.09 552.92 556.17 558.35 C7-C4 80 79 61.717 0.20 0.87 0.50 0.10 0.44 5.0 6.1 7.4 3.22 8.06 4.21 18 0.50 552.31 552.62 552.97 553.30 558.35 556.73 C8-C7 81 80 94.000 0.67 0.67 0.50 0.34 0.34 5.0 5.0 7.8 2.61 8.04 3.96 18 0.50 552.72 553.19 553.31 553.80 556.73 556.90 C9-C8 82 77 24.000 0.09 0.09 0.80 0.07 0.07 5.0 5.0 7.8 0.56 8.04 2.55 18 0.50 551.95 552.07 552.22 552.35 555.78 555.78 C5-C3 83 76 24.000 0.11 0.11 0.80 0.09 0.09 5.0 5.0 7.8 0.68 8.05 1.67 18 0.50 550.91 551.03 551.72 551.34 554.74 554.74 C6-C2 Project File: PROP STORM SEWERS-DAVIS VILL REVISED 3.2023.stm Number of lines:83 Run Date: 3/14/2023 NOTES:Intensity=73.28/(Inlet time+12.00)A 0.79; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2023 00 A � jrENGIN E GIN EERING HOUND SEDIMENT BASIN / EROSION CONTROL CALCULATIONS DESIGN OF RIPRAP OUTLET PROTECTION User Input Data Calculated Value Reference Data Designed By: BCL Date: 6/16/2023 Checked By: BCL Date: 6/16/2023 Company: PLOTT HOUND ENGINEERING Project Name: KMCC INDUSTRIAL Project No.: 21.27.008 Site Location(City/Town) KINGS MOUNTAIN Culvert Id. Al OF Total Drainage Area(acres) 24.58 Step 1.Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tubs-are(depth is less than half the outlet pipe diameter.it is classified muumuu tailwater condition. If it is greater than half the pipe diameter.it is classified maximum condition. Pipes that outlet onto side flat areas with no defined channel are assumed to have a inn nun tailwater condition unless reliable flood stage elevations show otherwise. Outlet pipe diameter,Do(in.) 48 Tailwater depth(in.) 60 Minimum/Maximum tailwater? Max TW(Fig.8.06b) Discharge(cfs) 80.29 Velocity(ft./s) 8.85 Step 2. Based on the tailwater conditions determined in step I.enter Figure 8.06a or Figure 8.06b.and determine d;o nprap size and minimum apron length (L).The ds size is the median stone size in a well-graded nprap apron. Step 3. Dete minne apron width at the pipe outlet.the apron shape.and the apron width at the outlet end from the same figure used m Step'_. Minimum TW Maximum TW Figure 8.06a Figure 8.066 Riprap dso,(ft.) 0.9 Minimum apron length,La(ft.) 26 Apron width at pipe outlet(ft.) 12 Apron shape Apron width at outlet end(ft.) 30 Step 4.Determine the maximum stone diameter din„=I5xdso Minimum TW Maximum TW Max Stone Diameter,dmax(ft.) 1.35 0 Step 5.Determine the apron thickness. Apron thickness=15 x Minimum TW Maximum TW Apron Thickness(ft.) 2.025 0 Step 6. Fit the nprap apron to the site by making it level for the minimum length.L.from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Sonic locations may requre luring of the entire channel cross section to assure stability It niap be necessary to increase the size of riprap where protection of the channel side slopes is necessary(Appendix 8.05) Where overfalls exist at pipe outlets or flows are excessive.a plunge pool should be considered.see page 8 06.8. DESIGN OF RIPRAP OUTLET PROTECTION User Input Data Calculated Value Reference Data Designed By: BCL Date: 6/16/2023 Checked By: BCL Date: 6/16/2023 Company: PLOTT HOUND ENGINEERING Project Name: KMCC INDUSTRIAL Project No.: 21.27.008 Site Location(City/Town) KINGS MOUNTAIN Culvert Id. B1 OF Total Drainage Area(acres) 2.62 Step 1.Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the twin-ate(depth is less than half the outlet pipe diameter.it is classified muumuu tailwater condition. If it is greater than half the pipe diameter.it is classified nraxmrunr condition. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a mnnmun tailwater condition unless reliable flood stage elevations show otherwise. Outlet pipe diameter,Do(in.) 30 Tailwater depth(in.) 0 Minimum/Maximum tailwater? Min TW(Fig.8.06a) Discharge(cfs) 13.33 Velocity(ft./s) 5.41 Step 2. Based on the tailwater conditions determined in step I.enter Figure 8.06a or Figure 8.06b.and deternu ne d,0 nprap size and muumuu'apron length (L,).The do size is the median stone size m a well-graded nprap apron. Step 3. Determne apron width at the pipe outlet.the apron shape.and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Figure 8.06a Figure 8.066 Riprap d50,(ft.) 0.5 Minimum apron length,La(ft.) 18 Apron width at pipe outlet(ft.) 7.5 7.5 Apron shape Apron width at outlet end(ft.) 20.5 2.5 Step 4.Determine the maximum stone diameter din„=I5xd,o Minimum TW Maximum TW Max Stone Diameter,dmax(ft.) 0.75 0 Step 5.Determine the apron tlrckness. Apron thickness=15 x Minimum TW Maximum TW Apron Thickness(ft.) 1.125 0 Step 6. Fit the nprap apron to the site by making it level for the nnnimmn length.L.from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Sonic locations may requre lumrg of the entire charnel cross section to assure stability It niay be necessary to increase the size of riprap where protection of the channel side slopes is necessary(Appendix 8.05) Where overfalls exist at pipe outlets or flows are excessive.a plrmge pool should be considered.see page 8 06.8. DESIGN OF RIPRAP OUTLET PROTECTION User Input Data Calculated Value Reference Data Designed By: BCL Date: 6/16/2023 Checked By: BCL Date: 6/16/2023 Company: PLOTT HOUND ENGINEERING Project Name: KMCC INDUSTRIAL Project No.: 21.27.008 Site Location(City/Town) KINGS MOUNTAIN Culvert Id. B15-B14 Total Drainage Area(acres) 1.95 Step 1.Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tarlwater depth is less than half the outlet pipe diameter.it is classified muumuu tailwater condition. If it is greater than half the pipe diameter.it is classified maximum condition. Pipes that outlet onto aside flat areas with no defined channel are assumed to have a ni mmun tailwater condition unless reliable flood stage elevations show otherwise. Outlet pipe diameter,Do(in.) 24 Tailwater depth(in.) 0 Minimum/Maximum tailwater? Min TW(Fig.8.06a) Discharge(cfs) 11.6 Velocity(ft./s) 5.77 Step 2. Based on the tailwater conditions determined in step I.enter Figure 8.06a or Figure 8.06b.and determine d;o nprap size and minimum apron length (L.).The d0 size is the median stone size in a well-graded nprap apron. Step 3. Detnmine apron width at the pipe outlet.the apron shape.and the apron width at the outlet end from the same figure used m Step'_. Minimum TW Maximum TW Figure 8.06a Figure 8.066 Riprap dso,(ft.) 0.4 Minimum apron length,La(ft.) 13 Apron width at pipe outlet(ft.) 6 Apron shape Apron width at outlet end(ft.) 15 Step 4.Determine the maximum stone diameter din„=I5xdso Minimum TW Maximum TW Max Stone Diameter,dmax(ft.) 0.6 0 Step 5.Deteruine the apron thickness. Apron thickness=15 x Minimum TW Maximum TW Apron Thickness(ft.) 0.9 0 Step 6. Fit the nprap apron to the site by making it level for the minimum length.L.from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along charnel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Sonic locations may requre linurg of the entire charnel cross section to assure stability It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary(Appendix 8.05) Where overfalls exist at pipe outlets or flows are excessive.a plunge pool should be considered.see page 8 06.8. DESIGN OF RIPRAP OUTLET PROTECTION User Input Data Calculated Value Reference Data Designed By: BCL Date: 6/16/2023 Checked By: BCL Date: 6/16/2023 Company: PLOTT HOUND ENGINEERING Project Name: KMCC INDUSTRIAL Project No.: 21.27.008 Site Location(City/Town) KINGS MOUNTAIN Culvert Id. C1 OF Total Drainage Area(acres) 2.26 Step 1.Determine the tailwater depth from channel characteristics below the pipe outlet for the design capacity of the pipe. If the tubs-ate(depth is less than half the outlet pipe diameter.it is classified munumun tailwater condition. If it is greater than half the pipe diameter.it is classified nraxmrunr condition. Pipes that outlet onto side flat areas with no defined channel are assumed to have a mnnmun tailwater condition unless reliable flood stage elevations show otherwise. Outlet pipe diameter,Do(in.) 24 Tailwater depth(in.) 0 Minimum/Maximum tailwater? Min TW(Fig.8.06a) Discharge(cfs) 10.18 Velocity(ft./s) 5.22 Step 2. Based on the tailwater conditions determined in step I.enter Figure 8.06a or Figure 8.06b.and deternu ne d,0 riprap size and muumuu'apron length (L,).The do size is the median stone size m a well-graded riprap apron. Step 3. Determne apron width at the pipe outlet.the apron shape.and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap dso,(ft.) 0.4 Minimum apron length,La(ft.) 13 Apron width at pipe outlet(ft.) 6 Apron shape Apron width at outlet end(ft.) 15 Step 4.Determine the maximum stone diameter din =15 x dso Minimum TW Maximum TW Max Stone Diameter,dmax(ft.) 0.6 0 Step 5.Determine the apron thickness. Apron thickness=15 x Minimum TW Maximum TW Apron Thickness(ft.) 0.9 0 Step 6. Fit the riprap apron to the site by making it level for the nnnimmn length.L.from Figure 8.06a or Figure 8.06b. Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Sonic locations may impure lumng of the entire channel cross section to assure stability It niay be necessary to increase the size of riprap where protection of the channel side slopes is necessary(Appendix 8.05) Where overfalls exist at pipe outlets or flows are excessive.a plrmge pool should be considered.see page 8 06.8. DAVIS VILLAGE EROSION CONTROL PHASE 1 BASIN CALCULATIONS SEDIMENT BASIN Al NCDENR 6.61 Primary Spillway: Riser/Barrel Dewatering Mechanisim: Skimmer Denuded Area 18.3 AC Drainage Area 18.3 'AC Time of Concentration 5.0 Min. Hydrology Method: Rational C I DA Q2= 0.6 x 6.10 x 18.3 = 67.0 CFS Qto= 0.6 x 7.78 x 18.3 = 85.4 CFS Q50= 0.6 x 9.14 x 18.3 = 100.4 CFS Storage Requirements 100 AC Max Drainage Area 1,800 CF of Storage per Disturbed Area Volume of Storage Req'd 435 SF of Surface Area per CFS of Q10 Peak 1,800 CF/AC= 32,940 CF Flow Depth= 6.00 FT 2:1 Min.Length to Width Ratio M+in.Depth 2.0 FT Surface Area Req'd Minimum 1 FT Freeboard 435 SF X Qto= 37,160 SF Minimum Dewatering Time=24 hours Min.of Three Baffles Required Size Basin \ Max of 15 FT Dam Height / L=2 x Width L=2W W=(SA/(2xH)^0.5 W= • L= 274 (Approximate for sizing purposes) Area(SF) Elev Top of Dam 29,072 560 Top Of Storage 56,988 558 36,057 554 Bottom of Storage 25,004 552 Bottom of Perm Pool 16,594 551 Volume of Storage Provided I 247,151 CF Surface Area Provided 56,988 SF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 32940 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 4.0 inches 1.5 inches 3.0 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm SEDIMENT BASIN B1 NCDENR 6.61 Primary Spillway: Riser/Barrel Dewatering Mechanisim: Skimmer Denuded Area 9.4 AC Drainage Area 9.4 AC Time of Concentration 5.0 Min. Hydrology Method: Rational C I DA Q2= 0.6 x 6.10 x 9.4 = 34.4 CFS Qio= 0.6 x 7.78 x 9.4 = 43.9 CFS Q50= 0.6 x 9.14 x 9.4 = 51.5 CFS Storage Requirements 100 AC Max Drainage Area 1,800 CF of Storage per Disturbed Area Volume of Storage Req'd 435 SF of Surface Area per CFS of Q10 Peak 1,800 CF/AC= 16,920 CF Flow Depth= 2.00 FT 2:1 Min.Length to Width Ratio M+in.Depth 2.0 FT Surface Area Req'd Minimum 1 FT Freeboard 435 SF X Q10- 19,087 SF Minimum Dewatering Time=24 hours Min.of Three Baffles Required Size Basin \ Max of 15 FT Dam Height / L=2 x Width L=2W W=(SA/(2xH)^0.5 W= L= 196 (Approximate for sizing purposes) Area(SF) Elev Top of Dam 17,230 ' 580 Top Of Storage 20,570 578 18,675 577 Bottom of Storage 15,022 ' 576 Bottom of Perm Pool 8,295 ' 575 Volume of Storage Provided I 36,471 CF Surface Area Provided 20,570 SF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 16920 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.5 inches 1.2 inches 2.4 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm SEDIMENT BASIN Cl (2) NCDENR 6.61 Primary Spillway: Riser/Barrel Dewatering Mechanisim: Skimmer Denuded Area 4.5 AC Drainage Area 4.5 AC Time of Concentration 5.0 Min. Hydrology Method: Rational C I DA Q2= 0.6 x 6.10 x 4.5 = 16.5 CFS Qio= 0.6 x 7.78 x 4.5 = 21.0 CFS Q50= 0.6 x 9.14 x 4.5 = 24.7 CFS Storage Requirements 100 AC Max Drainage Area 1,800 CF of Storage per Disturbed Area Volume of Storage Req'd 435 SF of Surface Area per CFS of Q10 Peak 1,800 CF/AC= 8,100 CF Flow Depth= 5.00 FT 2:1 Min.Length to Width Ratio M+in.Depth 2.0 FT Surface Area Req'd Minimum 1 FT Freeboard 435 SF X Qto= 9,138 SF Minimum Dewatering Time=24 hours Min.of Three Baffles Required Size Basin Max of 15 FT Dam Height L=2 x Width L=2W W=(SA/(2xH)^0.5 W= 68 L= 136 (Approximate for sizing purposes) Area(SF) Elev Top of Dam 19,557 558 Top Of Storage 15,692 556 8,667 552 Bottom of Storage 7,056 551 Bottom of Perm Pool 5,499 550 Volume of Storage Provided 56,580 CF Surface Area Provided 15,692 SF ®CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 8100 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.0 inches 0.9 inches 1.8 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm SKIMMER BASIN#1 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 10.0 AC Drainage Area 10.0 AC 10 AC Max Drainage Area Qio= 0.6 x 7.78 x 10.0 46.7 CFS 1,800 CF of Storage per Disturbed Area Q50= 0.6 x 9.14 x 10.0 54.8 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Storage Requirements Max.Dam Height=5 FT. Min.Top Width=5 FT. 2:1 Min.Length to Width Ratio Volume of Storage Req'd Min.of Three Baffles Required 1,800 CF/AC Drainage 10.0 18,000 CF Min.Dewatering Time=2 Days / Depth= 3 FT -- Surface Area=325 SF per Q10 Peak Flow x 1=SF L=2W W=(V/(2xH))^0.5 W= 88 L=_L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 94 x 18 SF ! 20,795 SF 576 Top of Storage Dims 88 x 12 SF 17,445 SF 574.0 Bottom Dims 82 x 6 SF 12,797 SF 571.0 By Planimeter J Surface Area Provided 17,445 SF Volume of Storage Provided 45,363 CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 18000 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain wafer is to be II wit bel.wecrr swnris,du nul iirJuJe that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.5 inches 1.2 inches 2.5 inches https://plotthoundeng.sharepointcom/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm ' Skimmer Basin 2 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 4.9ii AC / 10 AC Max Drainage Area Drainage Area 4.9 AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 4.9 22.9 CFS Disturbed Area Qso= 0.6 x 9.14 x 4.9 26.9 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 4.9 8,820 CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 7,434 SF L=2W W=(V/(2xH))^0.5 W= 67 L=_L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 77 x 30 SF 12,3 SF 568 Top of Storage Dims 67 x 20 SF 11,003 SF 567.0 Bottom Dims` 57 x 10,SF 7,532 SF 564.0 By Planimeter Surface Area Provided '11,ASF Volume of Storage Provided 27, CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 8820 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.0 inches 0.9 inches 1.8 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm ' Skimmer Basin 3 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 2.9*AC / 10 AC Max Drainage Area Drainage Area 2.6 AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 2.6 12.1 CFS Disturbed Area Q50= 0.6 x 9.14 x 2.6 14.111 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 2.6 4,680 CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 3,944 SF L=2W W=(V/(2xH))^0.5 W= 49 L= AL=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 59 x I SF SF 580 Top of Storage Dims 49 x SF SF 578.5 Bottom Dims` 39 x SF SF 575.0 By Planimeter Surface Area Provided -SF Volume of Storage Provided CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 4680 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 1.5 inches 0.7 inches 1.4 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm Skimmer Basin 4 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 4.6 AC (-10 AC Max Drainage Area Drainage Area 4.6 AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 4.6 21.5 CFS Disturbed Area Qso= 0.6 x 9.14 x 4.6 25.2 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 4.6 8,280 CF Min.of Three Baffles Required Depth= 5 FT \ Surface Area=325 SF per Q10 Peak Flow x 6,979 SF L=2W W=(V/(2xH))^0.5 W= 65 L= 130 L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 75 x 30 SF 13,621 SF 578 Top of Storage Dims 65 x 20 SF 12,338 SF 576.5 Bottom Dims 55 x 10 SF 9,564 SF 573.0 By Planimeter Surface Area Provided 12,338 SF Volume of Storage Provided 38,329 CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 8280 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.0 inches 0.9 inches 1.8 inches htlps://plotthoundeng.sharepoint.com/sites/PloltHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm Skimmer Basin 5 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 1.5 AC 1-10 AC Max Drainage Area Drainage Area 1.5 AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 1.5 7.0 CFS Disturbed Area Q50= 0.6 x 9.14 x 1.5 8.2 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 1.5 2,700 CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 2,276 SF L=2W W=(V/(2xH))^0.5 W= 37 L= 74 L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 47 x 30 SF 7,802 SF 582 Top of Storage Dims 37 x 20 SF 6,823 SF 580.5 Bottom Dims 27 x 10 SF 4,751 SF 577.0 By Planimeter Surface Area Provided 6,823 SF Volume of Storage Provided 20,255 CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 2700 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain. state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 1.5 inches 0.5 inches 1.1 inches htlps://plotthoundeng.sharepointcom/sites/PloltHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm TOWNHOME SKIMMER 1 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 1.7 AC 1-10 AC Max Drainage Area Drainage Area 1.7 AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 1.7 7.9 CFS Disturbed Area Q50= 0.6 x 9.14 x 1.7 9.3 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 1.7 3,060 CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 2,579 SF L=2W W=(V/(2xH))^0.5 W= 40 L= 80 L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 50 x 30 SF 12,795 SF 553 Top of Storage Dims 40 x 20 SF 11,749 SF 551.5 Bottom Dims 30 x 10 SF 7,376 SF 547.0 By Planimeter Surface Area Provided 11,749 SF Volume of Storage Provided 43,031 CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 3060 3 Number of Days to drain is usually determired by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 1.5 inches 0.6 inches 1.2 inches htlps://plotihoundeng.sharepointcom/sites/PloltHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm ' TOWNHOME SKIMMER 2 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 0.8 AC (-10 AC Max Drainage Area Drainage Area 0.8 AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 0.8 3.5 CFS Disturbed Area Qso= 0.6 x 9.14 x 0.8 4.1lCFS 325SFof Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 0.8 1,350 CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 1,138 SF L=2W W=(V/(2xH))^0.5 W= 26 L= 52 L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims x 30 SF 6,5 SF 552 Top of Storage Dims x I 20 SF 5,619 SF 550.5 Bottom Dims x 10 SF 3,681 SF 547.0 By Planimeter Surface Area Provided 5,619 SF Volume of Storage Provided 16,275 CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 1350 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain. state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 1.5 inches 0.4 inches 0.8 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS AND TRAP-WINGATE.xlsm DAVIS VILLAGE EROSION CONTROL PHASE 2 BASIN CALCULATIONS I SEDIMENT BASIN Al -PH2 NCDENR 6.61 Primary Spillway: Riser/Barrel Dewatering Mechanisim: Skimmer Denuded Area 29.0 AC Drainage Area 29.0 AC Time of Concentration 19.0 Min. Hydrology Method: Rational C I DA Q2= 0.6 x 3.75 x 29.0 = 65.3 CFS Qv)= 0.6 x 4.86 x 29.0 = 84.6 CFS Q50= 0.6 x 5.74 x 29.0 = 99.9 CFS Storage Requirements / 100 AC Max Drainage Area 1,800 CF of Storage per Disturbed Area Volume of Storage Req'd 435 SF of Surface Area per CFS of Q10 Peak 1,800 CF/AC= 52,200 CF Flow Depth= 6.00 FT 2:1 Min.Length to Width Ratio M+in.Depth 2.0 FT Surface Area Req'd Minimum 1 FT Freeboard 435 SFXQt0=P36,808 SF Minimum Dewatering Time=24 hours Min.of Three Baffles Required Size Basin \ Max of 15 FT Dam Height L=2 x Width \ / L=2W W=(SA/(2xH)^0.5 W= 136 L= 272 (Approximate for sizing purposes) Area(SF) Elev Top of Dam 52,124 560 Top Of Storage 44,802 558 28,833 554 Bottom of Storage 25,514 552 Bottom of Perm Pool 19,441 551 Volume of Storage Provided 201,617 CF Surface Area Provided 44,802 SF ®CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 52200 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. dram. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 4.0 inches 1.9 inches 3.7 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS PHASE 2.xlsm SEDIMENT BASIN B1 - PH2 NCDENR 6.61 Primary Spillway: Riser/Barrel Dewatering Mechanisim: Skimmer Denuded Area 9.3 AC Drainage Area 9.3 AC Time of Concentration 5.0 Min. Hydrology Method: Rational C I DA Q2= 0.6 x 6.10 x 9.3 = 33.9 CFS Q10= 0.6 x 7.78 x 9.3 = 43.2 CFS Q50= 0.6 x 9.14 x 9.3 = 50.7 CFS Storage Requirements ( 100 AC Max Drainage Area 1,800 CF of Storage per Disturbed Area Volume of Storage Req'd 435 SF of Surface Area per CFS of Q10 Peak 1,800 CF/AC= 16,650 CF Flow Depth= 2.00 FT 2:1 Min.Length to Width Ratio M+in.Depth 2.0 FT Surface Area Req'd Minimum 1 FT Freeboard 435 SF X Q10= 18,783 SF Minimum Dewatering Time=24 hours Min.of Three Baffles Required Size Basin Max of 15 FT Dam Height L=2 x Width L=2W W=(SA/(2xH)^0.5 W= 97 L= 194 (Approximate for sizing purposes) Area(SF) Elev Top of Dam 17,230 580 Top Of Storage 20,570 578 18,675 577 Bottom of Storage 15,022 576 Bottom of Perm Pool 8,295 575 Volume of Storage Provided 36,471 CF Surface Area Provided 20,570 SF ®CALCULATE FAIRCLOTH SKIMMER®SIZE Required Basin volume in cubic feet Days to Drain 16650 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.5 inches 1.2 inches 2.4 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS PHASE 2.xlsm SEDIMENT BASIN Cl - PH2 NCDENR 6.61 Primary Spillway: Riser/Barrel Dewatering Mechanisim: Skimmer Denuded Area 5.1 AC Drainage Area 5.1 AC Time of Concentration 5.0 Min. Hydrology Method: Rational C I DA Q2= 0.6 x 6.10 x 5.1 = 18.7 CFS Q10= 0.6 x 7.78 x 5.1 = 23.8 CFS Q50= 0.6 x 9.14 x 5.1 = 28.0 CFS Storage Requirements 100 AC Max Drainage Area 1,800 CF of Storage per Disturbed Area Volume of Storage Req'd 435 SF of Surface Area per CFS of Q10 Peak 1,800 CF/AC= 9,180 CF Flow Depth= 5.00 FT 2:1 Min.Length to Width Ratio M+in.Depth 2.0 FT Surface Area Req'd Minimum 1 FT Freeboard 435 SF X Qto= 10,356 SF Minimum Dewatering Time=24 hours Min.of Three Baffles Required Size Basin Max of 15 FT Dam Height L=2 x Width L=2W W=(SA/(2xH)^0.5 W= 72 L= 144 (Approximate for sizing purposes) Area(SF) Elev Top of Dam 19,557 558 Top Of Storage 15,692 556 8,667 552 Bottom of Storage 7,056 551 Bottom of Perm Pool 5,499 550 Volume of Storage Provided 56,580 CF Surface Area Provided 15,692 SF ®CALCULATE FAIRCLOTH SKIMMER®SIZE Required Basin volume in cubic feet Days to Drain 9180 3 Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 2.0 inches 0.9 inches 1.9 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS PHASE 2.xlsm ' SKIMMER BASIN 3-PH2 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area AC ( 10 AC Max Drainage Are- Drainage Area AC 1,800 CF of Storage per Q10= 0.6 x 7.78 x 1.8 CFS Disturbed Area Qso= 0.6 x 9.14 x 1.8 CFS 325 SF of Surface Area per CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 1.8 3,240 CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 2,731 SF L=2W W=(V/(2xH))^0.5 W= 41 L= 82 L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 51 x 30 SF SF 580 Top of Storage Dims 41 x 2JSF SF 578.5 Bottom Dims 31 x SF SF 575.0 By Planimeter Surface Area Provided -SF Volume of Storage Provided CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 324,:, Number of Days to drain is usually determined by local or The required basin volume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 1.5 inches 0.6 inches 1.2 inches https://plotthoundeng.sharepoint.com/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS PHASE 2.xlsm ' TOWNHOME SKIMMER 2-PH2 Primary Spillway: Stone Weir with Skimmer or Flashboard Riser Dewatering Mechanisim: Skimmer Denuded Area 0.7 !AC ( 10 AC Max Drainage Are Drainage Area 0.7 AC 1,800 CF of Storage per Q1D= 0.6 x 7.78 x 0.7 3.3 CFS Disturbed Area 325 SF of Surface Area per Q50= 0.6 x 9.14 x 0.7 3.8 'CFS CFS of Q10 Peak Flow Max.Dam Height=5 FT. Storage Requirements Min.Top Width=5 FT. 2:1 Min.Length to Width Volume of Storage Req'd Ratio 1,800 CF/AC Drainage 0.7 IMi CF Min.of Three Baffles Required Depth= 5 FT Surface Area=325 SF per Q10 Peak Flow x 1,062 SF L=2W W=(V/(2xH))^0.5 W= 26 L=_L=2 x Width (Approximate for Sizing Purposes) Rectangular By Planimeter Elev Top of Dam Dims 36 x 30 SF 6,5 SF 552 Top of Storage DimsIII 26 x 20 SF 5,619 SF 550.5 Bottom Dims 16 x SF 3,681 SF 547.0 By Planimeter Surface Area Provided 5,619 SF Volume of Storage Provided 16,275 CF ® CALCULATE FAIRCLOTH SKIMMER® SIZE Required Basin volume in cubic feet Days to Drain 3 Number of Days to drain is usually determined by local or The required basin vo'ume is the actual volume you intend to drain, state regulations.Where there is no requirement 3 days is not the provided or total volume which is often larger.If a pool of recommended.Keep in mind the quicker the basin is to drain water is to be maintained between storms,do not include that the larger the skimmer required.In NC,assume 3 days to volume. drain. SKIMMER SIZE ORIFICE RADIUS ORIFICE DIAMETER 1.5 inches 0.4 irches 0.7 inches hops://plotthoundeng.aharepointcom/sites/PlottHoundFiles2/Shared Documents/2021.27.008 Perry Crooke-Wingate 64 acres/4.Calculations/A.Erosion Control/EC SEDIMENT AND SKIMMER BASINS PHASE 2.xlsm DAVIS VILLAGE CLEAN WATER BYPASS PIPE CALCULATIONS Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Feb 22 2023 DAVIS VILLAGE SF BYPASS - 50YR Circular Highlighted Diameter (ft) = 3.00 Depth (ft) = 2.77 Q (cfs) = 95.00 Area (sqft) = 6.83 Invert Elev (ft) = 576.71 Velocity (ft/s) = 13.92 Slope (%) = 1.50 Wetted Perim (ft) = 7.76 N-Value = 0.012 Crit Depth, Yc (ft) = 2.88 Top Width (ft) = 1.58 Calculations EGL (ft) = 5.78 Compute by: Known Q Known Q (cfs) = 95.00 95 CFS IS CONSERVATIVE ESTIMATE TO PROTECT BYPASS 50-YR STORM EVENT FROM POSSIBLE IMPACTS FROM DEVELOPMENT IN THE i = 9.15 IN/HOUR FUTURE. LAND IS CURRENTLY WOODED/GRASSED WITH Tc = 5 MIN. SINGLE FAMILY HOMES @ APPROX. 1 UNIT PER 3 ACRES C = 0.6 ALTERNATIVE EXISTING FLOW IF NO DEVELOPMENT IN A = 17.1 AC FUTURE ON DRAINAGE AREA: i =4.63 IN/HR Tc= 30 MIN. C=0.3 Elev (ft) Q50=24 CFS Depth (ft) Section 580.00 3.29 v • 579.00 — 2.29 • • 578.00 • 1.29 • 577.00 • 0.29 • 576.00 • -0.71 575.00 -1.71 0 1 2 3 4 5 Reach (ft) IV. OFFSITE STORM WATER CALCULATIONS w NOTE: g TYPE OF SURFACE C OWNER IS RESPONSIBLE TO REMOVE EXISTING TREES/OBSTRUCTIONS LOCATED WITHIN THE SIGHT LINE. Z Z IL'to $ STORM DRAINAGE CHART Pavement 0.7-0.9 7? C'N 2 PERMISSION FROM ADJACENT PROPERTY OWNERS IS 0 E _ Project: DAVIS VILLAGE Date: 09.06.2022 REQUIRED PRIOR TO TREE/OBSTRUCTIONS REMOVAL FROM 2 w w N rc Location: PHIFER ROAD(SR1819),WINGATE TOWNSHIP IN UNION COUNTY,NC Gravel surfaces 0.4-0.6 W F- .,i Revised: 06.15.2023 ADJACENT PROPERTY.IF TREES ARE ONLY TRIMMED AND k Z Z O W B Project No.: 21.27.008 Industrial areas 0.5-0.9 NOT FULLY REMOVED,AN EASEMENT WILL BE REQUIRED IN 0 Z U w ORDER TO MAINTAIN CLEAR SIGHT DISTANCE. D.w w Storm Frequency(Secondary Route):25-yr-C=0.45(NCDOT GUIDELINES FOR DRAINAGE STUDIES AND HYDRAULIC DESIGN MANUAL,TABLE 7-3) Computed By: JWJ Residential(Single-family) 0.3-0.5 , LL o Checked By: BCL �, ►O ce Q Si Line Drainage Area x C Q(cfs) Pipe: (%) (ft) (in) Invert (fps) (ft) HGL Hw/D Residential(Apartments.etc.) 0.5-0.7 a v 0. Area C Tc Sys.Tc DETAILS O jar) Incr. Total (25yr) Add. CIA Full N Slope Length Size UP DOWN Vel. Depth UP DN Grassed,steep slopes 0.3-0.4 , Oo CULVERT ENTRANCE 1 0.46 0.46 0.21 0.45 5.0 5.0 8.38 1.76 8.45 0.012 0.50% 24 18 561.68 561.56 3.59 0.48' 562.44 562.L2 0.32 REINFORCED CONCRETE PIPE(CLASS III) o Grassed,flat slopes 0.2-0.3 eo CULVERT ENTRANCE 2 0.91 0.91 0.41 0.45 5.0 5.0 8.38 3.43 8.30 0.012 0.50% 24 18 572.26 572.14 4.30 0.69' S23' 5'2.AA 0.46 REINFORCED CONCRETE PIPE(CLASS III) . Woods I Forest 0.1-0.2 SPREAD CALCS INLET ID Drainage 25 YR Q(cfs) BYPASS DEPTHS SPREAD DEPTH (%) Table 7-3 Typical Rational Runoff Coefficients Area C Tc (as) SF (25 yr) TOTAL CAPAJRED BYPASS FT IN. ROAD SLOPE ENT 1-C81 0.09 3,920 0.80 5.0 8.38 0.62 0.36 0.26 3.17 0.72 3.0% ENT 1-CB2 _ 0.05 2,178 0.80 5.0 8.38 0.36 0.24 0.12 2.37 0.60 3.0% ENT 2-C81 0.14 6,098 0.60 5.0 8.38 3.50 1.22 2.28 3.95 1.0 3.0% ENT 2-CB2 0.68 29,620 0.80 5.0 8.38 0.96 0.50 0.46 7.18 1.68 3.0% S. / / ENT CB2-- --_-_ �. ,- ENT CBI - Ipr ao:°'� I / / ( LI 'IM 5656 K - i C z- PROP.BMP II RIM 565.6 t �: �I 1fp \ - 575.0 P I I I 575 / /� _ V INV IN:561.56 18'RCP eke NV IN 561 68 18"RCP DA ENTRANCE 1 o ' / / L • P .INV OUT 561 68 18"RCP ,� /1 fi / / _ ", I sti - \ CULVERT:0.46 AC tl I,'( , 40 �: / Y , "!.-•_-; 1v: tiENTRANC' 4 \\ I :::: It. (SEE DETAIL THISSHEET) 1 565 - .`'il(•M_II�\� .5e1 sso '--s66; - -- ----- DITCH# __Pe..._ ��O-.552'/ / - 556 J 55] SSa� 560 - - -" z � - ----------__� -- - /yy5 / /� / r559� 661 - -56 - 563---.11�� r<--564_ / - _566 _ --- - �� // / - j � 24'of,B2EP�0.50% _�► < U) __ • _-565-��«-- _ 2.LF uF 1naroF�p56% U) `�- 5� _�->- �i N�-\\ 560._ s-tHIFERa D-- --- -- 562=_� = Ti�� /�` -564 = �.� - _ ohe - _ �5 ROP.GRW ix RCP lol n5n^,61n a[.P N}-n tea, % -- -€e'P aLIC RIGHT OFwA'r--- - 1L�f .X. - - - - - �� aV'Item• :WOW one -564 - __ J -- on 1 e �i • _PROP.ROADSIDE DITCH `` ' �/,.. _ 345'OF a"PVC SDIus U .� _ s_ _ 7 ;S"y � . (SEE DETAIL THIS SHEET) � 11i 1 I Oi/// - -_ -�563 555.0 w Z eu DITCH#1 START eo.33s �55 z 1 TH " / 556.33 I.E.EV.5 C� Q W GI/ � __ [__-� __-. - NTRANC ..I - -----\" 562 , --- END INV.ELEtl:553.47 Q Q Q ` _- •-7� -, - -_ " x - - -- ---- - l 6 EXIST.OVERHEAD J 0( �/ _- >/ / ) i i1 ; \c-- - - -- 1 I _ ` -.5 ES \ W z L.L -W - w UTILITY LINES _ -` --- 1✓ 550.0 PROP.CULVERT 1 PROFILE 550 w HORIZ.SCALE:1"=MY LL LL eO - zu 160 VERT.SCALE:1=5' U) _0 Q nil (IN FEET) 545,0 I 545 Q O 2 I inch=40 fE N 0+00 1+00 2+00 3+00 4+00 56605 IW -I PAVEMENT O SHOULDER(MIN.6') D(INCLUDES 6"F.B.) _ suacRAOEWI- 1 I d _________I1 P. / ,' i-h-1 /J _ _ "¢VIm DITCH SECT/ON jI 56� 5� / seD��Y 717/ L��� // $4.11" 4® � �� �oC-�SEE CHARTI 58 // -58]- �,, DA ENTRANCE2 � I '• % / ' CULVERT 0914C 1 �Mail. r= - / � - / -60 NI 4,tr IVA 561/ /�• iiiiiiiiiiiiltll� m N DITCH CHART �� / /11 p,y9 / --- D![ch (AC) (CH) SS(H:V) (FT) (FT) (FT) (%) (FPS) (FT) _ - /, �� -583-/ 81 / e �.�/ o Q Q NO. DPWMA Q10 L R 6 D W SLOPE N V10 d STABILIZATION -_ iotik'l - _ sea -- / \��� / �7/' �/� r 575.1 ������®� 75 m w m ttocc M o J 1 1.11E 2.70 2 2 1.5' 2 9.5 2 0.03 2.93 0.40 STRAW WITH NET 583-��-- ` �y \\ z� )/J " ® 7 /0.?/.' it r kitCfn -411111111111111, --- +�sao- _ 5\ i 5r3�/ 570.1 11111111111•1M 70 p C- -sJv._� �� r /mac/ • s._580 ,, ai a e Manning's n for Channels(Chow, 1959). - 5J9 --- _ � 0� �7�"•j / i °'] _�i 8 Type of Channel and Description Minimum Normal Maximum - �4-77 - - /� 565.1 65 irdi _ o 0 0 _� ! NT� C 7� .-' _ 0+00 1+00 / Di' S 8 0 Natural streams-minor streams(top width at floodstage<100 ft) - _s- ! - EXIST.PHIFER RD P. -+� s - 575�i 1.Main Channels Rnv ENT3 B _ �� � , - /i� z d d RIM:576.072_�_ �, ,�ai - _ �:�/// PROP.CULVERT 2 PROFILE O clean,straight,full stage,no rifts or deep pools 0.025 0.030 0.033 INV IN:572.26 18"RCP-,\ :` si -" -,r_s1A--��� / - HORIZ.SCALE:1"=50' i w w b.same as abovelbut more eT ses-ariaweeas uvaQ 0.035 (law INV OUT:572.26 18"ROP \\�� � I�a' __ ENT 2 OB 1 ! VERT.SCALE:1=s W p 8 p c.clean,winding,somepools and shoals 0.033 0.040 0.045 \ � � ���� iii Y__%yIV IN 572 �_- r "2 ' __ct.=-j " TrvloDRAWING ENGINEERING g putt _j� _ INV IN:572.1418"RCP / IS THE PROPERTY OF PLOTT • PART 24.of 18"RCPQ 0°10 ar• "IN�OUT:571.95 8'RCP y d.same as above,but some weeds and stones 0.035 0.045 0.050y�> \ _ - - - . - - TO BE 4Q FF .. \\ /\ /\ \ - ///" "/ EERmc AND IS RETURNED - - / REPRODUCEDOR COPIED INwHaAOR 1N PIN:0224202]C - - e.same as above,lower stages,more ineffective 0.040 0.048 0.055 KENNETH JORDAN JR _ _ - !� - _ _ OTHER PROJECT ANDR SUES.RFTURNeo slopes and sections &SHARON MARE JORDAN 5 L°y7 ` �_ / - . _ UPON REQUEST. DB.7150,PH.063 f.same as"d"with more stones 0.045 0.050 0.060 w0,7.t5 6v�5 Sys F - - _" n' _ / - PROJECT NUMBER ' \ �_ " /. _ / 21.27.008 g.sluggish reaches,weedy,deep pools 0.050 0.070 0.080 °hq / - - h.very weedy reaches,deep pools,or ftoodways / \� s]6 `" _" y- n G with heavy stand of timber and underbrush 0.075 0.100 0.150 MAT&O E 2 ua ' �� - " - / -/- .I \ _5 0 0 &CORINNA N BONILLA S VVV D3.7292,P0.253 Sheet 10 of 10 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 38.640 0.14 1.17 0.80 0.11 0.73 5.0 5.9 8.2 6.01 7.98 4.99 18 0.49 571.95 572.14 572.90 573.13 0.00 576.07 ENT2CB1-OF 2 1 24.000 0.68 1.03 0.60 0.41 0.62 5.0 5.8 8.3 5.12 8.04 4.03 18 0.50 572.14 572.26 573.39 573.13 576.07 576.07 ENT2CB2-ENT2C 3 2 47.472 0.35 0.35 0.60 0.21 0.21 5.0 5.0 8.6 1.80 8.09 2.57 18 0.51 572.26 572.50 573.13 573.00 576.07 0.00 ENT2HW2-ENT2 4 End 24.197 0.05 0.61 0.80 0.04 0.49 5.0 5.4 8.4 4.12 8.01 4.46 18 0.50 561.44 561.56 562.22 562.34 0.00 565.60 ENT1 CB2-OF 5 4 24.000 0.09 0.56 0.80 0.07 0.45 5.0 5.2 8.5 3.80 8.04 4.23 18 0.50 561.56 561.68 562.34 562.42 565.60 565.60 ENTICBI-ENTIC 6 5 24.181 0.47 0.47 0.80 0.38 0.38 5.0 5.0 8.6 3.23 8.01 3.90 18 0.50 561.68 561.80 562.42 562.48 565.60 0.00 HW-ENTICBI Project File: ENTRANCE DRIVEWAY ANALYSIS.stm Number of lines:6 Run Date: 6/22/2023 NOTES:Intensity=67.42/(Inlet time+11.10)A 0.74; Return period=Yrs.25 ; c=cir e=ellip b=box Storm Sewers v2023.00 Inlet Report Page 1 Line Inlet ID Q= Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt Byp Type Line Ht L Area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 ENT 2 CB 1 0.96 0.00 0.50 0.46 Comb 6.0 2.50 0.00 3.00 2.00 0.030 1.00 0.020 0.020 0.012 0.10 5.19 0.16 3.95 1.0 Off 2 ENT 2 CB 2 3.50 0.00 1.22 2.28 Comb 6.0 3.00 0.00 3.00 2.00 0.030 1.00 0.020 0.020 0.012 0.17 8.43 0.23 7.18 1.0 Off 3 Null Structure 1.80 0.00 1.80 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off 4 ENT 1 CB 2 0.36 0.00 0.24 0.12 Comb 6.0 2.50 0.00 3.00 2.00 0.030 1.00 0.020 0.020 0.012 0.07 3.58 0.13 2.37 1.0 Off 5 ENT1 CB 1 0.62 0.00 0.36 0.26 Comb 6.0 3.00 0.00 3.00 2.00 0.030 1.00 0.020 0.020 0.012 0.09 4.40 0.15 3.17 1.0 Off 6 Null Structure 3.23 0.00 3.23 0.00 Hdwl 0.0 0.00 0.00 0.00 0.00 Sag 0.00 0.000 0.000 0.013 0.00 0.00 0.00 0.00 0.0 Off Project File: ENTRANCE DRIVEWAY ANALYSIS.stm Number of lines:6 Run Date: 6/22/2023 NOTES: Inlet N-Values=0.016; Intensity=67.42/(Inlet time+ 11.10)A 0.74; Return period=25 Yrs. ; *Indicates Known Q added.All curb inlets are throat. Storm Sewers v2023.00 Inlet Section (Line 5 - Combination Inlet) - ENT1 CB 1 Page 1of1 All dimensions in feet Line ^ - L_c mThinatic n Inlet on Grade - ENT1 1_E 1 17�— � 3.4 J Q Inlet Gutter Depth Spread Byp Line# Catch Carry Capt Byp Length Depr Throat Width Slope Sw Sx Gutter Inlet Gutter Inlet Line (cfs) (cfs) (cfs) (cfs) (ft) (in) (in) (ft) (ft/ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (ft) 5 0.62 0.00 0.36 0.26 3.00 1.0 6.0 1.00 0.030 0.020 0.020 0.09 4.40 0.06 3.17 Offsite I Project File: No. Lines. 6 Run Date: 6/22/2023 Storm Sewers Inlet Section (Line 4 - Combination Inlet) - ENT 1 CB 2 Page 1of1 All dimensions in feet Line 4 - Combination Inlet on Grade - ENT 1 C E 2 4.,---,--r / ;.----_-- \ 0.15 11#0,(- 001. 11 _r.D 2.58 / Q Inlet Gutter Depth Spread Byp Line# Catch Carry Capt Byp Length Depr Throat Width Slope Sw Sx Gutter Inlet Gutter Inlet Line (cfs) (cfs) (cfs) (cfs) (ft) (in) (in) (ft) (ft/ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (ft) 4 0.36 0.00 0.24 0.12 Sweep 1.0 6.0 1.00 0.030 0.020 0.020 0.07 3.58 0.05 2.37 Offsite I Project File: No. Lines. 6 Run Date: 6/22/2023 Storm Sewers Inlet Section (Line 1 - Combination Inlet) - ENV Page 1of1 All dimensions in feet Line 1 - Combination Inlet on Grade - ENT 2 CB 1 ^ /7 i .C'` 4.19 . Gutter Depth Spread Line# Catch Carry Capt Length Depr Throat Width Slope Gutter Gutter (cfs) (cfs) (cfs) ifs) i (Mt) ft/ft) 1ftlft) I . . . . Sweep ! II0.030 0.020 0.020 1111 O site I Project File: No. Lines: 6 Run Date: 6/22/2023 Storm Sewers Inlet Section (Line 2 - Combination Inlet) - ENT 2 CB 2 Page 1of1 All dimensions in feet Line 2 - Combination Inlet on Grade - ENT 2 CE; 2 l 7.43 Q Inlet Gutter Depth Spread Byp Line# Catch Carry Capt Byp Length Depr Throat Width Slope Sw Sx Gutter Inlet Gutter Inlet Line (cfs) (cfs) (cfs) (cfs) (ft) (in) (in) (ft) (ft/ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (ft) 2 3.50 0.00 1.22 2.28 3.00 1.0 6.0 1.00 0.030 0.020 0.020 0.17 8.43 0.14 7.18 Offsite I Project File: No. Lines: 6 Run Date: 6/22/2023 Storm Sewers