HomeMy WebLinkAboutSW3230601_BUA Allocations_20230626 Denver Fitness Facility
N. NC 16 Business, Denver, NC
Lincoln County
Project Area and Density Calculation
RE: NCDEQ Stormwater Application
Line Item #8 (Project Percent Impervious Area
Project Density without Existing Development = [New BUA] divided by [Total Project Area] x 100
Given Data:
Existing On-Site Impervious N/A
Proposed On-Site Building 26,829 S.F.
Proposed On-Site Parking 60,095 S.F.
Proposed On-Site Sidewalks 6,065 S.F.
Proposed On-Site Other 10,222 S.F.
Existing Off-Site Impervious 15,328 S.F.
Total Project Area (3.568 AC.) 155,422 S.F.
1. Determine Poject Density:
PD = (New BUA)/(Project Area)x 100
_ (118,539)/(155,422)x 100
= 76.3% BUA Project Density***
' Per NCDEQ Staff, this number includes existing off-site impervious above which includes
impervious area from other parcels not owned by project developer. The subject parcel
BUA Project Density is 66.4%which includes impervious areas On-Site and improvements
within NCDOT R/W only.